Loading...
HomeMy WebLinkAboutExecutive Committee 2008ts. aTHE TORONTO AND REGION CONSERVATION AUTHORITY MEETING OF THE EXECUTIVE COMMITTEE #1/08 March 7, 2008 The Executive Committee Meeting #1/08, was held in the South Theatre, Black Creek Pioneer Village, on Friday, March 7, 2008. The Chair Gerri Lynn O'Connor, called the meeting to order at 10:38 a.m.. PRESENT Maria Augimeri David Barrow Rob Ford Jack Heath Colleen Jordan Reenga Mathivanan Ron Moeser Gerri Lynn O'Connor Richard Whitehead ABSENT Suzan Hall Anthony Perruzza Maja Prentice RES. #B1/08 - Moved by: Seconded by: MINUTES Ron Moeser Maria Augimeri THAT the Minutes of Meeting #12/07, held on February 1, 2007, be approved. Vice Chair Member Member Member Member Member Member Chair Member Member Member Member CARRIED SECTION I - ITEMS FOR AUTHORITY ACTION RES. #B2/08 - Moved by: Seconded by: GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Duffins Creek Watershed 911 Investments Ltd., CFN 40485. Acquisition of a property located north of Bethesda Sideroad and west of Tenth Line, Town of Whitchurch - Stouffville, Regional Municipality of York, under the "Greenlands Acquisition Project for 2006 - 2010 ", Flood Plain and Conservation Component, Duffins Creek River watershed. Maria Augimeri Colleen Jordan THE EXECUTIVE COMMITTEE RECOMMENDS THAT 2.6 hectares (6.4 acres), more or less, of vacant land being Part of Lot 8, Concession 9 and designated as Part 1 on Registered Plan 65R- 29936, located north of Bethesda Sideroad and west of Tenth Line, ,Town of Whitchurch - Stouffville, Regional Municipality of York, be purchased from 911 Investment Ltd.; THAT the purchase price be $2.00; THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land free from encumbrance, subject to existing service easements; THAT the firm of Gardiner Roberts LLP, Barristers & Solicitors, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid by TRCA; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to execute all necessary documentation required. CARRIED BACKGROUND. Resolution #A60/05 at Authority Meeting #9/05, held on November 25, 2005, approved the Greenlands Acquisition Project for 2006 -2010. Negotiations have been conducted with Mr. Randy Lebow of Sherman Brown Dryer Karol Gold Lebow, Barristers & Solicitors. As identified in the review of the zoning by -law amendment, 911 Investments Ltd. is to transfer • the Open Space Environmental part to TRCA (ie. Part 1 on 65R- 29936). Attached is a plan showing the location of the subject lands. RATIONALE . The subject lands are identified as valleylands and fall within TRCA's approved master plan for acquisition for the Duffins Creek watershed as outlined in the approved Greenlands Acquisition Project for 2006 -2010. The subject lands also fall within the Oak Ridges Moraine. The subject lands contain a woodiot, a stream corridor and a pond. 2 TAXES AND MAINTENANCE Based o.n our preliminary review of the.environmental criteria for lands that are eligible to receive a property tax exemption under the provincial Conservation Land Tax Incentive Program, it would appear that all of the subject property would be eligible for exemption for the 2009 taxation year. The addition of the subject parcel of land will not significantly impact TRCA's maintenance costs at this location. In addition, TRCA is currently working on a consolidated management plan with the Town of Whitchurch'Stouffville for the TRCA -owned lands within the Town. FINANCIAL DETAILS Funds for the costs related to this purchase are available in the TRCA land acquisition capital account. Report prepared by: Edlyn Wong, extension 5711 Email: ewong @trca.on.ca For Information contact: Edlyn Wong, extension 5711, Ron Dewell, extension 5245 Emails: ewong @trca.on.ca, rdewell @trca.on.ca Date: February 13, 2008 Attachments:1 3 6.7 :yrci7rA : • .A.VV •-•-•-• • A • ')%.‘ .4 • • ;. I • V‘ • • ..•■c„ Air,/ • • . • ••!-r% • r • . • 4 ; ! • ,:onservation „ . • City tRC.4 LANDS • • • ..113JECT PROPERTY • .\\ • • RES. #83/08 - Moved by: Seconded by: GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Don River Watershed Alice Smith, CFN 40489. Purchase of property located south of Major •Mackenzie Drive and east of Dufferin Street, City of Vaughan, Regional Municipality of York, under the "Greenlands Acquisition Project for 2006 - 2010 ", Flood Plain and Conservation Component, Don River watershed. Maria Augimeri Colleen Jordan THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.62 hectares (1.53 acres), more or Tess, of vacant land being Part of Lot 20, Concession 2 and designated as Parts 9, 10 and 11 on Plan 65R- 29603, City of Vaughan, Regional Municipality of York, located south of Major Mackenzie Drive and east of Dufferin Street, be purchased from Alice Smith; THAT the purchase price be $2.00; THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land free from encumbrance, subject to existing service easements; THAT the firm of Gardiner Roberts LLP, Barristers & Solicitors, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to execute all necessary documentation required. CARRIED BACKGROUND Resolution #A260/05 at Authority Meeting #9/05, held on November 25, 2005, approved the Greenlands Acquisition Project for 2006 -2010. Negotiations have been conducted with the owner's solicitor, Mr. Cosimo A. Crupi, Barrister and Solicitor, Crupi Law. Attached is a plan showing the location of the subject lands. Access to the subject lands will directly available from the internal road system of the proposed subdivision. RATIONALE The subject property falls within TRCA's approved master plan for acquisition for the Don River watershed as outlined in the approved Greenlands Acquisition Project for 2006 -2010. Through the review of subdivision 19T -05V11 for proposed single lot residential development.of this site, TRCA staff established the limits of the open space lands (i.e. Parts 9, 10 and 11 on Plan 65R- 29603) which are comprised of the valley corridor and tableland buffers of the East Don River at this location. TAXES AND MAINTENANCE Based on our preliminary review of the environmental criteria for lands that are eligible to receive a property tax exemption under the provincial Conservation Land Tax Incentive Program, it would appear that all of the subject property would be eligible for exemption for the 2009 taxation year. The addition of the subject parcel of land will not significantly impact TRCA's maintenance costs at this location. FINANCIAL DETAILS Funds for the costs related to this purchase are available in the TRCA land acquisition capital account. Report prepared by: George Leja, extension 5342 Email: gleja @trca.on.ca For Information contact: George Leja, extension 5342 or Ron Dewell, extension 5245 Emails: gleja @trca.on.ca or rdewell @trca.on.ca Date: February 15, 2008 Attachments: 1 Attachment 1 MILL T.: • 'GREENL.ANOS ACQUISITION'PROJECT;FQR 200e.2010- iFlood.Plalmand Conservation` Component; Don River Watershed", ce, Smith CFN 40499 Xtonserva n . , for The.living City TRCA LANDS INSINI SUBJECT PROPERTY 7 RES.#B4/08 - Moved by: Seconded by: OAK RIDGES CORRIDOR PARK . Implementation of the first phase of the Oak Ridges Corridor Park Management Plan, through the receipt of grant funding from the Oak Ridges Moraine Foundation as well as in -kind contributions from Oak Ridges Trail Association, Richmond Hill Naturalists and Oak Ridges Friends of the Environment. Maria Augimeri Colleen Jordan THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation . Authority (TRCA) enter into an agreement with the Oak Ridges Moraine Foundation to receive $125,010 in 2008 and $121,630 (in principle) in 2009 to implement Phase One of the Oak Ridges Corridor Park Management Plan; AND FURTHER THAT authorized TRCA officials be directed to take such action as is necessary to finalize the agreement with the Oak Ridges Moraine Foundation, including the signing and execution of documents. CARRIED BACKGROUND The Oak Ridges Corridor (ORC) Park, totalling 1,057 acres in size, is a provincially -owned parcel of land, acquired as a result of a land exchange (which took place on September 23, 2004) with private landowners in the Town of Richmond Hill. The purpose of the land exchange was to protect the last remaining natural corridor link between the eastern and western parts of the Oak Ridges Moraine (ORM) in Richmond Hill. Maintaining these lands as open space ensures continuity across the ORM in Richmond Hill, which is experiencing significant growth and development. ORC Park is generally located between Bathurst Street to the west and Bayview Avenue to the east, Jefferson Sideroad and Stouffville Road to the south, and is situated immediately south of the community of Oak Ridges. Approximately 100 acres .of-the land make up the Bathurst Glen Golf Course (managed by TRCA), abutting the westernmost boundary of the property. Aside from Bathurst Glen Golf Course, the land is generally forest cover (180 acres of forest), grassland (430 acres of grasslands), or in agricultural use (160 acres of agriculture ). The lands contain the headwaters,of two watersheds (Humber and Rouge) and play an integral role in the recharge of the headwater streams. The lands support a collection of natural heritage features such as two kettle lakes (64 acres of 'kettle lakes) and wetlands (81 acres of wetland). Additionally, this part of the ORM contains a high number of wildlife and plant species and may represent one of the most diverse habitats found on the•ORM. At.the request of the Province of Ontario, through the Ministry of Municipal Affairs and Housing, TRCA was asked to develop a management plan for the property with the objective that the lands be managed to protect and restore natural ecosystems, and that a five kilometre pedestrian trail be designed and built across the lands (the Spine Trail).. An advisory committee, consisting of stakeholders, was formed in June 2005 and the Oak Ridges Corridor. . Park Management Plan was finalized in early 2006. Additionally, the construction of the . east -west primary spine trail was completed in 2007, prior to the formal land transfer to the Province. The land transfer is now complete. Currently, discussions are ongoing between the Province and TRCA to have.TRCA manage the land. 8 In order to further the objectives set out in the management plan, TRCA staff submitted a grant funding application to the Oak Ridges Moraine Foundation in January 2008. In this application, the Oak Ridges Trail Association, Richmond Hill Naturalists and Oak Ridges Friends of the Environment also committed to support the project by assisting with hiking events, planting and stewardship activities, such as monitoring, clean -up, media releases and participant /volunteer recruitment. DETAILS OF WORK TO BE DONE The funding application requested assistance for three components: restoration, stewardship and monitoring activities. Firstly, this initiative will result in significant natural heritage gain (buffers, grasslands and forest) over a 2 year period: COMPONENT TARGET • PROPOSED Buffer Planting 29.6 acres 8.51 acres 28 percent of target Reforestation 328 acres 185 acres . 56 percent of target Grasslands Planting 92.5 acres • 3.4 acres and 80 acres of grasslands preparation and maintenance 4 percent of target Upon completion of these restoration objectives, ORC Park will be significantly closer to achieving its targeted natural areas, as stipulated in the management plan, which projects for the above: 48 percent forest, 17 percent grasslands and 2 percent buffer. Secondly, public awareness of the ORM will be increased as a result of this project through community engagement initiatives: restoration projects; youth activities; education programs; and events and workshops. Education programs, events and workshops will have a strong environmental stewardship theme and focus on the ORM and the unique natural heritage features of the park, including the 2 kettle lakes. Education initiatives-will include: family- focused nature events that highlight the unique species on the site and efforts to restore and enhance them; Healthy Yards workshops that will highlight techniques for using native and water efficient plants in landscaping; and a Healthy Yards Green Garden (HYGG) Makeover . contest that will promote front yard naturalization in new subdivisions: To ensure the community is informed of activities in the park, semi- annual newsletters, email updates, media releases, presentations to local community groups and a presence on the TRCA website will be provided. Lastly, to assist in restoration initiatives and to measure long -term changes in the ecosystems, a minor component of this initiative will be devoted to conducting monitoring surveys for Phillips Lake, Bond Lake, terrestrial (trees and ground cover) heritage, amphibian and breeding birds. These surveys will help determine if prescriptions set forth in the management plan are working or if they require adjustment to achieve desired outcomes. Additionally, assessing the state of terrestrial and aquatic heritage features of the park through monitoring activities ensures that the park is managed in a manner that protects and enhances the unique features and functions it provides on the ORM. TRCA has contributed to the advancement of this project through the completion of the following activities: construction of the Spine Trail (primary trail alignment across ORC Park); fencing /securement of all primary entrance /access points; fencing /securement of the perimeter of Phillips Lake; secondary entrance /access points around perimeter of the park have been identified. and associated fencing / securement requirements for the entire property are pending; • rear yard chain link sections have also been constructed for residences backing onto ORC Park; • terrestrial monitoring surveys for all vegetation communities, mapped all flora and fauna Species of Concern (breeding bird and amphibian surveys) as well -as road kill surveys. TRCA. staff will work closely with the Town of Richmond Hill and the Region of York to ensure that their objectives will be met through the implementation of the ORC management plan. FINANCIAL DETAILS The remaining funds will be received from the former landowner /developer, as stipulated in the land exchange agreement, by TRCA as building permits for development are issued. The remaining balance is expected within the next 5 years. The balance currently remaining in our account at TRCA is approximately $268,000. The financial contributions for 2008 -2009 are provided in the chart below. 2008 Financial Contributions Partner Partner In -Kind Partner Cash Contribution ORMF Request Approved TRCA .$66,700- $232,622 • - $125,010 Town of Richmond Hill ** $15,000 Region of York* TBD Remedial Action Plan $20,000 $20,000* Oak Ridges Trail Association $5,000 Oak Ridges Friends of the Environment $5,000 Richmond Hill Naturalists . - TBD TD Friends of the Environment Fund $2,550* TOTAL BUDGET $111,700 $255,172 .$125,010 10 2009 Financial Contributions Partner ORMF Request Partner Cash Contribution Partner In -Kind TRCA $121,630* $353,219 $77,000 Town of Richmond Hill ** $15,000 Region of York* TBD TD Friends of the Environment Fund $3,300* Oak Ridges Friends of the Environment $5,000 Oak Ridges Trail Association $5,000 Richmond Hill Naturalists TBD TOTAL BUDGET $121,630* $356,519 $102,000 *Funding received in principle - to be confirmed through resubmission of grant application in 2009. * *Further contributions pending council approval in spring 2008. Report prepared by: Susan Robertson, extension 5325 Email: srobertson @trca.on.ca For Information contact: Gary Wilkins, extension 5211 Email: gwilkins @trca.on.ca Date: February 27, 2008 SECTION II - ITEMS FOR EXECUTIVE ACTION RES. #B5/08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Development, Interference with Wetlands and Alterations to Shorelines and Watercourses. Pursuant to Ontario Regulation 166/06, written permission from the Authority is required for: a) straightening, changing, diverting or interfering in any way with the existing channel of a river, creek, stream or watercourse, or for changing or interfering in any way with a wetland; b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches, or pollution or the conservation of land may be affected by the development. A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected. Moved by: Seconded by: Richard Whitehead David Barrow 11 THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.1 - 8.1.36, inclusive and 8.1.68 - .8.1.71, inclusive), which are listed below. CARRIED CITY OF PICKERING 8.1.1. HIGHGLEN HOMES LIMITED To construct, reconstruct, erect.or place a building or structure and site grade on Part Lot 8, Plan 40R 24517, (1983 Woodview Avenue), in the City of Pickering, Petticoat Creek Watershed as located on the property owned by Highglen Homes Limited. The purpose is to construct a new home in a Regulated Area of the Petticoat Creek Watershed. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 107218 -SP -5, dated July 6, 2007, revised January 16, 2008, prepared by D.G Biddle & Associates Limited, received January 22, 2008; • Drawing No. ES -1, Sediment and Erosion Control Plan, dated. October 2006, prepared by D.G Biddle & Associates Limited, received.January 22, 2008. • RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This proposal consists of constructing a new home on a vacant lot on Woodview Avenue in Pickering. The property is located in the Area of Interference of the Townline Swamp Wetland Complex. However, all works are at least 35 metres from the wetland. During the review of a Land Division in 2004 that created these lots, an Environmental Impact Statement (EIS) was completed and approved by TRCA. The recommendations of this EIS, such as sediment fencing, preservation of trees and infiltration of stormwater were'suggested as mitigation measures. All of these proposed mitigation measures have been incorporated into the current proposal. . Control of Flooding: . . The proposed works are not located within the Regional Storm Floodplain. Pollution: Sediment fencing will be in place throughout the duration of construction to ensure that no sediment will enter the wetland. Dynamic Beaches: Not applicable 12 Erosion: There are no geotechnical issues associated with this application. Conservation of Land: Some vegetation will be removed as part of this application. The applicant has agreed to maintain a 10 metre vegetated buffer on the easterly portion of the lot. Plantings All plantings will be consistent with TRCA's Seed Mix Guidelines. Policy Guidelines: This proposal is consistent with Section 4.2.2 G, Infilling, of TRCA's Valley and Stream Corridor Management Program. CFN: 39732 - Application #: 647/07/PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: February 21, 2008 8.1.2 HIGHGLEN HOMES LIMITED To construct, reconstruct, erect or place a building or structure and site grade on Part Lot 7, Plan 40R 24517, (1987 Woodview Avenue), in the City of Pickering, Petticoat Creek Watershed as located on the property owned by Highglen Homes Limited. The purpose is to construct a new home in a Regulated Area of the'Petticoat Creek Watershed. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 107218 -SP -5, dated July 6, 2007, revised January 16, 2008, prepared by D.G Biddle & Associates Limited, received January 22, 2008; • Drawing No. ES -1, Sediment and. Erosion Control Plan, dated October 2006, prepared by D.G Biddle & Associates Limited, received January 22, 2008. RATIONALE • The application was reviewed by staff on the basis of the following information: Proposal: This proposal consists of constructing a new home on a vacant lot on Woodview Avenue in Pickering. The property is located in the Area of Interference of the Townline Swamp Wetland Complex. However, all .works are at least 35 metres from the wetland. During the review of a Land Division in 2004 that created these lots, an Environmental Impact Statement (EIS) was completed and approved by TRCA. The recommendations of this EIS, such as sediment fencing, preservation of trees and infiltration.of stormwater were suggested as mitigation measures. All of these proposed mitigation measures have been incorporated into the current proposal. 13 Control of Flooding: The proposed works are not located within the Regional Storm Floodplain. Pollution: Sediment fencing will be in place throughout the duration of construction to ensure that no sediment will enter the wetland. • Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues associated with this application. Conservation of Land: Some vegetation will be removed as part of this application. The applicant has agreed to maintain a 10 metre vegetated buffer on the easterly portion. of the lot. Plantings All plantings will be consistent with TRCA's Seed Mix Guidelines. • Policy Guidelines: This proposal-is consistent with Section 4.2.2 G, Infilling, of TRCA's Valley and Stream Corridor Management Program. CFN: 39733 - Application #: 648/07/PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: February 21, 2008. 8.1.3 5400 SIDELINE 32 To construct, reconstruct, erect or place a building or structure on Lot 33, Concession 9, PARCEL 5, (5400 Sideline 32), in the City of Pickering, Duffins Creek Watershed. 'The purpose is to construct a culvert in a Regulated Area of the Duffins Creek Watershed. The permit will be issued for the period of March 7, 2008 to March 6; 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -1, Site Plan, dated October 2007, prepared by Robert Segarra Architect Inc., received December 19, 2007; Culvert Details, no date, prepared by the applicant, received February 26, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 14 Proposal: The proposal consists of constructing a culvert to facilitate the construction of a driveway for a residential property. The culvert will maintain the flow of an intermittent stream located on the property. Control of Flooding: TRCA technical staff have determined that the proposed works will not affect the storage or conveyance of flood water. Pollution: Sediment fencing will be in place throughout the duration of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues associated with this application. Conservation of Land: Existing grades will be maintained. Any disturbed area will be restored upon completion of the works. Plantings There are no plantings required. Policy Guidelines: This proposal is consistent with Section 4.2.2 E, Property improvements and Ancillary Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 40352 - Application #: 027 /08 /PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: February 26, 2008 8.1.4 121 FINCH_ AVENUE To construct, reconstruct, erect or place a building or structure on Lot 13, Plan 329, (121 Finch Avenue), in the City of Pickering, Petticoat Creek Watershed. The purpose is to construct a second storey addition and garage in a Regulated Area of the Petticoat Creek Watershed. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 08- 01 -10, Plot Plan, dated January 30, 2008, prepared by New Castle Drafting & Design, received February 12, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 15 Proposal:. The proposal consists of constructing a garage and a second storey addition to an existing house. The property is located within the area of interference of the Townline Swamp Wetland Complex. The rear portion of this property is designed as a Provincially Significant Wetland. The proposed addition is setback 50 metres from the wetland. Control of Flooding: The proposed works are not located within the Regional Storm Floodplain. Pollution: Sediment fencing will be in place throughout the duration of construction to ensure that no sediment will enter the wetland. Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues associated with this application. Conservation of Land: There will be no significant vegetation removed as part of this application. Plantings . No plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 C, Minor Additions, of TRCA's Valley and Stream Corridor Management Program. CFN: 40478 - .Application #: 095 /08 /PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: February 21, 2008 8.1.5 • THE. CORPORATION OF THE CITY OF PICKERING To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 23, .Plan M -16, (910 Liverpool Road), in the City of Pickering, Frenchman's Bay Watershed. The purpose is to undertake site grading and permanently place fill material within "a Regulated Area. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form* part of this permit: • Drawing No. EX1, Existing Conditions /Removals, prepared by Cosburn Giberson Landscape Architects, dated November 21, 2007, Revision No. A, Revised on February 13, 2008, received by TRCA on February 19, 2008; 16 • Drawing No. L1, Layout and Grading Plan, prepared by Cosburn Giberson Landscape Architects, dated November 21, 2007, received by TRCA on February 12, 2008; • Drawing No. L2, Planting Plan and Irrigation Layout, prepared by Cosburn Giberson Landscape Architects, dated November 21, 2007, Revision No. A, Revised on February 12, 2008, received by TRCA on February 19, 2008; • Drawing No. D1, Details, prepared by.Cosburn Giberson Landscape Architects, dated November 21, 2007, received by TRCA on February 12, 2008; • Drawing No. 2/D6, Sediment Control Fencing Detail, prepared by City of Pickering, dated March 21, 1996, received by TRCA on February 19, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to undertake site grading and permanently place fill materials within a Regulated Area associated with the Pine Creek, a tributary to Frenchman's Bay. The works are required in order to construct a second lawn bowling green for the Pickering Lawn Bowing Club. A permit was issued by TRCA in the mid- 1990's for the first bowling green. Fill will be placed adjacent to the valleylands in order to achieve adequate grades for the additional green. An existing limestone retaining wall will be repaired and added to. TRCA staff have attended on site and are satisfied that an appropriate setback has been achieved from the Pine Creek valleylands. Control of Flooding: The works are not located within the Regional Storm Flood Plain. The control of flooding is not affected by this proposal. Pollution: Sediment and Erosion controls are to be in place in advance of any site alteration to ensure that no siltation to the adjacent valleylands takes place. Dynamic Beaches: Not applicable Erosion: There are no geotechnical or slope stability concerns with this proposal. Conservation of Land: A restoration planting plan has been prepared to accompany the proposed works. This plan provides for the planting of over 190 native trees and shrubs to buffer the proposed bowling green from the adjacent valley lands. These plantings will provides enhancements to the Pine Creek valley corridor and are to remain in an unmanicured self- sustaining natural state. Plantings Plantings will be provided as noted above. 17 Policy Guidelines: This proposal is consistent with Section 4.1.1, New Urban Development,.of TRCA's Valley and Stream Corridor Management Program. CFN: 40477 - Application #: 096/08 /PICK Report-Prepared by: Chris Jones, extension 5718 For information contact: Chris Jones, extension 5718 Date: February 26, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.6 88 SPEARS STREET To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 12, Plan 1427, (88 Spears Street), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a Regulated Area of the Humber River Watershed in order to facilitate the construction of a two- storey rear addition, a rear deck and a detached garage. in the rear yard of the existing two - storey dwelling. . The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A- 1,'Site Plan, prepared by Eddie Peres, dated September.2007, received on January 29, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a two- storey rear addition, a rear deck and a detached garage in the rear yard of the existing two- storey dwelling at 88 Spears Avenue in the City of Toronto. The subject site is located north of St. Clair Avenue West and west of Weston Road within a Regulated Area of the Humber River Watershed. Control of. Flooding: This'site is not located within a regional storm flood plain and the proposal.will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. 18 Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: . The appropriate tree protection fencing will be installed. Plantings Native tree shrubs and seed mix will be planted and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: The proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor 'Additions within Non - Established /Highly Urbanized Areas of the Authority's Valley and Stream Corridor Management Program. CFN: 39959 - Application #: 820/07/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 25, 2008 8.1.7 CITY. OF TORONTO To construct, reconstruct, erect or place a building or structure on Finch Avenue from Milvan Drive to Weston Road and Weston Road from Finch Avenue to Lanyard Road, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by the City of . Toronto. The purpose is to replace an existing watermain along Finch Avenue from Milvan Drive to Weston Road and Weston Road from Finch Avenue to Lanyard Road. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: _ • Drawings U -1610 -002 and 003 - Finch Avenue West Watermain Replacement from Weston Road to Milvan Drive; dated January 29, 2008; revised February 14, 2008; received February 19, 2008; Drawing U- 952 -006 - Weston Road Watermain Replacement from Lanyard Road to Finch Avenue W.; dated February 12, 2008; revised February 14, 2008; received February 19, 2008. • RATIONALE The application was reviewed by staff on the basis of the following information: 19 Proposal: The proposal consists of the replacement of an existing 300 millimetre diameter watermain along-Finch Avenue from Milvan Drive to Weston Road and an existing 400 millimetre diameter watermain along Weston Road from Finch Avenue to Lanyard Road. A portion of Finch Avenue north of Linylou Park and a portion of Weston Road at Lanyard Road are located within the Regulation Limit. Control of Flooding: No adverse impacts to the storage or conveyance of flood waters are anticipated as a result of this project. Pollution: Appropriate controls will be implemented and maintained throughout construction to prevent sediment and other deleterious substances from impacting the surrounding features. Dynamic Beaches: Not applicable. Erosion: There are no significant slope stability or geotechnical concerns with the proposed works.. Conservation of Land: There will be no impacts to significant aquatic or terrestrial features from the proposed works. One tree will require relocation for the installation of the new watermain adjacent to Finch Avenue at Lindylou Park, where the watermain will be aligned south of the road within the boulevard area for a portion of the route: Plantings All disturbed areas will be stabilized and restored with sod upon completion of the works. Policy Guidelines: The proposal complies with Section 4.3, Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 39779 - Application #: 698/07/TOR Report Prepared by: Alex Blasko, extension 5714 - For information contact: Alex Blasko, extension 5714 Date: February 22, 2008 8.1.8 250 ELLIS AVENUE To construct, reconstruct, erect or place a building or structure on Part Block A, Plan M -233, (250 Ellis Avenue), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is .to develop within the TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction-of new 2- storey single family detached dwelling. The existing 1.5- storey dwelling is to be demolished. 20 The permit will be issued for the period of March 7, 2008 to March 6. 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A1.0, Site Plan, prepared by Superkul Inc Architect, dated August 2007, Revision No. 5, revised on January 2, 2008, received on January 17, 2008; • Drawing No. A3.0, South Elevation, prepared by Superkul Inc Architect, dated August 2007, Revision No. 3, revised on December 21, 2008, received on February 26, 2008; • Drawing No. A3.1, East Elevation, prepared by Superkul Inc Architect, dated August 2007, Revision No. 3, revised on December 21, 2008, received on February 26, 2008; • Drawing No. A3.2, North Elevation, prepared by Superkul Inc Architect, dated August 2007, Revision N,o. 3, revised on December 21, 2008, received on February 26, 2008; • Drawing No. A3.3, West Elevation, prepared by Superkul Inc Architect, dated August 2007, Revision No. 3, revised on December 21, 2008, received on February 26, 2008; • Drawing No. L1, Landscape Plan, prepared by NAK Design Group, dated December 5, 2007, Revision No. 1, revised on December 21, 2007, received on January 17, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within the TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of new 2- storey single family detached dwelling. The existing 1.5- storey dwelling is to be demolished. The subject site is located south of Bloor Street W, east of South Kingsway, west of High Park and backs on to Rennie Park in . the City of Toronto. Control of Flooding: This site is not located within a regional storm flood plain and the proposal will have n� impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. Erosion: A slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance to the recommendations of this report. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. 21 Policy Guidelines: The proposal is consistent with Section 4.2.2:(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Area of the Authority's Valley and Stream Corridor Management Program. CFN: 40383 - Application #: 043/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 26, 2008 8.1.9 ISLINGTON GOLF CLUB LIMITED To site grade on Lot 8, 9, 10, 11, 12, Concession A. CLERGY BLOCK Lot 8, 9, 10, 11, 12, Plan 3390/2451, (45 Riverbank Drive), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed as located on the property owned by Islington Golf Club Limited. The purpose is to conduct site, grading in a Regulated Area of the Mimico Creek Watershed: The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. G -1, Proposed 15th Forward Tee Box Renovation, Cut /Fill Plan, dated November 5, 2007, prepared by Schollen & Company Inc., received February 13, 2008; • Location of Excess Fill, no date, prepared by Schollen & Company Inc., received January 29, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of renovating an existing tee located on Islington Golf Course in the Mimico Creek Watershed. As portion of the Mimico Creek runs within this property. The proposal is to cut a net volume of 194.02 square metres from an area outside of -the floodplain. The excess fill material that will be produced as part of this application will be placed outside of the Regional Storm Floodplain. TRCA technical staff have determined that this proposal will not affect any of TRCA's programs or policies. Control of Flooding: The proposed works are not located within the Regional Storm Floodplain. Pollution: Sediment fencing will be in place throughout the duration of construction to ensure that no • sediment will enter the watercourse. Dynamic Beaches: Not applicable 22 Erosion: There are no geotechnical issues associated with this application. Conservation of Land: There will be no significant vegetation removed as part of this application. Plantings No plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 H, Existing Resource Based Uses, of TRCA's Valley and Stream Corridor Management Program. CFN: 40182 - Application #: 922/07/TOR Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: February 21, 2008 8.1.10 19 AMARON AVENUE To construct, reconstruct, erect or place a building or structure on Lot 159, Plan 5475, (19 Amaron Avenue), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within the TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of new two- storey single family detached dwelling. The existing single- storey dvvelling.is to be demolished. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 4, Front and Rear Elevations, prepared by V. Samuel, dated January 14, 2008, received on January 31, 2008; • Drawing No. 5, Left-Side Elevation, prepared by V. Samuel, dated January 14, 2008, received on January 31, 2008; • Drawing No. 6, Right -Side Elevation, prepared by V. Samuel, dated January 14, 2008, received on January 31, 2008; • Drawing No. 7, Left-Side Elevation, prepared by V. Samuel, dated January 14, 2008, received on January 31, 2008; • Drawing No. 8, Lot Plan - Section and Details, prepared by V. Samuel, dated January 11, 2008, received on January 31, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 23 Proposal: The purpose of this application is to develop within the TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of new two - storey single family detached dwelling on the existing foundation. The existing single - storey dwelling is to be demolished. The subject site is located east of Kipling Avenue and south of Finch Avenue W in the City of Toronto. Control of Flooding: TRCA staff have confirmed that this site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment control fencing is not required as the proposed works are adequately setback from. the ravine lands. Dynamic Beaches: Not applicable. Erosion:. There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this application. Policy Guidelines: The.proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the Authority's Valley and Stream Corridor Management Program. CFN: 40415 - Application #: 057/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Dater February 25, 2008 8.1.11 29 DACRE CRESCENT To change a building or structure so that it alters its use or potential use, . • increases its size or increases the number of dwelling units on Lot 8, Plan M -611, (29 Dacre Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within the Regulated Area of the Humber River Watershed in order to facilitate the construction of a second- storey and front yard addition to the existing single- storey single family detached dwelling. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with . the following documents and plans which form part of this permit: 24 • Drawing No. SP, Site Plan, prepared by, Paul James, dated April 2007, Revision No. 4, revised on November 15, 2007, received on December 12, 2007; • Drawing No. A6, Front Elevation, prepared by, Paul James, dated October 2007, Revision No. 2, revised on November 15, 2007, received on December 12, 2007; • Drawing No. A7, Rear Elevation, prepared by, Paul James, dated October 2007, Revision No. 1, revised on October 10, 2007, received on December 12, 2007; • Drawing No. A8, Right -Side Elevation, prepared by, Paul James, dated October 2007, Revision No. 2, revised on November 15, 2007, received on December 12, 2007; • Drawing No. A9, Left-Side Elevation, prepared by, Paul James, dated October 2007, Revision No. 2, revised on November 15, 2007, received on December 12, 2007. RATIONALE The'application was reviewed by staff on the.basis of the following information: Proposal: The purpose of this application is to develop within the Regulated Area of the Humber River Watershed in order to facilitate the construction of a second - storey and front yard addition to the existing single- storey single family detached dwelling. The subject site is located at the bottom of an existing slope, south of Bloor Street W and east of Runnymede Road in the City of Toronto. Control of Flooding: This site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment fencing is not required at the proposed works are located at the bottom of the slope. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the Authority's Valley and Stream Corridor Management Program. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. 25 Policy Guidelines: The proposal is consistent with Section 4.2.2., Development and Redevelopment /Intensification within Non - Established Communities /Highly Urbanized Areas, of the T.RCA's Valley and Stream Corridor Management Program. CFN: 40253 - Application #: 948/07/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 25, 2008 8.1.12 20 TODD BROOK AVENUE To construct, reconstruct, erect or place a building or structure on Lot 3, Plan 4022, (20 Todd Brook Avenue), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a Regulated Area of the.Humber River Watershed in order to facilitate the construction of a new 2- storey single family detached dwelling. The existing dwelling is to be demolished. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with • the following documents and plans which form part of this permit: • Drawing No. 0, Site Plan, prepared by EZDimensions, dated January 22, 2008, received on January 22, 2008; • Drawing No. 4, Front /Back Elevations, prepared by EZDimensions, dated January 22, 2008, received on January 22, 2008; • Drawing No. 5, elevations, prepared by EZDimensions, dated January 22, 2008, received on January 22, 2008. RATIONALE. The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a new two - storey single family detached dwelling at 20 Todd Brook Avenue in the City of Toronto. The existing dwelling is to be demolished. The subject site is located north.of Albion Road, west of Islington Avenue within a Regulated Area of the Humber River Watershed. Control of Flooding: The subject site is not located within the regional storm flood plain. Therefore the proposal will have no impact on the storage and /or conveyance of floodwaters.. Pollution: -A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. 26 Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native tree shrubs and seed mix will be planted and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: The proposal is consistent with Section 4.2.2., Development, Redevelopment /Intensification within Non - Established Communities /Highly Urbanized Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40389 - Application #: 044/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 25, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.13 8 PENWOOD CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 76, Plan M =1290, (8 Penwood Crescent), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a cupola structure overtop of an existing patio at the rear of an existing dwelling. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: _ • Drawing No. A1.0, Site Plan, prepared by Richard Wengle Architect Inc., dated January 25, 2008, received by TRCA January 28, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include the construction of a roof and cupola structure overtop of an existing patio at the rear of the existing dwelling at 8•Penwood Crescent in the City of Toronto. The site is located east of Bayview Avenue, south of York Mills Road. Construction of the proposed works . commenced prior to issuance of any permits. Control of Flooding: The site is not located in the Regional Storm Floodplain. 27 'Pollution: Sediment fencing is not required as the proposed works are adequately set back from the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project: Policy Guidelines: • The proposal is consistent with section 4.2.2.B, Minor Additions, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40508 - Application #: 113/08/TOR Report Prepared by: Michelle Stafford, extension.5250 For information contact: Steve Heuchert, extension 5311 Date: February 22, 2008 8.1.14 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure and alter a watercourse on Timberlane Creek at Earl Bales Park, in the City of Toronto (North York Community Council Area), Don River Watershed as located.on the • property owned by the City of Toronto. The purpose is to stabilize portions of Timberlane Creek to mitigate erosion impacts and protect exposed sections of a sanitary sewer. . The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawings 3031 - 2007 -10 -02 to 05 - Earl Bales Park Timberlane Creek Channel Restoration; dated September 2007, received February 13, 2008; prepared by MMM Group. • RATIONALE The application was reviewed by staff on the basis of the following information: 28 Proposal: On November 30, 2007 TRCA received an application from the City of Toronto to undertake emergency works on Timberlane Creek to mitigate erosion impacts and protect exposed sections of a sanitary sewer. -TRCA staff concurred that the exposure of the sanitary sewer presented an immediate threat of injury to persons, loss of life, or loss of property. Upon review of the application, staff provided the City of Toronto with Approval for Emergency Works Under Ontario Regulation 166/06 to undertake the works on February 19, 2008. This application is being brought forward to the Executive Committee at this time for ratification. The proposal consists of. the stabilization of portions of Timberlane Creek to mitigate erosion impacts and protect exposed sections of a sanitary sewer. The channel works will include the installation of grade controls, the excavation and backfilling of affected slopes, and the installation of armourstone or riverstone to protect infrastructure and prevent further erosion. Work will be undertaken in the dry during low flow conditions, and will be completed prior to March 31, 2008. Construction access will be confirmed on site with TRCA prior to construction, and will follow the valley floor adjacent to the channel, or will be located within the channel where appropriate to minimize disturbance. The City of Toronto is currently completing the • tender process to initiate the works. Approval for this proposal was granted with the understanding that these works are a temporary solution to alleviate the immediate risk of.this emergency situation.. A comprehensive design for the control of stormwater in the Earl Bales Park Area and the further restoration of Timberlane Ravine will be initiated by the City of Toronto shortly, based on the recommendations of the Earl Bales Park Area Stormwater Management Plan (CFN 35707). Control of Flooding: No adverse impacts to the storage or conveyance of flood waters are anticipated as a result of this project. Pollution: Appropriate controls will be implemented and maintained throughout construction to prevent sediment and other deleterious substances from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no significant slope stability or geotechnical concerns with the proposed works. Conservation of Land: Construction access will be located to minimize disturbance to the existing vegetation and valley slopes. TRCA staff will meet on site with the contractor to confirm the access route prior to .construction. Plantings All disturbed areas will be stabilized and restored with appropriate native species. 29 Policy Guidelines: The proposal complies with Section 4.3, Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 40088 - Application #: 898/07/TOR Report Prepared by: Alex Blasko, extension 5714 For information contact: Alex Blasko, extension 5714 Date: February 26, 2008 8.1.15 319 RIVERVIEW DRIVE To construct, reconstruct, erect or place a building or structure on Part Lot 58, 59, 60, Plan M -275, (319 Riverview Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a pavillion landscaping structure in the rear yard. • The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • • Drawing No. Al, Site Plan, prepared by Landscape Plus Ltd., undated, received by TRCA February 11, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a pavillion landscaping structure in the rear yard of the existing dwelling at 319 Riverview Drive in the City of Toronto. The site is located west of Bayview Avenue and north of Lawrence Avenue East. Control of Flooding: The site is not located in a Regional Storm Floodplain. Pollution: • Sediment control fencing is not required as the yard is outlined with a solid wooden fence and the proposed works are adequately setback from any valley features. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this application. • Conservation of Land: No significant vegetation will be removed as a result of construction. 30 Plantings No plantings are required as part of this project. Policy Guidelines: The proposal is consistent with section 4.2.2.E, Property Improvements and Ancillary Structures, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40490 - Application #: 099/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: February 22; 2008 8.1.16 227 BURBANK DRIVE To construct, reconstruct, erect or place a building or structure on Part Lot 12, 13, Plan 2134, (227 Burbank Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a new two storey dwelling. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A01, Site Plan, dated January 20, 2008, received by TRCA staff February 21, 2008. • RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a new two- storey dwelling at 227 Burbank Drive in the City of Toronto. The site is located east of Bayview Avenue, south of Finch Avenue East. The existing dwelling is to be demolished. • Control of Flooding: The site is not located in a Regional Storm Floodplain. Pollution: Sediment control fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this application 31 Conservation of Land: No significant vegetation will be removed as a result of construction. Appropriate tree protection fencing will be installed. Plantings Native tree shrubs and seed mix will be planted. Policy Guidelines: This proposal is consistent with Section 4.2.2.D; Replacement Structures, of the TRCA's Valley. and Stream Corridor Management Program. • CFN: 39975 - Application #: 831/07/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: February 22, 2008 8.1.17 5 MAY TREE ROAD To construct, reconstruct, erect or place a building or structure on Part Lot 14, . PART 13, Plan 3955, (5 May Tree Road), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated.Area of the Don River Watershed to facilitate construction of a new two- storey dwelling, in- ground swimming pool, at grade spa, and pool cabana. The existing dwelling is to be demolished. The permit will be issued for the period of March 7, .2008 to March 6, 2010 in accordance with • the following documents and plans which form part of this permit: • Drawing No. L1, Landscape Proposal Rear Garden, prepared by Mark Hartley Landscape Architects, dated February 7,' 2008, received by TRCA February 13, 2008; • Drawing No. M, Site Plan, prepared by Richard. Wengle Architect Inc., dated January 29, 2008, received by TRCA February 13, 2008. Redlined by TRCA staff to indicate that all electrical components associated. with the Pool Cabana are to be elevated above the Regional Storm Elevation; • • Drawing No. A2, Lot Drainage & Housing Siting Control Plan, prepared by. R.G. McKibbon,Ltd., dated December 20, 2007, received by TRCA February 15, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a new two - storey dwelling, in- ground swimming pool, spa, and pool cabana. The site is located south of York Mills Road, east of Yonge Street. Although the site is partially located in the Hoggs Hollow Special Policy Area (SPA), the proposed works are located outside of the SPA limit. The existing dwelling is to be demolished. 32 Control of Flooding: The site is partially located in the Regional Storm Floodplain. The proposed works will be floodproofed to the Regional Storm Flood event. Pollution: Sediment fencing is not required as the proposed works are located in the valley and are adequately set back from the watercourse. Dynamic Beaches: Not applicable Erosion: There' are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction and appropriate tree protection fencing will be installed. • Plantings Native tree shrubs and seed mix will be planted. Policy Guidelines: This proposal is consistent with Section 4.2.2.D, Replacement Structures, and 4.2.2.E, Property Improvements and Ancillary Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 40322 - Application #: 011 /08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: February 26, 2008 8.1.18 23 GLENGOWAN ROAD To construct, reconstruct, erect or place a building or structure and site grade on Lot 177, Plan 511E, (23 Glengowan Road), in.the City of Toronto (North York Community Council Area), .Don River Watershed.. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a new two storey dwelling and in- ground swimming pool. The existing dwelling is to be demolished. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • .Drawing No. A -1, Site Plan, prepared by Peter Higgins Architect, dated January 2007, received February 15, 2007, received by TRCA February 20, 2007; • Drawing No. L -1, Landscape Plan, prepared by Peter Higgins Architect, dated January 2007, Revised May 1, 2007, received by TRCA May 1, 2007; Drawing No. A2, Site Grading Plan, prepared by H. Piller Corporation Ltd., dated February 7, 2007, received by TRCA February 20, 2007. 33 RATIONALE The application was reviewed by staff on the basis of the•following information: Proposal: The proposed works include construction of a new two- storey dwelling and in- ground swimming pool at 23 Glengowan Road in the City of Toronto. The site is located west of Mount Pleasant Road, south of Lawrence Avenue East. The existing dwelling is to be demolished. Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: A sediment control fence will be erected before commencement of any construction or grading works and will remain in place until the proposed works have been completed and any . exposed areas have been stabilized. Dynamic Beaches: Not applicable Erosion: • There are no geotechnical concerns associated with this application. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native tree shrubs and seed mix will be planted along the slope and a ravine . stewardship plan will be implemented for the site. Policy Guidelines: The proposal is consistent with Section 4.2.2.D, Replacement Structures, and 4.2.2.E, Property Improvements and Ancillary Structures, of the TRCA's Valley and Stream Corridor Management Program. CFN:.38873 - Application #: 092/07/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: February 26, 2008 34 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.19 CAL -WARD DEVELOPMENTS INC. To construct, reconstruct, erector place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 33, Concession B, (25 Herron Avenue), in the City of Toronto (Scarborough Community Council Area), Don River Watershed as located on the property owned by Cal -Ward Developments Inc.. The purpose is to site grade and develop in a Regulated Area of the Don River to facilitate the development of a ten. (10) lot single family subdivision. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 352 -101, General Plan, prepared by F. J. Ternoway Associates, dated December 15, 2007, received December 19, 2007; • Drawing No. 352 -301, Grading Plan, prepared by F. J. Ternoway Associates, dated December 15,2007, received January 28, 2008; • Drawing No. 352 -701 Sedimentation Control Plan, prepared by F.J. Ternoway Assoc, dated December 15, 2007, received December 19, 2007; • Drawing No. TP -1, Tree Preservation Plan, prepared by Aboud and Associates Inc, dated January 2008, Revision No. 1, revised February 22, 2008, received on February 25, 2008; • Drawing No. ALL -1, Composite Planting Plan, prepared by Aboud and Associates Inc, dated January 2008, Revision No. 1, revised February 22, 2008, received on February 25, 2008; • Drawing No. L -1, Landscape and Fencing Plan, prepared by Aboud and Associates Inc, dated October 2007, Revision No. 2, revised February 22, 2008, received on February 25, 2008; • .Drawing No. CP -1, Compensation Planting Plan, prepared by Aboud and Associates Inc; dated August 2007, Revision No. 2, revised February 22, 2008, received on February 25, 2008; • Drawing No. RSP -1, Ravine Stewardship Plan, prepared by Aboud and Associates Inc, dated August 2007, Revision No. 2, revised February 22, 2008, received on February 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: • Proposal: The proposal is to construct a ten (10) lot single family subdivision at 25 Herron Avenue, located south and west of Warden Avenue and St. Clair Avenue. East in the City of Toronto. The subject property includes a portion of the Taylor- Massey Creek valley in the Don. River Watershed and was subject to a lengthy approval process for Zoning By -law Amendment and Subdivision Approval Applications, since finalized: The proposed lot lines, and therefore rear yards and dwellings, are adequately buffered from the stable top of valley bank and the significant vegetation associated with the valley. The buffer and the valley slopes will be renaturalized and conveyed to public ownership as a condition of Subdivision Approval. 35 Control of Flooding: The subject property is not located within the Regional Storm Floodplain. Pollution: Temporary sediment control has been provided per the Greater Golden Horseshoe Area Conservation Authorities, Erosion and Sediment Control Guideline for Urban Construction. These controls include a temporary pond; rock check dams, sediment control fencing and stabilization seeding. Dynamic Beaches: Not applicable. Erosion: Temporary erosion control has been provided per the Greater Golden Horseshoe Area Conservation Authorities, Erosion and Sediment Control Guideline for Urban Construction. The long term stable slope has been identified through a geotechnical report and is located in excess of 10 metres from the development. Conservation of Land: The development is located in excess of five metres from the significant vegetation. A tree protection plan will be implemented prior to construction and a compensation planting plan and ravine stewardship plan will be implemented after the construction. • Plantings Extensive native tree, shrub and seed mix plantings are incorporated into the • compensation planting plan and ravine stewardship plan. Policy Guidelines: The proposal is consistent with Policy 4.1.1., New Urban Development, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40308 - Application #: 002 /08/TOR Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: February 25, 2008 8.1.20 45 SATOK TERRACE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on • Lot 51, Plan M -1080, (45 Satok Terrace), in the City of Toronto (Scarborough 'Community Council Area), Highland Creek Watershed. The purpose is to develop within a Regulated Area of the Highland Creek Watershed to facilitate construction of a front porch canopy, and a second - storey addition over top of the existing one - storey dwelling. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: 36 • Drawing No. Al, Site & Basement Plans, prepared by Jacob Design & Drafting Services, dated May 14, 2007, received by TRCA December 10, 2007; • Drawing No. A2, Ground Floor Plan (Modified), prepared by Jacob Design & Drafting Services, dated May 14, 2007, received by TRCA December 10, 2007; • Drawing No. A3, Second Floor Plan (Proposed), prepared by Jacob Design & Drafting Services, dated May 14,2007, received by TRCA December 10, 2007; • Drawing No. A4, Elevations, prepared by Jacob Design & Drafting Services, dated May 14, 2007, received by TRCA December 10, 2007; • Drawing No. A5, Elevations, prepared by. Jacob Design & Drafting Services, dated May 14, 2007, received by TRCA December 10, 2007: RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a front porch canopy and a second - storey addition over top of the existing one - storey dwelling at 45 Satok Terrace in the City. of Toronto. The site is located west of Meadowvale Road and south of Lawrence Avenue East. Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: Sediment.fencing is not required as the proposed works are adequately setback from top of bank'. . Dynamic Beaches: Not applicable Erosion: TRCA geotechnical staff reviewed a letter of opinion submitted each by a geotechnical engineer and a structural engineer and determined that the proposed additions will be setback adequately from the top of bank, and that the structure and slope will withstand the additional • load. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: The proposal is consistent with Section 4.2.2.C, Minor Additions, of the TRCA's Valley and Stream Corridor Management Program. 37 CFN: 40246 - Application #: 942/07/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: February 22, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.21 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure on 545 Commissioners Street, in the City of Toronto (Toronto and East York Community Council Area), Waterfront Watershed as located on the property 'owned by the City of Toronto. The purpose is to install an emergency generator on an existing parking lot. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing CS- 2008 -11 -1 = Central Services Building - Installation of Standby Generator - 545 Commissioners Street; dated January 2008; revised January 24, 2008; received January 28, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the installation of an emergency generator on the existing parking lot at 545 Commissioners Street. The property is located within the Lower Don Special Policy Area, however the generator will be mounted on a concrete slab so that it is elevated above the regional floodline elevation. Control of Flooding: No adverse impacts to the storage or conveyance of flood waters are anticipated as a result of this project. " Pollution: Appropriate controls will be implemented and maintained throughout construction.to prevent sediment and other deleterious substances from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no slope stability or geotechnical concerns with the proposed works. Conservation of Land: There will be no impacts to significant aquatic or terrestrial features from the proposed works. 38 Plantings No plantings will be required for this application, as it involves construction on an existing parking lot. Policy Guidelines: The proposal complies with Section 4.3, Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 40474 - Application #: 087/08/TOR Report Prepared by: Alex Blasko, extension 5714 For information contact: Alex Blasko, extension 5714 Date: February 22, 2008 8.1.22 181 FERRIS ROAD • To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 10, Plan M591, (181 Ferris Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a second - storey addition, attic -level storage space and a new covered front porch to the existing single- storey dwelling. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing unnumbered, Section 1.1 and Site Plan, prepared by Norman Ettinger, dated December 7, 2007, received on February 21, 2008; • Drawing No. 2, First Floor Plan, prepared by Norman Ettinger, dated December 6, 2007, received on February 21, 2008; • Drawing No 3, Proposed Second Floor Plan, prepared by Norman Ettinger, dated December 7, 2007, received on February 21, 2008; • Drawing No. 5, Front and East Elevation, prepared by Norman Ettinger, undated, received on February 21, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a second - storey, third - storey and front porch addition to the existing single- storey detached dwelling. The subject site is located south of St. Clair Ave E and west of Victoria Park Road in the City of Toronto. Control of Flooding: This site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. 39 Pollution: Sediment control fencing is not required as ,the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this application Policy Guidelines: The proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the Authority's Valley and Stream Corridor Management Program. CFN: 40515 - Application #: 118/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 25, 2008 8.1.23 5 + 5B THORNWOOD ROAD To construct, reconstruct, erect or place a•building or structure on Part Lot 2, Plan 383 -E, (5 +.5B Thornwood Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed in order to facilitate the reconstruction of the existing detached garage. - • The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -1, Plans Elevations and Section, prepared by ArchuCAD Design Inc., dated January 2008, received on January 18, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to reconstruct an existing detached garage at 5 -5B Thornwood Drive in the City. •of Toronto. The existing structure is failing. The subject site is located west of Mount Pleasant Road, south of St. Clair Avenue E. and backs on to Park Drive Reservation Lands in a Regulated Area of the Don River Watershed. 40 Control of Flooding: This site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. Erosion: A slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance to the recommendations of this report. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native tree shrubs and seed mix will be planted and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: The proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the Authority's Valley and Stream Corridor Management Program. CFN: 40428 - Application #: 069/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 25, 2008 8.1.24 785 EASTERN AVENUE . To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 149, Plan M445, (785 Eastern Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within the Regulated Area of the Don River Watershed in order to facilitate the construction of a one - storey rear addition (66.15 sq. m.) to the existing dwelling. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1 of 13, Site Plan, prepared by Avtech Designs, dated January 2008, revised January 18, 2008, received January 31, 2008; 41 • Drawing No. 11 of 13, Proposed Rear Elevation & Rail Section, prepared by Avtech Designs, dated December 2007, received January 31, 2008; • Drawing No. 12 of 13, Proposed Right Side Elevation, prepared by Avtech Designs, dated December 2007, received January 31, 2008; • • Drawing No. 13 of 13, Proposed Left Side Elevation & Section 'A', prepared by Avtech Designs, dated December 2007, received January 31, 2008. RATIONALE • The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a one - storey rear addition (66.15 sq. m.) to *the existing dwelling. The subject site is located in the Lower Don Special Policy Area, north of Lake Shore Boulevard E and west of Leslie Street in the City of Toronto. Control of Flooding: The subject property is located in the Lower Don Special Policy Area. However, TRCA staff have determined the proposed works are adequately flood - proofed and will not adversely impact the storage and /or conveyance of floodwaters. Pollution: Sediment fencing is not required as the proposed works are adequately setback from the • watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non: Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40447 - Application #: 076/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 26, 2008 CITY OF VAUGHAN 8.1.25 283 TREELAWN BOULEVARD To construct, reconstruct, erect or place a building or structure on Lot 18, Plari 65M -3377, (283 Treelawn Boulevard), in the City of Vaughan, Humber River Watershed. The purpose is to construct an inground pool, patio, shed and terraced armourstone retaining wall within a Regulated Area of the Humber River Watershed at 283 Treelawn Boulevard, in the City of Vaughan. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan prepared by Solda Pools, received by the TRCA January 16, 2008, redline revised to indicate the removal of excess fill material. Cross Section drawing A -A' prepared by Solda Pool, received by the TRCA January 16,. 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct an inground pool, patio, shed and terraced armourstone retaining wall within a Regulated Area of the Humber River Watershed. The proposal is located adjacent to an area identified by our mapping as being an ANSI and is in close proximity to the existing top of bank Iodated beyond the rear lotline. The proposed terraced armourstone retaining wall replaces an existing block retaining wall. A Geotechnical Report prepared by Terraprobe Limited, dated December 21, 2007, indicates that the proposed works will not have an adverse impact on the stability of the existing slope. Control of Flooding: The subject property is not within a flood plain. There are no flooding concerns with this application. Pollution: _ Sediment control fencing will be installed and maintained during the construction of the proposed works to prevent sediment from entering the adjacent valley system. Dynamic Beaches:. Not applicable. Erosion: TRCA staff is satisfied that the proposed works will not have an adverse impact on the valley wall and existing slope as plantings are proposed within a 3 metre buffer area between the property boundary and the proposed works to stabilize the area against erosion. Conservation of. Land: As a watercourse will not be impacted by the. proposal, no fisheries concerns will result. A 3 metre buffer area to be planted with native, non - invasive species will provide an adequate buffer between the valley system and the 'residential uses and enhance the existing ANSI feature adjacent to the subject property. 43 Plantings A 3 metre planting strip composed of native, non - invasive species between the rear lot line and the proposed development provides a better buffer between the existing residential uses and the valley system than the current sodded condition. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvement and Ancillary. Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 39415 - Application #: 424 /07/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: January 30, 2008 8.1.26 31 WATERSIDE CRESCENT To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 6, PIan.65M -3695, (31 Waterside Crescent), in the City of Vaughan; Don River Watershed. The purpose is to. construct an in- ground swimming pool, raised deck, cabana, two pergolas and planter terraces within a Regulated Area of the Don River Watershed at 31 Waterside • Crescent in the City of Vaughan. The•permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking prepared by Nick Miele, received by the TRCA February 22, 2008, agreeing to submit a Landscape Plan to the satisfaction of TRCA. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct an in- ground swimming pool, raised patio, cabana, two pergolas and planter terraces within a Regulated Area of the Don River Watershed. The proposed works will occur within the rear yard of an existing residential lot with the majority of the works being beyond a 2 metre setback from the rear property line, consistent with permits issued for neighbouring properties. Minor encroachments into the 2 metre buffer by the proposed planter terraces contain minimal hard- landscaping and do not extend further than.1 metre at its furthest point. A site visit conducted by TRCA staff December 11, 2007 determined that the top of bank is not well defined and is beyond the rear property line. Additionally, TRCA ecology staff are satisfied that the drip line does not impact the rear yard. There are no other significant natural features that will be affected by the project. . 44 Control of Flooding: The proposal is not located within the Regional Storm Flood Plain. There will be no impact on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be installed and maintained during construction to prevent sediment from entering the adjacent valley system. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As.a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings All plantings are to be composed. of native, non - invasive species. The planting of the 2 metre buffer provides an enhanced buffer between the valley system and the residential use and is an improvement over the current existing conditions. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 40254 - Application #: 949 /07/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: February 25, 2008 8.1.27 FERNBROOK HOMES To construct, reconstruct; erect or place a building or structure, site grade and interfere with a wetland on Lot 242, Plan 63M -3878, (65 Salamander Court), in the City of Vaughan, Don River Watershed as located on the property owned by. Fernbrook Homes. The purpose is to construct a new single- detached dwelling, deck and rear -yard property fence within a Regulated Area of the Don River Watershed at 65 Salamander Court in the City of Vaughan. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Site Grading Plan prepared by RN Design dated January 21, 2008, received by the TRCA on January 24, 2008, redline revised to indicate removal of excess fill material, erection of sediment control fencing and planting of native non - invasive species. 45 • Basement Floor Plan, Drawing No. 1 of 3, prepared by RN Design dated February 13, 2008, received by the TRCA on February 19, 2008. • Ground Floor Plan, Drawing No. 2 of 3, prepared by RN Design dated February 13, 2008, received by the TRCA on February 19, 2008. • Elevation Drawing, Drawing No. 3 of 3, prepared by RN Design dated February 13, 2008, received by the TRCA on February 19, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a new dwelling, deck and rearyard property fence within a Regulated Area of the Don River Watershed. The subject property is located entirely within an identified Wetland Area of Interference due to the proximity. of a locally significant wetland. TRCA staff note that as part of the subdivision process (19T- 02V08, Dreamwood Subdivision), a 10 metre buffer was created around the TRCA staked wetland and has been rezoned to an Open Space designation to prohibit development. The proposed works are located more than 15 metres away from this natural feature. Control of Flooding: The proposal will not be located within the Regional Storm Flood Plain. There will be no impact on the storage or conveyance of flood waters: Pollution: Sediment control fencing will be installed and maintained during construction to prevent sediment from entering the wetland buffer area and locally significant wetland. Dynamic Beaches: Not applicable. Erosion: There are no •eotechnical issues•associated with this application. _, Conservation of Land: As the watercourse will not be impactcd by the proposal, no fisheries concerns will result. The locally.significant wetland is sufficiently buffered from the development and will not be impacted. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be sodded or planted with native non - invasive species. Policy Guidelines: •The proposal is consistent with Section 4.2.2 G) - Infilling of the Authority's Valley and Stream Corridor Management Program. . 46 CFN: 40403 - Application #: 046 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: February 20, 2008 8.1.28 26 GOODMAN CRESCENT - To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 19, Concession4 Lot 78, Plan 5590, (26 Goodman Crescent), in the City of Vaughan, Don River Watershed. The purpose is to construct a replacement dwelling and attached deck within a Regulated Area of the Don River Watershed at 26 Goodman Crescent, in the City of Vaughan. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan (Drawing No. Al), prepared by Joe Chalklin, M.A.A.T.O dated April 26, 2007, received by the TRCA February 26, 2008, redline revised to indicate the erection and maintenance of sediment control fencing and the removal of excess fill material; • South and West Elevations Drawing (Drawing No. A5), prepared by Joe Chalklin, M.A.A.T.O dated April 26, 2007, received by the TRCA February 26, 2008; and • North and East Elevations Drawing (Drawing No. A6), prepared by Joe Chalklin, M.A.A.T.O dated April 26, 2007, received by the TRCA February 26, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a new replacement single- detached dwelling and attached deck within a Regulated Area of the Don River Watershed. The subject property is partially within the Regional Storm Flood Plain; however, the proposed works are located outside of the flood plain area. The flood plain elevation for the subject property is 229.4 metres above sea level (m.a.s.I.), all openings on the proposed dwelling are above 229.7 m.a.s.l., grading around the existing and proposed dwellings is at an elevation of 231.0 m.a.s:l. at its lowest point. The proposed dwelling is approximately 6 metres from the flood plain area. Control of Flooding: The proposed works are located outside of the Regional Storm Flood Plain; TRCA water resources engineering staff are satisfied that the proposed development will not have an impact on the storage and conveyance of flood waters. Pollution: Sediment control fencing will be installed and maintained during the duration of construction until the site has stabilized to prevent sediment from entering the adjacent stream corridcr. Dynamic Beaches: Not applicable. 47 Erosion: There are no geotechnical issues associated with this application. Conservation of Land: A watercourse is located approximately 45 metres away from the subject property. This watercourse will not be impacted by the proposal; no fisheries concerns will result. There are no other significant natural features on, or adjacent.to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded conditions and will riot affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 40087 - Application #: 893 /07NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: February 26, 2008 TOWN OF AJAX 8.1.29 INTERNATIONAL UNION. OF ELEVATOR CONSTRUCTORS LOCAL 50 To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 12, RANGE 3 Plan 40R -9512, (400 Westney Road South), in the Town of Ajax, Duffins Creek Watershed as located on the °property owned by International Union of Elevator • Constructors Local 50.. The purpose is to undertake site grading, permanently • place fill material and alter a watercourse in order to implement a commercial. site plan. The permit will be issued•for the period of March 7, 2008 to March 6, 2010 in accordance with 'the following documents and plans which form part of this permit: • Drawing No. A0.1, Proposed Site Plan & Statistics, prepared by Romanov Romanov Architects, dated October 13, 2006, Revision No. 3, revised on August 16, 2007, received by TRCA on January 21, 2008; • Drawing No. 206 -AJ84, Site Grading and Servicing Plan, prepared by Skira & Associates Ltd., dated September, 2006, Revised on July 25, 2007, received by TRCA on January 21, 2008; • Drawing No. L1, Tree Inventory /Preservation & Landscape Plan, prepared by Strybos Barron King, dated September 15, 2006, Revision No. 7, revised on August 7, 2007, received by TRCA on January 21, 2008; 48 • Drawing No. L2, Detail Sheet, prepared by Strybos Barron King, dated September 15, 2007, Revision No 3, revised on August 7, 2007, received by TRCA on January 21, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to undertake site grading, permanently place fill material and alter a watercourse within a Regulated Area in order to implement an approved commercial site plan. The site is located next to the main Duffins Creek southwest of Bayly Street and Westney Road in an industrial area of the Town of Ajax. The site plan consists of an office building /meeting hall and associated parking and landscaped areas. Grading and filling is required on the site in order to reach the appropriate grades for development. A stormwater scheme to be implemented required a new stormwater outfall to the Duffins Creek valleyands. Sustainable design measures have been incorporated into the plan at the request of TRCA staff and include the direction of clean roof water to the adjacent Duffins Creek Environmentally Significant Area and wetlands as well as the inclusion of an infiltration trench and landscaped area within the parking lot to reduce imperviousness and stormwater run -off from the site. Control of Flooding: The location of the Regional Storm Flood Plain adjacent to the site has been, plotted on the site plan and the required 10 metre setback has been achieved. No grading or filling activities are to take place within the Regional Storm Flood Plain area, as such the proposal has no effect upon the storage and conveyance of flood waters. Pollution: Sediment and erosion control measures have been placed on the plans and are to be in effect before site grading takes place. Dynamic Beaches: Not applicable Erosion: There are no geotechnical or slope stability concerns with this proposal. Conservation of Land: A buffer has been established between the areas to be developed and the woodlands, wetlands and flood plain associated with the Duffins Creek valleylands to the west of the site. A planting plan has been prepared for the site, which will establish a restored and vegetated buffer area from the valleylands to the west. Plantings A planting plan has been prepared as part of this proposal, as noted above. Policy Guidelines: This proposal is consistent with Section 4.1.1, New Urban Development, and Section 4.3. Infrastructure and Servicing, of TRCA's Valley and Stream Corridor Management Program: 49 CFN: 40404 - Application #: 047 /08 /AJAX Report Prepared by: Chris Jones, extension 5718 For information contact: Chris Jones, extension 5718 Date: February 26, 2008 8.1.30 REGIONAL MUNICIPALITY OF DURHAM To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Taunton Road, in the Town of Ajax, Carruthers Creek Watershed as located on the property owned by Regional Municipality of Durham. The purpose is to undertake site grading and permanently place fill material within a Regulated Area in order to establish a recreational trail. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. L -2a, STA. 4 +580 to 4 +320 Layout and Grading Plan, prepared by The MBTW Group, Revision No. 6, revised on December 5, 2007, received by TRCA on December 19, 2007, red -line revised by TRCA staff on February. 26, 2008; • Drawing No. L -2b, STA. 4 +580 to 4 +000 Planting Plan, prepared by The MBTW Group, Revision No. 6, revised on December 5, 2007, received by TRCA on December 19, 2007, red -line revised by TRCA staff on February 26, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to undertake grading and permanently place fill material in order to construct a recreational trail in the Town of Ajax. The trail is to be located on the south side of Taunton Road right of way between Salem and Audley Roads at the northernmost edge of the urban area of the Town of Ajax. In order to connect Salem and Audley roads, the trail • must cross the Carruthers Creek valleylands and the associated Regulated Area. The trail at the Carruthers Creek will have a paved 3 metre cross section and will be accompanied by .associated grading works and landscaping. No structural crossing of the Carruthers Creek is proposed, as the trail will use the existing culvert for Taunton Road. A 1.2 metre tall fence will separate.the trail as it crosses the Carruthers Creek Culvert. Control of Flooding: The majority of the trail within the Carruthers Creek valleylands will be within the Regional Storm Flood Plain as it overtops Taunton Road. Water Resource engineering staff are satisfied that the impact to the storage and conveyance of flood waters will be negligible. Pollution: A sediment and erosion control measures are outlined on the plans in order to prevent sedimentation of the valleylands. 50 Dynamic Beaches: Not applicable Erosion: There are no geotechnical or slope stability concerns associated with the proposal Conservation of Land: The proposed works are not located within any natural heritage features. A planting plan has been prepared which will provide for the planting of over 600 trees and shrubs as part of the comprehensive planting plan associated with this proposal. This will result in the restoration of portions of the Carruthers Creek valleylands previously disturbed for the widening of Taunton Road and the construction of the trail. A Letter of Advice will be issued by TRCA staff pursuant to the requirements of the Fisheries Act (Canada) due to the near water works required to construct the trail. Plantings Plantings will be provided as described above. Policy Guidelines: This proposal is consistent with Section 4.1.2, New Resource Based Uses, of TRCA's Valley and Stream Corridor Management Program. CFN: 39997 = Application #: 842 /07 /AJAX Report Prepared by: Chris Jones, extension 5718 For information contact: Chris Jones, extension 5718 Date: February 26, 2008 TOWN OF MARKHAM 8.1.31 UNIONVILLE ARMS PUB To construct, reconstruct, erect or place a building or structure on Lot 12, Concession 5, (189 Main Street), in the Town of Markham, Rouge River Watershed as located on the property owned by Unionville Arms _Pub. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the reconstruction of a commercial building due to fire. . The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance: with the following, documents and plans which form part of this permit: • Drawing SP -1, prepared by Gregory Design Group dated, January 31, 2008, stamped received by TRCA Planning and Development on February 13, 2008; • Drawing A -1, prepared by Gregory Design Group dated, January 31, 2008, stamped received by TRCA Planning and Development on February 13, 2008; • Drawing A -2, prepared by Gregory Design Group dated, January 31, 2008, stamped received by TRCA Planning and Development on February 13, 2008; • Drawing A -4, prepared by Gregory Design Group dated, January 31, 2008, stamped .received by TRCA Planning and Development on February 13, 2008; 51 • Drawing A -5, prepared by Gregory Design Group dated, January 31, 2008, stamped received by TRCA Planning and Development on February 13, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the reconstruction of two outside walls of an existing commercial building damaged due t� fire and to construct an 11 square metre second floor addition to the rear mechanical. room. Although the subject property is located within the Regional Storm Floodplain and is susceptible to flooding during a Regional Storm event, the subject property is located within the Unionville Special Policy Area (SPA). Both the TRCA and the Town of Markham have policies regarding development within the Unionville SPA, which would permit the reconstruction and minor alterations to the building that are being proposed. Additionally, TRCA staff has reviewed the proposed works and confirm that the proposed redevelopment is adequately flood protected. The proposed works involve the reconstruction of an existing building. As such, no significant vegetation will be removed as a result of construction. Control of Flooding: . TRCA staff has reviewed this proposal and do not anticipate any impacts to the storage and /or conveyance of flood waters. Pollution: The subject site is completed paved. In addition, existing development exists between this site and the nearest tributary of the Rouge River Watershed. As.such, sedimentation of any watercourse features is not expected to occur as a result of construction. Dynamic Beaches: • • Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. • Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries • related concerns associated with this project. Plantings No significant vegetation will be removed as a result of construction, and opportunity does not exist with the current proposal for providing additional plantings on the property. Policy Guidelines: This proposal is consistent with Section 4.2.2 (D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program.(VSCMP). 52 CFN: 40497 - Application #: 106 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: February 27, 2008 TOWN OF RICHMOND HILL 8.1.32 REGIONAL MUNICIPALITY.OF YORK To construct, reconstruct, erect or place a building or structure at Bayview Avenue and 19th Avenue, in the Town of Richmond Hill, Rouge River Watershed ,as located on the property owned by Regional Municipality. of York. The purpose is to formalize an Emergency Works Permit that was recently authorized by TRCA staff within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the replacement of a damaged traffic signal pole. - The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by D. Rumble, Region of York, dated January 23, 2008, stamped received by TRCA Planning and Development on January 23, 2008, redline revised by TRCA Planning and Development staff on February 26, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to formalize an Emergency Works Permit that was issued by TRCA staff to facilitate the replacement of a damaged traffic signal that took place on December 11, 2007. The area to which this application applies is located within a TRCA Regulated Area of • the Rouge River Watershed. The Emergency Works approval process was used for this particular case given that the damage to the above noted traffic signal at the southwest corner of Bayvievv Avenue and 19th Avenue presented an immediate threat of injury to persons, loss of life or loss of property. Upon notification of the _damage, TRCA staff met on -site with Region of York staff to discuss the project and assess the site conditions. Following our meeting, a permit was issued and the works that were carried out. The works consisted of the replacement of a wooden traffic signal pole in a 2 metre deep augured hole, stabilized with native fill and seed. The new pole was placed 1.5 metres to the east of the existing damaged pole to minimize potential disturbance to the adjacent watercourse. Erosion and sediment controls (i.e., silt fence) were erected prior to the commencement of any work, and the applicant has confirmed that they have remained throughout all phases of construction. All excavated soils have been removed from the site. Control of Flooding: The subject site is located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters were anticipated. 53 Pollution: Appropriate erosion and sediment controls (i.e., silt fence) were installed and maintained on the subject site throughout all phases of construction. Dynamic Beaches: • Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project Conservation of Land: No significant vegetation was removed as a result of construction. Plantings The applicant has identified that the disturbed areas were restored to original conditions following construction with a native and non - invasive seed mix composition. Policy Guidelines: The, proposal complied with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40370 - Application #: 031/08/RH Report Prepared by: Lisa Stern; extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: February 27, 2008 TOWN OF WHITCHURCH - STOUFFVILLE 8.1.33 REGIONAL MUNICIPALITY OF YORK To construct, reconstruct, erect or place a building or structure, temporarily or permanently place, dump or remove any material, originating on the site or . elsewhere and alter a watercourse on Lot 35., Concession 7 (watercourse crossing on Stouffville Road approximately 300m East of. McCowan Road), in the Town of Whitchurch - Stouffville, Rouge River Watershed as located on the property owned by Regional Municipality of York. The purpose is to construct and temporary /permanently remove /place fill /material in a regulated area and Regional Storm Flood plain to facilitate the construction of a watermain on the south side of Stouffville Road, crossing beneath a tributary of the Rouge Watershed approximately 300 metres east of McCowan Road, within the fisheries cold -water timing window of June 15 to September 15. The method for construction across the watercourse is Horizontal Directional Drilling (HDD). If frac - out(s) occur and HDD is no longer feasible, York Region will propose an alternate construction method for crossing the watercourse as a contingency measure, which may include in water works (alteration to a watercourse). Alternate construction method(s) will only be approved by TRCA staff through a revision to this permit if York Region submits a proposal to the satisfaction of . TRCA staff. . 54 The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to provide revisions to the engineering drawings, to provide further information as required, and to address TRCA comments, all to the satisfaction of TRCA; prepared by the Town of Whitchurch - Stouffville; dated February 20, 2008; received by TRCA February 20, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: Background The Town of Whitchurch - Stouffville (TOWS) currently receives its water supply from groundwater sources. A Municipal Class Environmental Assessment (EA) - Schedule B was filed by York Region in 2006 that identified the preferred solution for additional water supply to meet future growth in the TOWS. Additional water supply is required by.2009. The preferred solution is to extract additional water supply from Lake Ontario via the York Water System (YWS) and use it in combination with the existing groundwater supply. The additional lake based supply will provide approximately 25% of the Town's water supply. The additional water supply extraction will be undertaken by constructing a connection and booster station at the existing Markham Reservoir located south of Stouffville Road and east of McCowan Road. A watermain will then be constructed from the booster station to McCowan Road, where it will extend along the east side of McCowan Road north to Stouffville Road, at which point it will, run east along the south side of Stouffville Road. This application is for approval for York Region to construct the connection and booster pumping station at the Markham Reservoir and the watermain from this location to a point on Stouffville Road approximately 400 metres west of Highway 48. The EA also assessed watermain requirements eastward from this point to Ringwood Drive (passing Highway 48) to connect to the exiting system, and north on Hwy. 48 from Stouffville Road to Millard Street. _The Town of Whitchurch - Stouffville will be submitting a detailed design package in the future for a permit applic.ation to complete the watermain connection eastward from'the limit of York Region's contract . Watermain works were approved by TRCA through issuance of an Ontario Regulation 166/06 permit ( #C- 07464) to the TOWS in 2007 for connection to the existing system at Ringwood Drive and north on Highway 48 to Millard Street.. Regulated .Construction Works Proposed works within the regulated area include construction of the watermain on Stouffville Road where it crosses a watercourse on the south side, approximately 300 metres east of •McCowan Road.. Within the regulated area the watermain will be constructed by directional drilling approximately 2.8 metres below the watercourse. Works will be undertaken in the Regional Storm Floodplain including the construction of a temporary exit shaft for the directional drilling procedure, and the construction of a permanent underground valve chamber with a watertight lid. All post- construction grades in the regulated area and Regional Storm Floodplain will match existing grades. All other works apart from the directional drilling procedure will be constructed by open -cut methodology. 55 A contingency plan in the event that frac -out occurs during construction will be in place on the detailed design drawings. If it is determined during construction that directional drilling is not feasible due to frac -out, the proponent will be required to propose another suitable method for crossing the watercourse (i.e. jack and bore, open -cut of the watercourse) and obtain a revision to this permit from TRCA by submitting updated information as required by TRCA staff, to confirm the alternative method will not have significant impacts on the natural environment. During construction effective erosion and sediment control .(ESC) measures will be implemented to protect all natural features (aquatic and terrestrial). Any water derived from groundwater dewatering or pumping of open cut trench excavations will be managed to prevent impacts to surrounding natural environmental features. Control of Flooding: The storage or conveyance of floodwaters will not be impacted by the proposed works as final grades are to match existing grades in.the flood plain. Pollution: Standard erosion and sediment control measures (silt /sediment fence, rock check dams, etc.) will be implemented and maintained for the duration of construction and until the site is stabilized and restored to prevent construction generated sediment from entering any watercourse. Dynamic Beaches: Not applicable. Erosion: There will be nb slope stability concerns with the proposed project. Conservation of Land:. With erosion and sedimentation control plans and frac -out contingency plans in effect, impacts to the aquatic environment are not anticipated and the Fisheries and Oceans Canada (DFO) Operational Statement for High- Pressure Directional Drilling will apply for these works. Plantings All disturbed areas will be' restored to better than existing conditions with native /non- invasive species following construction. A.planting' plan will be implemented. to provide a net environmental gain in.the regulated area and riparian corridor of the watercourse. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. The location of the works is within the Oak Ridges Moraine (ORM) and Greenbelt. The project has been reviewed for the tests and best management practices described in Section 41(5)(a to • e) of the Oak Ridges Moraine Conservation Plan and complies with the Greenbelt Plan. 56 CFN: 39186 - Application #: 243/07/WS Report Prepared by: Chris Barber, extensioh 5715 For information contact: Chris Barber, extension 5715 Date: February 26, 2008 TOWNSHIP OF KING 8.1.34 TOWNSHIP OF KING To construct, reconstruct, erect or place a building or structure, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and interfere with a wetland on Lot 8, 9, Concession 3 (King City - Contract Area 6B), in the Township of King, Humber River Watershed as located on the property owned by Township of King. The purpose is to construct, place /remove fill /material within the wetland interference.limit and regulated area to install a sanitary sewer within King City Contract Area 6B. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to provide revisions to the engineering drawings, to provide further information as required, and to address TRCA comments, all to the satisfaction of TRCA; prepared by the Township of King; dated February 20, 2008; received by TRCA February 21, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: • Proposal: The King City Sanitary Sewer project was reviewed by TRCA staff during the Environmental . Assessment process. King City is being serviced with sanitary."sewers and local pumping stations to take existing residents off sewage septic systems and to plan for future growth: All sewage will ultimately discharge to the York Durham Sewage System (YDSS) on Yonge Street once all servicing has been constructed. There are a total of 13 contract areas of which nine (9) have already been constructed or are currently being constructed. This application has been submitted for Contract Area 6B, which will involve the.construction of a 200 millimetre diametre sanitary sewer by open -cut methodology in municipal road right -of -ways and easements at the northern end of King City. A portion of the works are located within regulated areas on Curtis Crescent, Tawes Trail Easement, and Tawes Trail. • During construction effective erosion and sediment control (ESC) measures will be implemented to protect all natural features (aquatic and terrestrial). Any water derived from . groundwater dewatering or pumping of open cut trench excavations will be managed to prevent impacts to, surrounding natural environmental features. Control of Flooding: The proposed project will not have significant impacts on the storage or conveyance of . floodwaters. 57 Pollution: Standard erosion and sediment control measures (silt /sediment fence, catchbasin silt control filter, etc.) will be implemented and maintained for the duration of construction and until the site is stabilized and restored to prevent construction generated sediment from entering any wetland /watercourse. Dynamic Beaches: Not applicable. Erosion: There are no slope stability concerns with the proposed project. Conservation of Land: With erosion and sedimentation controls in effect impacts to the aquatic and terrestrial 'environment are not anticipated. Plantings . All disturbed areas will be restored with native /non- invasive species following construction, as required. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. The location of the works is within the Oak Ridges Moraine (ORM) and Greenbelt. The project has been reviewed for the tests and best management practices described in Section 41(5)(a to e) of the Oak Ridges Moraine Conservation Plan and complies with the Greenbelt Plan. CFN: 40277 - Application #: 959/07/KING Report Prepared by: Chris Barber, extension 5715 For information contact: Chris Barber, extension 5715 Date: February 25, 2008 8.1.35 TOWNSHIP OF KING ••To construct, reconstruct, erect Or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on . the site or elsewhere and interfere with a wetland on Lot 8, 9, Concession 3 (King City - Contract Area 4C), in the Township of King, Humber River Watershed as located on the property owned by Township of King. The purpose is to construct,•site grade, place /remove fill /material within the wetland interference limit and regulated area to install a sanitary sewer, the Collard Drive Pumping Station and a sanitary forcemain within King City Contract Area 4C. Works within the regulated area on Station Road will be constructed during the cold -water fisheries timing window of June 15 to September 15. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: 58 • Letter of Undertaking to provide revisions to the engineering drawings, to provide further information as required, and to address TRCA comments, all to the satisfaction of TRCA; prepared by the Township of King; dated February 20, 2008; received by TRCA February 21, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The King City Sanitary Sewer project was reviewed by TRCA staff during the Environmental Assessment process. King City is being serviced with sanitary sewers and local pumping stations to take existing residents off sewage septic systems and to plan for future growth. All sewage will ultimately discharge to the York Durham Sewage System (YDSS) on Yonge Street once all servicing has been constructed. There are a total of 13 contract areas of which nine (9) have already been constructed or are currently being constructed. This application has been submitted for Contract Area 4C. Sanitary Sewer, Forcemain, Storm Sewer Replacement Contract Area 4C involves the construction of a 200 millimetre (mm) diametre sanitary sewer and 107 mm diameter forcemain by open -cut methodology in municipal road right -of -ways. A portion of the sanitary sewer is located within regulated areas on Collard Drive, Burns Boulevard, Findlay Avenue, and Station Road. A portion of the sanitary forcemain is located within a regulated area on Collard Drive and Burns Boulevard. On Station Road, the sanitary sewer will connect to the existing sanitary sewer immediately adjacent to the west side of the watercourse (existing culverts). Works within the regulated area on Station Road are to be completed during the cold -water fisheries timing window (June 15 to September 15). A portion of these works are also located within the estimated Regional Storm Floodplain, however grades post construction will match existing grades. A section of 600 mm diameter storm sewer will be replaced within a regulated area on Burns Boulevard. Collard Drive Sewage Pumping Station Construction of the Collard Drive Pumping Station will be within the municipal right -of -way on the east side of Collard Drive, south of Burns Boulevard. The station will be predominantly underground, however and area of approximately 2.5 metres by 2.5 metres and 1.5 metres above ground will be located within the regulated wetland interference limit. The proponent will provide an emergency overflow for this pumping station to protect the nearby residential areas from sewage back -up in the event of a complete failure of the pumping station. The overflow will discharge into the existing storm sewer manhole that outlets to a watercourse north of Collard Drive. This overflow will be located in a sanitary manhole upstream of the pumping station. Based on the local topography, the only available outlet for an emergency overflow for the pumping station is the existing 300 mm diameter storm sewer that outlets to the existing watercourse as identified above. The overflow will be a 200 mm diameter pipe extending from proposed manhole MH281C to the existing storm sewer manhole on Collard Drive. The overflow pipe will be sized to handle the ultimate peak design flow of the pumping station. To reduce the risk of a complete failure of the 'pumping station, a number of contingency features have been included in the design of the station. 59 A check valve will be installed to prevent the inflow of water into the sewer system in the event of a storm. The check valve will be a "duck- billed" type and will be installed in a separate manhole between the sanitary manhole and the storm manhole. This will protect the valve from siltation and debris and allow for easier maintenance. Construction and Environmental Management Plan (EMP) During construction effective erosion and sediment control (ESC) measures will. be implemented to protect all natural features (aquatic and terrestrial). Any water derived from groundwater dewatering or pumping of open cut trench excavations will be managed to prevent impacts to surrounding natural environmental features. Further, any dewatering will be monitored throughout construction and mitigation measures for potential effects identified implemented in accordance with the approved EMP. • Control of Flooding: The proposed project will not have significant impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (silt /sediment fence, catchbasin silt control filter, etc.) will be implemented and maintained for the duration of construction and until the site is stabilized and restored to prevent construction generated sediment from entering any wetland /watercourse: Dynamic Beaches: Not applicable. Erosion: There are no slope stability concerns with the proposed project. Conservation of Land: For works in the regulated area on Station Road, immediately west of the watercourse, with erosion and sedimentation control plans in effect the potential for a harmful alteration, disruption or destruction•(HADD).of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). Otherwise, impacts to the aquatic and terrestrial environment are not anticipated. Plantings All disturbed areas will be restored with native /non- invasive species following construction, as required. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. The location of the works is within the Oak Ridges Moraine (ORM) and Greenbelt. The project has been reviewed for the tests and best management practices described in Section 41(5) (a to e) of the Oak Ridges Moraine Conservation Plan and complies with the Greenbelt Plan. 60 •CFN: 40278 - Application #: 960 /07 /KING Report Prepared by: Chris Barber, extension 5715 For information contact: Chris Barber, extension 5715 Date: February 25, 2008 8.1.36 TOWNSHIP OF KING To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 6, 7, Concession 3 (King City - Contract Area 6A2), in the Township of King; Humber River Watershed as located on the property owned by Township of King. The purpose is to construct, place /remove fill /material within a regulated area to install a sanitary sewer and reconstruct the road pavement structure within King City Contract Area 6A2. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to provide revisions to the engineering drawings, to provide further information as required, and to address TRCA comments, all to the satisfaction of TRCA; prepared by the Township of King; dated February 20, 2008; received by TRCA February 21, 2008. RATIONALE The application was reviewed. by staff on the basis of the following information: Proposal: The King City Sanitary Sewer project was reviewed by TRCA staff during the Environmental Assessment process. King City is being serviced with sanitary sewers and local pumping stations to take existing residents off sewage septic systems and to plan for future growth. All sewage will ultimately discharge to the York Durham Sewage System (YDSS) on Yonge Street once all servicing has been constructed. There are a total of 13 contract areas of which nine (9) have already been constructed or are currently being constructed. This application has been submitted for Contract Area 6A2, which will involve the construction of a 200 millimetre diametre sanitary sewer by open -cut methodology in municipal road right -of -ways on various streets in Contract Area 6A2. A portion of the works are located within regulated areas on Dennison Street, East Humber Drive, and.Valleycrest Drive. Full reconstruction of the pavement structure is proposed on Dennison Street, East Humber Drive and Valleycrest Drive. The existing urban section will be reconstructed to match the existing urban profile and road widths. Urban sections will include removal and replacement of curb and gutter, sidewalks (where they exist) and installation of subdrains. For all works proposed in the Regional Storm Floodplain, post- construction grades will match existing grades. During construction effective erosion and sediment control (ESC) measures will .be implemented to protect all natural features (aquatic and terrestrial). Any water derived from groundwater dewatering or pumping of open cut trench excavations will be managed to- prevent impacts to surrounding natural environmental features. . 61 Control of Flooding: The proposed project will not have significant impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (silt /sediment fence, catchbasin silt control filter, etc.) will be implemented and maintained for the duration of construction and until the site is stabilized and restored to prevent construction generated sediment from entering any wetland /watercourse. Dynamic Beaches: Not applicable. Erosion: . There are no slope stability concerns with the proposed project. Conservation of Land: With erosion and sedimentation controls in effect impacts to the aquatic and terrestrial environment are not anticipated. Plantings • All disturbed areas will be restored with native /non- invasive species following construction, as required. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. The location of the works is within the Oak Ridges Moraine (ORM) and Greenbelt. The project has been reviewed for the tests and best management practices described in Section 41(5) (a to e) of the Oak Ridges Moraine Conservation Plan and complies with the Greenbelt Plan. CFN: 40279 - Application #: 961/07/KING Report Prepared by: Chris Barber, extension 5715 For information contact: Chris Barber, extension'5715 Date: February 25, 2008 THE FOLLOWING PERMIT APPLICATIONS WERE ERRATA ITEMS: RES.#B6/08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS Moved by Seconded by: • Richard Whitehead David Barrow 62 THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.38 - 8.1.47, inclusive (8.1.37 - 2058433 Ontario Ltd. and 8.1.48 - 11 Buttonville Crescent East were withdrawn)),•that had been scheduled on the agenda as errata applications for which all the required information was received and finalized as listed below. CARRIED CITY OF BRAMPTON 8.1.37 '2058433 ONTARIO LTD. To construct, reconstruct, erect or place a building or structure and site grade on Part Lot 3, Concession 2 EHS, (329 Clarence Street), in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by 2058433 Ontario Ltd.. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate an addition to an • industrial building. • Withdrawn 8.1.38 PARKSHORE GOLF CLUB (1083131 ONTARIO LTD.) To alter a watercourse on Lot 14, Concession 8 EHS, (7797 Goreway Drive), in the City of Brampton, Mimico Creek Watershed as located on the. property owned by Parkshore Golf Club (1083131 Ontario Ltd.). The purpose is to undertake works within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of'a weir intake structure to provide irrigation for the adjacent Parkshore Golf Club, located.in the City of Brampton. The permit will be issued for the period of March 7, 2008 to March 6, 2010. • Letter of Undertaking, prepared by T. Elias, R.J. Burnside and Associates Limited, dated March 5, 2008, to address all outstanding ecology related issues. RATIONALE _ The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a weir intake structure to provide water for irrigation purposes on the adjacent Parkshore Golf Club, located in the City of Brampton. Currently, the Parkshore Golf Course.takes water directly from a tributary traversing the subject lands associated with the Mimico Creek Watershed, using an informal weir intake structure. The current structure has been identified as a fish barrier. To formalize,the weir intake structure, the proponent has applied for a Permit to Take Water (PTW) from the Ministry • of the Environment (MOE). As required by MOE, the proponent is required to replace the current structure (which currently exceeds MOE's requirements for water intake) and install a correctly designed weir intake structure. In -water works will be required to facilitate this project. and during construction, all works will be completed in the 'dry'. The work area will be sealed off by implementing a coffer dam in accordance with TRCA's guidelines. The installation of the new weir intake will ensure that proper water levels are maintained for baseflow conditions. In 63 addition, the golf course has agreed to implement low water response measures as part of a Drought Management Plan, where water intake is decreased according to low water level alerts. In addition, the weir structure and channel banks will be properly stabilized using bioengineering techniques, such that it will not create unstable' bank conditions or contribute to erosion up or downstream. Enhancement riparian plantings and live planting stakes have been incorporated into the design of this project along the channel banks and within the golf course • limits in order to improve the ecological condition of this area. Control of Flooding: No excavated materials are proposed to be placed within the Regional Storm Floodplain. In addition, no equipment will be stored within the floodplain. As such, the proposed works associated with this application are not expected to result in any negative impacts to the storage and /or conveyance of floodwaters. Pollution: Standard sediment and erosion control measures (cofferdam, silt fence) will be implemented and maintained for the duration of construction in order to prevent construction generated sediment from entering any watercourse. Dynamic Beaches: Not-applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice (LOA) will be issued with this perrriit on behalf of Fisheries and Oceans Canada (DFO). This application is . subject to the Ministry of Natural. Resources (MNR) warm water fisheries timing window and any in- stream works must be completed between July 1 and March 31. In addition, enhancement plantings are proposed along the banks of the watercourse. Plantings All enhancement plantings are native and non - invasive in accordance with TRCA's planting guidelines. Policy Guidelines: The proposal is consistent with Section 4.3 - Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 39332 - Application #: 355/07/BRAM . Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: February 27, 2008 64 CITY OF PICKERING 8.1.39 1986 ROYAL ROAD To construct, reconstruct, erect or place a building or structure on Part Lot 16, Plan 316, (1986 Royal Road), in the City of Pickering, Duffins Creek Watershed. . The purpose is to construct a two storey addition within a Regulated Area of the Duffins Creek Watershed. The permit will be issued for the period of March 7, 2008 to March 6, 2010. • Drawings No. 1, Basement Plan, dated February 20, 2008, prepared by New Castle Drafting & Design, received March 3, 2008; • Drawings No. 2, Floor Plan, dated February 20, 2008, prepared by New Castle Drafting & Design, received March 3, 2008; • Drawings No. 3, Second Floor Plan, dated February 20, 2008, prepared by New Castle Drafting & Design, received March 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: . Proposal: The proposal consists of constructing a two storey addition to an existing house located within the floodplain of the Duffins Creek Watershed. This property is not located within a Special Policy Area. Control of Flooding: TRCA technical staff have reviewed the proposal and have determined that the works will not affect the storage or conveyance of flood waters. The proposed addition is approximately 50% of the original size of the house,. making, it a minor addition. Under TRCA's VSCMP an addition within the floodplain is allowed if it is not a major addition and' it meets the other policies of the program. The proposed addition will be floodproofed to the Regional .Storm Flood Elevation. Pollution: Sediment fencing will not be required as the proposed works are located away from the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues associated with this proposal. Conservation of Land: There will be no significant vegetation removed as part of this proposal. Plantings No plantings are required. 65 Policy Guidelines: This proposal is consistent with Section 4.2.2 C, Minor Additions, of TRCA's Valley and Stream Corridor Management Program. CFN: 40247 - Application #: 941/07/PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: February 22, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.40 171 LAKE PROMENADE To construct, reconstruct, erect or place a building or structure on 171 Lake Promenade, in the City of Toronto (Etobicoke York Community Council Area), Waterfront Watershed, The purpose is fo develop.within a TRCA Regulated Area of the Waterfront Watershed in order to facilitate the reconstruction of an existing seawall structure along the shoreline of the existing residential property..The existing seawall is to be demolished. The permit will be issued for the period of March 7, 2008 to March 6, 2010. • Drawing No. 1, Site Plan, prepared by Trow Associates Inc., dated October 13, 2007, received on December 28, 2007; • Drawing No. 3, Proposed Plan, prepared by Trow Associates Inc., dated October 13, 2007, received on .December 28, 2007; • Drawing No. 4, Sections, prepared by Trow Associates Inc., dated October 13,2007, received on December 28, 2007; • Drawing No. 5, Details, prepared by Trow Associates Inc., dated October 13, 2007, received on December 28, 2007. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Waterfront Watershed in order to facilitate the construction of a replacement.seawall structure. The subject site is located south of Lakeshore Boulevard W, east of Browns Line and abuts the shoreline of Lake Ontario in the City of Toronto. The existing seawall structure is failing and will be demolished. Both the existing and proposed seawall structure are comprised of an upper and lower deck, storage room and stairway access. The design of the proposed structure effectively decreases.the associated risks by reducing the extent of the lower deck. Control of Flooding: The subject site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. • 66 Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering Lake Ontario. Dynamic Beaches: Not applicable. Erosion: A slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance to the recommendations of this report. Further to this, the Applicant has agreed in writing to retain the services of a geotechnical consultant to be present on site during demolition and construction. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this application. Policy Guidelines: The proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the Authority's Valley and Stream Corridor Management Program. CFN: 40310 - Application #: 004 /08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 26, 2008 8.1.41 SENECA COLLEGE OF APPLIED ART AND TECHNOLOGY To construct, reconstruct, erect or place a building or structure on Lot 10, Concession 5 WYS, (21 Beverly Hills Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as Iodated on the property owned by Seneca College of Applied Art and Technology. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 40 metre monopole communication tower with a 12' x 16' equipment shelter. The permit will be issued for the period of March 7, 2008 to March 6, 2010. • Drawing unnumbered, Proposed plan of Survey, prepared by Lanthier & Gilmore Surveying Ltd., dated August 22, 2007, Revision No. 1, revised on February 12, 2008, received on February 19, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 67 Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 40 metre monopole communication tower with a 12' x 16' equipment shelter. . Control of Flooding: The subject property is located within the Regional Storm Flood Plain of the Humber River Watershed. However, TRCA staff have determined the proposed works will not adversely impact the storage and /or conveyance of floodwaters. Pollution: Sediment control fencing is not required .as the proposedworks are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: • No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this proposed development. Policy Guidelines: The proposal is consistent with Section 4.3. - Development Guidelines for Infrastructure and Servicing of the TRCA's Valley and Stream Corridor Management Program. CFN: 40513 - Application #:• 112/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 26, 2008 CITY OF VAUGHAN 8.1.42 BOCA EAST INVESTMENTS LTD. . To site grade and temporarily or permanently place, •dump.or remove any . material, originating on the site or elsewhere on Lot 12 :15, Concession 10 , between Rutherford Road, Huntington Road, Langstaff Road and Highway 50 (Planning Block 64), in the City of Vaughan, Humber.River Watershed as located. on the property owned by Boca East Investments Ltd. The purpose is to conduct site grading, temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a tributary of the Humber River, in order td conduct grading works and construct a series of temporary sediment ponds and outfalls, in order to facilitate servicing on Planning Block 64, in the City of Vaughan. 68 The permit will be issued for the period of March 7, 2008 to March 6, 2010. • Letter of Undertaking, prepared by Mr. David Kellershohn, Schaeffers Consulting Engineers, dated February 14, 2008, received February 21, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to conduct site grading, temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a tributary of the Humber River, in order to conduct topsoil stripping works and construct four (4) temporary sediment ponds and associated outfalls, in order to facilitate the servicing of Planning Block 64, in the City of Vaughan. Planning Block 64 is bounded by Rutherford Road to the north, Highway 50 to the west, Langstaff Road to the south and to the east by Huntington Road. There is an approved Master Environmental Servicing Plan (MESP) in place for Planning Block 64. This was approved earlier in 2005. During the MESP process, the limits of the Humber River valley corridor in this area were identified and delineated. Since the approval of the Block 64 MESP, TRCA staff has received and draft approved a related draft plan of subdivision (19T- 06V13). The subject works will address one of the conditions of draft plan approval, specifically as it relates to grading works on the subject site. The proposed works involve topsoil stripping works for the whole block including lands outside . and within the TRCA's Regulated Area for the Humber River. In addition, the applicant proposes to construct four (4) temporary sediment ponds to treat stormwater flows from the stripped site, prior to its discharge into the watercourse. A comprehensive erosion and sediment control plan has been submitted which includes the use of extensive environmental fencing cut -off swales, rock check dams, topsoil stockpiles, mud mat entrances along with'the aforementioned sediment ponds. Once construction activities are completed, all disturbed areas are to be stabilized through seeding (using a temporary erosion control mix). Inspectors will be on site to ensure the . continued effectiveness of erosion and sediment control measures. These inspections will'be carried out after every rainfall event and a minimum of once every week. Control of Flooding: The proposed grading works will be take place outside of the established development limits and outside the Regional Storm Flood Plain. As such, the storage or conveyance of flood waters will not be impacted by the proposed works. Pollution: Erosion and sediment control measures (as outlined above) will be implemented prior to construction and maintained for the duration of the works to ensure that sediment does not enter the nearby watercourse and adjacent valley corridor. 69 Dynamic Beaches: Not applicable. Erosion: Erosion will be minimized through the implementation of the aforementioned sediment control measures. There are no geotechnical /slope stability issues associated with the works. Conservation of Land: Given the discharge of.treated stormwater flows into a tributary of the Humber River, a Letter of Advice will be issued on behalf of Fisheries and Oceans Canada (DFO). Plantings • Temporary seed mix will be used after the grading works are completed. A comprehensive and robust planting plan, along with a valleyland restoration plan will be submitted as part of the detailed design works for the associated draft plan of subdivision . Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 40101 - Application #: 906 /07/VAUG Report Prepared by: Kevin Huang, extension 5307 . For information contact: Kevin Huang, extension 5307 Date: February 26, 2008 8.1.43 REGIONAL MUNICIPALITY OF YORK To construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade; temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 1 TO 5, Concession 2 TO 3; (Dufferin Street (Y.R. 53) from Steeles Avenue to Glen Shields Avenue (North) /Draper Boulevard), in the City of Vaughan, Don River Watershed as located on the property owned by Regional Municipality of York. The purpose is to site grade, temporarily or • permanently place, dump or remove any material (for Dufferin Street widening from 4 to 6 lanes plus turning lanes; for removing and reconstructing asphalt, islands; curbs, sidewalks, bus pads, catchbasins, manholes, storm sewers, headwall /outfalls, and constructing two new Oil Grit Separators (OGS) and new landscaped medians in a Regulated Areas between Stations-1+300 to 1. +700 and Stations 2 +200 to 2 +660; to change a structure.( from an open parapet wall to a solid parapet wall on the bridge at Station 1 + 610) and to construct new structures (asphalt, medians, sidewalks, bus pads, headwalls /outfalls, toe wall) within a Regional Storm Floodplain; to temporarily alter a watercourse ( tributary of. West Don River) during the warmwater timing window (July 1 to March 31) through isolation methods in order to construct the outfall /head walls at Stations 1 +450 and 1 +600 and Oil Grit Separators at Stations 1 +630 and, 2 +430 in the dry. 70 The permit will be issued for the period of March 7, 2008 to March 6, 2010. • Letter of Undertaking (to provide revised contract drawings /documents.to the satisfaction of TRCA staff on or before April 7, 2008;); dated February 28, 2008; received February 29, 2008; prepared by the Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The entire $9 million dollar contract consists of the widening 1.68 kilometres of Dufferin Street from 4 to 6 lanes plus turning lanes from Steeles Avenue in the south to Glenn Shields Avenue /Draper Boulevard in the north, which is south of Highway 407. TRCA staff has concern for the areas within the regulation lines surrounding the bridge across West Don River between Stations 1 +300 to 1 +700 in the south, surrounding the Westminster Creek that runs parallel to the east side of Dufferin Street in the north between Stations 2 +200 to 2 +660 as well as the TRCA owned lands south of the CN crossing at Station 1 +415. Both the West Don River and the Westminster Creek have Regional Storm Floodplains associated with them. There will be no in water works associated with this project, however, there will be near water works that will require standard erosion and sediment controls. The works will involve the excavating and the placing of fill for the road widening works from 4 to 6 lanes, which generally include the installing of the storm sewers and oil grit separators, the changing of the existing open parapet wall to a solid parapet wall on the bridge, and the constructing of two outfalls /headwalls and two Oil Grit Separators for water quality. Dufferin Street is the first of the Regional Municipality of York's roads to follow the new "Towards Great Regional Streets" Design Guidelines that will provide a vegetated median, a dedicated bus /High Occupancy Vehicle (HOV) lane in each direction as well as bike lanes and pedestrian walkways in combination with the 4 lanes of regular traffic. The works on TRCA' s owned lands involve grading back a hill to facilitate the road widening. No structures will be constructed on TRCA's lands,. and Region of York staff has advised there will be no need for maintenance in the future on these lands that need to be graded. The project was reviewed by TRCA Staff during the Environmental Assessment process through file CFN 36041. Control of Flooding: TRCA Staff has reviewed the hydraulic model for changing from an open parapet wall to a closed parapet wall and has determined that there will not be any negative impacts to flooding. Pollution: Standard erosion control measures will be implemented to ensure that the construction - generated sediments do not enter the watercourse. Oil grit separators will be constructed at 2 locations to enhance .water quality. Dynamic Beaches: Not applicable 71 Erosion: The Storm Water Management (SWM) Report has been reviewed by TRCA staff and the plans by the Region of York will addressed erosion. Conservation of Land: There will be near water works associated with this project. The two outfalls /head walls draining to the West Don River will be constructed on the east side of Dufferin Street with one located north of the bridge and another just -north of the CN tracks. As well two Oil Grit Separators (OGS) will be constructed near water, one near the bridge over the West Don River in the south and the other near the north end of the project limits- close.to Westminister Creek. Both the outfalls and OGSs will be isolated from the tributaries to the watercourses with standard erosion and sediment controls. With erosion and sedimentation plans in effect, the potential for -a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Fisheries and Oceans Canada (DFO). The proposed works will impact no significant terrestrial resource features. There is a section within the project limits that will be graded to facilitate the road widening on lands owned by the TRCA south of the CN tracks, on the east side of Dufferin Street. An archaeological investigation was conducted in 2007.on.the area to be graded and clearance has been received by TRCA's archaeologist from the Ministry of Culture. The TRCA's Real Estate Co- ordinator will be preparing a Permission To Enter (PTE) for the temporary working easement and the PTE will be issued at the same time as the TRCA permit. Plantings All disturbed areas will be restored with native /non - invasive species following construction. The Regional Municipality of York has provided a net benefit with the proposed plantings around the West Don River in the right of way and in the medians. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley. and Stream Corridor Management Program. - • CFN: 38529 - Application #: 775/06NAUG Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: February 26, 2008 72 TOWN OF CALEDON 8.1.44 PEEL DISTRICT SCHOOL BOARD To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any rriaterial, originating on the site or elsewhere at Macville Public School, Town of Caledon, Humber River Watershed, as located on the property owned by Peel District School Board. The purpose is to construct, reconstruct, erect or place a building or structure (sewage system) and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere at Macville Pubiic School, Town of Caledon, Humber River Watershed. The permit will be issued for the period of March 7, 2008 to March 6, 2010. • Letter of Undertaking to provide revisions to the engineering drawings to the satisfaction of TRCA; dated March 3, 2008; received March 4, 2008; prepared by Robbie/Young +Wright Architects. RATIONALE The application'was reviewed by staff on the basis of the following information: Proposal: This proposal consists of the construction of a new sewage system for Macville Public School to allow for an increased number of students and staff. The existing sewage system is considered undersized for the present and projected student enrollment and will be abandoned upon completion of the new sewage system. Proposed. works involve constructing a subsurface drainage system around the perimeter of the proposed leaching bed area to allow for gravity drainage of treated effluent offsite. Surface discharge will be to an open roadside ditch at the southeast corner of the property adjacent.to King Road. The Tertiary Sewage Treatment system will incorporate balancing tanks, septic tanks, a Waterloo Biofilter Treatment System, phosphate removal technology and an Aquamend Denitrification Unit. Control of Flooding: There will be no impacts to the control of flooding. Pollution: Standard erosion control measures will be implemented for the duration of construction, and until the site is restored, in order to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: • Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. 73 Conservation. of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). No in -water works will be conducted. Plantings All disturbed areas will be restored following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40411 - Application #: 053 /08 /CAL Report Prepared by: Sharon Lingertat, extension 5717 For information contact: Sharon Lingertat, extension 5717 Date: February 26, 2008 8.1.45 25 KIRKWOOD CRESCENT To construct, reconstruct, erect or place a building or structure at 25 Kirkwood Crescent, in the Town of Caledon, Etobicoke Creek Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a replacement deck structure at the rear of a residential dwelling located at 25 Kirkwood Crescent, in the Town of Caledon. The permit will be issued for the period of March 7, 2008 to March 6, 2010. • Letter of undertaking provided by. P. Bissell, dated March 5, 2008, to address outstanding TRCA ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: • The purpose of this application is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a replacement deck structure at the rear of a residential.dwelling located at 25 Kirkwood Crescent, in the Town of Caledon. The rear of the subject property is. adjacent to a valley corridor. The proposed structure is sufficiently setback from the valley corridor. As such, no geotechnical concerns with this proposal are anticipated. In addition, there are no flooding or ecology related concerns related to this development. No significant vegetation will be removed as a result of construction. Control of Flooding: The existing structure is located outside of the Regional Storm Floodplain. As such, no impact to the storage and /orconveyance of flood waters are anticipated. 74 Pollution: Appropriate sediment and erosion controls (i.e., silt fencing.) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: • There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of this project. There are no fisheries related concerns associated with this proposal. Plantings Enhancement plantings are proposed between the proposed development and the valley corridor. All plant species are native, non - invasive and consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40521 - Application #: 121 /08 /CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: February 27, 2008 8.1.46. 16000 AIRPORT ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 3, Concession 6 Plan Part of Carters Acre, (16000 Airport Road), in the Town of.Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 31.24 square metre (336.27 sq. ft) addition to the rear of the existing LOBO commercial building located at 16000 Airport Road in sthe Town of Caledon. The permit will be issued for the period of March 7, 2008 to March 6, 2010. • Cover Page, Sheet A0.0, prepared by C. Naylor, dated April 2007, Revision No.1, revised on June 22, 2007, stamped received by TRCA Planning & Development staff on February 12, 2008; , • Site Plan, Sheet A0.1, prepared by C. Naylor, dated May 15 2007., Revision No.1, revised on June 22, 2007, stamped received by TRCA Planning & Development staff on February 12, 2008; 75 • Proposed Storage Shed, Sheet A1.0, prepared by C. Naylor, dated April 2007, Revision No.1, revised on June 22, 2007, stamped received by TRCA Planning & Development staff on February 12, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 31.24 square metre (336.27 sq. ft.) addition to the rear of.the existing LCBO commercial building located at 16000 Airport Road in the Town of Caledon. The addition is required to provide recycling storage as part.of the provincial recycling initiative undertaken by the LCBO throughout the Province of Ontario.. At the rear of the property, a tributary of the Humber River Watershed traverses the site: This tributary, which flows in a north -south direction, through much of Caledon East, has been channelized, enclosed and divided by a number of streets and driveway crossings, resulting in sections of open channel alternated by enclosed sections of different lengths and culvert • • capacities: As a result of this condition, the existing building is located entirely within the . Regional Storm Floodplain. The proposed addition will constitute less than 50% of the total gross floor area. In addition, the proposed addition will also be adequately floodproofed; such that all openings (i.e., doors and windows) will be above the Regional Flood elevation. As well, the proposed works have been designed to adequately withstand water flow velocities expected during the Regional Storm event. Control of Flooding: The proposed works are located within the Regional Floodplain. TRCA Water Resources staff have confirmed that the proposed addition is not anticipated to have any significant impacts to . the storage and /or conveyance of flood waters. • Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and'will be maintained throughout all phases of construction. . Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project: Conservation of Land: . The proposed addition is located.within an existing asphalt parking lot :As.such, no significant . vegetation.will be removed as a result of this project. There are no fisheries.related concerns associated with this project. . Plantings . No vegetation is to be removed by the proposed works, and opportunities are not available through this permit to add additional plantings. 76 Policy Guidelines: This proposal is in conformity with Section 4.2.2. (C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 39461 - Application #: 458/07 /CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: February 27, 2008 TOWN OF MARKHAM 8.1.47 HOME BUILDER To construct, reconstruct, erect or place a building or structure, site grade and alter a watercourse on Part Lot 4, 5, Concession 9, (25 to 37 Kentview Crescent), in the Town of Markham, Rouge River Watershed as located on the property owned by Home Builder. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of seven (7) single family detached dwellings. The permit will be issued for the period of March 7, 2008 to March 6, 2010. • Letter of Undertaking, prepared by Oxnard Boxgrove Ltd., dated March 5, 2008, to address all outstanding engineering related issues.. RATIONALE • The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Roger River Watershed in order to facilitate the construction of seven (7) single family detached . dwellings at 25 to 32 Kentview Crescent, in the Town of Markham. The subject lands are located on the west side of a.valley corridor associated with the Rouge River Watershed. The subject lands to which this application applies were reviewed by TRCA staff through a draft plan of subdivision (19TM- 04001), zoning by -law amehdment (ZA_07 108731) and consent application (B05/07). Through the noted subdivision process, TRCA staff staked the top of bank for the adjacent valley corridor feature. The rear of the subject properties are setback a minimum of 10 metres inland from the staked top of bank. As such, TRCA's buffer requirements have been achieved. The proposed works are located outside of the Regional Storm Floodplain. The area to which this application applies is currently an agricultural field and is void of any significant vegetation. Control of Flooding: The subject lands are located outside of the Regional Storm Floodplain. As such, the storage and /or conveyance of flood waters will not be impacted. 77 Pollution: Appropriate erosion and sediment controls have been incorporated into the design of this project and will be installed and maintained during all phases of construction. Dynamic Beaches: Not applicable. Erosion: • There are no geotechnical and /or slope stability concerns related to this project. Conservation of Land: No significant vegetation will be removed as a result of this proposal. Through the related plan of subdivision review, an extensive planting plan was reviewed and approved for the area between this site and the valley corridor to improve the ecological condition of this area. There are no fisheries related concerns associated with this proposal. Plantings All plant species related to the approved enhancement plan are native and non - invasive, consistent with TRCA's guidelines. Policy Guidelines: The proposed works are in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40507 - Application #: 114 /08 /MARK Report Prepared by: Adam Miller, extension 5244 For information contact: Adam Miller, extension 5244 Date: February 27, 2008 8.1.48 11 BUTTONVILLE CRESCENT EAST To construct, reconstruct, erect or place a building or structure on Part Lot 14, Concession 4, (11 Buttonville Crescent East), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the demolition of an existing residential dwelling and the construction of a new residential dwelling. • Withdrawn PERMIT APPLICATIONS 8.1.49 - 8.1.66 ARE MINOR WORKS LETTER OF APPROVAL: RES. #B7/08 - . MINOR WORKS LETTER OF APPROVAL PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Richard Whitehead David Barrow 78 THAT minor works letter of approval granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.49 - 8.1.66, inclusive), which are listed below, be received. CARRIED CITY OF BRAMPTON 8.1.49 574 CONSERVATION DRIVE To construct a ground floor addition up to 50 sq. m (538 sq. ft) on (574 Conservation Drive), in the City of Brampton, Etobicoke Creek. Watershed. CFN: 40421 - Application #: 063 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: January 29, 2008 CITY OF PICKERING 8.1.50 1850 KINGSTON ROAD, UNIT 34 To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on (1850 Kingston Road, Unit 34), in the City of Pickering, Duffins Creek Watershed. CFN' 40483 - Application #: 101 /08 /PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: February 15, 2008 8.1.51 1790 FINCH AVENUE, UNIT 1 To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on (1790 Finch Avenue, Unit 1), in the City of Pickering, Duffins Creek Watershed. CFN: 40108 - Application #: 908 /07 /PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: February 15, 2008 8.1.52 2358 WILDWOOD CRESCENT To construct anon- habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 62, Plan 40M -1542, (2358 Wildwood Crescent), in the City of Pickering, Duffins Creek Watershed. CFN: 40459 - Application #: 081 /08 /PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: February 19, 2008 8.1.53 417 WOODGRANGE AVENUE To install a swimming pool on Part Lot 61, 62, Plan 283, (417 Woodgrange Avenue), in the City of Pickering, Rouge River Watershed. 79 CFN: 40410 - Application #: 052 /08 /PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: January 31, 2008 8.1.54 368 DYSON ROAD To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 44, Plan 283, (368 Dyson Road), in the City of Pickering, Rouge River Watershed. CFN: 40418 - Application #: 060 /08 /PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: January 31, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.55 CITY OF TORONTO To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on, (15 Grierson Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by City of Toronto. CFN: 40312 - Application #: 006 /08 /TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 15, 2008 8.1.56 56 ANTIOCH DRIVE To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 68, Plan 5071, Part Lot 69, Plan 5071, (56 Antioch Drive), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed.. CFN: 40406 - Application #: 048/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Nicole Moxley, extension 5284 Date: January 31, 2008 8.1.57 • 32 FORTY -FIRST STREET To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 283, Plan 2172, (32 Forty -First Street), in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed. CFN: 40427 - Application #: 068/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: January 30,2008 . 80 8.1.58 2 STONEY BROOK DRIVE To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 101, Plan, (2 Stoney Brook Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 40183 - Application #: 923/07/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: January 24, 2008 8.1.59 41 BRULE CRESCENT To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 57, Plan M539, (41 Brule Crescent), in the City of Toronto ( Etobicoke York Community Council Area), Humber River Watershed. CFN: 40249 - Application #: 945/07/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: January 24, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.60 UNIVERSITY OF TORONTO - SCARBOROUGH To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Part Lot 9, 10, Concession NO. 1 (130 Old Kingston Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by University of Toronto - Scarborough. CFN: 39584 - Application #: 545/07/TOR Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: January 30, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.61 759 KINGSTON ROAD To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Part Lot 18, Plan M467, (759 Kingston Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 40420 - Application #: 062 /08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 21, 2008 81 8.1.62 170 PARKVIEW HILL CRESCENT To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 17, Plan 3618, (170 Parkview Hill Crescent), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 40501 - Application #: 111/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 21, 2008 8.1.63 TALL TREED INVESTMENT II .CORPORATION To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on 400 Eastern Avenue, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by Tall Treed Investment II Corporation. CFN: 40419 - Application #: 061/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: January 30, 2008 TOWN OF RICHMOND HILL 8.1.64 L'ARCHE DAYBREAK To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Part Lot 54, 55, Plan 65M -2816, (11339 Yonge Street), in the Town-of Richmond Hill, Rouge River Watershed as located on the property owned by L'Arche Daybreak. CFN: 40492 - Application #: 098/08/RH Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: February 15, 2008 TOWN OF WHITCHURCH - STOUFFVILLE 8.1.65 38 LITTLE ROUGE CIRCLE To install a swimming pool on Lot 163, Plan, (38 Little Rouge Circle), in the Town of Whitchurch - Stouffville, Rouge River Watershed. CFN: 40452 - Application #: 083/08/WS Report Prepared by: Shannon McNeill, extension 5744 For information contact: Shannon McNeill, extension 5744 Date: February 15, 2008 82 , 8.1.66 46 LITTLE ROUGE CIRCLE To install a swimming pool on Lot 16, Plan 65M -3880, (46 Little Rouge Circle), in the Town of Whitchurch - Stouffville, Rouge River Watershed. CFN: 40451 - Application #: 082 /08 /WS Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: February 15, 2008 PERMIT APPLICATION 8.1.67 IS PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS: RES. #B8/08 - PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS • PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Richard Whitehead David Barrow THAT permission for routine infrastructure granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for application 8.1.67 - Toronto Hydro Energy Services, which are listed below, be received. CARRIED CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.67 TORONTO HYDRO ENERGY SERVICES To undertake sewer, watermain or utility installation or maintenance within an existing roadway on The West Mall from the Queensway to West•Mall Crescent, in the City of Toronto (Etobicoke York Community Council.Area), Etobicoke Creek Watershed as located on the property owned by the City of Toronto. CFN: 40426 - Application #: 067/08/TOR Report Prepared by: Alex Blasko,.extension 5714 For information contact: Alex•Blasko, extension 5714 Date: February 5, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.68 28 DONWOODS DRIVE To construct, reconstruct, erect or place a building or structure on Lot 41, Plan 2343, (28 Donwoods Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction. of a new two - storey dwelling. The existing dwelling is to be demolished. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: 83 • Drawing No. A -1, Site Plan, prepared by Peter Higgins Architect Inc., dated June 2007, revised January 2, 2008, received by TRCA February 20, 2008; • Drawing No. A -2, Landscape Plan, prepared by Peter Higgins Architect Inc., dated June 2007, revised January 2, 2008, received by TRCA February 20, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include. construction of a new two- storey dwelling at 28 Donwoods Drive in the City of Toronto. The site is located south of York Mills Road, east of Yonge Street. The existing dwelling is to be demolished. Control of Flooding: The site is not located in the Regional Storm.Floodplain. Pollution: Sediment fencing is not required as the proposed works are located in the valley and are adequately set back from the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No•significant vegetation will be removed as a result of construction. Appropriate tree protection fencing will be installed. Plantings Native tree shrubs. and seed mix will be planted. Policy Guidelines: This proposal is consistent with Section 4.2.1.B, Development Guidelines for Development /Redevelopment within Designated Two_Zone Areas or Special Policy Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40526 - Application #: 132/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: March 4, 2008 84 CITY OF VAUGHAN 8.1.69 1668137 ONTARIO INC. To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part of Lot 11, Concession 8, (5550 Langstaff Road), in the City of Vaughan, Humber River Watershed as located on the property owned by 1668137 Ontario Inc. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to remediate a contaminated site and to restore an altered valley / stream feature on Part of Lot 11, Concession 8 (5550 Langstaff Road), in the City of Vaughan. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Erosion & Sediment Control Plan (Drawing No. 12), prepared by Skira & Associates Ltd. dated June 2007, received by the TRCA on February 13, 2008; • Final Remedial Action Plan (RAP) V2 Report, prepared by Terra Firma Plus Inc., dated November 8, 2007, received by the TRCA on December 6, 2007. RATIONALE The application was reviewed by staff on the basis of the following information:. Proposal: The purpose of this application is to undertake grading and soil remediation works within a TRCA•Regulated Area of the Humber River which are required in order to facilitate the future development of the site for residential uses. The proposed works, as part of this permit application, are a part of a Remedial Action Plan (RAP) reviewed and approved by City of Vaughan and TRCA staff. Under a previous land owner, the subject property had been filled and used as an illegal landfill prior to 1989. According to the Ministry of the Environment, the site was used as a disposal site and charges were laid under the Environmental Protection Act. This filling had significantly altered the natural features on the site, resulting in the creation of a new.slope feature and alteration to the Regional Storm Flood Plain. The current owner of the property has indicated that the fill material is unsuitable for development and is proposing the removal of the material as part of this permit application. The grading works proposed with this application are required in order to remove contaminated soils that leached contaminants into the adjacent watercourse, as well as to address slope stability issues. Concurrent with the RAP, the proponent is required and has agreed to hire a qualified environmental inspector / engineer to be on -site to ensure that the erosion and sediment control measures to be applied are maintained at all times during the construction of the remediation works on the site. 85 As part of the RAP, the proponent will also use a layered approach to the removal of site material / contaminants. The purpose of this approach is to dig up the site layer by layer in order to ensure the stability of the site and to provide the continued upkeep of the erosion and sediment control measures necessary-to prevent the migration of materials or other matters during the course of construction. In addition, the applicant's related Draft Plan of Subdivision (19T- 06V15) and Zoning By -law Amendment Application (Z.06.74) have been conditionally approved by TRCA staff and provide for the ultimate grading and.replanting design for the future development. Control of Flooding: As part.of the conditions of approval for the related Draft Plan of Subdivision, the proposed top of bank is to be located 0.5 metres above the Regional Storm Flood Elevation. All developable land will be located outside of the Regional Storm Flood.Plain. TRCA water resources staff are satisfied that the slope and grading works will not . impede the storage and conveyance of floodwaters. Pollution:• A temporary drainage ditch with flow regulating rock check dams, outletting to a temporary sediment trap basin, will be constructed to control the transport of sediment and prevent sediment from entering the adjacent watercourse (Rainbow Creek). Additionally, sediment control fencing will be installed and maintained along the outside edge of the temporary . drainage ditch to contain sediment within the'temporary drainage channel. A qualified environmental inspector / engineer will be on -site and site material /contaminant removal will occur in layers to ensure proper erosion and sediment control measures are maintained. Dynamic Beaches: Not applicable. Erosion: TRCA geotechnical staff are satisfied that the proposed works will create a slope with greater stability than existing conditions, suitable for future development. Conservation of Land: The proposed works will remove contaminated soils that once leached contaminants into the adjacent watercourse (Rainbow Creek); thereby providing an improvement over existing conditions. As part of the conditionally approved Draft .Plan of Subdivision application, appropriate buffers will be implemented from the edge of the valley feature to prevent development from impacting the, future stable and vegetated slope /.valley wall. In addition, an Edge Management Plan will be implemented for areas around Rainbow Creek to ensure the protection of the watercourse and wildlife corridor. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings As part of the conditionally approved Draft Plan of Subdivision, all plantings within the site and associated linkages are to be composed of native species. The final re- planting and re- forestation designs are a part of the Draft Plan of Subdivision application. 86 Policy Guidelines: . The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary. Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 40517 - Application #: 120 /08 /VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: March 5, 2008 TOWN OF CALEDON 8.1.70 RIVER'S EDGE BOLTON LTD. C/O KIRK MAWHINNEY To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump.or remove any material, originating on the site or elsewhere on Lot 53, 63, Plan 43R- 20636, (60 Ann Street), in the Town of Caledon, Humber River Watershed as located on the property owned by River's Edge Bolton Ltd. c/o Kirk Mawhinney. The purpose is to construct a new residential condominium building within the Bolton Special Policy Area. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of undertaking provided by Frank Mazzotta, Armour Heights Developments, dated March 5, 2008, to address outstanding TRCA issues prior to the issuance of the permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This permit application is to permit the construction of a new multi- storey residential condominium building, and associated amenities within the Bolton Special Policy-Area (SPA), directly adjacent to Humber River Main Branch, in the Town of Caledon. The 'subject property, more specifically known as 60 Ann Street, is located north of King Street West, west of Queen Street within the Humber River valley in the historic community of the Village of Bolton. Development was previously contemplated on the subject property by Humber Manor Developments in the early 1990's which culminated in the property being rezoned by the Ontario Municipal Board (as discussed further below) at that time. The Current proposal is for the creation of a 6 storey 72 unit condominium building, (tapering to 3 stories on the eastern portion o the site) on a 0.69 hectare (1.7,acre) site. The proposed development will include 3 levels of underground parking, with outdoor amenity areas. As part of this development, lands directly adjacent to Humber River (approx. 10 metres in width) w'1 be gratuitously dedicated to the Town of Caledon. A landscaped area and trail will be' constructed by the developer within this area. 87 This portion of the Village of Bolton (historic community) is located within the valley of the Humber River, and is flood vulnerable in a Regional Storm event. The property is however, located within the Bolton Special Policy Area (SPA). Within SPAs (including the Bolton SPA), a lesser level of flood protection, as established by the Province and defined in the related . municipal official plan may be contemplated, subject to meeting technical floodproofing and • safe access requirements. The 2005 Provincial Policy Statement (PPS) has clarified the intent of SPAs as being to facilitate the continued viability of existing floodprone communities, with new development and redevelopment generally being on a small scale. Further, SPAs are not intended to facilitate intensification where opportunities exist within a community to intensify . outside of the SPA. The Town of Caledon Official Plan has policies with regard to development in the SPA. These identify that the minimum level of flood protection for all new structures shall be the 1:500 year storm event, (an 18% risk of flooding over the anticipated 100 year lifespan). The related SPA Policies also require 'Safe Access' to the site,. pursuant to Provincial guidelines. TRCA's Valley and Stream Corridor Management Plan similarly addresses development within SPAs, and identifies, in addition to the above, structural floodproofing requirements, and other criteria that are to be applied. As noted above, this, property was the subject of an OMB hearing in 1993, in which a rezoning application for the subject property was co.nsidered. Based upon discussions at that time with the then landowners, and the submission of technical reports, TRCA staff were generally satisfied by the end of the OMB hearing with the proposed rezoning of the property. This position was based upon the technical information available at that time, which indicated that the building could be floodproofed to the necessary level, and off-site impacts .of the development were not anticipated. TRCA staff identified at that time that development on the site would be subject to a more detailed review of floodproofing details, at the time of submission of a site plan and TRCA permit application. Provincial staff (MNR) also considered the application at the time, and based upon materials provided to them at the time, similarly were of the position that their interests had been substantially satisfied, and did not object to the rezoning application being approved by the OMB. The OMB approved a 'Multiple Residential' zoning classification, and a 'High Density Residential' Official Plan designation. Development did not proceed on the property at that time, and a formal development proposal was not brought forward for the property until the submission of a site plan by River's Edge Bolton Ltd. in. September of 2007. The current:zoning (as approved by the OMB) and OP designations require no further amendments to allow for the development presently proposed on the property. In the review of the proposed site plan application, and supporting technical details by TRCA staff, TRCA staff identified concerns with respect to potential impacts of this development on flooding on adjacent properties. It was, however, the assertion of the engineering consultants for the proponents that a lesser impact would result from the proposed development, through updating the floodplain modeling for this area. TRCA staff worked with the consultants to 'establish the parameters around which the area could be remodeled, and the potential impacts assessed. TRCA staff were extensively involved in the subsequent review of the updated modeling. The results of this updated modeling did not, significantly vary from the results of the existing TRCA model, however TRCA staff did update the floodplain modeling in the area to more accurately determine the potential impacts of this development. 88 The work completed by TRCA staff has identified that there will be an impact (although it is anticipated to be both localized and relatively minor in scope) that would result from the construction of the proposed building. Within an SPA, as the area is located within the floodplain, all development has some impact on the floodplain. The anticipated local impact associated with this proposal is in excess of the off-site impacts that are typically permitted in SPAs for new development, which must generally be within the limits of accuracy of the model. In this regard, the proposed development may result in a localized increase in flood levels in the order of 14 cm (6 inches) on an area on the north side of the Humber River valley, adjacent to the subject property during a Regional Storm event. This impact is anticipated to be localized to areas adjacent to the proposed building on the opposite side of the valley, and would only be experienced in storm events in excess of the 1:500 year storm event. Recognizing the limitations associated with the existing model, that are specific to the Bolton SPA, TRCA senior engineering staff are satisfied that the proposed off-site flooding impacts although measurable, are not excessive. With consideration for the OMB decision, which allows for a development of the size and intensity that is presently proposed, and the limitations of the existing floodplain model for this area as noted above, and the potential for an improved overall risk management and evacuation strategy to be developed for the floodprone areas of Bolton, TRCA senior staff are satisfied that this proposal represents an acceptable balance between a slight localized increase in flooding, and the decrease in risk for the broader Bolton community that would result from the above noted strategy. Through the modeling work completed by TRCA staff, TRCA staff have discovered areas which need to be operationally managed and attention must be focused during flood events, such as debris and ice risks associated with the Hickman Bridge upstream of this site, to reduce potential future risk on the areas adjacent that would be impacted by the proposed development across from the subject property. TRCA staff have initiated the larger discussions with the Town of Caledon on the need for a more comprehensive strategy for Bolton which would include the above noted strategy, and TRCA staff will continue active dialogue with Caledon on intensification and emergency management measures for the floodprone areas of Bolton. A future meeting is being arranged with the Province and Caledon staff to further discuss these. issues, as well as the nature of future development in the Bolton SPA. The proponent has agreed to contribute to the funding for the overall.risk management strategy that TRCA staff have recommended to operationally reduce the overall flood related risk in Bolton. The proponent has also committed to provide for safe access to the building during a Regional Storm event - pursuant to Provincial objectives. Final details on the form.of this access are being further refined in consultation with TRCA staff, finalized and reflected in the associated permit drawings prior to issuance of the permit. The requirement for dewatering of the underground parking areas during construction as well as permanent dewatering will similarly be further refined, and will be finalized and reflected in the associated permit drawings prior to issuance of the permit. This permit is being brought forward on the basis of a letter of undertaking provided by the proponent, which commits to address all outstanding TRCA issues prior to the issuance of the permit, and prior to all works for which a TRCA permit would be requires, being initiated on the site. 89 Control of Flooding: The proposed development is located within the Regional Storm Floodplain, and minor impacts to the floodplain are anticipated as a result of the proposed development. However, the potential impacts must be balanced with the potential gains that would result from reducing overall flood risk for Bolton through a comprehensive emergency management strategy. With consideration for the nature of this SPA and of development in SPAs in general, and with consideration for the localized impact that may result, in relation to the potential to reduce overall flood risk for Bolton through an emergency management strategy, TRCA senior engineering staff are satisfied that this proposal - in this.instance - represents'an acceptable impact. Pollution: . Appropriate erosion and sediment controls.will be installed and maintained on the subject property throughout all phases of construction, in accordance with TRCA's current Sediment and. Erosion Control Guidelines. Dynamic Beaches: Not applicable Erosion: The potential for erosion was previously considered during the approval of the related planning applications by the OMB. The reports at that time concluded that there would be no significant erosion concerns. As these 'reports have not been updated at this time, TRCA staff have recommended to Town of Caledon staff (as Caledon will take ownership of the lands directly adjacent to the Humber River) that this issue be further considered by Caledon, prior to their assumption of the lands. Conservation of Land: Based upon the envelope for development approved by the OMB, areas of existing vegetation on the western portion of this site may be removed through the development of this property. However, the applicant will be required to minimize all potential impacts.to the greatest possible extent, and to provide for additional plantings on lands to be conveyed to the Town of Caledon as compensation. Plantings All plant species will be native and non - invasive, consistent with TRCA's guidelines. Policy Guidelines: The proposal meets the intent of Section 4.2.1 (B) - Development within Designated Special Policy Areas - of the Authority's Valley and Stream Corridor Management Program. CFN: 39802 - Application #: 715/07/CAL Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Brian Denney, extension 6290 Date: March 5, 2008 90 TOWN OF RICHMOND HILL 8.1.71 ENBRIDGE GAS DISTRIBUTION INC. To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Sunset Beach Road and Bayview Park Lane, in the Town of Richmond Hill, Humber River Watershed as located on the property owned by Enbridge Gas Distribution Inc.. The purpose is to install a NPS 4 PE gas pipeline by trenchless technology underneath the culvert on the south side of Sunset Beach Road just east of Bayview Park Lane in the Town of Richmond Hill during the warmwater timing window of July 1 to March 31. The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing 1 of 2, Project No. 3.4268722; Drawing 2 of 2, Project No. 3.4268722; all dated November 1, 2007; all received February 6, 2008; all prepared by Enbridge Gas Distribution Inc. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the installation of a NPS 4 PE gas pipeline along Bayview Park Lane and Sunset Beach Road in the Town of Markham. The pipe will be installed by directional drill underneath the culvert located south west of the intersection of Bayview Park Lane and Sunset Beach Road during the warmwater timing window of July 1 to March 31. Control of Flooding: There will be no impacts to the control of flooding. Pollution: Standard erosion control measures (silt fencing, rock flow check dam) will be implemented for the duration of construction, and until the site is restored, in order to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). This application is subject to the warmwater fisheries timing window, no in water works can occur between April 1 to June 30. 91 Plantings All disturbed areas will be stabilized and restored upon completion of the works. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40425 - Application #: 066/08/RH Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: March 4, 2008 RES. #B9/08 Moved by: Seconded by: HEART LAKE CONSERVATION AREA Beach Centre Renovation Project. Award of contract for the Heart Lake Conservation Area Beach Centre Renovation Project. Ron Moeser Rob Ford THAT the contract for the Heart Lake Conservation Area Beach Centre Renovation.Project be awarded to Surrey Construction, at an upset cost not to exceed $130,000, plus 10% for contingencies, plus applicable taxes, it being the lowest tender received that meets Toronto and Region Conservation Authority (TRCA) specifications; THAT award of the contract be subject to terms and conditions satisfactory to TRCA staff and legal advisers (if necessary), including but not limited to determination of the final contract cost not to exceed the approved amount; THAT should staff be unable to achieve an acceptable contract with the above-mentioned contractor, staff be authorized to enter into contract negotiations with other contractors that submitted tenders, beginning with the second lowest bidder; AND FURTHER THAT authorized TRCA officials be directed to take such actions as is • necessary to implement the contract including .the signing and execution of documents. CARRIED* • BACKGROUND It is the intent of TRCA to draw an expanded and diverse client base to Heart Lake Conservation Area (HLCA) in order to increase revenue. It is also the intention of TRCA to pursue the recommendations outlined in :the Heart Lake Conservation Area Master Plan in its entirety. At Authority Meeting #5/06, held on June 23, 2006,•Resolution #A133/06 regarding the endorsement of the HLCA Master Plan was approved as follows: THAT the Heart Lake Conservation Area Master Plan, dated June 1, 2006 be approved; 92 AND FURTHER THAT funding for the implementation of the plan be included in the Toronto and Region Conservation Authority (TRCA) capital budget plan for Peel Region 2007 - 2011. One of the key recommendations of the HLCA Master Plan is the revitalization of the Heart Lake • Beach Centre building. The beach centre building at Heart Lake Conservation Area has fallen into disrepair, becoming a health and safety issue for staff and patrons. It has also become an eyesore to an otherwise aesthetically pleasing environment. Staff report frequent vandalism to the building envelope and have since closed the washrooms for public use. In response to the recently adopted Heart Lake Master Plan, Accent Building Sciences Inc. was retained to conduct an extensive building condition assessment of the existing beach centre building and develop reconstruction options for staff review. The study produced an assessment of the existing facilities property and identified the physical adequacy of the construction, material and equipment. The study produced four options for staff review. The four options for reconstruction included: 1. reconstruction of entire facility for re -use; 2. retain existing building and selectively re -use portions of the existing facility to incorporate storage, washroom and open air pavilion; 3. demolish entire facility and construct new facilities; 4. refurbish washrooms and open air pavilion only; demolish other portions of facility. Staff reviewed the options presented and concluded that option 4, 'Refurbish washrooms and open air pavilion only', was the most cost effective option. As a result of and in conjunction with the recently endorsed HLCA Master Plan and approved capital budget funding from the Regional Municipality of Peel, staff retained the services of Kregg Fordyce Architect for the preparation of the Heart Lake Conservation Area Beach Centre Renovation design. Staff worked closely with Kregg Fordyce Architect to prepare and refine the design and construction drawings required to move forward with the tendering, building permit and construction process. Highlights of the design include: • selectively eliminating portions of the existing building; • • existing washrooms and utility rooms are to be retrofitted to utilize sustainable conservation methods; • covered open air pavilion to be constructed adjacent to the existing washrooms by extending the existing roof line; • pavilion to retain the existing fireplace, concrete floor and existing flagstone patio. In December, 2007 staff retained the services of Rafat General.Contractors for the selective demolition of portions of the existing building. The demolition process was completed in early January, 2008, thus allowing staff to proceed to the construction phase of the project. In conjunction with Kregg Fordyce Architect, staff prepared a Request for Tender for the complete structural construction of the approved design. 93 The following firms were invited to submit tenders for the project: • Berkim Construction Inc.; • BWK Construction; • Dardon Contractors; • Frank Pellegrino General Contracting*Limited; • Precision Contracting; • . Rafat; • Surrey Construction; • Urbacon (c /o Janik Developments Inc.). Tender documents and drawings were distributed to the aforementioned general contractors. The tender closed on February 11, 2008 at 4:00 p.m. The public opening was held on February 13, 2008 at TRCA's. Head Office. Tenders were received as follows; COMPANY BID Berkim Construction Inc. $257,145.00 BWK Construction $299,250.00 Surrey Construction $188,257.72 ANALYSIS Staff evaluated the proposals based on criteria that included: • completeness; • compliance with tender requirements; • relevant project experience; • • references; and • .fee proposals. Based on the evaluation criteria and recommendations from Kregg Fordyce Architect, staff concluded that the tender submitted by Surrey Construction meets all requirements set out in the tender documents and is the lowest bid received. Subsequently, staff evaluated the tenders and determined that the lowest tendered bid is over the approved available budget of $130,000. Staff recommend that the following series of cost saving measures be implemented during the contract negotiating phase in order to reduce project cost:- 1. line item deletions: the project's scope•of work to be altered by directly deleting line items from the tender. form; 2. revisions using submitted unit prices: the project's scope. of work to be altered by revising the quantity of selected design elements (revised prices shall be calculated by applying the unit prices for addition and deletion of items submitted by the contractor on the tender form); 3. .negotiated reductions using submitted lump sum prices after redesign: reductions to be • achieved through the redesign of selected project elements and subsequent negotiations with the contractor. 94 As a result of the implementation of cost saving measures, the integrity of the project will remain intact, will not be compromised and the Heart Lake Beach Centre will become a focal point of the conservation area. Staff is confident that as a result of implementing the cost saving measures as outlined above during the contract negotiating phase, Surrey Construction will conduct the required tasks in a timely and cost effective manner that meet the approved facility budget of $130,000. If staff is • unable to come to a mutually agreeable contract, then staff will enter into contact negotiations with the next lowest bidder: FINANCIAL DETAILS The bid prices were substantially more than the estimated costs prior to tendering, due in large measure to the high level of demand for contractors in the current market. Funds required to support and complete this project are available from the Regional Municipality of Peel within the Public Use Peel Region Capital Budget account #421 -33. By changing some aspects of the design, but without sacrificing the functionality and longevity of the building, staff expect to be able to reduce the cost of the project to match approximately the available budget. Report prepared by: Brad Clubine, extension 5252 Email: bclubine @trca.on.ca For Information contact: Brad Clubine, extension 5252 Email: bclubine @trca.on.ca Date: February 22, 2008 RES.#B10/08 - Moved by: Seconded by: SUPPLY OF REFORESTATION SEEDLINGS Award of'Sole Source Contract. Approval to enter into a sole source purchase agreement with Somerville Nurseries_Inc. to supply reforestation seedlings in support of 2008 reforestation efforts. Maria Augimeri Reenga Mathivanan THAT a contract for the purchase of reforestation seedling stock to supply spring 2008 projects and program requirements be awarded to Somerville Nurseries Inc. at an upset limit of $88,495.57 plus applicable taxes, it being the supplier that best meets Toronto and Region Conservation Authority (TRCA) contract requirements; AND FURTHER THAT authorized TRCA officials be directed to .take such action as is necessary to implement the contract including signing and execution of documents. CARRIED 95 BACKGROUND Since 1995, with the closure of the Ontario Ministry of Natural Resources tree nursery program, TRCA and other Greater. Toronto Area (GTA) conservation authorities (Credit Valley, Nottawasaga Valley, Lake Simcoe Region and Halton Region) have been coordinating purchasing reforestation seedlings through Somerville Nurseries Inc. as a means of supplying their individual program requirements. Somerville Nurseries Inc., located in Everett (near Alliston), effectively took over the supply of reforestation stock following the provincial governments decision to transfer the propagation and production to the private sector. TRCA's seedling demand forecast is based on TRCA's experience with facilitating internal reforestation needs for TRCA and private landowner planting programs. In recent years, TRCA's demand has increased and forecasts reflect this: However, recent project initiatives have come forward in an accelerated fashion and have created a shortfall between.anticipated demand and actual orders. TRCA's anticipated demand for 2008 was provided to Somerville . Seedlings Inc. in 2005 to assist them in ascertaining seed collection and seeding targets as it takes up to 3 years to produce a marketable seedling. It is difficult to accurately gauge the actual number of seedlings required in advance of the planting season as new projects and other approvals come on line at different times. Accordingly, staff has gone back to Somerville Nurseries Inc. to fulfill these additional requirements as they are made known to staff and are added to TRCA's annual base allocation. For spring 2008, TRCA has again experienced an increased internal demand. for reforestation seedlings to satisfy larger project initiatives including Claireville regeneration and Oak Ridges Corridor Park. With the recent addition of the Peel Climate Change initiative, staff expects that the requests for seedlings may increase yet again before the start of the plantingseason. RATIONALE In response to the GTA conservation authorities (CA) aggregating their demand forecasts, Somerville Nurseries Inc. has provided consistent quality seedlings at very favourable unit pricing for CA orders, below market list. This pricing structure recognizes the volume of seedlings that CA's are requesting to fulfill their tree planting programs allowing for all quantities to be discounted at or below, the 1,000+ quantity rate. - While there are other reforestation seedling growers in Ontario, it has been and continues to be otir collective experience that Somerville Nurseries Inc. is offering us the best combination of: • consistent seedling quality; • seed, zone and genetic source control; • excellent unit pricing; • ability to provide for identified stock - species, size, type, age - class; • flexibility to meet last minute demand for.additional stock; • • convenience as the most local supplier; and • willingness to work with CA's to achieve seedling target.demand. FINANCIAL DETAILS Currently, with orders on file to date, staff is expecting to purchase over 1'70;000 seedlings for TRCA requirements at a cost of $88,495.57, plus PST and GST. 96 On approval, a parent purchase order will be issued to Somerville Nurseries Inc. with all costs directed to account 116 -09 -230: A deposit of 25% of the order value is required to confirm the order. Somerville Nurseries Inc. has been very flexible in extending the deposit due date from January 15, 2008. All costs associated with the purchase, shipping and handling and distribution of seedlings is recovered from the specific project /program budget accounts through an internal billing memo following the spring 2008 period. Report prepared by: Dave Rogalsky, extension 5378 Email: drogalsky @trca.on.ca For Information contact: Tom Hildebrand, extension 5379 Email: thildebrand @trca.on.ca Date: February 20, 2008 RES. #B11/08 - Moved by: Seconded by: SOLAR POWERED ELECTRIC PONTOON BOAT Award of sole source contract for a Solar Powered Electric Pontoon Boat for Lake St. George Field Centre. Ron Moeser Reenga Mathivanan THAT a contract for the design and construction of a 32 foot, 26 passenger commercial pontoon boat fitted with a solar powered electric propulsion system at acost not to exceed $84,995, plus applicable taxes, be awarded to Tamarack Lake. Electric Boat Company, it being the only company able to meet Toronto and Region Conservation Authority (TRCA) specifications; AND FURTHER THAT authorized TRCA officials be directed to take such action as is necessary to implement the contract including signing and execution of documents. CARRIED BACKGROUND Lake St. George Field Centre is a 350 acre residential environmental education facility that provides outdoor and environmental education programs primarily to students from the Toronto,. Toronto Catholic and York Region District school boards, along with other schools from across the Greater Toronto Area (GTA). With two dormitories, Lake Si. George Field Centre can accommodate up to 74 student, youth or adult visitors. Typical visits are between two to five days in duration. 97 A key feature of Lake St. George Field Centre is the lake from which the centre draws its name. . A 25 acre kettle lake consisting of two basins and a connecting channel, the lake is the primary focus of much of the environmental programming that takes place during the spring, summer and autumn months. A large portion of the lake -based programming occurs on a pontoon boat from which the students take part in a number of water and lake studies. For this purpose the field centre has used two different pontoon boats in recent years: a 24' Sylvan with 19" pontoons that accommodated up to 12 passengers and 2 crew members and, in 2007, a 19' Gilgetter that was able to accommodate 8 students /passengers and one crew member. The Gilgetter was purchased as a temporary measure until a new, larger boat could be built that better suits the needs of the field centre. In late autumn, 2006, TRCA staff began exploring options to replace the original 24' Sylvan pontoon boat as it had been repaired a number of times and was at the end of its life cycle. In exploring a range of commercially - available and custom pontoon boats, staff met with a number of boat manufacturers, all of which construct typical boats utilizing internal combustion outboard motors for propulsion. During this period staff also met with Tamarack Lake Electric Boat Company in Brechin, Ontario to discuss the potential of purchasing one of their solar - powered electric pontoon boats. Tamarack Lake Electric Boat Company manufactures commercial pontoon boats as pleasure craft utilizing a solar - powered electric propulsion system. Tamarack Lake boats emit zero emissions and utilize solar panels on the roof of the boat to power an electric motor for propulsion of the vessel. They are the only manufacturer of its type in•North America and have sold a number of boats to customers in North America and Europe, including one to Camp Bernard in Sundridge, Ontario. TRCA staff visited Camp Bernard in September of 2007 to test • their Tamarack Lake electric boat and found that while the size was smaller than what is required at Lake St. George, the design and propulsion systems were functional and with their zero emission output, provided an extremely high value of sustainability. This purchase provides a valuable addition to TRCA's suite of sustainable technologies and vehicles. TRCA staff met with the Tamarack Lake Electric Boat Company to discuss the possibility of having acustom boat built that met the specifications and needs of Lake St. George. The commercially- available boats that Tamarack Lake currently sells are smaller than what is required for the education programming at Lake St. George, and as such staff were interested in determining if the solar photo - voltaic array and propulsion systems could be fitted to a larger craft with a greater passenger load. Tamarack Lake confirmed that their solar powered electric propulsion systems could be scaled -up to.a larger platform to meet the needs of Lake St. George education programming and that they would be interested in submitting a proposal for the design and construction of this boat. RATIONALE On October 31, 2007 staff issued a request for proposal. to Tamarack Lake Electric Boat Company for the design and construction of a solar powered electric pontoon boat with capacity for 24 passengers and 2 crew members and included detailed'specifications.based on Transport Canada's regulations governing commercial vessels. In January of 2008, Tamarack Lake submitted a proposal to design and construct the boat as per TRCA specifications. 98 Staff recommend that the contract for the design and construction of this boat be awarded to Tamarack Lake Electric Boat Company. As the only manufacturer of solar powered electric pontoon boats in North America, Tamarack Lake is the only qualified bidder able to meet the specifications as outlined by TRCA and Transport Canada. FINANCIAL DETAILS Funds have been budgeted for this purchase in the Vehicle and Equipment Pool account and in the Lake St. George Field Centre operating budget. Report prepared by: Darryl Gray, extension 5604 Email: dgray @trca.on.ca For Information contact: Darryl Gray, extension 5604 Email: dgray @trca.on.ca Date: February 19, 2008 RES. #812/08 - Moved by: Seconded by: OUT OF COUNTRY TRAVEL Unilock Industry Talk and Technology Transfer, Chicago, Illinois April 8, 2008. Approval for Toronto and Region Conservation Authority staff to travel outside Canada to attend a seminar in the United States of . America. Ron Moeser Rob Ford THAT approval be granted for Derek Smith, Monitoring Coordinator, Sustainable Technologies, to attend and present at the Unilock Industry Talk and Technology Transfer seminar in Chicago, Illinois from April 7 - 9, 2008 at no cost to Toronto and Region Conservation Authority (TRCA). CARRIED BACKGROUND It has been well documented that urban development is causing detrimental, impacts on natural watercourses. Run -off from paved and impermeable surfaces carry a variety of pollutants that ultimately degrade river and lake ecosystems, as well as increase erosion and flooding due to the higher run -off volumes. To date, permeable pavements and bioretention swales are two of the most promising technologies currently used to infiltrate run -off and reduce pollutant loads from large parking areas. Considered one of the leading manufacturers of segmental pavers in North America, Unilock's® line of segmental 'permeable' pavers (SPP) allow run -off infiltration while maintaining a drivable surface. Since Septernber,.2004, TRCA, on behalf of its Sustainable Technologies Evaluation Program (STEP):, has been actively monitoring the performance of the SPPs at its demonstration project entitled 'Performance Evaluation of Permeable Pavement and a Bioretention Swale.' Unilock® has requested that a representative from TRCA/STEP present the interim results from the study at an upcoming seminar in Chicago. 99 The theme of the seminar is a one day industry talk and technology transfer session, followed by a ribbon cutting ceremony opening North America's largest SPP installation at U.S. Cellular Field (home of the Chicago White Sox baseball team). The seminar is expecting 150 attendees, including municipal /state /private engineers, architects,- planners, as well as the mayor of Chicago, local media and a representative of the United States Environmental Protection Agency. RATIONALE Unilock® has offered to sponsor Derek Smith to present TRCA objectives and interim results from the TRCA /STEP demonstration project. • Derek Smith will also be attending several private tours around the City of Chicago of other permeable pavement installations preceding the seminar as a means for professional • development and technology transfer. The TRCA policy on.travel requires Executive Committee approval for staff travel outside of the country on TRCA business. FINANCIAL DETAILS Cost to attend this conference including return flight, meals, accommodations and taxi fare will be paid in full by Unilock®. Funding will be provided by Unilock under the account code 416 -95 (STEP permeable pavement /bioswale). Report prepared by: Derek Smith, extension 5362 Email: dsmith @trca.on.ca For Information contact: Derek Smith, extension 5362 Email: dsmith @trca.on.ca Date: February 22, 2008 RES. #B13/08 - Moved by: • Seconded by: WEST HILL COMPANY LIMITED Ontario Municipal Board Hearing: Authorization to maintain party status before the Ontario Municipal Board on referrals related to a draft °plan of subdivision and official plan and zoning by -law amendment applications to permit a golf course community consisting of 75 residential lots and 18. hole golf course on the subject property. Ron Moeser Rob Ford THAT authorization be given to Toronto and Region Conservation Authority (TRCA) staff to maintain party status before the Ontario Municipal Board (OMB) regarding a proposed draft plan of subdivision and amendments to the official plan and zoning by -law; THAT staff continue to work . cooperatively with municipal partners and appellants to ensure that TRCA's draft conditions are implemented as part of the OMB process; 100 THAT staff be authorized to retain legal counsel to pursue this appeal before the OMB; AND FURTHER THAT the OMB and all parties and participants to the hearing be so advised. CARRIED BACKGROUND The subject property, approximately 85 hectares (210 acres) in size, is located on the west and east side of Leslie Street, north of Bloomington Road in Aurora. The lands are generally vacant and used for agricultural purposes. The site is characterized by a mixed topography and contains a number of significant wetlands and features. The lands draining into the Rouge River system are within the jurisdiction of TRCA, while the lands 'draining into the Holland system are under the jurisdiction of Lake Simcoe Region Conservation Authority (LSRCA). A portion of the site is also located within TRCA's Regulated area of the Rouge River watershed and subject to Ontario Regulation 166/06 (Development, Interference with Wetlands and Alterations to Shorelines and Watercourses Regulation). The proposal is to amend the Town of Aurora Official Plan and Zoning By -law in order to permit the development of a golf course community containing a residential subdivision of 75 lots, as well as an 18 hole golf course. Water and wastewater services for the entire site, including both the residential condominium and golf course, are to be provided by on -site groundwater wells, a private sewage collection system and communal sewage treatment plant. The applications have been appealed to the OMB by the proponent for the town's failure to render a decision on the proposed applications within the review period prescribed in the Planning Act, and for Town of Aurora Council's refusal or neglect to enact the proposed amendments. TRCA planning staff has been involved in the review of these files since January, 2001. The original submission was made to the town in 1988. In 1990, TRCA provided comments on a previous version of the application. A number of letters were forwarded to town staff and the consultants requiring additional information and material in order to complete the review of the Master Environmental Servicing Report (MESP). In May, 2007, TRCA issued notification of acceptance and approval of the MESP. TRCA also issued draft plan of subdivision and condominium conditions in January, 2008. Accordingly, TRCA staff is satisfied that the development can proceed on the basis that the MESP has established the requisite environmental principles and objectives, as well as the work required subsequently for design and implementation. The intent of TRCA's participation in the hearing is to ensure that the draft conditions issued by staff are adopted by the OMB, should the OMB approve the applications. The conditions are important in order to ensure the MESP principles previously established are implemented through the submission of the detailed reports and studies. TRCA's role will be advisory to assist the OMB and other parties to the hearing. 101 RATIONALE The next OMB pre- hearing is scheduled for March 7, 2008. The actual hearing will commence on April 7, 2008 and is scheduled for 3 weeks. Previous pre- hearings were held to determine the scope of the issues and establish the date of the hearing. Staff attended and provided preliminary comments respecting the MESP at the initial pre - hearing of February, 2007. TRCA was also successful in obtaining party status because the MESP was not completed. At the upcoming hearing, the OMB will consider a motion to combine this appeal with an associated Environmental Assessment for the road that will service the residential component. It should be noted the road will be private and will likely be a common element under the condominium 'application. DETAILS OF WORK TO BE DONE Staff is requesting authorization of the Executive Committee to retain legal counsel to ensure TRCA's interests, as identified in the draft plan conditions, are protected and addressed at the hearing of April 7, 2008. Staff and retained legal counsel will continue to work with the parties and participants to the hearing to resolve any outstanding issues, and will continue to represent the interests of the TRCA before the OMB. Report prepared by: Bill Kiru, extension 5306 Email: bkiru @trca.on.ca For Information contact: Bill Kiru, extension 5306 Email: bkiru @trca.on.ca Date: March 05, 2008 Attachments: 1 102 BLOOMINGTON ROAD • TOWN OF RICHMOND HILL LOCATION MAP APPLICANT: WEST HILL REDEVELOPMENT COMPANY LTD. FILES: 009 -04 -00, D14 -12 -00 & D07 -03 -00 FIGURE 1 SUBJECT LANDS 0 150 300 Metres AURORA )- .- Localon Map created by the Town of Aurora Planning Department, January 11 N, 2007. Map modified on February 22nd, 2008, Base data provided by York Region. I- ivawg3e14d NEW BUSINESS RES. #B14/08 - MILLCREEK ESTATES Town of Caledon Moved by: Seconded by: Richard Whitehead Ron Moeser THAT the Chief Administrative Officer be authorized to issue an Ontario Regulation 166/06 permit for Millcreek Estates Lot 7 - 2 Locke Drive, Town of Caledon, subject to staff being satisfied with the permit; THAT staff report back on the discussions relating to 2 Locke Drive; AND FURTHER THAT staff work with Town of Caledon staff to develop a combined approach for dealing with the entire subdivision and present the results to the Executive Committee. TERMINATION ON MOTION, the meeting terminated at 10:39 a.m., on Friday, March 7, 2008. CARRIED Gerri Lynn O'Connor Brian Denney Chair Secretary- Treasurer /ks 104 c. er THE TORONTO AND REGION CONSERVATION AUTHORITY MEETING OF THE EXECUTIVE COMMITTEE #2/08 April 11, 2008 The'Executive Committee Meeting #2/08, was held in the South Theatre, Black Creek Pioneer Village, on Friday, April 11, 2008. The Vice Chair Maria Augimeri, called the meeting to order at 9:36 a.m.. PRESENT Maria Augimeri. Vice Chair Suzan Hall Member Jack Heath Member Colleen Jordan Member Reenga Mathivanan Member Ron Moeser Member Maja Prentice Member Richard Whitehead Member ABSENT David Barrow Member Rob Ford Member Gerri Lynn O'Connor Chair Anthony Perruzza Member RES. #815/08 - MINUTES Moved by: Seconded by: Ron Moeser Reenga Mathivanan THAT the Minutes of Meeting #1/08, held on March 7, 2008, be approved. CARRIED CONFLICT OF INTEREST Maja Prentice declared a conflict of interest with item 7.8 - Advertising Vendors, as Ms. Prentice's daughter is employed by Rogers Telecomrnunications. 105 SECTION I - ITEMS FOR AUTHORITY ACTION RES. #B16/08 - Moved by: Seconded by: GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Duffins River Watershed 1320991 Ontario Limited, CFN 38587. Purchase of property located west of Tenth Line, south of .Hoover Park Drive, Town of Whitchurch- Stouffville, • Regional Municipality of York, under the "Greenlands Acquisition Project for 2006 - 2010 ", Flood Plain and Conservation Component, Duffins Creek watershed. Suzan Hall Maja Prentice THE EXECUTIVE COMMITTEE RECOMMENDS THAT 4.17 hectares (10.32 acres), more or Tess, of vacant land, being Part of Lot 33, Concession 9 and designated as Block 180 on registered plan 65M -3919 prepared by Donevan Fleischmann Petrich Ltd. OLS under job no. 2002 - 191 -3, Town of Whitchurch - Stouffville, Regional Municipality of York, located west of Tenth Line, south of Hoover Park Drive, be purchased from 1320991 Ontario Limited; THAT the purchase price be $2.00; THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land free from encumbrance, subject to .existing service easements; THAT the firm of Gardiner Roberts LLP, Barristers & Solicitors, be instructed to complete the transaction at the earliest possible date and the transaction include any other terms and conditions deemed appropriate by the Authority's Solicitor. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to•be. paid; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to execute all necessary documentation required, including an agreement to manage and protect the significant archaeological site found on the subject property. CARRIED BACKGROUND Resolution #A260/05 at Authority Meeting #9/05, held on November 25, 2005, approved the Greenlands Acquisition Project for.2006 -2010. The subject property contains a significant archaeological site. TRCA staff is.working with the developer (Fieldgate Developments), First Nations and Town of Whitchurch - Stouffville to ensure proper management of the site. Negotiations have been conducted with Mr. Arthur L. Shapero of Owens, Wright LLP Barristers & Solicitors. Attached is a plan showing the location of the subject lands. 106 RATIONALE The subject property falls within TRCA's approved master plans for acquisition for the Duffins Creek watershed as outlined in the approved Greenland Acquisition Project 2006 -2010. The lands are part of the Stotiffville Creek valleylands. TAXES AND MAINTENANCE Based on our preliminary review of the environmental criteria for lands that are eligible to receive a property tax exemption under the provincial Conservation Land Tax Incentive Program, it would appear that all of the subject property would be eligible for exemption for the 2009 taxation year. In addition, TRCA staff is currently working on a consolidated management agreement with the Town of Whitchurch- Stouffville. FINANCIAL DETAILS Funds for the costs related to this purchase are available in the TRCA land acquisition capital account. Report prepared by: Edlyn Wong, extension 5711, Ron Dewell, extension 5254 Email: ewong @trca.on.ca or rdewell @trca.on.ca For information contact: Ron Dewell, extension 5254 Email: rdewell @trca.on.ca Date: March 12, 2008 Attachments: 1 107 Attachment 1 A \ - :tx14.:401pr 4'Pltree 41* IV 4 " - 5-fouFFv‘ • Vrtvpi 4k, A, • r-"--14)0 • &COAT j1104; 0:0442 / FAO re \ 1/4 4* N •1. sik4 40eitiatetit% evettlitiliets11,1 ili.,.,111,0-01 0. nil :Mt h0/1 teni4- Agsg1 ,ak 00,, rt-Alov. Hitt peitTign hi • •.„ Sas§ WI 1514 1,f3.01*. 11.11 b*1 32 „, _ 2. • ..Y'' WOM6DriatThiaii for The Living City GREENLANDS ACQUISITION PROJECT FOR 2006-201 Flood Plain and Conservation Component, Duffles River Watershed 132a991 Ontario Limited CFN 38587 TRCALANDS_. SUBJECT PROPERTY 108 RES. #B17/08 - • Moved by: Seconded by: GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Rouge River Watershed Mattamy (Neilson) Limited, CFN 40080. Purchase of property located on the south side of Passmore Avenue, west of Neilson Road, City of Toronto (Scarborough Community Council Area), under the "Greenlands Acquisition Project for 2006 - 2010," Flood Plain and Conservation Component, Rouge River watershed. Suzan Hall Maja Prentice THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.57 hectares (1.42 acres), more or less, of vacant land, being Part of Lot 15, Concession 4, designated as Block 97 on Plan 66M -2384, City of Toronto (Scarborough Community Council Area), located on the south side of Passmore Avenue, west of Neilson Road, be purchased from Mattamy (Neilson) Limited; THAT the purchase price be $2.00; THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land free from encumbrance, subject to existing service easements; THAT the firm of Gardiner Roberts LLP, Barristers & Solicitors, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to execute all necessary documentation required. CARRIED BACKGROUND Resolution #A260/05 at Authority Meeting #9/05, held on November 25, 2005, approved the Greenlands Acquisition Project for 2006 -2010. Negotiations have been conducted with Mr. Shawn Huynh, Project Coordinator, of Mattamy (Neilson) Limited. Attached is a plan showing the location of the subject lands. RATIONALE The subject property falls within TRCA's approved master plan for acquisition for the Rouge River watershed as outlined in the approved Greenlands Acquisition Project for 2006 -2010. Through the review of residential subdivision No. SC- T19990009, TRCA staff established the limits of the open space lands (i.e. Block 97 on Plan 66M -2384) which are comprised of a tableland woodlot connected to the valley corridor of tfie Morningside Tributary Branch of the Rouge River. TAXES AND MAINTENANCE It is proposed that the lands be turned over to the City of Toronto for management. 109 FINANCIAL DETAILS, Funds for the costs related to this purchase are available in the TRCA land acquisition capital account. Report prepared by: George Leja, extension 5342 Email: gleja @trca.on.ca For Information contact: George Leja, extension 5342 or Ron Dewell, extension 5245 Emails: gleja @trca.on.ca or rdewell @trca.on.ca Date: December 17, 2007 Attachments: 1 110 ' 4 ;1. 101 1, 054; 1'N 55 ;1 :\,\\ \■%‘11 '‘\\\)\\• ..".' '1‘, .,....^ ' •'-'''' ... \ \ ‘ • .....„r^:f;...,"<.'; 1 74. . ........., • .. :;111 ...,-' .. ...- „.._.- _...-- -..., ._ .-- -....,..„ \,.. .,. ... ,... \ ,...........-z..... , \ , -\ r . • ... _ \ H,7,- •\ „7,,,/,- -...-:•-..,,,,!,', ,,...,..,., ,., 514 4 • ..., ,.. .•••..,,, ...„,„.... ill )1 • 1 . ,. ... .-- , 180 ■\!,, • c. \ • • • \`‘,Cp \\* ? \ \ ' \ , \-- 4;:• 1 ,5\ ' ; ) \'''\\ ,..*t s',.., -4V ""'N, \ • '''')\ ,..'-'4:tid e a • \ \\ '<'') 1.4,5 1.', • ,,;,..."' 1 OFfEENLANDtACO111SITION?ROJCT FOR 2006‘2010 Flood Plain and Conservation Component, Rouge River Watershed • Mattartlr(Neitson)iimited 'CFR tiooso —e•455°. 1 ,4, 1 1 1 .10Ssa,TO 1.1C1(1V-1..— onservaton Air The tivins City • r..7177/D TRCA LANDS SUBJECT PROPERTY RES. #B18/08 - Moved by: Seconded by: CITY OF TORONTO Conveyance of Land for the Don Valley Parkway located south of Eglinton Avenue, City of Toronto (Toronto and East York Community Council Area) Don River Watershed, CFN 33224. Receipt of a request from the City of Toronto for conveyance of land for the Don Valley Parkway located south of Eglinton Avenue , City of Toronto (Toronto and East York Community Council Area). Suzan Hall Maja Prentice THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region Conservation Authority (TRCA) is in receipt of a request from the City of Toronto to convey certain lands for the Don Valley Parkway located south of Eglinton Avenue, City of Toronto (Toronto and East York Community Council Area); AND WHEREAS it is in the opinion of TRCA that it is in the best interest of TRCA in furthering its objectives, as set out in Section 20 of the Conservation Authorities Act, to cooperate with the City of Toronto in this instance; THAT.a parcel of TRCA -owned land containing 0.608 hectares (1.502 acres), more or less, be conveyed to the City of Toronto for the Don Valley Parkway located south of Eglinton Avenue, said land being Part of Lot 7, Concession 3, From The Bay, City of Toronto, (Toronto and East York Community Council Area), designated as Part 2 on a plan of survey prepared by the City of Toronto, Works & Emergency Services Department under their Job Number 2002 -0091; THAT consideration is to be the nominal sum of $2.00, plus all legal, survey and other costs; THAT the City of Toronto is to fully indemnify and save harmless TRCA from any and all claims for injuries, damages or loss of any nature resulting in any way either directly or indirectly from this sale; THAT said conveyance is subject to the approval, if required, of the Minister of Natural . Resources in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O. 1990, Chapter C.27 as amended; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents. CARRIED 112 BACKGROUND As part of the Port Union Waterfront Regeneration Project, TRCA acquired lands from the Canadian National Railway Company (CNR) to undertake the construction. CNR agreed to convey to TRCA the lands required for the project subject to TRCA accepting other surplus CNR lands located in the Don Valley. The Don Valley Parkway crosses one of the surplus parcels within the Lower Don River valley corridor. It was CNR's preference that all their surplus lands at this location be conveyed to TRCA and TRCA would subsequently convey the portion of property within the Don Valley Parkway road allowance to the City of Toronto. It is our understanding that the reason these lands were owned by CNR is that they were required for railway purposes and CNR would only provide the former Municipality of Metropolitan Toronto with a crossing agreement to allow for construction of the Don Valley Parkway. The City will still maintain a crossing agreement for that portion of the Parkway that crosses the railway immediately south of this parcel. When TRCA previously considered this request at Meeting #.7102 on July 26, 2002, the Authority members were concerned that more land was being conveyed to the City than was actually required for the Parkway. TRCA staff has had discussion with City staff and they have reassessed the City's requirements, reducing the amount of and required from TRCA. The City of Toronto has conveyed lands to TRCA over the years for nominal consideration of $2.00 and has requested that these lands be conveyed for the nominal consideration of $2.00. A plan illustrating the subject land is attached. FINANCIAL DETAILS • The City of Toronto will assume all legal, survey and other costs involved in completing this transaction. Report prepared by: George Leja, extension 5342 and Michael Fenning, extension 5223 Emails: gleja @trca.on.ca or mfenning @trca.on.ca For Information contact: George Leja, extension 5342 or Ron Dewell, extension 5245 Emails: gleja @trca.on.ca or rdewell @trca.on.ca Date: March 19, 2008 Attachments: 1 113 Attachment 1 RE: CITY OF TORONTO Conveyance of Land for the Don Valley Parkway located south of Eglinton Avenue, City of Toronto (Toronto and East York Community Council Area) Don River Watershed CFN 33224 114 TRCAIANDS SUBJECT PROPERTY RES.#B19/08 - Moved by: Seconded by: CITY OF VAUGHAN Request for a Permanent Easement to Maintain a Box Culvert and Embankment, Don River Watershed, CFN 40560. Receipt of a request from the City of Vaughan to provide a permanent easement for the maintenance of a box culvert and embankment, east of Dufferin Street, south of Teston Road, in the City of Vaughan. Suzan Hall Maja Prentice THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region Conservation Authority (TRCA) is in receipt of a request from the City of Vaughan to provide a permanent easement for the maintenance of a box culvert and embankment, east of Dufferin Street, south of Teston Road, in the City of Vaughan; AND WHEREAS it is in the opinion of TRCA that it is in the best interest of TRCA in furthering its objectives, as set out in Section 20 of the Conversation Authorities Act, to cooperate with the City of Vaughan in this instance; THEREFORE LET IT BE RESOLVED THAT a permanent easement containing a total of 0.027 hectares (0.066 acres), more or less, be granted to the City of Vaughan for the maintenance of a box culvert and embankment, said land being Part of Block 62, Registered Plan 65M -3916, City of Vaughan, Regional Municipality of York, designated as Part 3 on Plan 65R- 28664; THAT consideration is to be the nominal sum of $2.00, plus all legal, survey and other costs to be paid by the City of Vaughan; THAT the City of Vaughan is to fully indemnify and save harmless TRCA from any and all claims for injuries, damages or loss of any nature resulting in any way either directly or indirectly from this easement or the carrying out of construction; THAT an archaeological investigation be conducted before any site disturbance with any mitigative measures required being carried out all at the expense of the City of Vaughan; THAT a permit pursuant to Ontario Regulation 166/06 be obtained prior to the commencement of construction; THAT all TRCA valleylands disturbed by the proposed works be revegetated / stabilized following construction and, where deemed appropriate by TRCA staff, a landscape plan be prepared for TRCA staff review and approval in accordance with existing TRCA landscaping guidelines; THAT the granting of this easement is subject to the' approval of the Minister of Natural Resources in accordance with.Section 21(2) of the Conservation Authorities Act, R.S.O. 1990, Chapter C.27 as amended; 115 AND FURTHER THAT the appropriate TRCA officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents. CARRIED BACKGROUND The City of Vaughan has formally requested a permanent easement for the maintenance of a box•culvert and embankment, east of Dufferin Street, south of Teston Road, in the City of Vaughan. As part of the development of subdivision 19T -03V16 by Midvale Estates Inc., a box culvert crossing over a tributary of the upper East Don River at Lady Jessica Drive is proposed within the limits of this subdivision. The City of Vaughan Engineering Department requires a , permanent easement across the subject TRCA -owned lands (Block 62 on Plan 65M -3916) to maintain the box culvert and the associated embankment which will be located immediately adjacent to the TRCA property. The area of the box culvert and embankment, including Block 62, are situated within the regulated area and Regional Storm flood plain of the East Don River tributary. A permit application pursuant to Ontario Regulation 166/06 was approved at Executive Committee Meeting #11/07, held on January 18, 2008. The permit is being held in abeyance until outstanding technical requirements have been 'adequately addressed and the conditions of permanent easement approval have been satisfied. A temporary working easement will not be required as part of the proposed construction. The subject TRCA lands were acquired from Midvale Estates Inc. on March 30, 2007 under the Greenlands Acquisition Project for 2006 -2010. Plantings: All lands disturbed by construction will be stabilized and, where deemed appropriate by TRCA staff, revegetated with native woody and herbaceous plant material in accordance with existing TRCA landscaping guidelines. A landscape plan will be prepared and form part of the permit pursuant to Ontario Regulation 166/06. A plan illustrating the permanent easement location is attached. FINANCIAL DETAILS The City of Vaughan has agreed to assume all legal, survey and other costs involved in completing this transaction. Report prepared by: George Leja, extension 5342 Email: gleja @trca.on.ca For Information contact:, George Leja, extension 5342 or Ron Dewell, extension 5245 Emails: gleja @trca.on.ca or rdewell @trca.on.ca Date: March 18, 2008 Attachments: 1 . 116 Attachment 1 CITY OF VAUGHAN Request for a Permanent Easement to Maintain a Box Culvert and Embankment, Don River Watershed. CFN 40560 • ••••••.-•-•"."4-*7 117 RES. #B20/08 - Moved by: Seconded by: OAK RIDGES MORAINE CORRIDOR PARK Town of Richmond Hill, Regional Municipality of York Agreement to Enter Into a Ground Lease with the Province of Ontario, CFN 36330. Seeks direction to enter into a ground lease for the. management of the Oak Ridges Corridor Park from the Ontario Realty Corporation as agent on behalf of HER MAJESTY THE QUEEN in right of Ontario as represented by the Minister of Public Infrastructure Renewal. Suzan Hall Maja Prentice THE EXECUTIVE COMMITTEE RECOMMENDS TO THE AUTHORITY THAT Toronto and Region Conservation Authority (TRCA) enter into a ground lease for the management of the Oak Ridges Corridor Park with the Ontario Realty Corporation (ORC) as agent on behalf of HER MAJESTY THE QUEEN in right of Ontario as represented by the Minister of Public Infrastructure Renewal; THAT the ground lease be subject to terms and conditions satisfactory to TRCA and its solicitors; AND FURTHER THAT authorized TRCA officials be directed to take such action as is necessary to implement the ground lease including the execution and signing of documents. CARRIED BACKGROUND At Authority Meeting #1 /05, held on February 25, 2005, Resolution #A6/05 was approved as follows: THAT the management plan be developed in consultation with all stakeholders including the Town of Richmond Hill, Region of York, Oak Ridges Moraine Foundation, interested landowners and various public interest groups; THAT staff be directed to seek avenues for funding assistance to implement the completion and recommendations of the management plan, including making application to the Oak Ridges Moraine Foundation; AND FURTHER THAT staff report back to the Authority on the status of the development of the management plan and its implementation. On September 23, 2004, the Minister of Municipal Affairs and Housing announced that the Province of Ontario and certain landowners on the Oak Ridges Moraine in the Town of Richmond Hill had reached an agreement to exchange lands. The purpose of the land exchange was to protect the last remaining natural corridor link between the eastern and western parts of the Oak Ridges Moraine in. Richmond.Hill. Under the agreement, 1,057 'acres (428 hectares) of land in Richmond Hill would come into public ownership (Attachment 1). In a letter dated February 9, 2005, the province requested TRCA to act as the province's agent in the creation of an environmental management plan, including the construction of a primary trail (spine trail) funded by the $3.5 million made available through the agreement with the landowners, and that TRCA enter into a management agreement with the province. 118 The province did not complete the and exchange until August, 2007. Through various agreements with the province, the landowners and TRCA, TRCA was able to proceed with the completion of the Oak Ridges Corridor Park Management Plan, approved at Authority Meeting #8/06, held on October 27, 2006, and the construction of the spine trail. Furthermore, .through agreements with Mattamy Homes, TRCA assumed the operation of the Bathurst Glen Golf Club. Since 2006, the province has held discussions with TRCA staff about management of the lands. In November, 2007, Ontario Realty Corporation (ORC) suggested that TRCA enter into a ground lease for the management of the Oak Ridges Corridor Park in accordance with the approved management plan.. ORC is recommending a ground lease as opposed to a management agreement primarily as a mechanism to allow TRCA to retain the net revenues from the golf course operation and use those revenues for park operations. Terms and conditions of the ground lease will reflect the following: 1. The operation of the park must be cost neutral to TRCA; TRCA will use net revenues from the Bathurst Glen Golf Course to operate the park and the province will be responsible for any shortfall in revenues. 2. The historic buildings on the site will be part of the ground lease and the province will be responsible for all costs associated with preservation, protection and restoration of these sites. 3. Property taxes for the Bathurst Glen Golf Course will be part of the costs of operating the golf course; property taxes on the balance of the lands will be the responsibility of the . province. 4. Term of the lease will be 20 years, although consideration is being given to having certain parcels where extensive.tree planting will occur having up to 50 years to enable participation in carbon credits programs. .5. TRCA will provide the province with annual budgets and financial statements. 6. TRCA will provide insurance on the leased lands including third party pollution coverage. 7. There will be a termination clause enabling either side to cancel on reasonable notice, probably at least 6 months. DETAILS OF WORK TO BE DONE Staff is in negotiation with provincial officials to complete the ground lease. Other stakeholders, including the Town of Richmond Hill, will be consulted regarding some aspects of the management agreement. FINANCIAL DETAILS • The ground lease is to have no direct cost to TRCA. It is in TRCA's interest to manage the ground lease and see the park developed successfully. There will be staff resources involved which will not be fully recovered. 119 Capital funding for the restoration of the lands and trail development is available under the terms of the provincial contribution agreement. A total of $3.5 million is planned to be spent over about 5 years. Report prepared by: Ron Dewell, extension 5245 Email: rdewell @trca.on.ca For Information contact: Ron Dewell, extension 5245; Jim Dillane, extension 6292 Emails: rdewell @trca.on.ca; jdillane @trca.on.ca Date: March.25, 2008 Attachments: 1 120 • •• tt F ,. • 1,4 t7' ,Zun, •.!;••••••t • ' 121 RES. #821/08 - Moved by: Seconded by: SECURITY SERVICES FOR TORONTO AND REGION CONSERVATION AUTHORITY FACILITIES Award of Contract. Recommends award of contract for Toronto and Region Conservation Authority's security services to other than lowest bidder. Suzan Hall Maja Prentice THE EXECUTIVE COMMITTEE RECOMMENDS THAT a contract to provide security services for 5 Shoreham Drive, Black Creek Pioneer Village and other Toronto and Region Conservation Authority (TRCA) facilities be awarded to Reilly's Security Services, at the unit prices described in this report dated March 31, 2008, this bid being the preferred bid that met TRCA specifications. CARRIED BACKGROUND Approximately every three years, TRCA staff initiate a request for tender for provision of security services for various TRCA facilities, particularly Black Creek Pioneer Village (BCPV) and 5 Shoreham Drive. The tender is sent to companies that have demonstrated capacity to provide the required services. The factors to be considered with respect to the type and level of service required were stipulated in the request for proposals; specifically, the following areas of interest were identified: 1) Hours of Service Security services will be supplied 7 days per week, 52 Weeks per year, 16 hours per day, from 1600 hours to 0800 hours. The services will be shared between Head Office and Black Creek Pioneer Village. 2) Insurance and Licensing Security firm licensing, insurance, Workplace Safety Insurance Board (WSIB) and compliance with the Occupational Health and Safety Act are required. 3) Quality of Service All officers will be required to be physically fit, experienced, seasoned officers, preferably with a community college law and security accreditation. All officers shall be bonded and licensed under the Private Security and Investigative Services Act (PSISA). 4) Other Required Services a) Alarm response to other TRCA locations on a fee for service basis in addition to the base cost of the primary contracted service quoted. • 122 b) The proposal will include at no additional charge: • the provision of a computerized guard tour system; and • alarm response to both named facilities and components thereof, 24 hours per day, 7 days per week. 5) Value Added Services Proponents were given the opportunity to identify 'value added services' which they wish to add at no additional cost beyond the stipulated requirements. 6) Price and Period of Service The successful security provider shall enter into a contractual relationship with TRCA acceptable to staff for a period of three years. Service can be cancelled by TRCA on 30 days written notice. RATIONALE The opportunity to submit proposals for the three year contract, including 10 statutory holidays annually, was given to five security firms. For purposes of comparison, the three year value of each bid was calculated based on the anticipated number of hours of service provided. Because the actual hours to be worked are unknown, the contract is awarded on an hourly unit pricing structure. The firms and their bids for the term of service are: G4S Security Services Canada Ltd. Reilly's Security Services Garda Security Knights on Guard Protective Services Intercon Security Ltd. $ 369,931.52 $ 396,283.20 $ 402,472.16 $ 474,455.00 No submission The above quoted fees do not include additional taxes. Staff has recommended that the contract be awarded to Reilly's Security Services for the following reasons: 1. The price differential between the two lowest bidders over 3 years is modest at $26,352. Reilly's bid provides a ,1% discount for invoices paid within 30 days. As this is TRCA's normal procedure, the differential will be reduced to less than $24,000, or about $8,000 annually. 2. Reilly's is the current provider of security services. They have provided excellent service over the term of the previous contract. Their staff is familiar with TRCA facilities, especially BCPV, which sometimes has difficult security issues. 3. There is a cost to transition to a new provider. TRCA staff time to initiate new security guards and procedures will certainly exceed the estimated $24,000 in savings over three years. 4. Reilly's. offered a number of 'value added' services at no additional charge including: security procedures arid equipment audits; staff safety and security training sessions. 123 5. Reilly's has existing authority from Toronto Police Services to issue parking tickets at 5 Shoreham and BCPV. The process for a new provider to secure this designation will be time consuming. 6. Reilly's offers the option of K9 service which was not included in the tender but may be required. The low bidder does not have this service. FINANCIAL DETAILS The total cost of the Reilly's tender over three years is described above. The contract will be awarded on the basis of the hourly unit costs as follows: Funds for the 2008 expenditure are included in the respective facility operating budgets: Report prepared by: Al Willison, extension 5285 Emails: awillison @trca.on.ca For Information contact: Al Willison, extension 5285 Emails: awillison @trca.on.ca Date: March 31,2008 RES. #622/08 - Moved by: Seconded by: PRINT VENDORS Preferred Vendor List. Preferred vendor list for Toronto and Region Conservation Authority's 2008 roster of print vendors. Suzan Hall Maja Prentice THE EXECUTIVE COMMITTEE RECOMMENDS THAT the roster of preferred print vendors for Toronto and Region Conservation Authority's (TRCA's) print requirements from January 1, to December 31, 2008 be established; THAT the total cost of services contracted to the preferred print vendors not exceed $250,000, plus applicable taxes; AND FURTHER THAT staff conduct a review of the performance of the individual vendors to determine any changes to the roster and budget allocation in 2009. CARRIED 124 Year 1 Year 2 Year 3 Site Supervisor $21.75 $22.40 $23.10 Security Guard $20.50 $21.15 . $21.80 Funds for the 2008 expenditure are included in the respective facility operating budgets: Report prepared by: Al Willison, extension 5285 Emails: awillison @trca.on.ca For Information contact: Al Willison, extension 5285 Emails: awillison @trca.on.ca Date: March 31,2008 RES. #622/08 - Moved by: Seconded by: PRINT VENDORS Preferred Vendor List. Preferred vendor list for Toronto and Region Conservation Authority's 2008 roster of print vendors. Suzan Hall Maja Prentice THE EXECUTIVE COMMITTEE RECOMMENDS THAT the roster of preferred print vendors for Toronto and Region Conservation Authority's (TRCA's) print requirements from January 1, to December 31, 2008 be established; THAT the total cost of services contracted to the preferred print vendors not exceed $250,000, plus applicable taxes; AND FURTHER THAT staff conduct a review of the performance of the individual vendors to determine any changes to the roster and budget allocation in 2009. CARRIED 124 BACKGROUND TRCA uses many print vendors for promotional activities. TRCA's requirements for vendors . include provision of quality service and products, quick turnaround time, price, industry reputation and meeting some evolving environmental standards (e.g. waterless printing, Forest Stewardship Council (FSC) certified paper and Ecostar certification). Over the last 6 months, staff has used these vendors and they have satisfied TRCA requirements, and therefore staff is recommending they be the eligible vendors for print material for 2008. Members are welcome to identify to staff other companies they would like us to consider in 2009. The proposed roster of preferred print vendors consists of the following companies: • All Signs Company • Astro Wear • • Bulls eye Marketing • CJ graphics • Fontasy • Graphic Apparel • Green Living Enterprise • Image on Barrie • Minute Man Press • Pulsar Printing • Repro Art • Swissprint International • Warren's Waterless These vendors provide print services for all marketing collaterals including brochures, flyers, signage and posters. If during this period, it is determined that these suppliers do not supply the best combination of quality, service and price for a particular product, staff may use the normal procurement procedure to source the products. FINANCIAL DETAILS The cost of services with this roster of vendors is not to exceed $250,000, plus applicable taxes. Funding for all marketing collaterals is provided in the 2008 operating budget for each of the respective departmental sections. Report prepared by: Adrienne Langston, extension 5201 Email: alangston@trca.on.ca For Information contact: Catherine MacEwen, extension 5219 Email: cmacewen @trca.on.ca Date: March 28, 2008 RES. #B23/08 - ADVERTISING VENDORS Preferred Vendor List. Preferred vendor list for Toronto and Region Conservation Authority's 2008 roster of preferred advertising vendors. 125 Moved by: Seconded by: Suzan Hall Maja Prentice THE EXECUTIVE COMMITTEE RECOMMENDS THAT the roster of preferred advertising vendors for Toronto and Region Conservation Authority's .(TRCA) advertising requirements from January 1, 2008 to December 31, 2008 be established; THAT the total cost of services contracted to the preferred advertising vendors not exceed $300,000, plus applicable taxes; • AND FURTHER THAT staff conduct a review of the performance of the individual vendors to determine any changes to the roster and budget allocation in 2009. CARRIED BACKGROUND • TRCA uses many advertising vendors for the promotion of activities and communication with key audiences. TRCA's criteria for selecting vendors includes price, reliability, quality of service, value added promotion and the ability to reach target audience effectively. The proposed .roster of preferred advertising vendors consists of the following companies: • Caledon Enterprise/ Publishing • City Parent • Frugal Bride • Get Out there communications • Halls.com • NOW magazine • Rogers Publishing • St. Joseph Media • Standard Radio Inc. (Includes EZ Rock.Radio) • The Liberal • The Globe and Mail • Today's Bride • Toronto Community News • Toronto Star • toronto.com • Wedding Essentials • Woodalls Campground • York Region Media Group . These vendors 'provide advertising services to promote facilities, events, initiatives, public meetings and awareness of environmental issu.es. If during this period, it is determined that these suppliers do not supply the best combination of quality, service and price for a particular product, staff may use the normal procurement procec}ure to source the products. 126 FINANCIAL DETAILS The cost of services with this roster of vendors is not to exceed $300,000, plus applicable taxes. Funding of all advertising services is provided in the 2008 operating budget of the respective departmental sections. Report prepared by: Adrienne Langston, extension 5201 Email: alangston @trca.on.ca For Information contact: Catherine MacEwen, extension 5219 Email: crnacewen @trca.on.ca Date: March 28, 2008 SECTION II - ITEMS FOR EXECUTIVE ACTION RES.#B24/08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Development, Interference with Wetlands and Alterations to Shorelines and Watercourses. Pursuant to Ontario Regulation 166/06, written permission from the Authority is required for: a) straightening, changing, diverting or interfering in any way with the existing channel of a river, creek, stream or watercourse, or for changing or interfering in any way with a wetland; b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development. A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the'conservation of land is affected. Moved by: Seconded by: Richard Whitehead Jack Heath THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.1 - 8.1.40, inclusive and 8.1.88 - .8.1.92, inclusive) which are listed below. CARRIED TOWNSHIP OF ADJALA - TOSORONTIO 8.1.1 ADJALA CONCESSION ROAD 3 To construct, reconstruct, erect or place a building or structure on Part Lot 1, 2, 3, 4, Plan 51 R - 30420, (Adjala Concesslpn Road 3), in the Township of Adjala - Tosorontio Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single - family dwelling located at Part Lot 1, Concession 3, in the Township of Adjala- Tosorontio. 127 The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. 07 -186, prepared by Calder Engineering Ltd., dated February 2008, stamped received by TRCA Planning & Development staff on March 3, 2008; • Planting Plan, Figure No. 3, prepared by Azimuth Environmental Consulting, dated February 2008, stamped received by TRCA Planning & Development staff on March 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works•within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single - family dwelling located at Part Lot 1 of Plan 51 R- 30420, Concession Road 3, in the Township of Adjala - Tosorontio. A tributary of. the Humber River Watershed traverses the northern portion of the.subject property. The proposed dwelling, and septic system are located on the tableland portion of the lot and are sufficiently setback from both the valley corridor and a wetland feature. In addition, there are no geotechnical, flooding, or ecology related issues with this proposal. Although no significant vegetation is proposed to be removed as a result of construction, an extensive planting enhancement plan has been provided along the valley corridor at the northern portion of the subject property to provide a net ecological gain for this area. Control of Flooding: TRCA staff has confirmed that the proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result al-construction. An enhancement planting plan has been submitted with this application to. achieve an ecological net gain for this area. Plantings Native, non - invasive enhancement plantings consistent with TRCA's guidelines are included as part of this application. 128 Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 39702 - Application #: 631/07/ADJ Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: April 2, 2008 CITY OF BRAMPTON 8.1.2 2058433 ONTARIO LTD To construct, reconstruct, erect or place a building or structure and site grade on Part Lot 3, Concession 2, E.H.S., (329 Clarence Street), in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by 2058433 Ontario Limited. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate an addition to an industrial building. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing GS -1, prepared by Hawley and Associates, dated March 4, 2008, stamped received by TRCA Planning and Development on March 5, 2008. • Drawing L1, prepared by Hawley and Associates, dated October 2, 2007, stamped received by TRCA Planning and Development on October 5, 2007. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: . The purpose of this application is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a 156 square metre (1,679 sq. ft.) addition to an existing industrial .building at 329 Clarence Street, in the City of Brampton. As part of the stormwater management strategy for this development, a stormwater swale has been incorporated into the design to drain runoff from the site and outlet to a receiving tributary of the Etobicoke Creek Watershed. No in -water works are proposed as a result of the proposed swale feature, as the outlet location is significantly setback from the edge of the watercourse feature. Additionally, all runoff from this site will be treated for quality and erosion control to ensure no adverse impacts to the receiving watercourse feature. The applicant proposes to achieve this requirement through the installation of a level spreader which will reduce the velocities of the stormwater entering the stream. An enhancement planting plan has been incorporated into the design of this project to improve the ecological condition of this area. 129 Control of Flooding: The subject property is located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters are anticipated. Pollution: Appropriate erosion and sediment controls will be installed and maintained on the subject property throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. With erosion and sediment control plans in effect, the potential for a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice (LOA) will be issued with this permit on behalf of Fisheries and Oceans Canada (DFO). Plantings All plant species are native and non - invasive, consistent with TRCA's guidelines. Policy Guidelines: The proposal is consistent with Section 4:2.2 (C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program. CFN: 39905 - Application #: 784 /07 /BRAM Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 2, 2008 8.1.3 10 VALLEYSIDE TRAIL • To undertake minor landscaping involving the placement, removal or regrading of material of.less than 30 cubic metres (equivalent to 3 truckloads) and construct a non - habitable accessory structure up to 50 sq: m (538 sq. ft) on Lot 29, Plan,•(10 Valleyside Trail)., in the City of'.Brampton, Humber River Watershed. The purpose is to permit the removal of unauthorized fill within .a TRCA Regulated Area of the Humber River watershed. The fill was placed on TRCA property behind the rear of an existing residential dwelling located at 10 Valleyside Trail, in the City of Brampton, without necessary TRCA approvals. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance' with the following documents and plans which form part of this permit: • Site Plan, prepared by TC, dated February 21, 2008, stamped received by TRCA Planning& Development staff on March 17, 2008. 130 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to remove unauthorized fill from within a TRCA Regulated Area of the Humber River watershed. The fill was placed on TRCA property at the rear of an existing residential dwelling located at 10 Valleyside Trail, in the City of•Brampton, without necessary TRCA approvals. As such, a violation notice has been issued. To resolve this violation, TRCA staff conducted a site visit to assess potential impacts. This proposal involves the removal of the unauthorized fill from the adjacent valleylands. Enhancement plantings are proposed with this application which involves the planting of native, non - invasive species in order to renaturalize the impacted area. There are no geotechnical, flooding, or ecology related concerns with this application. In addition, please be advised that a violation fee has been collected to resolve these issues. Also, the applicant will obtain a letter of entry from TRCA property staff in order to undertake the works associated with this application. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts.to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) will be used throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation was removed as a result of construction. Enhancement plantings are proposed as part' of this application in order to enhance the ecological condition of the natural features on -site. There are no fisheries related concerns associated with this proposal. • Plantings All plant species are native and non - invasive consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.2:2. (E) — Property Improvements & Ancillary Structures — of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40311 - Application #: 005 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: April 2, 2008 131 CITY OF PICKERING 8.1.4 PICKERING -BROCK CENTRE INC. To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Concession 1 Lot 17, Plan 40R11413, PARTS 1, 2, 3, (1842 Notion Road), in the City of Pickering, Duffins Creek Watershed as located on the property owned by Pickering -Brock Centre Inc.. The purpose is to erect a structure, undertake site grading and permanently place fill material within a Regulated Area in order to construct a retail development. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing ER -101, Construction Management and Erosion /Sediment Control Plan, prepared by Sernas Associates, dated August, 2007, received by TRCA on October 26, 2007; • Email Correspondence from Mr. Peter Warnica, C.E.T., dated March 20, 2008, confirming that site preparation works will not reduce Regional Flood Plain storage capacity on the site during interim phases of construction. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to erect a structure, undertake site grading and permanently place fill material within a Regulated Area in order to construct a retail development. The proposed development is to consist oflarge format retail stores, parking areas and a stormwater management pond. The subject lands are located north of the Pickering Design Centre plaza, east of Brock Road and north of Highway 401 and are separated from. the Duffins Creek valleylands by the Notion Road industrial area. The subject lands are currently vacant. Portions of the lands are vegetated with low quality or invasive trees and other vegetation. Presently, the majority of the site is located within the Regional Storm Flood Plain with flood 'depths of up to 2 metres of flooding. The flood plain at this point extends approximately 800 metres west from the Duffins Creek. Despite the flood hazard present.on the site, the lands are designated for retail development by.the City of Pickering and Region of Durham Official Plans. Staff have evaluated the flood risk, and the proposed management of the flood plain, and are satisfied that the site can be safely developed in accordance with the policies and criteria established by TRCA's Valley and Stream Corridor Management Program. This proposal would be the first of two permits. This first permit would allow the owner to begin initial site grading works subject to an approved sediment - _and erosion control plan. A second permit application will be made and brought forward for approval once the detailed design of the development has been finalized. City of Pickering staff have indicated in writing that they will support the flood plain management requirements of TRCA as the project moves forward to the detailed design stage. The City of Pickering is to hold a Letter of Credit to ensure that the grading works and site topography will maintain the required flood plain storage should the project not proceed to completion. 132 Control of Flooding: As noted above, the majority of the site is located within the Regional Storm Flood Plain with flood depths of up to 2 metres of flooding. In order to safely develop the site it must be 'floodproofed' by placing fill on the site to raise it above the elevation of the flood plain. In most circumstances, TRCA's Valley and Stream Corridor Management Program policies do not permit new development on lands susceptible to flooding. However, development may be permitted in circumstances where: the flood plain is considered to be unusually wide, the depths of flooding are shallow and flooding is infrequent. In addition, the applicant was required to prepare a Flood Plain Management Report. This report evaluated the flood plain characteristics and demonstrated to the satisfaction of TRCA staff that two key criteria could be met: 1) That there will be no upstream or downstream impacts to the control of flooding as a result of changes to flood storage and conveyance characteristics; and, 2) That the proposed amount of fill on the site within the flood plain will be offset by a corresponding cut (or depression). Careful evaluation of the existing flood plain characteristics, the required Flood Management-Report and the proposed development design, has satisfied TRCA staff that the criteria noted above have been met. Pollution: A sediment and erosion control plan has been submitted as part of this proposal in order to prevent the transportation of sediment off site. Dynamic Beaches: Not applicable Erosion: There are no geotechnical or slope stability issues associated with this proposal. Conservation of Land: As noted above, portions of the site contain low quality or invasive trees and other vegetation. As part of the site planning process, TRCA staff intend to request that an evaluation of the vegetation take place to confirm its quality and to provide for a mitigation plan that will provide for the planting of woody vegetation commensurate with the amount of vegetation to be removed as part of the development of the site. Plantings At this time, a planting plan has not been submitted for this proposal. However, via the site planning-process, TRCA staff intend to request that plantings take place to mitigate the removal of the existing low quality vegetation. Policy Guidelines: This proposal is consistent with Section 3.2.2 C) 2 - Policies & Procedures for Establishing Corridor Boundaries & Alterations- of TRCA's Valley and Stream Corridor Management Program. CFN: 39878 - Application #: 766/07/PICK Report Prepared by: Chris Jones, extension 5718 For information contact: Steve.Heuchert, extension 5311 Date: April 1, 2008 133 8.1.5 REGION OF DURHAM AND REGION OF YORK To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 15, 16, 17, NOW EXP 278 PART 1, 2 - 5, ETC., BF R2, R3, (901 McKay Road - Duffin Creek WPCP - Pickering), in the City of Pickering, Duffins Creek, Frenchman's Bay Watershed as located on the property owned by Region of Durham and Region of York. The purpose is to • construct, site grade, temporarily /perrrianently remove /place fill partially within a regulated area, and work within a wetland interference limit to enable works to be undertaken for the Stage 3 Expansion - Headworks Complex of the Duffins 'Creek Water Pollution Control Plant. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to provide minor revisions to the detailed design drawings; dated April 1, 2008; received April 2, 2008; prepared by York Region. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: In order to meet the projected sanitary sewerage servicing requirements of the York Durham Sewage System (YDSS) the Regions of Durham and York completed an Environmental Assessment (EA), "Provision of Additional Capacity at the Duffins Creek Water Pollution Control Plant - Schedule C Class Environmental Assessment" which was filed in September 2006 with the comment period ending on October 23, 2006. The preferred solution is to expand the Duffins Creek Water Pollution Control Plant. Site preparation works for the Stage 3 Expansion were conditionally approved as part of 2 separate permits in October 2006 - CFN 38202 and March 2007 - CFN 38855. The two aforementioned permits were issued in July 2007. The next phase of the work involves the initiation of the expansion. The Liquid Module Contract was previously approved under CFN 39297. The currently proposed works are for the construction of the Headworks Complex directly north of the Liquid Module site, and include the following: • Construction of the Headworks Building; covered aerated grit tanks, bidfilter, tank clean -out drain pad, transformers and new road and parking. Further design details will bereviewed by TRCA staff under separate permits. It has been agreed by TRCA and the Regions that enhancements to the site Would be incorporated into the .overall project.by teaming with TRCA to design and construct a new wetland and berming system in accordance with the overall "Greening and Biodiversity Concept Plan" which is being developed in consultation with the TRCA and the City `of Pickering. Due to time constraints, the above mentioned works need to proceed prior to completion of detailed landscaping and restoration plans. 134 The Regions have submitted a Letter of Commitment to TRCA which outlines their commitment to work with the TRCA to design and construct the new wetland and berrning system, to prepare and submit permit applications and, detailed drawings to the TRCA for review and comment for each stage of construction and to address all concerns and issues that TRCA identifies. The letter also commits to asses the disturbance to and removal of all existing vegetation carried out at all stages of construction (i.e. under permits relating to TRCA CFN 38202, 38855, 39297 and this permit) to ensure that all vegetation disturbance and removal is compensated for and that a net environmental enhancement is achieved'to the satisfaction of TRCA through the Greening and Biodiversity Plan. This was plan recently completed and brought forward for approval to Authority Meeting #2/08, held on March 28, 2008, with the following recommendation: • THAT the York Durham Water Pollution Control Plant Greening and Biodiversity Plan be approved; AND FURTHER THAT staff be directed to assist the Region of Durham and Region of York with the implementation of the Duffins Water Pollution Control Plant Greening and Biodkiersity Plan. The Regions have also submitted to TRCA an Environmental Management Plan (EMP) to describe the methods for mitigating environmental impacts for the construction and operation of the expanded Duffins Water Pollution Control Plant (WPCP). These methods will be implemented prior to, during, and post construction'as required to mitigate potential impacts on all components of the environment including natural, social and technical components. In addition to the mitigation measures, the Regions are committed to a detailed prograrn aimed at monitoring for compliance with the EMP. Control of Flooding: The storage or conveyance of floodwaters will not be impacted by the proposed works. Pollution: Standard sediment and erosion control measures will be implemented for the duration of construction and until the site is restored in order to prevent construction generated sediment from entering any watercourse, wetland feature or Lake Ontario. Dynamic Beaches: • Not applicable. Erosion: There will be no slope stability or erosion concerns with the proposed works. Conservation of Land: There will be no impacts to fish habitat as a result of the proposed works. Additional restoration will take •place as part of future works through the Greening /Biodiversity Plan. The detailed design associated with the Greening /Biodiversity Planfs being developed in consultation with staff of TRCA's Waterfront Restoration Division to ensure consistency with TRCA projects and objectives along the Lake Ontario Waterfront, as well as the Duffins Marsh. 135 Plantings Some disturbed areas will be restored with native non - invasive species following construction. Additional restoration will take place as part of future works through the Greening and Biodiversity Plan. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management.Program. CFN: 40476 - Application #: 090 /08 /PICK Report Prepared by: Alex Blasko, extension 5714 For information contact: Beth Williston, extension 5217 Date: April 2, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.6 11 WOODMERE COURT To construct, reconstruct, erect or place a building or structure on Lot 11, Plan • 5773, (11 Woodmere Court), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in.order to facilitate the • construction of a new single - family detached dwelling. The existing dwelling is to be demolished. The permit-will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing unnumbered, Site Plan /Replanting Plan, prepared by Richard Wengle Architect Inc., dated February 11, 2008, received on March 10, 2008; • Drawing No. L -2, Landscape Tree Replacement Plan, prepared by Landscape Consultants Limited, dated November 20, 3008, Revision No. 2, revised on February 11, 2008, received on March 10, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal:" The purpose is to construct a new single - family detached dwelling, in- ground pool, and associated hard and•soft landscaping at 11 Woodmere Court in the City.of Toronto. The . existing dwelling is to be demolished and the existing in- ground pool removed. The subject site is located west of Royal York Road, south of Eglinton Avenue West within the TRCA Regulated Area of the Humber River Watershed. Control of Flooding: • The site is not located within a Regional Storm Floodplain and the proposal will have no impact • on the storage and /or conveyance of floodwaters. 136 Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the golf course. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine . Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: The proposal is consistent with Section 4.2:2. (D) - Development Guidelines for Replacement Structures within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40570 - Application #: 164/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 1, 2008 8.1.7 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Eglinton Avenue West from Royal York Road to Scarlett Road, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by the City of Toronto. The purpose is to construct a sidewalk and bicycle path along a portion of Eglinton Avenue West from Royal York Road to east of Scarlett Road. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing P- 571 -043 - Eglinton Avenue West Sidewalk and Bicycle Path Construction from Royal York Road to 300m east of Scarlett Road; dated February 12, 2008; received February 15, 2008; prepared by City of Toronto Technical Services; • Drawing P- 571 -044 - Eglinton Avenue West Sidewalk and Bicycle Path Construction from Royal York Road to 300m east of Scarlett Road; dated February 12, 2008; received February 22, 2008; prepared by City of Toronto Technical Services. 137 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the construction of a sidewalk and bicycle path along Eglinton Avenue West from Royal York Road to east of Scarlett Road. The portion of Eglinton Avenue east of Scarlett Road is within the Regulation Limit. The works in this location include minor sidewalk improvements at the intersection of Eglinton Avenue and Scarlett Road, the construction of a small paved pedestrian area at the southeast corner of the intersection, and new lane markings and the installation of a concrete barrier along the south side of the bridge to accommodate the bicycle lane. Control of Flooding: No adverse impacts to the storage or conveyance of flood waters are anticipated as a result of this project. Pollution: Appropriate controls will be implemented and maintained throughout construction to prevent sediment and other deleterious substances from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no significant slope stability or geotechnical concerns with the proposed works. Conservation'of Land: There will be no impacts to significant aquatic or terrestrial features from the proposed works. No tree or shrub removals are required. Plantings Disturbed areas will be stabilized and restored as appropriate. . Policy Guidelines: The proposal complies with Section 4.3, Infrastructure and Servicing, of.the Authority's Valley and Stream Corridor Management Program. CFN: 39785 - Application #: 704/07/TOR Report Prepared by: Alex Blasko, extension 5714 For information contact: Alex Blasko, extension 5714 Date: April 2, 2008. 8.1.8 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure on Lot 10, Concession C (Dundas Street West over the Humber River) in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by the City of Toronto. The purpose is to rehabilitate the Dundas Street West bridge over the Humber River. 138 The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to provide minor revisions to the engineering drawings; dated March 31, 2008; received March 31, 2008; prepared by UMA Engineering Ltd. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the rehabilitation of the Dundas Street West bridge over the Humber . River. The works will include the rehabilitation of the existing piers and abutments, the replacement of the existing superstructure which is beyond feasible repair, and the construction of new bike lanes and railings. One pier is located within the watercourse, and it will be isolated using a cofferdam so that the rehabilitation of this pier can commence in the dry. Control of Flooding: No adverse impacts to the storage or conveyance of flood waters are anticipated as a result of this project. Pollution: Appropriate controls will be implemented and maintained throughout construction to prevent sediment, debris and other deleterious substances from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no slope stability or geotechnical concerns with the proposed works. Conservation of Land: Vegetation clearing will be required around the bridge to facilitate construction access. An Environmentally Significant Area has been identified directly north of the project site. A detailed tree inventory and removals /restoration plan has been developed to provide recommendations to minimize removals and restore the area upon completion of the works. Plantings Appropriate native tree and shrub species will be planted to restore the disturbed areas and to enhance the function and quality of existing vegetation. Policy Guidelines: The proposal complies with Section 4.3, Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 40175 - Application #: 917/07/TOR Report Prepared by: Alex Blasko, extension 5714 For information contact: Alex Blasko, extension 5714 Date: April 2, 2008 139 8.1.9 CITY OF TORONTO. To construct, reconstruct, erect or place a building or structure in Beaumonde Heights Park, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by the City of Toronto. The purpose is to replace Pedestrian Bridge No. 1 at Beaumonde Heights Park between July 1 and March 31. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Sheet 1 - Beaumonde Heights Park Pedestrian Bridge Replacement Located Over a Tributary of the Humber River in Beaumonde Heights Park, Toronto; revised March 26, 2008; received March 31, 2008; red line revised by TRCA March 31, 2008; prepared by Peter T. Mitches & Associates Limited. • Sheets 2, 3, 4 Beaumonde Heights Park Pedestrian Bridge Replacement Located Over a Tributary of the Humber River in Beaumonde Heights Park, Toronto; revised March 26, 2008; received March 31, 2008; prepared by Peter T. Mitches & Associates Limited. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the replacement of Pedestrian Bridge No. i over Albion Creek at Beaumonde Heights Park: The existing bridge has reached its end -of -life cycle, and the proposed works will include the removal of the existing bridge deck. The existing abutments will remain in place to provide stability for the new abutments, which will be constructed further back from the watercourse. A new bridge deck will be placed on the new.abutments. No in -water work is required. Control of Flooding: No adverse impacts to the storage or conveyance of flood.waters are anticipated as a result of this project. Pollution: Appropriate controls will be implemented and maintained throughout construction to prevent sediment and other deleterious substances from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no slope stability or geotechnical concerns with the proposed works. Conservation of Land: No tree or shrub removals will be required for the proposed works. 140 Plantings Appropriate native species will be planted near the work area to enhance the existing • riparian vegetation. Policy Guidelines: The proposal complies with Section 4.3, Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 40611 - Application #: 187/08/TOR Report Prepared by: Alex Blasko, extension 5714 For information contact: Alex Blasko, extension 5714 Date: April 2, 2008 8.1.10. 22 PASADENA GARDENS To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Lot 12, Plan 4655, (22 Pasadena Gardens), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a two- storey addition and deck to the rear of the existing • two- storey single family detached residential dwelling. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A100, Site Plan and General Info, prepared by Construction Studio Inc., dated January 27, 2008, received April 1, 2008; • Drawing No A601, South Elevation, prepared by Construction Studio Inc., dated January 27, 2008, received April 1, 2008; • Drawing No A602, Elevations, prepared by Construction Studio Inc., dated January 27, 2008, received April 1, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a two - storey addition and deck to the rear of the existing two- storey single family detached residential dwelling. The site is located west of Jane Street, east of Humber River and south of Dundas Street W abutting Eitenne Brule Park in .a TRCA Regulated Area of the Humber River Watershed. Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. 141 Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the adjacent ravine lands. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: The proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40626 - Application #: 200 /08 /TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 1, 2008 138 THOMPSON AVENUE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 12, Plan 3622, (138 Thompson Avenue), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a 2nd- storey addition to the existing 1.5- storey single family detached dwelling and the reconstruction of the existing front porch and rear sunroom. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • • Drawing No. SP, Site Plan, prepared by David W. SmaII Designs Inc., dated September 2007, Revision No. 3, revised on January 28, 2008, received on February 20, 2008; • Drawing No. 5, Front Elevation, prepared by Daviid W. SmaII Designs Inc., dated August 2007, Revision No. 2, revised on January 24, 2008, received on February 20, 2008; • Drawing No. 6, Right -Side Elevation, prepared by David W. SmaII Designs Inc., dated August 2007, Revision No. 2, revised on January 24, 2008, received on February 20, 2008; 142 • Drawing No. 7, Rear Elevation, prepared by David W. SmaII Designs Inc., dated August 2007, Revision No. 2, revised on January 24, 2008, received on February 20, 2008; • Drawing No. 8, Left -Side Elevation, prepared by David W. SmaII Designs Inc., dated August 2007, Revision No. 2, revised on January 24, 2008, received on February 20, 2008; • Drawing No. 9, Section A -A, prepared by David W. Small Designs Inc., dated August 2007, Revision No. 2, revised on January 24, 2008, received on February 20, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to construct a 2nd - storey addition and reconstruct the existing front porch and rear sunroom to the existing 1.5- storey single family detached dwelling at 138 Thompson Avenue in the City of Toronto. The subject site is located south of Bloor Street West and west of Royal York Road, backing on to Mimico Creek within a Regulated Area of the Mimico Creek Watershed. The proposed works are to be constructed in the regulatory flood plain. Control of Flooding: The subject property is located within a regulatory floodplain of the Mimico Creek Watershed. However,. TRCA staff have determined the proposed works will not adversely impact the storage and /or conveyance of floodwaters, and the proposed addition is adequately flood proofed. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: The proposal is consistent with Section 4.2.2., Development and Redevelopment /Intensification within Non - Established Communities /Highly Urbanized Areas, of the TRCA's Valley and Stream Corridor Management Program. 143 CFN: 40516 - Application #: 119/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 1, 2008 8.1.12. 5 WINGROVE HILL To construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 5, Plan 1635, (5 Wingrove Hill), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The . purpose is to develop within a Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a second - storey addition and renovation of the existing 1.5- storey single family detached dwelling. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing unnumbered, Site Plan, prepared by Valeriy Gopka, undated, received on March 19, 2008, redlined by TRCA staff on April 1, 2008; • Drawing No. A -1, Front (North) Elevation, prepared by Valeriy Gopka, dated February 2008, received on March 19, 2008; • Drawing No. A -2, Side (East) Elevation, prepared by Valeriy Gopka, dated February 2008, received on March 19, 2008; • Drawing No. A -3, Side (West) Elevation, prepared by Valeriy Gopka, dated February 2008, received on March 19, 2008; • Drawing No. A -4, Rear (South) Elevation, prepared by Valeriy Gopka, dated February 2008, received on March 19, 2008; • Drawing No. A -9, Typical Wall Section, prepared by Valeriy Gopka, dated February 2008, received on March 19, 2008; • Drawing No. A -10, Cross Section, prepared by Valeriy Gopka, dated February 2008, received on March 19, 2008. • RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to construct a 2nd - storey addition and renovate the existing 1.5 storey single family detached dwelling at 5 Wingrove Hill in the City of Toronto. The subject site is located south of Rathburn Road, west of Kipling,pvenue and backs on to Mimico Creek within a Regulated Area of.the Mimico Creek Watershed. The proposed works are to be constructed in the regulatory floodplain. 144 Control of Flooding: The subject property is located within a regulatory floodplain of the Mimico Creek Watershed. However, TRCA staff have determined the proposed works will not adversely impact the storage and /or conveyance of floodwaters, and the proposed addition is adequately flood proofed. Pollution: • A temporary sediment control fence will be installed to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recornmendatioris pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: The proposal is consistent with Section 4.2.2., Development and Redevelopment /Intensification within Non - Established Communities /Highly Urbanized Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40471 - Application #: 092/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 1, 2008 8.1.13 18 EDENBRIDGE DRIVE To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on • Part Block A, Plan 2581, Part Block C, D, Plan 2615, (18 Edenbridge.Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the installation of an in- ground pool and spa, terrace and associated landscaping. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No: P -01, Pool and Landscape Layout Plan, prepared by Gib -San Environmentals, dated February 6, 2008, received on March 13, 2008. 145 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to facilitate the installation of an in- ground pool and spa, terraced area and associated landscaping in the rear yard of an existing single family detached residential dwelling. The subject site is located west of Royal York Road, north of The Kingsway and backs on to an existing golf course within a TRCA Regulated.Area of the Humber River Watershed. The property is at the base of a mild slope which is located at the rear property boundary. Control of Flooding: This site is not located within a Regulated Floodplain and the proposal will have no impact on . the storage and /or conveyance of floodwaters. Pollution: Sediment control fencing is not required as the proposed works are located at the bottom of a minor slope and therefore adequately setback from the adjacent golf course. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Plantings will be provided as per the landscaping plan prepared to the satisfaction of Urban Forestry Ravine Protection Services. Policy Guidelines: This proposal is consistent with Section 4.2.2. (E) - Development Guidelines for Property Improvements and Ancillary Structures within Non - Established Communities /Highly Urbanized .Areas of the TRCA's Valley and.Stream Corridor Management Program. CFN: 40618 - Application #: 190/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 2, 2008 8.1.14 .:i 6 WESTMOUNT PARK ROAD • To construct, reconstruct, erect or place a building or structure on .6 Westmount Park Road, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose.is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the reconstruction of the existing retaining wall. 146 The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. L -1, Rear Layout Plan for Ravine Permit, prepared by Kent Ford Design Group, dated August 11, 2008, Revision No. 6, revised on September 27, 2008, received on October 22, 2007, redline revised by TRCA staff on April 1, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to reconstruct an existing retaining wall in the rear yard of the existing single family detached dwelling. The subject site is located South of Lawrence Avenue West and east of Royal York Road within a TRCA Regulated Area of. the Humber River Watershed. Control of Flooding: This site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: As per TRCA's redline revision, a temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided through a Ravine.Stewardship Plan as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: The proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established Communities /Highly Urbanized Areas, of the TRCA's Valley and Stream Corridor-Management Program. 147 CFN: 40054 - Application #: 876/07/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 1, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.15 29 BEECHWOOD AVENUE To construct, reconstruct, erect or place a building or structure on Lot 103, 104, Plan 1750, (29 Beechwood'Avenue), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of an attached garage at the front of the existing dwelling, and an in- ground pool, pool house, and ancillary structure at the rear of the existing dwelling. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form .part of this permit: • Drawing No. 1 /SP, Site Plan, prepared by Newman Cebulak, dated January 15, 2008, received by TRCA January 25, 2008; • Site and Grading Plan for Lots 103 and 104 Registered Plan 1750, prepared by Rady - Pentek & Edward Surveying Ltd., dated January 18, 2008, received by TRCA January 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of an attached garage at the front of the existing dwelling, and an in- ground pool, pool house and ancillary structure at the rear of the existing dwelling at 29 Beechwood Avenue in the City of Toronto. The'site is located south of York Mills Road, east of Yonge Street. Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: Sediment control fencing is not required as the proposed works are adequately set back from the watercourse. Dynamic Beadles: Not applicable Erosion: A geotechnical investigation has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. The proposed developments will be adequately setback from the top of bank. 148 Conservation of Land: No significant vegetation will be removed as a result of construction. Appropriate tree protection fencing will be installed. Plantings Native tree shrubs and seed mix will be planted. Policy Guidelines: This proposal is consistent with Section 4.2.2.C, Minor Additions, and Section 4.2.2.E, Property Improvements and Ancillary Structures, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40413 - Application #: 055/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Michelle Stafford, extension 5250 Date: April 2, 2008 8.1.16 26 IVOR ROAD To construct, reconstruct, erect or place a building or structure and site grade on Lot 6; Plan 2343, (26 Ivor Road), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a new two- storey dwelling with rear deck. The existing dwelling is to be demolished. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1, Site Plan and Landscape Plan, prepared by Sasha Milenov, Architect, undated, received by TRCA March 19, 2008; • Drawing No. 2, Grading Plan, prepared by Sasha Milenov, Architect, undated, received by TRCA March 19, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of . a new two - storey dwelling with rear deck, and repairs to the existing retaining walls on the side of the subject property at 26 Ivor Road in the City of Toronto. The site is located south of York Mills Road, east of Yonge Street. The existing dwelling is to be demolished. Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: Sediment control fencing is not required as the site is adequately set back from the watercourse. 149 Dynamic Beaches: Not applicable Erosion: A geotechnical assessment of the existing retaining walls has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: No significant vegetation will be removed to facilitate construction and appropriate tree protection fencing will be installed. Plantings Native tree shrubs and seed mix will be planted. Policy Guidelines: This proposal is consistent with Section 4.2.2.D, Replacement Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 40634 - Application #: 206/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 2, 2008 8.1.17 22 SWIFTDALE PLACE To change a building or structure so that it alters its use or potential use, . increases its size or increases the. number of dwelling units on Lot 900, Plan 4760, (22 Swiftdale Place), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within' a Regulated -Area of the Don River Watershed to facilitate construction of a one - storey addition to the front and a one - storey addition to the rear of the existing dwelling. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents' and plans which form,part of this permit: • Drawing No. Al, Proposed Site Plan; prepared by Spragge + Company Architects, dated August 15, 2007, received by TRCA February 20, 2008. .RATIONALE The application was reviewed by staff on the basis of tlip following information: Proposal: The proposed works include construction of a one - storey addition to the rear and a one- storey addition to the front of the existing dwelling at 22 Swiftdale Place in the City of Toronto. The site is located south of York Mills Road, east of.Don Mills Road. 150 Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: Sediment control fencing will be erected before commencement of any construction or grading works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. Dynamic Beaches: Not applicable Erosion: A geotechnical report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. The proposed addition will be adequately setback from the top of bank. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.C, Minor Additions, of TRCA's Valley and Stream Corridor Management Program. CFN: 40552 - Application #: 142/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 2, 2008 8.1.18 CITY OF TORONTO To site grade and alter a watercourse on Lot 5, Concession 3 Lot 5, Plan 64R -1035, (Bermondsey Works Yard at Bermondsey Road and Bartley Drive) in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by the City of Toronto. The purpose is to stabilize the slope surrounding the Bermondsey Works Yard. . The permit will be issued for the period of March 7, 2008 to March 6, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to provide minor revisions to the detailed design drawings; dated February 26, 2008; received February 26,'008; prepared by City of Toronto Technical Services. RATIONALE The application was reviewed by staff on the basis of the following information: 151 Proposal: The proposal consists of the stabilization of the slope surrounding the Bermondsey Works Yard to prevent further erosion and avoid to impacts to the adjacent rail tracks and watercourse. The unstable slopes along the south and west sides of the site will be cut back, regraded and planted to improve stability. The toe of the south slope will be moved back from the watercourse to avoid future erosion impacts and to create a more.stable bank. Access to the site will be through the works yard at the top of the slope to minimize disturbance to the surrounding vegetation. Control of Flooding: No adverse impacts to the storage or conveyance of flood waters are anticipated as a result of this project. Pollution: Appropriate controls will be implemented and maintained throughout construction to prevent sediment and, other deleterious substances from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: The proposed works will stabilize the existing slope and protect the area from future erosion impacts. Conservation of Land:. All vegetation on the failing slopes will be removed, however the regraded slope will increase the revegetation potential of the area. Plantings The regraded slope and surrounding area will be extensively planted with an appropriate native seed mix and native trees and shrubs to improve stability. Policy Guidelines: The proposal complies with Section 4.3, Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 38853 Application #: 078/07/TOR Report Prepared by: Alex Blasko, extension 5714 For information contact: Alex Blasko, extension 5714 . Date: April 2, 2008 8.1.19 33 MASON BOULEVARD To change a building or structure so th4t it alters its use or potential use, increases its size or increases the number of dwelling units on • Lot 10, Plan 2977, Part Lot 9, 8, Plan 2977, (33 Mason Boulevard), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate renovation of an existing non - habitable space into an addition to the finished floor area of the existing dwelling. 152 The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -1, Site Plan, prepared by Eva J Gordon Architect, dated February 2008, received by TRCA March 4, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include replacement of an enclosed glass porch with a two storey addition at the rear of the existing dwelling at 33 Mason Boulevard in the City of Toronto. The site is located west of Yonge Street, south of Wilson Avenue. Control of Flooding: The site is not located in a Regional Storm Floodplain. Pollution: Sediment control fencing is not required as part of this application. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No vegetation will be removed to facilitate construction and the proposed works are located within the footprint of the existing dwelling. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.C, Minor Additions, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40555 - Application #: 139/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 2, 2008 153 8.1.20 65 FOREST GROVE DRIVE To construct, reconstruct, erect or place a building or structure on Lot 13, Plan M -754, (65 Forest Grove Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a new two- storey dwelling and rear deck. The existing dwelling is to be demolished. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Rowan- Stanciu Ltd., dated December 21, 2007, received by TRCA staff January 15, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: • Proposal: The proposed works include the construction of a new two - Storey dwelling with a rear deck at 65 Forest Grove Drive in the City of Toronto. The site is located south of Finch Avenue East, west of Leslie Street. The rear wall of the new dwelling is to be located approximately in the same location as the rearwall of the existing dwelling, 10 metres from the Long- Term - Stable Top -of- Slope. Control of Flooding: The site is not located within a regional storm floodplain. As such, the storage or conveyance of flood waters will not be impacted. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable Erosion: A geotechnical slope stability. report has been reviewed and approved by TRCA geotechnical . engineering staff and the proposal will be constructed in accordance with the • recommendations of this report. The proposed house and deck will be adequately setback from the top of bank. Conservation of Land: No significant vegetation will be removed as a result ofy.construction. Plantings No plantings are required as part of this project. 154 Policy Guidelines: This proposal is consistent with Section 4.2.2.D, Replacement Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 40376 - Application #: 036/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 2, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.21 382 CENTENNIAL ROAD To construct, reconstruct, erect or place a building or structure on Lot 24, Plan 2732, (382 Centennial Road), in the City of Toronto (Scarborough Community Council Area), Rouge River Watershed. The purpose is to develop within a Regulated Area of the Rouge River Watershed to facilitate the construction of an addition to the existing rear porch and one - storey addition to the side and rear of the existing dwelling. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. SP -1, Site Plan Showing Proposed Addition to the Niven Residence, prepared by The Gregory Design Group, dated May 15, 2007, received by TRCA May 30, 2007; • Letter from Shaheen & Peaker Limited, Re: 382 Centennial Road Proposed Residential Addition, signed by Yves Beauparlant, dated April 2, 2008, received by TRCA April 2, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to develop within a Regulated Area of the Rouge River Watershed to facilitate the construction of an addition to the rear porch and a one - storey addition to the side and rear of the existing dwelling at 382 Centennial Road in the City of Toronto. The subject property is located south of Kingston Road and west of Port Union Road. Control of Flooding: The proposed works are not located within the Regional Storm Floodplain. Pollution: Sediment fencing is not required as the proposed works are adequately set back from the watercourse or any significant natural features. Dynamic Beaches: Not applicable 155 Erosion: A geotechnical study has been reviewed and approved by TRCA geotechnical engineering staff. In addition, the.applicant's consultant has agreed in writing to oversee construction and consult on issues pertaining to the foundation of the addition. Conservation of Land: There will be no impact on significant natural features or riparian vegetation. Plantings Plantings are not required as part of this application. Policy Guidelines: This project complies with Section 4.2.2.C, Minor Additions, of TRCA's Valley and Stream Corridor Management Program. CFN: 39316 - Application #: 336/07/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 2, 2008 8.1.22 137 ROEBUCK DRIVE To change a building or structure so that it alters its use or potential use,, increases its size or increases the number of dwelling units on Lot 24, Plan M639,.(137 Roebuck Drive), in the City of Toronto (Scarborough Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a new one - storey ground floor sunroom addition on Concrete piers to the rear of the existing dwelling. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. SP -01, Site Plan, prepared by Arrowsmith and Associates, dated February 27, 2008, received by TRCA March 26, 2008. Redlined by TRCA staff on April 1, 2008 to include sediment control fencing; • Drawing No. A -1, Floor Plans, prepared by Arrowsmith and Associates, dated February 27, 2008, revised March 13, 2008, received by TRCA March 26, 2008; • Drawing No. A -2, Elevations & Section, prepared by Arrowsmith and Associates, dated February 27, 2008, revised March 13, 2008, received by TRCA March 26, 2008; • Drawing No. A -3, Specifications, prepared by Arrowsmith and Associates, dated February 27, 2008, received by TRCA March 26,12008. RATIONALE The application was reviewed by staff on the basis of the following information: 156 Proposal: The proposed works include construction of a new one - storey ground floor sunroom addition on concrete piers to the rear of the existing dwelling at 137 Roebuck Drive in the City of Toronto. The site is located west of Kennedy Road, south of Eglinton Avenue East. Control of Flooding: The site is located in the Regional Storm Floodplain of Taylor Massey Creek but the proposed works are located outside the floodplain. Pollution: A sediment control fence will be erected before commencement of any construction or grading works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: The proposal is consistent with Section 4.2.2.C, Minor Additions, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40632 - Application #: 204/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 2, 2008 8.1.23 559 MEADOWVALE ROAD To construct, reconstruct, erect or place a building or structure on Lot 15, Plan 3499, '(559 Meadowvale Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. The purpose is to develop within a Regulated Area of the Highland Creek Watershed to facilitate construction of a new two- storey dwelling. The existing dwelling is to be demolished. The permit will be issued for the period of April 11, 200ti to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Grading Plan for Lot 15 Registered Plan 3499, prepared by H. Piller Corporation Ltd., undated, received by TRCA March 11, 2008. 157 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a new two - storey dwelling at 559 Meadowvale Road in the City of Toronto. The site is located on Meadowvale, between Ellesmere Road and Kingston Road. The existing dwelling is to be demolished. Control of Flooding: The subject property is located in the Regional Storm Floodplain.. The proposed dwelling is to be located at the highest elevation on the property, in the least flood vulnerable siting. The proposed dwelling is only partially located in the floodplain whereas the existing dwelling is fully located in the regional storm floodplain. The proposed works will be floodproofed to the Regional Storm Flood elevation. Pollution: Sediment control fencing is not required as the works are adequately setback from the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant trees will be removed as a result of construction. Appropriate tree protection fencing will be installed. Plantings Native.tree shrubs and seed mix will be planted. Policy Guidelines: This proposal is consistent with Section 4.2.2.D, Replacement Structures, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40589 - Application #: 169/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 2, 2008 8.1.24 29 SOUTH MARINE DRIVE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 73, Plan M -1012, (29 South Marine Drive), in the City of Toronto (Scarborough . Community Council Area), Waterfront Watershed. The purpose is to develop within the Toronto Waterfront to facilitate construction of a one - storey addition to the side of the existing dwelling. 158 The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the The. documents and plans which form part of this permit: • Sketch of proposed one- storey addition, received by TRCA February 14, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a one - storey addition with basement to the side of the existing dwelling at 29 South Marine Drive in the City of Toronto. The site is located south of Kingston Road, east of Markham Road. Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: Sediment control fencing is not required as the proposed works are adequately set back from the waterfront. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this application as the rear wall of the proposed side addition is in -line with the rear wall of the existing dwelling, the rear yard has an existing swimming pool, and the property limit does not extend into the sloping portion of the property.' The proposed addition is adequately setback from the top of slope. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.C, Minor Additions, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40498 - Application #: 109/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension-I5311 Date: April 2, 2008 159 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.25 94 MORSE STREET To construct, reconstruct, erect or place a building or structure on Lot 120, 121, Plan 423, (94 Morse Street), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a single- storey two -car detached garage in the rear yard of the .existing semi - detached dwelling. LOCATION MAP: not available The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 2 of 10, Site Plan, prepared by Chris Davis, dated August 29, 2007, received August 31, 2007. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a one - storey two -car detached garage in the rear yard of the existing dwelling. The subject site is located in the Lower Don Special Policy Area, south of Eastern Avenue and west of Carlaw Avenue in the City of Toronto. Control of Flooding: The subject property is located in the Lower Don Special Policy Area. However, TRCA staff have determined the proposed works ar,e adequately flood - proofed and will not adversely impact the storage and /or conveyance of floodwaters. Pollution: Sediment fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. • Plantings No.plantings are required as part of this project. 160 Policy Guidelines: This proposal is consistent with Section 4.2.2.(E) - Development Guidelines for Property Improvements and Ancillary Structures within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 39759 - Application #: 678/07/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 2, 2008 8.1.26 621 RUSHTON ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 8, Plan 2612, (621 Rushton Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a second - storey addition, two- storey side addition and rear second - storey cantilevered deck to the existing single- storey detached dwelling. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing unnumbered, Site Plan, prepared by Integral Design Associates, dated January 22, 2008, received on January 24, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a two- storey side addition, second - storey addition and rear second - storey cantilevered deck to the existing single- storey detached dwelling located at 621 Rushton Road in the City of Toronto. The subject site is located west of Bathurst Street, north of Vaughan Road and backs onto Cedarvale Park within the Don River Watershed. Control of Flooding: The site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering Cedarvale Park. Dynamic Beaches: Not applicable. 161 Erosion: • A geotechnical slop stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance to the recommendations of this report. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. . Policy, Guidelines: The proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40448 - Application #: 077/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 2, 2008 8.1.27 37 DOUGLAS CRESCENT . To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Lot 117, 1 18, Plan 2398, (37 Douglas Crescent), in the City of Toronto (Toronto and East York Community Council'Area), Don River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a two - storey addition and deck to the rear of the existing two - storey single family detached dwelling. The existing rear addition to the dwelling is to be demolished. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Jacob Design and Drafting Services, dated January 2008, received on March 11, 2008; • Drawing No. A5, Deck, prepared by Jacob Design and Drafting Services, dated January 2008, received on March 11, 2008; • Drawing No. A6, Section, prepared by Jacob Design and Drafting Services, dated January 2008, received on March 11, 2008;. i • Drawing No A7, Elevations, prepared by Jacob Design and Drafting Services, dated January 2008, received on March 11, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 162 Proposal: The purpose is to construct a two- storey addition and deck to the rear of an existing two - storey single family detached dwelling located at 37 Douglas Crescent in the City of Toronto. The subject site is located west of Bayview Avenue, south of Moore Avenue within a developed valley corridor of the Don River Watershed. Control of Flooding: This site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: The proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non- Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40599 - Application #: 177/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 1, 2008 8.1.28 -TALUS CAPITAL (EASTERN AVENUE) LIMITED To construct, reconstruct, erect or place a building or structure on Lot 118, 119, 122, 123, Plan D -135, Part Lot 117, 120, 121, Plan D -135, (356 Eastern Avenue), in the City of Toronto (Toronto and East ='ork•Community Council Area), Don River Watershed as located on the property owned by Talus Capital (Eastern Avenue) Limited. The purpose is to construct a new self storage building within a Regulated Area of the Don River Watershed. 163 The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. SP1, Site Plan, prepared by JH Rust Architect, dated March 18, 2008, received March 26, 2008; • Drawing No. G -1, Grading and Servicing Plan, prepared by V.A Piscione & Associates, dated October 4, 2007, received March 26, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the construction of a new self storage building at 356 Eastern Avenue. The subject property is located within the Regional Storm Floodplain of the Don River and also the Lower Don Special Policy Area. Control of Flooding: TRCA technical staff have reviewed the.proposal and determined that the works will not affect the storage or conveyance of flood waters. Further, the proposed structure is adequately floodproofed and meets TRCA's policies. Pollution: Sediment fencing is not required as the proposed works are removed from the valley. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this proposal. Conservation of Land: There will be no significant vegetation removed .as part of this permit as the site is fully urbanized. Plantings No. plantings are required. Policy Guidelines: This proposal is consistent with Section.4.2.1 B, Development Guidelines for Development /Redevelopment within the Designated Two Zone Areas or Special Policy Areas, of TRCA's Valley and Stream Corridor Management Program. CFN: 40620 - Application #: 196/08/TOR Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: March 31, 2008 164. CITY OF VAUGHAN 8.1.29 CITY OF VAUGHAN To construct, reconstruct, erect or place a building or structure and site grade on Lot 12, Concession 8 , (301 Vaughan Mills Road), in the City of Vaughan, Humber River Watershed as located on the property owned by City of Vaughan. The purpose is to upgrade an existing passive park to an active park with playground equipment within a Regulated Area of the Humber River Watershed at 301 Vaughan Mills Road, in the City of Vaughan. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan (Drawing No. SK -01), prepared by the City of Vaughan Department of Parks Development, received by the TRCA February 13, 2008; • Site Sections (Drawing No. SK -02), prepared by the'City of Vaughan Department of Parks Development, received by the TRCA February 13, 2008; • Existing Conditions, Site Preparation Plan (Drawing No. L1), prepared by the City of Vaughan Department of Parks Development, received by the TRCA March 14, 2008; • Grading and Servicing Plan (Drawing No. L3), prepared by the City of Vaughan Department of Parks Development, received by the TRCA March 14, 2008; • Planting Plan (Drawing No. L4), prepared by the City of Vaughan Department of Parks Development, received by the TRCA March 14, 2008; and • Construction Details (Drawing No. 01), prepared by the City of Vaughan Department of Parks Development, received by the TRCA March 14, 2008; RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to upgrade an existing passive park to.an active park within a Regulated Area of the Humber River Watershed at 301 Vaughan Mills Road, in the City of Vaughan. The works will include the installation of park furniture, a planting area, a playground area, electrical and lighting works and minor grading works. The works are located within the valley / stream corridor but are outside of the Regional Storm Flood Plain. Control of Flooding: TRCA water resources engineering staff are satisfied that the proposed works will not have an impact on the storage and conveyance of flood waters as the works are outside of the Regional Storm Flood Plain. Pollution: Sediment control fencing will be installed and maintained during the construction period to prevent sediment from entering the adjacent valley system and watercourse. Dynamic Beaches: Not applicable. 165 Erosion: There are no•geotechnical issues associated with this application. Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. Tree protection fencing will be erected around the dripline of existing trees within the area of disturbance. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings The proposal increases the amount of plantings and vegetation currently on site. All proposed plantings and seed mixes are composed of native non - invasive species. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 40491 - Application #: 097 /08 /VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: March 20, 2008 8.1.30 19 PARK RIDGE DRIVE To construct, reconstruct, erect or place a building or structure on Lot 31, Plan 65M -3738, (19 Park Ridge Drive), in the City of Vaughan, Humber River Watershed. The purpose is to construct a cabana with an interlocking brick • walkway within a Regulated Area of the Humber River Watershed at 19 Park Ridge Drive, in the City of Vaughan. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, (Drawing No. Al), prepared by Napa Design Group, revision dated May 4, 2005, received by the TRCA.April 2, 2008, redline revised to indicate that all hardsurfacing works including the cabana roof are to drain away from the slope. RATIONALE The application was reviewed by staff on the basis of the following information: 166 Proposal: The purpose is to construct a cabana with an interlocking brick walkway within a Regulated Area of the Humber River Watershed. Based upon a site visit conducted February 15; 2008 by TRCA staff and the Site Plan provided by the applicant, the proposal is located approximately 3 metres away from an existing top of bank. A geotechnical letter prepared by Soil Probe Ltd., dated March 24, 2008 indicates that the proposed cabana will not adversely impact the slope nor is subject to damage due to erosion over time. The geotechnical letter also recommends that any hardsurfacing around the cabana should be sloped in a way that directs stormwater away from the slope towards the centre of the property. Additionally, the letter recommends • that rain gutters should be included in the. design of the cabana and should be outleted away from the slope. Control of Flooding: The proposal is not located within the Regional Storm Flood Plain. There will be no impact on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be installed and maintained during construction to prevent sediment from entering the adjacent valley system. Dynamic Beaches: Not applicable. Erosion: TRCA geotechnical staff are satisfied that the proposed works will not have an adverse impact on the adjacent valley wall and valley system. All hardsurfacing including the cabana are to drain away from the slope feature. Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 40455 - Application #: 086 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 :` Date: April 1, 2008 167 8.1.31 187 CLARENCE STREET To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and site grade on Part of Lot 14, Plan 546, (187 Clarence Street), in the City of Vaughan, Humber River Watershed.. The purpose is to construct an addition to an existing home within a Regulated Area and Regional Storm Flood Plain of the Humber River Watershed at 187 Clarence Street, in the City of Vaughan. .The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with • the following documents and plans which form part of this permit: • • Site Plan (Drawing No. Al), prepared by Turner Fleisher Architects Inc., dated February 27, 2008, received by the TRCA March 4, 2008, redline revised to indicate the erection of sediment control fencing and the removal of all excess fill material; • Floor Plans (Drawing No. A2), prepared by Turner Fleisher Architects Inc., dated February 27, 2008, received by the TRCA March 4, 2008; • Elevations (Drawing No. A4), prepared by Turner Fleisher Architects Inc., dated February 27, 2008, received by the TRCA March 4, 2008; and • Letter prepared by K.O. & Partners Ltd., dated February 28, 2008, received by the TRCA March 4, 2008 confirming the structural integrity of the proposed addition in a Regional Storm event. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a basement, ground floor and second floor addition to an existing •dwelling within a Regulated Area of the. Humber River Watershed. The property is entirely within the.Woodbridge Special Policy Area (SPA) and within the Regional Storm Flood Plain. The proposed works are located approximately 45 metres away from the main tributary.of the Humber River. Based upon a topographical survey provided by the applicant and TRCA flood modelling, the property is outside of the 350 year flood plain and safe access is provided to the 350 year storm level. The 350.year flood elevation is 143.35 metres above sea level (m.a.s.I.). It is noted that the proposed addition will be floodproofed to this elevation and will also include a 0.3:m freeboard; as such, the proposed works comply with the Valley and Stream Corridor Management Program (VSCMP) guidelines for development within an SPA. There will be no geotechnical / slope stability issues associated with the•proposal and no significant natural features will be affected by the project. A letter prepared by K.O. & Partners Ltd., dated February 28, 2008 provides confirmation that the proposed structure can withstand • the flood pressure of a Regional Storm event. Control of Flooding: The proposed works are located within the Regional, Storm Flood Plain. However, TRCA water resources engineering staff are satisfied that the proposed development will have minimal impact on the storage and conveyance of flood waters. Additionally, the.proposed addition has • been floodproofed to the 350 year flood elevation and is not located within the floodway. 168 Pollution: Sediment control fencing will be installed and maintained during the construction of the addition to prevent sediment from entering the adjacent watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As the watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.1 B) — Development / Redevelopment within Designated Two Zone Areas or Special Policy Areas - of the Authority's Valley and Stream Corridor Management Program. CFN: 40430 - Application #: 071 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: March 18, 2008 8.1.32 67 CROMDALE RIDGE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Block 39, Plan 65M -2604, (67 Cromdale Ridge), in the City of Vaughan, Humber River Watershed. The purpose is to recognize a deck enclosure constructed to create an addition to an existing home within a Regulated Area.of the Humber River Watershed at 67 Cromdale Ridge, in the City of Vaughan. The permit will be issued for.the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan (Drawing No. SP), prepared by Mina Design Group, dated October 31, 2007, received by the TRCA March 7, 2008; • Existing Ground Floor Plan (Drawing No. A -1), prepared by Mina Design Group, dated October 31, 2007, received by the TRCA March 7, 2008; • Proposed Ground Floor Plan (Drawing No. A -2), prepared by Mina Design Group, dated October 31, 2007, received by the TRCA March 7, 2008; and • Rear Elevation Drawing (Drawing No. A -3), prepared by Mina Design Group, dated October 31, 2007, received by the TRCA March 7, 2008; 169 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to recognize a deck enclosure that was constructed on an existing raised concrete deck in order to create an approximate 27 square metre addition to an existing home within a Regulated Area of the Humber River Watershed. The works were completed in January 2008 and this permit is to be issued as an after the works permit. Based upon a site visit conducted by TRCA staff March 13, 2008, the proposal is located approximately 6 metres from an existing.top of bank. Additionally, the works have been constructed on an existing structure without alteration to the grading or removal of vegetation. Accordingly, there are no. impacts to the valley wall as a result of this construction. Control of Flooding:' ' The completed works are not located within the Regional Storm Flood Plain. There is no impact on the storage or conveyance of flood waters. Pollution: There were no excavation or grading'works as part of this proposal and the works are sufficiently setback from the slope feature; as a result, sediment did not enter the adjacent valley system. Dynamic Beaches: Not applicable. • Erosion: TRCA geotechnical staff are satisfied that the completed works have not impacted the nearby. slope.feature. Conservation of Land: As a watercourse was not impacted by the proposal, no fisheries concerns will result. There are no other significant.natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings The completed works are located on a previously existing elevated concrete deck; no vegetated areas were disturbed by the works. Policy Guidelines: This proposal is consistent with Section 4.2.2 C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program. 0 CFN: 40573 - Application #: 160 /08/VAUG . Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: March 18, 2008 170 8.1.33 EAST SIDE OF KIPLING AVENUE, NORTH OF KIRBY ROAD To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 31, Concession 7, on east side of Kipling Avenue, north of Kirby Road, in the City of Vaughan, Humber River Watershed. The purpose is to construct a structure, conduct site grading, temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a tributary of the Humber River, in order to construct a storm outfall and a single - family residence on Old Forest Lane, near the northeast corner of Kipling Avenue and Kirby Road, in the City of Vaughan. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Lot Grading Plan, Drawing No. LG -1, prepared by Valdor Engineering Inc., Revision No. 2 (revised March 18, 2008), received March 25, 2008. • General Plan - Storm Drainage Plan, Drawing No. ST -1, prepared by Valdor Engineering Inc., Revision No. 2 (revised March 18, 2008), received March 25, 2008. • Storm Sewer Outlet, Drawing No. P -2, prepared by Valdor. Engineering Inc., Revision No. 2 (revised March 18, 2008), received March 25, 2008. • Erosion and Sediment Control Plan, Drawing No. ES, prepared by Valdor Engineering Inc., Revision No. 2 (revised March 18, 2008), received March 25, 2008. • Landscape Plan, Drawing No. L1 of 3, prepared by Valdor Engineering Inc., Revision No. 3 (revised March 20, 2008), received March 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following-information: Proposal: The proposal is to construct a structure, conduct site grading, temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a tributary of the Humber River, in order to construct a storm outfall and a single - family residence on Old Forest Lane, near the northeast corner of Kipling Avenue and Kirby Road, in the City of Vaughan. The proposed works and subject area form part of a draft approved plan of subdivision (19T- 03V07). This subdivision, consisting of three (3) estate residential lots located north of Kirby Road; on the east side of Kipling Avenue. A tributary of the Humber River is located to the east. The subject lands are surrounded by agricultural lands (east, north and south). A portion of the subdivision lands (eastern lot) is located within the TRCA's Regulated Area for the Humber River. During the associated draft plan of subdivision processt the limits of the natural features on site including the physical top of bank and Regional Storm-Flood Plain were identified and delineated on the draft plan. A 10 metre buffer has been provided on the eastern boundary of the subject lands. These lands including those below top of bank and in the Regional Storm Rood Plain have been re -zoned into an appropriate open space category and will be conveyed into public ownership (TRCA) as part of the registration of the subdivision. 171 A stormwater outlet is to be constructed at the southeast corner of the subject lands. This outlet, which is located outside of the aforementioned buffer area, will convey treated storm runoff to a tributary of the Humber River. In addition, the proposed works involve site grading associated with the development of a single - family estate residence on the easternmost lot in the subdivision. The proposed residence will be located entirely on the tableland portion of the site, away from the buffer and valley corridor areas. Control of Flooding: The proposed outfall and residence are located outside of the Regional Storm Flood Plain of the Humber River. As such, the storage or conveyance of flood waters will not be impacted. Pollution: Sediment control fencing will be erected around the proposed work site prior to construction and maintained for the duration of the works to ensure.that sediment does not enter the nearby valley system and watercourse. Dynamic Beaches: Not applicable. Erosion: Erosion on site will be minimized through the implementation of the aforementioned sediment control measures. There are no geotechnical /slope stability issues associated with the proposed works. Conservation of Land: Given the discharge of flows into the flood plain and watercourse from the proposed outfall, a Letter of Advice will be issued on behalf of Fisheries and Oceans Canada (DFO). No significant vegetation will be removed for these works. Plantings A comprehensive planting /restoration plan for the buffer area has been submitted and meet TRCA Planting Guideline requirements. Policy Guidelines: This proposal complies with Section 4.1.1 - New Urban Development and Section 4.3 - Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40616 - Application #: 192 /08 /VAUG Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date: April 1, 2008 8:1.34 47 WYCLIFFE AVENUE To construct, reconstruct, erect or place a building or structure on Lot 27, Plan M -2023, (47 Wycliffe Avenue), in the City of Vaughan, Humber River Watershed. The purpose is to construct a replacement sunroom.addition to an existing dwelling within a Regulated Area of the.Humber River Watershed at 47 Wycliffe Avenue, in the City of Vaughan. 172 The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by Apple Ridge Design Ltd., received by the TRCA on February 20, 2008; • West Elevation Drawing, prepared by Apple Ridge Design Ltd., received by the TRCA on February 20, 2008; and • South Elevation Drawing,s prepared by Apple Ridge Design Ltd., received by the TRCA on February 20, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a replacement sunroom addition on the same footprint of an existing sunroom within a Regulated Area of the Humber River Watershed: The proposed works are located approximately 25 metres away from the Regional Storm Flood Plain which is • located beyond the front boundary of the subject property. According to our mapping, the works are located within a valley and approximately 6.5 metres away from the top of bank; however, based upon a site visit by TRCA staff on February 26, 2008, staff have determined that: the subject property is relatively flat and the slope feature is located outside of the property. Control of Flooding: The proposed works are outside of the Regional Storm Flood Plain. There will be no impact on the storage or conveyance of floodwaters. Pollution: Sediment controls are not required as the proposed works are sufficiently setback from any natural features. Dynamic Beaches: Not applicable. Erosion: Based upon a site visit conducted by TRCA staff on February 26, 2008, TRCA geotechnical staff are satisfied that are no geotechnicaf issues associated with the proposed replacement addition. Conservation of Land: As a watercourse will not be impacted by the proposal; no fisheries concerns will result. There are no other significant natural features on, or adjacent,to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. 173 Policy Guidelines: The proposal is consistent with Section 5.2.2 D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 40514 - Application #: 115 /08 /VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: March 6, 2008 TOWN OF MARKHAM 8.1.35 21 CASTLEGLEN BOULEVARD To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 73, Plan 65M -3832, (21 Castleglen Boulevard), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an inground swimming pool. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and planswhich form part of this permit: • Site Plan, prepared by Pioneer Family Pools, dated March 31, 2008, stamped received by TRCA Planning and Development on April 1, 2008, redline revised by TRCA Staff on April 1, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of the application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an inground swimming pool. The subject property. contains an existing dwelling, located within an approved residential subdivision. The subject property is located adjacent to a valleycorridor feature of the Rouge . River Watershed. TRCA staff has conducted a site inspection and confirm that the proposed works are sufficiently setback from the valley corridor feature. The area to which this application applies is currently a manicured lawn and is void of any significant vegetation: Controlof Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, there are no anticipated impacts to the storage and /or conveyar}ce of flood waters. Pollution: • Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. • 174 Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of the proposed construction. Plantings As rio significant vegetation will be removed, no plantings are required. Policy Guidelines: This proposal is consistent with. Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40637 - Application #: 215/08 /MARK • Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 2, 2008 8.1.36 17 CASTLEGLEN BOULEVARD To construct, reconstruct, erect or place a building or structure on Lot 75, Plan 65M -3832, (17 Castleglen Boulevard), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River. Watershed in order to facilitate the construction of an inground swimming pool. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Schedule C, prepared by Pioneer Family Pools, dated January 5, 2008, stamped received by TRCA Planning and Development on March 31, 2008 as redline revised by TRCA staff on April 11, 2008. RATIONALE The application was reviewed•by staff on the basis of the following information: Proposal: The purpose of the application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an inground swimming pool. The subject property contains an existing dwelling, Iodated within an approved residential subdivision. The subject property is located adjacent to a valley corridor feature of the Rouge River Watershed. TRCA staff has conducted a site inspection and confirm that the proposed works are sufficiently setback from the valley corridor feature. The area to which this application 'applies is currently a manicured lawn and is void of any significant vegetation. The proposed works are located outside of the Regional Storm Floodplain. . 175 Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, there are no anticipated impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable: Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of the proposed construction. Plantings As no significant vegetation will be removed, no plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40636 - Application #: 208 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 2, 2008 TOWN OF RICHMOND HILL 8:1.37 30 BLYTH STREET To construct.,. reconstruct, erect or place a building or structure on Lot 9, Plan • 65M -2360, (30 Blyth Street), in the Town of Richmond Hill, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in.order to facilitate the construction_ of an inground swimming pool. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of 'this permit: • Site Plan, prepared by Pioneer Family Pools, dated March 31, 2008, stamped received by TRCA Planning and Development on March•31, 2008 as redline revised by TRCA• Staff on April 11, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 176. Proposal: The purpose of the application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an inground swimming pool. The subject property contains an existing dwelling, located within an approved residential subdivision. The subject property is located adjacent to a valley corridor feature of the Humber River Watershed. TRCA staff has conducted a site inspection and confirm that the proposed '.works are sufficiently setback from the valley corridor feature. The area to which this application applies is currently a manicured lawn and is void of any significant vegetation. The proposed works are located outside of the Regional Storm Floodplain. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, there are no anticipated impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction: Dynamic Beaches: Not applicable. Erosion: There are no geotechnical arid /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of the proposed construction. Plantings As no significant vegetation will be removed, no plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40638 - Application #: 214/08/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 2, 2008 8.1.38 16 WALMER ROAD To construct, reconstruct, erect or place,a building or structure on Lot.38, Plan 2027, (16 Walmer Road), in the Town oflRichmond Hill, Don River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a residential dwelling. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: 177 • Site Plan, prepared by Young and Young Surveying, dated March 6, 2008, stamped received by TRCA Planning and Development on March 12, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a residential dwelling located at 16 Walmer Road, in the Town of Richmond Hill. The subject site is located within an approved subdivision and currently contains an existing dwelling, which is proposed to be demolished. The area to which this application applies is currently the existing dwelling footprint and the manicured lawn: As such, no significant natural feature will be impacted. Additionally, the proposed works are located outside,of the Regional Storm Floodplain. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, there are no anticipated impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this • application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of the proposed construction. Plantings As no significant vegetation will be removed, no additional plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40591 - Application #: 171/08/RH Report Prepared by: Lisa Stern, extension 5370 ., . For information contact: Quentin Hanchard, extension 5324 Date: April 2, 2008 178 TOWN OF WHITCHUCH - STOUFFVILLE 8.1.39 2 SKYRIDGE COURT To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 11, Plan M -88, (2 Skyridge Court), in the Town of Whitchurch- Stouffville, Rouge River Watershed. The purpose is to construct a second storey addition within a Regulated Area of the Rouge River Watershed. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A01, Site Plan, dated August 6, 2007, prepared by Vikas Gajjar, received March 26, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of building a second storey addition to an existing house on Skyridge Court. The subject property is located adjacent to the Bruce Creek valley corridor as well as an Area of Natural and Scientific Interest. A portion of the existing house is located less than 10 metres from the top of bank, however, the addition will be located .over the existing garage and will not encroach any further into the valleylands. Further the location of the addition is more than 10 metres from the valley corridor. Control of Flooding: The proposed works are not located within the Regional Storm Floodplain as such there will be no issues with storage or conveyance of flood waters. Pollution: As the property is located adjacent to the valley feature sediment fencing will be in place throughout the duration of construction to ensure that no sediment will enter the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues with this application. Conservation of Land: There will be no significant vegetation removed as part of this proposal. Plantings No plantings are required. ,i Policy Guidelines: This proposal is consistent with Section 4.2.2 C, Minor Additions, of TRCA's Valley and Stream Corridor Management Program. 179 CFN: 39719 - Application #: 640/07/WS Report Prepared by: Shannon McNeill, extension 5744 For information contact: Bill Kiru, extension 5306 Date: March 31, 2008 TOWNSHIP OF KING 8.1.40 1170 15TH SIDEROAD • To construct, reconstruct, erect or place a building or structure and site grade on Lot 6, Plan 522, (1170 15th Sideroad), in the Township of King, Humber River Watershed. The purpose is to construct a replacement dwelling, septic system and driveway extension within a Regulated Area of the Humber River Watershed. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance' with the following documents and plans which form part of this permit: • Site Plan (Drawing No. 1), dated January 11, 2008, received by the TRCA March 27, 2008, redline revised to indicate removal of excess fill material; • Silt Fence Detail Drawing (Drawing No. D1), dated March 24, 2008, received by the TRCA March 27, 2008; • Planting Memo, dated March 13, 2008, prepared by SENES Consulting Limited, received by the TRCA. March 27, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a replacement dwelling, septic 'system and driveway extension within a Regulated Area of the Humber .River Watershed: The proposal is located within the 120 metre Wetland Area of Interference buffer around Eversley.Lake, which is a Provincially Significant Wetland and a part of the Eaton -Hall -Mary Hackett wetland complex. The proposed works are approximately 95 metres away from Eversley Lake: The subject property is generally' well vegetated and the proposed development and area of disturbance will require the removal. of some of this vegetation. However, through the associated Site Plan Approval (application no. SPD- 08 -03) the applicant has provided a replanting and tree protection plan to the satisfaction of TRCA ecology staff that will result in a net gain of vegetation. Control of Flooding: The proposal is not located within the Regional Storm Flood Plain. There will be no impact on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be installed and maintained during construction to prevent sediment from entering the nearby wetland. Dynamic Beaches: Not applicable. 180 Erosion: There are no geotechnical issues associated with this application. • Conservation of Land: As a watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. TRCA ecology staff are satisfied that the proposed works will not have an adverse impact on the nearby wetland. There are no other significant natural features on, or adjacent to the site that.may be negatively impacted by the project. Plantings The proposed replanting and tree protection plan will result in a.net gain in native, non - invasive vegetation and other disturbed areas on -site will be restored to their existing sodded condition. Policy Guidelines: The proposal is consistent with Section 4.2.2 D) Replacement Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 40635 - Application #: 209 /08 /KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: April 1, 2008 THE FOLLOWING PERMIT APPLICATIONS WERE ERRATA ITEMS: RES. #B25/08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS Moved by: Seconded by: Richard Whitehead Jack Heath THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.41 - 8.1.70, inclusive), that had been scheduled on the agenda as errata applications for which all the required information was received and finalized as listed below. CITY OF BRAMPTON 8.1.41 CARRIED 2055619 ONTARIO INC. To construct, reconstruct, erect or place a building or structure and site grade on Block 19322, Plan PEEL CONDOMINIUM PLAN 322, (190 Clark Boulevard), in 'the City of Brampton, Etobicoke Creek 11k/atershed as located on the property owned by 2055619 Ontario Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a second residential condominium building with 29 storeys and 224 units. 181 The permit will be issued for,the period of April 11, 2008 to April 10, 2010. • Letter of Undertaking, prepared by M. Giuliano, IBI Group, dated April 9, 2008, to address outstanding ecology and engineering related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: . The purpose of this project is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a second residential condominium building with 29 storeys and 224 units. A residential condominium building and parking facility currently exist on the subject property. The proposed works are located on the existing parking lot. The west side of the subject property is Iodated immediately adjacent to Norton Park Place, owned by the City of Brampton. This park has been identified as a 'target area' for natural cover enhancement through TRCA's Terrestrial Natural Heritage System Strategy (TNHSS). Recognizing the recommended natural cover enhancement for this area, the TRCA has existing Habitat Implementation Plans (HIPs) in place for North Park Place to help achieve TRCA's natural cover targets for the Etobicoke Creek Watershed as established by the . Etobicoke and Mimico Creek Watershed Report Card (2006). Given the above noted targets and the opportunities through this project, as an element of this proposal, extensive, naturalization of the valley land corridor portion of the subject property and the abutting Norton Park Place has been incorporated into the design of this project. All proposed plant species are native and non - invasive, consistent with TRCA's guidelines. The proposed works are located on the tableland portion of the site and are sufficiently setback from the adjacent natural area and are located outside of the Regional Storm Floodplain. The proposed works require an amendment to the Zoning By -law in order to permit the proposed development. As an element of this application,.the valley corridor portion of the subject property (including a 10 metre buffer area) will be formally recognized and protected to prohibit development and /or alterations and will be placed into an 'appropriate zoning category (i.e., Hazard Land / Open Space). In addition, the applicant has agreed to enter into an agreement with the City of Brampton in regard to the public ownership of the valley corridor portion of the site. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction. Dynamic Beaches: Not applicable. 182 Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. However, an extensive planting plan has been submitted with this application to improve the ecological condition of the adjacent natural area. Plantings All plant species are native and non - invasive consistent with TRCA's guidelines. Policy Guidelines: The proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor- Management Program (VSCMP). CFN: 40609 - Application #: 185/08/BRAM Report Prepared by: Adam Miller, extension 5244 For information contact: Adam Miller, extension 5244 Date: April 2, 2008 8.1.42 ALTERRA HOMES (BRAMPTON) LTD. To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 23, 24, 25, Block 2, Plan BR -4, Part Lot 14, 15, 16, 17, 26, Block 2, Plan BR -4, (9 George Street North), in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by Alterra Homes (Brampton) Ltd.. The purpose is to develop and to construct within the Regulatory Fioodplain (Downtown Brampton Special Policy Area), to facilitate the construction of a new residential high -rise building at 11 (9) George Street. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Letter of undertaking provided by Vince Cornacchia, Cornacchia Planning Services, dated April 9; 2008, to address all outstanding TRCA issues, prior to the issuance of the permit. RATIONALE The application was reviewed by staff on the basis of the following information: 183 Proposal: This permit application is the third of three pertaining to development on the subject property. Previous permits were considered and approved by the TRCA Executive Committee for site remediation works, as well as the construction of foundations (approved by the Executive Committee at the December 7, 2007 Executive Committee meeting) associated with the development of this site, and construction of this building. Separate permits were brought forward for this development to allow for phasing of the works while the necessary approvals were being attained from the Province and the City of Brampton. The subject property is located within the Regulatory Floodplain, in the Downtown Brampton Special Policy Area (SPA). To facilitate the proposed development on the subject property, rezoning .and Official Plan amendment applications were required to allow for the building which is presently proposed. These amendments require Provincial approval, in addition to endorsement from the TRCA. A recommendation report, which was supported_by the Executive Committee, was brought forward to the Executive Committee at the November 2, 2007 meeting to provide TRCA's concurrence with the technical elements of the proposed planning applications. This report identified that future permit applications would be brought forward for the development of the site, subsequent to final sign -off being provided by the Province, and any outstanding design details being integrated into the site plan application, to the satisfaction of TRCA staff. On December 7, 2007 a permit for the construction of the foundation of the building was approved by the Executive.Committee; and issued on March 18, 2008, subsequent to the resolution of outstanding TRCA issues. As noted in the previous permit reports, TRCA staff are satisfied, based upon the extension process that has been completed, and the materials submitted to date, that the proposed building meets TRCA's floodproofing requirements•for development within a Special Policy Area. Confirmation has similarly been provided by the. Province and the City of Brampton that their requirements have also been satisfied.'On this basis, staff are now in position to recommend the final approval of this building and associated development, which are the subject of this permit. Control of Flooding: The subject property, and proposed development are located within an SPA, and the Regulatory Floodplain. TRCA staff have reviewed the supporting technical analysis, and are • satisfied that the building will be constructed to meet TRCA's floodproofing criteria. Additionally, TRCA staff are satisfied that the proposed development will not adversely impact upon the. . storage or conveyance of flood.flows, beyond levels which have been anticipated for Special Policy Areas. Pollution: Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction. Additionally, through the re- development of this site, contaminated materials are being removed from the site, and the site1remediated. Dynamic Beaches: Not applicable. Erosion: 4 There are no geotechnical and /or slope stability concerns related to this application. 184 Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this project. Plantings Due to the urban location, and the scope of the development proposed on the site, plantings beyond the City's landscaping requirements are not feasible. Policy Guidelines: This proposal is in consistent with Section 4.2.1 - Development and Redevelopment /Intensification within Established Communities /Highly Urbanized Communities - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40640 - Application #: 211/08/BRAM Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: April 2, 2008 8.1.43 BELL CANADA To construct, reconstruct, erect or place a building or structure south of Ebenezer Road, east of McVean Drive, in the City of Brampton, Humber River Watershed as located on the property owned by Bell Canada. The purpose is to undertake works within a TRCA Regulated Area in. order to facilitate the installation of an underground Bell Canada utility conduit by directional bore method. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Plan 401, prepared by Plantec Consulting Engineers, dated June 5, 2007, Revision No. 3, revised on March 26, 2008, stamped received by TRCA Planning & Development staff on March 26, 2008; • Plan 701, prepared by Plantec Consulting Engineers, dated June 5, 2007,. Revision No. 3, revised on March 26, 2008, stamped received by TRCA Planning & Development staff on March 26, 2008. RATIONALE The.application was reviewed by staff on the basis of the following information: .Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the installation of an underground utility conduit along the south side of Ebenezer Road; in the City of Brampton. The underground conduit will run under the watercourse and will be installed by directional bore method. The proposed works will be constructed.a minimum 2.0 metres below the watercourse bottom (warm water stream). The entry and exit locations will be appropriately setback from the valley corridor feature. All disturbed areas as a result of construction will be restored with native and non - invasive species. 185 Control of Flooding: No excavated material will be stockpiled within the Regional Storrs Floodplain and all existing grades will be maintained. As such, no impacts to the storage and /or conveyance of flood waters are anticipated.' Pollution: Appropriate erosion and sediment controls (i.e., silt fende) have been proposed with this application, and will be maintained throughout all phases of construction. The silt fence will surround the bore pit locations to impede the overland migration of construction generated sediment. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. The proposed works meet the conditions identified by the Fisheries and Oceans Canada (DFO) Operational Statement (OP). Plantings As no vegetation is to be removed by the proposed works, plantings are not required. All disturbed areas will be restored with a native, non - invasive seed mix composition. Policy Guidelines: This proposal is in conformity with Section 4.3 - Infrastructure and Servicing - of.the Authority's Valley and Stream Corridor Management Plan (VSCMP).. CFN: 39760 - Application #: 669/07/BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: April 2, 2008 CITY OF MISSISSAUGA 8.1.44 BELL CANADA To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere along Danville Road (North of Abilene Drive), in the City of Mississauga, Etobicoke Creek Watershed as located on the property owned.by Bell Canada! The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the installation of an underground Bell Canada utility conduit by directional bore method. The permit will be issued for the period of April 11, 2008 to April 10, 2010. 186 • Letter of undertaking prepared by Plantec Consulting Engineers, dated April 9, 2008, to address all outstanding engineering and ecology concerns. RATIONALE The application was reviewed by'staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate.the installation of an underground utility conduit along Danville Road, approximately 254 metres north of Abelene Drive, in the City of Mississauga. The underground conduit will run under the watercourse and will be installed by directional bore method. The proposed works will be constructed at minimum 2.0 metres below the watercourse bottom (warm water stream). The entry and exitlocations will be appropriately setback from the valley corridor feature. All disturbed areas will be restored and all existing grades will be maintained. Control of Flooding: No excavated material will be stockpiled within the Regional Storm Floodplain and all existing grades will be maintained. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. The controls are to surround the bore pit locations to impede the overland migration of construction generated sediments. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project Con servation of Land: No significant vegetation will be removed as a result of construction. The proposed works meet the conditions identified by the Fisheries and Oceans Canada (DFO) Operational Statement (OP). Plantings As no vegetation is to be removed by the proposed works, plantings are not required. All disturbed areas will be restored with a native, non - invasive seed mix composition. Policy Guidelines: This proposal is in conformity with Section 4.3 - Infrastructure and Servicing - of the Authority's. Valley and Stream Corridor Management Plan (VSCMP). 187 CFN: 39821 - Application #: 723/07/MISS Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 2, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.45 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure on Thorndale Avenue, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by the City of Toronto. The purpose is to reconstruct the road, construct a new storm sewer and replace the existing sanitary sewer and watermain on Thorndale Avenue. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Drawings U- 2626 -002 and 003 - Thorndale Avenue Road Reconstruction, Storm Sewer Construction, Sanitary Sewer and Watermain Replacement from Earlington Avenue to the Humber River; dated January 30, 2008; revised March 11, 2008; received March 12, 2008; prepared by City of Toronto Technical Services. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the reconstruction of Thorndale Avenue from Earlington Avenue to Thorndale Crescent, the construction of a new 450 millimetre diameter storm sewer within the roadway, and the replacement of the existing 100 millimetre diameter watermain with a new 150 millimetre diameter watermain and theexisting 200 millimetre diameter sanitary sewer with a new 250 millimetre diameter sanitary sewer: The new storm sewer will direct runoff from the southern portion of Earlington Avenue and the extent of Thordale Avenue to an existing outfall at the Humber River at the base of Thorndale Avenue. There will be no change in the amount of runoff directed to the existing outfall, as this area is currently directed to the outfall through a ditch system. Control of Flooding: No adverse impacts to the storage or conveyance of flood waters are anticipated as a result of this project. Pollution: Appropriate.controls will be implemented and maintairked throughout construction to prevent • sediment and other deleterious substances from entering the watercourse. Dynamic Beaches: Not applicable. 188 Erosion: There are no significant slope stability or geotechnical concerns with the proposed works. Conservation of Land: There will be no impacts to significant terrestrial or aquatic habitat from the proposed works. Plantings • Disturbed areas will be stabilized and restored as appropriate. Policy Guidelines: The proposal complies with Section 4.3, Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 39780 - Application #: 699/07/TOR Report Prepared by: Alex Blasko, extension 5714 For information contact: Alex Blasko, extension 5714 Date: April 2, 2008 8.1.46 31 GRENADIER HEIGHTS To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 13, Plan M 491, Part Lot 12, Plan, (31 Grenadier Heights), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a Regulated Area of the Humber River Watershed in order to facilitate the construction of a 1- storey and 3- storey addition to the rear of the existing 2- storey dwelling. The permit will be issued for the period of April 11, 2008 to April 10;2010. • Drawing No. A -1, Site Plan, prepared by Del -Dom Design & Construction, dated March 2008, received on April 2, 2008, redlined by TRCA staff on April 9, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a Regulated Area of the Humber River Watershed in order to facilitate the construction of a 1- storey and 3- storey addition to the rear of the existing 2- storey single family detached dwelling. The proposed addition is cantilevered approximately 2 feet beyond the rear foundation wall. The site is located north of The Queensway, east of South Kingsway and abuts Grenadier Pond of High Park at the rear property line. Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. 189 Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native and non - invasive plantings will be provided as per City of Toronto Urban Forestry guidelines. Policy Guidelines: The proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non- Established /Highly Urbanized Areas of the Authority's Valley and Stream Corridor Management Program. CFN: 39622 - Application #: 573/07/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 2, 2008 8.1.47 3 BRENTSIDE COURT To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 4, Plan 5579, (3 Brentside Court), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a ground floor.addition and attached garage to the east -side of the existing one - storey single family detached dwelling. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Drawing unnumbered, Site Plan, prepared by Fluvio. Visone, dated January 29, 2008, received on January 29, 2008. :a RATIONALE The application was reviewed by staff on the.basis of the following information: 190 Proposal: The purpose of this application is to construct of a ground floor addition and attached garage to the east -side of the existing one - storey detached dwelling at 3 Brentside Court in the City of Toronto. The subject site is located south of Eglinton Avenue W., west of Scarlett Road and backs on to the Humber River within a TRCA Regulated Area of the Humber River Watershed. Control of Flooding: This site is not located within a regional storm floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment. control fence will be installed to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: The proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the Authority's Valley and Stream Corridor Management Program. CFN: 40416 - Application #: 058/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 2, 2008. 8.1.48 6 MOSSOM PLACE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 103, Plan M -356, (6 Mossom Place), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed`. The purpose is to develop within a Regulated Area of the Humber River Watershed in order to facilitate the construction of a two - storey addition, one - storey addition and deck to the rear of the existing single family detached dwelling. The existing deck is to be removed. 191 The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing unnumbered, Site Plan , prepared by John Willmott Architect-Inc., dated June 18, 2007, received on June 22, 2008; • Drawing No. L -1, Planting Plan, prepared by Aldershot Landscape Contractors Limited, dated December 2007, received on January 23, 2008. RATIONALE The application was reviewed by staff on the basis of the .following information: Proposal: The proposed is to construct a two - storey addition, one - storey mud room addition and deck to the rear of the existing single family detached dwelling. The subject site is located south of Bloor Street W, west of South Kingsway, east of the Humber Marshes in a TRCA Regulated Area of the Humber River Watershed. Control of Flooding: This site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: • A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. Erosion: A slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance to the recommendations of this report. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native tree shrubs and seed mix will be planted and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: The proposal is consistent.with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the,■uthority's Valley and Stream Corridor Management Program. CFN: 39400 - Application #: 409/07/TO,R Report Prepared by.: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 2, 2008 192 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.49 GROSS CAPITAL INC. To install a swimming pool, undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres. (equivalent to 3 truckloads) and construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 12, Plan 3736, (120 Northdale Road), in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by Gross Capital Inc.. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of an in- ground swimming pool,, two cabanas and a pergola at the rear of the existing dwelling. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Drawing No. DP -1, Drainage Plan, prepared by Feherty and Associates Ltd., dated February 2008, received by TRCA April 3, 2008; • Drawing No. L -1, Site Plan, prepared by 3.D Exteriors, dated February 2008, received by TRCA April 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of an ih- ground swimming pool, two cabanas, and a pergola at the rear of the existing dwelling at 120 Northdale Road in the City of Toronto. The site is located east of Bayview.Avenue, south of Highway 401. The proposed pool deck will maintain a minimum setback of 3.5 metres from the top of bank. . Control of Flooding: The site is not located in the Regional Storm Floodplain. 'Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable Erosion: A geotechnical report has been reviewed by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. The proposed works will be adequately setback from the top of bank. Conservation of Land: No significant vegetation will be removed to facilitate construction and the appropriate tree protection fencing will be installed. 193 Plantings A 3.5 metre buffer of native tree shrubs will be planted along the top of bank. Policy Guidelines: This proposal is consistent with Section 4.2.2.E, Property Improvement and Ancillary Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 39921 - Application #: 801/07/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 2, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.50 94 APPLEFIELD DRIVE To construct, reconstruct, erect or place a building or structure on Lot 100, Plan 5386, (94 Applefield Drive), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. The purpose is to develop within the Highland Creek Watershed to facilitate construction of a new two - storey dwelling. The existing dwelling is to be demolished. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Drawing No. Al, Site Plan, prepared by Khalil U. Syed Architect, dated February 22, 2008, received by TRCA March 12, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a new two - storey dwelling with walk -out basement at 94 Applefield Drive in the City of Toronto. 'The site is located west of Brimley Road, south of Ellesmere Road. The existing dwelling is to be demolished. Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: A sediment control fence will be erected before commencement of any construction or grading works and will remain in place until the proposed workp. have been completed and any' exposed areas have been stabilized. Dynamic Beaches: Not applicable 194 Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native tree shrubs and seed mix will be planted along the slope and a ravine stewardship plan will be implemented for the site. Policy Guidelines: The proposal is consistent with Section 4.2.2.D, Replacement Structures, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40590 - Application #: 168/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 2, 2008 CITY OF VAUGHAN 8.1.51 MACRODYNE HOLDCO INC. To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and site grade on Lot 33, Plan M -1801, (311 Connie Crescent), in the City of Vaughan, Don River Watershed as located on the property owned by Macrodyne Holdco Inc.. The purpose is to construct an addition of approximately 810 square metres to an existing one storey industrial building and reconstruct a gabion basket retaining wall within a Regulated Area of the Don River Watershed at 311 Connie Crescent, in the City of Vaughan. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Site Plan (Drawing No. SP -1), prepared by Keewatin -Aski Ltd., revised March 3, 2006, received by, the TRCA January 11, 2008; • • Erosion Sediment Control Plan (Drawing No. ESC -1), prepared by Keewatin -Aski Ltd., dated February 22, 2006, received by the TRCA February 26, 2008; • Letter prepared by Keewatin Group Ltd., dated February 21, 2008, received by the TRCA February 26,. 2008 regarding structural integrity of the proposed additions; • Letter prepared by Keewatin Group Ltd., dated February 21, 2008, received by the TRCA February 26, 2008 regarding internal floodproofing. • RATIONALE The application was reviewed by staff on the basis of the following information: 195 Proposal: The purpose is to construct an addition of approximately 810 square metres to an existing one storey industrial building. At the time of the approval of the existing industrial building in 2000, the subject property was identified as a Fill Line Extension area under TRCA mapping, as such no permits under the previous Regulation (Ontario Regulation 158) were required. In addition, no floodplain mapping data was available for.the subject area at the time. More recent flood plain mapping has revealed that the subject property is prone to flooding during a Regional and a 100 year event. The proposed addition represents an increase of 46% of the current floor area of the existing building which is within the 50% maximum allowed by the Authority's Valley and Stream Corridor Management Program (VSCMP). In addition to the proposed expansion, the landowner is also proposing to construct a gabion structure within the subject property in order to facilitate a driveway. The proposed gabion structure is above an existing gabion wall and is located further away from the watercourse than the existing wall. Additionally, no instream works are required for the construction of the proposed gabion wall. According to the hydraulic modelling of the West Don dated August 2006, the subject property and proposed location for the•expansion are within Regional and 100 year flood plains. Due to the configuration of the site, existing paved areas and the industrial nature of the area, a buffer' between the developed area and the adjacent watercourse cannot be achieved. The watercourse adjacent to the subject property was highly altered and channelized during the draft plan of subdivision process, as such, the watercourse does not provide a significant ecological function. Through the Site Plan Approval process (Site Plan Approval application DA.06.027), a reduction in the buffer was approved subject to the implementation of satisfactory floodproofing measures, satisfactory erosion and sediment control measures, and compensation provided by the applicant for planting restoration offsite at a more appropriate location within the Don River Watershed. Due to the configuration of the existing structure and the requirements of the industrial operation to maintain a consistent floor elevation, 'dry protection' level of floodproofing is not achievable for the addition; as a result, the proposal focuses on achieving 'wet protection' consistent with Section 4.2.2 C) 3) ii) of the VSCMP. As part of this permit, precautions have been taken to reduce risks associated with potential flooding. Additionally, Keewatin Group Ltd. engineers have confirmed that existing and proposed structures can withstand a Regional.storm and the structural integrity will not be compromised. Control of Flooding: The proposed works are located within the Regional Storm Flood Plain; however, TRCA water resources engineering staff are satisfied that the proposed development will have minimal impact on the storage and conveyance.of flood watersland that the precautions taken are satisfactory because they do not increase the risk to property damage. Pollution: Sediment control fencing will be installed and maintained during the construction of the addition and gabion basket retaining wall to prevent sediment from entering the adjacent watercourse. 196 Inamic Beaches: Not applicable Erosion: There are no geotechnical issues associated with this application. Conservation of Land: The adjacent watercourse is already highly altered, does not currently support any sensitive species and will not be significantly impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may. be negatively impacted by the project. Plantings Through the Site Plan Approval process, compensation for a net loss of riparian plantings has been obtained to allow TRCA to restore other portions of the watershed. All other disturbed areas are to be restored to their existing vegetated condition and will not affect any•significant natural feature. Policy Guidelines: The proposal is consistent with Section 4.2.2 C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program. CFN: 40412 - Application #: 054 /08 /VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: April 2, 2008 8.1.52 RUTHERFORD CONTWO INVESTMENTS LIMITED To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 15, Concession 2, on the southeast corner of Rutherford Road and Dufferin Street, in the City of Vaughan, Don River Watershed as located on the property owned by Rutherford Contwo. Investments Limited. The purpose is to construct a structure, conduct site grading, temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a tributary of the Don River, in order to construct a stormwater management facility and an associated outfall, to facilitate the servicing of a proposed residential development on the southeast corner of Dufferin Street and Rutherford Road, in Planning Block 10; in the City of Vaughan. The permit will be issued for the period of April 11,-2006 to April 10, 2010. • Letter of Undertaking, prepared by David Giugovaz, Valdor Engineering, dated March 4, 2008, received March 6, 2008. 197 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to construct a structure, conduct site grading, temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a tributary of the Don River, in order to construct a stormwater management pond and an associated outfall, to facilitate the servicing of a proposed residential subdivision, located on the southeast corner of Dufferin Street and Rutherford Road, in Planning Block 10. (Langstaff Woods), in the City of . .Vaughan. Planning Block 10 is bounded by Highway 7.to the south, Dufferin Street to the west, Rutherford Road to the north and to the east by Bathurst Street. The subject property, which is approximately 26.4 ha (65.2 ac) in size, is bounded to the south and east by two existing residential subdivisions. The proposed stormwater facility will service the surrounding lands which are part of a draft approved plan of subdivision (19T- 05V06). Block 10 has an approved Master Environmental Servicing Plan (MESP) in place. However, the original owner of the subject lands was a non - particpating landowner during the Block 10 MESP process. The proposed pond and outfall will be located adjacent to a valley open space corridor, along Rutherford Road. The limits of the open space block were previously identified and delineated during the associated draft plan of subdivision process. The proposed subdivision along with the pond / outfall are located within the Settlement Area land use designation under the Oak Ridges Moraine Conservation Plan (ORMCP). Given that the nearby watercourse is a hydrologically sensitive feature on the Oak Ridges Moraine, measures have been included in the pond's design to minimize the impacts associated with the discharge of stormwater runoff into this feature. These measures include a bottom draw pipe, a cooling trench and a planting strategy to.promote shading along the pond perimeter. This permit application for servicing.fulfills a condition of draft approval issued by TRCA staff. TRCA staff has received and reviewed detailed technical submissions relating to the proposed works and has provided comments to the agent, Valdor Engineering. At this time, minor issues relating to the design of the outfall and landscaping are being addressed and TRCA technical staff is confident that these issues can be resolved in a timely manner. These issues in no way affect the location of the proposed works which were determined during the draft plan approval stage. The permit will not be released until such time as these issues are resolved. Control of Flooding: . The proposed stormwater pond is located outside of the Regional Storm Flood Plain of the Don River: Technical staff at the TRCA has reviewed technical submissions for the proposed storm outfall structure located within the Regional Storm Flood Plain and is satisfied that the o.utfall will not affect the storage or conveyance of.flood waters. Pollution: Sediment and erosion control measures will be implemented prior to the construction of the • proposed works and will be maintained for the duration of construction, to ensure that sediment does riot enter the nearby valley system and watercourse. 198 Dynamic Beaches: • Not applicable. Erosion: Erosion will be minimized through the implementation of the aforementioned sediment control measures. There are no geotechnical /slope stability issues associated with the works. Conservation of Land: Given the discharge of treated stormwater flows into a tributary of the Don River, a Letter of Advice will be issued on behalf of Fisheries and Oceans Canada (DFO). Plantings Extensive and comprehensive plantings of native plant material will be carried out around the proposed pond and storm outfall, in accordance with TRCA's Planting Guidelines. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. CFN: 39542 - Application #: 512 /07 /VAU.G Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date: March 27, 2008 8.1.53 RUTHERFORD CONTWO INVESTMENTS LIMITED To construct, reconstruct, erect or place a building or structure, site grade; temporarily or permanently place, dump or remove any material, originating on . the site•or elsewhere and alter a watercourse on Lot 15, Concession 2, on the southeast corner of Rutherford Road and Dufferin Street, in the City of Vaughan, Don River Watershed as located on.the property owned by Rutherford Contwo Investments Limited. The purpose is to construct a structure, conduct site grading, temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a tributary of the Don River, in order to install a foundation drain collector (FDC) outlet, to service a local area near the southeast corner of Dufferin Street and Rutherford Road, in Planning Block 10`(Langstaff Woods), in the City of Vaughan. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Letter of Undertaking, prepared by David Giugovaz, Valdor Engineering, dated March 4, 2008, received March 6, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 199 Proposal:. The proposal is to construct a structure, conduct site grading, temporarily or permanently place, dump or remove any material within a Regulated Area and 'to alter a tributary of the Don River, in order to install a foundation drain collector (FDC) outlet, to service a local area near the southeast corner of Dufferin Street and Rutherford Road, in Planning Block 10, in the City of Vaughan. Planning Block 10 is bounded by Highway 7 to the south, Dufferin Street to the west, Rutherford Road to the north and to the east by Bathurst Street. At this time, TRCA staff is processing an associated O.Reg. 166/06 permit application for a stormwater management facility and outfall for the surrounding subject lands (512/07 /VAUG). A large portion of the undeveloped lands will drain towards this proposed facility and once treated, stormwater flows will be,discharged into the nearby tributary of the Don River. However, due to grading constraints, stormwater runoff from a small portion (approximately 1.78 ha) of the proposed residential subdivision in the northeast corner cannot be conveyed to •the stormwater management (SWM) pond (Pleasant Ridge Avenue and Mary Ellen Baker Court). As such, the applicant proposes to install an FDC outlet to convey flows to the north side of Rutherford Road, where it will be discharged into the East Don River tributary. TRCA staff has received and reviewed detailed technical submissions relating to the proposed works and has provided comments to the agent, Valdor Engineering. At this time, minor issues relating to the outlet headwall and other design matters are being addressed and TRCA • . technical staff is confident that these issues can be resolved in a timely manner: The permit will not be released until such time as these issues are resolved. Control of Flooding: • TRCA staff has reviewed the location and details pertaining to the proposed outlet and is satisfied that the works will not impact the storage or conveyance of flood waters. Pollution: Sediment and erosion control measures will be implemented prior to the construction of the outlet and will be maintained for the duration of construction to•ensure that sediment does not enter the adjacent watercourse. • Dynamic Beaches: Not applicable. Erosion: Erosion will be minimized through the implementation of the aforementioned sediment control measures. There are no geotechnical /slope stability issues associated with•the proposed works. Conservation of Land: Given the discharge of flows from the subject site, a Letter of Advice will be issued on behalf of Fisheries and Oceans Canada (DFO). 200 Plantings No significant vegetation will be removed for the proposed works. As such, no plantings will be required for the FDC outlet. However, a comprehensive planting plan has been submitted for the adjacent stormwater management pond and outfall. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 39543 - Application #: 513/07/VAUG Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date: March 27, 2008 8.1.54 RUTHERFORD CONTWO INVESTMENTS LIMITED .To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 15, Concession 2, on the southeast corner of Rutherford Road and Dufferin Street; in the City of Vaughan, Don River Watershed as. located on the property owned by Rutherford Contwo Investments Limited. The purpose is to construct - erect or place a building, conduct site grading and to temporarily or permanently place, dump or remove any material within a Regulated Area, in order to facilitate the development of a residential • subdivision on the southeast corner of Dufferin Street and Rutherford Road, in Planning Block 10 (Langstaff Woods), in the City of Vaughan. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Letter of Undertaking, prepared by David Giugovaz, Valdor Engineering, dated March 4, 2008, received March 6, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to construct - erect or place a building, conduct site grading and to temporarily or permanently place, dump or remove any material within a Regulated Area, in order to facilitate the servicing and the development of a residential subdivision on the southeast corner of Dufferin Street and Rutherford Road, in Planning Block 10.(Langstaff Woods), in the City of Vaughan. Planning Block 10 is bounded by Highway 7 to the south, Dufferin Street to the west, Rutherford Road to the north and to the east by Bathurst Street. The subject property, which is approximately 26.4 ha (65.2 ac) in size, is bounded.to the south and east by two existing residential subdivisions. The proposed works involve site grading in order to facilitate the servicing of the subject lands, as well as the construction of single - family residences. It is noted that the proposed works form part of the lands that were draft approved under Draft Plan of Subdivision 19T -05V06 (Rutherford Contwo Investments). 201 Block 10 has an approved Master Environmental Servicing Plan (MESP) in place. However, the original owner of the subject lands was a non - participating landowner during the Block 10 MESP process. The limits of the adjacent valley corridor and watercourse were previously identified and delineated during the aforementioned draft plan process. This permit application for servicing fulfills a condition of draft approval issued by TRCA staff. TRCA staff has received and reviewed detailed technical submissions relating to the proposed works and has provided comments to the agent, Valdor Engineering. At this time, minor issues relating to erosion and sediment controls are being addressed and TRCA technical staff is confident that these issues can be resolved in a timely manner. The permit will not be released until such time as these issues are resolved. Control of Flooding: The'proposed works including the location of the proposed lots /residences are located outside of the Regional Storm Flood Plain of the Don River. As such, the storage or conveyance of flood waters will not be affected. Pollution: Erosion control measures including sediment fencing will be erected prior to the initiation of works and maintained for the.duration of construction to ensure that sediment does not enter the nearby valley system and watercourse. Dynamic Beaches: Not applicable. Erosion: Erosion on site will be minimized through the implementation of the aforementioned sediment control measures. There are no geotechnical /slope stability issues associated with the proposed works. Conservation of Land: There are no in -water works proposed as part of the subject application. In addition, no significant vegetation will be removed for the grading works as well as the construction of the residential subdivision homes. A 10 metre setback, in accordance with the TRCA's Valley and Stream Corridor Management Program has been provided on the subject lands. The valley corridor along with the Regional Storm Flood Plain and buffer area will be dedicated into public ownership (TRCA) at the time the associated subdivision is registered. . Plantings An edge management plan along with a comprehensive restoration plan for the buffer • area will be submitted as part of the detailed :design process for the associated draft plan of subdivision. This plan will be submitted to TRCA for review and approval, prior to the registration of the subdivision, or any phase thereof. 202 Policy Guidelines: This proposal complies with Section 4.1.1 - New Urban Development and Section 4.3 - Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. CFN: 39544 - Application #: 514 /07 /VAUG Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date: March 27, 2008 8.1.55 RUTHERFORD CONTWO INVESTMENTS LIMITED To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove'any material, originating on the site or elsewhere and alter a watercourse on Lot 15, Concession 2, on the southeast corner of Rutherford Road and Dufferin Street, in the City of Vaughan, Don River Watershed as located on the property owned by Rutherford Contwo Investments Limited. The purpose is to construct a structure, conduct site grading, temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a tributary of the Don River, in order to extend an existing culvert under Rutherford Road, near the southeast corner of Dufferin Street and Rutherford Road, in Planning Block 10 (Langstaff Woods), in the City of Vaughan. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Letter of Undertaking, prepared by David Giugovaz, Valdor Engineering, dated March 4, 2008, received March 6, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to construct a structure, conduct site grading, temporarily or permanently place, dump or remove any material within.a Regulated Area and to alter a tributary of the Don River, in order to extend an existing culvert under Rutherford Road, near the southeast corner of Dufferin Street and.Rutherford Road, in Planning Block 10 (Langstaff Woods), in the City of Vaughan. Planning Block 10 is bounded by.Highway 7 to the south, Dufferin Street to the west, Rutherford Road to the north and to the east by Bathurst Street. A tributary of the East Don River is located adjacent to Rutherford Road, and flows through an existing culvert structure and proceeds in a northerly direction into Planning Block 11. This existing,culvert is approximately 1800 mm in size and is located 500 metres east of Dufferin Street. 'the total. drainage area to this culvert is approximately 82.4 ha. 203. A 22.5 metre extension to the culvert is required in order to facilitate the construction of the intersection of.Pleasant Ridge Avenue and Rutherford Road. This will permit an aligned intersection with Crimson Forest Drive, located to the riorth in Planning Block 11. Previously, TRCA staff had reviewed detailed designs for an extension to this culvert in Block 11 as well as the implementation of an extensive effort to restore the watercourse through the use of natural channel design techniques (Permit, No. C -06163 - issued on June 2, 2006). TRCA staff has received and reviewed detailed technical submissions relating to the proposed works and has provided comments to the agent, Valdor Engineering. At this time, issues relating to design details (i.e., stone sizing and staging plans) are being addressed and TRCA technical staff is confident that these issues can be resolved in a timely manner. Additionally, due to the length of the proposed culvert extension, authorization from Fisheries and Oceans Canada (DFO) will be required. The permit will not be released until such time as these aforementioned TRCA issues are resolved and authorization from DFO is issued. Control of Flooding: TRCA technical staff has reviewed floodline modelling for the proposed culvert extension and is satisfied that the proposed works will not impact the storage or conveyance of flood waters. Pollution: Sediment control measures including fencing will be installed prior to the initiation of construction and maintained for the. duration of the works to ensure that sediment does not enter the watercourse. Dynamic Beaches: Not applicable. Erosion: Erosion will be minimized through the implementation of the aforementioned sediment control measures. There are no geotechnical /slope stability issues associated with the proposed works. Conservation of Land: Given the length of the proposed culvert and the nature of the works, an authorization from DFO will be required. The subject permit will not be issued until this authorization is issued. Plantings No vegetation will be removed as part of the proposed works. However, plantings of native material will be carried out along the edge of the valley, in accordance with the TRCA's Planting Guidelines. 0 Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. 204 CFN: 39545 - Application #: 515 /07 /VAUG Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date: March 27, 2008 8.1.56 7961 ISLINGTON AVENUE To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 7 WEST HALF , Concession 7, (7961 Islington Avenue), in the City of Vaughan, Humber River Watershed. The purpose is to construct a replacement dwelling and garage and place fill within a Regulated Area of the Humber River Watershed at 7961 Islington Avenue in the City of Vaughan. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Site Plan (Drawing No. Al), prepared by Accurate Designs, dated September 2007, received by the TRCA March 20, 2008 redline revised to indicate erection of sediment control fencing; • • Proposed Basement Plan (Drawing No. A2), prepared by Accurate Designs, dated September 2007, received by the TRCA March 20, 2008; • Proposed Ground Flood Plan (Drawing No. A3), prepared by Accurate Designs, dated September 2007, received by the TRCA March 20, 2008; • Front & Rear Elevations (Drawing No. A4), prepared by Accurate Designs, dated September 2007, received by the TRCA March 20, 2008; • Left & Right Elevations (Drawing No. A5), prepared by Accurate Designs, dated September 2007, received by the TRCA March 20, 2008; • Site Grading and Servicing Plan (Drawing No. 207- VA146 -1), prepared by Skira & Associated Ltd., revise dated February 26, 2008, received by the TRCA February 27, 2008; • Cross- Sections-Plan (Drawing No. 207- VA146 -2), prepared by Skira & Associated Ltd., revise dated February 26, 2008, received by the TRCA February 27, 2008; • Letter of Undertaking, prepared by the applicant, dated April 8, 2008 received by the TRCA April 9, 2008 stating that an updated geotechnical report will be submitted to the satisfaction of the TRCA. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a replacement dwelling and garage and place fill within a Regulated Area of the Humber River Watershed desigfated by the Province as a Special Policy Area. The proposal is partially.located within the Regional Storm Flood Plain and entirely within the Woodbridge Special Policy Area (SPA). The existing dwelling is located outside of the Regional Storm Rood Plain and the siting of the proposed dwelling occupies the majority of the footprint of the existing dwelling; however, in order to accommodate the proposed dwelling a limited amount of fill material is required to expand the buildable area outside of the flood plain. 205 In addition, flood proofing measures have been implemented in the design of the dwelling where no filling is proposed to ensure the structure is floodproofed to the Regional event, consistent with the Authority's Valley and Stream Corridor Management Program ( VSCMP). All openings within the proposed dwelling are above 145.47 metres above sea level (rn.a.s.I.) which is the Regional Storm Flood elevation of 145.17 m.a.s.l. plus 0.3 metres freeboard. Due to the existing driveway configuration and topography of the site, it is not technically feasible to floodproof the replacement garage structure. As the existing garage is already within the Regional Storm Flood Plain, TRCA staff are satisfied that the proposed replacement garage does not increase the risk to life and property and is consistent with VSCMP policies for SPAs. A direct internal connection from the proposed garage to the basement of the proposed floodproofed home is not permitted. Control of Flooding: The proposed works are partially located within the Regional Storm Flood Plain; however, TRCA water resources engineering staff are satisfied-that the proposed development will have minimal impact on the storage and conveyance of flood waters and appropriate floodproofing measures have been implemented in the design of the replacement dwelling. As the existing garage to be replaced is already within the Regional Storm Flood Plain, .a replacement garage within the Regional Storm Flood Plain will not increase the risk to life or property. Pollution: Sediment control fencing will be installed and maintained during construction to prevent sediment from migrating onto neighbouring properties. Dynamic Beaches: Not applicable. Erosion: TRCA geotechnical staff are satisfied that proposed development will not have an adverse impact on the adjacent valley wall. Conservation of Land: As a watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be. restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.1 B) - Development / Redevelopment within Designated Two Zone-Areas or Special Policy Areas - of the Authority's Valley and Stream Corridor Management Program. 206. CFN: 40610 - Application #: 186 /08 /VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: April 2, 2008 TOWN OF CALEDON 8.1.57 DELMARK HOMES INC. To construct, reconstruct, erect or place a building or structure on Lot 44, Plan 43M -860, (19 Proctor Avenue), in the Town of Caledon, Humber River Watershed as located on the property owned by Delmark Homes Incorporated. The purpose is to undertake works within a TRCA Regulated .Area of the Humber River Watershed in order to facilitate the construction of a single - family dwelling located at 19 Proctor Avenue, in the Town of Caledon. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Letter of Undertaking, prepared by Delmark Homes Incorporated, dated April 8, 2008, to address all outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single - family dwelling at 19 Proctor Avenue, in the Town of Caledon. The subject property is located in the vicinity of the Provincially Significant Hockley Valley Wetland Complex (PSW), which is located on the abutting lands to the west. Additionally, the subject property contains significant upland vegetation contiguous to the above noted wetland complex. The upland vegetation has been identified as the Innis - Gibson Lake Kettles Life Science Area of Natural and /or Scientific Interest (ANSI). Although the subject property is located on the Oak Ridges Moraine (ORM), this site, which is located within the Mills Creek Estates Subdivision, was draft approved by the Ministry of Municipal Affairs and Housing (MMAH) prior to the enactment of the Oak Ridges Moraine Conservation Act and the Oak Ridges Moraine Conservation Plan (ORMCP). At the March 7, 2008 TRCA Executive Committee meeting, TRCA staff were directed by members of the TRCA Executive Committee to contrive a strategy to deal with the remaining vacant Tots within the approved subdivision and report back to the TRCA Executive Committee. with details related to the strategy. Since then, TRCA staff have met with Town of Caledon staff and have developed initial guidelines to review future development on the remaining lots. Through future dialogue with Town of Caledon staff, it is anticipated that this strategy will be finalized. It is our expectation that the guidelines will be completed.prior to the upcoming May • 9, 2008 TRCA Executive Committee meeting: As an element of this strategy, a screening map will be provided to the Town of Caledon identifying lots containing natural features and /or 207 hazard lands of significant concern that pose substantial development constraints. Additionally, the guidelines are being developed using a systems approach to minimize impacts of development on significant natural features located within the approved subdivision and externally. Until the above noted guidelines are approved, in the interim, the principles associated with the guidelines will be used through the development review process for each application, including this project. With respect to this proposal, the principles of the future guidelines for the larger subdivision area have been used. Based on our review of the setbacks.proposed from the natural area, it is our opinion that no ecological and /or hydrological impacts are anticipated as a result of this • development The proposed septic system will use an eco -flow biofilter unit, which will significantly reduce the amount of grading necessary to facilitate development. Additionally, the mantle footprint typically required for a standard septic bed has been significantly reduced as a result of the eco -flow biofilter unit. As an element of this application, an extensive restoration /enhancement planting plan has been incorporated into the design of this project. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are -anticipated. • Pollution: • Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: • There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: • No significant vegetation will be removed as a result of construction. There are no fisheries related concerns. Plantings Native, non - invasive plant species consistent with TRCA's guidelines are included as part of this application to achieve an ecological net gain for this area. Policy Guidelines: - This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 40531 - Application #: 128/08/CAL i Report Prepared by: Jason Wagler, extension 5743' For information contact: Quentin Hanchard, extension 5324 Date: April 2, 2008 208 8.1.58 DELMARK HOMES INC. To construct, reconstruct, erect or place a building or structure on Lot 46, Plan 43M -860, (13 Proctor Avenue), in the Town of Caledon, Humber River Watershed as located on the property owned by Delmark Homes Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single - family dwelling located at 13 Proctor Avenue, in the Town of Caledon. The permit will be issued for the period of April 1 1, 2008 to April 10, 2010. • Site Plan, Drawing No. 98315 S46, prepared by UMA Engineering Ltd., dated April 8, 2008, stamped received by TRCA Planning & Development staff on April 8, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber'River Watershed in order to facilitate the construction of a single - family dwelling at 13 Proctor Avenue, in the Town of Caledon. The subject property is located in the vicinity of the Provincially Significant Hockley Valley Wetland Complex (PSW), which is located at the rear portion of the subject property.. Additionally, the subject property contains significant upland vegetation contiguous t'o the above noted wetland complex. The upland vegetation has been identified as the Innis- Gibson Lake Kettles Life Science Area of Natural and /or Scientific Interest (ANSI). Although the subject property is located on the Oak Ridges Moraine (ORM), this site, which is located within the Mills Creek Estates Subdivision, was draft approved by the Ministry of Municipal Affairs and Housing (MMAH) prior to the enactment of the Oak Ridges Moraine Conservation Act and the Oak Ridges Moraine Conservation Plan (ORMCP). At the March 7, 2008 TRCA Executive Committee meeting, TRCA staff were directed by members of the TRCA Executive Committee to contrive a strategy to deal with the remaining vacant lots within the approved subdivision and report back to the TRCA Executive Committee with details related to the strategy. Since then, TRCA staff have met with Town of Caledon staff and have developed initial guidelines to review future development on.the remaining lots. Through future dialogue with Town of Caledon staff, it is anticipated that this strategy will be finalized. It is our expectation.that the guidelines will be completed prior. to the upcoming May 9, 2008 TRCA Executive Committee meeting. As an element of this strategy, a screening map will be provided to the Town of Caledon identifying lots containing natural features and /or hazard lands of significant concern that pose substantial development constraints. Additionally, the guidelines are being developed using a systems approach to minimize impacts of development on significant natural featuresjlocated within the approved subdivision .. and externally. Until the above noted guidelines are approved; in the interim, the principles associated with the guidelines will be used through the development review process for each application, including this project. 209 With respect to this proposal, the principles of the future guidelines for the larger subdivision area have been used. Based on our review of the setbacks proposed from the natural area, it is our opinion that no ecological and /or hydrological impacts are anticipated as a result of this development The proposed septic system will use an eco -flow biofilter unit, which will significantly reduce the amount of grading necessary to facilitate development. Additionally, the mantle footprint typically required for a standard septic bed has been significantly reduced as a result of the eco -flow biofilter unit. As an element of this application, an extensive restoration /enhancement planting plan has been incorporated into the design of this project. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (i.e., heavy -duty silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Native, non - invasive enhancement plantings consistent with TRCA's guidelines are included as part of this application to enhance the feature located at the rear of the property. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 40530 - Application #: 129/08/CAL • Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: April 2, 2008 8.1.59 • DELMARK HOMES INC. To construct, reconstruct, erect or placga building or structure on Lot 50, Plan 43M -860, (Proctor Avenue), in theTown of Caledon, Humber River Watershed as located on the property owned by.Delmark Homes Incorporated. The purpose is to undertake works within al-RCA Regulated Area sof the Humber River Watershed in order to facilitate the construction of a single - family dwelling on Proctor Avenue, in the Town of Caledon. 210 The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Site Plan, Drawing No. 98315 S50, prepared by UMA Engineering Ltd., dated April 8, 2008, stamped received by TRCA Planning & Development staff on April 8, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single - family dwelling at Lot - 50 on Proctor Avenue, in the Town of Caledon. The subject property is. located in the vicinity of the Provincially Significant Hockley Valley Wetland Complex (PSW), which is located on the subject lands to the east. Although the subject property is located on the Oak Ridges Moraine (ORM), this site, which is located within the Mills Creek Estates Subdivision, was draft approved by the Ministry of Municipal Affairs and Housing (MMAH) prior to the enactment of the Oak Ridges Moraine Conservation Act and the Oak Ridges Moraine Conservation Plan (ORMCP). At the March 7, 2008 TRCA Executive Committee meeting, TRCA staff were directed by members of the TRCA Executive Committee. to contrive a strategy to deal with the remaining • vacant lots within the approved subdivision and report back to the TRCA Executive Committee with details related to the strategy. Since then, TRCA staff have met with Town of Caledon staff and have developed initial guidelines to review future development on the remaining lots. Through future dialogue with Town of Caledon staff, it is anticipated that this strategy will be • finalized. It is our expectation that the guidelines will be completed prior to the upcoming May 9, 2008 TRCA Executive Committee meeting. As an element of this strategy, a screening map will be provided to the Town of Caledon identifying lots containing natural features and /or hazard lands of significant concern that pose substantial development constraints. Additionally, the guidelines are being developed using a systems approach to minimize impacts of development on significant natural features located within the approved subdivision and externally. Until the above noted guidelines are approved, in the interim, the principles associated with the guidelines will be used through the development review process for each application, including this project. With respect to this proposal, the principles of the future guidelines for the larger subdivision area have been used. Based on our review of the setbacks proposed from the natural area, it is our opinion that no ecological and /or hydrological impacts are anticipated as a result of this development The proposed septic system will use an eco -flow biofilter unit, which will significantly reduce the amount of grading necessary. to facilitate development. Additionally, the mantle footprint typically required for a standard septic bed has been significantly reduced as a result of the eco -flow biofilter unit. As an element :if this application, an extensive enhancement planting plan has been incorporated into the design of this project. Control of Flooding: The proposed works are located, outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. 211 Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: .No significant vegetation will be removed as a result of construction. Plantings Native, non - invasive enhancement plantings consistent with TRCA's guidelines are included as part of this application to provide a net ecological gain with this application. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's . Valley and Stream Corridor Management Plan (VSCMP). CFN: 40605 - Application #: 181/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: April 2, 2008 8.1.60 17604 THE GORE ROAD To construct, reconstruct, erect or place a building or structure on Part Lot 29, Concession 3, ALBION, (17604 The Gore Road), in the Town of Caledon,. Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single - family dwelling located at 17604 The Gore Road, in the Town of Caledon. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Letter of Undertaking, prepared by D. Meric, dated April 8, 2008, to address all outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: . 212 Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single - family dwelling located at 17604 The Gore Road, in the Town of Caledon. A tributary of the Humber River Watershed traverses the rear portion of the subject property. An Oak Ridge Moraine (ORM) wetland feature is also located at the rear of the site. Additionally, significant upland habitat exists adjacent to the stream and around the perimeter of the wetland feature. The proposed dwelling and septic system are located on the tableland portion of the site and are sufficiently setback from both the stream corridor and wetland feature. In addition, there are no geotechnical, flooding, or ecology related issues with this proposal. Although no significant vegetation is proposed to be removed with this application, an extensive planting enhancement plan has been provided along the edge of the natural areas on -site to provide an ecological net gain for this area. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. An enhancement planting plan has been submitted with this application to achieve an ecological net gain for this area. Plantings Native, non - invasive enhancement plantings consistent with TRCA's guidelines are included as part of this application to enhance the natural features located at the rear of the. property. Policy Guidelines:. This proposal is in conformity with Section 4.1.1 - New Urban Development - of ,the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 40630 - Application #: 203 /08 /CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extens,bn 5324 Date: April 2, 2008 213 TOWN OF MARKHAM 8.1.61 63 BURWELL CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 23, Plan M -1975, (63 Burwell Crescent), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a sunroom addition at the rear of an existing residential dwelling located at 63 Burwell Crescent, in the Town of Markham. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Site Plan, Drawing No. A -1, prepared by R. A. Ramprasad, dated January 30, 2008, stamped received by TRCA Planning & Development staff on April 7, 2008; • Foundation Plan, Drawing No. A -2, prepared by R. A. Ramprasad, dated January 30, 2008, stamped received by TRCA Planning & Development staff on March 20, 2008; • Main Floor Plan, Drawing No. A -3, prepared by R. A. Ramprasad, dated January 30, 2008, stamped received by TRCA Planning & Development staff on March 20, 2008; • Roof View, Drawing No. A -4, prepared by R. A. Ramprasad, dated January 30, 2008, stamped received by TRCA Planning & Development staff on March 20, 2008; • Elevation Views, Drawing No. A -5, prepared by R. A: Ramprasad, dated January 30, 2008, stamped received by TRCA Planning & Development staff on March 20, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the . Rouge River Watershed in order to facilitate the construction of a sunroom addition located at 63 Burwell Crescent, in the Town of Markham. The rear of the property is adjacent to a tributary of the Rouge River Watershed. The proposed addition is located within the Regional Storm Floodplain and will be floodproofed in accordance with TRCA's floodproofing requirements. TRCA staff has confirmed that the proposed addition is located outside of the hydraulic • floodway. In addition, TRCA staff do.not anticipate any significant impacts to the storage and /or conveyance of floodwaters as a result of construction. There are no ecological or geotechnical concerns with-this application. Control of Flooding: The proposed works are located within the Regional Storm Floodplain. However, TRCA staff do not anticipate.any significant impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. 214 Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: The construction area is currently a manicured lawn. As such, no significant vegetation will be removed as a result of this project. There are no fisheries related concerns associated with this project. Plantings As no vegetation is to be removed by the proposed works, additional plantings are not required. Due to the small scale of the project, opportunities for plantings on other areas of the property could not be considered through this project. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40520 - Application #: 123/08 /MARK Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: April 2, 2008 8.1.62 11 BUTTONVILLE CRESCENT EAST. To construct, reconstruct, erect or place a building or structure on Part Lot 14, Concession 4, (11 Buttonville Crescent East), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the demolition of an existing residential dwelling and the construction of a new residential dwelling. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Drawing A -1, prepared by John Shuki Lau Architect Inc., dated April 3, 2008, stamped received by TRCA Planning and Development on April 7, 2008; • Letter of undertaking prepared by John Shuki Lau Architect Inc., dated April 9, 2008, to address outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: 215 Proposal: The purpose of this application is to undertake works within_a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the demolition of an existing residential dwelling and the construction of a new residential dwelling. The subject property is located adjacent to a valley corridor feature of the Rouge River Watershed. TRCA staff has conducted a site inspection and confirm that the proposed works are sufficiently setback from the valley corridor feature. The area to which this application applies is currently a manicured lawn and is void of any significant vegetation. The proposed works are located outside of the Regional Storm Floodplain. An enhancement planting plan has been incorporated into the design of this proposal to improve the ecological condition of this area. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters is anticipated. Pollution:. Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability.concerns related to this application. Conservation of Land: No significant vegetation will be removed as result of construction. Although no vegetation- will be remove, the applicant is proposed extensive plantings along the rear of the property, abutting the valley corridor. There are no fisheries related concerns associated with this application. Plantings All plant species are native and non - invasive, consistent with TRCA's guidelines. Policy Guidelines: This proposal is consistent with Sectiori. 4:2.2 (D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40503 - Application #: 103 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 2, 2008 21.6 8.1.63 TOWN OF MARKHAM To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on 120 meters downstream from the southern limit of the Toronto Ladies Golf Course, Pomona Mills Creek, east of Henderson Avenue, in the Town of Markham, Don River Watershed as located on the property owned by Town of Markham. The purpose is to construct, alter a watercourse, site grade, temporarily /permanently remove /place fill /material within a regulated area and Regional Storm Floodplain to implement channel restoration, sanitary sewer protection, and storm sewer outfall modifications within a section of the stream corridor and valley corridor of Pomona Mills Creek, located 120 metres downstream from the southern limit of the Toronto Ladies Golf Course, near Henderson Avenue, in the Town of Markham. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Letter of Undertaking to provide minor revisions to engineering and landscape drawings to the satisfaction of TRCA staff; dated April 9, 2008; received April 9, 2008; prepared by the Town of Markham. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The Town of Markham is currently undertaking a Municipal Class Environmental Assessment (EA) to develop a restoration plan for the Pomona Mills Creek Sub - Watershed which.will address issues relating to erosion restoration, infrastructure protection, environmental improvements to the valley system, and habitat enhancement. This EA is still underway with overall plans to be developed and submitted at later date. Prior to this EA being completed a need to protect existing sanitary sewer infrastructure from exposure has been identified by York Region and the Town of Markham. At this location, the existing channel crosses York Region's existing sanitary sewer in four locations. York Region and the Town of Markham have collaborated to develop a design that will mitigate bed and bank scouring associated with the weir, protect existing sewer infrastructure and enhance aquatic habitat and fish passage and be in keeping with the overall objectives of the Class EA Study. Proposed Works The proposed works include raising the channel bed, stabilization and enhancement 'of the bed morphology to discourage future degradation and lateral adjustments and slight realignment of the bankfull channel (within the high flow channel) away from the existing sanitary sewer. No • explicit infrastructure protection for the sanitary sewer is required to substantially reduce risks at this site as protection of the sewer and manholes. is intended to be achieved through the overall channel design. The following works will achieve the Objectives of the Class EA currently underway and will help determine requirements for enhancements and erosion mitigation that will tie in both upstream and downstream of the subject location. 217 During construction erosion and sediment controls will be in place as all work will be completed in the dry. Construction supervision will be provided on site by a qualified professional to ensure the project is being constructed in accordance with approved designs and to ensure the environment is protected to the highest standards possible. A fish removal plan will be in place to relocate any live fish from upstream of the project area to the downstream side, to ensure fish are protected.. A monitoring plan will be implemented to assess and monitor any deficiencies post- construction with any required maintenance or adjustment to be further implemented as required. Control of Flooding: Cut and fill will be taking place within the Regional Storm Floodplain however TRCA Water Management Staff has reviewed the proposal and are satisfied that the proposed project will not have significant impacts on the storage or conveyance of floodwaters. Pollution: • Standard erosion control measures (silt /sediment fencing, rock flow check dam) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the Wetland/watercourse. Dynamic Beaches: Not applicable • Erosion: There are no geotechnical /slope stability issues associated with the proposal. There will be no slope stability concerns with the proposed project. A Monitoring Plan will implemented to . assess and monitor any deficiencies post- construction with any required maintenance or adjustment to be.further implemented as required. • Conservation of Land: With erosion and sedimentation control plans in effect the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries 'and Oceans Canada (DFO). In -water works will be completed during the warm -water fisheries timing window of July 1 to March 31. Plantings All disturbed areas will be restored with a combination of native non - invasive seeding, live stakings and potted plants following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40528 - Application #: 126 /08 /MARK Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: April 2, 2008 218 TOWN OF RICHMOND HILL 8.1.64 VIN -CAR DEVELOPMENTS To construct, reconstruct, erect or place a building or structure on Lot 63, Plan 2027, (70 Pemberton Road), in the Town of Richmond Hill, Don River Watershed as located on the property owned by Vin -Car Developments. The purpose is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of two new dwellings. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Drawing L1, prepared by Liberty Home Group, dated March 19, 2008, stamped received by TRCA Planning and Development on March 27, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of the application is undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of two new residential dwellings at 70 Pemberton Road, in the Town of Richmond Hill. The subject lands are located within an approved residential subdivision and currently contain one existing dwelling, which is proposed to be demolished. The applicant is proposing the construction of two new residential on the subject lands, which through a future consent application is proposed to be severed. Although the property is partially located within the Regional Storm Floodplain; the proposed dwellings are proposed to be located entirely outside of the floodplain, and will be sufficiently setback. There are no geotechnical, ecological, or fisheries related concerns with this application. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters is anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will.be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings As no significant vegetation will be removed, no plantings are required. 219. Policy Guidelines: This proposal is consistent with Section 4.1 - New Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP) and Section 4.2.2 (D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40086 -. Application #: 894/07/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 2, 2008 TOWN OF WHITCHURCH- STOUFfVILLE 8.1.65 2054889 ONTARIO LIMITED To site grade, temporarily or permanently place, dump or rerriove any material, originating on the site or elsewhere and alter a watercourse on Lot 1, Concession 3, ( Stouffville Road at Woodbine Avenue), in the Town of Whitchurch - Stouffville, Rouge River Watershed as located on the property owned by 2054889 Ontario Limited. The purpose is to undertake site grading, permanently place fill material and alter a watercourse in order establish a stormwater management pond. The permit will be issued for the period of April 11, 2008 to April 10, 2010. .• Drawing No. ESI, Erosion and Sediment Control Plan, prepared by W.R. Hodgson & Associates, dated June 2006, Engineer's Stamp signed December 10, 2007, received by TRCA on December 12, 2007; • Drawing No. DE5, SWM Pond Details, prepared by W.R. Hodgson & Associates, dated June 2006, Engineer's Stamp signed March 13, 2007, received by TRCA on April 17, 2007; • Drawing No. L.1, Planting Plan -North Pond and Buffer, prepared by Todhunter Associates, dated November 2006, Revision No. 7, revised on March 5,.2008, received by TRCA on March 20, 2008; Drawing No. L.2, Planting Plan -South Pond Outfall, prepared by Todhunter Associates, dated December 2006, Revision No. 6, revised on March .5, 2008, received by TRCA on March 20, 2008; • Drawing No. L3, Details, prepared by Todhunter Associates, dated November 2006, . Revision No. 5, revised on March 5, 2008, received by TRCA on March 20, 2008.. 'RATIONALE . The application was reviewed by staff on the basis of the following information: 220 Proposal: The applicant seeks permission to undertake site grading, permanently place fill material and alter a watercourse in order to establish a new industrial /employment plan of subdivision. The proposed pond is located on the east side of the Berczy Creek valleylands and is required to service lands in the northwest quadrant of th'e community of Gormley within the Town of Whitchurch- Stouffville. The proposed pond design contains an outfall structure and emergency spillway, which discharge to the Berczy Creek. The outfall will contain a plunge pool and level spreader in order to disperse the discharge of stormwater from the pond. The location of the pond and the outlet was previously approved in principle by TRCA staff during review of the associated draft plan of subdivision application (File No. 19T- 89032). The proposal is consistent with Section 4.3 A 3) of the Valley and Stream Corridor Management Program (VSCMP) wherein outfalls and stormwater management facilities are permitted in valley and stream corridors. Control of Flooding: Portions of the pond outfall structure and pond will be located within the Regional Storm Flood Plain. The pond has been designed to safely convey flood flows and will not affect the control of flooding. Pollution: Erosion and sediment controls will be erected prior to the initiation of construction and will be maintained for the duration of works to ensure that sediment does not enter the nearby valley system and watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical or slope stability. concerns with this proposal. The stormwater management pond has been designed to detain and control the discharge of stormwater run -off within the plan of subdivision area in order to prevent increased erosion within the Berczy Creek system. Conservation of Land: The pond has been sited away from any existing natural, self- sustaining vegetation with an adequate buffer from the Berczy Creek itself: There are no in -water works proposed as part of this application. Staff will issue a Letter of Advice on behalf of Fisheries and Oceans Canada (DFO) with this permit, since DFO Authorization pursuant to the Fisheries Act (Canada) is not required. All disturbed areas are to be stabilized and planted following construction. Plantings Planting plans providing for the restoration and enhancement of the pond and valleyland edge with plantings of native trees and shrubs have been prepared as part of this proposal. Policy Guidelines: This proposal is consistent with Section 4.3, Infrastructure and Servicing, of TRCA's Valley and Stream Corridor Management Program. 221 CFN: 38558 - Application #: 792/06/WS Report Prepared by: Chris Jones, extension 5718 For information contact: Chris Jones, extension 5718 Date: April 1, 2008 8.1.66 REGIONAL MUNICIPALITY OF YORK To construct, redonstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 1, 35, Concession VII, (Culvert 14 at Station 18 +300 on Stouffville Road west of Highway 48), in the Town of Whitchurch- Stouffville, Rouge River Watershed as located on the property owned by Regional Municipality of York. The purpose is to construct a structure ( asphalt paving for Stouffville Road widening) within a Regional Storm Floodplain; site grade and place fill (for storm sewer installation, road widening) in a Regulated Area. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Letter of Undertaking (to provide revisions to engineering and landscape drawings to the satisfaction of TRCA staff and to provide the landowner's authorizations for works in the regulated area outside the Regional Municipality of York's Right of Way) dated April 3, 2008; received April 4, 2008; prepared by Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The Regional Municipality of York is undertaking a road project on Stouffville Road to widen from 2 to 4 lanes from Woodbine Avenue to the centre line of Highway 48. This file deals with the regulated section west of Highway 48. Specifically the proposed works include the construction of the road widening, the installation of the new storm sewers and the connection to the existing storm sewer on Stouffville Road west of Highway 48. An existing culvert crosses from the north west quadrant of Stouffville Road and Highway 48 to the south east quadrant. There are no in water works proposed at the existing culvert 14. The site is within a Regional Storm Floodplain and a Regulated Area. The project will need to adhere to the Oak Ridges Moraine legislation. The project was reviewed by TRCA staff during the Environmental Assessment process in the Stouffville Road file number 34684. 222 This section of Stouffville Road near Highway 48 is located on the Oak Ridges Moraine. On the west of Highway 48 the area is designated as "Countryside Area." All watercourses on the Oak Ridges Moraine have been identified as hydrologically sensitive features. There is one watercourse within the project limits, however there will be no. in water works associated with the project. Section 41 of the Oak Ridges Moraine Conservation Plan indicates in Subsection 5 that transportation and infrastructure may be permitted to cross hydrologically sensitive features (Le. watercourses) subject to the tests and best management practices described in section 41(5)(a to e). The consultants for the Region have identified in their submission how the project conforms to the Oak Ridges Moraine legislation. This works associated with this project including the connection to the storm sewer have been reviewed under the Environmental Assessment Act, Ontario Regulation,166 and under the Fisheries Act for the tests and best management practices. Control of Flooding: Existing ground elevations throughout the Regional Storm Floodplain will be maintained,• therefore, the control of flooding will not be implicated. Pollution: Standard erosion control measures will be implemented to ensure that the construction - generated sediments do not enter the watercourse. To prevent sediment transfer to the watercourse, the existing 760 mm diameter storm sewer in the east will be blocked and the sediment in the existing catchbasin will be removed with a vacuum truck prior to the proposed 600mm diameter sewer from the west being connected. There will not be a direct connection to the existing culvert 14'. An Oil Grit Separator is 'also proposed down gradient of the existing catchbasin and before the culvert. Dynamic Beaches: Not applicable Erosion: There will be no slope stability issues related to the works. Conservation of Land: As there will be no in stream work associated with the project there will be no concerns related to fish habitat loss. The proposed works will impact no significant terrestrial resource features. Plantings All disturbed. natural areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 39422 - Application #: 430/07/WS Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: April 1, 2008 223 8.1.67 REGIONAL MUNICIPALITY OF YORK To construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade, temporarily or permanently place, durrrp or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 1, 35, Concession VII, (Culvert 12 at Station 16 +670 on Stouffville Road 310 m east of McCowan Road), in the Town of • Whitchurch - Stouffville, Rouge River Watershed as located on the property owned by Regional Municipality of York. The purpose is to•construct structures asphalt paving for Stouffville Road widening, retaining wall., headwall, parapet wall on south side of existing twin box culverts) within a Regional Storm • Floodplain; site grade and place fill (for storm sewer installation, road widening, retaining wall /headwall construction) in a Regulated Area; temporarily alter a watercourse (tributary of Little Rouge Creek) during the coldwater timing window (June 15 to September 15) through a coffer dam method during the Culvert 12 break in with the storm sewer, and through a silt fence barrier to isolate the proposed retaining wall /head wall during construction from the existing watercourse. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Letter of Undertaking (to provide revisions to engineering and landscape drawings to the satisfaction of TRCA staff and to provide the landowner's authorizations for works in the regulated area outside the Regional Municipality of York's Right of Way) dated April 3, 2008; received April 4, 2008; prepared by Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The Regional Municipality of York is undertaking a road project on Stouffville Road to widen from 2 to.4 lanes from Woodbine Avenue to the centre line of Highway 48. This file deals with the regulated section east of McCowan Road. Specifically the proposed works include the construction of the road widening, construction of the retaining wall, headwall and parapet wall on the south side of the existing twin box culverts, the•installation of the new storm sewers and the break in connection of the storm sewers to the existing box culvert 12, east of McCowan Road. The watercourse.will be altered temporarily with the proposed works during the culvert break in and during the construction of the retaining wall and headwall. The site is within a Regional Storm Floodplain and a Regulated Area. The project will need to adhere to the Oak Ridges Moraine legislation. The project was reviewed by TRCA staff during the Environmental Assessment process in the Stouffville Road file number 34684. This section of Stouffville Road east of McCowan Road is located on the Oak Ridges Moraine. • The area surrounding the watercourse east of McCowan Road is designated as "Natural Linkage." Either side of the watercourse the area is designated as "Countryside." All watercourses on the Oak Ridges Moraine have been identified as hydrologically sensitive features. There is one watercourse within the project limits, and there will be near water works . associated with the retaining wall /headwall construction and in water works associated with the 224 direct connection to the culvert with the proposed storm sewer. Section 41 of the Oak Ridges Moraine Conservation Plan indicates in Subsection 5 that transportation and infrastructure may be permitted to cross hydrologically sensitive features (i.e. watercourses) subject to the tests and best management practices described in section 41(5) (a to e). The consultants for the Region have identified in their submission how the project conforms to the Oak Ridges Moraine legislation. The works associated with this project, including the break in to the culvert and the retaining wall /headwall works have been reviewed under the Environmental Assessment Act, Ontario Regulation 166 and under the Fisheries Act for the tests and best management practices. Control of Flooding: Staff has reviewed the hydraulics for the proposed structures (retaining wall /head wall /parapet wall) and the proposed profile of the road and has determined that there will not be any negative impacts to flooding. Pollution: Standard erosion control measures will be implemented to ensure that the construction - generated sediments do not enter the watercourse. To prevent sediment transfer to the watercourse during the culvert break in, a temporary cofferdam with pea gravel will isolate the works from the watercourse. A silt fence will be installed to isolate the proposed retaining wall /headwall works from the watercourse. An Oil Grit Separator is also proposed west of the culvert break in. Dynamic Beaches: Not applicable Erosion: There will be no slope stability issues related to the works. Conservation of Land: There will be in stream works associated with this project. There will be a culvert break in associated with the proposed storm sewer, and there will be near water works associated with the retaining wall /head wall. construction. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Fisheries and Oceans Canada (DFO). The proposed works will impact no significant terrestrial resource features. Plantings All disturbed natural areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section' 4.3 - Infrastructurg and Servicing of the Authority's Valley and Stream Corridor Management Program. 225. CFN: 39426 - Application #: 435/07/WS Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: April 2, 2008 TOWNSHIP OF KING 8.1.68 TOWNSHIP OF KING To construct, reconstruct, erect or place a building or structure and site grade in Noble Ridge Community, in the Township of King, Humber River Watershed as located on the property owned by Township of King. The-purpose is to construct, site grade, place /remove fill /material within the regulated area to install a sanitary sewer. Works within the regulated area on Hill Farm Road will be- constructed during the warm - waterfisheries timing window of July 1 to March 31. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Letter of undertaking to provide minor revisions to engineering drawings, typical notes, restoration and sediment control, all to the satisfaction of TRCA; dated April 9, 2008; received April 9, 2008; prepared by the Township of King. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The Nobleton Sewage Servicing Plan was reviewed by TRCA staff during the Environmental Assessment process. Nobleton is proposed to be serviced with a gravity sewer collection system, a raw sewage pumping.station and forcemain, a wastewater treatment plant and a treated effluent outlet pipe to the Humber River. The sewer will allow for residents to be taken off sewage septic systems, and to-accommodate approved growth. This permit application is for a portion of sanitary sewer along Goodfellow Crescent, south to Hill Farm Road and further south through the park to Wellar Avenue in the Town of Nobleton. It involves the installation of a 375 millimetre (mm) diametre sanitary sewer. The pipe will be installed by open -cut methodology in municipal road right -of -ways and in the park. A portion of the sanitary sewer is located within the regulated areas of Goodfellow Crescent, Hill Farm Road, the,park and_Wellar Avenue. Works within the regulated area on Hill Farm Road are to be completed by directional drilling under the existing culvert during the .warm -water fisheries timing window (July 1 to March 31). A portion of these works are also located within the estimated Regional Storm Floodplain, however.grades1post construction will match existing grades. f 226 During construction effective erosion and sediment control (ESC) measures will be implemented to protect all natural features (aquatic and terrestrial). Any.water derived from groundwater dewatering or pumping of open cut trench excavations will be managed to prevent impacts to surrounding natural environmental features. Further, any dewatering will be monitored throughout construction and mitigation measures for potential effects identified implemented in accordance with the approved contingency plan. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion control measures (silt /sediment fencing, rock flow check dam, dewatering • trap) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the wetland /watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). This application is subject to the warm -water fisheries timing window. No significant vegetation will be removed as a result of construction. The location of the proposed works is within the Greenbelt. All permanent and intermittent streams in the Greenbelt are identified as Key Hydrologic Features. Section 4.2.1 of the Greenbelt Plan indicates in Subsection 2 e) that infrastructure may be permitted to cross Key Hydrologic Features provided that construction practices minimize the negative impacts on features and their functions. This project has been reviewed to confirm that there will be no negative impacts on the features and their. functions. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing -.of the Authority's Valley and Stream Corridor Management Program. CFN: 38642 - Application #: 011 /07 /KING Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: April 1, 2008 227 8.1.69 TOWNSHIP OF KING To construct, reconstruct, erect or place a building or structure and site grade on King Road, east of Highway 27, in the Township of King, Humber River Watershed as located on the property owned by Township of King. The purpose is to construct, site grade, place /remove fill /material within the regulated area to install a sanitary sewer and watermain. Works within the regulated area on King Road will be constructed during the cold -water fisheries timing window of July 1 to September 15. The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Letter of undertaking to provide minor revisions to engineering drawings, typical notes, restoration and sediment control, all to the satisfaction of TRCA; dated April 9, 2008; received April 9, 2008; prepared by the Township of King. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The Nobleton Sewage Servicing Plan was reviewed by TRCA staff during the Environmental Assessment process. Nobleton is proposed to be serviced with a gravity sewer collection system, a raw sewage pumping station and forcemain, a wastewater treatment plant and a treated effluent outlet pipe.to the Humber River. The sewer will allow for residents to be taken off sewage septic systems, and to accommodate approved growth. Water Supply and Storage for the community of Nobleton was reviewed by TRCA staff during the Environmental Assessment process. The watermain will service planned and approved growth in the community. This permit application is for a portion of sanitary sewer and watermain along King Road, east of Highway 27, in the Town of Nobleton. It involves the installation of a 450 millimetre (mm) diametre sanitary sewer and a 300 millimetre (mm) diametre watermain. The pipes will be installed by open -cut methodology in municipal road right -of -ways. A portion of each pipe is located within the regulated area on King Road, west of Elizabeth Drive. Works within the regulated.area on King Road are to be completed by directional drilling under an existing culvert during the.cold -water fisheries timing window (July 1 to September 15). A portion of these works.are also located within the estimated Regional Storm Floodplain, however grades post construction will match existing grades. During construction effective erosion and sediment control (ESC) measures will be . implemented to protect all natural features (aquatic and terrestrial). Any water derived from groundwater dewatering or pumping of open cut trench excavations . will be managed to prevent impacts to surrounding natural environmental,Jeatures. Further, any dewatering will be monitored throughout construction and.mitigation measures for potential effects identified implemented in accordance with the approved contingency plan. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. 228 Pollution: Standard erosion control measures (silt /sediment fencing, rock flow check dam, dewatering trap) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the wetland /watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal: Conservation of Land: With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). This application is subject to the cold -water fisheries timing window. Local construction unwatering will be required and Hydrogeological staff have no significant groundwater related.concerns. No significant vegetation will be removed as a result of construction. The location of the proposed works is within the Greenbelt. All permanent and intermittent streams in the Greenbelt are identified as Key Hydrologic Features. Section 4.2.1 of the Greenbelt Plan indicates in Subsection 2 e) that infrastructure may be permitted to cross Key Hydrologic Features provided that construction practices minimize the negative impacts on features and their functions. This project has been reviewed to confirm that there will be no negative impacts on the.features and their functions. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 39009 - Application #: 146/07/KING Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: April 2, 2008 8.1.70 , TOWNSHIP OF KING To construct, reconstruct, erect or placea building or structure and site grade on King Road, west of Greenside Drive, in fie Township of King, Humber River Watershed as located on the property owned by Township of King. The purpose is to construct, site grade, place /remove fill /material within the regulated area to install a sanitary sewer and watermain. Works within the regulated area on King Road will be constructed during the cold -water fisheries timing window ofJuly 1 to September 15. 229 The permit will be issued for the period of April 11, 2008 to April 10, 2010. • Letter of undertaking to provide minor revisions to engineering drawings, typical notes, restoration and sediment control, all to the satisfaction of TRCA; dated April 9, 2008; received April 9, 2008; prepared by the Township of King. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The Nobleton Sewage Servicing Plan was reviewed by TRCA.staff during the Environmental Assessment process. Nobleton is proposed to be serviced with a gravity sewer collection system, a raw sewage pumping station and forcemain, a wastewater treatment plant and a treated effluent outlet pipe to the Humber River. The sewer will allow for residents to be taken off sewage septic systems, and to accommodate approved growth. Water Supply and Storage for-the community of Nobleton was reviewed by TRCA staff during the Environmental Assessment process. The watermain will service planned and approved growth in the community. This permit application is for a portion of sanitary sewer and watermain along King Road, west of Greenside Drive, in the Town of Nobleton. It involves the installation of-a 300 millimetre (mm) diametre sanitary sewer and a 300 millimetre (mm) diametre watermain. The pipes will be installed by open -cut methodology in municipal road right -of -ways. A portion of each pipe is located within the regulated area on King Road, west of Greenside Drive. Works within the regulated area on King Road are to be completed by directional drilling under an existing culvert during the cold -water fisheries timing window (July 1 to September 15). A portion of these works are also located within the estimated Regional Storm Floodplain, however grades post construction will match existing grades. During construction effective erosion and sediment control (ESC).measures will be .implemented to protect all natural features (aquatic and terrestrial). Any water derived from groundwater dewatering or pumping of open cut trench excavations will be 'managed to prevent impacts to surrounding natural environmental features. Further, any dewatering will. be monitored throughout construction and mitigation measures 'for potential effects identified implemented in accordance with the approved contingency plan. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion control measures (silt /sediment fencing, rock flow check dam, dewatering trap) will be implemented and maintained for the durafion of construction, and until the site is stabilized and restored, in.order to prevent construction generated sediment from entering the wetland /watercourse. Dynamic Beaches: Not applicable 230 Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). This application is subject to the cold -water fisheries timing window. Local construction unwatering will be required and Hydrogeological staff have no significant groundwater related concerns. No significant vegetation will be removed as a result of construction. The location of the proposed works is within the Greenbelt. All permanent and intermittent streams in the Greenbelt are identified as Key Hydrologic Features. Section 4.2.1 of the Greenbelt Plan indicates in Subsection 2 e) that infrastructure may be permitted to cross Key Hydrologic Features provided that construction practices minimize the negative impacts on features and their functions. This project has been reviewed to confirm that there will be no negative impacts on the features and their functions. Plantings All disturbed areas will be restored with native non - invasive species following. construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 39010 `- Application #: 147/07/KING Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: April 2, 2008 PERMIT APPLICATIONS 8.1.71 - 8.1.72 ARE PERMISSION FOR ROUTINE . INFRASTRUCTURE WORKS: RES. #B26/08 - PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Richard Whitehead Jack Heath THAT permission for routine infrastructure granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for applications 8.1.71 and 8.1.72, which are listed below, be received. CARRIED 231 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.71 CITY OF TORONTO To undertake road /pathway resurfacing or reconstruction on Lot 07555 -0011 (LT), Plan BLKC - PLAN M854 (Bloordale Park south between'Toledo Road and Cosway Court), in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed as located on the property owned by the City of Toronto. The purpose is to repair an existing pathway in Bloordale Park between Toledo Road and Cosway Court. The permit will be issued for the period of March 4, 2008 to March 3, 2010 in accordance with the following documents and plans which form part of this permit: • Drawings L.1 and L.2 - Bloordale Park Asphalt Repair Plan; dated December 10, 2007; revised February 21, 2008; recevied February 25, 2008; prepared by Fleisher Ridout Partnership Inc. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of repairs to the.existing asphalt pathway in Bloordale Park between Toledo Road and Cosway Court. The works will include the reconstruction of the existing pathway, the installation of\a culvert under a section of the path to improve drainage, and the paving of a short informal trail connection to Renforth Drive. Control of Flooding: No adverse impacts to the storage or conveyance of flood waters are anticipated as a result of this project. Pollution: Appropriate controls will be implemented and maintained throughout construction to prevent sediment and other deleterious substances from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no slope stability or geotechnical concerns with the proposed works. Conservation of Land: There will be no impacts to significant aquatic or terrestrial features from the proposed works. Plantings Disturbed areas will be stabilzed and restored with sod. 232 Policy Guidelines: The proposal complies with Section 4.3, Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 40529 = Application #: 125/08/TOR Report Prepared by: Alex Blasko, extension 5714 For information contact: Alex Blasko, extension 5714 Date: March 4, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.72 CITY OF TORONTO To undertake road /pathway resurfacing or reconstruction in Taylor Creek Park, north of Haldon Avenue, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by the City of Toronto and Toronto and Region Conservation Authority. The purpose is to resurface a parking lot in Taylor Creek Park, north of Haldon Avenue. The permit will be issued for the period of March 11, 2008 to March 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing L1- Taylor Creek Parking Lot - Layout and Grading Plan; dated January 7, 2008; received February 29, 2008; prepared by Fleisher Ridout Partnership Inc. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of resrufacing an existing parking lot in Taylor Creek Park north of Haldon Avenue. The works will also include the minor regrading of an existing swale to improve drainage. A portion of the parking lot is located on TRCA property, under management agreement with the City of Toronto. Control of Flooding: No adverse impacts to the storage-or conveyance of flood waters are anticipated as a result of this project. Pollution: Appropriate controls will be implemented and maintained throughout construction to prevent sediment and other deleterious substances from entering the watercourse. . .i Dynamic Beaches: Not applicable. Erosion: There are no significant slope stability or geotechnical concerns with the proposed works. 233 Conservation of Land: There will be no impacts to significant aquatic or terrestrial features from the proposed works. All existing trees will be protected. Plantings • Disturbed areas will be stabilized and restored with sod. Policy Guidelines: . The proposal complies with Section 4.3, Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 40544 - Application #: 143/08/TOR Report Prepared by: Alex Blasko, extension 5714 For information contact: Alex Blasko, extension 5714 Date: March 11, 2008 PERMIT APPLICATIONS 8.1.73 - 8.1.87 ARE MINOR WORKS LETTER OF APPROVAL: RES. #B27/08 - MINOR WORKS LETTER OF APPROVAL PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Richard Whitehead • Jack Heath THAT minor works letter of approval granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.73 8.1.87, inclusive), which are listed below, be received. CARRIED CITY OF PICKERING 8.1.73 537 RODD AVENUE . To construct a non - habitable accessory structure up to '50 sq. m (538 sq. ft) on Part Block A, Plan 233, (537 Rodd Avenue), in the City of Pickering, Rouge River Watershed. CFN: 40602 - Application #: 184/08/PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: March 20, 2008 8.1.74 HIGHGLEN HOMES LIMITED To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part Lot 16, PART 6, Plan 40R- 24517, (1991 Woodview Avenue), in the City of Pickering, . Petticoat.Creek Watershed as located on the property owned by Highglen Homes Limited. • 234 CFN: 40547 - Application #: 153/08/PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: March 5, 2008 8.1.75 HIGHGLEN HOMES LIMITED To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part Lot 16, PART 5, Plan 40R- 24517, (1995 Woodview Avenue), in the City of Pickering, Petticoat Creek Watershed as located on the property owned by Highglen Homes Limited. CFN: 40548 - Application #: 154/08 /PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: March 5, 2008 8.1.76 HIGHGLEN HOMES LIMITED To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part Lot 16, PART 4,•PIan 40R- 24517, (1999 Woodview Avenue), in the City of Pickering, Petticoat Creek Watershed as located on the property owned by Highglen Homes Limited. CFN: 40549 - Application #: 155/08/PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: March 5, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) ' " . 8.1.77 9 EDGEHILL ROAD To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Block Y, Plan 2683, Part Block E, Plan 2630, Part Block Z, Plan 2683, (9 Edgehill Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 40593 - Application #: 173/08/TOR Report Prepared by: Nicole Moxley, extension 52841 For information contact: Steve Heuchert, extension 5311 Date: March 20, 2008 235 8.1.78 NEW LIFE CHRISTIAN ASSEMBLY OF TORONTO To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 10, Plan M -527, (573 Albion Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by New Life Christian Assembly of Toronto. CFN: 40525 - Application #: 133/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert,. extension 5311 Date: February 29, 2008 8.1.79 35 OLD MILL DRIVE • To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 5, Plan 2345, (35.OId Mill Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 40600 - Application #: 176/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: March 20, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL) 8.1.80 1740338 ONTARIO LTD. To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq: ft) on Lot 79, Plan M -597, (116 Rykert Crescent), in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by 1740338 Ontario Ltd.. CFN: 40216 - Application #: 933/07/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: March 12, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.81 UNIVERSITY OF TORONTO To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on , (1265 Military Trail), in the City of Toronto (Scarborough' Community Council Area), Highland Creek Watershed as located otn.the property owned by University of Toronto. CFN: 40499 - Application #: 110/08 /TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: March 3, 2008 236 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.82 7 NESBITT DRIVE To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot.28, Plan 2398, (7 Nesbitt Drive), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed.. CFN: 40627 - Application #: 199/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 1, 2008 . 8.1.83 FU YI ENTERPRISES LTD. To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Part Lot 31, 32, Plan, (1275 Queen Street East), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property . owned by Fu Yi Enterprises Ltd.. CFN: 40624 - Application #: 198/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: March 28, 2008 CITY OF•VAUGHAN 8.1.84 IMPERIAL OIL LIMITED To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part Of West Half Lot 11, Concession 3, (8555 Keele Street), in the City.of Vaughan, Don River Watershed as located on the property owned by Imperial Oil Limited. CFN: 40574 - Application #: 161 /08 /VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: March 13, 2008 TOWN OF WHITCHURCH - STOUFFVILLE 8.1.85 82. LAKEVIEW AVENUE To construct a ground floor addition up to 50 sq. M .(538 sq. ft) on Lot 64, Plan 404, (82 Lakeview Avenue), in the Town of Whitchurch- Stouffville, Rouge River - Watershed. 237 CFN: 40598 - Application #: 178/08/WS Report Prepared by: Shannon McNeill, extension 5744 For information contact: Bill Kiru, extension 5306 Date: March 20, 2008 TOWNSHIP OF UXBRIDGE 8.1.86 1389 3RD CONCESSION To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 2, Concession 3 , (1389 3rd Concession), in the Township of Uxbridge, Duffins Creek Watershed. CFN: 40546 - Application #: 152/08/UXB Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: March 5, 2008 8.1.87 ST. LAWRENCE STARCH CO. LTD. To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on , (3197 York - Durham Line), in the Township of Uxbridge, Duffins Creek Watershed as located on the property owned by St. Lawrence Starch Co. Ltd.. CFN: 40592 - Application ##: 172/08/UXB Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: March 20, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.88 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure on Lot 20, Concession 3 FTH (Skyway Avenue at Mimico Creek, between 150 Skyway Avenue and 195 Galaxy Boulevard), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed as located on the property owned by the City of Toronto. The purpose is to rehabilitate the Skyway Avenue Bridge over Mimico Creek. The permit will be issued for the period of April 11, 20018 to April 10, 2010 in accordance with the following documents and plans which form part ofthis permit: • Drawings 624- S3024 -30, 31, 38 - Skyway Avenue Bridge Over Mimico Creek Structure Rehabilitation; dated March 2008; received March 28, 2008; prepared by McCormik Rankin Corporation. 238 ' RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the rehabilitation of the Skyway Avenue Bridge over Mimico Creek, including the replacement of the existing barrier with concrete parapets and open steel railing, rehabilitation of the abutment ballast walls and deck ends, bearing replacement, approach grading, minor patching and other repairs. Control of Flooding: No adverse impacts to the storage or conveyance of flood waters are anticipated as a result of this project. Pollution: Appropriate controls will be implemented and maintained throughout construction to prevent sediment, debris and other deleterious substances from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no slope stability or geotechnical concerns with the proposed works. Conservation of Land: There will be no impacts to significant aquatic or terrestrial features from the proposed works. The proposal will comply with the Fisheries and Oceans Canada Ontario Operational Statement for Bridge Maintenance. Plantings All disturbed areas will be stabilized and restored as appropriate. Policy Guidelines: The proposal complies with Section 4.3, Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 40335 - Application #: 016/08/TOR Report Prepared by: Alex Blasko, extension 5714 For information contact: Alex Blasko, extension 5714 Date: April 7, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.89 2 MEADOWCLIFFE DRIVE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 159, Plan M440/2, (2 Meadowcliffe Drive), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to develop within a Regulated Area of the Waterfront to facilitate construction of an entryway addition to the front of the existing dwelling. 239 The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Gary McMurtry Architectural Technologist, dated January 21, 2008, received by TRCA April 4, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a small entryway addition to the front of the existing dwelling at 2 Meadowcliffe Drive in the City of Toronto.. The site is located south of Kingston Road, west of Bellamy Road South. Excavation and concrete works associated with the proposed works were initiated without a permit. A violation was issued on the property and work has since ceased. The proponent submitted an application for the proposed works, together with double the processing fee, to resolve the violation. It is understood that the subject property is prone to erosion, and vulnerable over the long term, though not in any imminent threat. The proposed works are minor in nature, adding only 13.7 square metres (147 square feet) to accommodate a new foyer and. closets. Control of Flooding: The site is not located in the Regional Storm floodplain. Pollution: Sediment fencing is not required as the proposed works are at the front of the property and adequately setback from the waterfront. Dynamic Beaches: Not applicable Erosion: The proposed works are minor in nature and will not adversely impact erosion on the slope given that the addition is located at the front of the existing dwelling, in the area of lowest risk. As such, a geotechnical report was'not required as part of this application. • Conservation of Land: No vegetatio•will be removed as a result of construction. • Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is in keeping with the intent of Section 4.2.2.C, Minor Additions, of the TRCA's • Valley and Stream Corridor Management Program. 240 CFN: 40679 - Application #: 244/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 9, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.90 HYDRO ONE NETWORKS INC. To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 14, 15, Concession 1 FTB Block A, Plan 88E, Lot 1, 2, Plan 88E, Part Lot 29, Plan 110, (14 St. Matthews Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by City of Toronto/The Riverdale Centre for Continuing Care (Bridgepoint Health). The purpose is to excavate and place fill and install a 300 mm diameter hydro duct, two manholes and 1.8 km of hydro cable. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Letter from Hydro One Networks - to fulfill all TRCA requirements, dated April 2, 2008, received April 4, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The Bridgepoint Health Centre (former Riverdale Hospital) is located north of Gerrard Street East, west of Broadview Avenue, south of Riverdale Park and east of the Don Valley Parkway in the City of Toronto. As part of the comprehensive redevelopment of the Health Centre, Hydro One will be relocating approximately 200 metres of its hydro duct on the west side of the site near the top of the remnant valley bank above the Don Valley Parkway. The relocation and installation of two new manholes within the Regulated Area is necessary to allow for the development of a new pedestrian walkway, access road and hospital buildings on the west side of the site. TRCA staff has been involved in the comprehensive review of the various planning applications required to facilitate the redevelopment and are satisfied that the design of the redevelopment will result in greater public access to the Don Valley trail system as well as an increase in the overall density of native plantings in the area. The existing site is highly urbanized with a surface parking over the existing hydro duct located at or near the top of bank. This parking will be replaced by a multi - purpose trail, reconstructed stable top of bank and native landscaping and will be subject to an additional TRCA permitting process in the coming years. The redevelopment has been secured through /approved zoning permissions and will be further ensured through Site Plan Agreement. 241 Conditional Approval: TRCA staff have met with all proponents and City of Toronto representatives to coordinate the conceptual approval of the project masterplan including approval in principle of the Hydro One . •duct relocation. Hydro One,will be combining the duct relocation work with its planned replacement of 1.8 km of hydro cable through an existing spare hydro duct. Hydro has informed Bridgepoint Health and TRCA staff that this work must take place beginning May 5, • 2008 in order to avoid peak loads and allow for staged electricity disruption downtown during periods of low demand. TRCA staff and City of Toronto Urban Forestry staff are generally satisfied with the proposal but have not had a chance to confirm the final details. As such, staff is requesting permission from the Executive Committee .to allow staff to approve the issuance of the Ontario Regulation 166/06 permit for this project subject to Hydro One receiving confirmation from • Bridgepoint Health that the location of the duct is acceptable, confirmation from a geotechnical engineer that the proposal will not have an impact on slope stability either during or after construction, and confirmation from City of Toronto Urban Forestry that the proposed vegetation removals-and restoration plan is acceptable. Control of Flooding: The proposed duct relocation is not located within a Regional Storm Floodplain. Excavation pits for the new cable are located within the Regional Storm Floodplain but grades will be returned to existing and there will be no impact on the storage or conveyance of floodwaters. Pollution: Temporary sediment control will be provided. The work site is located well away from the Don River. Dynamic Beaches: Not applicable. Erosion: The proposal will have no impact on erosion to the watercourse. A letter from a Geotechnical Engineer will be provided confirming that the duct relocation will have no impact on slope stability either during or after construction. Conservation of Land: The site is currently urbanized and there will be no impact on significant vegetation. Plantings Approximately 28 small diameter non- native trees, and 2 elm trees will need to be removed as part of the project. The permit will not, be issued until such time as the City of Toronto's Urban Forestry.staff are satisfied with the proposed native tree and shrub . restoration program. Additional restoration plantings will be installed above the relocated hydro duct upon redevelopment of the hospital site. Policy Guidelines: This proposal is in conformity with Section 4.3 - Infrastructure and'Servicing - of the TRCA's •Valley and Stream Corridor Management Program (VSCMP). 242 CFN: 40653 - Application #: 224/08/TOR Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: April 4, 2008 . TOWN OF CALEDON 8.1.91 SOUTH FIELDS COMMUNITY INC. To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 19, 20, Concession 2 EHS Plan 21T- 06004C, 21T- 06002C, (Kennedy Road and Mayfield Road), in the Town of Caledon, Etobicoke Creek Watershed as located on the property owned by South Fields Community Inc.. The purpose is to undertake works within a Regulated area in order to facilitate site grading and site preparation works and the construction of temporary stormwater ponds and outfalls associated with a new residential subdivision. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of undertaking provided by Jennifer Cappola - Logullo, David Schaeffer Engineering Limited, dated April 9, 2008,,to address all outstanding TRCA Engineering and Ecology issues prior to the issuance of the permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This permit application is to facilitate initial site preparation and temporary stormwater management works associated with a proposed residential subdivision on the subject property. The subject property is located east of Kennedy Road, north of Mayfield Road in the Mayfield West (South Fields) community in the Town of Caledon. Four plans of subdivision within this community, all located north of Mayfield Road east of Kennedy Road, were draft.approved by the Ontario Municipal, Board earlier this year. TRCA staff participated in a number of • discussions outside of the formal hearing, and were successful in attaining conditions of approval that were agreeable to all parties. Both the. Town of Caledon. and the proponents have expressed their desire to move quickly through the approval process for these subdivisions. In this regard, the proponent is presently seeking permission from the Town of Caledon to complete site grading and preparation works on portions of the southern two plans of subdivision (located directly north of the proposed Highway 410 extension). These subdivisions (under common ownership) are traversed by headwater tributaries (Tributary 18 and 19, as identified in the Master Environmental Servriring Plan) of Etobicoke Creek. As discussions are underway with TRCA staff regarding the long -term treatment of these features in the context of net gain and overall enhancement opportunities, alteration of these features is. not included in this permit, and will be subject to a separate future permit,'which will also include the proposed permanent stormwater management outfalls and works. At this time, permission is being sought for: grading and servicing works within the associated regulated 243 areas (outside of the watercourse features); access across the northerly headwater tributary, (which bisects the subject property) to gain access for servicing of the lands to the north within this phase; and, for the temporary stormwater management ponds and outfalls, should it'be determined upon submission of the final drawings, that a permit would be required for these works. TRCA staff are continuing discussions with the proponents to refine the scope and design of the proposed works, to ensure that they meet TRCA's requirements. Although it is anticipated that there will be additional modifications to the drawings associated with this permit prior to issuance, TRCA staff are satisfied that the remaining items can be addressed in the near future. Due to the required timelines for this project, the works identified under this permit must commence in advance of the next Executive Committee meeting, (which would provide the next opportunity for this permit application to be considered). The proponent has provided a letter of undertaking to address all outstanding TRCA issues prior to the issuance of the permit. . Control of Flooding: The proposed works will not be located within the mapped Regulatory Floodplain, and are being completed in accordance with the approved Master Environmental Servicing Plan. Consequently, no impacts to flood storage or conveyance are anticipated. Pollution: Appropriate sediment and erosion control measures are to be installed and maintained during all phases of construction. .A Scoped Construction Monitoring Program has been created by the proponent for the proposed development, which provides for regular monitoring of adjacent natural features to ensure that unacceptable impacts do not result from the construction activities. This document also establishes a protocol, such that any problems identified can be quickly rectified. No in -water works are proposed with the subject permit. Dynamic Beaches: Not applicable Erosion: There are no slope stability and /or erosion related concerns with this application. Erosion control measures, based upon TRCA's Sediment and Erosion Control Guidelines, will be applied as applicable. Conservation of Land: The subject works are being completed within an approved plan of subdivision, in accordance with an approved Master Environmental Servicing Plan. As a component of the larger Mayfield West community development, dedication of natural features, and associated buffers will be provided.. Plantings A comprehensive planting plan will be implemepted through the development of the Mayfield West community. Enhancements to natural cover within the valley corridor, planting of buffer areas, and.the creation of new planted Greenway Corridors are all anticipated within this community. 244 Policy Guidelines: This proposal is consistent with Section 4.3 - Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40678 - Application #: 243/08/CAL Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: April 9, 2008 8.1.92 TOWN OF CALEDON To construct, reconstruct, erect or place a building or structure and site grade on Lot 1, Concession 6 (Equity Prestige Business Park _ west Phase - Parr Boulevard and Coleraine Drive), in the Town of Caledon, Humber River Watershed as located on the.property owned. by Town of Caledon. The purpose is to undertake works within a TRCA.Regulated Area of the Humber River •Watershed in order to facilitate the construction of the expansion to an existing stormwater management facility located adjacent to Parr Boulevard, in the Town of Caledon. The permit will be issued for the period of April 11, 2008 to April 10, 2010 in accordance with the following documents and plans which form part of this permit: • Pond Design, Drawing No. 12, prepared by Pitura Husson Limited, dated June 1, 2007, Revision No. 9, revised on April 4, 2008, stamped received by TRCA Planning & Development staff on April 8, 2008; • Erosion and Sediment Control Plan, Drawing No. 13, prepared by Pitura Husson Limited, dated June 1, 2007, Revision No. 8, revised on April 4, 2008, stamped received by TRCA Planning & Development staff on April 8, 2008; • Pond Details, Drawing No. 20, prepared by Pitura Husson Limited, dated June 1, 2007, Revision No. 7, revised on February 15, 2008, stamped received by TRCA Planning & Development staff on April 8, 2008; • Landscape Plan - Pond, Drawing LS -1, prepared by Brodie & Associates Landscape Architects Inc., dated August 2007, Revision No. 3, revised on January 9, 2007, stamped received by TRCA Planning & Development staff on April 8, 2008; • Landscape Details - Pond, Drawing LS -2, prepared by Brodie & Associates Landscape Architects Inc., dated August 2007, . Revision No. 3, revised on January 9, 2007, stamped received by TRCA Planning & Development staff on April 8, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 245 Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area in order to facilitate the construction of an expansion to an existing stormwater management pond and the relocation of an existing outfalf structure, located west of Coleraine Drive and North of Mayfield Road, in the Town of Caledon. As approved within the Bolton South Master Environmental Servicing Plan, these works are required to expand the existing approved stormwater management facility in order to provide stormwater quality and quantity control for the construction of a 41, 480 square metre (446, 484 sq. ft..) warehouse facility on lands to.the north of the existing pond. The stormwater management pond and outfall are located on the tableland portion of the site, outside of the regulated area. TRCA technical staff have confirmed that the proposed works will not adversely.impact any floodplain, geoenvironmental, and /or fisheries related matters. However, please note that a letter of advice on behalf of Fisheries and Oceans Canada (DFO) will be prepared prior to the issuance of this permit. In addition, funds will be obtained through this application in order to provide innovative stormwater management techniques immediately downstream of the proposed works. Also, native, non - invasive plantings surrounding the facility are proposed as part of this application. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation. will be removed as a result of construction. In addition, a mix of terrestrial /aquatic enhancement plantings will be provided. There are no fisheries related concerns with this proposal. Plantings . .Native, non - invasive plant species consistent with TRCA's guidelines are included as part of this application to achieve an ecological net gain for this area. Policy Guidelines: This proposal is inconformity with Section 4.3 - Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program CFN: 40677 - Application #: 242/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date:, April 9, 2008 246 RES. #828/08 - Moved by: Seconded by: REQUEST FOR DISPOSAL OF TORONTO AND REGION CONSERVATION AUTHORITY -OWNED LAND East side of Duffy's Lane, north of King Street, CFN 40518. Toronto and Region Conservation Authority is in receipt of a request from Pat and Linda Paniccia to explore the possibility of a sale of a fragment of TRCA -owned land located on the east side of Duffy's Lane, north of King Street, Town of Caledon, Regional Municipality of Peel, Humber River watershed. Jack Heath Suzan Hall THE EXECUTIVE COMMITTEE RECOMMENDS THAT the potential disposal of a fragment of land on the east side of Duffy's Lane, north of King Street, Town of Caledon, Regional Municipality of Peel, be referred to Toronto and Region Conservation Authority (TRCA) staff for review and discussion in accordance with established TRCA policies; AND FURTHER THAT a report be brought forward to the Executive Committee at a future date recommending further action. CARRIED BACKGROUND This request is being brought to the attention of the Executive Committee in accordance with Resolution #26, adopted by TRCA at Authority Meeting #1/91, held on February 22, 1991. A letter has been received from Pat and Linda Paniccia, requesting the sale of a fragment of TRCA -owned land situated on the east side of Duffy's Lane, north of King Street for an addition to their existing rural residential property. TRCA, Town of Caledon, and Regional Municipality of Peel staff will be circulated the land sale proposal for review and comment. A plan illustrating the location of the subject lands is attached. Report prepared by: George Leja, extension 5342 Email: gleja @trca.on.ca For Information contact: George Leja, extension 5342 or Ron Dewell, extension 5245 Email: gleja @trca.on.ca or rdewell @trca.on.ca Date: March 06, 2008 Attachments: 1 247 .r' • REQUEST FOR DISPOSAL OF TORONTO AND REGION CONSERVATION AUTHORITY -OWNED LAND East side of Duffy's Lane, north of King Street CFN 40518 =OHIO A.0 +ccc,uv ^Y-. onservation" for' f,e Living Cily 12:777,73,TRCA LANDS 173%9 -,;.9 SUBJECT PROPERTY 248 • RES. #829/08 - Moved .by: Seconded by: RYERSON UNIVERSITY Memorandum of Agreement. Approval to enter into negotiations with Ryerson University to develop a strategic partnership that enhances post - secondary educational opportunities and research into innovative sustainable technologies at The Living City Campus at Kortright. Colleen Jordan Suzan Hall WHEREAS the vision for The Living City Campus at Kortright includes the development of a post- secondary sustainable technologies education and research centre; THEREFORE LET IT BE RESOLVED THAT staff be directed to negotiate an agreement with Ryerson University to further the development of a strategic education and research partnership around innovative sustainable technologies at The Living City Campus at Kortright; THAT the agreement be on terms and conditions satisfactory to Toronto and Region Conservation Authority (TRCA) staff and solicitors; AND FURTHER THAT any agreement be subject to Authority approval. CARRID. BACKGROUND In 2005, Toronto and Region Conservation Authority (TRCA) started a process to define a vision and concept plan for the Kortright Centre for Conservation. After several internal and one external stakeholder meetings, a consensus of a draft vision emerged that affirmed the.need to develop an education, demonstration and research partnership that would support and accelerate the sustainability agenda. With assistance from Urban Strategies Inc., key TRCA staff and external stakeholders like the Humber Watershed Alliance refined the concept and vision as The Living City Campus at Kortright. The Living City Campus at Kortright vision plan was presented_at a public meeting in February.of 2008 and was approved at Authority Meeting #2/08, held on March 28, 2008 by amended resolution #A45/08 as follows: THAT the plan dated March, 2008 for The Living City Campus at the Kortright Centre for Conservation, as illustrated in Attachment 1, be approved; AND FURTHER THAT staff be directed to: • adopt 'The Living City Campus at Kortright' name and begin.branding the title on signs and in future marketing and communications materials; • seek funding sources and partners to implement the vision plan; • have further public consultation ors the need, design and other related issues regarding the The Meeting Place building (conference centre or adult education centre), before that component is implemented; • have further study and public consultation on the ,installation of wind turbines to ensure noise pollution and injury to birds is avoided, before that component is implemented; 249 • recruit new members to participate on a community stewardship committee consisting of interested citizens, interest groups and organizations to help TRCA with detailed planning, management and implementation of the Boyd North and Glassco Park Management Plan and implementation of The Living City Campus at Kortright vision; • bring a business plan to the Authority on each component of the vision. The vision and goals for The Living City Campus at Kortright state: Vision: The vision for The Living City Campus at Kortright aims to inspire, support and monitor change toward sustainable living, leading the way toward sustainable development and the use of sustainable technologies through practice, education and market transformation. Goals: • to instill an appreciation and understanding of the interrelationships in and between healthy ecological systems and our lifestyles; • to develop relevant and innovative demonstrations and programs that..inspire people to adopt sustainable practices and technologies; • to motivate, and support individuals, organizations, government and businesses to pursue sustainable actions and to celebrate their successes; and • to foster on -site research collaborative with academics, business, and government that supports sustainable living issues. The research goal of the vision is a natural extension to Kortright's leading role in demonstrating leading edge sustainable technologies. In order to accelerate the sustainability agenda, research is needed to develop new technological opportunities but also to provide credible monitoring and evaluation that provides the scientific rigor respected by business, government and the community. The cornerstones to successfully developing the research component of the vision is to initiate a partnership with a highly respected post- secondary institution that has experience and complimentary aspirations around the development and verification of sustainable technologies. Over the past 4 years several departments at Ryerson University have partnered with TRCA on a variety of sustainability.projects, including the.latest effort that produced an evaluation tool to select the heating systems for the Archetype Sustainable House. TRCA currently has a general Memorandum of Understanding with Ryerson University to work together on sustainability issues. Ryerson University has expressed an interest in working more closely with TRCA and other post secondary institutions, especially colleges, in a collaborative effort to. facilitate the research and development of new sustainable technologies. 250 These negotiations are to formalize this partnership and lay the ground work for more concrete opportunities that would see the creation of a Sustainable Technologies Education and Research Centre at The Living City Campus at Kortright. Staff will develop a business case to assess the feasibility of this partnership prior to reporting back on an.agreement. Report prepared by: Alex Waters, 905 - 832 -2289 Email: awaters @trca.on.ca For Information contact: Alex Waters, 905 - 832 -2289 Email: awaters @trca.on.ca Date: April 3, 2008 RES. #B30/08 - Moved by: Seconded by: MEDIA SERVICES FOR CORPORATE COMMUNICATIONS Contract Extension. Extension of contract for Toronto and Region Conservation Authority's communications and media relations services. Colleen Jordan Suzan Hall THAT the contract for Toronto and Region Conservation Authority's (TRCA) corporate communications and media relations services for January 1, to December 31, 2008 be awarded to Brown and Cohen Communications and Public Affairs for a cost not to exceed $85,000, plus applicable taxes; THAT the contract for TRCA's communications and media relations services for Black Creek Pioneer Village for January 1, to December 31, 2008 be awarded to Philpot Communications for a cost not to exceed $40,000, plus applicable taxes; AND FURTHER THAT staff conduct a request for proposal with three vendors in September, 2008 to select a roster of media companies to meet TRCA's evolving communications needs. CARRIED BACKGROUND TRCA has had a communications and media relations services contract with Brown and Cohen Communications and Public Affairs (hereafter Brown and Cohen), since 2004 for.corporate • communications. In addition, TRCA has had a contract with Philpot Communications since 2007, primarily addressing the communication needs of Black Creek Pioneer Village. Philpot Communications was selected due to their expertise in recreational and cultural media management. Both these agencies have assisted in positioning TRCJC well in the local media and there has been a significant improvement in the quality of coverage. Both agencies have extensive experience in the industry. Brown and Cohen's expertise lies with the public sector in general, while Philpot Communications has expertise in the recreational and cultural milieu. 251 FINANCIAL DETAILS The contract with Brown and Cohen is at a cost not to exceed $85,000, plus applicable taxes and the contract with Philpot Communications is.at a cost not to exceed $40,000, plus • applicable taxes. Funds for 2008 communications and media relations services are identified in the 2008 communications department and Parks and Culture operating budgets respectively. Report prepared by: Adrienne Langston, extension 5201 Email: alangston @trca.on.ca For Information contact: Catherine MacEwen, extension 5219 Email: cmacewen @trca.on.ca Date: March 28, 2008 RES.#B31/08 - Moved by: Seconded by: TOMMY THOMPSON PARK INFRASTRUCTURE DESIGN PROJECT Award of Contract. Award of contract to provide architectural services for designs, specifications, construction drawing, costing and permits for the construction of an entry feature and staff booth facility; an environmental shelter; an ecological research station; and washroom facilities. Reenga Mathivanan Richard Whitehead THAT the consulting firm of Montgomery Sisam be retained to complete the Tommy Thompson Park (TTP) Infrastructure Design Project at a total cost not to exceed $148,150 plus applicable taxes. AND FURTHER THAT authorized Toronto and Region Conservation Authority (TRCA) officials be directed to take such action as is necessary to implement the contract, including the signing and.execution of documents. CARRIED BACKGROUND Tommy Thompson Park (TTP) (also known as the Leslie Street Spit) has been under construction using landfill from operations in the Greater Toronto Area since the early 1950's. Toronto and Region Conservation Authority (TRCA) currently owns 247 hectares of this peninsula, which extends 5 kilometres into Lake Ontario. Other areas still under construction will be transferred to TRCA upon the completion of lake filling activities. TTP is a unique natural area which has been formally designated as an "Important Bird Area" (IBA) of global significance by Birdlife International. It comprises a large portion of the North Shore Environmentally Significant Area (ESA). Tommy Thompson Park has also established itself as a unique place for a variety of human activities, attracting well over 300,000 visitors a year. These users only access the park on weekends and holidays, and represent a very. broad range of park users including birdwatchers, naturalists, cyclists, in -line skaters, pleasure walkers, joggers, researchers and. students. 252 The master plan for Tommy Thompson Park was completed in 1989 and then revised in 1992 through the Minister of the Environment's approval under the Environmental Assessment Act. The park is operated under the Interim Management Program in accordance with the delegated responsibilities given to TRCA by the Province of Ontario. Until recently, very limited funding has been provided toward the implementation of the master plan. Instead, the vision for the park has been partially realized through funds directed to the Interim Management Program and through partnered habitat creation and.enhancement projects. While adhering to its primary goal of preserving and creating a unique, car free urban wilderness, Tommy Thompson Park has the potential to,better accommodate its users, and to provide a more attractive and inviting fagade to the arriving public, as well as encouraging the public to better understand the uniqueness of this urban wilderness park. With the recent renewal of interest in the City of Toronto's waterfront, numerous waterfront plans and strategies have emerged, most notably planning for the Lake Ontario Park by Toronto Waterfront Revitalization Corporation (TWRC). Lake Ontario Park will create a unified, inter - connected ensemble of diverse landscapes along an extensive Lakeshore waterfront. It links together a mix of locations, communities and territories along the waterfront. Lake Ontario Park will be a powerfully unique place, a 'big nature' parkland with remarkably vast and distinctive landscapes of great ecological, cultural and scenic potential. TTP is a significant feature within Lake Ontario Park and as such integration of the Lake Ontario Park planning process into the discussion and design of the TTP infrastructure is critical. TWRC is providing the funding necessary to implement the first phase of the Tommy Thompson Park Master Plan. A requirement of this funding is for consulting assignments to present and discuss their concepts and designs with TWRC and their design consultant for Lake Ontario Park and the Design Review Panel implemented by TWRC. This will be accommodated within the scope of work for this project. A Terms of Reference (TOR) and a Request for Proposal (RFP) were distributed to the following consulting firms: • Oleson Worland Architect •_ Baird Sampson Neuert Architects - Jon Neuert • Brown and Storey Architects • HOK Canada — Richard Williams • Gordon Cheney • Christine Wood Architect " • Montgomery Sisam Architects • PLANT Architect Inc. Invited consultants were required to submit proposals outlining a detailed work plan, budget and work schedule to develop the following: a) Designs, specifications, construction drawings and. permits for the construction of the five infrastructure components, as they relate to the proposed operational and functional uses of the site. 253 b) Conceptual sketches and plans for future site features, including seating, signage, interpretive features and fencing. Specifically there are six components included in this project: 1. a serviced park entranceway and Shuttle Bus turn around kiosk; 2. a serviced Staff Booth /Interpretive Area at the neck of the Spit; 3. Environmental Shelter with off-line washroom facilities; 4. two remote off-line washroom buildings; 5. an off-line Ecological Research Station building; and 6. park infrastructure features including seating, signage, interpretive features, fencing and other features as required. .Four proposals were received by March 28, 2008 with bids as follows: • BIDDER AMOUNT (PLUS GST) Oleson Worland Architects $138,300 Montgomery Sisam $148,150 Brown and Story Architects $156,000 PLANT Architect Inc. $165,540 RATIONALE While adhering to its primary goal of preserving and creating a unique,' car free.urban wilderness, Tommy Thompson Park has the potential to better accommodate its users . and to provide a-more attractive and inviting facade to the arriving public, as well as encouraging the public to better understand the uniqueness of this urban wilderness park. The four proposals were reviewed by the selection committee made up of the TRCA and TWRC management and supervisory staff that are responsible for Tommy Thompson Park implementation and Lake Ontario Park planning. The proposals were evaluated by the • committee on April 3, 2008, using the following criteria: • clear understanding of project objectives and scope of work; • knowledge of the site and the waterfront context; • qualification of the firms and design of comparable projects; • ability to provide all deliverables; • approach, and sensitivity of design to the urban wilderness context of the site; • ability design to the highest level of sustainability and minimum footprint; • ability to work with the numerous agencies, stakeholders; interest groups, and waterfront design processes; . • cost. Upon comparison of the proposals from the four subrrifssions, it was determined that all firms produced sound proposals that were generally consistent in approach and cost. All but one firm had worked with TRCA staff on similar projects in the past. The PLANT Architect proposal costs were significantly higher then_the others and the firm's expertise is primarily related to residential architecture and not public park environments. 254 The cost of the Oleson Worland Architects proposal was the lowest of the four. However, the selection committee had concerns with the proposal's approach to the site. The committee felt that the proposal was lacking in detail and understanding of the 'Urban Wilderness' theme within a waterfront context. The design foundation and guiding principles were not consistent with TRCA's sustainability criteria and an approach that minimizes ecological footprint. The Montgomery Sisam proposal was the second lowest cost. However, it was the most comprehensive and consistent with the overall goals for the park. They clearly understand the project objectives and are proven award winning architects in the field of sustainability and environmental sensitivity. They are clearly able to meet all the deliverables in the timeframe provided. Their attention to multi - purpose structures and reusable and movable architecture are ideal for TTP, particularly given the multitude of other planning initiatives being undertaken in the vicinity of the site. Staff from both TWRC and TRCA felt that the Montgomery Sisam proposal was clearly superior when evaluated against the selection criteria. TRCA and TWRC have both had positive experiences with the firm in completing projects efficiently on schedule and within budget. FINANCIAL DETAILS TWRC is providing the funding necessary t� implement the Tommy Thompson Park Master Plan. Funding has been allocated in TRCA's 2008 Tommy Thompson Park Master Plan Implementation budget (accounts 216 -22 and 216 -32). Report prepared by: Ralph Toninger, extension 5366 Email: rtoninger@trca.on.ca For Information contact: Ralph Toninget, extension 5366 Email: rtoninger@trca.on.ca Date: April 8, 2008 RES. #B32/08 - PURCHASING POLICY Update of Sole.Source Procedures. Response to a request for an update of the policy and procedures relating to award of sole source procurement contracts Moved by: Colleen Jordan Seconded by: Maja Prentice THAT the Purchasing Policy report, dated March 31, 2008, be received. ,c CARRIED BACKGROUND . At Authority Meeting #11/07, held on January 29,2008, Resolution #A311/07 was approved as follows: 255 IT IS RECOMMENDED THAT the summary of procurements approved by the Chief Administrative Officer or his designate for the July 1, 2007 to December 31, 2007 period be received. This resolution was in response to the Toronto and Region Conservation Authority (TRCA) Purchasing Policy. The Purchasing Policy was approved at Authority Meeting #5/05, held on June 24, 2005, by Resolution #A124/05, in part, as follows: THAT the Purchasing Policy dated May, 2005, with the following amendments, be approved; • staff report to the Business Excellence Advisory Board semi - annually with a list of all Requests for Quotations and Requests for Proposals approved by the Chief Administrative Officer pursuant to Schedule 'A'; _ Pursuant to the resolution quoted above, the summary of Requests for Quotations and Requests for Proposals from July 1, 2007 to December 31, 2007, was received. The report includes approvals of $10,000 or greater, to the maximum allowable limit under the policy, approved by the Chief Administrative Officer or his designate: RATIONALE In the course of discussion of the above mentioned reports, staff was asked to provide the Authority with an update of the TRCA Purchasing Policy as it . relates to 'sole source' or non - competitive procurement. Attachment 1 is section 1.14 of the purchasing policy which describes the criteria to be used for non - competitive procurement. The complete policy is available and can be sent to members electronically as requested. Also attached is Schedule A (Attachment 2) of the Purchasing Policy which describes the limits and authorization for purchasing. The authorization limits provide for the.Chief.Administrative Officer (CAO) /Secretary- Treasurer or designate to approve acceptance of non - competitive bids up to $50,000, subject to the criteria set out in section 1.14. Tenders /quotations over $50,000 require Executive and /or Authority approval. The procedure followed by staff is to prepare a report in the same format as communications to the Authority. The report is categorized as 'procurement not requiring board approval' and is recorded in the TRCA Minutes and Agendas database. In these reports, the responsible staff make recommendations for non - competitive procurement to the CAO with an explanation demonstrating that the criteria of section 1.14 have been met. In future summary reports to the Authority, staff will include a brief explanation as to why sole source was appropriate for the • particular services or goods procured. In 2007, staff identified 32 items purchased under the sole source provisions with value up to $50,000 for which CAO approval was granted. .s The following lists the application of the criteria of section 1.14 in each item procured: Criteria 1. "Only one supplier for reasons listed" • Beer products: The Beer Store is the designated supplier of multiple brands of beer. It is possible to go to individual breweries, but the product available is limited to their brands and the pricing is no different than The Beer Store. 256 • All weather weigh gauges: need for compatibility with existing equipment. • Bytown Marine - real time stream gauges: need for compatibility with existing equipment and specialized expertise with respect to stream gauge network (3 contracts, June, September and November, 2007). • Career Edge: this is a unique organization that supplies interns at a subsidized rate to enable them to gain experience. • Bell Canada - fibre optic cable - market based monopoly. • Telus Communications - phone system for World Green Building Council (WGBC) Secretariat at Earth Rangers: Telus is the only supplier available in this location within the time frame required. • Qualstar Tape Library: compatibility with existing equipment a key criteria. Cost effective in terms of comparable equipment. • CJ Graphics - Healthy Yards publication: unique product offering. • Warrens Waterless Printing - TRCA annual report: unique sustainable printing process. • Ikon Office Solutions - Captaris /Rightfax software: unique product and price is competitive with market for the same software. • Amsdell Inc. - computer.server: need for equipment compatible with existing technology; proven track record with TRCA; pricing is competitive with the market place. • Stargarden Software - payroll module: existing supplier of payroll software; compatibility a key issue for critical payroll system. Criteria 3. "extension of contract as cost effective solution" • Parish Geomorphic: project proved more complicated requiring additional design solutions. • Harrington and Hoyle Landscape Architects: had completed successfully the design of the Heart Lake Aquatic Playground; cost effective to extend the work to include contract management. • Harvey Associates - contract management roof project: consultant prepared specifications for the project; cost effective for them to complete the contract management work. • Acorus Restoration - supply of plant material: reliable supplier in 2007; need to ensure reliable supply in 2008; meets TRCA standards; time is of the essence to ensure supply in 2008. Criteria 4. "Emergency" - time is of the essence • Greenwood and Associates: urgency of securing support to enable the WGBC Congress to proceed. • Sandy Cove Marine Pontoon Boat: only company to supply boat in time frame required. • R &M Construction - erosion project: emergency repairs needed; company has required expertise and has done work in the same area for Town of Markham. Criteria 5. ''specialized skills, expertise, experience" • Negotiation Skills training - Stitt Feld Handy Group: expertise in the subject area particularly as it relates to the municipal planning environment. • Integris Real Estate: specialized expertise with respect to waterfront expropriation issues; experience as expert witness. • Brown and Company Engineering: had done previous work for TRCA and City of Toronto . Parks; Forestry and Restoration for design of bridges in Toronto parks; economical to use same firm as design can be similar. • XCG Consultants: regional experts on the national water balance model. 257 • Schollen and Company - joint project with Credit Valley Conservation: agreement that Schollen and Company has the specialized expertise and experience needed to complete the work. • Dr. Raymond G. Cole - WGBC building assessment methods: unique expertise in the research area. • • Zo.rn Environmental Consulting - statistical analysis of terrestrial data: unique expertise required. • Computational Hydraulics Inc - weather radar tools: unique product and expertise. • HMT Sales Tax Consultants: unique expertise; successful recovery work with TRCA; pricing is very competitive. • PricewaterhouseCoopers LLP - Goods and Services Tax (GST) consulting: unique expertise in the GST field. • Enerlife Consulting - support to TRCA sustainable communities project: unique expertise; past support to TRCA for this project; role of principal, Ian Jarvis as Chair of Canada Green Building Council. Criteria 6. "Schedule B provisions" • Central Lake Ontario Conservation Authority (CLOCA) - hydrogeology services: by agreement among five Durham Region conservation authorities for sharing of service costs • DCS Consulting - Don Mouth Toronto Waterfront Revitalization Corporation (TWRC) Project: by agreement with TWRC and Toronto Economic Development Corporation (TEDCO). DETAILS OF WORK TO BE DONE In future reports to the Executive Committee, staff will provide an explanation as to why sole sourcing was required. Report prepared by: Jim Dillane, extension 6292 Email: jdillane @trca.on.ca For Information contact: Jim Dillane, extension 6292 Email: jdillane @trca.on.ca Date: April 1, 2008 Attachments: 2 258 Attachment 1 TORONTO AND REGION CONSERVATION AUTHORITY PURCHASING POLICY Section 1.14 Non - Competitive Procurement Process A non - competitive procurement process shall only be used if one or more of the following conditions apply and a process of negotiation is undertaken to obtain the best value in the circumstances for the TRCA. Authorized Buyers are authorized to enter into negotiations without formal competitive bids, under the following circumstances: 1. The goods and services are only available from one source or one supplier by reason of: • A statutory or market based monopoly • A fluctuating market prevents the TRCA from obtaining price protection or owing to market conditions, required goods or services are in short supply • Existence of exclusive rights (patent, copyright or licence) • Need for compatibility with goods and services previously acquired and there are no reasonable alternatives, substitutes or accommodations • Need to avoid violating warranties and guarantees where service is required 2. An attempt to purchase the required goods and services has been made in good faith using a competitive method and has failed to identify a successful supplier. 3. When the extension or reinstatement of an existing contract would prove most cost - effective or beneficial. The extension shall not exceed one year. The goods and services are required as a result of an emergency, which would not reasonably permit the use of the other methods permitted. 5. The required goods and services are to be supplied by a particular vendor or supplier having special knowledge, skills, expertise or experience that cannot be provided by any other supplier. Any other sole or single source purchase permitted under the provisions of this policy including those noted in Schedule `B'. 259 Attachment 2 TORONTO AND REGION CONSERVATION AUTHORITY PURCHASING POLICY SCHEDULE `A' PURCHASING METHODS, LIMITS AND AUTHORIZATION PURCHASING METHOD LIMITS AUTHORIZATION TO AWARD .Request for Tender - See 1.4, Over $200,000 $100,000 $200,000 Authority Executive Committee Request for Quotation - See 1.4 Informal Request for Quotation - See1.4 Up to $100,000 Up to $10,000 Chief Administrative Officer/ .Secretary- Treasurer or designate Request for Proposal -See 1.4 Over $200,000 $100,000 - $200,000 Up to $100,000 Authority • Executive Committee Chief Administrative Officer/ Secretary- Treasurer or designate No requirement for competition but best value to be obtained - See 1.3 Up to $1,000 Chief Administrative Officer/ Secretary- Treasurer or designate Non Competitive Procurement (Sole source/ Negotiation) - See 1:14 • Note: In the case of an emergency over $50,000 the Chief Administrative Officer/ .Secretary- Treasurer is authorized .to act immediately and report to the Executive Committee at the earliest opportunity Over $200,000 $50,000 - $200,000 Up.to $50,000 Authority Executive Committee • Chief Administrative Officer/ Secretary- Treasurer or designate 'ACCEPTABLE BID OR LIMITS • AUTHORITIES PROPOSAL Over $200,000 $50,000 - $200,000 Up to $50,000 Authority Executive Committee . Chief Administrative Officer/ Secretary- Treasurer or designate Lowest acceptable bid or highest . Over $200,000 Authority ranked proposal not being $25,000 - $200,000 Executive Committee accepted for any reasons other Up to $25,000 Chief Administrative Officer/ than those specified in 1.8 Secretary- Treasurer or designate . DISPOSAL OF GOODS LIMITS AUTHORITIES Value of items (estimated market value at time of disposal) Over $200,000 $50,000 - $200,000 Up to $50,000 Authority Executive Committee . Chief Administrative Officer/ Secretary- Treasurer or designate 260 Notes and interpretations: 1. In accordance with Section 1.3 Authorization and Limits, the Chief Administrative Officer /Secretary- Treasurer or designate shall maintain a list of designated employees and their respective authorities and limitations. 2. If the lowest acceptable bid as a result of a Request for Tender is less than $100,000, authorization for the award shall still be made by Executive Committee. 3. If the lowest acceptable bid as a result of a Request for Quotation is more than $100,000 authorization for award shall be made by Executive Committee. 4. If the lowest bidder is not selected, a report shall be provided to the Executive Committee for their information at the next available meeting . 261 TERMINATION ON MOTION, the meeting terminated at 10:57 a.m., on Friday, April 11, 2008. Gerri Lynn O'Connor Brian Denney . Chair Secretary- Treasurer /ks 262 THE TORONTO AND REGION CONSERVATION AUTHORITY MEETING OF THE EXECUTIVE COMMITTEE #3108 May 9, 2008 The Executive Committee Meeting #3/08, was held in the South Theatre, Black Creek Pioneer Village, on Friday, May 9, 2008. The Vice Chair Maria Augimeri, called the meeting to order at PRESENT Maria Augimeri Vice Chair Suzan Hall Member Reenga Mathinvanan Member Maja Prentice Member Richard Whitehead Member PRESENT VIA CONFERENCE CALL Colleen Jordan Member Ron Moeser Member ABSENT David Barrow 0 Member Rob Ford • Member Jack Heath Member Gerri Lynn O'Connor Chair Anthony Perruzza Member RES. #B33/08 - MINUTES Moved by: Seconded by: Ron Moeser Suzan Hall THAT the Minutes of Meeting #2/08, held on April 11, 2008, be approved. CARRIED 263 PRESENTATIONS (a) A presentation by Quentin Hanchard, Manager, Development, Planning and Regulation, TRCA, in regard to item 8.2 - Millcreek Estates. The presentation was made without quorum so there is not a motion for receipt of the presentation: SECTION I - ITEMS FOR AUTHORITY ACTION RES. #B34/08 - Moved by Seconded by: GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Etobicoke Creek Watershed Kingdom Covenant International, CFN 40703. Acquisition of a property located at 40 Rakely Court, south of Eglinton Avenue West and east of Dixie Road, City of Toronto, under the "Greenlands Acquisition Project for 2006 - 2010 ", Flood Plain and Conservation Component, Etobicoke Creek River watershed. Suzan Hall Richard Whitehead THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.42 hectares (1.04 acres), more or. Tess, of vacant land being Part of Lot F, on the Etobicoke River (in range with Concession 2 North of Dundas Street) and designated as Parts 1 -8 inclusive. on Registered Plan 66R- 22928, located at 40 Rakely Court (south of Eglinton Avenue West and east of Dixie Road), City of Toronto, be purchased from Kingdom Convenant International; THAT the purchase price be $2.00; THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land free from encumbrance, subject to existing service easements; THAT the firm of Gardiner Roberts LLP, Barristers & Solicitors, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid by TRCA; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to execute all necessary documentation required. CARRIED BACKGROUND Resolution #A60/05 at Authority Meeting #9/05, held on November 25, 2005, approved the Greenlands Acquisition Project for 2006-20-10. Negotiations have been conducted with Mr. John Lohmus of IBI Group. As a condition of site plan approval, Kingdom Covenant International is to transfer the Open Space Environmental part to TRCA (ie. Parts 1 -8 inclusive on Registered Plan 66R - 22928). 264 Attached is a plan showing the location of the subject lands. RATIONALE The subject lands are identified as valleylands and fall within TRCA's approved master plan for acquisition for the Etobicoke Creek watershed as outlined in the approved Greenlands Acquisition Project for 2006 -2010. TAXES AND MAINTENANCE It is proposed that the lands be turned over to the City of Toronto for management. FINANCIAL DETAILS Funds for the costs related to this purchase are available in the TRCA land acquisition capital account. Report prepared by: Edlyn Wong, extension 5711 Emails: ewong @trca.on.ca For Information contact: Edlyn Wong, extension 5711, Ron Dewell, extension 5245 Emails: ewong @trca.on.ca, rdewell @trca.on.ca Date: April 11, 2008 Attachments: 1 265 Attachment 1 `• • • _ • , • • ,•-•TO RENFORTH Dicr • • ...... • • / . GREENLANO ACQUISITION PROJECT FOR 2006 2010 6bpd, Fhain-nd, Creek Watershed fl§c1:Or*CoVell a nt. ti a • icFN,.4o7a• • • " iturciuro;vg) upon, FT,.:•;—,, fr?$,PrY011:91;1' ILAS • T,R6A qtilpiCT:p110PERTS' 11,..1MW 266 --" • \s. RES.#B35/08 - Moved by: Seconded by: GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Rouge River Watershed Ralph and Linda Hollander, CFN 40084. Purchase of property, municipally known as 1229 Bethesda Road, east of Bayview Avenue, on the south side of Bethesda Road, in the Town of Richmond Hill, in the Rouge River watershed. Suzan Hall Richard Whitehead THE EXECUTIVE COMMITTEE RECOMMENDS THAT 20.45 hectares (50.54 acres), more or less, consisting of a rectangular shape parcel of land, improved with a two storey stone exterior finished single family residence, triple detached garage and boat house, including a 9 acre kettle lake, said land being Part of Lot 5, Concession 2, Town of Richmond Hill, Regional Municipality of York and municipally known as 1229 Bethesda Road, be purchased from Ralph and Linda Hollander; THAT the purchase price be $3,450,000; THAT acquisition by Toronto and Region Conservation Authority (TRCA) is conditional on all necessary funding being available from one or more of following sources: Oak Ridges Moraine Foundation, Regional Municipality. of York, Town of Richmond Hill, City of Toronto and other potential funding sources; THAT TRCA receive conveyance of the land required free from encumbrance, subject to existing service easements; THAT Gardiner, Roberts, Barristers and Solicitors, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to . the closing for land transfer tax, legal costs and disbursements are to be paid; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to execute all necessary documentation required. CARRIED BACKGROUND Resolution #A260/05 at Authority Meeting #9/05, held on November 25, 2005, approved the Greenlands Acquisition Project for 2006 -2010. In the late 1990's the Rouge Park Alliance/TRCA developed a Pool of Priority Sites for Acquisition and included in the list was the Jefferson Forest Environmentally Significant Area (ESA) and the Provincial Life Science Area of Natural and Scientific Interest (ANSI) called the Wilcox Lake Wetlands and Uplands, in an area approximately bounded between Bayview Avenue and Leslie Street, north of Stouffville Road and south of Bethesda Road. This is considered to be an important headwaters area for the Rouge River. In February 2001, the first property in the area, a 46 acres property, 940 Stouffville Road, was purchased by TRCA with funding assistance from the Town of Richmond Hill, the Regional Municipality of York and the Province of Ontario. 267 In May -2001, the Oak Ridges Moraine Protection Act, 2001 froze all development applications on the moraine including an area referred to as Yonge East and West in the Town of Richmond Hill (Oak Ridges Corridor Park- herein "Corridor Park "). On September 23, 2004, the Minister of Municipal Affairs and. Housing announced that the Province of Ontario and certain landowners on the Oak. Ridges Moraine in the Town of Richmond Hill had reached an agreement to exchange lands. The purpose of the land exchange was to protect the last remaining natural corridor link between the eastern and western parts of the Oak Ridges Moraine in Richmond Hill. Under the agreement, 1,057 acres (428 hectares) of land in Richmond.Hill would come into public ownership. The Province completed the land exchange in August 2007, and became owners of the Oak Ridges Corridor Park. Approximately 120 acre of the 1,057 acre Corridor Park is found in the Jefferson Forest ESA east of Bayview, (Corridor Park East). In addition to the corridor park lands an opportunity arose for the Province to secure and protect additional adjacent lands in public ownership within the Corridor Park East area. Through this process TRCA acquired 269 acres within the Corridor Park East. Another important part of the Corridor Park East land assembly, 900 Stouffville Road, a 25 acre parcel, was acquired in 2006, through a partnership involving the Regional Municipality of York, the Town of. Richmond Hill, City of Toronto, and the Oak Ridges. Moraine Foundation. This raised the total land owned by TRCA in the Corridor Park East to 341 aces and the total Corridor Park to 1,398 acres. (Provincial lands plus TRCA lands). This acreage does not include TRCA's Lake St. George property or Town of Richmond Hill park lands. Only two, large parcels remain to be acquired to complete the Corridor Park East land assembly. A 45 acre property fronting on Stouffville Road and the subject property 1229. Bethesda Road (Swan Lake). Ralph and Linda Hollander have given TRCA an opportunity to purchase their property and staff is recommending we acquire it to help complete the land assembly in . this area and add an important parcel to the Corridor Park. The agreements conditional on the availability of funding. The offer at hand is supported by an appraised value based on independent valuations. Negotiations have been conducted with the owners. Attached is a plan showing the location of the subject lands. RATIONALE The subject property falls within TRCA's approved master plan for acquisition for the Rouge River watershed as outlined in the approved Greenlands Acquisition Project for 2006 -2010. The subject property is also included in the Pool of Priority Acquisition Sites for the Rouge Park approved by the Rouge Park Alliance. 26.8 It is located in the headwaters of the Rouge River, in the provincially significant Wilcox Lake and Uplands Area of Natural and Scientific Interest and within the Jefferson Forest Environmentally Significant Area (ESA #90). TRCA biologists have visited the site to conduct natural area inventories and have documented the presence of bog communities and numerous species of conservation concern. The property is designated as Natural Core Area under the Oak Ridges Moraine Conservation Plan. The addition of the subject parcel will compliment TRCA's holdings in this area. TAXES AND MAINTENANCE Since this property has been designated as a provincially significant ANSI it will be eligible to receive a property tax exemption. TRCA, together with other stakeholders including the Town of Richmond Hill, Regional Municipality of York and Ontario Realty Corporation are currently preparing a management plan for the Corridor Park East lands. 1229 Bethesda Road property will be included in this process. FINANCIAL DETAILS The subject property was identified on the list of properties approved by the City of Toronto to be funded from the city's Land Acquisition for Source Water Protection Reserve. The city will fund up to 33% of the costs of the acquisition for properties on the list located outside of the city boundaries. Oak Ridges Moraine Foundation (ORMF) staff has indicated during preliminary discussions that they would support a contribution by the ORMF to this purchase. Other potential funding sources are the Town of Richmond Hill, Regional Municipality of York, Ducks Unlimited and Wildlife Habitat Canada. Expenditures related to this acquisition will be charged to. account 004 -11 -502. Report prepared by: Ron Dewell, extension 5245 Emails: rdewell @trca.on.ca For Information contact: Ron Dewell, extension 5245 Emails: rdewell @trca.on.ca Date: April 25, 2008 Attachments: 1 269 Attachment 1 GREENLANDS ACQUISITION PROJECT FOR 2006 =2010 Flood'.Plain and Conservatioo'Con ponerit, Rouge River Watershed Ralph :and`Liiida Hollander • CFN 40084 rti TOtONTOAM) RLO N - , 'onservation• for J'h'e•Livia *'GI1y• G= . TRCA LANDS - ':,:;:;'`•,`:SUBJECT PROPERTY 270 RES. #B36/08 - Moved by: Seconded by: EXCHANGE OF LANDS Vicinity of Riverside Drive, Town of Ajax Marshall Homes Duffins Creek Watershed, CFN 40709. Receipt of request from Marshall Homes to exchange lands west of Riverside Drive and south of Rossland Road, Town of Ajax, Regional Municipality of Durham. Suzan Hall Richard Whitehead WHEREAS THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation Authority (TRCA) is in receipt of a request from Marshall Homes, the owner of a parcel of land west of Riverside Drive and south of Rossland Road within the Town of Ajax; WHEREAS it is in the opinion of TRCA that it is in the best interest of TRCA in furthering its objectives, as set out in Section 20 of the Conservation Authorities Act, to proceed with an exchange in this instance; THEREFORE LET IT BE RESOLVED THAT TRCA enter into an exchange of lands on the following basis: a) Marshall Homes will convey to TRCA a parcel of land containing 1.169 hectares (2.89 acres) more or less, of vacant land, being Lot 17, Concession 2, Town of Ajax, Regional Municipality of Durham, being Block A on a sketch illustrating the proposed land exchange prepared by J. D. Barnes Limited under Ref. No. 07 -25- 990 -03 -A; b) TRCA will convey to Marshall Homes two parcels of land containing a total area of 0.096 hectares (0.24 acres), more or less, of vacant land, being Lot 17, Concession 2, and Part Block 3, Plan 342, Town of Ajax, Regional Municipality of Durham, being Parcels 1 and 2 on a sketch illustrating the proposed land exchange prepared by J:-D. Barnes Limited under Ref: No. 07 -25- 990 -03 -A; c) Marshall Homes is to pay all legal and survey costs; d) completion of this sale will be subject to any Planning Act approvals that maybe required for the severance. Marshall Homes must obtain, at their sole expense, the approval of the Land Division Committee for the Regional Municipality of Durham and any additional approvals which Marshall Homes may desire or the municipality requires; e) any additional conditions as deemed appropriate by the TRCA staff or solicitor; f) that the sale be subject to the approval of the Minister of Natural Resources in accordance with Section 21(2) of the Conservation Authorities Act C.27 as amended; 271 AND FURTHER THAT appropriate TRCA officials be authorized and directed to take .. whatever action may be required to give effect thereto, including the obtaining of any necessary approvals and the execution of any documents. CARRIED BACKGROUND A letter was received on April 11, 2008, from Mr. Ian.McCullough, Vice President of Marshall Homes requesting that TRCA enter into a land exchange involving two small parcels of TRCA -owned land (comprising approximately 0.24 acres) in exchange for a much larger parcel of land presently under the ownership of Marshall Homes (approximately 2.89 acres in size) located west of Riverside Drive and south of Rossland Road. Marshall Homes is preparing a draft subdivision plan for lands they have assembled in this area. Through ongoing discussions with Marshall Homes, TRCA staff and Town of Ajax officials have agreed that the small fragments of TRCA -owned lands are surplus to our needs and can be incorporated into the draft plan in exchange for a 1.169 hectare block of valleyland that is not part of the draft plan. Other valley and floodplain lands within the plan will be dedicated to TRCA.for a nominal amount. This will be subject to a separate report to the board. Staff is prepared to recommend the land exchange as outlined in .the report, as the acquisition of the Marshall Homes property will help consolidate TRCA ownership in this area, help achieve our conservation objectives, create environmental linkages and the potential for increased public use along this corridor of the Duffins Creek. The subject lands are part of much larger parcels of property that were acquired by TRCA on May 12, 1965, from Fredrick Bussey and on October 18, 1978, from John Garay &Associates Ltd. in trust, under the Duffins Creek master plan for flood plain and valley land acquisition. A sketch showing the location of the subject sites is attached. FINANCIAL DETAILS All costs associated with the transaction will be paid by Marshall Homes. Report prepared by: Tom Campitelli, extension 5335 Emails: tcampitelli @trca.on.ca For Information contact: Ron Dewell, extension 5245 or Tom Campitelli, extension 5335 Emails: rdewell @trca.on.ca or tcampitelli @trca.on.ca Date: April 15, 2008 Attachments: 1 272 Attachment 1 EXCHANGE OF LANDS Vicinity of Riverside Drive, Town of Ajax Marshall Homes: Duffins Creek Watershed CFN 40709 I i��D1tk f15 /� i . ,q`q x �i t_1 1 0 7 •1.ANOS ?O.BE'CONVEYED BY.; MARSHALL HOMES TO=.TRCA' 4:ANRs To, 8[tCQNVEYED�70 MARSHAU:(HUMEs evii-f ca; 273 YY^ X70773/$075. tion for The Living City fTRCALANDS .1AND$ TO BE CONVEYED TO (r -•- -::: -i .MARSHALL HOMES BY•TRCA .F A SHALL HOMES TOTRCA { ` X7 //1 l „, r.. w RES. #837/08 - Moved by: Seconded by: SANITARY SEWER PROJECTS King Township Area of the Humber River Watershed. Report in •response to the letter from Ms. Madeleine McDowell regarding the dewatering processes for the sanitary sewer projects and its affect upon the groundwater table in King Township. Suzan Hall Richard Whitehead WHEREAS THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation Authority (TRCA) understands concerns raised by the Humber Heritage Committee regarding the construction of underground pipes, potential dewatering processes and their possible effects to the natural environment in the. King Township area, of the Humber River watershed; WHEREAS the proponent is committed to notify the. Coordinator, Environmental Monitoring Review (YDSS), TRCA, if triggers are approached and mitigation measures should be implemented; WHEREAS TRCA staff will continue to work with the proponent if necessary to avoid and or mitigate negative affects to the environment; THEREFORE LET IT BE RESOLVED THAT the Coordinator, Environmental Monitoring Review (YDSS) continue to be involved in both projects on a regular basis reviewing all future submissions and monitoring information and by interacting with the proponent, contractors and other regulatory .agencies' technical staff to ensure that all previous commitments are followed; • AND FURTHER THAT. the Coordinator, Environmental Monitoring Review (YDSS) and enforcement staff continueto conduct site visits to the areas under construction to ensure that projects are built according to the plans. BACKGROUND At Authority Meeting #2/08, held on March 28, 2008, a letter dated March 8, 2008, was received from Madeleine McDowell, .Chair of the Humber Heritage Committee, in regard to dewatering • (Attachment 1). The letter outlined the Humber Heritage Committee's concerns with the dewatering processes and their effects upon the groundwater table in the King Township area of the Humber River watershed. In addition to concerns about the potential negative impacts of dewatering on Oak Ridges Moraine's ecosystem health, the committee expressed their concerns about the sustainability of mains and sewage pipes in the long term. The committee is concerned about potential negative effects on the Humber River baseflow, water productions . wells and indigenous species. • CARRIED 274 In 2004, the position of Coordinator, Environmental Monitoring Review (YDSS) for all York Durham Sanitary Sewer (YDSS) projects was created at TRCA. The coordinator is regularly involved in each YDSS project. The coordinator reviews all monitoring and mitigation reports on behalf of TRCA, Ministry of Natural Resources (MNR) and Fisheries and Oceans Canada (DFO), and communicates with the Ministry of Environment (MOE) as required. The coordinator is responsible for coordination and communication with the proponent, its contractors, consultants and environmental inspectors, and for conducting site visits. TRCA enforcement staff is responsible for ensuring that conditions of permit approvals are satisfied. As directed at Authority Meeting #2108 via Resolution #A39/08, TRCA staff reviewed the concerns of Ms. McDowell and offers the following response. RATIONALE There are two sewer construction projects currently underway in The Township of King within the Humber River watershed: the King City Trunk Sewer and the Nobleton Trunk and Sewage Treatment Plant (STP). Both projects were previously addressed in a report to Authority Meeting #10/05, held on January 6, 2006 (Res. #A297/05). The sewers in both King City and Nobleton are being constructed in a surficial layer of till deposits. Till deposits normally possess low permeability rates, and therefore provide a relatively slow hydraulic connection between • groundwater and surface water bodies. The King City project is approximately half complete, and there has been no dewatering to date, nor is any anticipated for the remaining project areas. The Nobleton project has no planned construction dewatering,-however if groundwater is encountered, a contingency dewatering plan has been developed as part of the approved Environmental Management Plan (EMP), and a contingency Permit To Take Water (PTTW) has been issued by MOE. As summarized below, TRCA staff has no concerns about construction dewatering for either project. King City Trunk Sewer A Schedule B Class Environmental Assessment was completed for the King City Trunk Sewer by York Region in 1995 and updated in 2001. Requests for a Part II Order were received by the Minister and they were denied. In response to MOE requirements under the Oak Ridges Moraine Act, the Oak Ridges Moraine Conservation Plan Compliance Report for the King City Sanitary Sewer was completed in January 2004, and amended in 2006. The project is being permitted and . constructed through approximately 12 contract areas. To date; five contracts have been successfully built, and permits for three additional contract areas have been issued by TRCA. TRCA is currently reviewing permit applications for the final four contract areas. During the construction of the five built contract areas, only limited construction unwatering of trenches and pits has occurred. A PTTW from the Ministry of the Environment was not required. 275 For the first three contract areas of the King City Trunk Sewer project, TRCA requested the proponent to design an Environmental Management Plan (EMP) prescribing monitoring program, triggers and their response, mitigation and communication protocols for each contract area. This request was satisfied, and according to each EMP, regular monitoring information has been provided to TRCA for review. No dewatering was required for the implementation of any contract 'area. TRCA has advised the proponent that EMPs are not required for the remaining contract areas for the King City Trunk Sewer project as dewatering is not anticipated. However, York Region has retained the services of an environmental consulting firm to continue a monitoring program through construction of all contract areas. Should an • issue.arise, York Region has committed to consult with TRCA through the YDSS coordinator to develop an immediate and effective mitigation strategy. Given that there has been no dewatering for groundwater control associated with the construction of the King City Trunk Sewer to date, and no dewatering is anticipated for the construction of the remaining contract areas, staff has determined that there have been no negative impacts to the Oak Ridges Moraine's ecosystem health, Humber baseflow, water production wells and indigenous species. York Region is responsible for the maintenance of the sewer pipes, and has a regular monitoring and maintenance program in place in accordance with MOE regulations. Nobleton Trunk Sewer and Sewage Treatment Plant (STP) A Class EA was completed for the Nobleton Trunk and STP in 2005. TRCA staff has worked with the proponent on various submissions and technical discussions. To date, -all concerns and potential negative effects to the environment have been addressed by the proponent, and an EMP was completed. According to the EMP, the proponent.is committed to monitor all sensitive environmental features including the existing natural wetland and Humber River, and appropriately mitigate any negative effects during construction. While no dewatering for groundwater control is planned, there is potential that unwatering of trenches and pits may occur as a contingency measure to facilitate construction. As such, the MOE has issued a contingency PTTW. . At TRCA's request, York Region, has agreed to construct an artificial wetland at the outfall of the effluent pipe. As part of the project, York Region will monitor the wetland relative to its hydraulic functions and 'effluent quality for one year post - construction. The treated effluent will enter a new constructed wetland, where it is expected that seasonal ammonia levels will be reduced, and then outlet into the Humber River. In compliance with the MOE policy, York Region has developed a comprehensive phosphorous offset strategy. The strategy includes the . decommissioning of a septic system in the Nobleton Community, the planting of agricultural land north of Nobleton, and the decommissioning of the barn and manure stage areas at the Albion Hill Dairy Farm as approved at Authority Meeting #3 /08,'held .on April 25, 2008. 276 Permits CFN 38493 and CFN 38494 have been approved by the Executive Committee for these two projects. TRCA staff reviewed the project applications under the habitat protection provisions of the Conservation Authorities Act and the Fisheries Act. There is a EMP in place, including provisions for regular. reporting and communications through TRCA's.YDSS coordinator. Should dewatering be required, there are adequate provisions in place to ensure the protection of the Oak Ridges Moraine's ecosystem health, Humber base flow, water production wells and indigenous species. Again, York Region is responsible for the maintenance of the sewer pipes, and has a regular monitoring and maintenance program in place in accordance with the MOE regulations. Report prepared by: Beth Williston, extension 5217; Tamara Kondrachova, extension 5629 Emails: bwilliston @trca.on.ca; tkondrachova @trca.on.ca For Information contact: Beth Williston, extension 5271; Tamara Kondrachova, extension 5629; Emails: bwilliston @trca.on.ca; tkondrachova @trca.on.ca Date: April 17, 2008 Attachments: .1 277 Attachment 1 HUMBER HERITAGE COMMITTEE 163 HUMBERCREST BLVD. 4 TORONTO, ONTARIO M6S 4L5 - atgl AiezatUtVas,ViiivAl Chair and Authority Members, . March 8th, 2008 Toronto and Region Conservation Authority, 5 Shorham Drive, Downsview, Ontario M3N 1S4 Dear Chair O'Connor: On behalf of the Humber Heritage Committee, I wish to again express our grave concern with the dewatering process and its affect upon the ground water table. It, is of most particular concern to us in the area of the Moraine, where the entire eco system is so fragile and water oriented, with its post glacial evolution of root and drainage systems. Now, the King area of the Humber watershed is about to suffer a:continuing shock of doubtful sustainability as mains and sewage pipes are installed and the use of this technique: Nal:exacerbate,it<fiuther. We expressed our concerns a decade ago with regard to the potential affect on the HHumber base flow as well as well-water and indigenous species. These concerns have not diminished. Thank you for your kind attention_ Yours sincerely,. . Madeleine McDowell Chair, Humber Heritage Committee 278 RES. #B38/08 - Moved by: Seconded by: MIMICO WATERFRONT LINEAR PARK BOARDWALK Contract RSD08 -08. Award of Contract RSD08 -08 for construction of the Mimico Waterfront Linear Park Boardwalk. Suzan Hall Richard Whitehead THE EXECUTIVE COMMITTEE RECOMMENDS THAT contract RSD08 -08 for construction of the Mimico Waterfront Linear Park Boardwalk be awarded to The Ontario Construction Company Ltd. for the total amount of $348,955 plus GST, which includes a contingency amount of $25,000 to be expended as authorized by Toronto and Region Conservation Authority (TRCA), it being the lowest bid that meets TRCA specifications; AND FURTHER THAT authorized TRCA• officials be directed to take such action as is necessary to implement the contract including signing and execution of documents. CARRIED BACKGROUND The Mimico Waterfront Linear Park Project is located at the south end of Superior Avenue south of Lake Shore Boulevard in the City of Toronto. Implementation of phase one of the Mimico Waterfront Linear Park Project commenced on July 4, 2006 with an anticipated completion date of July 2008. Part of the phase one project includes construction of a boardwalk feature to be located in the central sector of the project, south of Amos Waites Park, along the north shore of the sheltered embayment. The boardwalk is a key feature of the waterfront park project linking pedestrian trails and providing viewing opportunities for park users. Detailed design for the boardwalk was •completed by Brown and Company Engineering Ltd, RATIONALE Contract RSD08 -08 was publicly advertised in the Daily Commercial News on March 26, 2008, with a mandatory site meeting held on April 03, 2008. A total of ten perspective bidders attended the mandatory site meeting with the following bids being received: Bidder . Contingency (excluding G.S.T) Estimated Value of . Contract (excluding GST) The Ontario Construction Company Ltd. $25,000.00 $348,955.00 Dean Construction Co. Ltd $25,000.00 NO BID AMG Metals Inc. $25,000.00 NO BID Somerville Construction $25,000.00 $510,500.00 Lombardi Construction $25,000.00 NO BID Pine Valley Enterprises Inc. $25,000.00 $776,300.00 Marbridge Construction Ltd. $25,000.00 $493,000.00 Martinway Contracting Ltd. $25,000.00 $503,599.00 Loc Pave Construction Limited $25,000.00 $597,000.00 APlus General Contractor $25,000.00 $485,000.00 279 Based on a review of the bids received by. staff and the consultant and an assessment of the • lowest bidder's experience and ability to undertake similar projects, staff recommend that Contract RSD08 -08 be awarded to The Ontario Construction Company Ltd. for the total bid amount of $348,955, plus GST, as it is the lowest bidder that meets TRCA specifications. In accordance with TRCA's Purchasing Policy, Authority approval is required. FINANCIAL DETAILS Funds are available within the approved budget (account #206 90) from Toronto Waterfront Revitalization Corporation. Report prepared by: Mark Preston, 416- 392 -9722 For Information contact: Mark Preston, 416 - 392 -9722 Emails: mpreston @trca.on.ca Date: April 30, 2008 RES. #B39/08 - Moved by: . Seconded by: LONG TERM OFFICE ACCOMMODATION PROJECT •Needs Analysis and Preliminary Building Evaluation Phase. Report on the needs analysis and preliminary building evaluation phase of the project to meet TRCA long term office accommodation needs. - Ron Moeser Suzan Hall. THE EXECUTIVE COMMITTEE RECOMMENDS THAT a Long Term Office. Accommodation Working Group consisting of Toronto and Region Conservation Authority (TRCA) Members representative of the participating municipalities including the Chair, be created to support and guide staff in development and implementation of the Long Term Office Accommodation project; . THAT staff include in the 2009 -2013 capital budget projections funding for the project; AND FURTHER THAT the working group and staff report back to the Executive Committee no later than .December 31, 2008. AMENDMENT Moved by: Seconded by: Ron Moeser Suzan Hall THAT the following be inserted after the second paragraph of the main motion: THAT at the Authority meeting on May 23, 2008, members be asked to indicate their interest in serving on the Working Group which will include Chair Gerri Lynn O'Connor, Councillor Ron Moeser and Councillor Maria Augimeri. 280 THE AMENDMENT WAS CARRIED • THE MAIN MOTION, AS AMENDED, WAS CARRIED BACKGROUND TRCA has grown considerably since its main office at 5 Shoreham Drive was constructed in the • 1970's. The purpose of the Long Term Office Accommodation Project is to determine the office accommodation needs of TRCA over the next 20 years and recommend a comprehensive, cost effective solution. 1. TRCA is currently using a number of locations to meet its office accommodation requirements: 2. 5 Shoreham Drive - the original "head office ", about 22,000 sq ft., about 140 staff; 3. Black Creek Pioneer Village (BCPV) - offices for BCPV administration as well as 1,500 sq.ft. for Conservation Foundation and Marketing staff; 4. 70 Canuck Drive, Downsview Park - leased space of about 14,000 sq. ft. housing about 50 staff in the Watershed Management Division, Communications, Conservation Land Planning and Source Protection sections; 5. Boyd Office (Former Boyd Field Centre) - about 8,000 sq. ft. housing Restoration Services, Regional Watershed Monitoring and other staff, about 40 in total. TRCA also has a.number of field locations such as Kortright and Eastville which house administrative staff for various field operations. In previous reports, staff advised that there were immediate short term needs to be resolved. - TRCA has entered into lease arrangements for space at Downsview Park and anticipates extending that lease space for.the next five years. Also, TRCA 'has completed the'Restoration • Services Centre which has space for Restorations Services and Parks and Culture. staff. Short . term office 'space needs have been largely resolved. RATIONALE Staff has undertaken preliminary work using an outside consultant to consider costs of creating office space as well as opportunities to lease or build space .in the vicinity of 5 Shoreham Drive. There is a need to determine how much space is needed. This analysis involves use of an office space planning consultant to meet with management staff, assess current space usage, determine future needs and report on the needs of TRCA. Preliminary estimates of immediate space requirements total about 40,000 sq ft. Other considerations include meeting room space for the Authority, training and education facilities, storage etc.. As reported in earlier communications to the Authority, options to be considered include: • leasing additional space; • building new space either as a new structure or addition(s) to existing structures; • partnerships with other organizations to create or lease space; • sharing space with municipal partners. 281 If there is an opportunity to create new office space either through lease or ownership, TRCA would want such space to represent the very best of emerging green office technology. Leadership in Energy and Environmental Design (LEED) Platinum would-be the standard to which TRCA should aspire. Also, TRCA would want to demonstrate the application.of other opportunities such as technological innovations allowing for "work at home" and video /teleconferencing to reduce travel and its impact on the environment. Given these goals, staff believe there are partnership opportunities with like minded organizations. Parc Downsview Park (PDP), for example, shares many of the same values as TRCA and has discussed with staff opportunities to participate in the future development of facilities at PDP. Staff has met with representatives of York University (York U) and is exploring opportunities with York.U. Given the growth, existing and planned,. York U's Faculty of Science and Engineering has expressed interest in working with TRCA on a project to create additional space. There are obvious synergies with the university in particular because this could involve the York Institute for Research and Innovation in Sustai'nability, a group with whom TRCA staff has a strong working relationship. .The site for new office space is the parking area at Black Creek Pioneer Village in conjunction with the existing office at 5 Shoreham Drive. There is significant benefit for TRCA to maintain a "head office" presence in this area given access to major highways and being close to the geographic centre of TRCA's area of jurisdiction. Also, this location is attractive because of proximity to existing facilities at BCPV and the new subway. DETAILS OF WORK TO BE DONE Staff will finalize awork plan for the office needs analysis including terms of reference for consultant support. Staff is .considering all of the issues involved in creating new office space, not the least of which is a financial plan. The timeframe is to report back to the Executive Committee by year end with the needs analysis preliminary building evaluation and a project plan including financial projections. To support and advise staff as the project moves forward, it is proposed that the Authority. create a small Long Term Office Accommodation Working Group consisting of the Chair and interested Authority members representative of the participating municipalities.. It is suggested that the working group. would have.no fewer than five members. It would meet as needed to support the staff group responsible for the project: Staff reports would flow through the working group to the Executive Committee. Financial requirements for the project will be determined as the project proceeds and will be included in the 2009 - 2013 . capital projections. Initial costs for design will be included in the 2009 2010 capital 282 FINANCIAL IMPLICATIONS Staff has made provision in the 2008 budget for $75,000 to complete the office space needs analysis and preliminary building evaluation. In the 2009 -2013 capital budget plan, staff will include funds for the project. Specifically, funding in 2009- 2010 will be sufficient for design and preliminary construction costs: Report prepared by: Jim Dillane, extension 6292 Emails: jdillane @trca.on.ca For Information contact: Jim Dillane, extension. 6292; Ron Dewell, extension 5245 Emails: jdillane @trca.on.ca; rdewell @trca.on.ca Date: April 22, 2008 SECTION II - ITEMS FOR EXECUTIVE ACTION RES. #B40/08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Development, Interference with Wetlands and Alterations to Shorelines and Watercourses. Pursuant to Ontario Regulation 166/06, written permission from the Authority is required for: a) straightening, changing, diverting or interfering in any way with the existing channel of a . river, creek, stream or watercourse, or for changing or interfering in any way with a wetland; b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development. A permit may .be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected. Moved by: Seconded by: Suzan Hall Richard Whitehead THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.1 8.1.44, with the exception of 8.1.9 - Enbridge Gas Distribution Inc. which was withdrawn, and 8.1.93 - Filmport Developments Inc.) which are listed below. CARRIED CITY OF BRAMPTON 8.1.1 18 BLACK CHERRY LANE To temporarily or permanently place, dump or remove any material; originating on the site or elsewhere on Lot 9, Plan 43M -1512, (18 Black Cherry Lane), in the City of Brampton, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an in ground pool. 283 The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by Calogero Riolo, dated April 18, 2008, stamped received by TRCA Planning and Development on April 18, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an in ground pool.The subject property is located adjacent to a valley corridor feature of the Humber. River Watershed. TRCA staff has conducted a site inspection and confirm that the proposed works appear to be sufficiently setback from the valley corridor feature. The area to which this application applies is currently a manicured lawn and is void of any significant vegetation. The proposed works are located outside of the Regional Storm Floodplain. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters is anticipated. Pollution: Appropriate erosion and sediment controls (Le., silt.fence) will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as result of construction. • Plantings As no significant vegetation will be removed, no plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40783 - Application #: 306 /08 /BRAM Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 30, 2008 284 8.1.2 CITY OF BRAMPTON To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on.the site or elsewhere, in Centennial Park off Mary Street, in the City of Brampton, Etobicoke Creek Watershed, as located on the property owned by City of Brampton. The purpose is to construct, reconstruct, erect or place a building or structure (pedestrian bridge), site grade (pedestrian pathway) and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere (bank stabilization) in Centennial Park off Mary Street, in the City of Brampton, Etobicoke Creek Watershed, as located on the property owned by TRCA. All construction activity will only be carried out during the warm water timing window of July 1 to March 31. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Sheet L - 1 of 6 - Bridge Replacement Centennial Park - Removal and Sedimentation Plan; dated September 2007; received February 26, 2008; prepared by MMM Group; red -line revised April 25, 2008; • Sheet L - 2 of 6 = Bridge Replacement Centennial Park - Layout and Landscape Plan; dated September 2007; received February 26, 2008; prepared by MMM Group; red -line revised April 25, 2008; • Sheet L - 3 of 6 - Bridge Replacement Centennial Park - Cross sections; dated September 2007; received February 26, 2008; prepared by MMM Group; red -line revised April 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of removing an existing steel pedestrian bridge with wood decking (13.0m span) and replacing it with a new prefabricated steel pedestrian bridge (18.0m span). in Centennial Park over the west branch of the Etobicoke Creek. The new bridge will require some regrading of the pathway and new abutment footings. Riverstone (200mm to 300mm) will be placed under the new bridge, adjacent to the watercourse, for bank protection. No in -water works are anticipated. Control of Flooding: There will be no impact to the control of flooding. Pollution: Standard sediment and erosion controls (silt fence, and filter bag or sediment trap with splash pad) will be in place for the duration of construction and until the site is restored to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable 285 Erosion: There are no geotechnical /slope stability. issues associated with the proposal. Conservation of Land: With the erosion and.sedimentation controls in effect, the potential for Harmful Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice (LOA) will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). All construction activity will only be carried out during the warm water timing window of July 1 to March 31. Plantings All disturbed areas will be restored with native /non- invasive species following construction. . Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 40178 - Application #: 918 /07 /BRAM Report Prepared by: Scott Smith, extension 5758 For information contact: Sharon Lingertat, extension 5717 Date: April 29, 2008 8.1.3 CITY OF BRAMPTON To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere in Laurel Crest Park off Lambeth Street, . in the City. of Brampton, Etobicoke Creek Watershed, as located on the property owned by City of Brampton. The purpose is to construct, reconstruct, erect or place a building or structure (pedestrian bridges), site grade (pedestrian pathway) and temporarily or permanently place, dump.or remove any material, originating on the site or elsewhere (bank stabilization) in Laurel Crest Park off Lambeth Street, in the City of Brampton, Etobicoke Creek Watershed, as located on the property owned by City of Brampton. All construction activity will only be carried out during the warm water timing window of July 1 to March 31. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Sheet L - 1A of 6 - Bridge Replacement and Installation Laurel Crest Park - Removal Plan; dated June 2007; received February 26, 2008; prepared by MMM Group red -line revised.April 25, 2008; • Sheet L - 1B of 6 - Bridge Replacement and Installation Laurel Crest Park - Removal Plan; dated June 2007; received February 26, 2008; prepared by MMM Group; 286 • Sheet L - 2 of 6 - Bridge Replacement and Installation Laurel Crest Park - Layout, and Landscape Plan; dated June 2007; . received February 26, 2008; prepared by MMM Group; red -line revised April 24, 2008; • Sheet L - 3 of 6 - Bridge Replacement and Installation Laurel Crest Park - Cross Sections; dated June 2007; received February 26, 2008; prepared by MMM Group; Sheet L - 6 of 6 - Bridge Replacement and Installation Laurel Crest Park - Landscape Details; dated June 2007; received February 26, 2008; prepared by MMM Group. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of removing an existing wooden pedestrian bridge (10.92m span) and replacing it with a new prefabricated steel pedestrian bridge (12.00m span) in Laurel Crest Park over a tributary of the Etobicoke Creek. The existing asphalt pathway will be re- aligned requiring the removal of an existing culvert. A second prefabricated steel pedestrian bridge (12.00m) span will be installed at the new alignment of the pathway. The re- alignment of the pathway will require minor re- grading. New abutment footings will be installed for each bridge. The top layer of gabion baskets under the existing pedestrian bridge will be removed and the stones stockpiled for' re -use on the site for bank stabilization. Riverstone (200mm to 300mm) will be placed under both bridges, adjacent to the watercourse, for bank protection. No in -water works are anticipated. Control of Flooding: There will be no impact to the control of flooding. Pollution: Standard sediment and erosion controls (silt fence, filter bag, and sediment trap with splash pad) will be in place for the duration of construction and until the site is restored to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With the erosion and sedimentation controls in effect, the potential for a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice (LOA) will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). All construction activity will only be carried out during the warm water timing window of July 1 to March 31. Plantings All disturbed areas will be restored with native /non- invasive species following construction. A net ecological gain will be achieved at this site (7 shrubs and 30 trees). 287 Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 40179 - Application #: 919/07/BRAM Report Prepared by: Scott Smith, extension 5758 For information contact: Sharon Lingertat, extension 5717 Date: April 29, 2008 8.1.4 • CITY OF BRAMPTON To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere in Valley Brook Park off Williams Parkway,.in the City of Brampton, Etobicoke Creek Watershed, as located on the property owned by City of Brampton. The purpose is to construct, reconstruct,erect or place a building or structure (pedestrian bridge), site grade (pedestrian pathway), and temporarily or permanently place; dump or remove any material, originating on the site or elsewhere (bank stabilization) in Valley Brook Park off Williams Parkway, in the City of Brampton, Etobicoke Creek Watershed, as located on the property owned by City of Brampton. All construction activity will only be carried outduring the warm water timing window of July 1 to March 31. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Sheet. L - 1 of 6; Bridge Replacement Valley Brook Park - Removal and Sedimentation Plan; dated September 2007; received February 26, 2008; prepared by MMM Group; red -line revised April 28, 2008; • Sheet L - 2 of 6; Bridge Replacement Valley Brook Park - Layout and Landscape Plan; dated September 2007; received February 26,2008; prepared by MMM Group; • Sheet L - 3 of 6; Bridge Replacement. Valley Brook Park - Cross. Sections;, . dated September 2007; received February 26,.2008; prepared by MMM Group. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of removing an existing concrete pedestrian bridge (12.0m span) and replacing it with a new prefabricated steel pedestrian bridge (20.0m span) in Valley Brook Park. over the westbranch of the Etobicoke Creek. The new bridge will require some regrading of the pathway and new abutment footings. Riverstone (200mm to 300mm) will be placed under the new bridge, adjacent to the watercourse, for bank protection. No in -water works are anticipated. Control of Flooding: There will be no impact to the control of flooding. 288 Pollution: Standard sediment and erosion controls (silt fence) will be in place for the duration of construction and until the site is restored to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With the erosion and sedimentation controls in effect, the potential for a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice (LOA) will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). All construction activity will only be carried out during the warm water timing window of July 1 to March 31. Plantings All disturbed areas will be restored with native /non - invasive species following construction: A net ecological gain will be achieved at this site (37 shrubs and 4 trees). Policy Guidelines: This proposal complies with Section 4.3 Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 40180 - Application #: 920 /07 /BRAM Report Prepared by: Scott Smith, extension 5758 For information contact: Sharon Lingertat, extension 5717 Date: April 29, 2008 8.1.5 .CITY OF BRAMPTON To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse, Kennedy Road (north of Highway 407), in the City of Brampton, Etobicoke Creek Watershed as located on property owned by the City of Brampton. The purpose is to construct, reconstruct, erect or place a building or structure (road widening, culvert extension), site grade, temporarily or permanently place, dump or remove any material, originating on site or elsewhere and alter a watercourse (culvert extension, watercourse realignment), Kennedy Road (north of Highway 407), in the City of Brampton, Etobicoke Creek Watershed. All in or near water works must be completed between July 1 and March 31. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: 289 • Letter of Undertaking to provide-revisions to the engineering drawings to the satisfaction of TRCA; dated April 25, 2008; received April 28, 2008; prepared by City of Brampton. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This proposal consists of widening Kennedy Road from 2 lanes to 4 lanes, constructing left turn lanes, a sidewalk on the east side and a bike /pedestrian path on the west side. Existing 1700 . mm diameter CSP twin culverts will be extended by 7.5 m on the west side. An existing watercourse located north of the culverts' runs parallel to Kennedy Road. and will be realigned to tie into the culvert extension. An armourstone berm will be constructed between the 2 culverts that will act as a flow control structure to ensure that the low flow.channel is directed through • the north culvert to concentrate flows and facilitate fish passage. Control of Flooding: There will be no impacts to the control of flooding. Pollution: Standard erosion control measures (silt fencing, rock check dams) will be implemented for the duration of construction, and until the site is restored, in order to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). This application is subject to the Ministry of Natural Resources (MNR) warmwater fisheries timing window. All in or near water works must be completed between July 1 and March 31. Plantings . All disturbed areas will be restored with native non - invasive species following construction. A net ecological gain will be achieved at this site (362 shrubs). Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. 290 CFN: 40339 - Application #: 020 /08 /BRAM Report Prepared by: Sharon Lingertat, extension 5717 For information contact: Sharon Lingertat, extension 5717 Date: April 28, 2008 8.1.6 CITY OF BRAMPTON To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, Kennedy Road at the Etobicoke Creek bridge, in the City of Brampton, Etobicoke Creek Watershed as located on property owned by the City of Brampton. The purpose is to construct, reconstruct, erect or place a building or structure (road widening, retaining.. walls), site grade and temporarily or permanently place, dump or.remove any material, originating on site or elsewhere, Kennedy Road at the Etobicoke Creek bridge, in the City of Brampton, Etobicoke Creek Watershed. The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Letter of Undertaking to provide revisions to the engineering drawings to the satisfaction of TRCA; dated April 25, 2008; received April 28, 2008; prepared by City of Brampton. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This proposal consists of widening Kennedy. Road from 2 lanes to 4 lanes, constructing left turn . lanes, and a sidewalk on both the east and west sides. The existing bridge over Etobicoke Creek has already been sized to accommodate the road widening and therefore no works are proposed on the bridge structure. The retaining-wall on the northwest side of Kennedy Road, closest to the bridge, will be extended vertically by approximately 1.5 m to 5.6 m to accommodate the road widening. The same retaining wall furtherr north will be removed and reconstructed. The retaining wall . on the southwest side will be extended vertically -by 0.5 m to a height of 3.4 m. An existing retaining wall on the southeast side of Kennedy Road will be completely reconstructed. Control of Flooding: There will be no impacts to the control of flooding. Pollution: Standard erosion control measures (silt fence) will be implemented for the duration of construction, and until the site is restored, in order to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable 291 Erosion: There will be no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be •mitigated. No in -water works will be conducted. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40340 - Application #: 021 /08 /BRAM Report Prepared by: Sharon Lingertat, extension 5717 For information contact: Sharon Lingertat, extension 5717 Date: April 28, 2008 8.1.7 CITY OF BRAMPTON To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on East Half Lot 2; Concession 6 EHS, (South of 104 Walker Drive), in the City of Brampton, Mirriico Creek Watershed as located on the property owned by City of Brampton. The purpose is to construct, reconstruct, erect or place a building or structure (sidewalk), site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere (sidewalk), along a portion_of Walker Drive, City of Brampton, Mimico Creek Watershed. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing L4 -1 - Walker Drive, Proposed Sidewalk West Side From Clark Blvd. to South . Limits; dated April 2008; received April 24, 2008; Engineer's Stamp April 23, 2008; prepared by City of Brampton. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This proposal consists of constructing a 2.25 m concrete sidewalk along the west side of Walker Drive, in the location of the watercourse crossing. The sidewalk will connect to an -existing concrete sidewalk to the south, along.the same road. Control of Flooding: There will be no impacts to the control of flooding. 292 Pollution: Standard erosion control measures (silt fence) will be implemented for the duration of construction, and until the site is restored, in order to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There will be no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO).. No in -water works will be conducted. Plantings All disturbed areas will be stabilized. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40617 - Application #: 191 /08 /BRAM Report Prepared by: Sharon Lingertat, extension 5717 For information contact: Sharon Lingertat, extension 5717 Date: April 28, 2008 8.1.8 ENBRIDGE GAS DISTRIBUTION INC. To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on The Gore Road, in the City of Brampton, Humber River Watershed as located on the property owned by Enbridge Gas Distribution Inc.. The purpose is to install a NPS 1 PE IP gas pipeline crossing a tributary of the Humber River on the east side of The Gore Road approximately 308 metres north of Castlemore Road, City of Brampton, Regional Municipality of Peel. The pipeline will be installed using trenchless technology. The permit will be issued for the period of May 9, 2008 to May.8, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing 1 of 2; dated November 29, 2007; received December 27, 2007; redline revised March 19,2008; prepared by Enbridge Gas Distribution Inc. 293 RATIONALE The application was reviewed by staff on the basis of the following information: • Proposal: The proposal consists of the installation of a NPS 1 PE IP gas pipeline crossing the Humber River on the east side of The Gore Road, approximately 308 metres north of Castlemore Road, City of Brampton, Regional Municipality of Peel. The working pits are approximately 30 metres away from the watercourse. The works will take 2 to 3 days to complete. Control of Flooding: There will be no adverse impacts to the storage or conveyance of flood waters as a result of this project. Pollution: Appropriate controls will be implemented and maintained throughout construction to prevent sediment and other deleterious substances from entering the watercourse. Dynamic Beaches: Not applicable Erosion: . There are no slope stability: or geotechnical concerns with the proposed works. Conservation of Land: There will be no in water works as part of this project. Any in water works would require a revision to the permit and could not occur between April.1 to June 30 in order to comply with the warmwater fisheries timing window. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD).of fish habitat will be . mitigated and a Letter of Advice will be written by TRCA•staff on behalf of the Department of Fisheries and Oceans (DFO). There will .be-no impacts to significant aquatic or terre.strial features from the proposed works. Plantings . Disturbed areas will be stabilized and restored with sod. Policy Guidelines: The proposal complies with Section 4.3, Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 40409 - Application #: 051 /08 /BRAM Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: April 21, 2008 • . 294 8.1.9 ENBRIDGE GAS DISTRIBUTION INC. To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere at 143 Heart Lake Road South, in the City of Brampton, Etobicoke Creek Watershed, as located on property owned by Enbridge Gas Distribution Inc.. The purpose is to construct, reconstruct, erect or place a building or structure (gas line), site grade (ditch) and temporarily or permanently . place, dump or remove any material originating on site or elsewhere (open cut) at 143 Heart Lake Road South, in the City of Brampton, Etobicoke Creek Watershed. No in -water works will take place. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to provide revisions to the engineering drawings to the satisfaction of TRCA; dated April 29, 2008; received April 30, 2008; prepared by Enbridge. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This proposal consists of installing a gas line to a building located at 143 Heart Lake Road South. The line will be constructed by open cut from the building, across a drainage channel and will end at a tie -in pit located on the east side of Heart Lake Road South. No in- water . works will take place. Control of Flooding: There will be no impacts to the control of flooding. Pollution: Standard erosion control measures will be implemented for the duration of construction, and until the site is restored, in order to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). No in -water works will take place. 295 Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40649 - Application #: 222 /08 /BRAM Report Prepared by: Sharon Lingertat, extension 5717 For information contact: Sharon Lingertat, extension 5717 Date: May 1, 2008 CITY OF PICKERING 8.1.10 1526 BEECHLAWN DRIVE To construct, reconstruct, erect or place a building or structure on Lot 59, Plan 40M -1500, (1526 Beechlawn Drive), in the City of Pickering, Duffins Creek Watershed. The purpose is to construct a new side door entrance within a Regulated Area of the Duffins Creek Watershed. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, no date, submitted by the applicant, received April 10, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: • Proposal: The proposal consists of creating a' new side door entrance to an existing house. The subject property is located within the Regulatory Storm Floodplain of the Duffins Creek. Control of Flooding: TRCA technical staff have reviewed the application and are satisfied with the proposal. The new door will be floodproofed to the Regulatory Storm Flood elevation, • Pollution: Sediment fencing is not required as the subject property is not located adjacent to a. watercourse or natural feature. Dynamic Beaches: Not applicable Erosion:• There are no geotechnical concerns associated with this application: 296 Conservation of Land: There will be no significant vegetation removed as part of this application. Plantings No plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 E, Property Improvements and Ancillary Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 40725 - Application #: 269/08/PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: April 29, 2008 8.1.11 702 ANTHONY COURT To construct, reconstruct, erect or place a building or structure on Lot 83, Plan M -1189, (702 Anthony Court), in the City of Pickering, Petticoat Creek Watershed. The purpose is to construct a replacement second storey deck. on an existing house located within the Regulatory Floodplain of the Petticoat Creek Watershed. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No A -1, Foundation Plan, Site Plan, Deck Plan, dated April 4, 2008, prepared by. Davis Moskal Designs, received April 17, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of constructing a replacement second storey deck at 702 Anthony Court in the City of Pickering. The subject property is located within the Regulatory Storm Floodplain of the Petticoat Creek. As this is a replacement deck there will be no further encroachment into the Petticoat Creek Valley. Control of Flooding: The proposed deck is located within the Regulatory Storm Floodplain. However, TRCA technical staff have confirmed that the second storey deck will not affect the storage or conveyance of flood waters. Pollution: Sediment fencing will be in place throughout the duration of construction in order to ensure that no sediment will enter the watercourse. Dynamic Beaches: Not applicable 297 Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as part of this proposal as the area where works will take place is an existing rear yard. Additionally, no further encroachment into the valley will occur. Plantings No plantings are required as part of this application. Policy Guidelines: This proposal is consistent with Section 4.2.2 D; Replacement Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 40741 - Application #: 275/08/PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: April 29, 2008 8.1.12 519 BELLA VISTA DRIVE To construct, reconstruct, erector place abuilding or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot°30, Plan 233, (519 Bella Vista Drive), in the City of Pickering, Rouge River Watershed. The purpose is to construct . a new .home within a Regulated Area of the Rouge River Watershed. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, dated April 2008, prepared by Hunt Design Associates, received April 24, 2008; . • Siting and Grading Plan,: dated April 2008, prepared by Hunt Design Associates, received April 29, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the construction of a new house on an existing lot abutting Lake Ontario. The previous house located on this property was demolished. The new house will be located further from the to of bank than the demolished house. 298 Control of Flooding:- There are no floodplain concerns with this proposal. TRCA technical staff have reviewed the 100 year flood level for Lake Ontario and have ensured that the subject property is located outside of the floodplain. Pollution: Sediment fencing will be in place throughout the duration of the construction to ensure that no sediment will enter Lake Ontario. Dynamic Beaches: Not applicable Erosion: A geotechnical report was submitted and reviewed by TRCA technical staff as part of this application. TRCA technical staff are satisfied that the proposed house is adequately set back from the long term stable top of bank. Conservation of Land: Minimal grading will take place on site as part of the construction. All disturbed area will be restored once construction is complete. Plantings All plantings will be consistent with TRCA's Seed Mix Guidelines. Policy Guidelines: This proposal is consistent with Section 4.2.2 D, Replacement Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 38187. -. Application #: 496/06/PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: April 29, 2008 . CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.13 433 THE KINGSWAY To construct, reconstruct, erect or place a building or structure on Part Block A, Plan 2581, 2615, (433 The Kingsway), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area in order to facilitate the construction of a new two- storey single family detached dwelling. The existing dwelling is to be demolished. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by PhD. Design Incorporated, dated December 2007, received on April 2, 2008; 299 • Drawing No. A6, Front Elevation, prepared by PhD. Design Incorporated, dated February 2008, received on April 2, 2008; • Drawing No. A7, Rear Elevation, prepared by PhD. Design Incorporated, dated February 2008, received on April 2, 2008; • Drawing No. A8, Side Elevation (West), prepared by PhD. Design Incorporated, dated February 2008, received on April 2, 2008; • Drawing.No. A9, Side Elevation (East), prepared by PhD. Design Incorporated, dated February 2008, received on April 2, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to construct a new two - storey single family detached dwelling including an inground outdoor swimming . pool on the property located at 433 The Kingsway in the City of Toronto. The proposed building footprint will located further from the crest of slope than the existing dwelling. The subject site is located within the Humber River Watershed, east of Islington Avenue, south of Eglinton Avenue west and abuts St. Georges Golf and Country Club atits rear property line. Control of Flooding: This site is not located within the Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment and erosion control fence will be installed to prevent construction debris from entering the adjacent golf course. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability brief has been reviewed and approved by TRCA geotechnical . engineering staff. There are no geotechnical concerns associated with this application. Conservation of Land: .The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be 'implemented. Policy Guidelines: The proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. 300 CFN: 40675 - Application #: 238/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve.Heuchert, extension 5311 Date: April 30, 2008 8.1.14 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure on The Queensway from Mimico Creek to Lady Bank Road, in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed as located on the property owned by the City of Toronto. The purpose is to rehabilitate a portion of the The Queensway from Mimico Creek to Lady Bank Road. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing P- 2603 -031 - The Queensway Major Road Rehabilitation from Mimico Creek to Lady Bank Road; dated April 8, 2008; received April 15, 2008; prepared by City of Toronto Technical Services Division. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the major rehabilitation of The Queensway from Mimico Creek to Lady Bank Road. A portion of the Queensway from Mimico Creek to approximately Woodford Park Road is located within the Regulation Limit. The works in this location will be limited to pavement restoration and sidewalk removal and replacement. Control of Flooding: No adverse impacts to the storage or conveyance of flood waters are anticipated 'as a result of this project. Pollution: Appropriate controls will be implemented and maintained throughout construction to prevent sediment and other deleterious substances from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no slope stability or geotechnical concerns with the proposed works. Conservation of Land: There will be no impacts to significant aquatic or terrestrial features from the proposed works. 301 Plantings No tree or shrub removals will be required. All disturbed areas will be stabilized and restored with sod. Policy Guidelines: The proposal complies with Section 4.3, *Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 39788 - Application #: 707/07/TOR Report Prepared by: Alex Blasko, extension 5714 For information contact: Beth Williston, extension 5217 Date: April 21, 2008 . 8.1.15. CITY OF TORONTO. . To, construct, reconstruct, erect or place a building or structure on Oakfield Drive, in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed as located on the property owned by the City of Toronto.. The purpose is to replace a portion of sanitary sewer along Oakfield Drive. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • • Drawing U -2211 -002 - Oakfield Drive Sanitary Sewer Replacement from Royal York Road to Mimico Trunk Sewer; dated 2007; revised April 18, 2008; received April 21, 2008; prepared by R.V. Anderson Associates Limited. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The, proposal, consists of the replacement of a portion of a 200 millimetre diameter sanitary sewer with a new 250 millimetre diameter sewer along Oakfield Drive. The terminus of Oakfield Drive is located within the Regulation Limit. All work will be limited to the road allowance; set back from any significant slopes.' . Control of Flooding: No adverse impacts to the storage or conveyance of flood waters are anticipated as. a result of this project. Pollution: Appropriate controls will be implemented and maintained throughout construction to prevent sediment and other deleterious substances from entering the watercourse. • Dynamic Beaches: Not applicable. 302 Erosion: There are no significant slope stability or geotechnical concerns with the proposed works. Conservation of Land: There will be no impacts to significant aquatic or terrestrial features from the proposed works. No tree or shrub removals are required. Plantings All disturbed areas will be stabilized and restored as appropriate. Policy Guidelines: The proposal complies with Section 4.3, Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 40755 - Application #: 287/08/TOR Report Prepared by: Alex Blasko, extension 5714 For information contact: Beth Williston, extension 5217 Date: April 22, 2008 8.1.16 33 RIDGE POINT CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 116, Plan 4398, (33 Ridge Point Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a one - storey rear addition to the existing two- storey single family detached dwelling. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1, Site Plan, prepared by TH Design, dated November 2, 2007, received on April 30, 2008; • Drawing No. 5, Wall Sections, prepared by TH Design, dated November 2, 2007, received on April 30, 2008; • Drawing No. 6, Elevations, prepared by TH Design, dated November 2, 2007, received on Apri1•30, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to construct a one - storey addition to the rear of the existing two- storey dwelling at 33 Ridge Point Crescent in the City of Toronto. It is noted that the existing dwelling is located beyond the Tong -term stable top of slope. In light of this, the foundations for the proposed addition are situated lower than the footings of the existing dwelling and within the zone of long term slope stability, The proposed foundation design effectively decreases the risks associated with slope stability.The subject site is located south of Lawrence Avenue West and east of Black Creek Drive within the Humber River Watershed. 303 Control of Flooding: This site is not located within the Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment and erosion control fence will be installed to prevent construction debris from entering the watercourse. Dynamic Beaches:. Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical . engineering staff and the proposal will be constructed in accordance with the recommendations of this report. . Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: The proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40414 - Application #: 056/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 30, 2008 8.1.17 207 RIVERSIDE DRIVE To construct, reconstruct, erector place a building or structure on Part Lot 179, Plan M356,-(207 Riverside Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop.within a TRCA Regulated Area of the. Humber River Watershed in order to facilitate the construction of the proposed partial secohd storey addition and a 1- storey side addition to the existing 2.5- storey single family detached dwelling. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in ,accordance with the following documents and plans which form part of this permit: Drawing No. A.01, Site Plan prepared by Spragge + Company. Architects; dated May 2006, Revision No. 3, revised on May 2, 2007, received April 25, 2008. . 304 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to construct a partial second - storey addition and a one - storey side addition to the existing 2.5- storey dwelling at 207 Riverside Drive in the City of Toronto. The subject site is located north of The Queensway and west of South Kingsway within the Humber River Watershed. Control of Flooding: This site is not located within the Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment and erosion control fence will be installed to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: No significant vegetation will be removed as a result of construction. • Plantings No plantings are required as part of this project. Policy Guidelines: The proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40099 - Application #: 901/07/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 30, 2008 305 8.1.18 120 - THOMPSON AVENUE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 21, Plan 3622, (120 Thompson Avenue), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to 'develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a partial second storey addition and facade improvements to the existing 1.5- storey dwelling. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A1.b, Site Plan, prepared by PhD. 2008, received on April 2, 2008; • Drawing No. A4, Elevations, prepared by PhD. 2008, received on April 2, 2008; , • Drawing No.: A5, Elevations, prepared by PhD. 2008, received on April 2, 2008. Design Incorporated, dated February Design Incorporated, dated February Design Incorporated, dated February RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this.application is to construct a 2nd - storey addition to the existing 1.5- storey . . single family detached dwelling at 120 Thompson Avenue in the City of Toronto. The subject site is located south of Bloor Street West and west of Royal York Road, backing on to Mimico Creek within a Regulated Area of the Mimico Creek Watershed. The proposed works are to be constructed in the regulatory flood. plain. Control of Flooding: • . . The subject property is located within a regulatory floodplain of the Mimico'Creek Watershed. However, TRCA staff have determined the proposed works will not adversely impact the storage and /or conveyance of floodwaters, and the proposed addition will be less than 50% of the existing habitable gross floor area. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the watercourse. . Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. • Conservation of Land: The appropriate tree protection fencing will be installed. 306 Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: The proposal is consistent with Section 4.2.2., Development and Redevelopment /Intensification within Non - Established Communities /Highly Urbanized Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40674 - Application #: 239/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 30, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.19 5 ARTINGER COURT To construct, reconstruct, erect or place a building or structure on Lot 15, Plan 5454, (5 Artinger Court), in the City of Toronto (North York. Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of anew two - storey dwelling. The existing dwelling is to be demolished. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A1.1, Site Plan, prepared by David Wooldridge Inc., undated, received by TRCA March 13, 2008; • Drawing No. 41, Basement Plan, prepared by David Wooldridge Inc., dated April 2006, received by TRCA March 13, 2008; • Drawing No. A2, Ground Floor Plan, prepared by David Wooldridge Inc., dated April 2006, received by TRCA March 13, 2008; • Drawing No. A3, Second Floor Plan, prepared by David Wooldridge Inc., dated April 2006, received. by TRCA March 13, 2008; • Drawing No. A4, Elevations Roof Plan /Section, prepared by David Wooldridge Inc., dated April 2006, received by TRCA March 13, 2008; • Drawing No. A5, Elevations, prepared by David Wooldridge Inc., dated April 2006, received by TRCA March 13, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include the construction of a new two- storey dwelling at 5 Artinger Court in the City of Toronto. The site is located east of.Bayview Avenue, south of Lawrence Avenue East. The existing dwelling is to be demolished. 307 Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: Sediment control fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable Erosion: . There are no geotechnical issues associated with this proposal. Conservation of Land: No significant vegetation will be removed. Plantings • No plantings are required. Policy Guidelines: . This proposal is consistent with Section 4.2.2.D, Replacement Structures, of the TRCA's Valley and Stream Corridor Management Program: • CFN: 40606 - Application #: 180/08/TOR Report Prepared by: Michelle Stafford, extension 5250: . For information. contact: Steve Heuchert, extension 53.11 Date: April 29, 2008 . 8.1.20 441 BLYTHWOOD ROAD To change a building or structure so that it alters its use or potential use, • increases its size or increases the number of dwelling units on Lot 15, Plan 205, (441 Blythwood Road), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a deck and two- storey addition to the rear of the existing dwelling. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A1.0, Site Plan, prepared by Baldwin & Franklin Architects Inc., dated May 28, 2007, received by TRCA March 31, 2008; • Drawing No. L1.0, Landscape Plan, prepared by Baldwin & Franklin Architects Inc., dated May 28, 2007, received by TRCA March 31, 2008; • Drawing No. A2.0, Basement /.Ground Floor Plan, prepared by Baldwin & Franklin Architects Inc., dated May 28, 2007, received by TRCA March 31, 2008; • Drawing No. A2.1, First /Second Floor Plan, prepared by Baldwin & Franklin Architects Inc., dated May 28, 2007, received by TRCA March 31, 2008. 308 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a deck and two- storey addition to the rear of the existing dwelling at 441 Blythwood Road in the City of Toronto. The subject property is located east of Mount Pleasant Road, north of Eglinton Avenue East. Control of Flooding: The subject site is not located in the Regional Storm Floodplain. Pollution: Sediment control fencing is not required as the proposed works are adequately set back from the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as part of this application. Plantings No plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2.C, Minor Additions, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40667 - Application #: 235/08/TOR Report Prepared by Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 29, 2008 8.1.21 53 PLYMBRIDGE ROAD To construct, reconstruct, erect or place a building or structure on Lot 22, Plan 2478, (53 Plymbridge Road), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of an in- ground pool, patio and pergola. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: 309 • Drawing No. L -1, Site Content Plan, prepared by Kent Ford Design Group, dated November 12, 2007, received by TRCA March 14, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works consist of construction'of an in- ground swimming pool, patio, and pergola in the rear yard at 53 Plymbridge Road in the City of Toronto. The site is located in the Hoggs Hollow Special Policy Area (SPA), south of York Mills Road, east of Yonge Street. Control of Flooding: The subject property is located within the Regulatory Floodplain, however, TRCA technical staff have determined that the proposed works will not adversely impact the storage and /or conveyance of flood waters. All materials used in the construction of the patio /pool decking area will be dry laid and therefore pervious. In addition, the pergola structure is located outside of the hydraulic floodway. Pollution: Sediment control fencing will be erected before commencement of any construction or-grading works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this proposal. Conservation of Land: No significant vegetation will be removed to facilitate construction and appropriate tree protection fencing will be installed. Plantings Under a previous permit the property entered into Ravine Stewardship. The stewardship plan will be supplemented with additional plantings of native tree shrubs and seed mix: Policy Guidelines: This proposal is consistent with Section 4.2.1.B, Development Guidelines for Development/Redevelopment within Designated Two Zone Areas or Special Policy Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40754 Application #: 285/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 29, 2008 310 8.1.22 6 ST. MARGARETS DRIVE To construct, reconstruct, erect or place a building or structure on Lot 3, PART 4, Plan 2773, (6 St. Margarets Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River watershed to facilitate construction of a new two - storey dwelling and detached garage. The existing dwelling and detached garage are to be demolished. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A0, Proposed Site Plan, prepared by Taylor Hannah Architect Inc., dated November 7, 2007, received by TRCA November 8, 2007; • Drawing No. SG -1, Site Grading Plan, prepared by MGM Consulting Inc., dated December 18, 2007, revised February 8, 2008, . received by TRCA April 23, 2008; • Drawing No. 1, Preliminary Landscape Plan, prepared by Mark Hartley Landscape Architects, dated August 29, 2007, revised November 8, 2007, received by TRCA November 8, 2007. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a new two- storey dwelling and detached garage, and renovation of an existing in- ground swimming pool at 6 St. Margarets Drive in the City of Toronto. The site is located east of Yonge Street, south of York Mills Drive in the Hoggs Hollow• Special Policy Area (SPA). The existing dwelling and detached garage are to be demolished. Control of Flooding: The proposed structures will be floodproofed to the 350 Year Storm Flood event. Due to site constraints the proposed works cannot be floodproofed to the Regional Storm Flood event. However, a letter from a structural engineer has been received stating that the proposed structures can withstand depths and velocities under the Regional Storm Flood event. In addition, the proposed works include draining the footing drain and area drain from one low stairwell area through 'a perforated piping system and infiltration trench covered with geotextile sock towards the watercourse. TRCA technical staff have reviewed the proposed drainage and area satisfied that the system is necessary to protect the foundations of the dwelling, and that appropriate measures have been taken to filter and reduce outflow into the watercourse. Pollution: A sediment control fence will be erected before commencement of any construction or grading works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. Dynamic Beaches: Not applicable 311 Erosion: • A Geotechnical Investigation and Slope Stability Analysis have been reviewed and approved by TRCA geotechnical engineering staff and'the proposed works will be adequately set back from top of bank. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Native tree shrubs and seed mix will be planted. Policy Guidelines: The proposal is consistent with Section 4.2.1.8, Development/Redevelopment within Designated Two Zone Areas or Special Policy Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 39889 - Application #: 776/07/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 29, 2008 8.1.23 SHEPPARD VALLEY HOLDINGS LTD. To construct, reconstruct, erector place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot.16, Concession 3 EYS Lot 46, Plan M -1291, (25 Buchan Court), in, the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by Sheppard Valley Holdings Ltd.. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a trail system associated with an adjacent condominium and townhouse development located outside of the Regulated Area.: The permit will be issued for the period of May 9, 2008 to May 8, 2010'in accordance with the • following documents and plans which form part of this. permit: • :Drawing No. L -la, Landscape Master.Plan, prepared by The MBTW Group, dated.June • 2, 2005, received by TRCA November 21, 2007; • Drawing No. D -1, Planting Details, prepared by the MBTW Group, dated June 27, 2005, revised April 23, 2008, received by TRCA April 25, 2008; • Drawing No. TPP -4, Ravine Zone Tree Removal and. Protection Plan, prepared by The MBTW Group, dated September 15, 2004, revised April 23, 2008; received by TRCA April 25, 2008; • Drawing. No. TPP -3, Private Property Tree Removal and Protection Plan, prepared by The MBTW Group, dated September 15, 2004, revised April 23, 2008, received by TRCA April 25, 2008; f • • Drawing No. RS -1; Ravine Stewardship and 10 Meter Set Back Plans, prepared by The MBTW Group, dated February 22, 2008, revised April 23, 2008, received by TRCA April 25, 2008; . 312 • Drawing No. SEC, Siltation Erosion Control Plan, prepared by Underhill Associates Ltd., dated July 2006, revised November 20, 2007, received by TRCA November 21, 2007; • Drawing No. A1-01, Tower 1 Site Plan and Statistics, prepared by Rafaeal + Bigauskas Architects, dated July 2007, revised September 28, 2007, received by TRCA November 21, 2007; • Drawing No. SH1, Excavation Shoring Plan, Details and Notes, prepared by Cityzen and Menkes, dated May 24, 2007, received by TRCA November 21, 2007; • Drawing No. SH2, Excavation Shoring Sections, prepared by Cityzen and Merikes, dated August 22, 2007, revised October 15, 2007, received by TRCA November 21, 2007. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction shoring affiliated with an adjacent residential development consisting of an 18 storey condominium tower, a 16 storey condominium tower, underground parking connecting the two towers, and 45 townhouse units, as well as a park and trail system located in a Regulated Area of the Don River Watershed that is to be conveyed into public ownership upon completion of the work. The residential site is located at 25 Buchan Court, in the City of Toronto, north of Sheppard Avenue East, east of Leslie Street. Control of Flooding: A portion of the site is located in the Regional Storm Floodplain. Only passive recreational walking trails are proposed for this portion of the site. Pollution: Sediment control fencing will be erected prior to commencement of any construction or grading works in-the Regulated Area, and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues associated with the trail system. Details of the shoring works necessary to facilitate the adjacent residential construction have been reviewed and approved by TRCA geotechnical engineering staff and the proposed works will be adequately set back from top of bank. Conservation of Land: Vegetation in the valley lands and ten -metre buffer will be adequately protected throughout construction of the proposed works. No significant features within the Regulated Area will be removed to facilitate construction, and the valley lands and buffer will be conveyed into public ownership upon completion of the works. 313 Plantings • Native tree shrubs and seed mix will be planted and an extensive ravine stewardship plan will be implemented for the site. Policy Guidelines: The proposal is consistent with Section 4.1.2, New Resource -based Uses, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40075 - Application #: 890/07/TOR . Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 30, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.24 23 FENWOOD HEIGHTS To change a building or structure so. that it alters its use or potential use, increases its size or increases the number of. dwelling .units on Lot 51, Plan 3757, (23.Fenwood Heights), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to develop within a Regulated Area of the Lake Ontario Waterfront to facilitate construction of a one - storey addition to the rear, and a two- storey addition to the side of the existing dwelling. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A1.1, Site Plan, prepared by Richard Wengle Architect Inc., dated April.. 22,2008, received by TRCA April 25, 2008; 0 Drawing No. Al, Front Elevation, prepared by Richard Wengle Architect Inc., dated April 22, 2008, received by TRCA April 25, 2008; Drawing No. A2, Side Elevation, prepared by Richard Wengle Architect Inc., dated April 22, 2008, received by TRCA April 25, 2008; • Drawing No. A3, Rear Elevation, prepared by Richard Wengle Architect Inc., dated April 22, 2008, received by TRCA April 25, 2008; • Drawing No. A4, Side Elevation, prepared by Richard Wengle Architect Inc., dated April 22, 2008, received by TRCA April 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: • Proposal: The proposed works include construction of a one - storey addition to the rear, and a two - storey addition to the side of the existing dwelling at 23 Fenwood Heights in the City of Toronto. The site is located east of McCowan Road, south of Kingston Road, and adjacent to Cudia Park. Control of Flooding: The site is not located in the Regional Storm Floodplain. 314 Pollution: Sediment control fencing will be erected before commencement of any construction or grading works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. Dynamic Beaches: Not applicable Erosion: A geotechnical study and slope stability analysis has been reviewed and approved by TRCA geotechnical engineering staff and the proposed works will be adequately set back from top of bank. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Native tree shrubs and seed mix will be planted along the slope. Policy Guidelines: This proposal is consistent with section 4.2.2.B, Minor Additions, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40780 - Application #: 303/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 29, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.25 1268738 ONTARIO LTD. To construct, reconstruct, erect or place a building or structure on Lot 63, 64, 65, Plan 416, (508 Eastern Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by 1268738 Ontario Ltd.. The purpose is to construct new residential dwellings within a Regulated Area of the Don River Watershed. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the . following documents and plans which form part of this permit: • Drawings No. 1, Site Plan, dated December 2004,. prepared by G. Bettencourt Designs, received April 3, 2008; • Drawing No. 6, Front Elevations, dated December 2004, prepared by G. Bettencourt Designs, received April 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 315 Proposal: The proposal consists of maintaining the existing residential dwellings on site and redeveloping the remaining vacant land into 3 storey residential units. The subject property is located within the Regional Storm Floodplain of the Don River and the Lower Don Special Policy Area. Control of Flooding: TRCA technical staff have reviewed the proposal and determined that the works will not affect the storage or conveyance of flood waters. Further, all openings have been flood proofed to the Regulatory Storm Flood elevation. Pollution: Sediment fencing is not required as the subject property is not located adjacent to a watercourse or natural feature. Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues associated with this application. Conservation of Land: The site to be developed is currently paved therefore no significant features will be impacted by . the proposed works. Plantings No plantings are required as part of this application. Policy Guidelines: This proposal is consistent with Section 4.2.1 B, Development Guidelines for Development/Redevelopment within Designated Two Zone Areas or Special Policy Areas, of TRCA's Valley and Stream Corridor Management Program. CFN: 40663 - Application #: 234/08/TOR. Report Prepared by: Shannon McNeiII, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: April 29, 2008 8.1.26 569 KING STREET EAST INC. To construct, reconstruct, erect or place a building or structure on. Part Lot 26, 27, Plan 108, (569 King Street East), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by 569 King Street East Inc.. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the conversion of an existing two- storey commercial building into a six- storey condominium building with one level of underground parking, retail at- grade, and 46•residential units on floors two to six. • 316 The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A101, Site Plan / Roof Plan / Context Plan and Site Statistics, prepared by Quadrangle Architects Limited, dated March 29, 2007, Revision No. 3, revised on November 27, 2007, received on April 7, 2008; • Drawing No. A201, Ground Floor Plan, prepared by Quadrangle Architects Limited, dated March 29, 2007, Revision No. 3, revised on November 27, 2007, received on April 7, 2008; • Drawing No. A401, North and South Elevations, prepared by Quadrangle Architects Limited, dated March 29, 2007, Revision No. 2, revised on November 2, 2007, received on April 7, 2008; • Drawing No: A402, West Elevation, prepared by Quadrangle Architects Limited, dated March 29, 2007, Revision No. 2, revised on November 2, 2007, received on April 7, 2008; • Drawing No. A403, East Elevation, prepared by Quadrangle Architects Limited, dated March 29, 2007, Revision No. 2, revised on November 2, 2007, received on April 7, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to convert the existing two - storey commercial building into a six - storey condominium building with one level of underground parking, retail at- grade, and 46 residential units on floors two to six. The subject site is located within the Lower Don SPA. • • However, the works are situated outside of the floodplain and are adequately setback from the Don River. The proposed works are contained within the developed street system and are consistent with the surrounding streetscape. Control of Flooding: TRCA Mapping shows that this site is partially located within the Regional Storm Floodplain of the Don River and subject to a Regional Storm Floodplain Elevation of 77.37 metres. The site is also located within the Lower Don SPA which recognizes the existing commercial and residential development within the floodplain and allows new development/redevelopment in the area, subject to new structures meeting the minimum 350 -year flood - proofing requirements. In light of this, the topographical survey for the subject site prepared by R. Avis Surveying Inc. on January 26, 2006 indicates that the site is elevated above the Regional Storm Floodplain by over a metre. Therefore the property is not subject to flooding. Pollution: The site is within the developed Lower Don community and far removed from any natural areas including the Don River. Existing servicing is in place to address surface water run -off during and after construction. Dynamic Beaches: Not applicable. 317 Erosion: There are no slope stability /geotechnical concerns associated with this application. Conservation of Land: The entire property is located within a highly urbanized area surrounded by both commercial and residential developments. There are no significant natural.features on the site and there are no slope stability /geotechnical issues associated with the project. Future floodproofing measures (i.e. construction of a berm) are proposed for this portion of the Lower Don SPA which would remove this area from the floodplain. Plantings Not applicable. Policy Guidelines: The proposal is consistent with Section 4.2.1(B)3.iii: - Development Guidelines for Development/Redevelopment within Designated Two. Zone /Special Policy Areas - of the Authority's Valley and Stream Corridor Management Program. CFN: 40680 - Application #: 245/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 30, 2008 8.1.27 HAROLD GROSS REALTY INC. AND MICHAEL GROSS REALTY INC. To construct, reconstruct, erect or place a building or structure on 1 Market Street, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by Harold Gross Realty Inc. and. Michael Gross Realty Inc.. The purpose is to construct a temporary sales trailer within a Regulated Area of the Don River Watershed. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • ' Drawing No. A001 Site Plan,. dated March 7, 2008, prepared by Edward Weinberg Architect, received April 10, 2008; • Drawing No. A -202, North & South Elevations Sections, dated April 8, 2008, prepared by Edward Weinberg Architect, received April 14, 2008; • • Drawing No A -201, East & West Elevations, dated April 8, 2008, prepared by Edward Weinberg Architect, received April 14, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: 318 Proposal: The proposal consists of placing a temporary sales trailer on the subject property which is currently a parking lot. The sales trailer is for a condominium building that is being proposed on this site. TRCA staff are currently reviewing the site plan for the condominium as well. This property is located within the Regional Storm Floodplain of the Don River Watershed as well as the Lower Don Special Policy area. Control of Flooding: TRCA technical staff have reviewed this application and determined that the proposed structure will not affect the storage or conveyance of flood waters. Further, the doors and windows have been flood proofed to the Regulatory Floodplain elevation.. Pollution: Sediment fencing will not be required for the works as the site is not located adjacent to any watercourse or natural feature. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: There will be no significant vegetation removed as part of this proposal. Plantings No plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.1 B, Development Guidelines for Development/Redevelopment within Designated Two Zone Areas or Special Policy Areas, of TRCA's Valley and Stream Corridor Management Program. CFN: 40724 - Application #: 268/08/TOR Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: April 29, 2008 8.1.28 87 HARPER AVENUE To construct, reconstruct, erect or place a building or structure on Part Lot 13, 14,. Block H, Plan REG PLAN 920 YORK, (87 Harper Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a new two-storey dwelling. The existing dwelling and is to be demolished. The permitwill be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: 319 • Drawing No. 2.0, Site Plan, prepared by Wayne Swadron Architect, dated August 2007, Revision No. 9, revised April 14, 2008, received April 15, 2008; • Drawing No. A -3.1, North Elevation, prepared by Wayne Swadron Architect, dated August 2007, Revision No. 8, revised April 14, 2008, received April15, 2008; • Drawing No. A -3.2, West Elevation, prepared by Wayne Swadron Architect, dated August 2007, Revision No. 8, revised April 14, 2008, received April 15, 2008; • Drawing No. A -3.3, South Elevation, prepared by Wayne Swadron Architect, dated August 2007, Revision No. 8, revised April 14, 2008, received April 15, 2008; • Drawing No. A -3.4, East Elevation, prepared by Wayne Swadron Architect, dated January 25, 2008, Revision No. 2, revised April 14, 2008, received April 15, 2008; • Drawing No. L -1.2, Landscape Plan Drainage and Grading, prepared by Wayne Swadron Architect, dated January 25, 2008, Revision No. 2, revised April 14, 2008, received April 15, 2008; • Drawing No. L -1:3, Landscape Sections, prepared by Wayne Swadron Architect, dated August 2007, Revision No. 9, revised April 14, 2008, received April 15 ;2008; • Drawing, Infiltration Trench, prepared by Richardson Foster Ltd, received April 15, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a new two - storey dwelling and landscaping at 87 Harper Avenue in the City of Toronto. The site is located at the east terminus of St. Clair .Avenue East and backs onto the Don River Valley. The existing dwelling will be demolished.. Control of Flooding: The subject property is not located within a Regional Storm Floodplain. Pollution: A sediment control fence will be erected before commencement of any construction or grading works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. • Dynamic Beaches: Not applicable. • Erosion: The proposed dwelling is located in a similar footprint as the former dwelling and is sufficiently set back from the top of bank. There are no geotechnical concerns with the proposal. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Additional native trees will be planted on the site. 320 Policy Guidelines: The proposal is consistent with Section 4.2.2.D., Replacement Structures, of the TRCA's Valley and Stream Corridor Management Program. CFN: 39794 - Application #: 713/07/TOR Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: April 22, 2008 CITY OF VAUGHAN 8.1.29 56 STARWOOD ROAD To construct, reconstruct, erect or place a building or structure on Part Lot 15, Concession 2 Lot 1, Plan 65M -3685, 56 Starwood Road, in the City of Vaughan, Don River Watershed. The purpose is to construct a raised deck with stairs within a Regulated Area of the Don River Watershed at 56 Starwood Road in the City of Vaughan. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan prepared by the applicant, received by the TRCA April 11, 2008; and • Rear Elevation Drawing prepared by the applicant, received by the TRCA April 11,. 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a raised deck with stairs within a Regulated Area of the Don River Watershed. The proposal is located within the sodded rear yard of 56 Starwood Road and is within a valley / stream corridor. Based upon a site visit conducted by TRCA staff on January 23, 2008, the rear yard of the subject property does not contain a significant grade change and contains no significant vegetation or natural features. • Control of Flooding: The proposed works are located outside of the Regional Flood Plain. There will be no impact on the storage or conveyance of flood waters. Pollution: The transport of sediments will not occur as the rear yard is currently sodded, the area of disturbance is relatively minor, and grade change in the rear yard is very gentle. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. 321 Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. • Policy Guidelines: The proposal is consistent with Section 4.2.2 E)'- Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN:.40702 - Application #: 262 /08 /VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: April 17, 2008 8.1.30 MAYVON INVESTMENTS LIMITED AND ZUREIT HOLDINGS LIMITED To construct, reconstruct, erector place a building or structure, site grade and interfere with a wetland on Lot 11, Plan 19T- 00V02, 71 William Bowes Boulevard, in the City of Vaughan, Don River Watershed as located on the property owned by Mayvon Investments Limited and Zureit Holdings Limited. The purpose is to construct a new single detached dwelling within a • Regulated Area of the Don River Watershed at 71 William Bowes Boulevard in the City of Vaughan. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the . following documents and, plans which form part of this permit: • Site and Grading Plan, prepared by Hunt Design Associates Inc., dated April 10, 2008, received by the TRCA April 17, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: , Proposal: The purpose is to constructa new single detached dwelling within a Regulated Area of the Don River Watershed. The subject property is within a Wetland Area of Interference. TRCA staff note that as part of the Draft Plan of Subdivision process (19T -00V02 - Mayvon Subdivison), a 10 metre buffer was created around the TRCA staked valley / stream corridor boundary and was conveyed to the TRCA to prohibit development and protect the adjacent natural features. The proposed works are located 4.69 metres from this buffer. Control of Flooding: The proposed works are not within the Regional Storm Flood Plain. There will be no impact on • the storage or conveyance of flood waters. 322 Pollution: Sediment control fencing has already been installed as part of the subdivision grading works and will be maintained during construction to prevent sediment from entering the buffer area and adjacent valley / stream corridor. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. The nearby wetland is sufficiently buffered from the development and will not be impacted. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be sodded and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 G) lnfilling - of the Authority's Valley and Stream Corridor Management Program. CFN: 40753 - Application #: 270 /08 /VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: April 28, 2008 8.1.31 91 NAPIER,STREET To construct, reconstruct, erect or place a building or structure and site grade on Part Lot 24, 50, 51, Plan 275, 91 Napier Street, in the City of Vaughan, Humber River Watershed. The purpose is to construct a replacement dwelling and deck within a Regulated Area of the Humber River Watershed at 91 Napier Street in the City of Vaughan. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by Lloyd & Purcell Ltd., revise dated April 8, 2008, received by the TRCA April 14, 2008; • Silt Fencing Detail, dated April 15, 2008, received by the TRCA April 15, 2008; and • Letter of Undertaking, prepared by the homeowner, dated April 28, 2008, received by the TRCA April 29, 2008 indicating that a Landscaping Plan will be submitted to the satisfaction of the TRCA. 323 RATIONALE The application . was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a replacement home and wooden deck within a Regulated Area of the Humber River Watershed. The proposed home is located over 10 metres from an existing top -of -bank and does not encroach further towards the bank than the existing home and existing enclosed 'deck, both of which are to be demolished. The proposed replacement home does not exceed the 50% permitted additional floor space of the existing'home and is located on the footprint of the existing home. The proposed wooden deck is setback further from the existing top -of -bank than the.existing enclosed deck. A Geotechnical Slope Assessment prepared by Jagger Hims Limited, dated April 11, 2008, provides recommendations on erosion mitigate measures to help reinforce the stability of the existing slope. The applicant is to implement the measures recommended by Jagger Hims Limited as part of this permit application. . Control of Flooding: The proposed works are outside of the Regional Flood Plain. There will be no impact on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be installed and maintained during construction to prevent sediment from entering the adjacent valley system. Dynamic Beaches: Not applicable. Erosion: • As recommended by the Geotechnical Slope Assessment prepared by Jagger Hims Limited, . erosion mitigation measures will be implemented in order to reinforce the stability of the slope. The proposed works are set further back from the slope hazard than the existing dwelling and existing enclosed deck. Conservation of Land:. As the watercourse will not be impacted by the proposal, no fisheries concerns will result. All plantings are to be native, non - invasive species to prevent any ecological degradation to the adjacent valley land system. Plantings Plantings of native, non - invasive species will be provided to the satisfaction of TRCA staff. All other disturbed areas will be restored to their existing sodded condition. Policy Guidelines: The proposal is consistent with Section 4.2.2 D) - Replacement Structures -• of the Authority's Valley and Stream Corridor Management Program. 324 CFN: 40568 - Application #: 166 /08 /VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: April 29, 2008 TOWN OF AJAX 8.1.32 COUGS INVESTMENTS LIMITED To site grade and alter a watercourse on Lot 1, 3, Concession 4 Lot 1, 3, Plan 40M -1578, (2700 Audley Road North), in the Town of Ajax, Carruthers Creek Watershed as located on the property owned by Cougs Investments Limited. The purpose is to undertake site grading and alteration of a watercourse in order to construct a watermain and sanitary sewer line. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. P -101, Taunton Road From STA 0 +450.000 To STA 0 +625.000, prepared by Sernas Associates, dated August 2007, Engineer's Stamp Dated February 19, 2008, received by TRCA on February 20, 2008; • Drawing No. P -102, Sanitary & Watermain Easement From STA 0 +000.000 To STA 0 +225.000, prepared by Sernas Associates, dated August 2007, Engineer's Stamp Dated February 19, 2008, received by TRCA on February 20, 2008; • Drawing No. P -103, Sanitary & Watermain Easement From STA 0 +225.000 To STA 0 +475.000, prepared by Sernas Associates, dated August 2007, Engineer's Stamp Dated February 19, 2008, received by TRCA on February 20, 2008; • Drawing No. P -105, Sanitary & Watermain Easement.From STA 0 +750.000 To STA 1+000.000, prepared by Sernas Associates, dated August 2007, Engineer's Stamp Dated February 19, 2008, received by TRCA on February 20, 2008; • Drawing No. P -106, Sanitary,& Watermain Easement From STA 1+000.000 To STA 1 +250.000, prepared by Sernas Associates, dated August 2007, Engineer's Stamp Dated February 19, 2008, received by TRCA on February 20, 2008; • Drawing No. OPSD 219.200, Ontario Provincial Standard Drawing: Sandbag Flow Check Dam, dated November 2006, received by TRCA on February 20, 2008; • . Drawing No. OPSD 221.020, Ontario Provincial Standard Drawing: Temporary Water Passage System Pumping and Piping, dated November 2000, received by TRCA on • February 20, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: . 325 Proposal: The applicant seeks permission to undertake site grading and the alteration of a watercourse in order to construct a watermain and sanitary sewer line. The lines are proposed in order to service a 27 lot estate residential subdivision located on the east side of the Carruthers Creek adjacent to the Deer Creek Golf Course in northeast Ajax. The majority of construction is to take place outside of the Carruthers Creek valleylands on table lands located to the east However, at Taunton Road construction will take place within the Regional Storm Flood Plain. Northerly, an open cut crossing of a small intermittent tributary to the Carruthers is proposed. Control of Flooding: As the topography of the land is to be returned to the pre- disturbance condition, there will be no impact to the storage or conveyance of flood waters. Pollution: Sediment and erosion controls are to be established prior to construction, as shown on the. - drawings. At the location of the open cut crossing of the intermittent tributary, works are to take place during dry conditions. Should an unexpected rainfall occur, pumping and piping contingencies have been proposed. Dynamic Beaches: Not applicable Erosion: There are no geotechnical or slope stability concerns with this proposal. Conservation of Land: Staff have requested that a nearby hedgerow is to be protected during construction. All disturbed areas are to be restored and stabilized post construction with a native seed mix. A Letter of Advice will be issued by staff pursuant to TRCA's Level III Agreement with Fisheries and Oceans Canada with respect to the management of fish habitat during construction • activities. Plantings .As the works traverse manicured golf course fairways and an agricultural field, no plantings have been required. Policy Guidelines: This proposal is consistent with Section 4.3, Infrastructure and Servicing, of TRCA's Valley and Stream Corridor Management Program. CFN: 40109 - Application #: 907 /07 /AJAX Report Prepared by: Chris Jones, extension 5718 For information contact: Chris Jones, extension 5718 .Date: April 30, 2008 326 8.1.33 TOWN OF AJAX To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 5, Concession 2, (Kerrison Drive), in the Town of Ajax, Carruthers Creek Watershed. The purpose is to construct the extension of Kerrison Drive from the bridge over Carruthers Creek, west to Salem Road. The fisheries timing window for in and near water works is July 1 to March 31. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to provide revisions to the engineering and landscape drawings and Landowner Authorization; dated April 29, 2008; received April 29, 2008; prepared by the Town of Ajax. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal includes the extension of Kerrison Drive from the west abutment of the bridge over Carruthers Creek (currently under construction as per TRCA Permit C- 08090) west toward Salem Road. These works were included in the Kerrison Drive from east of Harwood Avenue to Audley Road and Design of Structure over Carruthers Creek Class Environmental Assessment, December 2005. Control of Flooding: The storage or conveyance of floodwaters will not be impacted with the proposed works. Pollution: Standard sediment and erosion control measures will be implemented and maintained for the duration of construction and until.the site is stabilized and restored in order to prevent construction generated sediment from entering any watercourse. Sediment and erosion control has been provided per the Greater Golden Horseshoe Area Conservation Authorities, Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: There will be no slope stability concerns with the proposed works. Conservation of Land: With erosion and sedimentation plans in effect the potential for a harmful alteration, disruption or destruction (HADD). of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The fisheries timing window for in and near water works is July 1 to March 31. 327 Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40395 - Application #: 045 /08 /AJAX Report Prepared by: Laura Richards,. extension 5723 For information contact: Laura Richards, extension 5723 Date: April 29, 2008 8.1.34 TOWN OF AJAX To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 9, Concession 3, in the Town of Ajax, Duffins Creek Watershed as located on the property owned by Town of.Ajax. The purpose is to construct a pedestrian trail and three' pedestrian bridges in the Miller's Creek valley corridor from just north of Williamson Drive to Taunton Road. The fisheries.timing window for in and near water works is July 1 to.September 15. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: Letter of Undertaking to provide revisions to the engineering and landscape drawings; dated April 29, 2008; received April 29, 2008; prepared by the Town of Ajax. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to construct Phase II of a pedestrian trail alongside Miller's Creek in the Town of Ajax. Phase I is between Rossland Road in the south and Williamson Drive in the north. Phase II is between Williamson Drive in the south and Taunton Road in the north, where a link will be, made to the Taunton Trail system. This phase of the project includes a 3.0 metre wide trail and three 12.0 metre pedestrian bridges over Miller's Creek. Control of Flooding: The proposal is partially located within the Regional Storm Floodplain. A hydraulic analysis was prepared and confirms that the proposal, including the pedestrian bridges, will not have an impact on up or downstream flooding. 328 Pollution: Standard sediment and erosion control measures will be implemented and maintained for the duration of construction and until the site is. stabilized and restored in order to prevent construction generated sediment from entering any watercourse. Sediment and erosion control has been provided per the Greater Golden Horseshoe Area Conservation Authorities, Erosion and Sediment Control Guideline for Urban Construction. ,Dynamic Beaches: Not applicable Erosion: There will be no slope stability concerns with the proposed works. Conservation of Land: Miller's Creek was reconstructed using natural channel design during the development of the 'Nottingham Community approximately three years ago. With erosion and sedimentation plans in effect the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The fisheries timing window for in and near water works is July 1 to September 15. Plantings Native trees, shrubs and seed mix will be planted in the valley corridor following construction. Policy Guidelines: The proposal is consistent with Section 4.3., Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40407 - Application #: 049 /08 /AJAX Report Prepared by: Laura Richards, extension 5723 For information contact: Laura Richards, extension 5723 Date: April 29, 2008 TOWN OF MARKHAM 8.1.35 19 CASTLEGLEN BOULEVARD To temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 16, Concession 6 Lot 74, Plan 65M -3832, 19 Castleglen Boulevard, in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an in ground swimming pool. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: 329 • Site Plan, prepared by C. Sodhi, dated April 29, 2008, stamped received by TRCA Planning and Development on April 29, 2008, redline revised by TRCA staff on May 9, • 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of the application is to undertake works within.a TRCA Regulated Area of the . Rouge River Watershed in order to facilitate the construction of an in ground swimming pool. The subject property contains an existing dwelling, located within an approved residential subdivision. The subject property is located. adjacent to a valley corridor feature of the Rouge River Watershed. TRCA staff has conducted.a site inspection and confirm that the proposed works appear to be sufficiently setback from the valley corridor feature. The area to which this • application applies is currently a manicured lawn and is void of any significant vegetation. The. proposed works are located outside of the Regional Storm Floodplain. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, there are no anticipated impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic .Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of the proposed construction. Plantings As no significant vegetation will be removed, no plantings are required. ' Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40786 Application #: 313/08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 30, 2008 330 8.1.36 7550 19TH AVENUE To construct, reconstruct, erect or place a building or structure on Lot 31, Concession 10, 7550 19th Avenue, in the Town of Markham, Duffins Creek Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Duffins Creek Watershed in order to facilitate the construction of a new storage building. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the . following documents and plans which form part of this permit: • Site Plan, prepared by D. Passafiume, dated April 29, 2008, stamped received by TRCA Planning and Development on April 29, 2008; • Floor Plan, prepared by R. Walker, dated April 2, 2008, stamped received by TRCA Planning and Development on April 29, 2008; • Foundation Detail, prepared by R. Walker, dated April 2, 2008, stamped received by TRCA Planning and Development on April 29, 2008; Notes, prepared by R. Walker, dated April 2, 2008, stamped received by TRCA Planning and Development on April 29, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose, of this application is to undertake works within a TRCA Regulated Area of the Duffins Creek Watershed in order to facilitate the construction of a new storage building: The 'property contains several buildings including a dwelling and an existing barn. The subject property contains a wetland to the north of the proposed storage building, however TRCA Staff have confirmed that the proposed works appear to be sufficiently.setback from the wetland feature. The area to which this application applies is currently an agricultural field and is void of any significant vegetation. The proposed works are located outside of.the Regional Storm Floodplain. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, there are no anticipated impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of the proposed construction. 331 Plantings As no significant vegetation will be removed, rio plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40788 - . Application #: 314/08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324. Date: April 30, 2008 8.1.37 58 TROTHEN CIRCLE . To temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 4, Plan M1909, (58 Trothen . Circle), in the Town of.Markham,- Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an in ground swimming pool. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by Buoyline Pools, dated April 22,.2008, stamped received by, TRCA Planning and Development on April 22, 2008, redline revised by TRCA Planning and Development on May 9, 2008. . RATIONALE The . application was reviewed by staff on the basis of the following information: Proposal: . The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in.order to facilitate the construction of a swimming pool in the Regional Storm Floodplain. Although the works are located within the floodplain, TRCA Water Resources staff • have reviewed the proposal and do.not anticipate any impacts to the storage and /or conveyance of floodwaters. Additionally, all existing grades will be maintained. The area to which this application applies is void of any significant vegetation and is currently manicured lawn. • Control of Flooding: • TRCA Water Resources staff have reviewed this proposal and do not anticipate any impacts to the storage and /or conveyance of flood waters. The proposed inground swimming pool is located outside of the hydraulic floodway. All excavated fill will be removed from the floodplain. Pollution - Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject property during all phases of construction. 332 Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Since no significant vegetation will be removed, additional plantings are not required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40776 - Application #: 298 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 30, 2008 8.1.38 LINDVEST PROPERTIES (CORNELL) LIMITED To construct, reconstruct, erect or place a building-or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 9, 10, Concession 9, southeast of 9th Line and Highway 7, in the Town of Markham, Rouge River Watershed as located on the property owned by Lindvest Properties (Cornell) Limited. The purpose is to construct - erect or place a building, conduct site grading and to temporarily or permanently place, dump or remove any material within a Regulated Area of the Rouge River, in order to facilitate the construction of a mixed use development (high density residential buildings and commercial buildings) southeast of 9th Line and Highway 7,-in the Town of Markham. • The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Grading Concept, Drawing No. GR -1, prepared by Ecotech Consulting Engineers, dated 2008, received April 21; 2008; • Site Plan - Commercial Development: Phase 1, Drawing No. A -100, prepared by Petroff Partnership Architects, Revision No. 13 (revised January 18, 2008), received. April 21, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 333 Proposal: The proposal is to construct - erect or place a building, conduct site grading and to temporarily or permanently place, dump or remove any material within a Regulated Area of the Rouge River, in order to facilitate the construction of a mixed use development, including two condominium buildings and a commercial development, on the south side of Highway 7, east of 9th Line, in the Grand Cornell Community, in the Town of Markham. The proposed works'involve site grading in order to facilitate the servicing and development of the subject site, which will consist of two residential condominium buildings fronting on Highway 7.as well as multiple commercial buildings including a grocery store and several banks. The Cornell Community is located in northeast Markham, bounded by Highway 407 to•the south, the Donald Cousens Parkway to the east and north and 9th Line to the west. The subject site is approximately 9.7 ha (24 ac) in size and is located immediately north of a tableland woodlot which contains a wetland and tributary of the Rouge River. The property is partially located within the TRCA's Regulated Area; specifically the southern portion of the property adjacent to the woodlot. During the original Cornell Secondary Plan process, the limits of this tableland woodlot were identified and delineated. A 10 metre buffer was established around the woodlot and has been rezoned into an appropriate open space category. The woodlot will be conveyed into public .ownership; to the Town of Markham. The proposed development respects the 10.metre buffer around the woodlot and is located outside of the Regional Storm Flood Plain of the watercourse. Control of Flooding: The subject site is located outside of the Regional Storm Flood Plain of the Rouge River. As such, the storage or conveyance of flood waters will not be impacted. Pollution: Erosion and sediment control measures will be erected prior the initiation of works to ensure that sediment does not migrate into the woodlot and wetland /watercourse area. These measures will be maintained for the duration of construction. Dynamic Beaches: Not applicable. Erosion. Erosion on site will be minimized through the implementation of the aforementioned sediment control measures. There are no geotechnical /slope stability issues associated with the proposed works. • Conservation of Land: There are no in -water works proposed as part of the subject application. In addition, no significant vegetation will be removed for the grading works and the development of the proposed buildings. 334 A 10 metre setback has been provided from the edge of the tableland woodlot feature. The woodlot feature along with the buffer area has been rezoned into an appropriate open space category and will be dedicated into public ownership (Town of Markham). Plantings No vegetation will be removed as part of this application. However, decorative landscape elements will be incorporated into the site plan which will meet TRCA Planting Guidelines. Policy Guidelines: This proposal complies with Section 4.1.1 - New Urban Development, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40775 - Application #: 297 /08 /MARK Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date: April 29, 2008 8.1.39 28 MELCHIOR CRESCENT To temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 4, Plari 65M -2459, 28 Melchior Crescent, in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed to facilitate the construction of an in ground pool and related landscaping. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Concept Plan, prepared by Keenan Designs, dated November 2007, stamped received by TRCA Planning and Development April 29, 2008, redline revised by TRCA Staff, May 9, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed to facilitate the construction of an in ground pool and related landscaping. The subject property is located adjacent to a valley corridor feature of the Rouge River Watershed. TRCA staff has conducted a site inspection and confirm that the proposed works appear to be sufficiently setback from the valley corridor feature. The area to which this application applies is currently a manicured lawn and is void of any significant vegetation. The proposed works are located outside of the Regional Storm Floodplain. An enhancement planting plan has been incorporated into the design of this proposal to improve the ecological condition of this area. 335 Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters is anticipated. • Pollution: Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this. application. Conservation of Land: No significant vegetation will be removed as result of construction. Although no vegetation will be removed, the applicant has proposed extensive plantings along the rear of the property, abutting the valley corridor. There are no fisheries related concerns associated with this application. Plantings All .plant species are native and non - invasive, consistent with TRCA's guidelines. Policy Guidelines: • - This proposal is consistent with Section 4.2.2 (E) Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP)._. . CFN: 40784 - Application #:.304/08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 30, 2008 8.1.40 4228 19TH AVENUE . To construct, reconstruct, erect or place a building or structure on Part Lot 31, Plan 5, 4228 19th Avenue, in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the replacement of a barn. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form.part of this permit: • Site Plan, prepared by Norm Kevilovski, dated April 18, 2008, stamped received by TRCA Planning and Development on April 18, 2008, redline revised by TRCA Staff on May 9, 2008. r RATIONALE The application was reviewed by staff on the basis of the following information: 336 Proposal: The purpose of this is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the replacement of a barn. The subject property is located adjacent to a valley corridor feature of the Rouge River Watershed. TRCA staff has conducted a site inspection and confirm that the proposed works appears to be sufficiently setback from the valley corridor feature. The proposed barn will be placed at the same location as the existing barn, as such the area to which this application applies is void of any significant vegetation. The proposed works are located outside of the Regional Storm Floodplain. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters is anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are, no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as result of construction. Plantings As no vegetation will be removed, no plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40766 - Application #: 291 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard,• extension 5324 Date: April 30, 2008 TOWN OF WHITCHURCH- STOUFFVILLE 8.1.41 1339685 ONTARIO INC. To construct, reconstruct, erect or place a building or structure and site grade on Part Lot 11, Plan 65M -2840, 28 Abbotsford Road, in the Town of Whitchurch- Stouffville, Rouge River Watershed as located on the property owned by 1339685 Ontario Inc. The purpose is to construct a new house on an existing lot within a Regulated Area of the Rouge River Watershed. 337 The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. OF, Site Plan, dated April 2008, redline revised by TRCA April 28, 2008, prepared by Castlemount Homes, received April3, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the construction of a new house on an existing lot on Preston Lake: 0 The subject property is located within the Area of Interference of Preston Lake which is 0 . designated a Provincially Significant Wetland (PSW). The new house will be located more than 30 meters from the PSW. A Natural Heritage Evaluation (NHE) was completed as part of this application. The NHE determined that the proposed house would not have adverse affects to the adjacent wetland as there is a paved road separating the lot and the PSW. Control of Flooding: There are no floodplain concerns associated with this proposal as the works are not located within the Regulatory Storm Floodplain. 0 . Pollution: Sediment fencing will be in place throughout the duration of construction to ensure that no sediment will enter the wetland. • Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues associated with this application. Conservation of Land: There will be no significant vegetation removed as part of.this application. The existing lot has already been cleared of vegetation and been sodded: ' Plantings No plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 G, Infilling, of TRCA's Valleyland Stream Corridor. Management Program. CFN: 40554 - Application #: 140/08/WS Report Prepared .by: Shannon McNeill, extension 5744 For information contact: Bill Kiru,rextension 5306 Date: April 29, 2008 338 8.1.42 26 RATCLIFF ROAD To construct, reconstruct, erect or place a building or structure on 26 Ratcliff Road, in the Town of Whitchurch- Stouffville, Rouge River Watershed. The purpose is to construct a new detached garage within a Regulated Area of the Rouge River Watershed. The permit will be issued" for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, no date, redline revised by TRCA April 28, 2008, prepared by applicant, received April 28, 2008; • Planting List, no date, prepared by applicant, received April 28, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of constructing a new detached slab on grade garage in the rear yard of the existing house. There are two Provincially Significant Wetlands (PSW) located on the subject property. The proposed garage will be more than 30 metres from the PSW. The location of the garage has already been disturbed form previous tree removal: The compensation plantings as part of this permit application will provide restoration to the existing disturbed area providing a net ecological gain. Control of Flooding: There are no flooding concerns associated with this proposal as the works are not located within the Regulatory Storm Floodplain. Pollution: Sediment fencing will be in place throughout the duration of construction to ensure that no sediment will enter the wetland. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this proposal. Conservation of Land: There will be removal of a small portion of trees in order to accommodate the new garage. The applicant will be compensating at a 3:1 ratio for the trees removed. The trees will be planted in a area adjacent to the PSW. Plantings All plantings are in accordance with TRCA's Seed Mix Guidelines. 339 Policy Guidelines: This proposal is consistent with Section 4.2.2 E, Property Improvements and Ancillary Structures, of TRCA's Valley and Steam Corridor Management Program. CFN: 40652 - Application #: 223/08/WS Report Prepared by: Shannon McNeill, extension 5744 For information contact: Bill Kiru, extension 5306 Date: April 29, 2008 8.1.43 YORK REGION DISTRICT SCHOOL BOARD To site grade, temporarily or permanently place, dump or remove any • material, originating on the site or elsewhere and interfere with a wetland on Lot 3, Concession 9, (90 Greenwood Road), in the Town of Whitchurch- Stouffville, Duffins Creek Watershed as located on the property • owned by York Region District School Board. The purpose is to undertake site grading and permanently place fill material within an area of interference of a wetland. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 205212 -SP, Site Servicing and Grading Plan, prepared by EMC Group Limited, dated December 2005, Revision No. 4, revised on May 1, 2007, received by TRCA on April 9, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to undertake site grading and permanently place fill material within an area of interference of a wetland in order to establish the grades for a school yard. The works are proposed as part of the new H. Bowes Public Elementary School project in the northeast quadrant of the community of Stouffville, west of the Tenth Line. A portion of the school block is within a Regulated Area due to the presence of a nearby wetland within the Stouffville Reservoir Conservation Area. The proposed grading works are outside of the Conservation Area and wetland but are close enough to.fall under the 120 metre 'area of • interference' established under Ontario Regulation 166/06. Additionally, the wetland is . • separated from the proposed filling by a GO Transit rail line. Due to the separation distance and barrier posed by the railway embankment, staff are satisfied that the works Will nave no impact on the wetland. Control of Flooding: • Not applicable, as there is no Regional Storm Flood Plain on the subject lands. Pollution: Sediment and erosion controls are to be established, as shown on the plan. 340. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical or slope stability concerns with this project. Conservation of Land: As the works are proposed on lands that were formerly agricultural fields, there is no impact to natural heritage features. Plantings A landscape plan will be implemented for the school project including the planting of trees and shrubs around the school yard. Policy Guidelines: This proposal is consistent with Policy 2.1.6 of the Provincial Policy Statement 2005. CFN: 40739 - Application #: 281/08/WS Report Prepared by: Chris Jones, extension 5718 For information contact: Chris Jones, extension 5718 Date: April 30, 2008 TOWNSHIP OF ADJALA- TOSORONTIO. 8.1.44 ADJALA CONCESSION ROAD 3 To construct, reconstruct, erect or.place a building or structure on Lot 1, Concession 3, (Adjala Concession Road 3), in the Township of Adjala - Tosorontio, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single - family dwelling located at Part Lot 1, Concession 3, in the Township of Adjala - Tosorontio. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. 07 -186, prepared by Calder Engineering Ltd., dated February 2008, stamped received by TRCA Planning & Development staff on .March 3, 2008; • Planting Plan, Figure No 3, prepared by Azimuth Environmental Consulting, dated February 2008, stamped received by TRCA Planning.& Development staff on March 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 341 Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single - family dwelling located at Part Lot 1 of Plan 51 R- 30420, Concession Road 3, in the Town of Adjala - Tosorontio. A tributary of the Humber River Watershed traverses the northern portion of the subject property. The proposed dwelling and septic system are located on the tableland portion of the lot ..and are sufficiently setback from both the valley corridor and a wetland feature. In addition, there are no geotechnical, flooding, or ecology-related issues with this proposal. Although no significant vegetation is proposed to be removed as a.result of construction, an extensive planting enhancement plan has been provided along the valley corridor.at the northern portion of the subject property to provide a net ecological gain for this area. Control of Flooding: TRCA staff has confirmed that the proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (Le., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction.. An enhancement planting plan has been submitted with this application to achieve an ecological net gain for this area. Plantings Native, non - invasive enhancement plantings consistent with TRCA's guidelines are included as . part of this application. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 40744 - Application #: 282/08/ADJ Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: April 30, 2008 342 THE FOLLOWING PERMIT APPLICATIONS WERE ERRATA ITEMS: RES. #B41 /08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS Moved by: Seconded by Suzan Hall Richard Whitehead THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.45 - 8.1.72, with the exception of 8.1.59 - Region of Peel), that had been scheduled on the agenda as errata applications for which all the required information was received and finalized as listed below. RES. #B42 /08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS Moved by: Seconded by: Maja Prentice Richard Whitehead CARRIED THAT a permit be granted in accordance with Ontario Regulation 166/06 for application 8.1.59 - Region of Peel, that had been scheduled on the agenda as errata applications for which all the required information was received and finalized as listed below. CARRIED CITY OF BRAMPTON. 8.1.45 CITY OF BRAMPTON To construct, reconstruct, erect or place a building or structure on Queen Street East between Scott Street and Centre Street, in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by City of Brampton. The purpose is to construct, reconstruct, erect or place a building or structure (bridge).on Queen Street East between Scott Street and Centre Street, in the City. of Brampton, Etobicoke Creek Watershed as located on the property owned by City of Brampton. All construction activity will only be carried out during the warm water timing window of July 1 to March 31.. The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Letter of Undertaking to provide revisions to the engineering drawings to the satisfaction of TRCA; dated May 1, 2008; received May 2, 2008; prepared by the City of Brampton. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of.replacing the existing deck, sidewalk and parapet walls of the Queen Street bridge, between Scott Street and Centre Street across the West Branch of Etobicoke Creek. MCI and sealer will be applied to all concrete surfaces. 343 Control of Flooding: There will be no impact to the control of flooding. Pollution: • Standard sediment and erosion controls (filter cloth and scaffolding for intercepting debris) will be in place for the duration of construction and until the site is restored to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechhical /slope stability issues associated with the proposal. Conservation of Land: With the erosion and sedimentation controls in effect, the potential for a Harmful 'Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice (LOA) will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO).. All construction activity will only be carried out during the warm water timing window of July 1 to March 31. Plantings No vegetation will be removed or harmed during construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 40613 - Application #: 189/08/BRAM Report Prepared by: Scott Smith, extension 5758 For information contact: Beth Williston, extension 5217 Date: April 29, 2008 • 8.1.46 COOPERATIVE FEDERR DE QUEBEC To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot A, Plan 636, (318 Orenda Road), in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by Cooperative Federr De. Quebec. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in-order to facilitate an addition to an existing industrial building. The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Letter of Undertaking provided by Olymel S.E.C, dated May 7, 2008, stamped received by TRCA Planning and Development, May 7, 2008, to address outstanding engineering related issues. . 344 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate an 296.5 square metre addition to an existing industrial building. The subject lands are located within the Regional Storm Floodplain and are part of the Avondale Special Policy Area (SPA). The SPA designation recognizes areas within a community that have historically existed in the floodplain and where strict adherence to Province wide policies concerning new development would result in social or economic hardships for the community. Under the SPA criteria, redevelopment on a small scale may be permitted within the floodplain provided adequate flood proofing measures can be incorporated into the design and construction of all proposed buildings. It is not the intent of SPA's to facilitate intensification, or a level of development that is not in keeping with that which was previously approved by the Province. The area is located within the regulatory floodplain, however, TRCA technical staff are satisfied that this proposal will not adversely affect the flow and /or conveyance of floodwaters and the building will be appropriately floodproofed. The area to which this application applies is void of any significant vegetation and is currently an asphalt surface. Control of Flooding: TRCA Water Resources staff have reviewed this proposal and do not anticipate any impacts to the storage and /or conveyance of flood waters. The proposed works will be adequately flood protected. The proposed addition is located outside of the hydraulic floodway. All excavated fill will be removed from the floodplain. . Pollution: Appropriate erosion and sediment controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Since no significant vegetation will be removed, additional plantings are not required. Policy Guidelines: The proposal is consistent with Section 4.2.2 C) - Minor Additions, of the Authority's Valley and Stream Corridor Management Program. 345 CFN: 40777 - Application #: 299/08/BRAM Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 30, 2008 8.1.47 34 BLAKETON COURT To construct, reconstruct, erect or place a building or structure on (34 Blaketon Court), in the City of Brampton, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an in- ground swimming pool at the rear of an existing dwelling located at 34 Blaketon Crescent, in the City of Brampton. The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Letter of Undertaking, prepared by M. Prospero, dated May 6, 2008, to address all: outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to . undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an in- ground swimming pool . at the rear of an existing dwelling located at 34 Blaketon Crescent, in the City of Brampton. The rear of the subject property is adjacent to a valley corridor. The proposed pool is located on the tableland portion of the site appears to be setback sufficiently from the valley.corridor. In addition,.enhancement plantings are proposed as part of this application to achieve a net ecological gain. Control of Flooding: . . The proposed works are located outside of the Regional Floodplain. As such,' no impacts to the . storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. • Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. 346 Plantings The proposed pool is located within an existing manicured lawn. No significant vegetation will be removed as a result of the construction. However, a planting plan is proposed with this, application in accordance with TRCA's Restoration Guidelines. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40791 - Application #: 309 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: April 30, 2008 CITY OF MISSISSAUGA 8.1.48 REGION OF PEEL To construct, reconstruct, erect or 'place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Willowbank Trail in the City of Mississauga, Etobicoke Creek Watershed as located on the property owned by the Region of Peel. The purpose is to construct, reconstruct, erect or place a building or structure (watermain) and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere (granular material) on Willowbank Trail in the City of Mississauga, Etobicoke Creek Watershed, as located on the property owned by the Region of Peel.. The permit will be issued for the period of May 9, 2008 to May 8, 2010. Letter of Undertaking to provide revisions to the engineering drawings to the satisfaction of TRCA; dated May 1, 2008; received May 1, 2008; prepared by the Region of Peel. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: • The proposal consists of installing a 300mm diameter watermain by jack and bore at Little Etobicoke Creek along Willowbank Trail. Drilling pits will be constructed within the road right of way. Granular material will be temporarily stored on -site. No in -water works are anticipated. Control of Flooding: There will be no impacts to the control of flooding. 347 Pollution: Standard sediment and erosion controls (silt fence, filter bag) will be in place for the duration of construction and until the site is restored to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated withrthe proposal. Conservation of Land: With the erosion and sedimentation controls in effect, the potential for a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and an Operational Statement will be issued by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). The jack and .boring will be done in accordance with the Punch and Bore Crossings Ontario Operational Statement from the Department of Fisheries and Oceans (DFO). Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's. Valley and Stream Corridor Management Program. CFN: 38584 - Application #: 796/06/MISS - Report Prepared by: Scott Smith, extension 5758 For information contact: Beth Williston,. extension 5217 Date: April 30, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.49 16 RIVERBANK DRIVE To change the use, size, or number of dwelling. units of a structure; or undertake work that does not change the footprint of the existing structure �n Lot 17, Plan 4036, (16 Riverbank Drive), in the City of Toronto (Etobicoke York Community Council Area), sMimico Creek Watershed. The purpose is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in • order to facilitate the construction of an enclosed sunroom addition and deck to the rear of the existing one - storey single . family detached dwelling. The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Drawing No. 07- 20 =A1, Plans and Section, prepared by Wong.& Wong Engineering Inc., dated July 3, 2007, received December 10, 2007; • Drawing No. 07- 20 -A2, Plans and Elevation, prepared by Wong & Wong Engineering Inc., dated July 3, 2007, received December 10, 2007. 348 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within the Regulated Area of the of the Mimico Creek Watershed in order to facilitate the construction of an enclosed sunroom addition and deck to the rear of the existing one - storey single family detached dwelling. The subject site is located west of Islington Avenue and north of Mimico Creek on the north side of Riverbank Drive in the City of Toronto. Control of Flooding: The subject property is located within the regulatory flood plain of the Mimico Creek Watershed however, TRCA staff have determined the proposed works will not adversely impact the storage and /or conveyance of flood waters. Pollution: Sediment control fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a part of construction. Plantings No plantings are required as part of this proposed development. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40184 - Application #: 924/07/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 30, 2008 349 • 8.1.50 55 EDGEHILL ROAD To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Block B, Plan 2630, Part Block A, Plan 2630, (55 Edgehill Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA . Regulated Area of the Humber River Watershed in order to facilitate the construction of a new two- storey single family detached dwelling with an attached garage, indoor /outdoor swimming pools, removal of an existing tennis court and associated landscaping. The existing dwelling,is to be demolished. The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Drawing No. A -01, Site Plan and Servicing Plan, prepared by Tony Gornik, dated April 15, 2008, Revision No. 11, revised on April 15, 2008, Redlined by TRCA staff on May 7, 2008, received on April 16, 2008; • Drawing No. L1, Landscape Plan including Tree Preservation Plan, Grading and Sediment Control, prepared by John Lloyd & Associates, dated January 24, 2008, Revision No. 2, revised on April 11, 2008, Redlined by TRCA staff on May 7, 2008, received on April 16, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to construct a new two- storey single family detached dwelling with an attached garage, indoor /outdoor swimming pools and associated landscaping at 55 Edgehill Road in the City of Toronto. The existing dwelling is to be demolished and an existing tennis court isoto be removed. The subject site is located north of Dundas Street West and east of Royal York. Road within a TRCA Regulated Area of the Humber. River Watershed. Control of Flooding: . This site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and or conveyance.of floodwaters.- Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. 350 Conservation of Land: The appropriate tree protection fencing will be installed. Plantings A ravine stewardship plan including the naturalization of a portion of the existing tennis court will be implemented. Native plantings will be provided as per Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40464 - Application #: 089/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 30, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.51 ST. JOHN'S REHABILITATION HOSPITAL • To alter a watercourse on Part Lot 21, 22, Concession 1 EYS, (285 Cummer Avenue), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to alter a watercourse through raising a portion of the channel bed, installing grade control and restoring the channel bank with bioengineered bank treatment. The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Drawing No. GEO -1A, Exposed Watermain Planform and Profile, prepared by Geomorphic Solutions, revised April 16, 2008, received April 17, 2008; • Drawing No.GEO -2A, Exposed Watermain Cross- Sections prepared by Geomorphic Solutions, revised April 16, 2008, received April 17, 2008; • Drawing No. PESC -1A, Exposed Watermain Phasing and E.S.C, prepared by Geomorphic Solutions, revised April 28, 2008, received April 30, 2008; • Drawing No. GEO -1 B, Exposed Maintenance Hole Planform and Profile, prepared by Geomorphic Solutions, revised April 16, 2008, received April 17, 2008; • Drawing No. GEO -2B, Exposed Maintenance Hole Cross - Sections, prepared by Geomorphic Solutions, revised April 28, 2008, received April 30, 2008; • Drawing No. PESC-1B, Exposed Maintenance Hole Phasing and E.S.C., prepared by Geomorphic Solutions, revised April 28, 2008, received April 30, 2008; • Drawing No. DET -1, Restoration Details, prepared by Geomorphic Solutions, revised April 28, 2008, received April 30, 2008; • Drawing No. RES -1, Restoration Details, prepared by Geomorphic Solutions, dated April 16, 2008, received April 17, 2008. 351 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to alter a watercourse through raising a portion of the channel bed, installing grade control (rock vortex weirs) and restoring the channel bank•with bioengineered bank treatment (vegetated buttress). The proposed works are required in order to protect existing infrastructure at two sites located along Newtonbrook Creek. The first site contains an exposed watermain that provides a secondary source of municipal water to the adjacent hospital. The second site located downstream of the watermain contains an exposed sanitary sewer maintenance hole which is maintained by the City of Toronto. The watermain and sewer maintenance hole have become exposed due to severe channel bank erosion and downcutting. Control of Flooding: The proposed works are located within the Regional Storm Floodplain, however the works will not affect the storage or conveyance of flood. waters. Pollution: Silt fencing and coffer dams will be secured around all construction areas to prevent the migration of construction generated sediment into the watercourse. Dynamic Beaches: Not applicable Erosion - There are no geotechnical issues with the proposed works. Conservation of Land: All filled and disturbed areas will be stabilized and revegetated following construction. No significant resource features will be impacted by the proposed works. There will be no impact .to fisheries as all work will be conducted in the dry. The proposed, works will have no impact to fisheries and will not result in 'a HADD. A Letter of Adice will be issued on behalf of DFO. Plantings New riparian . plantings of native trees and shrubs will be planted on both sides of the altered and disturbed portions of .Newtonbrook Creek. Policy Guidelines: The proposal is consistent with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 39945 - Application #: 814/07/TOR Report Prepared by: Mark Rapus, extension 5259 For information contact: Mark Rapus, extension 5259 Date: April 30, 2008 352 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.52 SCARBORO GOLF AND COUNTRY CLUB To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 16, Concession D, (321 Scarborough Golf Club Road), in the City of_Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by Scarboro Golf and Country Club. The purpose is to remove and place fill material and site grade within the floodplain and regulated area in order to facilitate renovations of greens and fairways on the existing golf course. The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Letter of Undertaking prepared by R.J Burnside & Associates Limited dated and received May 7, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The fairway and green renovations were initiated by the club in the late months of 2007 golfing season without the benefit of a permit under Ontario Regulation 166/06. The applicant ceased all construction activity in late 2007. In January 2008, the applicant submitted this permit application in hopes of completing the golf course renovations in the Spring of 2008. Control of Flooding: A portion of the grading /cutting and filling works took place within the floodplain portion of the property, namely holes 5,6,7,12 and 17. TRCA staff requested the applicant undertake a floodplain analysis of the 'west tributary of Highland Creek in order to assess the impacts of the proposed and partially completed works upon the floodplain. TRCA staff are in agreement with the conclusions of the floodplain analysis which reveal that there will be no significant impacts to the upstream and downstream storage or conveyance of flood waters. Pollution: A silt fence will be secured around all construction areas to prevent the migration of constructions generated sediment into the watercourse. Dynamic Beaches: Not applicable. Erosion: Not applicable. Conservation of Land: The proposed works will be executed beyond the margin (top of bank) of the watercourse, thereby mitigating direct impacts on the existing creek bank. All filled and disturbed areas will be stabilized and re- vegetated following construction. No significant resource features will be impacted by the proposed works. 353 Plantings 20 trees have been removed to accommodate the golf course renovations. The City of Toronto, Urban Forestry Department have required the planting of 60 new trees on the property to enhance the natural cover in the valley corridor. Policy Guidelines: The proposal complies with Section 4.4.2 (H) Existing Resource - Based Uses - of the Authorities Valley and Stream Corridor.Management Program. CFN: 40377 - Application #: 037/08/TOR Report Prepared by: Mark Rapus, extension 5259 For information contact: Mark Rapus, extension 5259 Date: April 30, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.53 INTERVAL HOUSE INC. To construct, reconstruct, erect or place a building or structure on 2 Montcrest Boulevard in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by Interval House Inc.. The purpose is to develop within a TRCA . Regulated Area of the Don River Watershed in order to facilitate the construction of a new deck and associated walk -way for wheelchair access and a stairway for rear access to the existing building. The building is presently used as housing for a not- for - profit women's shelter. The permit will be issued for the period of May 9, 2008 . to May 8, 2010. Letter of Undertaking, prepared by Paul Whelan, dated and received May 7, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to construct a new deck and associated walk -way for wheelchair access and a stairway for rear access to the existing building at 2 Montcrest Boulevard in the City of Toronto. This proposal is comprised of slope stabilization improvements through the implementation of native geo- textile planting strips for a memorial garden. The building is presently used as housing fora not - for - profit women's shelter. The subject site is located west of Broadview Avenue and south of Danforth Avenue within the Don River Watershed. Control of Flooding: This site is not located within the Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. 354 Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. Erosion: The proposed works will be an improvement to the stability of the slope through the implementation of native . and non - invasive plantings. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native and non- invasive plantings will be provided as per Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: The proposal is consistent with Section 4.2.2 (E) - Development Guidelines for Property Improvements and Ancillary Structures within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40749 - Application #: 274/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 30, 2008 8.1.54 39 DON VALLEY DRIVE To construct, reconstruct, erect or place a building or structure on Lot 69, 70, Plan 2477, (39 Don Valley Drive), in the City of Toronto (Toronto and East York Community. Council Area), Don River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a new.two-storey single family detached dwelling and the reconstruction of the top two tiers to the existing terraced retaining wall structure. The existing dwelling is to be demolished. The permit will be issued for the period of May 9, 2008 to May 8, 2010. • . Drawing No. 1, Site Plan, prepared by TH Design inc., dated November 3, 2007, received on December 6, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 355 Proposal: The purpose. of this application is to construct a new two- storey single family detached dwelling and reconstruct the top two tiers of the existing terraced retaining wall structure in the rear yard of the property at 39 Don Valley Crescent in the. City of Toronto. The existing dwelling is to be demolished. The subject site is located north of Pottery Road and west of Broadview Avenue within the Don River Watershed. Control of Flooding: This site is not located within the Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment and erosion control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: . The proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. . CFN: 40215 - Application #: 932/07/TOR Report Prepared by: Nicole Moxley; extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 30, 2008 356 CITY OF VAUGHAN 8.1.55 BLOCK 11 PROPERTIES INC. To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 16, Concession 2, Bathurst Street/Rutherford Road, in the City of Vaughan, Don River Watershed as located on the property owned by Block 11 Properties Inc. The purpose is to conduct site grading, temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a watercourse, in order to remove existing culverts in the East Don River, in Planning Block 11, in the City of Vaughan. The permit will be issued for the period of May 9, 2008 to May 8, 2010. Letter of Undertaking, prepared by GEMS, dated May 7, 2008, received May 7, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to conduct site grading, temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a tributary of the East Don. River, in order to remove existing culverts northwest of Bathurst Street and Rutherford Road, in Planning Block 11, in the City of Vaughan. Planning Block 11 is bounded by Rutherford Road to the south, Dufferin Street to the west, Major Mackenzie Drive to the north and Bathurst Street to the east. The proposed work site is located within lands that are a part of draft approved plan of subdivision 19T -95062 (Woodvalley Developments). The work site is located south of Bridge Crossing A (previously approved under Ontario Regulation 158 permit no. C- 05196) and on the east branch of the East Don River. An existing farm access road, which is constructed of gravel overtop concrete slabs, crosses the watercourse via multiple culverts. In order to remove the existing culverts, a coffer dam /pump by -pass system will be implemented. The temporary by -pass of the channel will allow the works to be completed in predominantly dry conditions, thereby isolating disturbance to the immediate area 'of the work site. Prior to the construction of the coffer dam, a qualified fisheries biologist will determine the .presence of aquatic species in the isolated portion of the channel and conduct a fish removal, if necessary. Two coffer dams will be constructed approximately 5 metres upstream and downstream of the proposed work site. Flows will be diverted for the duration of construction which is estimated to be a maximum of 10 days. Once flow has been diverted from the work area, the culvert removal works will be conducted. Once the culverts are removed, the stream bed and banks will be reconstructed. No machinery will enter the watercourse.. 357 Control of Flooding: TRCA technical staff has reviewed technical submissions relating to the proposed works and is satisfied.that the storage or conveyance of flood waters will not be impacted by the removal of the culvert. Pollution: To prevent the transfer of sediment downstream during the in- stream works, terrafix sediment • logs will be placed downstream of the proposed works site to mitigate against mobilized • sediment. In addition, sediment fencing will also be erected along the farm access road to prevent sediment from migrating into the downstream reaches of the watercourse. Dynamic Beaches: Not applicable. Erosion: Sediment will be minimized through the implementation of the aforementioned sediment control measures. There are no geotechnical /slope stability issues associated with the proposed works. J Conservation of Land: Given that a coffer dam/pump by-pass system will be implemented in the watercourse, a Letter of Advice will be issued on behalf of Fisheries and Oceans Canada (DFO): Riparian vegetation on the banks of the watercourse will be removed in order to facilitate the proposed works. • • Plantings . 0 Plantings of native, non- invasive species will be carried out on the banks of the restored watercourse and along the farm access road, in accordance with TRCA's Planting Guidelines. Policy Guidelines: Thisproposal complies with Section 4.2.2(F) - Opportunities for Regeneration, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40470 - Application #: 093 /08/VAUG Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date: April 30, 2008 358 8.1.56 • CANADIAN PACIFIC RAILWAY To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse near McGillivary Road to Major Mackenzie Drive, in the City of Vaughan, Humber River Watershed as located on the property owned by Canadian Pacific Railway. The purpose is to construct, reconstruct, erect or place a building or structure (3.0m x 2.4m x 20m.precast box culvert, gabion walls, asphalt road), site grade, temporarily or permanently place, dump or remove any. material, originating on the site or elsewhere and alter a watercourse to facilitate a new connection road from McGillivary Road to Major Mackenzie Drive, in the City of Vaughan, Humber River Watershed as located on the property owned by Canadian Pacific Railway during the warmwater timing window (July 1 to March 31). The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Letter of Undertaking to provide revisions to engineering drawings to the satisfaction of TRCA staff; dated May 6, 2008; received May 6, 2008; prepared by from Canadian Pacific Railway. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the construction of a new road between McGillivary Road in the south to Major Mackenzie Drive in the north, in the City of Vaughan, Regional Municipality of York. The works will include a culvert installation and gabion walls. Huntington Road in the west will be closed due to railway issues, and a new north -south access is required. The project was reviewed by TRCA staff during the Environmental Assessment process (CFN 35129). This proposal was previously approved at Executive Meeting #2/05 under permit #C -05425 for the period of April 8, 2005 to April 7, 2007. The owner, did not commence the works before the expiration of the original.permit and now a new permit is required. Control of Flooding: The proposed culvert will not have any implications to flooding. Pollution: Standard erosion control measures (silt/sediment fencing, rock flow check dam, catchbasin, silt control filter) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the wetland /watercourse. Dynamic Beaches: Not applicable 359 Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be provided by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). No significant vegetation will be removed as a result of construction. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 40686 - Application #: 258 /08NAUG Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: April 30, 2008 8.1.57 DUNPAR DEVELOPMENTS INC. • To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lots 9, 10, Concession 7,. 8299 and 8355 tripling Avenue, in the City of Vaughan,- Humber River Watershed as located on the property owned by Dunpar Developments Inc.. The purpose . is to permit development within a Regulated Area of the Humber River Watershed at 8299 and 8355 Kipling Avenue, in the City of Vaughan to facilitate the demolition of two single- family homes and the construction of a 116 -unit townhouse development, which was draft approved as part of a . residential plan of subdivision (19T- 06V03). The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Drawing No. C -1, Site Servicing Plan, prepared by John Towle Associates Limited, revised April 29, 2008, received May 6, 2008; . • Drawing No. C -2, Site Grading Plan, prepared by John Towle Associates Limited, revised April 22, 2008, received May 6, 2008; • Drawing No. C -4, Erosion and Sediment Control Plan, prepared by John Towle Associates Limited, revised April 22, 2008, 'received. May 6, 2008; • Drawing No. C -5, Demolition Permit Plan, prepared by John Towle Associates Limited, revised April 29, 2008, received May 6, 2008; • Sheet No. L -1, Landscape Plan, prepared by Alexander Budrevics & Associates Limited, revised March 24, 2008, received April 10, 2008; Sheet No. EM -1, Edge Management Plan, prepared by Alexander Budrevics & Associates. Limited, revised March 24, 2008, received April 10, 2008;. 360 • Sheet No. D -1, Landscape Details, prepared by Alexander Budrevics & Associates Limited, revised March 24, 2008, received April 10, 2008; • Sheet No. D -2, Landscape Details, prepared by Alexander Budrevics & Associates Limited, revised March 24, 2008, received April 10, 2008; • Revised Tree Preservation Plan for 8299 & 8355 Kipling Avenue - Vaughan, prepared by The Tree Specialists, Inc., dated January 10, 2008, received February 7, 2008; • Letter of Undertaking, signed by Tom Giancos of Dunpar Developments Inc., dated April 28, 2008, received April 28, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to permit development within a Regulated Area of the Humber River Watershed at 8299 and 8355 Kipling Avenue, in the City of Vaughan, to facilitate the demolition of two single - family homes and the construction of a 116 -unit townhouse development, which was draft approved as part of a residential plan of subdivision (19T- 06V03). The proposed development is located to the south and west of a well- vegetated slope, which extends down to the Humber River. An 18 -metre buffer was established between the proposed townhouse development and the adjacent physical top of bank through our review of the related official plan amendment, zoning by -law amendment and draft plan of subdivision applications (OP.06.008, Z.06.022 and 19T- 06V03). The valley vegetation, the long -term stable top of bank and a buffer area were captured within the 18 -metre allowance. These lands were rezoned into an open space category and will be dedicated into public ownership. A chain link fence will be established between the townhouse development and the open space lands. • Landscape and.edge management plans have also been prepared for this area. No grading will occur within the 18 -metre buffer except as required during the demolition of the two existing single - family homes. The existing homes are closer to the physical top of bank than the proposed townhouse development. As such, the demolition works will be restricted to the immediate area around the existing homes, which will be delineated by sediment control fencing. Once the demolition works are complete and the area restored, a double row of sediment control fencing and straw bales will'be installed between the new development limit and the open space lands. Grading for the subdivision will occur up to the limit of the open space lands. Control of Flooding: The proposed development will not be located within the Regional Storm flood plain. There will be no impact on the storage or conveyance of floodwaters. Pollution: Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from entering the adjacent natural features. Dynamic Beaches: Not applicable. 361 Erosion: There will be no.geotechnical /slope•stability issues associated with the proposed development. In addition, the implementation of the aforementioned sediment and erosion control measures will minimize erosion on the site. Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings Landscape, edge management and tree preservation plans have been prepared for the site, including the valley lands and buffer, to the satisfaction of TRCA staff. Policy Guidelines: The proposal is consistent with Section 4.1.1 (New Urban Development) and Section 4.2.2 F) (Opportunities for Regeneration) of the Authority's Valley and Stream Corridor Management Program. CFN: 40693 - Application•#: 253 /08NAUG Report Prepared by: Coreena Smith, extension 5269 For information contact: Coreena Smith, extension 5269 Date: April 28, 2008 TOWN OF CALEDON 8.1.58 15915 MOUNT HOPE ROAD To construct, reconstruct, erect or place a building or structure on Lot 19, Concession 7., (15915 Mount Hope Road), in the Town of Caledon, Humber River Watershed. The purpose' is to undertake works within. a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single - family dwelling located at 15915 Mount Hope Road, in the Town of Caledon. The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Letter of Undertaking, prepared by P. Kolb, dated May 6, 2008, to address all outstanding ecology related issues. RATIONALE . The application was reviewed by staff on the basis of the following information: 362 Proposal: The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, 164 square metre (1768 sq. ft.) single - family dwelling on Lot 19, Concession 7, in the Town of Caledon. The property is located within the area of interference of an adjacent oak ridges moraine wetland feature. Please note that' construction of the foundation for the proposed.works has occurred without a TRCA permit. The foundation works are setback approximately 20 metres from the wetland feature. TRCA staff have since visited the site and considering the agricultural use of the property, the works appear to be sufficiently setback from the wetland feature. As such, no impacts to the wetland feature are anticipated. Additionally, there are no flooding, hydrological, . geotechnical or ecology related concerns associated with this proposal. However, enhancement plantings are proposed with this application surrounding the wetland feature in order to achieve a net ecological gain. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries related concerns associated with these works. Plantings All disturbed areas will be re- vegetated with native and non - invasive species as per TRCA's post - construction restoration guidelines. Policy Guidelines: This proposal is in conformity with Section 4'1.1 - New Urban Development, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40569 - Application #: 165/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: April 30, 2008 363 8.1.59 REGION OF PEEL To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material originating on the site or elsewhere and alter a watercourse along Kennedy Road in the Town of Caledon, Etobicoke Creek Watershed as located on property owned by the Region of Peel. The purpose is to construct, reconstruct, erect or place a building or structure (elevated tank, access road, overflow pond), site grade (elevated tank), temporarily or permanently place, dump or remove any material originating on site or elsewhere and alter a watercourse (culvert), along the east side of Kennedy Road (south of King Street), Town of Caledon, Etobicoke Creek Watershed: • The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Plan EC1 = Mayfield West Elevated Tank, Environmental Controls; dated March 2008; received May 2, 2008; Engineer's Stamp May 2, 2008; prepared by Genivar; red line revised May 5, 2008; • Plan G2 -B - Kennedy Road Elevated Tank, Site Plan and Sections; dated March 2008; received March 27, 2008; Engineer's Stamp March 25, 2008; prepared by Genivar; • Plan L -1 - Kennedy Road Elevated Tank, Landscape Plan & Details; dated December 2007; received March 27, 2008; prepared by Schollen & Company Inc. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This proposal consists of the construction of a 9.2 ML elevated tank with 2 -600 mm diameter inlet/outlet watermains running east and west from the elevated tank to Kennedy Road. An access road will be constructed to the tank and a 300 mm diameter culvert will be constructed • under the access road to convey water through an existing drainage channel. An overflow pond will be constructed adjacent to the elevated tank as a contingency measure. The overflow pond will also be used during initial commissioning and during maintenance of the tank. Control of Flooding: There will be no impacts to the control of flooding. Pollution: Standard erosion control measures (double silt fence, rock check dam) will be implemented for the duration of construction, -and until the site is restored, in order to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There will be no geotechnical /slope stability issues associated with the proposal. 364 Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). No in -water works will be conducted. Plantings All disturbed areas will be restored with native /non- invasive species. A net ecological gain (362 trees, 517 shrubs) will be achieved for this site. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40422 - Application #: 064 /08 /CAL Report Prepared by: Sharon Lingertat, extension 5717 For information contact: Sharon Lingertat, extension 5717 Date: April 23, 2008 8.1.60 WINDMILL CUSTOM HOMES To construct, reconstruct, erect or place a building or structure on Lot 18, Plan 43M -755, (18 Dolan Drive), in the Town of Caledon, Humber River Watershed as located on the property owned by Windmill Custom Homes. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single- family dwelling located at 18 Dolan Drive, in the Town of Caledon. The permit will be issued for the period of May 9, 2008 to May 8, 2010. Leiter of Undertaking, prepared by Windmill Custom Homes, dated May 6, 2008, to address all outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single - family dwelling located at 18 Dolan Drive, in the Town of Caledon. • The rear of the subject property is adjacent to a valley corridor. A geotechnical study was submitted with this application to confirm the long -term stable top of bank associated with the valley corridor at the rear of the property. Based on our review of the submitted geotechnical report, it appears that the proposed dwelling is sufficiently setback from the determined long -term stable slope. As such, no geotechnical concerns are anticipated. In addition, there are no ecology related concerns with this application. However, a planting enhancement plan has been proposed in order to achieve a net ecological gain with this application. 365 Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters is anticipated. Pollution: • Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this application: Conservation of Land: No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries related concerns associated with these works. Plantings Native, non - invasive enhancement plantings consistent with TRCA's guidelines are included as part of this application as per TRCA's post- construction restoration guidelines. Policy Guidelines:. This proposal is in conformity with Section 4.1.1 - New Urban Development, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40051 - Application #: 873/07/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: April 30, 2008 TOWN OF MARKHAM 8.1.61 ANGUS GLEN DEVELOPMENTS LTD. To site grade, temporarily or permanently place, dump or remove any material, originating on.the site or elsewhere and alter a watercourse on Part • Lot 19, 20, Concession 5 Lot 24, PART OF 25, Plan 6037, (Major Mackenzie Drive), in the Town of Markham, Rouge River Watershed as located on the property owned by Angus Glen Developments Ltd.. The purpose is to , undertake site grading, permanently place fill material and alter a watercourse in order to . establish two stormwater management pond outfalls and establish one permanent stormwater management pond. The permit will beissued for the period of May 9, 2008 to May 8, 2010. . • Letter of Undertaking from Mr. Geof Nicholson, C.E.T. of .Sabourin. Kimble & Associates, committing to revise all plans to the satisfaction of TRCA staff. 366 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to undertake site grading, permanently place fill material and alter a watercourse in order to establish two stormwater management pond outfalls and establish.one permanent stormwater management pond. The works are located within a large residential development known as Angus Glen West Village (File No. 19TM- 030004), which is located on the west side of the Bruce Creek northwest of the intersection of Major MacKenzie Drive and Kennedy Road in the Town of Markham. Previously, in March of 2007, the Executive Committee granted permission to undertake the rough grading and establishment of the associated sediment and erosion control measures on the table land portions of the site. At this point in time, the owner wishes to finish construction of a permanent stormwater management pond and construct the outfalls for that pond and a second 'interim' pond. The outfall structures require construction activities to take place within the valleylands of the Bruce Creek. Control of Flooding: The proposed pond outfalls will be located within the Regional Storm Flood Plain. The outfalls have been designed to safely convey flood flows and will not negatively affect the control of flooding. Pollution: The outfalls have been sited as far back from the Bruce Creek as possible. The stormwater management ponds have been designed to treat stormwater to Ministry of the Environment Level 1 'Enhanced' standards. A sediment and erosion control plan is to be implemented and maintained for the duration of construction so that sedimentation of the watercourse will be prevented. Dynamic Beaches: Not applicable • Erosion: There are no geotechnical or erosion concerns with the proposed construction activities. The stormwater management ponds have been designed to detain stormwater run off iri order to prevent an increase of erosion within the watercourse. Conservation of Land: There are no in-water works proposed as part of this application. In addition, there are no significant natural heritage features at the outfall locations. However, some woody vegetation including cedar trees may need to be removed in order to construct the outfalls. Staff will issue a Letter of Advice.on behalf of Fisheries and Oceans Canada (DFO) with this permit pursuant to TRCA's Level III Agreement. All disturbed areas are to be stabilized following construction. Plantings Following construction, disturbed areas are proposed to be restored and enhanced with native plantings in accordance with a landscape plan that has been reviewed as part of this permit. 367 • Policy Guidelines: This proposal is consistent with Section 4.3, Infrastructure and Seryicing, of TRCA's Valley and Stream Corridor Management Program. CFN: 39165 - Application #: 228/07 /MARK Report Prepared by: Chris Jones, extension 5718 For information contact: Chris Jones, extension 5718 Date: April 30, 2008 8.1.62 27 THORNLEA ROAD To construct, reconstruct, erect or place a building or structure on Lot 70, Plan 9766, 27 Thornlea Road, in the Town of Markham, Don River Watershed. The purpose is to'undertake works within a Regulated Area of the Don River Watershed in order to facilitate the construction of a new residential dwelling. . The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by D. Woolridge, dated April.8, 2008, stamped received by TRCA Planning and Development on April 8, 2008, redline revised by TRCA Staff on May 9, 2008. RATIONALE . The application was reviewed by staff on the basis of the following information: . Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the demolition of an existing residential dwelling and the construction of a new residential dwelling. The subject property is located adjacent to a valley corridor feature of the Don River Watershed. TRCA staff has conducted a site inspection and confirm that the proposed works appear to be sufficiently setback from the valley corridor feature. The area to which this application applies is currently a manicured lawn and is void of • any significant vegetation. The proposed works are located outside 'of the Regional Storm Floodplain. . Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters is anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject property during all phases of construction. • Dynamic Beaches: Not applicable 368 Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as result of construction. Plantings As no significant vegetation will be removed, plantings are not required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40690 - Application #: 255 /08 /MARK Report Prepared .by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 30, 2008 8.1.63 REGION OF YORK To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 20, Concession IX, (Major Mackenzie Bridge over the Little Rouge River, West of 9th Line), in the Town of Markham,. Rouge River Watershed as located on the property owned by Region of York. The purpose is to remove the existing bridge (6.9m Length x 14.3m Span/Width x 3.0m Height) and construct structures (23.0 m Length x 25.0m Span/Width x 3.0 m Height bridge with pedestrian rail, temporary retaining walls on north side and permanent retaining walls on south side, abutment walls on all four quadrants, asphalt paving, outfalls on south side) within a Regional Storm Floodplain; to excavate and place fill for bridge footings, for temporary retaining and permanent retaining walls, for abutment walls, for road widening, for outlet's, for ultimate fill slope) in a Regulated Area; to interfere with a wetland with road widening /bridge construction; to temporarily alter a watercourse (Little Rouge River) during the coldwater timing window (July 1 to September 15) through .a coffer dam method in order to work in the dry to conduct in water and near water works associated with the bridge, outfall, abutment wall and retaining wall construction. The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Letter of Undertaking (to provide revisions to engineering drawings and landscape drawings to the satisfaction of TRCA staff); dated May 1, 2008; received May 1, 2008; prepared by the Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: 369 Proposal: The entire - proposal consist of the widening of Major Mackenzie Drive from Highway 48 to Ninth Line from two to four lanes while maintaining a rural cross section with grassed swales. This file deals with the bridge removal and replacement on Major Mackenzie drive with a net benefit of an increase in span /width from approximately 15 metres to 25 metres as well as an increase in length from approximately 7 metres to 23 metres to accommodate the road widening. The height of the bridge will remain constant at 3 metres. The entire site is located within a Regulated Area as well as a Regional Storm Floodplain associated with the Little Rouge River. There is a wetland area on the north ad south sides of the existing bridge. York Region staff has indicated that the construction of the project will be phased with a temporary retaining wall construction on the.north side while land expropriation is underway. When the land authorization has been received the temporary retaining walls will be removed and the ultimate fill slope will be constructed. This will be facilitated through a revision to the approved plans. This section of Major Mackenzie Drive is located in the.Greenbelt and York Region is required to comply with that legislation. The works associated with this project have been reviewed under the Environmental Assessment Act in file 38734, Ontario Regulation 166 and under the Fisheries Act for the tests and best management practices. Control of Flooding: Staff has reviewed the hydraulics for the proposed bridge structure and has determined that there will not be any negative impacts to flooding. The existing span size of approximately 15 metres will be increased to 25 metres which will facilitate flow. Pollution: Standard erosion control measures (silt fences, pea gravel coffer dams) will be implemented to ensure that the construction - generated sediments do not enter the watercourse. Dynamic Beaches: Not applicable Erosion: There will be no slope stability issues related to the works. Conservation of Land: There will be in stream works associated with this project. A coffer dam method will be utilized to isolate the watercourse from construction. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Fisheries and Oceans Canada (DFO). The impacts to.the wetland on the-north and south side of the bridge will be minimized as much as technically possible during construction.. Plantings All disturbed areas will be restored with native /non- invasive species following construction. 370 Policy Guidelines: The proposal complies with Section 4.3 — Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 40534 - Application #: 134 /08 /MARK Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: April 30, 2008 8.1.64 REGION OF YORK To construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on.Lot 20, Concession IX , (Ninth Line Bridge over the Little Rouge River approximately 400-metres South of Major Mackenzie Drive East between Major Mackenzie and 16th Avenue), in the Town of Markham, Rouge River Watershed as located on the property owned by Region of York. The. purpose is to construct structures (bridge length extension of 5.92 metres on west side and 4.14 metres on east side on an existing bridge with dimensions of 12.41m Length x 25.0 m Span/Width x 3.4m Height, pedestrian rail, temporary retaining walls on east side and permanent retaining walls on west side, abutment walls on all four quadrants, asphalt paving) within a Regional Storm Floodplain; to excavate and place fill (.for bridge extension footings, for temporary retaining and permanent retaining walls, for abutment walls, for road widening, for ultimate fill slope on the east side) in a Regulated Area; to interfere with.a wetland with the road widening; to temporarily alter a watercourse ( Little Rouge River ) during the coldwater timing window (July 1 to.September 15) through isolation methods in order to work in the dry to conduct in water /near water works associated with the bridge, abutment walls and retaining wall construction. The permit will be issued for the period of May 9, 2008 to May 8, 2010. •• Letter of Undertaking (to provide revisions to engineering drawings and landscape drawings to the satisfaction of TRCA staff); dated May 1, 2008; received May 1, 2008; prepared by the Regional Municipality of York. RATIONALE • The application was reviewed by staff on the basis of the following information: 371 Proposal: The entire proposal consist of the widening of Ninth Line from 16th Avenue to Major Mackenzie Drive from two to four lanes while maintaining a rural cross section with grassed swales. This file deals with the bridge extension on Ninth Line with an increase in length from 12.41 to 22.00 metres to accommodate the road widening. The span will remain at 25 metres as well as the height of the bridge . at 3.4 metres. The entire site is located within a Regulated Area as well as a Regional Storm Floodplain associated with the Little Rouge River. There is a wetland area on the west side of the existing bridge. York Region staff has indicated that the construction of the project will be phased with a temporary retaining wall construction on the east side while land . expropriation is underway. When the land authorization has been received the temporary retaining walls will be removed and the ultimate fill slope will be constructed. This will be . facilitated through a revision to the approved plans. This section of Ninth Line is located in the Greenbelt and York.Region is required to comply with that legislation. The works associated with this project have been reviewed under the Environmental Assessment Act in file 38734, Ontario Regulation 166 and under the Fisheries Act for the tests and best management practices. Control of Flooding : Staff has reviewed the hydraulics for the proposed bridge extension and has determined that there will not be any negative impacts to flooding. Pollution: Standard erosion control measures (silt fences, isolation measures) will be implemented to .ensure that the construction - generated sediments do not enter the watercourse. Dynamic Beaches: Not applicable Erosion: .'There will be no slope stability issues related to the works. Conservation of Land: There,will be in stream works associated with this project. An isolation method will be utilized to isolate the watercourse from construction of the extension and the abutment walls. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the . Fisheries and Oceans Canada (DFO). The impacts to the wetland on the west side of the bridge will be minimized as much as technically possible during construction. Plantings • . All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 — Infrastructure and Servicing of the Authority's Valley and Stream Corridor.Management Program. 372 CFN: 40536 - Application #: 136 /08 /MARK Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: April 30, 2008 8.1.65 TOWN OF MARKHAM To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on 7015 Leslie Street, in the Town of Markham, Don River Watershed as located on the property owned by Town of Markham. The purpose is to site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on 7015 Leslie Street, in the Town of Markham, Don River Watershed, during the warmwater fisheries timing window of July 1 to March 31 in order to facilitate long term infrastructure protection and riparian corridor enhancement. The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Letter of Undertaking to provide minor revisions to engineering and landscape drawings to the satisfaction of TRCA staff; dated May 7, 2008; received May 7, 2008; prepared by the Town of Markham. RATIONALE The application was reviewed_ by staff on the basis of the following information: Proposal: The Town of Markham has undertaken a study called the Markham Erosion Restoration Implementation Plan, June 2007. The study was carried out under the Municipal Class Environmental Assessment planning process. The purpose of this study was to identify priority erosion restoration sites along the watercourses within the Town of Markham which may pose a risk to public health and safety, and to develop a restoration plan ,to address these erosion sites on a site specific basis. TRCA has been involved and provided input in the review of this plan. This proposal is identified in the plan as Site No.,2. The proposed works at this site will involve channel stabilization and infrastructure protection by the implementation of riparian corridor enhancements and revegetation. Control of Flooding: The storage or conveyance of floodwaters will not be impacted by the proposed works. Pollution: Standard erosion control measures (silt /sediment fencing, cofferdam, dam and pump, silt control filter) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable 373 Erosion: The proposal is to conduct instream works to stabilize a channel. Staff has reviewed the proposal and has no channel stability concerns with the proposed works. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be provided by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). This application is subject to the warmwater fisheries timing window, all works to be completed from July 1 to March 31. • Plantings All disturbed areas will be restored with native non - invasive species following construction. This project will result in a net gain of vegetation along the study, area. Policy Guidelines: The proposal complies with Section 4.3 = Infrastructure and Servicing - of the Authority's Valley.. and Stream Corridor Management Program. CFN: 40190 - Application #: 930 /07 /MARK Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: April 30, 2008 8.1.66 YORK REGION STANDARD CONDOMINIUM To construct, reconstruct, erect or place a building or'structure on Lot 20, Concession 8, 9909 Highway 48, in the Town of Markham, Rouge River. Watershed as located on the property owned by York Region Standard. Condominium. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a telecommunications tower. The permit will be issued for the period of May 9, 2008 to May, 8, 2010. • Letter of Undertaking provided by Bell Mobility, dated May 7, 2008 to address all outstanding ecology related issues. . . RATIONALE The application was reviewed by staff on the basis of the following information: 374 Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a telecommunication tower compound on the subject site. The compound area will include•a monopole tower, equipment shed and will be enclosed by a fence. The subject site is located within the Regional Storm Floodplain, TRCA staff had requested that the applicant make modifications to the location and /or design of the proposed development in order to site it outside of the Regional Storm Floodplain. However, the structures will be appropriately flood proofed to the Regional Storm Elevation and all excavated materials will be removed from the flood plain. The area to which this application applies is currently a manicured lawn and is void of any significant vegetation. An enhancement planting plan has been incorporated into the design of this proposal to improve the ecological condition of this area. Control of Flooding: . TRCA Water Resources staff has reviewed this proposal and do not anticipate any impacts to the storage and /or conveyance of flood waters. However, additional confirmation will be required prior to issuance of the permit, that the proposed tower and compound can meet TRCA's floodproofing requirements. The proposed structures are located outside of the hydraulic floodway. All excavated fill will be removed from the floodplain. Pollution: Appropriate erosion and sediment controls will be installed and maintained on the subject property throughout all phases of construction, in accordance with TRCA guidelines. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as result of construction. Although no vegetation will be removed, the applicant has proposed extensive plantings along the rear of the property; abutting the valley corridor. Plantings All plant species are native and non - invasive, consistent with TRCA's guidelines. Policy Guidelines: The proposal is consistent with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program CFN: 40445 - Application #: 074 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 30, 2008 375 TOWN OF RICHMOND HILL 8.1.67 62 CATALINA CRESCENT To temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 7, Plan 65M -3230, 62 Catalina Crescent, in the Town of Richmond Hill, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a pool and related landscaping. The permit will be issued for the period of May 9, 2008 to May 8, 2010, • Letter of undertaking prepared by Performance Pools, dated May 7, 2008, to address outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a pool and related landscaping, within a wetland interference area adjacent to a stream corridor feature. TRCA staff has conducted a site inspection and confirm that the proposed works are sufficiently setback from the feature. The area to which this application applies is currently a manicured lawn and is void of any significant vegetation. The proposed works are located outside of the Regional Storm Floodplain. . Control of Flooding: The proposed works are located 'outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters is anticipated. • Pollution: • . Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: . There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as result of construction. Plantings As no significant vegetation will be removed, no plantings are required. 376 Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40659 - Application #: 225/08/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 30, 2008 8.1.68 11 WASAGA COURT • To temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 138, Plan 65M -3896, 11 Wasaga Court, in the Town of Richmond Hill, Rouge River Watershed. The purpose is to undertake works within a Regulated Area of the Rouge River Watershed in order to facilitate the construction of an inground pool. The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Letter of Undertaking, provided by S. Brockstein of Tribute Communities, dated May 7, 2008 to address all outstanding engineering related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a Regulated Area of the Rouge River Watershed in order to facilitate the construction of an inground pool. The subject property is located adjacent to a valley corridor feature of the Rouge River Watershed. TRCA staff has conducted a site inspection and confirm that the proposed works appears to be sufficiently . setback from the valley corridor feature.. The area to which this application applies is currently a manicured lawn and is void of any significant vegetation. The proposed works are located outside of the Regional Storm Floodplain. Control of Flooding: The subject property is located adjacent to a valley corridor feature of the Rouge River Watershed. The proposed works are located outside of the Regional Storm Floodplain. Pollution: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters is anticipated. Dynamic Beaches: Not applicable Erosion: Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject property during all phases of construction. 377. Conservation of Land: No significant vegetation will be removed as result of construction. Although no vegetation will be removed, the applicant is proposing plantings.along the rear of the property, abutting the • valley' corridor. Plantings All plant species are native and non-invasive, consistent with TRCA's guidelines. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40774 - Application #: 296/08/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 30, 2008 8.1.69 ,'SONGBIRD ESTATES (LAKE WILCOX) LTD. To change a building or structure so that it alters its use or potential. use, increases its size or increases the number of dwelling units on Lot 109, Plan 240, 216 Lakeland Crescent, in the Town of Richmond Hill, Humber River Watershed as located on the property owned by Songbird Estates (Lake Wilcox). Limited. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new dwelling. The permit will be issued for. the period. of May 9, 2008 to May 8, 2010. • Site Plan, prepared by Ark Design Concepts, dated April 14, 2008, stamped received by TRCA Planning and Development on April 29, 2008; • Drawing N1, prepared by Ark Design Concepts,. dated April 14, 2008, stamped received by TRCA Planning and Development on April 29, 2008; • Drawing Al, prepared by Ark Design Concepts, dated April 14, 2008, stamped received by TRCA Planning and Development on April 29, 2008; • Drawing A2, prepared by Ark Design Concepts, dated April 14, 2008, stamped received by TRCA Planning and Development on April 29, 2008; • Drawing A3, prepared by Ark Design Concepts, dated April 14, 2008, stamped received by TRCA Planning and Development on. April 29, 2008; • Drawing A4, prepared by Ark Design Concepts, dated April 14, 2008, stamped received by TRCA Planning and Development on April 29, 2008; • Drawing A5, prepared by Ark Design Concepts, dated April 14, 2008, stamped received by TRCA Planning and Development on April 29, 2008; • Drawing A6, prepared by Ark Design Concepts, dated April 14, 2008, stamped received by TRCA Planning and Development on April 29, 2008; • Drawing A7, prepared by Ark Design Concepts, dated April 14, 2008, stamped received by TRCA Planning and Development on April 29; 2008; 378 • Drawing A8, prepared by Ark Design Concepts, dated April 14, 2008, stamped received by TRCA Planning and Development on April 29, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new dwelling at 216 Lakeland Crescent, in the Town of Richmond Hill. The subject property which currently contain an existing dwelling to be demolished is located within an approved residential development in the Lake Wilcox Special Policy Area (SPA). The subject site and the proposed dwelling are located entirely within the Regional Storm Floodplain. Although the works are located within the floodplain, the proposed dwelling will be appropriately floodproofed. The area to which this application applies is void of any significant vegetation and is currently manicured lawn. There are no geotechnical concerns related to this application. Control of Flooding: TRCA Water Resources staff have reviewed this proposal and do not anticipate any impacts to the storage and /or conveyance of flood waters. The proposed dwelling is located outside of the hydraulic floodway and will be appropriately flood proofed. All excavated fill will be removed from the floodplain. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Since no significant vegetation will be removed, additional plantings are not required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40532 - Application #: 127/08/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 30, 2008 379 8.1.70 81 BURNDEAN COURT To site grade on Lot 1217, Plan 03219, 81 Burndean Court, in the Town of Richmond Hill, Don River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of an in ground pool. The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Site Plan, prepared by Betz Pools, dated April 9, 2008, stamped received by TRCA Planning and Development on April 28, 2008. RATIONALE The application was reviewed by staff on the basis of the following information:. Proposal: . . The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a swimming pool and related concrete patio in the Regional Storm Floodplain. Although the works are located within the flood plain, all existing grades.will be maintained. The area to which this application applies is void of any significant vegetation and is currently manicured lawn: Control of Flooding: TRCA Water Resources staff have reviewed this proposal and do not anticipate any impacts to the storage and /or conveyance of flood waters. The proposed inground swimming pool is located outside of the hydraulic floodway. All excavated . fill will be removed from the floodplain. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject . property during all phases of construction. Dynamic Beaches: .Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Since no significant vegetation will be removed, additional plantings are not required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). 380 CFN: 40750 - Application #: 273/08/RH . Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Harichard, extension 5324 Date: April 30, 2008 TOWNSHIP OF KING 8.1.71 TOWNSHIP OF KING To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on King Road, west of Highway 27, in the Township of King, Humber River Watershed as located on the property owned by Township of King. The purpose is to construct, site grade, place /remove fill /material within the regulated area to install a sanitary sewer and watermain. Works associated with the watercourse crossing within the regulated area on King Road will be constructed during the cold -water fisheries timing window of July 1 to September 15. The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Letter of Undertaking to provide minor revisions to engineering drawings to the satisfaction of TRCA staff; dated May 7, 2008; received May 7, 2008; prepared by Township of King. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The Nobleton Sewage Servicing Plan was reviewed by TRCA staff during the, Environmental Assessment process. Nobleton is proposed to be serviced with a gravity sewer collection system, a raw sewage pumping station and forcemain, a wastewater treatment plant and a treated effluent outlet pipe to the Humber River. The sewer will allow for residents to be taken off sewage septic systems, and to accommodate approved growth. Water Supply and Storage for the community of Nobleton was reviewed by TRCA staff during the Environmental Assessment process. The watermain will service planned and approved growth in the community. • This permit application is for a portion of sanitary sewer and watermain along King Road, west of Highway 27, between Kinsley Street and Wellington, in the Town of Nobleton. It involves the installation of a 250 millimetre (mm) diametre sanitary sewer and a 300 millimetre (mm) diametre watermain. The pipes will be installed by open -cut methodology in municipal road right -of -ways. A portion of each pipe is located within the regulated area on King Road. Works within the regulated area on King Road are to be completed by directional drilling under an existing culvert during the cold -water fisheries timing window (July 1 to September 15). 381 During construction effective erosion and sediment control (ESC) measures will be implemented to protect all natural features (aquatic and terrestrial). Any water derived from groundwater dewatering or pumping of open cut trench excavations will be managed to prevent impacts to surrounding natural environmental features. Further, any dewatering will be monitored throughout construction and mitigation measures for potential effects identified implemented in accordance with the approved contingency plan. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion control measures (silt /sediment fencing, rock flow check dam, dewatering trap) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the wetland /watercourse. Dynamic Beaches: Not applicable Erosion: ' There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With .erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a.Letter of Advice will be written by • TRCA staff on behalf of the Department of Fisheries and Oceans (DrO). This application is • subject to the cold - water, fisheries timing window. Local construction unwatering will be required and Hydrogeological staff have no significant groundwater related concerns. No significant vegetation will be removed as a result of construction.. The location of the proposed works- is within the Greenbelt. All permanent and intermittent streams in the Greenbelt are identified as Key.Hydrologic Features. Section 4.2.1 of the Greenbelt Plan indicates in Subsection 2 e) that infrastructure may be permitted to cross Key Hydrologic Features.provided that construction practices minimize the negative impacts on features and their functions. This project has been reviewed to confirm that there will be no negative impacts on the features and their functions. Plantings All disturbed areas will be . restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40645 - Application #: 210/08 /KING Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: April 29, 2008 382 8.1.72 TOWNSHIP OF KING To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Contract Area 5, in the Township of King, Humber River Watershed as located on the property owned by Township of King. The purpose is to construct, place /remove fill /material within a regulated area to install a sanitary sewer and reconstruct the road pavement structure within King City Contract Area 5. The permit will be issued for the period of May 9, 2008 to May 8, 2010. • Letter of undertaking to provide minor revisions to engineering drawings to the . satisfaction of TRCA staff; dated May 7, 2008; received May 7, 2008;. prepared by the Township of King. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The King City Sanitary Sewer project was reviewed by TRCA staff during the Environmental Assessment process. King City is being serviced with sanitary sewers and local pumping stations to take existing residents off sewage septic systems and to plan for future growth. All sewage will ultimately discharge to the York Durham Sewage System (YDSS) on Yonge Street once all servicing has been constructed. There are a total of 13 contract areas of which nine (9) have already been constructed or are currently being constructed. This application has been submitted for Contract Area 5, which will involve the construction of a 200 millimetre diametre sanitary sewer by open -cut methodology in municipal toad right -of -ways on various streets in Contract Area 5. A portion of the works are located within regulated areas on Warren Road, King Road and the King Boulevard Pumping Station connection. Full reconstruction of the pavement structure is proposed on Warren Road and King Road. The existing urban section will be reconstructed to match the existing urban profile and road widths. Urban sections will include removal and replacement of curb and gutter, sidewalks (where they exist) and installation of subdrains. For all works proposed in the Regional Storm Floodplain, post- construction grades will match existing. grades. During construction effective erosion and sediment control (ESC) measures will be implemented to protect all natural features (aquatic and terrestrial). Any water derived from groundwater dewatering or pumping of open cut trench excavations will be managed to prevent impacts to surrounding natural environmental features. Control of Flooding: The proposed project will not impact storage or conveyance of floodwaters. 383 • Pollution: Standard erosion and sediment control measures (silt /sediment fence, catchbasin silt control filter, etc.) will be implemented and maintained for the duration of construction and until the site is stabilized and restored to prevent construction generated sediment from entering any wetland /watercourse. Dynamic Beaches: Not applicable Erosion: There are no slope stability concerns with the proposed project. Conservation of Land: There will be no in stream work associated with this project. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). The location of the proposed works is within the Oak Ridges Moraine (ORM) and Greenbelt. Section 41 of the Oak Ridges Moraine Conservation Plan indicates in Subsection 5 that transportation and infrastructure may be permitted to cross hydrologically sensitive features (i.e. watercourses) subject to the tests and best management practices described in section 41(5)(a to e). This project has been reviewed for the tests and best management practices. Where a project is located within the ORM and. the Greenbelt, the ORM legislation prevails. Plantings All disturbed areas will be restored with native /non- invasive species following construction, as required. Policy Guidelines: . The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. The location of the works is within the Oak Ridges Moraine (ORM) and Greenbelt. The project has been reviewed for the tests and best management practices described in Section 41(5)(a to e) of the Oak Ridges Moraine Conservation Plan and complies with the Greenbelt Plan. CFN: 40646 - Application #: 213/08/KING Report Prepared by: Suzanne Bevan, extension. 5759 For information contact: Suzanne Bevan, extension 5759 Date: April 29, 2008 • PERMIT APPLICATION 8.1.73 IS PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS: RES.#B43/08 - PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Suzan Hall Richard Whitehead 384 THAT permission for routine infrastructure granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for application 8.1.73 - Enbridge Gas Distribution Inc., which is listed below, be received. TOWN OF CALEDON CARRIED 8.1.73 ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer and watermain or utility watercourse by trenchless technology on McLaughlin Road, in the Town of Caledon, Humber River Watershed as located on the property owned by Enbridge Gas.Distribution Inc.. The purpose is to install a NPS 0.5 PE IP gas pipeline crossing a tributary of the Humber River on the north side of McLaughlin Road approximately 1860 metres east of King Street, Town of Caledon, Regional Municipality of Peel. The pipe will be installed underneath the watercourse by trenchless technology using the Fisheries and Oceans Canada Ontario Operational Statement for High- Pressure Directional Drilling. The permit will be issued for the period of April 2, 2008 to April 1, 2010 in accordance with the following documents and plans which form part of this permit: Drawing 1 of 1, Work Request No. 4327266; dated November 28, 2007; received January 30, 2008; prepared by Enbridge Gas Distribution Inc RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the installation of a NPS 0.5 PE IP gas pipeline. The pipe, is proposed to be installed by trenchless technology. The working pits are approximately 15 metres away from the watercourse. The works will take 2 to 3 days to complete. Control ofFloodinq: There will be no adverse impacts to the storage or conveyance of flood waters as a result of this project. Pollution: Appropriate controls will be implemented and maintained throughout construction to prevent sediment and other deleterious substances from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There are no slope stability or geotechnical concerns with the proposed works. 385 Conservation of Land: There will be no impacts to significant aquatic or terrestrial features from the proposed works. The Fisheries and Oceans Canada Ontario Operation Statement for High- Pressure Directional Drilling will be utilized. All existing trees will be protected. Plantings Disturbed areas will be stabilized and restored with sod. Policy Guidelines: The proposal complies with Section 4.3, Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 40436 - Application #: 072 /08 /CAL Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne. Bevan, extension 5759 Date: April 2, 2008 PERMIT APPLICATIONS 8.1.74 - 8.1.92 ARE MINOR WORKS LETTER OF APPROVAL: RES. #B44/08 -- MINOR WORKS LETTER OF APPROVAL PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Suzan Hall Seconded by: Richard Whitehead THAT minor works letter of approval granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.74 - 8.1.92, inclusive), which are listed below, be received. CARRIED CITY OF BRAMPTON 8.1.74. 55 SUMMER VALLEY DRIVE To construct, reconstruct, erect or place a building or structure on Lot 179, Plan 43M -1276, (55 Summer Valley Drive), in the City of Brampton, Humber River Watershed. CFN: 40011 - Application #: 852/07/BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 -Date: April 3, 2008 8.1.75 56 HAWKRIDGE TRAIL To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 12A, Plan 43M -1713, (56 Hawkridge Trail), in the City of Brampton, Humber River Watershed. 386 CFN: 40748 - Application #: 277/08/BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date::April 24, 2008 8.1.76 16 PASADENA AVENUE To install a swimming pool on Lot 214, Plan 43M 1714, (16 Pasadena Avenue), in the City of Brampton, Humber River Watershed. CFN: 40722 - Application #: 267/08/BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: April 18, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.77 19 DACRE CRESCENT To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a ground floor addition up to 50 sq. m (538 sq. ft) on 19 Dacre Crescent in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 39720 - Application #: 641/07/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 24, 2008 8.1.78 218 PARK LAWN ROAD To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads), construct a ground floor addition up to 50 sq. m (538 sq. ft), construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than .150 sq. m (1614 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 5, Plan 2234, (218 Park Lawn Road), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. CFN: 40633 Application #: 207/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 1, 2008 387 8.1.79 73 BLACK CREEK BOULEVARD To construct a ground floor addition up to 50 sq. m .(538 sq. ft) on Part Lot 89, 90, Plan 3366, (73 Black Creek Boulevard), in the City of Toronto (Etobicoke York Community Council Area), Humber.River Watershed. CFN: 40673 - Application #: 240/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 17, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.80 CITY OF TORONTO (PARKS, FORESTRY & RECREATION DIVISION) To undertake minor landscaping involving the placement, removal or regrading of material of Tess than 30 cubic metres (equivalent to 3. truckloads) and construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on , (443 Arlington Avenue), in the City of Toronto (North York • Community Council Area), Don River Watershed as located on the property owned by City of Toronto (Parks, Forestry & Recreation Division). CFN: 40657 - Application #: 228/08/TOR Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: April 7, 2008 . 8.1.81 8 ROYCREST AVENUE To construct a ground floor addition up to 50 sq. m (538 sq. ft): on Lot 1.8, • Plan 3722, (8 Roycrest Avenue), in the City of Toronto (North York Community Council Area), Don River Watershed: CFN: 40650 - Application #: 217/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 28, 2008 . .8.1.82 WINDEMERE CUSTOM HOMES To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but Tess than 150 sq. m (1614 sq. ft) on Lot 125, Plan RP 1750, (69 Highland Crescent), in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by Windemere Custom Homes. CFN: 40752 - .Application #: 271/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 28, 2008 • . 388 8.1.83 YORK CONDOMINIUM CORPORATION NO. 14 To construct a non - habitable accessory structure up to 50 sq. m (538 sq, ft) on , (19 London Green Court), in the City of Toronto (North York Community Council Area), Humber River Watershed as located on the property owned by York Condominium Corporation No. 14. CFN: 40747 - Application #: 278/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: April 29, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.84 23 GOVERNORS ROAD To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lots 74, 75, Plan 2398, (23 Governors Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 40656 - Application #: 229/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 22, 2008 8.1.85 10 WINDLEY AVENUE To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 148, Plan 1741, (10 Windley Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 40683 - Application #: 247/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve. Heuchert, extension 5311 Date: April 17, 2008 8.1.86 11 WEMBLEY DRIVE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on (11 Wembley Drive), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 40696 - Application #: 260/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve. Heuchert, extension 5311 Date: April 24, 2008 389 8.1.87 105 DALRYMPLE DRIVE To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Part Lot 8, Plan 5224, (105 Dalrymple Drive), in the City of Toronto (Toronto and East York Community Council Area), Humber River Watershed. CFN: 40682 - Application #: 246/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: April 22, 2008 CITY OF VAUGHAN 8.1.88 • 163 COOKS MILL CRESCENT To . construct; reconstruct, erect or place a building or structure on Lot 102, Plan .65M -3917, (163 Cooks Mill Crescent), in the City of Vaughan, Don River Watershed. CFN: 40672 - Application #: 237 /08NAUG Report Prepared by: Deborah Agnew, extension For information contact: Bill Kiru, extension 5306 Date: April 23, 2008 TOWN OF CALEDON 8.1.89 122 JAMES STREET To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 48, Plan BOL - 7, (122 James Street), in the Town of Caledon, Humber River Watershed. CFN: 40746 - .Application #: 279/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: April 24, 2008 8.1.90 RON WILSON CONSTRUCTION LIMITED To construct aground floor addition or structure greater than 50 sq. m (538 sq. ft) but Tess than 150 sq. m (1614 sq. ft) on Lot 21, Plan M -418,' (13 Simpon Road), in the Town of Caledon, Humber River Watershed as located on the property owned by Ron Wilson Construction Limited. CFN: 40688 - Application #: 256/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: April 15, 2008 390 TOWN OF MARKHAM 8.1.91 20 PARAMOUNT ROAD To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 53, Plan 4877, (20 Paramount Road), in the Town of Markham, Rouge River Watershed. CFN: 40661 - Application #: 231/08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 8, 2008 TOWN OF RICHMOND HILL 8.1.92 6 MOLISE COURT To install a swimming pool on Block 65, Plan 65M -2113, (6 Molise Court), in the Town of Richmond Hill, Don River Watershed. CFN: 40655 - Application #: 230/08/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: April 8, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.93 FILMPORT DEVELOPMENTS INC ,To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Block 2, Plan 540 -E, (225 Commissioners Street), in the City of Toronto. (Toronto and East York Community Council Area), Waterfront Watershed as located on the property owned by Filmport Developments Inc.. The purpose is to construct the first portion of Phase 2 of the FilmPortProject comprised of a 7,800 square metre, four storey commercial building. The permit will be issued for the period of May 9, 2008'to May 8, 2010 in accordance with the following documents and plans which form part of this permit:. • Letter of Undertaking from FilmPort - to fulfill all TRCA requirements, dated May 5, 2008, received May 6, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 391 Proposal: The proposal is to excavate, shore up the excavation and install cassions in order to begin the development of the first portion of Phase 2 of the "FilmPort" project and, upon Site Plan approval, to construct a 7,800 square metre, four storey commercial building to: be leased to the film industry. The building will be located south of Basin Street and east of the Don Roadway. The entire proposed FilmPort development is 45 acres located in the Toronto Port Lands in the vicinity of Commissioner's Street, between the Don Roadway to the west, Lakeshore Boulevard to the north, Bochette Street to the east, and the Ship Channel to the south. This area is entirely within the Lower Don Special Policy Area. Phase 1 comprising 21,550 square metres of sound stages, production offices and support facilities was subject to TRCA Permit No. C -06497 approved on October 13, 2006 and now substantially constructed. The grading proposal for the first portion of Phase 2 will tie. into the grades for Phase 1 and will protect the proposed commercial building from flooding. TRCA Water Resources Ehgineering staff has confirmed that this will not have an impact on flooding nor have the potential to impact • any of the alternatives to implementation of the Don Mouth Naturalization and Port Lands Flood Protection Project Environmental Assessment, given the preliminary preferred alternative. Conditional Approval: TRCA staff has met with all proponents and City of Toronto representatives to coordinate the conceptual approval of the Site Plan. FilmPort has informed TRCA and City of Toronto staff that excavation, shoring and the installation of cassions must begin as soon as possible in order to meet an occupancy deadline for the tenant, a large employer in the film business. FilmPort has agreed that they will bear full responsibility for any changes to the location of cassions through the Site Plan review process. TRCA staff are satisfied with the technical merits of the proposal (i.e. no impactto the control of flooding) but-have not had .a chance to review the final details. As such, staff is requesting permission from the Executive Committee to: 1) allow staff. to . approve the issuance.of the Ontario Regulation 166/06 permit for this project subject to FilmPort receiving confirmation from the City of Toronto that the location of the excavation, shoring and cassions is-acceptable andconfirrriation from TRCA's Water Resources Engineering staff that the erosion and sediment control plan is acceptable; and 2)-allow staff to approve the issuance of a permit revision for the final grading and development of the building .at a later date subject to confirmation from TRCA's Water Resources Engineering staff that the -proposal is adequately protected from flooding. Control of Flooding: Portions of the site are estimated to be slightly below the grade of the Regional Storm Flood Elevation. The excavation, shoring and installation of cassions will have no impact on the control of flooding. As part of the grading and development of the building, the site will be raised, bringing it above the floodplain elevation. .This .wiII have no impact on the control of flooding as the revised grading is minor and the site is located in close proximity to Lake Ontario. Pollution: • Temporary sediment and erosion controls will be installed during construction. The stormwater management system will be designed to tie into Phase I and upgraded with additional quality control. Dynamic Beaches: • Not applicable. 392 Erosion: There are no geotechnical issues with the proposal. Water quantity control is not required as the stormwater discharges to Lake Ontario. Conservation of Land: The site is currently undeveloped former industrial lands and does not contain any significant natural resources. Plantings No plantings beyond City- required site landscaping are required. Policy Guidelines: The proposal is in consistent with Section 4.2.1 (B) - Development/Redevelopment within Designated Two Zone Areas or Special Policy Areas - of the TRCA's Valley and Stream Corridor Management Program. CFN: 40802 - Application #: 319/08/TOR Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: May 6, 2008 RES.#B45/08 - Moved by: Seconded by: MILLCREEK ESTATES Town of Caledon, Regional Municipality of Peel Humber River Watershed. Development on existing vacant lots of record within the Mill Creek Estates Subdivision which contain or are adjacent to significant natural features. Suzan Hall , Richard Whitehead THAT Toronto and Region Conservation Authority (TRCA) staff continue discussions with Town of Caledon staff with regard to completing a development protocol and guideline package to assist in establishing best management practices and suitable development for lots within the Mill Creek subdivision; THAT TRCA staff consult with Ministry of Natural Resources (MNR) staff prior to the completion of the protocol, and that the protocol once established, be forwarded to the Ministry of Natural Resources (MNR) for their information; AND FURTHER THAT TRCA staff be directed to explore potential opportunities for more broadly applying a similar collaborative protocol on other similar applications within the Town of Caledon. CARRIED 393 BACKGROUND During TRCA staff's review of a permit application for development on a vacant lot of record at 2 'Locke Drive in the Town of Caledon, TRCA staff identified potential concerns with respect to development-on this property given its close proximity to significant natural features. TRCA staff also identified potential future concerns with respect to development on other vacant lots within this plan of subdivision, on which the potential for future development may be significantly effected by the natural features within this area. At Executive Committee Meeting #1108, held on March 7, 2008, Resolution #B14/08 was approved as follows: THAT the Chief Administrative Officer be authorized to issue an Ontario Regulation 166/06 permit for Millcreek Estates Lot 7 - 2 Locke Drive, Town of Caledon, subject to staff being.satisfied with the permit; THAT staff report back on the discussions relating to 2 Locke Drive; AND FURTHER THAT staff work with Town of Caledon staff to develop a combined approach for dealing with the entire subdivision and present the results to the Executive Committee. 2 Locke Drive Permit Application Subsequent to the March 7, 2008 Executive Committee meeting, TRCA staff met with the landowner of 2 Locke Drive and Town of Caledon staff to resolve the outstanding issues with respect to development on this property. At the time at which this permit application was brought forward for the consideration of the • Executive Committee, modifications were required to the development proposal to minimize any potential impacts on the Provincially Significant Wetland, located directly to the north on an adjacent property. Through the subsequent discussions with the landowner, modifications were made to the proposed grading, limits of disturbance, as well as limits of the building envelope to reduce potential impacts on the adjacent wetland. As part of these modifications, the • proposed building envelope was reduced to include only the lands on the front portion of the property, while the proposed building envelope was removed from the rear of the lot to ensure the long -term protection of the existing natural features. Proposed grading on the lot will be minimized in areas adjacent to natural features, and the owner has committed to utilize a state of the art septic system to minimize any potential impacts to the adjacent Wetland. Additionally, the owner agreed to provide for restoration and enhancement of portions of the property on which development will not be occurring, to enhance the natural linkage function that it currently provides. After having successful negotiations, a TRCA permit was issued shortly thereafter for this property. 394 Mill Creek Estates Subdivision Further to the direction from the Executive Committee, TRCA staff also met with Town of Caledon staff to discuss the larger issues with respect to development within this subdivision. Based upon these discussions, an internal protocol is being established for managing development applications within this subdivision to ensure that the approval process will fully consider both TRCA and Town of Caledon requirements. Of principal issue to the Authority is minimizing the potential impacts of development on the significant natural features and systems that are located on, and traverse, the subject property. Subdivision History Mill Creek Estates is a registered plan of subdivision located on the east side of The Gore Road, south of Old Church Road in the Town of Caledon. This subdivision was originally draft approved in 1974, amended in 1988, and subsequently registered. At that time, provincial ministries (Ministry of Natural Resources (MNR) and Ministry of Municipal Affairs and Housing (MMAH)) performed the natural environment related plan review function that TRCA presently provides, and TRCA was not actively involved in the planning or approvals for this subdivision. Based upon the planning policies in place at that time, lots were permitted which partially or wholly contained wetlands, or were directly adjacent to the wetlands. Due to a number of factors, development did not proceed within this subdivision at that time, and the lots were sold , to individual landowners. Since the time in which this subdivision was approved the wetlands that traverse this subdivision were assessed and designated by the Province. These wetlands now form part of the Hockley Valley Provincially Significant Wetland Complex. The lands have also been subsequently designated under the Oak Ridges Moraine Conservation Plan (ORMCP) as `Natural Core'. Based upon today's Provincial Policy requirements,. a subdivision of this nature • • would not be permitted. However, as a registered plan of subdivision, the lots have already been established and sold, and development on these properties is consequently only subject to a limited number of provisions of the ORMCP and Town .of Caledon Official Plan, pertaining to existing lots of record. ' Current Issues TRCA staff has recently received a number of permit applications, and Caledon scoped site plan control circulations, for development on the lots within this subdivision. Through the review of these applications it became apparent to TRCA staff that there may be lots within this subdivision on which development (from the perspective of TRCA staff) may be significantly constrained, or precluded, as a result of the significant natural features on the lots. The permit application for 2 Locke Drive that was discussed at the March 7, 2008 Executive Committee meeting was the first of these permit applications to be considered by TRCA under Ontario Regulation 166/06, through which TRCA regulates development within and adjacent to wetland areas. 395 Town of Caledon staff has confirmed that in accordance with their ORMCP conformity amendment to their Official Plan, that the Town may not have the ability to preclude development on existing lots of record within approved subdivisions on the Oak Ridges Moraine (ORM) which have significant natural features - where planning approvals were attained in advance of the Oak Ridges Conservation Act being passed. On such lots, Town staff has indicated that they will work with the landowners, through the Town's scoped site plan control process to reduce the potential impacts of the development to the greatest possible extent. While TRCA's requirements for considering' applications made under Ontario Regulation 166/06 are most often complementary with the Town's policies and the requirements of the Planning 'Act, in such situations where historic planning approvals allow for 'grandfathered' development . to occur that may not be permitted under present day planning policies, TRCA's requirements for the issuance of a TRCA permit may differ from the Town's requirements for development. Due to the circumstances described above, development on some of the lots within the Mill Creek Estates subdivision may be among those which are not consistent. Under the Conservation Authorities Act and Ontario Regulation 166/06, TRCA regulates development within an area of interference which includes wetlands and adjacent areas. Within these areas, in order, for TRCA staff to support the issuance of a permit, the proposal must pass. tests relating to Control of Flooding, Pollution,. Conservation of Lands, Erosion and other parameters. Should through the review of an application, TRCA.staff determine that a development proposal does not meet one or.more of these tests, should the proposal be . supported by Town staff, the position of the two agencies may not be complementary. DETAILS OF WORK TO BE DONE The above -noted issues were discussed with Town staff and it was determined that an informal protocol should be established, which would be utilized by Town staff in pre - consultation discussions with landowners within this subdivision to flag the potential issues of TRCA. While . the details of this protocol are still being refined, this protocol will include a color -coded map of this subdivision on which the lots will be coded based upon the potential interests of TRCA. It is expected at this time, that the following coding would apply: • > For lots which contain wetland features and on which development (from the perspective of TRCA staff) would be.:significantly constrained or precluded, Town of Caledon staff will direct proponents to.TRCA first, and will not process a scoped site plan approval application until such time as proponent has had discussions with TRCA staff. • On lots which are adjacent to wetlands, or those with a significant linkage function, proponents would be given guidelines for development on these properties, and directed to consult with TRCA staff. • For lots on which development is unlikely to be significantly effected by natural features, a copy of the guidelines for development should be provided to the proponent, however, Town staff may proceed with discussions with the proponents with respect to development concepts without first referring the proponent to TRCA. 396 While the guidelines identified above are still being developed, and additional discussions will be required between TRCA and Town staff with regard to the content of the guidelines, it is anticipated that these will provide guidance on best management practices and site design. The location of development on the property, grading works, and the location and extent of ancillary uses are likely to be included. TRCA staff will work further with the Town of Caledon to design the guidelines, and to effectively implement an enhanced approach to development within this subdivision that will be complementary to the interests of both agencies. Prior to the completion of the protocol, TRCA staff will also consult with MNR staff regarding the provincial interests. A copy of this report, and the proposed protocol (once completed) will be forwarded to MNR for their information. Report prepared by: Quentin Hanchard, extension 5324 Emails: ghanchard @trca.on.ca For Information contact: Quentin Hanchard, extension 5324 Emails: ghanchard @trca.on.ca Date: April 30, 2008 RES.#B46/08 - Moved by: Seconded by: ONTARIO REGULATION 166/06 PERMIT RE- ISSUANCE PROTOCOL A Permit Re- Issuance Protocol to streamline the review and approval process for works that have received a permit from Toronto and Region Conservation Authority under Ontario Regulation 166/06, but where the permit will expire before the works are completed. Suzan Hall Richard Whitehead WHEREAS Toronto and Region Conservation Authority (TRCA) staff is committed to working cooperatively with all of TRCA's municipal partners, landowners and stakeholders regarding the implementation of Ontario Regulation 166/06, including opportunities to streamline the approval process where appropriate; WHEREAS TRCA, through its Business Excellence objective, is committed to improving and streamlining the administration of regulation compliance; THEREFORE LET IT BE RESOLVED THAT the "Permit Re- Issuance" protocol, including the delegation of approval authority to TRCA staff, as outlined in the staff report, be approved and implemented; AND FURTHER THAT the municipal building and engineering departments of TRCA's member municipalities be so advised. CARRIED 397 BACKGROUND On May 8, 2006, TRCA's "Development, Interference with Wetlands and Alterations to Shorelines and Watercourses" Regulation, Ontario Regulation 166/06, was formally approved. It replaced TRCA's "Fill, Construction, and Alteration to Waterways" Regulation, Ontario Regulation 158. To facilitate the transition from the old regulation to the new regulation and to improve service delivery to applicants and member municipalities, the Authority approved a "Permission for Minor Works" protocol (Authority Meeting #5/06, held on June 23, 2006, Resolution #A152/06) and a "Permission for Routine Infrastructure Works" protocol (Authority Meeting #10/07, held on January 4, 2008, Resolution #A293/07). Both protocols allow for a streamlined permit approval process for works that do not impact flooding, erosion, dynamic • beaches, pollution or the conservation of land. In addition, approval authority was delegated to TRCA staff under both protocols. Regardless of whether approvals are granted through one of the streamlining protocols noted above, or through the regular process wherein TRCA staff forward recommendations of approval to the Executive Committee, permits pursuant to Ontario Regulation 166/06 cannot be extended. Under Ontario Regulation 166/06, permits are issued for two years and legally there is no opportunity to extend the expiry date of the approval. In recognition of the fact that some works, especially those related to public infrastructure projects, require more than two years to reach completion, the need to develop a protocol to streamline the re- issuance of a previously approved permit was identified. Typical reasons for why projects take longer than two years to • complete relate to the process of tendering and awarding.contracts, budgeting, and . construction constraints associated with fisheries timing windows. • RATIONALE . As nearly two years have passed since the adoption of Ontario Regulation 166/06; and permits under the Regulation can only be issued for two years, the initial permits granted by TRCA will soon start to expire. Under the existing process, applicants will have to apply for a new permit following the expiration of their original permit. As part of this process,.new 'copies .of the previously approved plans /documents and a fee associated with a.new•permit will have to be submitted. Further, the application will be subject to TRCA's regular review and approval • procedures, including the requirement for Executive Committee approval. If the.Permit Re- Issuance Protocol is approved by the Executive Committee, and upon notification generally 60 days prior to the expiration of their Ontario Regulation .166/06 permit, applicants will be able to apply for a permit to be re- issued. This will entail the submission of an application form, including confirmation that the supporting plans /documents are identical to those previously approved by TRCA or the submission of new plans /documents where minor modifications are proposed that are in keeping with the original approval, a fee equivalent to 50% of the current permit fee, and a streamlined approval process that would include the delegation of approval authority to TRCA staff. As per existing protocols, permits are signed by • the Director, Planning and Development, an appojnted enforcement officer, or staff designated • • by the Director, Planning and Development. This new protocol will result in the issuance of new • permits, but the review and approval of those permits.will be streamlined, taking into consideration that the works were previously reviewed and approved .by TRCA. Similar to the existing streamlining protocols, all re- issued permits will be forwarded to the Executive • . Committee for their information. The issuance of a new permit will ensure that TRCA maintains our legislative obligations under Ontario Regulation 166/06, while providing an opportunity to expedite the review process and improve service delivery. 398. Criteria Outlined below are the criteria that will be used to determine if a previously approved Ontario Regulation 166/06 permit may be re- issued: • Original permit was not issued under the "Permission for Minor Works" protocol or the "Permission for Routine Infrastructure Works" protocol, as these protocols capture works that are minor or routine in nature and therefore should not require longer than two years to complete. • Works must be identical to the original permit or minor modifications in keeping with the intent of the original permit. • Property ownership as per the original permit remains the same. • No prior re- issuances. Notwithstanding the above, any requests for a permit re- issuance will be assessed in accordance with all new updated technical hazard information and policies (e.g. floodproofing requirements may need to be modified if new flood plain information indicates increased risk). There is no guarantee of an automatic approval. In addition, a permit may be re- issued one time only, after which the project is considered new works. Processing Fee TRCA's Administrative Fee Schedule for permit applications was updated on January 4, 2008. Included within the fee structure is a processing fee of 50% of the current regular permit fee for one -time only permit re- issuances under Ontario Regulation 166/06. DETAILS OF WORK TO BE DONE The "Permit Re- Issuance" protocol will be circulated to the building and engineering departments of municipalities in TRCA's jurisdiction. If required, staff will meet with appropriate staff of the municipalities to discuss the protocol. Summary There are no provisions under Ontario Regulation 166/06 to extend permits. On a one -time basis, and upon notification generally 60 days prior to the expiration of an Ontario Regulation 166 /06.permit, ;applicants may apply for the re- issuance of a new permit for the original approved works, before the works are considered new. Such requests will be assessed in accordance with any new updated technical hazard information and policies. There is no guarantee of an automatic approval. The intent of the proposed "Permit Re- Issuance" protocol is to continue to provide a streamlined, expeditious, and efficient review and approval process for the implementation of our regulatory responsibilities. Staff will review and monitor the effectiveness of this protocol for consideration in any future updates to the Regulation, should the opportunity arise. Report prepared by: Robyn McMullen, extension 5687 Emails: rmcmullen @trca.on.ca For Information contact: Laurie Nelson, extension 5281 Emails: Inelson @trca.on.ca Date: April 18, 2008 399 RES. #B47/08 - Moved by: Seconded by: REGIONAL WATERSHED MONITORING NETWORK Stream Gauge Monitoring and Maintenance. Sole source the hiring of Ontario Hydrometric Services Limited (OHS) to construct, maintain, monitor and archive stream flow data as part the Toronto and Region Conservation Authority's Regional Monitoring Network. Suzan Hall Richard Whitehead THAT the Toronto and Region Conservation Authority (TRCA) enter into an agreement with Ontario Hydrometric Services Limited (OHS) for a period of one year to construct, maintain, monitor and archive stream flow data at 23 existing stream gauges as part of TRCA's Regional Monitoring-Network Program at a cost not to exceed $117,310 plus .. applicable taxes; AND FURTHER THAT staff be authorized to take necessary action to implement the agreement, including signing of documents. CARRIED . BACKGROUND TRCA; with the support of our member municipalities, has developed and implemented a regional monitoring network within TRCA's area of jurisdiction. The network has been designed to be a comprehensive, integrated and coordinated system which fulfils the needs of the Remedial Action Plan (RAP), TRCA, and the individual watershed andwaterfront councils and alliances, while furthering the interests of municipal, provincial and federal partners. The regional monitoring program includes aquatic habitat and species, fluvial geomorphology, terrestrial natural heritage (flora and fauna), surface water quality, surface water quantity (flow and precipitation), groundwater and air quality. . . The surface water quantity component, which includes precipitation and stream flow data is critical to TRCA's flood forecasting and warning program and is also used by municipalities and consultants for stormwater management planning, municipal infrastructure design and watershed modelling. The focus of this assignment is to retain a consultant for one year to maintain, monitor and archive stream flow data for 23 gauges within TRCA's entire stream gauge network. In addition to data management, this project also involves the maintenance, monitoring, data acquisition and processing, training, and continued development of stage /discharge relationships, for all TRCA stream gauges. . RATIONALE • Historically, the. majority of gauging has been carried out by Environment Canada, through their Water Survey Canada (WSC) division for stream gauge monitoring. Outside of Environment Canada's objectives, TRCA identified the need to increase the knowledge base of our watersheds by increasing the number of gauges and expanding the network. Presently, TRCA staff does not have sufficient staff resources needed to operate and maintain the network, . therefore, staff require the services of a private contractor. Today, the availability of private contractors who undertake water quantity'work is still limited in the area. While some consulting, firms offer a service of flow gathering in storm and sanitary sewers, very few are able to monitor open channel flows to Environment Canada standards. 400 In 2007, OHS participated in a competitive bid process to provide these services to TRCA. Based on a detailed review and evaluation of the proposals, TRCA unanimously agreed that OHS should be awarded the contract. Therefore, TRCA would like to sole source OHS for the following reasons: • OHS has successfully monitored and maintained over a hundred stream gauges throughout Ontario including TRCA's stream gauge network for the past ten years; • existing stage /discharge curves could be compromised if a less experienced consultant was retained; • OHS conducts all field work and data processing for TRCA and has gained experience in TRCA monitoring needs and objectives, location of the existing stations, and has provided technical expertise regarding various types of monitoring equipment; • OHS is familiar with the set -up, downloading and Serial Data Interface (SDI) sensor programming of the Sutron 9210 datalogger used by TRCA at some of their stream gauge stations; • • training will be provided so that TRCA staff can gain the knowledge required to complete these tasks in -house in the future. FINANCIAL DETAILS TRCA has provided a detailed task list to Ontario Hydrometric Services Limited for which they have provided a quote of $117,310 plus applicable taxes. Staff is of the opinion that this represents good value for the extent of work requested. OHS has the most experience in the field of open channel flow monitoring and has successfully and effectively provided TRCA with these services for the past 10 years. Staff is therefore recommending the project be a sole source contract with Ontario Hydrometric Services Ltd because they have continued to demonstrate the knowledge and capacity required to meet TRCA's needs. As per TRCA's Purchasing Policy, sole source contracts from $50,000 to $200,000 require approval from the Executive Committee. Funds required to complete this project are available within the approved 2008 Regional Watershed Monitoring Network and Flood Forecasting and Warning Program budget accounts 124 -20 and 122 -46. A maximum upset limit of $117,310 plus applicable taxes has been set for this project. Report prepared by: Lisa Moore, extension 5367 Emails: Imoore @trca.on.ca • For Information contact: Lisa Moore, extension 5367, Craig Mitchell, 647 - 212 =2410 Emails: Imoore @trca.on.ca, cmitchell @trca.on.ca Date: April 15, 2008 401 RES. #B48/08 - OUT OF COUNTRY TRAVEL Engineering for Ecosystem Restoration Workshop Series, University of Buffalo, Amherst, New York, June 9 - 13, 2008. Approval for Toronto and Region Conservation Authority staff to travel outside Canada to attend a professional development workshop in the United States of America. Moved by: Suzan Hall Seconded by: Richard Whitehead THAT approval be granted for Moranne McDonnell, Project Manager, Environmental Engineering Projects, and :Patricia Newland, Supervisor, Project Planning and Monitoring, to attend the Engineering for Ecosystem Restoration Workshop ".Stream Ecology and Restoration - Function Based Hydraulic Structure, Biological Assessment and 'Bioengineering Design" at the University of Buffalo in Amherst, New York from June 9 - 13, 2008 at a cost not to exceed $2,500 paid for by Toronto and Region Conservation Authority, (TRCA); AND FURTHER THAT a presentation be made at Executive Committee Meeting #5/08, to be held on July 11, 2008 with an overview of the conference. CARRIED BACKGROUND Erosion is a natural process that has traditionally been controlled with 'hard' engineering practices that are now well -known by industry professionals as often having - detrimental impacts on stream ecology. Recognizing the need corporately to deliver long -term erosion • • control projects in a more sustainable manner, it is necessary to continue fostering the professional development of staff by supporting training on the latest environmentally - sensitive • • stream restoration practices. . A global focus on climate change and the need to brace for higher intensity and more frequent storm events places soil bioengineering at the forefront of erosion control because unlike inert structures like concrete and gabion that weaken with age, bioengineering uses Living material that grows stronger over time. The root systems of these living structures provide substantial strength 'and resistance to movement, while providing food and cover for wildlife, becoming a sustainable part of the local ecosystem. Staff's limited experience with bioengineering to date has been extremely positive, encouraging the incorporation of bioengineering techniques on TRCA managed projects. Although bioengineering and biotechnical erosion control methods have been widely used since the 1970's, many of these techniques are relatively new to the Greater Toronto Area (GTA), and more specifically, to TRCA. A recently announced workshop series being held at the University of Buffalo provides an opportunity for industry professionals who design and manage stream restoration projects to learn the latest techniques in bioengineering and network with other professionals in watershed restoration. The topics at this workshop include: . • stream restoration design based on form and function of stream ecosystems; • overview of biological parameters of riverine systems; . • bioengineering techniques and riparian management including the use of native species and the control and impact of invasive species; 402 • three days of hands on case studies of local stream and riparian restoration projects (field training); • field biological assessments, characterizations and statistical analysis. The instructors include Dave Derrick, an internationally recognized Research Engineer with the .US Army Corps of Engineers' (USACE) Engineering Research and Development Center (ERDC), Paul Furhmann, Habitat Restoration Specialist with Ecology and Environment Limited, and Dr. Chris Pennuto, Macroinvertebrate Ecologist at Buffalo State College. RATIONALE Moranne McDonnell and Patricia Newland are the lead contacts for the planning, design and approvals for TRCA erosion control projects. Many of the smaller -scale projects are designed in -house by Moranne McDonnell and Patricia Newland, while larger projects are designed by consulting engineers under their direction. It is highly desirable for staff to attend this workshop because unlike other class training workshops on stream restoration that cover basic principles and techniques and which are generally aimed at planners and reviewers, this workshop is geared toward the designers and builders of bank stabilization works. Attendance at this workshop will provide staff the opportunity to bring leading -edge technologies to TRCA, helping to continue building TRCA's reputation as a leader in environmentally - sensitive erosion control. At present there are no known workshops within the GTA that offer the same combination of comprehensive in -class training and field work. Furthermore, it is anticipated that this training will streamline the internal approvals process for TRCA erosion control projects, allowing .staff to manage a greater number of projects annually and reducing individual project costs that result from a lengthy review process. The TRCA policy on travel requires Executive Committee approval for staff travel outside of the country on TRCA business. Upon return from the workshop a presentation will.be prepared for the board highlighting the training and the techniques learned at the workshop. FINANCIAL DETAILS Cost to attend this 5 day workshop is $1,000 (US) for two staff. Total cost; including mileage reimbursement, lodging, and meals is not to exceed $2,500 (CAD). Funding is to be shared between the Erosion Monitoring and Maintenance budgets for Toronto (40 %), Peel (35 %), York (20 %) and Durham (5 %), the percentage indicated for each reflecting the approximate amount of time staff spend managing erosion control projects in each region. Funding is available in accounts 139 -01, 189 -05, 189 -01 and 189 -50. Report prepared by: Moranne McDonnell, 416 - 392 -9725 Emails: mmcdonnell @trca.on.ca For Information contact: Moranne McDonnell, 416- 392 -9725 Emails: mmcdonnell @trca.on.ca Date: April 22, 2008 403 SECTION IV - ITEMS FOR THE INFORMATION OF THE BOARD RES.#B49/08 - Moved by: Seconded by: LOWEST BID NOT ACCEPTED . Picnic Tables. Receipt of report approved by the Chief Administrative Officer on award of contract for manufacturing 200 park picnic tables. Suzan Hall Richard Whitehead IT IS RECOMMENDED THAT the report from the Chief Administrative Officer on award of contract to Precision Custom Welding, who was not the lowest bidder, be received. CARRIED BACKGROUND At Authority Meeting #5/05, held on June 24, 2005, Resolution #A1.24/05 approved the Purchasing Policy. As .per Schedule 'A' of the policy, if the lowest bidder is not selected, a report shall be provided to the Executive Committee for their information at the next available meeting. In this regard, the report, outlined in Attachment 1 that was approved by the Chief Administrative Officer on April 10, 2008 is provided for information. • Report prepared .by: Kathy Stranks, extension 5264 Emails: kstranks @trca.on.ca For Information contact: Kathy Stranks, extension 5264 Emails: kstranks @trca.on.ca Date: April10, 2008 Attachments: 1 404 Attachment 1 TO: Chair and Members of the Procurement Not Requiring Board Approval Meeting RFQ Lowest Bid Not Accepted ($10,000 to $25,000) - Jan 1 to June 30, 2008, June 30, 2008 FROM: Derek Edwards, Director, Parks and Culture RE: PICNIC TABLES KEY ISSUE Award of contract for manufacturing 200 park picnic tables. RECOMMENDATION THAT the contract for manufacturing 200 park picnic table frames be awarded to Precision Custom Welding fora cost not to exceed $21,790.00, plus applicable taxes. BACKGROUND Each year as part of the Public Use Infrastructure budget, new picnic tables are purchased to replace tables throughout the parks' picnic areas and campgrounds. RATIONALE Parks and Culture staff issued a Request for Quotation to manufacture galvanized steel frames for 200 picnic tables. Staff received interest from three companies but only two quotes were received as follows: COMPANY COST (plus taxes) Trilcor Correction Ind. $19,950 Precision Custom Welding $21,790 Laurentian Ind. ' NO BID Based on the quotes received, staff recommend that the contract be awarded to Precision Custom Welding as they were the only company that could supply galvanized tables as requested in the RFQ. Trilcor could only supply powder coated metal, not galvanized which from past experience rusts in .a matter of a few years. Laurentian did not submit a quote. FINANCIAL DETAILS Funds are available for this project are identified in the 2008 Public Use Infrastructure Capital budget. Report prepared by: Alex Waters, 905 - 832 -2289 extension 227 Emails: awaters @trca.on.ca For Information contact: Alex Waters, 905- 832 -2289 extension 227 Emails: awaters @trca.on.ca Date: January 21, 2008 405 TERMINATION ON MOTION, the meeting terminated at 9:48 a.m., on Friday, May 9, 2008. Maria Augimeri Vice Chair . /ks 406 Brian Denney Secretary- Treasurer (S. THE TORONTO AND REGION CONSERVATION AUTHORITY MEETING OF THE EXECUTIVE COMMITTEE #4/08 June 13, 2008 The Executive Committee Meeting #4/08, was held in the South Theatre, Black Creek Pioneer Village, on Friday, June 13, 2008. The Chair Gerri Lynn O'Connor, called the meeting to order at 9:35 a.m.. PRESENT Maria Augimeri Vice Chair Suzan Hall Member Jack Heath Member Reenga Mathivanan Member Ron Moeser Member Gerri Lynn O'Connor Chair Maja Prentice Member Richard Whitehead Member PRESENT VIA CONFERENCE CALL • Colleen Jordan Member ABSENT David Barrow Member Rob Ford Member Anthony Perruzza. Member RES. #B51/08 - MINUTES Moved by: Seconded by: Ron Moeser Jack Heath THAT the Minutes of Meeting #3/08, held on May 9, 2008, be approved. CARRIED 407 SECTION I - ITEMS FOR AUTHORITY ACTION RES. #B52/08 Moved by: Seconded by: GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Don River Watershed Thomas J. Bata, CFN 40941. Acquisition of a conservation_easement, located at 44 -46 Park Lane Circle, south of Lawrence Avenue, and east of Bayview Avenue, City of Toronto.. Maria Augimeri Maja Prentice THE EXECUTIVE COMMITTEE RECOMMENDS THAT a conservation easement for the protection of the environmental features and functions containing 1.04 hectares (2.56 acres), more or less, consisting of an irregular shaped parcel of land being Part of Lot 5, Concession 2 EYS and Part of Block A on Registered Plan 2584 and designated as Part '4 on the draft R -plan prepared by R. Avis Surveying Inc., Project No. 2227 -0, City of Toronto, be purchased from Thomas J. Bata; THAT the purchase price be $2.00; THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land free from encumbrance, subject to existing service easements; THAT Thomas J. Bata be responsible for the cost of preparing a survey to identify the conservation easement; THAT the firm Gardiner Roberts LLP, Barristers &.Solicitors, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to execute all necessary documentation required. CARRIED BACKGROUND Resolution #A260/05 at Authority Meeting #9/05, held on November 25, 2005, approved the Greenlands Acquisition Project for 2006 -2010. As a condition 'of a consent application, Thomas J. Bata is required to grant a conservation easement over the valleylands. Negotiations have been condycted with the owner's agent, Ms. Marsha Ornstein of Owens, Wright LLP, Barristers & Solicitors. Attached is a plan showing the location of the subject lands. 408 RATIONALE The subject property falls within the TRCA's approved master plan for acquisition for the Don River watershed as outlined in the approved Greenland Acquisition Project 2006 -2010. The lands are comprised of valleylands. TAXES AND MAINTENANCE The lands subject to the easement will continue to be in private ownership. As such, the owner will be responsible for taxes and maintenance. • FINANCIAL DETAILS Funds for the costs related to this purchase are available in the TRCA land acquisition capital account. Report prepared by: Edlyn Wong, extension 5711 Emails: ewong @trca.on.ca For Information contact: Edlyn Wong, extension 5711, Ron Dewell, extension 5245 Emails: ewong @trca.on.ca, rdewell @trca.on.ca Date: May 21, 2008 Attachments: 1 409 Attachment 1 • GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Don River Watershed CFN 40941 toisEscE AVE' f 1.081 r 1 410 onservafton for The Riving City ►111% TRCALANDS SUBJECT.'PROPERTY •�v' • • • \ \ \Y' • n • 4. • RES. #B53/08 - Moved by: Seconded by: 2008/09 TRANSFER PAYMENT ALLOCATION FOR DRINKING • WATER SOURCE PROTECTION Approval to enter into a Memorandum of Understanding with the Ministry of Natural Resources for the 2008/09 Operating, Administration and Water Budget Transfer Payments for MNR Drinking Water Source Protection Partnership funding. Suzan Hall Maja Prentice THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation Authority (TRCA) as the CTC watershed region lead enter into a Memorandum of Understanding with the Ministry of Natural Resources (MNR) providing $1,941,940.50 for the 2008 -2009 Operating, and Administration and Water Budget Transfer Payments; AND FURTHER THAT authorized TRCA officials be directed to take such action as is necessary to implement the agreement with MNR, including the execution and signing of documents and entering into agreements with municipalities in the CTC Source Protection Region. CARRIED BACKGROUND On an annual basis, TRCA acting as lead Source Protection Authority develops a business plan for the Province of Ontario for provincially mandated activities that support the Clean Water Act as detailed in Ontario Regulation 284. This business plan is developed with significant input from the Credit Valley Conservation Authority (CVC) staff and the Central Lake Ontario Conservation Authority (CLOCA) staff. TRCA submitted the business plan in March of 2008 for the fiscal year. of April 1, 2008 - March 31, 2009 totally $1,611,940.50 for Operating and Administrative Activities and $330,000 for Water Budget and Water Quality Risk Assessment. On May 28, staff was informed that the business plan had been accepted and that TRCA is eligible for a Transfer Payment Allocation from MNR of $1,899,395.29 ($1,569,395.29 for Operating and Administration and $330,000.00 for Water Budget studies). TRCA has unspent funding of $42,545.21 from payments made in 2007 -2008 on hand which makes up the difference between the business plan ask and the transfer approved for the Operating and Administrative Activities. The Memorandum of Understanding, once sighed, provides for two transfer payments based on the approved business plan. The first transfer is 75% of the approved allocation to the lead conservation authority at the start of the fiscal year. The second transfer is 25% based on need and progress presented in the November 30th in -year status report. These funds are held in a segregated account and TRCA, CVC and CLOCA are paid for work completed based on quarterly invoices. In addition, these funds, cover work carried out by municipalities who enter into Memoranda of Understanding with TRCA as lead source protection authority. The Municipalities are paid for specific technical work from the segregated trust fund. Report prepared by: Adele Freeman, 416- 661 -6600 extension 5238 Emails: afreeman @trca.on.ca Date: June 03, 2008 411 RES. #B54/08 - Moved by: Seconded by: BLACK CREEK PIONEER VILLAGE VISITOR'S CENTRE Award of Contract RSD08 -14. Award of Contract RSD08 -14 for Black Creek Pioneer Village Visitor's Centre Roof Replacement /modifications. Jack Heath Reenga Mathivanan THE EXECUTIVE COMMITTEE RECOMMENDS THAT Contract RSD08 -14 be awarded to Flynn Canada Ltd. for the total cost not to exceed $298,180.00, plus applicable taxes, it being the lowest bid that meets Toronto and Region Conservation Authority (TRCA) specifications.. CARRIED BACKGROUND In 1999, the Authority approved the Future Directions Strategy for Black Creek Pioneer Village. Amajor part of the strategy is the capital projects for restoration of buildings and new attractions infrastructure which has been ongoing since the year 2000. The Visitor's Centre roof was originally constructed in 1985 with ongoing minor repairs over the past number of years but has now reached its' life expectancy and now requires major replacement /modifications. Peter Rohmann, a roofing consultant, was retained to provide the detailed design for the proposed roof Yeplacement and modifications. The preferred option selected is a Sika Sarnafil PVC membrane system as it provides 'a number of benefits such as: • made of waterproof material, which does not allow for ponding of rain water; • recyclable; • easy to install; • easy to maintain, which therefore provides for low maintenance c osts; • durable; • it reflects most of the Ultra Violet (UV) rays that strike the surface. On a hot day (85 degrees Fahrenheit), a black roof surface can heat up to 172 degrees . Fahrenheit, while a white PVC membrane roof will only heat up to 91 degrees Fahrenheit. The Sika Sarnafil EnergySmart roofing membrane also meets the design criteria for one Leadership in Energy and Environmental Design (LEED) credit under Sustainable.Sites Credit 7.2: Heat Island Effect: Roof. The intent of the Heat Island Credit is to "reduce heat islands to minimize impact on microclimate and human and wildlife habitant ". RATIONALE Contracts documents were issued to a total of nine pre - qualified contractors who are trained and certified to install the Sarnafil roof membrane system by the supplier. A mandatory site meeting was held on Thursday, May 15, 2008 with a total of eight potential bidders attending. The Tender Opening Committee opened tenders received on May 23, 2008 with the following results: 412 Bidder TOTAL (excluding G.S.T.) Flynn Canada Ltd. $298,180.00 T. Hamilton & Sons Roofing $300,243.00 Provincial Industrial Roofing & Sheet Metal Co. Ltd. $333,217.00 Topline Roofing $344,900.00 Atlas -Apex Roofing $363,423.00 All -Bond Roofing • $454,750.00 Dean - Chandler $406,075.00 All -Bond Roofing $454,750.00 Based on the bids received staff recommends that Contract RSD08 -14 be awarded to Flynn Canada Ltd. forthe total cost not to exceed $298,180.00, plus GST, it being the lowest bid meeting TRCA specifications. . FINANCIAL DETAILS Funds are available within Toronto capital account code 501 -01. Report prepared by: Mark Preston, 416 - 392 -9722 For Information contact: Mark Preston, 416 - 392 -9722 Email: mpreston @trca.on.ca Date: May 27, 2008 RES. #B55/08 - Moved by: Seconded by: PORT UNION WATERFRONT IMPROVEMENT PROJECT, (PHASE 2) City of Toronto Tender RSD08 -12 for Supply and Delivery of 4 to 6 Tonne Armour Stone. Award of Tender RSD08 -12 for the supply and delivery of approximately 6,600 tonnes of 4 to 6 tonne armour stone to the Port Union Waterfront Improvement Project (Phase 2), City of Toronto. Suzan Hall Maja Prentice THE EXECUTIVE COMMITTEE RECOMMENDS THAT Contract RSD08 -12 for the supply and delivery of approximately 6,600 tonnes of 4 to 6 tonne armour stone to the Port Union Waterfront Improvement Project (Phase 2), City of Toronto, for the total amount not to exceed $297,000.00 plus applicable taxes be awarded to Stonescape Quarry, it being the lowest bid that meets Toronto and Region Conservation Authority (TRCA) specifications. CARRIED 413 BACKGROUND The Port Union Waterfront Improvement Project (Phase 2) is located south of Lawrence Avenue east, between Chesterton Shores and the Rouge River in the City of Toronto. The project will consist of approximately 1.6 km of shoreline protection, trails and parkland development. Shoreplan Engineering Limited has been retained as the coastal engineering consultant. The preferred option through the Class Environmental Assessment process calls for the construction of 6 headlands and 7 beach units. RATIONALE Tender RSD08 -12 was publicly advertised in the Daily Commercial News. Tender packages were sent to a total of twelve potential bidders. The Tender Opening Committee opened tenders received on May 23, 2008 with the following results: BIDDERS APPROXIMATE QUANTITY - (tonnes) TOTAL UNIT PRICE (per tonne) ESTIMATED VALUE OF CONTRACT (plus GST) Stonescape Quarry 6,600 $45.00 $297,000.00 • Glenn Windrem Trucking - 6,600 $48.34 $319,044.00 Dufferin Aggregates 6;600 $60.60 $399,960.00 Nelson Aggregate Co. 6,600 $68.00 $448,800.00 York Paving 6,600 • $68.20 $450,120.00 Lafarge Aggregates 6,600 - $77.00 $508,200.00 J.C. Rock Ltd 6,600 $79.27 $523,182.00 Based on the bids received, staff recommend award of Tender RSD08 -12 to Stonescape Quarry for the total unit price of $45.00 per tonne and a total amount not to exceed $297,000.00 plus GST, it being the lowest bid meeting TRCA specifications. FINANCIAL DETAILS Funds are available from Toronto Waterfront Revitalization Corporation within account #224 -70. Report prepared by: Joe Delle Fave, 416 - 392 -9724 For Information contact: Joe Delle Fave, 416 - 392 -9724 Email: jdellefave @trca.on.ca Date: May 27, 2008 RES. #B56/08 - CONTRACT RSD07 -11 EXTENSION Supply of Rental Rates for Operated Heavy Construction Equipment and Dump Trucks. Extension of Contract RSD07 -11, for the Supply of Rental Rates for Operated Heavy Construction Equipment and Dump Trucks, for a further one year period. 414 Moved by: Seconded by: Jack Heath Maria Augimeri THE EXECUTIVE COMMITTEE RECOMMENDS THAT Contract RSD07 -11 for Supply of Rental Rates for Operated Heavy Construction Equipment and Dump Trucks, awarded in 2007 to Sartor & Susin Ltd. be extended for a period of one year to July 31, 2009 subject to terms, conditions and performance satisfactory to Toronto and Region Conservation Authority (TRCA) staff. CARRIED BACKGROUND At Authority Meeting #6107, held on July 27, 2007, Resolution #A167/07 was approved as follows: THAT Toronto and Region. Conservation Authority (TRCA) utilize, as required, the services of Sartor and Susin Ltd. for the supply of operated heavy construction equipment and dump trucks for the period August 1, 2007 to July 31, 2008, it being the proposal that best meets TRCA's requirements at the lowest overall cost; AND FURTHER THAT staff be authorized to use the next lowest tender if the need arises. In preparation of the original tender documents, staff included a provision whereby the successful bidder could request a one year extension to the contract at a specific maximum percent increase or decrease to the unit prices bid. Sartor & Susin Ltd. have requested, in•writing, a one year extension to their contract with an overall year two increase, in the unit rates, of 5 percent. RATIONALE TRCA and Sartor & Susin Ltd. have worked together on numerous successful projects over many years and through the tendering process, Sartor & Susin Ltd. have consistently provided the lowest unit rates with a broad spectrum of equipment and fully experienced operators. Staff has reviewed the proposed new rate structure, in conjunction with a performance review, and are satisfied that the requested 5 percent increase is indicative of overall industry operating cost increases and are warranted. FINANCIAL DETAILS The value of this contract is estimated to be approximately $1,500,000 based upon a review of similar workloads in previous years. An increase or decrease in workload will have an impact on the value of this contract extension. The operated equipment is rented on an "as required" basis with no minimum or maximum rental hours guaranteed. Report prepared by: Jim Berry, 416 - 392 -9721 Email: jberry @trca.on.ca For Information contact: Jim Berry, 416 - 392 -9721 Email: jberry @trca.on.ca Date: June 03, 2008 415 RES. #B57/08 - Moved by: Seconded by: AQUATIC PARK SAILING CLUB 2008 -2010 License Agreement. As part of the ongoing management program at Tommy Thompson Park, staff has outlined the proposed 2008 -2010 license agreement with the Aquatic Park Sailing Club. Suzan Hall Maja Prentice THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation Authority (TRCA) enter into the 2008 -2010 License Agreement with the Aquatic Park Sailing Club; AND FURTHER THAT authorized TRCA officials be directed to take action required to implement the Aquatic Park Sailing Club lease agreement at Tommy Thompson Park, including the signing and execution of documents. CARRIED BACKGROUND The Aquatic Park Sailing Club (APSC) is a small community sailing club that has leased a portion of the waterlot and landbase at Tommy Thompson Park (TTP) since 1976. Historically this lease was reviewed and .executed by the Authority on an annual basis as a component of the Interim Management Program at Tommy Thompson Park. In 1997, the APSC requested that their Licence Agreement be extended for a three -year term with a set fee schedule for that time period. Staff was of the opinion that a multi -year lease would be appropriate, and developed a three -year lease which was approved at Authority Meeting #2/99, held on February 26, 1999. The conversion of the annual Licence Agreement to a three -year Licence Agreement has been beneficial to both the APSC and TRCA. It has allowed both the APSC and TRCA staff the ability to forecast budgets and fee schedules more effectively. The last Licence Agreement was for the 2005 -2008 term and was approved at Authority Meeting #3/05, held on April 29, 2005 by Resolution #A75/05 as follows: THAT staff be directed to execute the 2005 -2007 Licence Agreement with the Aquatic Park Sailing Club; AND FURTHER THAT staff be authorized to take whatever action is required in connection with the Aquatic Park Sailing Club lease agreement at Tommy Thompson Park, including the execution of all necessary documentation required. The Club has again committed to.an annual financial contribution to the shuttle van service for the lease period. The Club also assists staff with a variety of projects including litter clean -up, tree wrapping for protection against beaver damage and naturalization initiatives around the leased area. The conditions of the proposed 2008 -2010 Licence Agreement will be the same as used in previous years. Vehicle parking on site and access during public hours will be'limited to' three (3) weekends in the spring and three (3) weekends in the fall to facilitate dock installation and removal. During public hours outside the above, the Aquatic Park Sailing Club members must • park their vehicles at the Leslie Street parking area. During non - public hours (i.e. Monday to Friday), vehicular access to leased land will be granted to members of the Club upon proof of membership and key privileges. 416 A fee schedule for the three -year lease period has been established with an annual increase of 2.5 %, per year for 2008, 2009 and 2010 respectively. This annual rate of increase is based on previous negotiations with the Club, TTP staff, TRCA Conservation Lands and Property Services staff and the City of Toronto Sailing Club fee schedule. The following is the proposed fee schedule: 2008 $9,784.26 ( +$238.64 or 2.50% increase from 2007) 2009 $10,028.87 ( +$244.61 or 2.50% increase from 2008) 2010 $10,279.59 ( +$250.72 or 2.50% increase from 2009). In addition to the annual lease payments, the APSC will continue to provide TRCA with a minimum annual $2,500 contribution to help offset the costs of the shuttle van service. In light of the rising fuel costs, TRCA staff has requested that the APSC increase their contribution to the shuttle van to a sum of $3,000 for 2008. TRCA staff and the APSC will assess the contribution annually to determine whether future increases are required. The APSC also contribute financially to additional projects as they arise, such as restoration planting, shoreline works and site improvements. The Club also offers its facilities to TRCA and our programs free of charge. The Aquatic Park Sailing Club has agreed to the terms and conditions of the 2008 -2010 Licence Agreement. RATIONALE As in previous years, staff is of the opinion that a three -year Licence Agreement would be appropriate. The Tommy Thompson Park Master Plan has been approved and includes the APSC in its present form. The APSC appreciates the. longer term commitment from TRCA. and a three -year lease will allow the Club the ability to forecast their budget and fee schedule more effectively. Further, the Club has again committed to an annual contribution to the shuttle van service for the lease period, and the Club members volunteer for a variety of work days, to improve Tommy Thompson Park. A three -year term will also allow TRCA the ability to forecast revenue for Tommy Thompson Park and will reduce the administration associated with executing the lease on an annual basis. FINANCIAL DETAILS Revenue generated from the lease agreement with the Club will be used to defray park operating costs including, staffing, monitoring and interpretive activities as part of the Tommy Thompson Park Interim Management Program (Account 210 -19). The annual shuttle van contribution by the Club will be used to directly offset the cost of the park shuttle van service. Report prepared by: Ralph Toninger, extension 5366 Email: rtoninger@trca.on.ca For Information contact: Ralph Toninger, extension 5366 Email: rtoninger@trca.on.ca Date: May 30, 2008 417 RES. #858/08 - Moved by: Seconded by: CITY OF TORONTO MEMORANDUM OF UNDERSTANDING Automated Watercourse Monitoring Network. Approval to enter into a Memorandum of Understanding with the City of Toronto to implement an Automated Watercourse Monitoring Network. Ron Moeser Jack Heath THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation Authority (TRCA) enter into a Memorandum of Understanding (MOU) with the City of Toronto for the design, construction, monitoring and maintenance of an automated watercourse monitoring network for the City's wet weather flow monitoring initiatives; THAT the MOU be on terms and conditions satisfactory to TRCA staff and as necessary, its solicitors; AND FURTHER THAT TRCA authorized signing officers be directed to take such action as is necessary to execute the MOU including obtaining all necessary approvals and signing of documents. CARRIED BACKGROUND • The City of Toronto completed its Wet Weather Flow Management Master Plan (WWFMMP), which utilizes various control strategies to manage combined sewer overflows and stormwater discharges. Toronto Water is now undertaking a 25 -year monitoring plan to install and operate several watercourse monitoring stations within the City's jurisdiction for the purpose of assessing tributary water quality /quantity before and after the implementation of the City's WWFMMP strategies. Because TRCA has.extensive expertise and an on -going role in the monitoring of watercourses within TRCA's jurisdiction, the City has asked TRCA to enter into an agreement to lead the implementation of fourteen automated water quality /quantity monitoring stations strategically located across the City (Attachment 1), as well as conduct all construction and monitoring related duties. TRCA will design and construct the automated monitoring network, conduct all field services, provide technical expertise and basic statistical analysis, and seasonal. summary reports. RATIONALE TRCA has specialized expertise in automated watercourse monitoring and can therefore cost effectively support the City in their Wet Weather Flow Management Master Plan program. Both TRCA and the City have mutual environmental protection goals and have had a long history of successful past partnerships. TRCA will have full disclosure to all the data collected as part of this project, which will improve TRCA's water management strategies in the City. The MOU covers the period from July 1, 2008 to June 30, 2009 with the intent that the agreement will be reassessed and renewed on an annual basis if the City deems TRCA to be the lead organization to continue the monitoring. 418 FINANCIAL DETAILS The City of Toronto will cover the cost of TRCA's services in an amount not to exceed $205,000 for the installation of all fourteen monitoring stations and $145,000 to complete all monitoring /maintenance duties outlined in the City's approved monitoring protocol or the first year. The City will also provide all laboratory services and purchase all monitoring equipment requested by TRCA. These expenses are in addition to the installation or monitoring budgets listed above. Report prepared by: Derek Smith, extension 5362 Email: dsmith @trca.on.ca For Information contact: Derek Smith, extension 5362 Email: dsmith @trca.on.ca Date: June 02, 2008 Attachments: 1 41.9 Attachment 1 t 7 - 8 • . 3 • • 7;;', 7.. , a n! r ! Er ....-. o ... ... ' 2 - ,': •-= i - / t:', '= ,' Q. :•i-, `,.; -- _ _ ' c' F ...,.. ,.i _ o ,.. 7 - ,;.; ..: __.----; 7 0 ri) o 7 g . .. .„ ...] 4 :_- .-., d, r-- v,' -. . L''..., Uilltur 31 4." — 4# 11! 3,01,0e, ‘vu --- "i• E I", - a - \ Ilif,,,, °. „4", ----.-- i • • • - „ , _ ` A I , E 420 RES. #B59/08 - Moved by: Seconded by: YORK - PEEL - DURHAM - TORONTO / CONSERVATION AUTHORITIES MORAINE COALITION GROUNDWATER STUDY Status Update and 2008 Groundwater Management Program. Update on status of York -Peel- Durham - Toronto and Conservation Authorities Moraine Coalition Groundwater Management Program and approval of contracts for 2008. Suzan Hall Maja Prentice THE EXECUTIVE RECOMMENDS THAT staff be directed to implement the 2008 work plan of the York -Peel- Durham - Toronto (YPDT) Groundwater Management Program; THAT the existing three -year contract with Earthfx Incorporated to provide ongoing groundwater flow modeling, database and website management services to the program be renewed for a further three years, at a cost not to exceed $200,000, plus applicable taxes, per calendar year, subject to performance satisfactory to Toronto and Region Conservation Authority (TRCA) staff; THAT a contract be negotiated with the University of Waterloo for a partnership in the new Groundwater Resource Management Chair for a period of three years, at a cost not to exceed $50,000 per year; AND FURTHER THAT a contract be negotiated with Water and Earth Science Associates to assist with the migration of the Provincial Groundwater Monitoring data into the database at a cost not to exceed $30,000, plus applicable taxes. CARRIED BACKGROUND The YPDT Groundwater Management Study was initiated in 2000 as a partnership between the regions of York, Peel, and Durham, and the City of Toronto, and the associated six conservation authorities (Credit Valley, Toronto and Region, Lake Simcoe Region, Kawartha Region, Ganaraska Region and Central Lake. Ontario) with . a view to arriving at consistency in groundwater management both from a technical and analytical perspective as well as from a policy and management perspective. With similar goals and objectives, staff, acting on behalf of the Conservation Authorities Moraine Coalition, (CAMC) are also directing groundwater work across the entire Oak Ridges Moraine (ORM). The joint YPDT /CAMC groundwater team referred to in this staff report now currently consists of three full time contract staff members, the hydrogeological and planning staff members from the various partner agencies, as well as a core team of consultants from Earthfx Inc. The full time staff are employees of CLOCA, which provides all of the staffing resources for this project. Project initiatives that are tied more closely to the interests of the four municipal partners are part of the YPDT study and are approved by TRCA, while projects tied more closely to the overall moraine study are approved by CLOCA. - 421 The YPDT /CAMC groundwater initiative continues to contribute insightful, practical deliverables to the partner agencies. The key focus areas of the groundwater program continue to be data management, geological understanding, numerical groundwater modeling and policy development. A large part of the program's success has been the delivery of data and tools at a practical level to partner agency staff and their consultants who are charged with understanding the groundwater system for a variety of day -to -day issues. Since its inception in 1999 the project has transitioned through two stages: • Stage 1 -1999 to 2001 - this stage bf work was undertaken by a consultant team and was focused on identifying issues related to groundwater management and protection. The work culminated in a report (AMEC Earth and Environmental et al., 2001) that documented some of the groundwater work taking place in other jurisdictions across Canada and the United States. The report also inventoried and prioritized areas and issues to be considered for additional work. • Stage 2 - 2001 to 2007 - this stage of work has been characterized by developing and building an analysis system that includes several well defined tools required for understanding and managing the groundwater flow system across the area (e.g. -database, digital geology, groundwater flow model). The YPDT /CAMC project is now moving into a third stage: • Stage 3 - 2008 to 2013 - This stage,of work will focus on implementing the tools within various upcoming groundwater studies that arise in the next few years. This stage will also focus on infilling geological and hydrogeological data gaps and on maintaining and updating the available tools. The purpose of this report is to provide a brief update on the accomplishments of the groundwater program in 2007 and to obtain support for the planned 2008 initiatives that the YPDT Technical Steering Committee has recommended at its past meeting, including retaining required consulting resources. The YPDT Technical Steering Committee is comprised of hydrogeological and planning staff from the City of Toronto, Peel, Durham and York regions as well as the six associated conservation authorities. 2007 ACCOMPLISHMENTS An annotated list of some of the 2007 accomplishments is presented below: Groundwater Flow Modeling - in 2007 modeling work was focused in the Region of Durham to provide a similar level of understanding that has been accomplished through York Region and the City of Toronto (2004) and in Peel Region in 2006. The Durham modeling work is largely completed and the consultant to the project is completing the report. Through 2007 the groundwater flow model has been used to support: • the York - Durham Southeast Collector sewer project; • Source Water Protection Vulnerable Area delineation (wellhead capture zones) for municipal supply wells in Peel and York regions; • Source Water Protection Tier 1 Water Budgeting carried out by CLOCA and by TRCA. 422 Database - Through 2007 additional temporal data, most notably from York Region, have been added to the database. New boreholes have been opportunistically added to the database. As an example, the boreholes drilled for the Southeast Collector project in York and Durham Regions have been incorporated.- In 2007, with provincial funding, the database was expanded northward to include the entire area of the South Georgian Bay Lake Simcoe and Trent Coalition Source Water Protection Regions, thus enabling them to continue to rely on the YPDT -CAMC database as a key foundation for groundwater work in the area. Reporting Progress has been made on a number of reports: • Use of Groundwater Flow Model - In 2007, an effort was made to address the concerns of the Ministry of the Environment (Central Region) with respect to the use of the YPDT -CAMC program's groundwater flow model. A guidance document: " Application of the Numerical Groundwater Flow Model - Considerations" has been written to provide direction on how the YPDT -CAMC analysis system, and in particular the groundwater flow model, should be used. • Geology Tracking - In 2007 a report summarizing the construction of the various versions of the geological surfaces and the thought process that went into their production was produced. •• Ontario Geological Survey Reports - In 2007, collaboration continued with the Ontario Geological Survey and two reports were published by the Ontario Geological Survey ( "Groundwater Resources Study of the Credit River Watershed" and "An investigation of Buried Bedrock Valley Aquifer System in the Schomberg Area of Southern Ontario "). • Management Reports - Two program management reports were prepared in 2007, one being a memorandum of understanding between the partner agencies, and a second being a report summarizing the day to day operations and future directions of the project. Professional presentations /seminars - YPDT /CAMC staff provided professional talks to a variety of groups and conferences in 2007, including: • Oak Ridges Moraine Foundation's "Moraine For Life" Symposium; • Trent University Symposium on Source Water Protection; • American Water Works Association conference in Toronto; and • Water Environment Association of Ontario Symposium on Source Water Protection. Appointments - Steve Holysh, YPDT /CAMC program manager was appointed to a twelve member.national expert panel by the Council of Canadian Academies to address the question "What is needed to achieve sustainable management of. Canada's groundwater resources, from a science perspective ?" as posed by the Federal government. 2008 PROGRAM Early in 2008, the Technical Steering Committee outlined six priority areas for future YPDT /CAM.0 work: • continued maintenance of tools developed; • database maintenance and synchronization; modelling /analyses; • technical support for source water protection; • geological analysis; and 423 • preparation of a report on the state of water resources across the ORM. These priorities were discussed with, and endorsed by, the commissioners of Public Works and Planning for the four senior partner agencies (York, Peel, Durham and Toronto) at the April 25, 2008 Executive Steering Committee meeting. The 2008 work plan includes the following six priority areas: 1. Memorandum of Understanding and Data Sharing Through 2007, YPDT staff worked with a team of legal representatives from York, Peel, Durham and Toronto to build a memorandum of understanding for the YPDT /CAMC Groundwater Management Program. This document has been finalized and is in the process of being signed by all 13 partner agencies. Among other things, the document sets out a procedure for external sharing of the data and information that has been amassed by the program over the past eight years. The YPDT /CAMC team will meet with the hydrogeological community in the fall of 2008 to establish a framework for data sharing between the program and external consulting companies. This will broaden the input to the program, allowing more professionals to directly input to the study. 2. University Partnership A research chair in Groundwater Resource Management is being established at the University of.Waterloo. In keeping with the Stage 3 direction of implementation, as outlined above, staff believe that it would be beneficial for the YPDT team to be a part of this new initiative. Therefore, it is recommended that YPDT /CAMC staff negotiate a three -year contract between TRCA (as lead agency) and the University of Waterloo, at a cost not to exceed $50,000 per year. This will allow staff to input into the type of research.that is required to improve Ontario's overall groundwater management. In becoming a partner, staff hope to attract the University's many world renowned groundwater researchers and their students to work within the Greater Toronto Area using the groundwater analysis system that has been developed for this important groundwater management project. 3. Provincial Groundwater Monitoring Network (PGMN) Data Since it was established some five years ago, groundwater levels and chemistry data have been collected at many designated wells across the Oak Ridges Moraine area. In 2008, this information needs to be incorporated into the program database so that it can be available to the entire project team for model calibration and validation. YPDT /CAMC staff has had discussions with Water and Earth Science Associates (WESA) to assist the project in this regard. WESA, and in particular Mr. Tom Killingbeck, were instrumental in establishing the PGMN network in the early days by testing wells and installing the necessary monitoring and telemetric equipment. WESA continue to provide PGMN consulting to a majority of the nine conservation authorities partnered in the YPDT /CAMC program and are therefore familiar with the data collected and any corrections or adjustments needed to ensure high quality water level monitoring results. Given this past experience that WESA will bring to the task, YPDT /CAMC staff are recommending that a one year contract not to exceed $30,000, plus applicable taxes, be established with WESA • to assist in moving the PGMN data into the program database. 424 4. Maintenance of Database and Website Staff plan to release an updated version of the database in 2008. This will involve incorporating new information from the Ministry of the Environment as well as new streamflow and climate data from Environment Canada. In 2008, due to its increasing size and complexity, the database is being migrated from Access to SQL Server. This will open up several strategic data management possibilities, including on -line access to the database by partner agencies which would enable ready access to products, such as the scanned reports from the report library. With respect to the website, staff is looking to build specific applications, for example a dynamic cross - section tool, onto the website to standardize the geological products that are being used by the partner agencies and their consultants. Other aspects of the program web -site will also be evaluated over the year.• Earthfx Inc. has been the key consultant to the program with regards to the website, database and groundwater flow modeling. Between 2005 and 2007 the YPDT /CAMC program had a_multi -year agreement with Earthfx Inc. The Technical Steering Committee has reviewed the work and deliverables from Earthfx over this time and is satisfied that the quality of the work received continues to be at a high level. The YPDT team also recognizes that Earthfx continues to be a small specialized consulting firm and that their capacity to deliver has been stretched at times during the past three years. To address this capacity limitation, the YPDT /CAMC team is recommending that the work plan for 2008 with Earthfx not include groundwater flow modeling (see below). Given their valuable experience on the project, staff is recommending that the existing multi -year contract with Earthfx be renewed for a further three years from 2008 through to 2011, at a cost not to exceed $200,000 per year, plus applicable taxes. This contract will include geodatabase and website management services, as well as hydrogeological interpretation and technical assistance to the groundwater modelling consultant. As in the past, the Technical Steering Committee will review deliverables from Earthfx on a regular basis, and on an annual basis, assign consulting tasks to Earthfx. 5. Groundwater Modelling As mentioned above, the YPDT /CAMC program is entering a stage whereby the products developed under the program are to be used in support of partner agency hydrogeological projects. In this regard, the YPDT /CAMC team is proposing to initiate an applications stream to the, groundwater modelling component of the program. Whereas Earthfx has been the main developer of the groundwater flow model and will continue to provide support to the future modeling development under the recommended contract above, the addition of a new modeling consultant to assist in applications will provide several benefits to the project: • additional capacity to run the program's groundwater flow models; • additional scrutiny on the groundwater flow models allowing for additional professional input; and • increased transfer of modeling knowledge to public sector staff. 425 With respect to this, staff is proposing to prepare a Request for Proposal (RFP) that will be circulated to area groundwater modeling firms for bid. The RFP will be structured to. solicit assistance in running the program's groundwater flow models with a focus on one or two specific projects that will be approved by the Technical Steering Committee. It is recommended that this RFP be prepared by staff and that the preferred consultant be selected by the Technical Steering Committee. The contract will be prepared in accordance with TRCA's Purchasing Policy. SUMMARY The YPDT Groundwater Management Study continues to provide an example of a successful partnership initiative between the Federal government, the Province, municipalities and conservation authorities. Through the initiative, the partner agencies have managed to capitalize on the economies of scale to each agency's benefit by undertaking collective initiatives only once rather than taking different approaches at each agency. The Oak Ridges Moraine provides a common physiographic link to all of the partner agencies. FINANCIAL DETAILS The three contracts (University, of Waterloo, EarthFX, WESA) recommended in this communication total $280,000, plus applicable taxes for 2008, and can be implemented within the current budget for the project (account code 104 -90). Report prepared by: Steve Holysh, extension 5588 Email: sholysh @trca.on.ca For Information contact: Steve Holysh, extension 5588 Email: sholysh @trca.on.ca Date: June 3, 2008 SECTION II - ITEMS FOR EXECUTIVE ACTION RES. #860/08 - r APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Development, Interference with Wetlands and Alterations to Shorelines and Watercourses. Pursuant to Ontario Regulation 166 /06,.written permission from the Authority is required for: a) straightening, changing, diverting or interfering in any way with the existing channel of a river, creek, stream or watercourse, or for changing or interfering in any way with a wetland; b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development. A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected. 426 Moved by: Seconded by: Ron Moeser Maja Prentice THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.1 - 8.1.31, inclusive, and 8.1.120 - 296 Riverside Drive), which are listed below. CARRIED CITY OF BRAMPTON 8.1.1 12 NORMANDY PLACE To construct, reconstruct, erect or place a building or structure on Lot 135, Plan M -338, (12 Normandy Place), in the City of Brampton, Etobicoke Creek Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a new ancillary deck structure at the rear of an existing residential dwelling located at 12 Normandy Place, in the City of Brampton. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Aerial View, stamped received by TRCA Planning & Development staff on May 22, 2008; • Stair Detail, stamped received by TRCA Planning & Development staff on May 22, 2008; • Window & Door Detail, stamped received by TRCA Planning & Development staff on May 22, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area_of the Etobicoke Creek Watershed in order to facilitate the construction of an ancillary deck structure at the rear of an existing residential dwelling located at 12 Normandy Place, in the City of Brampton. The rear of the property is adjacent to a stream corridor. The proposed works are located outside of the Regional Floodplain and are sufficiently setback. As such, there are no flooding, geotechnical, or ecology related concerns with this application. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are. anticipated. Pollution: Appropriate erosion and sediment controls (silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. 427 Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings The proposed deck is located within an existing manicured lawn. No significant vegetation will be removed as a result of the construction. As such, additional plantings are not required. . Policy Guidelines: This proposal is in conformity with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40904 - Application #: 404 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 CITY OF PICKERING 8.1.2 2045 UXBRIDGE - PICKERING TOWNLINE To alter a watercourse on Part Lot 15, Concession 9, (2045 Uxbridge- Pickering Townline), in the City of Pickering, Duffins Creek Watershed. The purpose is to interfere with a watercourse in order to dredge a pond within the Duffins Creek Watershed. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Plan submitted by the applicant, received November 26, 2007. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the rehabilitation of an online pond located on the subject property. The majority of the works consist of the dredging of the pond as it has high levels of sediment. The works are anticipated to provide a net gain as the dredging will provide more flood storage and the restoration planting will provide an ecological improvement to the pond. Control of Flooding: The pond has an associated flood plain as it is connected to a watercourse. The proposed dredging works will provide more flood storage and result in a net gain. 428 Pollution: Appropriate sediment controls will be maintained throughout the duration of the construction. All the material removed from the pond will be kept on site but will be placed outside of the floodplain. Dynamic Beaches: Not applicable Erosion: There are no geo- technical issues associated with these works. Conservation of Land: The proposal consists of dredging the pond only. Original grades will be maintained and the. area around the pond will be planted with native species according to TRCA's guidelines. TRCA technical staff have confirmed that there are no anticipated fisheries issues. A Letter of Advice will be issued on behalf of DFO for the works. Plantings Plantings will be in accordance with TRCA's Seed Mix guidelines. Policy Guidelines: The proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 40071 - Application #: 889/07/PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: June 4, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.3 143 LAKE SHORE DRIVE To construct, reconstruct, erect or place a building or structure on Lot 17, Plan 1592, (143 Lake Shore Drive), in the City of Toronto (Etobicoke York Community Council Area), Waterfront Watershed. The purpose is to develop within a TRCA Regulated Area of the Waterfront Watershed in order to facilitate the construction of a new two- storey single family detached dwelling with a rear deck. The existing dwelling is to be demolished. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit:. • Drawing No. Al, Site Plan, prepared by Hicks Partners, dated February 28, 2008, Revision No. 6, revised on February 28, 2008; • Drawing No. A4 -1, Elevations, prepared by Hicks Partners, dated February 28, 2008, Revision No. 7, revised on February 28, 2008; • Drawing No. A4 -2, Elevations, prepared by Hicks Partners, dated February 28, 2008, Revision No. 7, revised on February 28, 2008. 429 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Waterfront Watershed in order to facilitate the construction of a new two- storey single family detached dwelling inclusive of a rear deck /covered porch and two -car attached garage. The existing dwelling is to be demolished. The subject site is located south of Lakeshore Boulevard West, abutting Rotary Park to the west and Lake Ontario to the south. Control of Flooding: This site is not located in the Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Temporary sediment control fencing is to be installed and maintained during construction in order to prevent construction debris from entering Lake Ontario. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this proposal. Conservation of Land: The proposed building footprint is adequately setback from the existing shoreline and there is no proposed change to the existing grading of the site. The entire property is located within a developed community along this portion of the lakefront and is consistent with the surrounding development. There will be no impact on significant natural features, riparian vegetation or fisheries. Plantings No plantings are required as part of this application. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40540 - Application #: 146/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 3, 2008 430 ' 8.1.4 CONSEIL SCOLAIRE DE DISTRICT CATHOLIQUE CENTRE.SUD To construct, reconstruct, erect or place a building or structure on Part Lot 3 - RANGE 1, KING'S MILL RESERVE, (755' Royal York Road), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed as located on the property owned by Conseil Scolaire de district Catholique Centre -Sud. • The purpose is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the installation of three portable classrooms on a paved portion of the existing school site. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing unnumbered, Site Plan, prepared by Atkins Group Corporation, undated, received on May 9, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the installation of three portable classrooms on the school property. The,subject site is located on the east side of Royal York Road, west of Mimico Creek and north of the Queensway in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: This site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment control fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this application. Policy Guidelines: The proposal is consistent with Section 4.2.2.(E) - Development Guidelines for Property Improvements. and Ancillary Structures within Non - Established /Highly Urbanized Areas of the. TRCA's Valley and Stream Corridor Management Program. 431 CFN: 40881 - Application #: 378/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 3, 2008 • 8.1.5 153 EAST DRIVE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Lot 3, Plan 5052, (153 East Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a two - storey addition to the rear of the existing two- storey semi - detached duplex dwelling. • The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -1.0, Site Plan, prepared by Edifice Consulting Group Ltd., dated February 8, 2008, received on May 5, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a two- storey addition to the rear of the existing two- storey semi - detached duplex dwelling. The subject site is located south of Eglinton Avenue West and east of Scarlett Road in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: This site is not located in the Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment control fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. 432 Plantings No plantings are required as part of this application. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Developed Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40833 - Application #: 343/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 3, 2008 8.1.6 191 HUMBERVALE BOULEVARD . • To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 3, Plan 4076, (191 Humbervale Boulevard), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a second - storey addition to the existing single- storey detached dwelling and a garage addition to the front of the existing attached garage. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1, Site Plan and Typical Wall Section, prepared by Trevor Gain & Associates, undated, received on March 31, 2008; • Drawing No. 5, North Elevation, prepared by Trevor Gain & Associates, undated, received on March 31, 2008; • Drawing No. 6, West Elevation, prepared by Trevor Gain & Associates, undated, received on March 31, 2008; • Drawing No. 7, South Elevation, prepared by Trevor Gain & Associates, undated, received on March 31, 2008; • Drawing No. 8, East Elevation, prepared by Trevor Gain & Associates, undated, received on March 31, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a second - storey addition to the existing single- storey detached dwelling and a garage addition to the front of the existing attached garage. The subject site is located east of Royal York Road and south of Bloor Street West in the City of Toronto (Etobicoke York Community Council Area). 433 Control of Flooding: This site is not located in the Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment control fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this application. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) — Development Guidelines for Minor Additions within Non - Established /Highly Developed Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40660 - Application #: 226/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 3, 2008 .8.1.7 35 CANEROUTH DRIVE To construct, reconstruct, erect or place a building or structure on Lot 23, Plan 1198, (35 Canerouth Drive), in the City of Toronto (Etobicoke York Community • Council Area), Etobicoke Creek Watershed. The purpose is to develop within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the •construction of a new two- storey single family detached dwelling with a below grade 5 -car garage. The existing dwelling is to be demolished. The permit will be issued for the period. of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Richard Wengle Architect Inc., dated December 21, 2007, received June 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 434 Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a new two- storey single family detached dwelling with a below grade 5 -car garage. The existing dwelling is to be demolished. The subject site is located south of Rathburn Road, west of Renforth Drive and backs on to Elmcrest Creek in the City of Toronto (Etobicoke York Community.Council Area). Control of Flooding: This site is not located in the Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Temporary sediment control fencing is to be installed and maintained during construction in order to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this proposal. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Native and non - invasive plantings will be provided as per the City of Toronto's Urban Forestry and Ravine Protection Guidelines. Policy. Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40321 - Application #: 010 /08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 3, 2008 CITY OF TORONTO - (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.8 26 MEDALIST ROAD To change a building or structure so that it alters.its use or potential use, increases its size or increases the number of dwelling units on Lot 314, Plan M866, (26 Medalist Road), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of two two- storey additions to the rear of the existing dwelling. 435 The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with .the following documents and plans which form part of this permit: • Drawing No. SP, Site Plan, prepared by Scott Petrie, dated December 7, 2007, received by TRCA March 12, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works consist of two two- storey additions to the rear of-the existing dwelling located at 25 Medalist Road in the City of Toronto. The site is located north of York Mills Road, west of Bayview Avenue. Control of Flooding: The site is not located in the Regional Storm Floodplain. • Pollution: - A sediment control fence will be erected before commencement of any construction or grading works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. . Dynamic Beaches: . Not applicable Erosion: A geotechnical report has been reviewed and approved by TRCA geotechnical engineering staff and the proposed works are adequately set back from the top of bank. The proposed works do not extend any further towards the valley than the existing limit of development. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required.as part of this project. Policy Guidelines: The proposal is consistent with Section 4.2.2.B, Minor Additions, of TRCA's Valley and Stream Corridor Management Program. CFN: 40446 - Application #: 075/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: June 3, 2008 436 8.1.9 25 VIAMEDE CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 15, Plan 5482, (25 Viamede Crescent), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a ground floor addition to the front, and a second storey addition above the existing dwelling. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Proposed Site Plan, prepared by Lorne Rose Architect, dated November 9, 2007, received by TRCA November 9, 2007; • Drawing No. A2, Front Elevation, prepared by Lorne Rose Architect, dated November 9, 2007, received by TRCA November 9, 2007; • Drawing No. A3, Rear Elevation, prepared by Lorne Rose Architect, dated November 9, 2007, received by TRCA November 9, 2007; • Drawing No. A4, North Elevation; prepared by Lorne Rose Architect, dated November 9, 2007, received by TRCA November 9, 2007; • Drawing No. A5, South Elevation, prepared by Lorne Rose Architect, dated November 9, 2007, received by TRCA November 9, 2007. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a one - storey addition at the front, and a second - storey addition above the existing dwelling located at 25 Viamede Crescent in the City of Toronto. The site is located south of Finch Avenue East, east of Bayview Avenue. Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: A sediment control fence will be erected before commencement of any construction and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. Dynamic Beaches: Not applicable Erosion: A geotechnical letter of opinion has been reviewed and approved by TRCA geotechnical engineering staff and the proposed works are located no further than the existing limit of development. Conservation of Land: No significant vegetation will be removed as a result of construction and appropriate tree protection fencing will be installed. 437 Plantings No plantings are required as part of this project. Policy Guidelines: The proposal is consistent with Section 4.2.2.B, Minor Additions, of TRCA's Valley and Stream Corridor Management Program. CFN: 40017 - Application #: 857/07/TOR _Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: June 3, 2008 8.1.10 36 DONWOODS DRIVE To construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and site grade on Lot 37, Plan 2343, (36 Donwoods Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a rear addition with basement walk -out, and second storey addition over existing garage. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Wayne Long Architect, dated November 2007, redlined by applicant to remove proposed accessory structure from plans, received by TRCA June 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a rear addition with basement walk -out, and a second storey addition of an existing garage at 36 Donwoods Drive in the City of Toronto. The site is located south of York Mills Road, east of Yonge Street. Control of Flooding: . The site is not located in the Regional Storm Floodplain. Pollution: Sediment•control fencing is not required as the proposed works are adequately set back from the watercourse. Dynamic Beaches: . Not applicable 438 Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed to facilitate construction and the appropriate tree protection fencing will be installed. Plantings Native tree shrubs and seed mix will be planted. Policy Guidelines: This proposal is consistent with Section 4.2.2.B, Minor Additions, of the TRCA's Valley and ' Stream Corridor Management Program. CFN: 40562 - Application #: 156/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: June 3, 2008 8.1.11 36 GLENGROVE AVENUE EAST To change a building or structure so that it alters its use or potential use, • increases its size or increases the number of dwelling units on Part Block A, Plan 1485 YORK, (36 Glengrove Avenue East), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a second storey addition above the existing dwelling. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Plot Plan, unknown author, undated, received. by TRCA March 3, 2008; • Drawing No. 6, New Elevations and Typical Building Section, prepared by Charles G. Bunker Architect Inc., dated February 18, 2006, received by TRCA May 30, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a second storey addition above the existing dwelling located at 36 Glengrove Avenue East in the City of Toronto. The site is located east of Yonge Street, south of Lawrence Avenue East. Control of Flooding: The site is not located in the Regional Storm Floodplain. 439 Pollution: A sediment control fence will be erected prior to commencement of any construction works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. ynamic Beaches: Not applicable Erosion: A structural engineering letter has been reviewed and approved by TRCA geotechnical engineering staff and the proposed works are setback from the top of bank. Conservation of Land: No vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: The proposal is consistent with Section 4.2.2.B, Minor Additions, of TRCA's Valley and Stream Corridor Management Program. CFN: 40601 - Application #: 175/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: June 3, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.12 34 HILLSIDE DRIVE To construct, reconstruct, erect or place a building or structure and site grade on Lot 50, Plan 2967, (34 Hillside Drive), in. the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed in order to facilitate the construction of a new two - storey single family detached dwelling. The existing dwelling is to be demolished. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A0, Survey, Drawing List, Planning Data-and Building Data, prepared by Stevens Burgess Architects Ltd., dated July 2007, Revision No. 1, revised on October 19, 2007, received on December 12, 2008, redlined by TRCA staff on June 3, 2008; • Drawing No. Al, Partial Site Plan, prepared by Stevens Burgess Architects Ltd., dated July 2007, Revision No. 1, revised on October 19, 2007, received on December 12, 2008. 440 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: - The purpose of this application is to construct a new two- storey single family detached dwelling. The existing dwelling is to be demolished. The subject site is located west of • Broadview Avenue and north of Pottery Road in the City of Toronto (Toronto and East York • Community Council Area). Control of Flooding: This site is not located within the Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment and erosion control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Native and non - invasive plantings will be provided as per the City of .Toronto's Urban Forestry and Ravine Protection Guidelines. Policy Guidelines: The proposal is consistent with Section 4.2.2.(D) - Development-Guidelines for Replacement Structures within Non - Established Communities /Highly Urbanized Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40309 - Application #: 003 /08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 3, 2008 441 CITY OF VAUGHAN 8.1.13 1678575 ONTARIO INC. To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Lot 7, Concession 7, (86 Woodbridge Avenue), in the City of Vaughan, Humber River Watershed as located on the property owned by 1678575 Ontario Inc.. The purpose is to construct a temporary sales pavilion within a Regulated Area of the Humber • River Watershed at 86 Woodbridge Avenue, in the City of Vaughan. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. A -1.0 prepared by Intra Architect Inc., dated August 2006, received by the TRCA May 15, 2008; • Floor Plan, Drawing No. A -3.0 prepared by Intra Architect Inc., dated August 2006, received by the TRCA May 15, 2008; • South Elevation Drawing, Drawing No. A -5.0 prepared by Intra Architect Inc., dated August 2006, received by the TRCA May 15, 2008; • East Elevation Drawing, Drawing No. A -5.1 prepared by Intra Architect Inc., dated August 2006, received by the TRCA May 15, 2008; and • North Elevation Drawing, Drawing No. A -5.2 prepared by Intra Architect Inc., dated August 2006, received by the TRCA May 15, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to recognize a temporary sales pavilion within a Regulated Area of the Humber River Watershed which has already been constructed. The subject property is located at the northwest corner of Woodbridge Avenue and Clarence Avenue and is entirely within a Regulated Area and Regional Storm Flood Plain. The Regional Storm Elevation for the subject property is approximately 145.87 m.a.s.l. (metres above sea level). The subject property is also within the Woodbridge Special Policy Area (SPA) and outside of the floodway, as such, SPA redevelopment policies apply. A two storey office / residential building is currently located on the subject property. The temporary sales pavilion is connect with the existing building but has been designed to be dry flood - proofed by having the finished floor elevation at 146.17 m.a.s.I (Regional Storm Elevation plus 0.3 m freeboard) and all openings of the temporary sales pavilion have been located at this minimum height, consistent with the requirements of the TRCA's Valley and Stream Corridor Management Program. Control of Flooding: The temporary sales pavilion has been floodproofed to the Regional Storm Elevation plus 0.3 metres freeboard. TRCA staff are satisfied that the impacts to the storage or conveyance of flood waters will be minimal. 442 Pollution: The work has already been completed and the disturbed area has been stabilized, there is no - risk of the transportation of sediment to the nearby watercourse. Dynamic Beaches: • Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As the watercourse is not impacted by the proposal, no fisheries concerns resulted. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas have been restored to their previous sodded condition. Policy Guidelines: The proposal is consistent with Section 4.2.1 B) - Development /Redevelopment within • Designated Special Policy Areas - of the Authority's Valley and Stream Corridor Management Program. CFN: 40830 - Application #: 339 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: May 22, 2008 8.1.14 4011 TESTON ROAD To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on 4011 Teston Road, in the City of Vaughan, Humber River Watershed. The purpose is to construct an inground pool, cabana and patio area within a Regulated Area of the Humber River Watershed at 4001 -4011 Teston Road, in the City of Vaughan. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Landscape Restoration, Planting & Details Plan, Drawing No. L -5, prepared by Robert Boltman, revise dated April 9, 2008, received by the TRCA April 15, 2008, redline revised to indicate the removal of excess fill material from the property; and • DiBiase Property Restoration Report, prepared by North -South Environmental Inc., revise dated April 27th, 2005, received by the TRCA February 19, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 443. Proposal: The purpose is to construct an inground pool, cabana and patio area, perform site grading and landscape restoration work within a Regulated Area of the Humber River Watershed. Based upon a site visit conducted by TRCA staff July 19, 2007 and the Landscape Plan revise dated April 9, 2008, the proposed works are located approximately 3 metres away from the existing top of bank. The 3 metre setback area is to be significantly vegetated with native, non - invasive . species in order to provide an enhanced buffer between the valley feature and the proposed residential uses. Control of Flooding: The proposed works are not located within the Regional Storm Flood Plain, there will be no impact on the storage or conveyance of flood waters. Pollution: Sediment Cpntrol Fencing will be erected and maintained during the duration of construction to prevent the transport of sediment into the adjacent valley system. Dynamic Beaches: Not applicable. Erosion: Based upon the drawings provided and the site visit, TRCA Geotechnical staff have no concerns with the proposed structures. Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. A 3 metre, vegetated buffer area is provided around the existing top of bank and enhances the edge of the valley feature. Plantings All disturbed areas outside of the patio and buffer area are to be restored to their existing sodded.condition. Plantings within the buffer area are composed of native, non - invasive species. - Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 39505 - Application #: 488 /07NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: June 3, 2008 444 8.1.15 BLOCK 12 PROPERTIES To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 23, Concession 2, on the south side of Teston Road and east side of Dufferin Street, in the City of Vaughan, Don River Watershed as located on the property .. owned by Block 12 Properties. The purpose is to conduct site grading, temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a watercourse, in order to remove an existing culvert in the East Don River, in Planning Block 12, in the City of Vaughan. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this 'permit: • Red -Line Revised Culvert Removal Plan, Drawing No..CR -1, prepared by Schaeffers Consulting Engineers, Revision No. 1 (revised March 6, 2008), received March 13, 2008. • Red -Line Revised Mitigation Plan Details, Drawing No. 2D of 2U, prepared by Aboud & Associates Inc., Revision No. 4 (revised December 2007), received December 27, 2007. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to conduct site grading, temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a tributary of the East Don River, in order to remove an existing culvert southeast of Teston Road and Dufferin Street, in Planning Block 12, in the City of Vaughan. Planning Block 12 is bounded by Major Mackenzie Drive to the south, Dufferin Street to the west, Teston Road to the north and Bathurst Street to the east. The proposed work site is located within lands that are a part of draft approved plan of subdivision 19T -03V17 (Fernbrook Homes - formerly Lindstone Development Corp.). The work site is located south of Via Romano Boulevard and Sweet Emily Court. The proposed works involve the removal of an existing 500 mm diameter CSP culvert and grading works on the site to match the existing upstream and downstream grades at.the north end of Tributary 'A' in Block 12. Environment fencing and rock check dams will be installed around the work site to control erosion and sediment deposition. A coffer dam and pump by -pass system will be implemented in order to allow for the works to take place in the dry. Once isolated, the culvert will then be removed. The site will be restored and enhanced as part of the overall Edge Management /Restoration Plan for Block 12. Control of Flooding: TRCA technical staff has reviewed technical submissions relating to the proposed works and is satisfied that the storage or conveyance of flood waters will not be impacted by the proposed removal of the culvert. 445 Pollution: Sediment fencing will be erected around the work site along with rock check dams and coir Togs. Additionally, the inlet of the pump by -pass system will be wrapped in filter fabric to ensure that sediment is not transferred downstream. • Dynamic Beaches: Not applicable. Erosion: Sediment will be minimized through the implementation of the aforementioned sediment control measures. There are no geotechnical /slope stability issues associated with the proposed works. Conservation of Land: Given that a coffer dam /pump by -pass system will be implemented in the watercourse, a Letter of Advice will be issued on behalf of Fisheries and Oceans Canada (DFO). Plantings Restoration of the work site will take place after the completion of the works. This restoration will consist of plantings of native, non - invasive species and will be carried out in accordance with the TRCA's Planting Guidelines. Policy Guidelines: This proposal. complies with Section 4.2.2(F) - Opportunities for Regeneration, of the TRCA's Valley and Stream Corridor Management Program. CFN: 38761 - Application #: 030 /07NAUG Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date: June 4, 2008 8.1.16 ENBRIDGE GAS DISTRIBUTION INC. To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lady Jessica Drive,.iri the City of Vaughan, Regional Municipality of York, Don River Watershed. The purpose is to site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere to install a pipeline by open cut in the City of Vaughan, Regional Municipality of York. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance.with the following documents and plans which form part of this permit: • Sheet 2 of 5; dated February 15, 2008; received May 20, 2008; red line revised June 3, 2008; prepared by Enbridge Gas Distributions Inc. RATIONALE The application was reviewed by staff on the basis of the following information: 446 Proposal: The proposal involves the installation of a NPS 4 PE IP gas main crossing a tributary of the Don River on the south side of Lady Jessica Drive about 60m east of Priolo Court, in the City of Vaughan, Regional Municipality of York. The pipeline is proposed to be installed by open cut approximately 2.7m above the proposed culvert approved under TRCA Permit C- 08174. All works will take place within the municipal road right of way. Control of Flooding: There will be no impacts to the control of flooding. Pollution: Standard erosion control measures (silt/sediment fencing) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the. wetland /watercourse. Dynamic Beaches: Not applicable Erosion: There will be no in stream work associated with the project. Conservation of Land: There will be no in stream work associated with the project. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40923 - Application #: 417 /08NAUG Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: June 3, 2008 8.1.17 ENBRIDGE GAS DISTRIBUTION INC. To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere Lady Valentina Avenue, in the City of Vaughan, Regional Municipality of York in Don River Watershed. The purpose is to site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere to install two gas pipelines by open cut in the City of Vaughan, Regional Municipality of York. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: 447 • Sheet 4 of 5; dated February 15, 2008; received May 20, 2008; red line revised June 3, 2008; prepared by Enbridge Gas Distribution Inc. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the installation of a NPS 2 PE IP gas main crossing a tributary of the Don River on the north side of Lady Valentina Drive about 54m east of Heintzman Crescent and the installation of a NPS 4 PE IP gas pipeline crossing the same tributary on the south side of Lady Valentina Avenue about 75m east of Heintzman Crescent, in the City of Vaughan, Regional Municipality of York. The pipelines are proposed to be installed by open cut approximately 1 m above the proposed culvert approved under TRCA Permit C- 08165. All works will take place within the municipal road right of way. Control of Flooding: There will be no impacts to the control of flooding. Pollution: Standard erosion control measures (silt /sediment fencing)will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the wetland /watercourse. Dynamic Beaches: Not applicable Erosion: There will be no in stream work associated with the project. Conservation of Land: There will be no in stream work associated with the project. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40925 - Application #: 419 /08NAUG Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: June 3, 2008 448 8.1.18 ENBRIDGE GAS DISTRIBUTION INC. To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere near the north east corner of Dufferin Street and Major Mackenzie Drive, in the City of Vaughan, Regional - Municipality of York, Don River Watershed. The purpose is to site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere to install a gas header service by open cut in the City of Vaughan, Regional Municipality of York. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Sheet 1 of 3; Sheet 2 of 3; dated March 24, 2008; received May 23, 2008; red line revised June 3, 2008; prepared by Enbridge Gas Distributions Inc. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the installation of .a NPS 2 PE IP gas header service adjacent to a tributary of the Don River at the north east corner of Dufferin Street and Major Mackenzie Drive, in the City of Vaughan, Regional Municipality of York: The pipeline is proposed to be installed - by open cut above the top of bank. Control of Flooding: There will be no impacts to the control of flooding. Pollution: Standard erosion control measures (silt /sediment fencing) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: • There will be no in stream work associated with the project. Conservation of Land: . There will be no in stream work associated with the project. Plantings All disturbed areas will be restored with native non- invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. 449 CFN: 40928 - Application #: 422 /08 /VAUG Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: June 3, 2008 8.1.19 85 GRAND VISTA CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 23, Plan 65R- 25382, (85 Grand Vista Crescent), in the City of Vaughan, Humber River Watershed. The purpose is to construct an inground pool with surrounding 3 foot wide patio within a Regulated Area of the Humber River Watershed. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan prepared by the applicant, received by the TRCA on May 27, 2008, redline revised to indicate the erection of sediment control fencing, removal of excess fill material and pool to be drained away from the slope. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct an inground pool and patio within a Regulated Area of the Humber River Watershed. Based upon a site visit conducted by TRCA staff on January 22, 2008, the proposed works are located approximately 4 metres from a small retaining wall. The height of the retaining well at its closest point to the proposed works is approximately 30 cm and gradually increases in height to approximately 90 cm at the edge of the property boundary. This retaining wall was approved as part of the Draft Plan of Subdivision (19T -89024 - Vellore Village). Control of Flooding:, The proposed works are not located within a Regional Storm Flood Plain, there is no impact on the storage or conveyance of flood waters. Pollution: Sediment Control Fencing will be erected and maintained for the duration of construction to prevent sediment from entering the adjacent valley land feature. . Dynamic Beaches: Not applicable. Erosion: Based upon the site visit and drawings submitted by the applicant, TRCA Geotechnical staff have . no concerns regarding the proposed works. 450 Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. The adjacent valley lands will not be impacted by the proposal. Plantings All disturbed areas will be restored to a sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 40357 - Application #: 028 /08 /VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: June 3, 2008 8.1.20 36 RIVERSIDE BOULEVARD To construct, reconstruct, erect or place a building or structure and site grade on Lot 109, Plan 3765, (36 Riverside Boulevard), in the City of Vaughan, Don River Watershed. The purpose is to construct a replacement dwelling within a Regulated Area of the Don River Watershed at 36 Riverside Boulevard, in the City of Vaughan. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. A1.0, prepared by. Richard Librach Architect Inc., dated April 25, 2008, received by the TRCA May 29, 2008, redline revised to indicate erection of sediment control fencing and removal of excess fill material from property; • Site Grading Plan, prepared by. Avanti Surveying Inc., dated April 10, 2008, received by the TRCA May 29, 2008; • Landscape Plan, prepared by Griffith Property Services, dated May 27, 2008, received by the TRCA May 29, 2008; • Elevation Drawings, Drawing Nos. A -3.0, A -3.1, A -3.2 & A -3.3, prepared by Richard Librach Architect Inc., dated May 28, 2008, received by the TRCA May 29, 2008; • Section Drawings, Drawing Nos. A -4.0 & A -4.1, dated May 28, 2008, received by the TRCA May 29, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a replacement dwelling with an attached garage and perform grading works within a Regulated Area of the Don River Watershed. Based upon TRCA mapping, the subject property is . partially within the Regional Flood Plain and contains a slope feature. The floodplain area is located at the rear of the property and the proposed dwelling is located at the top of a large slope and sufficiently setback from the floodplain. 451 As part of the associated City of Vaughan Minor Variance Application (Application No. A399/07) TRCA staff conducted a site visit November 19, 2007 and determined that the proposed development is located within a wide, tiered valley system and a small portion of the proposed home extends over a gentle slope which forms part of a remnant vegetated draw feature located along the northern side yard of the subject property. The inner portion of the draw feature is well vegetated and the proposed works will result in the removal of some of the ornamental vegetation found at the edge / end of this vegetated area. The furthest extent of the proposed works to the rear of the property is located over 5 metres away from a significantly steeper and deeper slope feature found in the rear yard of the subject property. TRCA staff staked the existing top -of -bank December 6, 2007 and a Geotechnical / Slope • Stability Assessment prepared by Soil Engineers Ltd., revise dated February 28, 2008 states that the existing top -of -bank as staked by the TRCA can be considered as the long -term stable top -of -bank and that the proposed dwelling will not impact the stability of the slope. As noted earlier, a small portion of the proposed home (a portion of the garage) extends over a gentle slope which forms part of a partially vegetated draw feature. Negotiations with the landowner and architect have included modifications to the building design and footprint to shift the garage further from the top of bank and existing natural vegetation. The works will not result in a significant Toss of vegetation as the area is currently sodded and the valley is already in a highly altered state; however, some vegetation located along the edge / end of the vegetated portion of the draw feature will be selectively removed. Compensation plantings will be provided for this vegetation removal. The compensation planting will be composed of native, non - invasive shrubs and trees, will extend the vegetated portion of the draw feature toward the front of the property as well as act as a privacy barrier with the neighbouring property. Control of Flooding: The proposed works are outside of the Regional Storm Flood Plain, there will be no impact on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be erected and maintained during the duration of construction to prevent sediment transport into the adjacent draw feature and valley system. Dynamic Beaches: Not applicable. Erosion: A Geotechnical / Slope Stability Assessment prepared by Soil Engineers Ltd., revise dated February 28, 2008 concluded that the proposed works will not impact the stability of the existing slope which can also be considered as the long -term stable top of bank. • Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. The vegetated draw feature will have some vegetation removed from the edge; however, compensation planting will be provided to extend the vegetated portion of the draw feature further towards the front of the property as well as provide privacy for the neighbouring property. 452 Plantings All disturbed areas aside from the area to be planted with woody plants, which will extend the vegetated portion of the draw feature, will be restored to their existing sodded condition. Compensation planting along the northern boundary of the subject property consists of native, non - invasive species. Policy Guidelines: The proposal is consistent with Section 4.2.2. - Development & Redevelopment within Highly Urbanized Areas - of the Authority's Valley and Stream Corridor Management Program. CFN: 40797 - Application #: 317 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: June 4, 2008 8.1.21 29 CLOVER LEAF STREET To construct, reconstruct, erect or place a. building or structure on Lot 62, Plan 65M -2177, (29 Clover Leaf Street), in the City of Vaughan, Humber River Watershed. The purpose is to construct a deck within a Regulated Area of the Humber River Watershed at 29 Clover Leaf Street, in the City of Vaughan. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. Al, prepared by the applicant, received by the TRCA on May 21, 2008; • Floor Plan, Drawing No. A2, prepared by the applicant, received by the TRCA on May 21, 2008; • Rear Elevation Drawing, Drawing No. A3, prepared by the applicant, received by the TRCA on May 21, 2008; • West Elevation Drawing, Drawing No. A4, prepared by the applicant, received by the TRCA on May 21, 2008; • East Elevation Drawing, Drawing No. A5, prepared by the applicant, received by the TRCA on May 21, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a raised deck attached to an existing dwelling within a Regulated Area of the Humber River Watershed. The proposal is located within the meander belt of the headwaters of a small tributary which empties into Jersey Creek and outside of the Regional Storm Floodplain. The proposed deck is located approximately 10 metres from the Regional Storm Floodplain. 453 Control of Flooding: TRCA Water Resource staff are satisfied that the proposed works will not impact the storage or conveyance of flood waters. Pollution: The proposal will not result in the transport of sediment into the nearby watercourse due to the small area of disturbance and a sufficient setback through an existing sodded lawn. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 40929 - . Application #: 423 /08 /VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: May 30, 2008 TOWN OF CALEDON 8.1.22 22 MEADOWBROOK COURT To construct, reconstruct, erect or place a building or structure on Lot 11, Plan 43M -1586, (22 Meadow Brook Court), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction.of an ancillary deck structure at the rear of an existing residential dwelling located at 22 Meadow Brook Court, in the Town of Caledon. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, stamped received by TRCA Planning & Development staff on May 20, 2008. 454 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal; The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an ancillary deck structure at the rear of an existing residential dwelling at 22 Meadow Brook Court, in the Town of Caledon. The rear of the subject property is adjacent to a valley corridor. The proposed development setback from the valley corridor is sufficient. As such, there are no flooding, geotechnical or ecology related concerns anticipated with this proposal. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. There are no fisheries related concerns associated with this proposal. Plantings The proposed deck is located within an existing manicured lawn. No significant vegetation will be removed as a result of the construction. As such, additional plantings are not required for this project. Policy Guidelines: • This proposal is in conformity with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40893 - Application #: 395/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 8.1.23 9817 COLUMBIA WAY To construct, reconstruct, erect or place a building or structure on 9817 Columbia Way, in the Town of Caledon, Humber River Watershed. The purpose is to construct within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a residential dwelling. 455 The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by M. Pagliaro, dated April 26, 2006, redline revised by TRCA Planning and Development staff May 29, 2006, stamped received by TRCA Planning and Development staff April 26, 2006. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This proposal involves construction within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 278.71 square metre (3000 sq. ft.) residential dwelling at 9817 Columbia Way, in the Town of Caledon. The subject property is approximately 1.38 hectares (3.42 ac.) in size. A residential building and storage shed exist on the subject property. The existing structures are located within the Regulatory Floodplain. In conjunction with this project, the existing residential dwelling will be demolished. The new residential building will be constructed outside of the Regulatory Floodplain. Although a significant portion of the site is heavily vegetated, the area to which this application applies is void of any significant vegetation and is currently a manicured lawn. This application is a re- issuance of Ontario Regulation 166/06 permit C- 06205, issued June 9, 2006. Control of Flooding: The proposal is not located within a Regulatory Floodplain and therefore will not impact the storage or conveyance of flood waters. Pollution: Appropriate erosion and sediment control measures (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable Erosion: . There are no geotechnical and /or slope stability concerns related to this application.. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no geotechnical and /or fisheries related concerns associated with this proposal. Plantings All disturbed areas will be restored using a TRCA approved seed mix. All proposed species will be native and non - invasive. 456 Policy Guidelines: The works conform with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40947 - Application #: 436/08/CAL Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: June 3, 2008 TOWN OF MARKHAM 8.1.24 TOWN OF MARKHAM To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere (Woodbine Avenue - Contract 3 - from Betty Roman Boulevard (Station 11 +700) to Elgin Mills Road (Station 12 +480)), in the Town of Markham, Rouge River Watershed as located on the property owned by Regional Municipality of York. The purpose is to excavate and place fill ( for Woodbine Avenue Bypass, for storm sewer installation, for footings, retaining walls and abutment installation) in a Regulated Area; to construct structures (8.5m wide x 72m length x 2.5 m high open bottom concrete culvert, footings, retaining walls, abutments, wingwalls, headwalls, guiderails and asphalt paving) within a Regional Storm Floodplain. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking (to provide revisions to engineering drawings, revisions to restoration plans and to provide the landowner authorizations); dated June 3, 2008; received June 3, 2008; submitted by the Town of Markham RATIONALE The application was reviewed by staff on the basis'of the following information: Proposal: The entire project involves the Woobine Avenue Bypass from Major Mackenzie Drive in the south to 19th Avenue in the north. The project has been divided into 5 contracts, and this file deals with Contract 3- the Betty Roman Culvert section from just south of Betty Roman Boulevard to just south of Elgin Mills Road. The plans submitted indicate Contract 3 involves the construction of the Woodbine Avenue • Bypass with a proposed culvert and the associated storm sewers. The location of the works is from immediately south of Betty Roman Boulevard to just south of Elgin Mills Road. The works involve the construction of the Betty Roman open bottom concrete culvert at Betty Roman Boulevard with dimensions of an 8.5 metre width /span x 72 metre length x 2.5 metre height within the regulated area and a Regional Storm Floodplain. A fluvial geomorphic report was submitted to address the width and the hydraulic model was submitted to address the capacity. 457 There is a regulated area surrounding the "original watercourse" to the north that drains from the west to the east. This "original watercourse" was temporarily relocated to a "diversion channel" to the south in order to conduct works in the dry for this proposed culvert as well as works for the proposed subdivision. The "ultimate watercourse, " handled under File 40694 will be created and flows will be passed through the Betty Roman Culvert during initiating at the tie in date during the coldwater timing window of July 1 to September 15. Also under file 39246 a deep sanitary sewer will be installed in the same geographic area as Contract 3. The location of Contract3 is within a Regulated Area and a Regional Storm Floodplain. The project was reviewed by TRCA staff during the Environmental Assessment process in file 33728. Control of Flooding: Staff has reviewed the hydraulics for the proposed structures and has determined that there will not be any negative impacts to flooding. Pollution: • Standard erosion control measures (rock check dams, silt fence.) will be implemented to ensure that the construction - generated sediments do not enter the neighbouring diversion channel. Dynamic Beaches: Not applicable Erosion: There will be no slope stability issues related to the works. • Conservation of Land: As there will be no in stream work associated with the project there will be no concerns related to fish habitat loss. The culvert will be constructed in the dry when no flows will be within the channel. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - of the Authority's Valley and Stream Corridor Management Program. CFN: 37735 - Application #: 234 /06 /MARK Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: June 4, 2008 458 8.1.25 TOWN OF MARKHAM To construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lot 21, Concession 3, Block 162, Plan 65M -3644, (Woodbine Avenue - Contract 5 -100 metres north of Major Mackenzie Drive between Stations 10 +000 to 10 +460), in the Town of Markham, Rouge River Watershed as located on the property owned by Regional Municipality of York. The purpose is to construct structure (4 metre wide x 31 metre long open bottom concrete box culvert) within a Regional Storm Floodplain; to place fill (for culvert removal and replacement) in a Regulated Area; to alter a watercourse (Carlton Creek) during the coldwater timing window (July 1 to September 15) through a dam and pump around method in order to work in the dry. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking (to provide revisions to engineering drawings, revisions to restoration plans and to provide the landowner authorizations); dated May 30, 2008; received May 30, 2008; submitted by the Town of Markham. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The entire project involves the Woodbine Avenue Bypass from Major Mackenzie Drive in the south to 19th Avenue in the north. The project has been divided into 5 contracts, and this file deals with Contract 5- the Woodbine Avenue Bypass - South Culvert located 100 metres north of Major Mackenzie. The project limits are from Major Mackenzie Drive (Station 10 +000) to the tie in point from the new Woodbine Avenue South to the old Woodbine Avenue (Station 10 +460). The plans submitted indicate Contract 5 involves the removal and replacement of the Woodbine Avenue South Culvert. The plans submitted indicate the proposal is to remove the existing 1.8 metre diameter x 38 metre long corrugated steel pipe arch and replace with a 4 metre wide x 31 metre long open bottom concrete box culvert. A fluvial geomorphic report was submitted to address the width and the hydraulic model was submitted to address the capacity. The location of Contract 5 is within a Regulated Area and a Regional Storm Floodplain associated with Carlton Creek. The Town of Markham has determined that this project classifies as a Schedule A Environmental Assessment. Control of Flooding: Staff has reviewed the hydraulics for the proposed structure and has determined that there will not be any negative impacts to flooding. 459. Pollution: Standard erosion control measures (rock check dams, silt fence., coffer dam and pump) will be implemented to ensure that the construction - generated sediments do not enter the watercourse. Dynamic Beaches: Not applicable • Erosion: There will. be no slope stability issues related to the works. Conservation of Land: There will be in stream works associated with this project. Carlton Creek will be altered temporarily during the coldwater timing window by a coffer dam and pump in order to work in the dry during the culvert removal and replacement. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). The proposed works will impact no significant terrestrial resource features. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - of the Authority's Valley and Stream Corridor Management Program. CFN: 40502 - Application #: 107 /08 /MARK Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: June 4, 2008 TOWN OF RICHMOND HILL 8.1.26 ENBRIDGE GAS DISTRIBUTIONS INC. To temporarily or permanently. place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Stouffville Road, in the Town of Richmond Hill, Regional Municipality of York, Rouge River Watershed. The purpose is to site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere to install a gas pipeline by directional drill, on Stouffville Road, in the Town of Richmond Hill, Regional Municipality of York. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: 460 • Sheet 2 of 2; dated November 21, 2007; received January 28, 2008; red line revised June 3, 2008; prepared by Enbridge Gas Distributors Inc. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the installation of a NPS 2 PE IP gas main crossing the Rouge River, on the north side of Stouffville Road, at the north east corner of Gormley Road and Stouffville Road, in the Town of Richmond Hill, Regional Municipality of York. The pipeline is proposed to be installed by directional drill approximately 2.1m below the watercourse. The working pits are located approximately 36m west and 23m east of the watercourse. All works will take.place within the municipal road right of way. Control of Flooding: There will be no impacts to the control of flooding Pollution: Standard erosion control measures (silt/sediment fencing) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the wetland /watercourse. Dynamic Beaches: Not applicable Erosion: There will be no in stream work associated with the project. Conservation of Land: There will be no in stream work associated with the project. With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated and an Ontario Operation Statement for High- Pressure Directional Drilling will be provided by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). This application is subject to the coldwater fisheries timing window of July 1 to September 15. No significant vegetation will be removed as a result of construction. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40444 - Application #: 073/08/RH Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: June 3, 2008 461 TOWN OF WHITCHURCH - STOUFVILLE 8.1.27 DC GROUP INC. • To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on 38 Gormley Industrial Avenue, in the Town of Whitchurch - Stouffville, Rouge River Watershed as located on the property owned by DC Group Inc.. The purpose is to undertake site grading and permanently place fill material in order to construct an industrial building. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -1, Site Plan, prepared by Hendrik Op't Root Architect Ltd, dated July 10, 2006, Revision No. 3, revised on March 13, 2008, received by TRCA on May 5, • 2008; • Drawing No. G -2, Site & Grading Plan, prepared by Gunnell Engineering Ltd., dated June 22, 2006, Revision No. 2, revised on April 21, 2008, received by TRCA on May 5, 2008; • Drawing No. G -3, Cross - Sections, prepared by Gunnell Engineering Ltd., dated September 5, 2007, Revision No. 2, Revised on April 21, 2008, received by TRCA on May 5, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to undertake site grading and the permanent placement of fill material within a Regulated Area in order to construct an industrial building. The development is located adjacent to a headwater tributary of the Berczy Creek in the northeast quadrant of the community of Gormley within the Town of Whitchurch - Stouffville. The subject lands were subdivided in the 1980's and have remained vacant since that time. When the plan of subdivision was originally designed, the Berczy Creek tributary was channelized and routed along the northern edge of the subject lands within a drainage easement. The watercourse is to remain in this state and is not to be disturbed during construction activities. A chain link fence is to be erected in order to separate the developed area of the site from the existing watercourse, which since the 1980's has experienced the establishment of successional riparian vegetation within the channel. Control of Flooding: TRCA staff have worked with the applicant in order to determine the extent of the Regional Storm Flood Plain associated with the on -site tributary. Based upon review by TRCA Water Management Staff, it has been determined that the Regional Storm Flood Plain will be contained within the existing channel on the subject lands. Given that the channel is to remain in its present condition without alteration during construction, the proposal will not have an impact upon the storage and conveyance of flood waters. 462 Pollution: Sediment control fencing is to be erected between the tributary and the balance of the site in order to prevent sedimentation of the watercourse during construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical or slope stability concerns with this proposal. Conservation of Land: The existing riparian vegetation and channelized watercourse corridor are to be retained in the current condition. No significant natural heritage features are to be removed as part of this proposal. Plantings No plantings were required as part of this proposal, however existing vegetation is to be retained as described above. Policy Guidelines: This proposal is consistent with Section 4.2.2 G), Existing Development - Infilling, of TRCA's Valley and Stream Corridor Management Program. CFN: 40815 - Application #: 327/08/WS Report Prepared by: Chris Jones, extension 5718 For information contact: Chris Jones, extension 5718 Date: May 23, 2008 8.1.28 3952 BETHESDA ROAD To construct, reconstruct, erect or place a building or structure on Lot 6, • Concession 6 Lot 6, Plan 65R -2045, (3952 Bethesda Road), in the Town of Whitchurch- Stouffville, Rouge River Watershed. The purpose is to construct an addition to an existing house within a Regulated Area of the Rouge River - Watershed. • The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, no date, prepared by Italo Marti and Associates, received May 28, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of constructing a new two storey addition to an existing house located at 3952 Bethesda Road in Stouffville. The property is regulated due to the two wetlands located behind the house in the rear yard. The proposed addition is located in front of the house. As such, there is no further encroachment towards the wetland. The proposed addition is approximately 25 metres from the wetland. 463 Control of Flooding: The subject property is not located within the Regulatory Floodplain. As such, there are no flooding concerns. Pollution: Sediment fencing will be in place throughout the duration of construction to ensure that no sediment will enter the watercourse. • Dynamic Beaches: Not applicable Erosion: . There are no geotechnical concerns with this application. • . Conservation of Land: A previous permit was issued in November 2007 for a garage. Through this application the applicant agreed to do restoration works along the wetland. These works will be completed when the addition is finished. Plantings All plantings will be in accordance with TRCA's guidelines. Policy Guidelines: This proposal is consistent with Section 4.2.2 C, Minor Additions, of TRCA's Valley and Stream Corridor Management Program. CFN: 40742 - Application #: 283/08/WS Report Prepared by: Shannon McNeill, extension 5744 • For information contact: Bill Kiru, extension 5306 Date: June 4, 2008 8.1.29 88 CEDAR RIDGE ROAD To construct, reconstruct, erect or place a building or structure on, (88 Cedar Ridge Road), in the Town of Whitchurch - Stouffville, Rouge River Watershed. The purpose is to construct a new home within a Regulated Area of the Rouge River Watershed. . The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, dated May 9, 2008, prepared Battaglia Architects Inc., received by TRCA May 12, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: 464 Proposal: The proposal consists of constructing a new one and half storey single family residential home at 88 Cedar Ridge Road. The subject property is located adjacent to the Rouge River valley and within close proximity to a Provincially Significant Wetland. Through discussion with the applicant and review of a geotechnical report the house has be sited in a location that is satisfactory to TRCA staff. The house is situated on the tableland portion of the property and it is approximately 12 metres from the top of bank. There are no anticipated affects to the adjacent valleyland and wetland. Control of Flooding: The subject.property is not located within the Regulatory Floodplain. As such, there are no flooding concerns. Pollution: Sediment fencing will be in place throughout the duration of construction to ensure that no sediment will enter the adjacent valleyland or wetland. Dynamic Beaches: Not applicable Erosion: TRCA technical staff have reviewed a geotechnical report prepared for the applicant. The house has been situated on the tableland portion of the property and with a adequate buffer to ensure that there will be no erosion issues. Conservation of Land: There will be no significant vegetation removed as part of this application. The lot has an existing tableland portion that has been previously cleared. Plantings No plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 G, Infilling, of TRCA's Valley and Stream Corridor Management Program. CFN: 40379 - Application #: 039/08/WS Report Prepared by: Shannon McNeill, extension 5744 For information contact: Bill Kiru, extension 5306 Date: June 3, 2008 . TOWNSHIP OF KING 8.1.30 15 LASKAY LANE To construct, reconstruct, erect or place a building or structure on 15 Laskay Lane, in the Township of King, Humber River Watershed. The purpose is to reconstruct an existing two level garage within a Regulated Area of the Humber River Watershed at 15 Laskay Lane, in the Township of King. 465 The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan Drawing, prepared by the Applicant, received by the TRCA June 2, 2008; • Floor Plans Drawing, prepared by Johnvale Contractors Co. Ltd., dated June 1, 2008, received by the TRCA June 2, 2008; • Elevation Drawings, prepared by Johnvale Contractors Co. Ltd., dated June 1, 2008, received by the TRCA June 2, 2008; • Section Drawing, prepared by Johnvale Contractors Co. Ltd., dated June 1, 2008, received by the TRCA June 2, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to reconstruct an existing two level garage within a Regulated Area of the Humber River Watershed. The proposal is located just outside of the Regional Storm Flood Plain; however, based upon a site visit by TRCA staff on February 26, 2008, the footprint of the existing garage is located along the valley wall. Based upon a slope stability study by Jagger Hims Limited, dated May 12, 2008, the stability concerns along the slope to be built upon are considered negligible. The study also recommends that the footings for the new garage be constructed in competent native soil or well compacted fill and that the footings extend to the base of the slope grade. The drawings submitted by the applicant has implemented this recommendation. Control of Flooding: TRCA Water Resources engineers have determined that the proposed works are located in close proximity to but outside of the Regional Flood Plain. There will be no impact on the flood storage or conveyance of flood waters. Pollution: Sediment control fencing will be installed and maintained during construction to prevent . sediment from entering the nearby watercourse. Dynamic Beaches: Not applicable. Erosion: Based upon the slope stability study by Jagger Hims Limited, TRCA geotechnical staff have no concerns with the stability of the slope provided that the site is stabilized immediately following construction. As indicated in the drawings provided by the applicant, immediate stabilization works will be undertaken. Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively affected by the project. . 466 Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 40482 - Application #: 102 /08 /KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: June 4, 2008 8.1.31 REGIONAL MUNICIPALITY OF YORK To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 5, Concession 5, (south west quadrant of King Road and Jane Street - Phase I), in the Township of King, Humber River Watershed as located on the property owned by Regional Municipality of York. The purpose is to construct a structure (asphalt paving, curb and gutter, steel beam guard rail) in a Regional Storm Floodplain; to excavate and place fill (for removing existing failed storm sewer pipes on the west side of Kinghorn Bridge, for replacement with new storm sewer pipes with appropriate bedding material; for restoration of the fill embankment slopes on the west side of the Kinghorn bridge) in a Regulated Area. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Sheet 1 Slope and Sewer Restoration (Phase 1); dated May 20, 2008; Engineers Stamp May 21, 2008; received May 21, 2008; prepared by McCormick Rankin Corporation on behalf of the Regional Municipality of York; • Sheet 2 Sewer Profile Section and Details (Phase I) dated May 20, 2008; Engineers Stamp May 21, 2008; received May 21, 2008; prepared by McCormick Rankin Corporation on behalf of the Regional Municipality of York; • Sheet 7 Temporary Works, Sediment and Erosion Control (Phase I); dated May 20, - 2008; Engineers Stamp May 21, 2008; received May 21, 2008; prepared by McCormick Rankin Corporation on behalf of the Regional Municipality of York; RATIONALE The application was reviewed by staff on the basis of the following information: 467 Proposal: Both Phase I and Phase II of this project are classified as "Emergency Works" since the King Road infrastructure and the storm sewer infrastructure as well as the Humber River water quality are at risk. Phase I involves restoring the failed west bank and Phase II involves removal of sediment from the Humber River. This file deals with Phase I approvals only. An "Authorization for Phase I Emergency Works" letter was issued on May 22, 2008 in order for Regional Municipality of York staff to proceed with the west side bank restoration. A failed storm sewer pipe at the south west quadrant of King Road and Jane Street has caused an erosion scar (approximately 10 m wide by 25 metres long) on the west side of Kinghorn Bridge. The Regional Municipality of York needed to implement Phase I of the emergency works starting the week of May 26, 2008 and anticipated works to continue for approximately 3 weeks into June 2008. The Emergency Works are required in order to prevent further damage to existing road and storm sewer infrastructure (Phase I) as well as to reduce the extension of the sediment plume into the Humber River (Phase II). A five metre section of steel beam guide rail at the bridge structure approach is completely undermined and provides no protection of the fill embankment or bridge. Public safety is an immediate concern. The Regional Municipality of York's submission of May 15, 2008 indicated that the storm outfall failure on the west side of the bridge is believed to have resulted from leakage of water from the buried corrugated steel pipe (CSP) outfall, subsurface erosion of soil from below and adjacent to the pipe, and subsequent collapse of the pipe and overlying soil. The submission also indicated that the cause of the leakage has not been confirmed but may involve corrosion of the CSP or separation of the joints due to creep movements in the slope. Phase I of the emergency works involves removing the failed sewer pipes, replacing with suitable backfill material and new pipes as well as the restoring the curb, gutter, asphalt pavement and stabilizing slopes with a temporary erosion control blanket. Machinery will access from the west and will not need to cross the river. There will be no in water works associated with Phase I and the duration will be 2 to 3 weeks from the week of May 26. Phase II of the emergency works involves removing the sediment plume from the Humber River as well as restoring the east outtall which has suffered some slumping. Phase II, under another Central File Number 40870 will involve in water works associated with the stream rehabilitation. The duration of Phase II will be 3 to 4 weeks starting July 1, 2008 during the coldwater window restriction due to the presence of redside dace. The Phase II Emergency Works letter has not been issued as of the date of this report since the Consultant needs to finalize the plans for the proposed in water works which will commence no earlier than July 1. Issuance of the Emergency Works letter is anticipated in June 2008 after finalization of the plans and a report for ratification for the Phase II works will be prepared for the July 11, 2008 Executive Committee agenda. The entire project site is located within a Regional Storm Floodplain and a Regulated Area. Landowner authorization has been allocated for works outside the Regional Right -of -Way. Control of Flooding: The existing grades within the Regional Storm Floodplain will be maintained, therefore, there will be no implications to flooding. 468 Pollution: Standard•erosion control measures (silt fence between slope and watercourse, plugging manhole and diverting flows) wilt be implemented to ensure that the construction - generated sediments do not enter the watercourse during slope restoration. Dynamic Beaches: Not applicable Erosion: There will be no slope stability issues related to the works. The proposed restoration works will stabilize the west bank. Conservation of Land: There will not be any in stream works associated with Phase I of this project. The watercourse will be isolated from the bank restoration works with a sediment fence. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The proposed works will impact no significant terrestrial resource features. Plantings Between Phase I and Phase II the disturbed slopes will be stabilized and restored with a temporary erosion control blanket. Ultimate restoration of all disturbed areas with native /non- invasive species will occur during Phase II of the works which will initiate July 1 during the coldwater timing window and will continue for 3 to 4 weeks. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 40858 -. Application #: 360/08 /KING Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: May 30, 2008 THE FOLLOWING PERMIT APPLICATIONS WERE ERRATA ITEMS: RES.#B61/08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS Moved by: Seconded by: Ron Moeser Maja Prentice THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.32 - 8.1.62, inclusive), that had been scheduled on the agenda as errata applications for which all the required information was received and finalized as listed below. CARRIED 469 CITY OF BRAMPTON 8.1.32 ENBRIDGE GAS DISTRIBUTION INC. To construct, reconstruct, erect or place a building or structure on 143 Heart Lake Road South, in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by Enbridge Gas Distribution Inc.. The purpose is to construct, reconstruct, erect or place a building or structure (gas line) at 143 Heart Lake Road South in the City of Brampton, Etobicoke Creek Watershed. No in -water works will take place. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of Undertaking to provide revisions to the engineering drawings to the satisfaction of TRCA staff; dated June 9, 2008; received June 10, 2008; prepared by Enbridge Gas Distribution. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This proposal consists of installing a gas line to a building'located at 143 Heart Lake Road South. The line will be constructed by Torpedo method from the building, under a culvert, and will end at a tie -in pit located on the east side of Heart Lake Road South. No in -water works will take place. Control of Flooding: There will be no impacts to the control of flooding. Pollution: Standard erosion control measures will be implemented for the duration of construction, and until the site is restored, in order to prevent construction generated sediment from entering the • watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). No in -water works will take place. Plantings • All disturbed areas will be'restored with native non - invasive species following construction. 470 Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40649 - Application #: 222 /08 /BRAM Report Prepared by: Scott Smith, extension 5758 For information contact: Beth Williston, extension 5217 Date: June 3, 2008 8.1.33 OURAY DEVELOPMENTS INC. To construct, reconstruct, erect or place a building or structure and site grade . on Lot 5, Concession 10, (Highway 50), in the City of Brampton, Humber River Watershed as located on the property owned by Ouray Developments Inc. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a commercial development and outfall structure on Highway 50, south of Ebenezer Road, in the City of Brampton. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of Undertaking, prepared by Ouray Developments Inc., dated June 10, 2008, to address all outstanding engineering and ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of six commercial buildings and an outfall structure on the west side of Highway 50, south of Ebenezer Road, in the City of Brampton. The subject property is located adjacent to a valley corridor. The limits of development for the subject property were established through the earlier planning reviews for this area. As such, the proposed works are setback sufficiently from the valley corridor. Stormwater from the subject property will drain to an existing stormwater management pond adjacent to Ebenezer Road in order to provide water quantity and quality controls. Additionally, innovative Stormchambers will be installed on the subject property in order to incorporate best management practices (BMPs), which were not part of the earlier planning approvals. In addition to providing additional stormwater controls, the Stormchambers will provide groundwater infiltration to replicate pre - development hydrology. Currently, a drainage ditch traverses this site, which drains a portion of the Block 57/58 lands within the City of Vaughan and a portion of Highway 50 to the adjacent valleylands. Through the subject application, the ditch is to be enclosed and a formalized outfall structure is to be completed in order to prevent future erosion of the valley slope. The outfall structure, designed in accordance with TRCA's guidelines, will continue to discharge drainage from a portion of Highway 50 and the Block 57/58 lands. At such time when the Highway.50 widening is completed, a Stormceptor unit is to be installed to provide stormwater quality treatment for the 471 Highway 50 drainage prior to entering the proposed outfall. Appropriate stormwater quantity and quality controls will be implemented at such time when future development on Block 57/58 lands is proposed. As such, there are no flooding, geotechnical, or ecology related concerns with this application. Plantings are proposed within the valley corridor, surrounding the proposed outfall structure and within the buffer in order to provide a net ecological gain with this application. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this proposal. Plantings. All proposed plantings will be native and non - invasive consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40504 - Application #: 104 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 8.1.34 OURAY DEVELOPMENTS INC. To construct, reconstruct, erect or place a building or structure and site grade on Lot 5, Concession 10, (Southwest Corner of HWY 50 and Ebenezer Road), in the City of Brampton, Humber River Watershed as located on the property owned by Ouray Developments Inc. The purpose is to undertake works within a TRCA Regulated Area in order to facilitate the construction of 104 residential townhouse units on the west side of Highway 50, south of Ebenezer Road, in the City of Brampton. . The permit will be issued for the period of June 13, 2008 to June 12, 2010. 472 • Letter of Undertaking, prepared by Ouray Developments Inc., dated June 10, 2008, to address all outstanding engineering and ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of residential townhouse community on the west side of Highway 50, south of Ebenezer Road, in the City of Brampton. The subject property is located adjacent to a valley corridor. The limits of development for the subject property were established through the earlier planning reviews for this area. The proposed works are setback sufficiently from the valley corridor. Stormwater will drain to an existing stormwater management facility designed to accommodate the proposed development. In addition to stormwater controls, innovative cultech storage tanks will be utilized on the subject property in order to incorporate best management practices (BMPs), which were not part of the earlier planning approvals. In addition to providing additional stormwater controls, the Stormchambers will provide groundwater infiltration to replicate pre - development hydrology. There are no flooding, geotechnical, or ecology related concerns with this application. Plantings are proposed within the buffer adjacent to the valley in order to provide a net ecological gain. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. , Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject propertyduring all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this proposal. Plantings All proposed plantings will be native and non - invasive consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New.Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). 473 CFN: 40621 - Application #: 193/08/BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 8.1.35 WHISKEY HILL ESTATES INC. To site grade on Lot 8, Concession 8 NDS, (Castlemore Road and McVean Drive), in the City of Brampton, Humber River Watershed as located on the property owned by Whiskey Hill Estates Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate grading and servicing works related to a proposed subdivision. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of Undertaking, prepared by D. Horgan, Candevcon Limited, dated June 11, 2008, to address all outstanding engineering and ecology related concerns. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate grading and servicing related to a proposed 17 single- detached lot subdivision (21T-99019). The western property limit is located adjacent to a valley corridor of the Humber River Watershed known as Claireville Conservation Area. As such, the adjacent valley lands are owned by the TRCA. TRCA Property Section has identified that there is a long -term encroachment on the TRCA lands, which relates to the previous land owner. As an element of this application, the owner agrees to remove an existing retaining wall, fence, pool decking and regrade /restore the valley slope. As an element of the proposed restoration work, an extensive enhancement planting plan has been submitted to improve the ecological condition of Claireville Conservation Area. A buffer area adjacent to the valley corridor has also been incorporated into the subdivision design. Please note that the proposed enhancement planting plan extends to the proposed buffer area to provide further ecological improvements. As an element of the related subdivision review, the buffer area will be placed into public ownership and appropriate zoned (i.e., Open Space) to ensure the long -term protection and enhancement of the adjacent natural area. The proposed works are located outside of the Regional Storm Floodplain. . • Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters is anticipated. Pollution: Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction. 474 Dynamic Beaches: Not applicable. Erosion: Although a retaining wall is proposed to be removed as a component of this application, there are no geotechnical and /or slope stability concerns with this application. Conservation of Land: In order to necessitate the removal of existing development on lands owned by the TRCA, removal of existing vegetation is required. However, an inventory of existing vegetation has been completed by the proponent and a report provided for our review. Based on this document, only non - native and invasive species will be removed. Additionally, an extensive enhancement planting plan has been submitted with this application to provide an ecological net benefit for this area. Plantings All plant species are native and non - invasive consistent with TRCA guidelines. Policy Guidelines: This project is in conformity with Section 4.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 39697 - Application #: 626/07/BRAM Report Prepared by: Adam Miller, extension 5244 For information contact: Adam Miller, extension 5244 Date: June 4, 2008 CITY OF MISSISSAUGA 8.1.36 CATHOLIC CEMETERIES ARCHDIOCESE OF TORONTO To construct, reconstruct, erect or place a building or structure on Part Lot 10, Concession 3 EHS, (6933 Tomken Road), in the City of Mississauga, Etobicoke Creek Watershed as located on the property owned by Catholic Cemeteries Archdiocese of Toronto. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of the expansion to the existing Assumption Cemetery, located at 6933 Tomken Road, in the City of Mississauga. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of Undertaking, prepared by M. Everard, dated June 10, 2008, to address all outstanding ecology and engineering related issues. RATIONALE The application was reviewed by staff on the basis of the following information: 475 Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of the Phase 2 expansion to the existing Assumption Cemetery, located at 6933 Tomken Road, in the City of Mississauga. The proposed expansion is to occur on tableland areas of the site currently void of any significant vegetation. An existing swale, which traverses the middle of the subject property, has been identified as a 'target area' for natural cover enhancement through TRCA's Terrestrial Natural Heritage System Strategy (TNHSS). As an element of the proposed cemetery expansion to the east of the swale, extensive re- naturalization of the swale has been incorporated into the design of this project. In addition, there are no flooding, geotechnical, or ecology related concerns with this application. As noted above, a planting enhancement plan has been provided in order to achieve a net ecological gain. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no.geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this proposal. Plantings All proposed plantings will be native and non - invasive consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40588 - Application #: 170 /08 /MISS Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 476 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.37 85 BABY POINT CRESCENT To construct, reconstruct, erect or place a building or structure and site grade on Part Lot 260, Plan 1582, (85 Baby Point Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is.to develop within a Regulated Area of the Don River Watershed in order to facilitate the construction of a carport and the replacement of an existing terrace and retaining wall. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Drawing No. S1 -1, Plan and Notes, prepared by Aldershot Landscape Contractors Limited, dated April 2008, received on May 7, 2008; • Drawing No. S2 -1, Sections, prepared by Aldershot Landscape Contractors Limited, dated April 2008, received on May 7, 2008; • Drawing No. S3 -1, Typical Notes & Details, prepared by Aldershot Landscape Contractors Limited, dated April 2008, received on May 7, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to develop within a Regulated Area of the Humber River Watershed in order to facilitate the construction of a carport and replacement of the existing terrace and retaining wall. The subject property is located west of Jane Street and south of Dundas Street West in the City of Toronto (Etobicoke York). The replacement terrace and retaining wall are to be reconstructed within the same footprint as the existing structures. Control of Flooding: The proposal is not located within a Regional Storm Floodplain and therefore will not impact the storage or conveyance of flood waters. Pollution: A sediment control fence will be installed to prevent construction debris from entering the adjacent ravine. Dynamic Beaches: Not applicable. . Erosion: There are no erosion issues associated with this project. Conservation of Land: TRCA staff have reviewed the geo- technical report submitted by the applicant and are satisfied that there are no slope stability issues associated with the project. There will be no impact on significant natural features, riparian vegetation or fisheries. 477 Plantings Plantings are not required as part of this application. Policy Guidelines: The proposal is consistent with Section 4.2.2.E - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 37881 - Application #: 325/06/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 3, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.38 180 TEDDINGTON PARK AVENUE To construct, reconstruct, erect or place a building or structure on Lot 8, Concession 1, (180 Teddington Park Avenue), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a two- storey replacement dwelling, two detached garages, and a replacement in- ground swimming pool. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • . Drawing No. Al, Site Plan, prepared by J.F. Brennan Design /Build, dated June 3, 2008, received by TRCA June 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a new two- storey dwelling, two detached garages, and a replacement in- ground swimming pool at 180 Teddington Park Avenue in the City of Toronto. The site is located north of Lawrence Avenue East, west of Yonge Street. The existing dwelling and in- ground swimming pool are to be demolished. Control of Flooding: The site is not located in the Regional Storm Floodplain. • Pollution: Sediment control fencing is not required as the'site is adequately set back from the watercourse. Dynamic Beaches: Not applicable 478 Erosion: A geotechnical investigation has been reviewed and approved by TRCA geotechnical engineering staff. The proposed works are located in the same area as the existing dwelling, beyond the top of bank. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Native tree shrubs and seed mix will be planted. Policy.Guidelines: The proposal is consistent with Section 4.2.2.D, Replacement Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 39970 - Application #: 824/07/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: June 4, 2008 8.1.39 37 DOWNSVIEW AVENUE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on 37 Downsview Avenue, in the City of Toronto (North York Community Council Area), Humber River Watershed. The purpose is to develop within a Regulated Area of the Humber River Watershed to facilitate construction of a second - storey addition over top of the existing one - storey dwelling. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Drawing No. A -1, Site Plan, prepared by TAG Structural Group, dated March 2008, revised June 2, 2008, received by TRCA June 4, 2008; • Drawing No. A -2, Existing Basement and Ground Floor Plan, prepared by TAG Structural Group, dated March 2008, received by TRCA June 4, 2008; • Drawing No. A -3, 2ND Floor Plan & Roof Plan, prepared by TAG Structural Group, dated March 2008, received by TRCA June 4, 2008; • Drawing No. A -4, Elevations, prepared by TAG Structural Group, dated March 2008, revised June 2, 2008, received by TRCA June 4, 2008; • Drawing No. A- 5,.Elevations, prepared by TAG Structural Group, dated March 2008, revised June 2, 2008, received by TRCA June 4, 2008; • Drawing No. A -6, Sections, prepared by TAG Structural Group, dated March 2008, received by TRCA June 4, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 479. Proposal:. The proposed works include the construction of a second - storey addition over top of the existing one - storey dwelling with finished basement at 37 Downsview Avenue in the City of Toronto. The site is located east of Jane Street, north of Highway 401. Control of Flooding: The subject property is located in the Regional Storm Floodplain of the Humber River Watershed. . Pollution: Sediment fencing is not required as the site is adequately set back from the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as part of this application. Plantings No plantings are required. Policy Guidelines: The proposal is consistent with Section 4.2.2.B, Minor Additions, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40760 - Application #: 288/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: June 4, 2008 CITY OF TORONTO (SCARBOROUGH,COMMUNITY COUNCIL AREA) 8.1.40 9 REDLAND CRESCENT EAST To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and site grade on Block G, Plan M -350, (9 Redland Crescent East), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to develop within a Regulated Area to facilitate construction of a two storey addition to the rear, and an attached garage to the front of the existing dwelling. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of Undertaking, prepared by Gabriela Grigoriu, dated June 2, 2008, received by TRCA June 4, 2008. 480 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include the construction of a two storey addition with basement to the rear, and an attached garage to the front of the existing dwelling located at 9 Redland Crescent East in the City of Toronto. The site is located east of Brimley Road South, south of Kingston Road. Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: Sediment control fencing will be erected prior to commencement of any construction or grading works, and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. Dynamic Beaches: Not applicable Erosion: A geotechnical study has been reviewed and approved by TRCA geotechnical engineering staff and the proposed works will be adequately set back from the top of bank. Conservation of Land: No significant vegetation will be removed as a result of construction and appropriate tree protection fencing will be installed. Plantings Native tree shrubs and seed mix will be planted along the crest of slope, consistent with TRCA's guidelines. Policy Guidelines: The proposal is consistent with Section 4.2.2.B, Minor Additions, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40500 - Application #: 108/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: June 4, 2008 481 TOWN OF CALEDON 8.1.41 10 NATUREVIEW COURT To construct, reconstruct, erect or place a building or structure on Lot 18, Plan 43M -1374, (10 Natureview Court), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an in- ground swimming pool at the rear of an existing dwelling located at 10 Natureview Court, in the Town of Caledon. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of Undertaking, prepared by C. Howe, dated June 10, 2008, to address all outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an in- ground swimming pool, shed, and retaining structure at the rear of an existing dwelling located at 10 Natureview Court, in the Town of Caledon. The rear yard of the existing dwelling contains a gradual slope, which forms the part of the valley corridor that was previously graded through the subdivision process. Please note that the lot grading and limit of development was previously approved through the subdivision process. The proposed works are located on the regraded slope due to the constraints of the lot and will be setback approximately 2.5 metres from the adjacent valley lands. TRCA staff has confirmed that no erosion or geotechnical concerns are anticipated with this application. In addition, the buffer area between the adjacent valley corridor and the proposed works is to be densely planted as part of this application in order to achieve a net ecological gain. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. 482 Plantings The proposed pool is located within an existing manicured lawn. No significant vegetation will be removed as a result of the construction. However, a planting plan is proposed with this application in accordance with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40787 - Application #: 312/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 8.1.42 MOUNT PLEASANT ROAD AND CASTLEDERG SIDEROAD To construct, reconstruct, erect or place a building or structure on the East Half Lot 16, 17, Concession 8, (Mount Pleasant Road and Castlederg Sideroad), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new residential dwelling and driveway on a vacant lot of record located on Mount Pleasant Road, in the Town of Caledon. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of Undertaking, prepared by Calder Engineering Ltd., dated June 10, 2008, to address all outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new 499.80 square metre (5, 380.0 sq. ft.) single - family dwelling on a vacant 15.33 hectare (37.87 acre)lot. The subject property is located adjacent to a wetland feature. The proposed works are setback approximately 30 metres from the wetland feature. As such, the works appear to be sufficiently setback from the wetland feature and no ecological /hydrological impacts are anticipated with this proposal. The ecological condition of the wetland is in poor condition as a result of past agricultural practices. Enhancement plantings proposed with this application, which are to surround the wetland feature, are designed to improve the thermal condition of the wetland and receiving watercourse, and to provide an ecological net gain. Additionally, there are no flooding, geotechnical or ecology related concerns associated with this proposal. Control of Floodinq: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters are anticipated 483 Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. •Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries related concerns associated with these works. Plantings A planting plan in accordance with TRCA's guidelines has been submitted with this • application. In addition, all disturbed areas will be re- vegetated with native and • -non- invasive species as per TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40811 - Application #: 323/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 8.1.43 19353 GLEN HAFFY ROAD To alter a watercourse on 19353 Glen Haffy Road, in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the repair of a spillway structure within an existing pond located at 19353 Glen Haffy Road, in the Town of Caledon. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Site Plan, prepared by R. Wilson, stamped received by TRCA Planning & Development staff on June 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 484 Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the repair of a spillway structure located within an online pond at 19353 Glen Haffy Road, in the Town of Caledon. Currently, a slump in the native material at the bottom of the pond has caused the majority of the pond water to bypass the spillway structure, which regulates the pond water level. As a result, the current pond level is quite low and is affecting waterquality and fish habitat. Prior to initiating works, pond levels will be lowered by slowly removing a key in the spillway structure. This will maintain the baseflow of the upstream creek and ensure the work area is dry. In order to repair the spillway, clay material will be compacted and a bentofix liner will be placed in the area of the slumpage to reinstate the spillway control structure. Please note that the proposed works will not result in a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat. A Letter of Advice on behalf of Fisheries and Oceans Canada (DFO) will be issued with this permit to ensure compliance with the Federal Fisheries Act. The proposed works will improve the current ecological state of the pond by returning the pond water level to its previous state. There are no flooding, geotechnical, or ecology related concerns with this proposal. Control of Flooding: The proposed works are located within the Regional Floodplain. TRCA Water Resources staff have confirmed that this proposal will not have any significant impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate erosion and sediment control measures will be implemented and maintained through all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns anticipated with this proposal. Conservation of Land: No significant vegetation will be removed as a result of construction. As noted above, the proposed works will not result in a HADD. As such, a Letter of Advice on behalf of DFO will be issued to.ensure appropriate measures are incorporated to mitigate any potential fisheries related impacts. Plantings As no significant vegetation will be removed as a result of construction, enhancement plantings are not required with this application. Policy Guidelines: The proposed works are in conformity with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program (VSCMP). 485 CFN: 40939 - Application #: 425/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 . 8.1.44 HIGHWAY 50 AND CASTLEDERG SIDEROAD To construct, reconstruct, erect or place a building or structure on Lot 16, Concession 8, (Highway 50 and Castlederg Sideroad), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, single - family dwelling on Lot 16, Concession 8, Castlederg Sideroad, in the Town of Caledon. The permitwill be issued for the period of June 13, 2008 to June 12, 2010. • Letter of Undertaking, prepared by A. Diminutto, dated June 10, 2008, to address all outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, single - family dwelling on a vacant lot of record at Lot 16, Concession 8, in the Town of Caledon. A tributary of the Humber River Watershed traverses the front portion of the property adjacent to Castlederg Sideroad. The proposed works will be located on a tableland portion of the subject property away from the valley corridor associated with the above -noted tributary. Based on our review, the proposed works appear to be sufficiently setback from the valley corridor. An existing driveway and watercourse crossing will be utilized in order to gain access to the tableland portion of the lot where the works are proposed. No new work is proposed to the existing driveway. The existing driveway is located within the Regional Floodplain. Based on minimal flood depths expected at the crossing location during a Regional Storm event, TRCA staff has confirmed that access to the tableland portion of the property is 'safe'. As such, there are no flooding, geotechnical or ecology related concerns associated with this proposal. In addition, enhancement riparian plantings are proposed with this application along.the banks of the watercourse in order to provide a net ecological gain. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters are ariticipated Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. 486. Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries related concerns associated with these works. Plantings A planting plan in accordance with TRCA's guidelines has been submitted with this application. In addition, all disturbed areas will be re- vegetated with native and non - invasive species as per TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40821 - Application #: 334/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact. Quentin Hanchard, extension 5324 Date: June 4, 2008 8.1.45 REGION OF PEEL To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere at the existing ditch on the south side of Caledon Trailway from Caledon East Well No. 3 to approximately 140 metres to the west, in the Town of Caledon, Humber River Watershed, as located on the property owned by Town of Caledon. The purpose is to site grade (ditch restoration) and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere (rip -rap flow dissipater), at the existing ditch on the south side of the Caledon Trailway from Caledon East Well No. 3 to approximately 140 metres to the west, in the Town of Caledon, Humber River Watershed as located on the property owned by the Town of Caledon. All construction activity will be carried out in the cold water timing window of July 1 to September 15. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Ditch Restoration Plan - Caledon East Well No. 3; dated April 2, 2008; by Earth Tech Canada Inc.; Received June 3, 2008; red -line revised June 11, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to re -grade the existing ditch to restore its capacity and will be constructed such that it is approximately a minimum of 0.4m below the trail elevation. A permanent rip -rap flow dissipater will be installed at the outlet of the ditch. No in -water works are anticipated. 487 Control of Flooding: There will be no impact to the control of flooding. Pollution: Standard sediment and erosion controls (silt fence, rock check dams) will be in place for the duration of construction and until the site is restored to prevent construction generated sediment from entering the watercourse Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues with the proposal. Conservation of Land: With the erosion and sedimentation controls in effect, the potential for a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice (LOA) will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). All construction activity will only be carried out during the cold water timing window of July 1 to September 15. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program.' CFN: 40687 - Application #: 257/08/CAL Report Prepared by: Scott Smith, extension 5758 For information contact: Beth Williston, extension 5217 . Date: June 3, 2008 8.1.46 SOUTH FIELDS COMMUNITY INC. To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Concession 2 EHS, Lot 19, 20, Plan 21T- 06004C, 21T- 06002C, (Kennedy Road and Mayfield Road), in the Town of Caledon, Etobicoke Creek Watershed as located on the . property owned by South Fields Community Inc.. The purpose is to facilitate the reconstruction, enhancement and renaturalization of Tributaries 18 and 19 of the Etobicoke Creek through Phase one of the South Fields community. The permit will be issued for the period of June 13, 2008 to June 12, 2010. 488 • Letter of undertaking provided by Jim Gardner, Director of Engineering and Site Servicing, Monarch Corporation, dated June 10, 2008, to address outstanding TRCA Ecology and Engineering requirements, prior to the issuance of this permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This permit application is one of four before the Executive Committee at this meeting pertaining to Phase 1 of the South Fields (Mayfield West) community in the Town of Caledon. A previous permit application was brought forward to, and approved by the Executive Committee at the April 11,2008 meeting for initial site grading and temporary stormwater management works. The four permits presently before the Executive Committee for consideration are to facilitate the realignment and reconstruction of Kennedy Road through the South Fields Community - portions of which are within TRCA's Regulated areas, to facilitate the connection of new realigned sections of two Etobicoke Creek headwater tributaries within this phase, and to facilitate the construction of permanent stormwater management infrastructure. This permit is to facilitate the reconstruction, enhancement and renaturalization of Tributaries 18 and 19 of the Etobicoke Creek through Phase one of the South Fields community. South Fields (Mayfield West) is a planned new community located within the Town of Caledon, north of the Highway 410 extension, South of King Street, between the Etobicoke Creek valley to,the west, and Dixie Road to the East. TRCA staff have worked with the Town of Caledon as well as the proponents for the past several years in the planning of this community. Phase one of the South Fields Community, which is comprised of four plans of subdivision, is now proceeding through planning approvals, based upon the draft approvals attained through the Ontario Municipal Board earlier this year. As noted in the April 11, 2008 permit report for pre - servicing works on the subject property, TRCA staff were successful in attaining conditions of approval that were agreeable to all parties outside of the formal hearing process. Both the Town of Caledon and the proponents have expressed their desire to move quickly through the approval process for these subdivisions. As part of the master planning process for the South Fields community, an assessment of the headwater watercourse features within the proposed community was conducted by the consulting team. This assessment identified that opportunities existed through this development to enhance the function of some of the existing headwater watercourse features. In exchange, some features which were deemed to have a lesser significance and function were identified by the consultants for removal. The restoration of portions of Tributaries 18 and 19, were among those targeted for enhancement and renaturalization. A portion of the works associated with the restoration and enhancement of these tributaries was included with the permit approved by the Executive Committee at the April 11, 2008 meeting. The remainder of the works, which includes the connection of the new channel corridors - that are to be constructed off -line of the existing watercourses, to the existing corridors - are part of this permit. All in- stream works must be completed within the Cold Water Fishery Timing Window, and must be completed in accordance with the requirements of the Letter of Advice on behalf of Fisheries and Oceans Canada (DFO) that will be issued with this permit. 489 TRCA staff are continuing discussions with the proponents to refine the scope and design of the proposed works, to ensure that they meet TRCA and DFO requirements. Although it is anticipated that there may be additional modifications to the drawings associated with this permit prior to issuance, TRCA staff are satisfied that the remaining items can be addressed in the near future. Due to the required timelines for this project, the works identified under this permit must commence in advance of the next Executive Committee meeting, (which would provide the next opportunity for this permit application to be considered). Control of Flooding: The proposed works will be partially located within the mapped Regulatory Floodplain, however, no impacts (if not improvements) to flood storage and conveyance are anticipated with the works associated with this permit. Pollution: Appropriate sediment and erosion control measures'are to be installed and maintained during all phases of construction. A comprehensive monitoring plan will be utilized during and after the construction of the enhanced corridors. All in -water works, as well as all works directly adjacent to Tributaries 18 and 19, will be completed within the Cold Water Fisheries Timing Window. Dynamic Beaches: Not applicable Erosion: There are no slope stability and /or erosion related concerns with this application. Erosion control measures, based upon TRCA's Sediment and Erosion Control Guidelines, will be . applied as applicable. Conservation of Land: The subject works are being completed within an approved plan of subdivision. In concert with other related enhancement works being completed within the Mayfield West community, a net environmental gain will be attained through these combined works. Plantings A comprehensive planting plan will be implemented through the development of the . Mayfield West community. Enhancements to natural cover within the valley corridor, planting of buffer areas, and the creation of new planted Greenway Corridors are all anticipated within this community. Policy Guidelines: This proposal is consistent with Section 4.3 - Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40955 - Application #: 442/08/CAL Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 490. 8.1.47 SOUTH FIELDS COMMUNITY INC. To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Concession 2 EHS, Lot 19, 20, Plan 21T- 06004C, 21T- 06002C, (Kennedy Road and Mayfield Road), in the Town of Caledon, .Etobicoke Creek Watershed as located on the property owned by South Fields Community Inc.. The purpose is to undertake works within a Regulated area in order to facilitate the realignment of Kennedy road, north of Mayfield Road in the Town of Caledon, and the removal and replacement of an existing culvert under Kennedy Road. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of undertaking provided by Jim Gardner, Director of Engineering and Site Servicing, Monarch Corporation, dated June 10, 2008, to address outstanding TRCA Ecology and Engineering requirements, prior to the issuance of this permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This permit application is one of four before the Executive Committee at this meeting pertaining to Phase 1 of the South Fields (Mayfield West) community in the Town of Caledon. A previous permit application was brought forward to, and approved by the Executive Committee at the April 11, 2008 meeting for initial site grading and temporary stormwater management works. The four permits presently before the Executive Committee for consideration are to facilitate the realignment and reconstruction of Kennedy Road through the South Fields Community - portions of which are within TRCA's Regulated areas, to facilitate the connection of new realigned sections of two Etobicoke Creek headwater tributaries within this phase, and to facilitate the construction of permanent stormwater management infrastructure. This permit is to facilitate the realignment and reconstruction of a portion of Kennedy Road, within TRCA's Regulated areas. South Fields (Mayfield West) is a planned new community located within the Town of Caledon, north of the Highway 410 extension, South of King Street, between the Etobicoke Creek valley to the west, and Dixie Road to the East. TRCA staff have worked with the Town of Caledon as well as the proponents for the past several years in the planning of this community. Phase one of the South Fields Community, which.is comprised of four plans of subdivision, is now proceeding through planning approvals, based upon the draft approvals attained through the Ontario Municipal Board earlier this year. As noted in the April 11, 2008 permit report for pre - servicing works on the subject property, TRCA staff were successful in attaining conditions of approval that were agreeable to all parties outside of the formal hearing process. Both the Town of Caledon and the proponents have expressed their desire to move quickly through the approval process for these subdivisions. 491 An Environmental Assessment (Schedule C) was completed for the proposed Kennedy Road realignment. TRCA staff reviewed the materials relating to this Environmental Assessment (EA), and provided comments on the proposed design. As not all of TRCA's comments were fully addressed prior to the completion of the EA. These items will need to be addressed to the satisfaction of TRCA staff prior to this permit being released. TRCA staff are continuing discussions with the proponents to refine the scope and design of the proposed works, to ensure that they meet TRCA's requirements. Although it is anticipated that there may be additional modifications to the drawings associated with this permit prior to issuance, TRCA staff are satisfied that the remaining items can be addressed in the near future. Due to the required timelines for this project, the works identified under this permit must commence in advance of the next Executive Committee meeting, (which would provide the next opportunity for this permit application to be considered). Should the outstanding issues not be addressed in advance of this Executive Committee meeting, the proponent will be providing a letter of 'undertaking to address all outstanding TRCA issues prior to the issuance of the permit. Of principal issue to TRCA staff will be to ensure that the proposed span of the new Kennedy Road culvert meets the intent of the enhancement plan for Tributary 19 of the Etobicoke Creek, which is being completed upstream and downstream of this new crossing, as part of the required terrestrial and aquatic compensation and enhancement plan for this area of South Fields. A component of this plan is to enhance fish passage through. the new culvert, and to create additional direct fish habitat upstream of the proposed culvert. Control of Flooding: The proposed works will be partially located within the Regulatory Floodplain, however, the replacement culvert has been sized to convey necessary flood flows, and to enhance the current flood conveyance capacity of this crossing. Consequently, improvements to flood storage and conveyance are anticipated with the new Kennedy Road culvert. Pollution: Appropriate sediment and erosion control measures are to be installed and maintained during all phases of construction. All in -water works, as well as all works directly adjacent to Tributary 19, will be completed within the Cold Water Fisheries Timing Window. Dynamic Beaches: Not applicable Erosion: There are no slope stability and /or erosion related concerns with this application. Erosion control measures, based upon TRCA's Sediment and Erosion Control Guidelines, will be applied as applicable. Conservation of Land: The subject works are being completed within an approved plan of subdivision, as part of an approved environmental assessment. Plantings A comprehensive planting plan will be implemented through the development of the Mayfield West community. Enhancements to natural cover within the valley corridor, planting of buffer areas, and the creation of new planted Greenway Corridors are all • anticipated within this community. 492 Policy Guidelines: This proposal is consistent with Section 4.3 - Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40954 - Application #: 443/08/CAL Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 8.1.48 SOUTH FIELDS COMMUNITY INC. To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Concession 2 EHS, Lot 19, 20, Plan 21T-06004C, 21T-06002C, (Kennedy Road and Mayfield Road), in the Town of Caledon, Etobicoke Creek Watershed as located on the property owned by South Fields Community Inc.. The purpose is to undertake works within a Regulated area in order to facilitate the construction of permanent stormwater management outfalls and associated infrastructure within the South Fields (Mayfield West) community in the Town of Caledon. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of undertaking provided by Jim Gardner, Director of Engineering and Site Servicing, Monarch Corporation, dated June 10, 2008, to address outstanding TRCA Ecology and Engineering requirements, prior to the issuance of this permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This permit application is one of four before the Executive Committee at this meeting pertaining to Phase 1 of the South Fields (Mayfield West) community in the Town of Caledon. A previous permit application was brought forward to, and approved by the Executive Committee at the April 11, 2008 meeting for-initial site grading and temporary stormwater management works. The four permits presently before the Executive Committee for consideration are to facilitate the realignment and reconstruction of Kennedy Road through the South Fields Community - portions of which are within TRCA's Regulated areas, to facilitate the connection of new realigned sections of two Etobicoke Creek headwater tributaries within this phase, and to facilitate the.construction of permanent stormwater management infrastructure. This permit is to facilitate the construction of permanent stormwater management pond E3 and outfalls associated with the stormwater management ponds within Phase 1 of the South Fields community. 493 South Fields (Mayfield West) is a planned new community located within the Town of Caledon, north of the Highway 410 extension, South of King Street, between the Etobicoke Creek valley to the west, and Dixie Road to the East. TRCA staff have worked with the Town of Caledon as well as the proponents for the past several years in the planning of this community. Phase one of the South Fields Community, which is comprised of four plans of subdivision, is now proceeding through planning approvals, based upon the draft approvals attained through the Ontario Municipal Board earlier this year. As noted in the April 11, 2008 permit report for pre- servicing works on the subject property, TRCA staff were successful in attaining conditions .of approval that were agreeable to all parties outside of the formal hearing process. Both the Town of Caledon and the proponents have expressed their desire to move quickly through the approval process for these subdivisions. The proposed stormwater management pond and outfalls are to be constructed in accordance with the Master Environmental Servicing Plan (MESP) which was endorsed by the TRCA, and approved by the Town of Caledon. TRCA staff are continuing discussions with the proponents to refine the detailed design of the proposed works, to ensure that they meet TRCA requirements. Although it is anticipated that there may be additional modifications to the drawings associated with this permit prior to issuance, TRCA staff are satisfied in principle with the proposed designs, and are satisfied that the remaining items can be addressed in the near future. Due to the required timelines for this project, the works identified under this permit may commence in advance of the next Executive Committee meeting, (which would provide the next opportunity for this permit application to be considered), and thus are being brought forward at this time. Control of Flooding: The proposed works will be partially located within the mapped Regulatory Floodplain, however, the proposed pond is being designed in accordance with TRCA requirements, and no impacts to flood storage and conveyance are anticipated with the works associated with this permit. Pollution: Appropriate sediment and erosion control measures are to be installed and maintained during all phases of construction. A comprehensive monitoring plan will be utilized during and after the construction of the proposed ponds to ensure that they are functioning in accordance with the design parameters. Dynamic Beaches: Not applicable Erosion: There are no slope stability and /or erosion related concerns with this application. Erosion control measures, based upon TRCA's Sediment and Erosion Control Guidelines, will be applied as applicable. Conservation of Land: The subject works are being completed within an approved plan of subdivision, in accordance with the approved MESP. As such, the proposed works are not anticipated to negatively impact upon the conservation of land. 494 Plantings A comprehensive planting plan will be implemented through the development of the Mayfield West community. Enhancements to natural cover within the valley corridor, planting of buffer areas, and the creation of new planted Greenway Corridors are all anticipated within this community. Policy Guidelines: This proposal is consistent with Section 4.3 - Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40957 - Application #: 444/08/CAL Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 8.1.49 SOUTH FIELDS COMMUNITY INC. To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Concession 2 EHS, Lot 19, 20, Plan 21T-06004C, 21T-06002C, (Kennedy Road and Mayfield Road), in the Town of Caledon, Etobicoke Creek Watershed as located on the property owned by South Fields Community Inc.. The purpose is to- undertake works within a Regulated area in order to facilitate the construction of permanent stormwater management outfalls and associated infrastructure within the South Fields (Mayfield West) community in the Town of Caledon. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of undertaking provided by Jim Gardner, Director of Engineering and Site Servicing, Monarch Corporation, dated June 10, 2008, to address outstanding TRCA Ecology and Engineering requirements, prior to the issuance of this permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This permit application is one of four before the Executive Committee at this meeting pertaining to Phase 1 of the South Fields (Mayfield West) community in the Town of Caledon. A previous permit application was brought forward to, and approved by the Executive Committee at the April 11, 2008 meeting for initial site grading and temporary stormwater management works. The four permits presently before the Executive Committee for consideration are to facilitate the realignment and reconstruction of Kennedy Road through the South Fields Community - portions of which are within TRCA's Regulated areas, to facilitate the connection of new realigned sections of two Etobicoke Creek headwater tributaries within this phase, and to facilitate the construction of permanent stormwater management infrastructure. This permit is to facilitate the construction of a permanent stormwater management pond and outfalls associated with Pond E4 within Phase 1 of the South Fields community. 495 South Fields (Mayfield West) is a planned new community located within the Town of Caledon, north of the Highway 410 extension, South of King Street, between the Etobicoke Creek valley to the west, and Dixie Road to the East. TRCA staff have worked with the Town of Caledon as well as the proponents for the past several years in the planning of this community. Phase one of the South Fields Community, which is comprised of four plans of subdivision, is now proceeding through planning approvals, based upon the draft approvals attained through the Ontario Municipal Board earlier this year. As noted in the April 11, 2008 permit report for • pre - servicing works on the subject property, TRCA staff were successful in attaining conditions of approval that were agreeable to all parties outside of the formal hearing process. Both the Town of Caledon and the proponents have expressed their desire to move quickly through the approval process for these subdivisions. The proposed stormwater management pond and outfalls are to be constructed in accordance with the Master Environmental Servicing Plan (MESP) which was endorsed by the TRCA, and approved by the Town of Caledon. TRCA staff are continuing discussions with the proponents to refine the detailed design of the proposed works, to ensure that they meet TRCA requirements. Although it is anticipated that there may be additional modifications to the drawings associated with this permit prior to issuance, TRCA staff are satisfied in principle with the proposed designs, and are satisfied that the remaining items can be addressed in the near future. Due to the required timelines for this project, the works identified under this permit may commence in advance of the next Executive Committee meeting, (which would provide the next opportunity for this permit application to be considered), and thus are being brought forward at this time. Control of Flooding: The proposed works will be partially located within the mapped Regulatory Floodplain, however, the proposed ponds are being designed in accordance with TRCA requirements, and no impacts to flood storage and conveyance are anticipated with the works associated with this permit. Pollution: Appropriate sediment and erosion control measures are to be installed and maintained during all phases of construction. A comprehensive monitoring plan will be utilized during and after the construction of the proposed ponds to ensure that they are functioning in accordance with the design parameters. Dynamic Beaches: Not applicable Erosion: There are no slope stability and /or erosion related.concerns with this application. Erosion control measures, based upon TRCA's Sediment and Erosion Control Guidelines, will be applied as applicable. Conservation of Land: The subject works are being completed within an approved plan of subdivision, in accordance with the approved MESP. As such, the proposed works are not anticipated to negatively impact upon the conservation of land. 496 Plantings A comprehensive planting plan will be implemented through the development of the Mayfield West community. Enhancements to natural cover within the valley corridor, planting of buffer areas, and the creation of new planted Greenway Corridors are all anticipated within this community. Policy Guidelines: This proposal is consistent with Section 4.3 - Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40956 - Application #: 445/08/CAL Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 TOWN OF MARKHAM 8.1.50 15 STATION LANE To construct, reconstruct, erect or place a building or structure on Lot J, Plan 335, (15 Station Lane), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an addition to an existing dwelling.' The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Drawing Al, prepared by The Gregory Design Group, dated May 19, 2008, stamped received by TRCA Planning and Development May 28, 2008; • Drawing A2, prepared by The Gregory Design Group, dated 2008, stamped received by TRCA Planning and Development May 28, 2008; • Drawing A3, prepared by The Gregory Design Group, dated May 28, 2008, stamped received by TRCA Planning and Development May 28, 2008; • Drawing A6, prepared by The Gregory Design Group, dated May 28, 2008, stamped received by TRCA Planning and Development May 28, 2008, redline revised by TRCA Staff June 13, 2008; • Drawing A7, prepared by The Gregory Design Group, dated May 28, 2008, stamped received by TRCA Planning and Development May 28, 2008; • Drawing A8, prepared by The Gregory Design Group, dated February 14, 2008, stamped received by TRCA Planning and Development May 28, 2008; • Drawing A9, prepared by The Gregory Design Group, dated May 28, 2008, stamped received by TRCA Planning and Development May 28, 2008; • Drawing Al0, prepared by The Gregory Design Group, dated May 28, 2008, stamped received by TRCA Planning and Development May 28, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 497 Proposal: The purpose is to undertake works within a TRCA Regulated Area of the Rouge River . Watershed in order to facilitate the construction of an addition to an existing dwelling. The existing dwelling is a heritage designated home built in the mid- 1800's. The subject site is currently a manicured lawn and void of any significant vegetation. Although the majority of the subject site is located within the Regional Storm Floodplain, the proposed addition to the dwelling will be appropriately floodproofed, and all excavated fill will be removed from the floodplain. No flood impacts to surrounding properties are anticipated as a result of this development. Control of Flooding: TRCA staff are satisfied that the proposed works will not impact the storage and /or conveyance of flood waters. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as result of construction. • Plantings As no vegetation will be removed, no additional plantings are required. Policy Guidelines: The proposal is consistent with Section 4.2.2 (C) - Minor Additions, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40648 - Application #: 216 /08 /MARK • Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 8.1.51 TOWN OF MARKHAM To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse west of 59 Elgin Street, in the Town of Markham, Don River Watershed as located on the property owned by Town of Markham. The purpose is to site grade, temporarily or permanently place, dump or remove any material originating on the site or elsewhere and alter a watercourse south of Elgin Street, in the Town of Markham, Regional Municipality of York in order to facilitate the construction of 'a concrete headwall and bed and bank restoration during the warmwater fisheries timing window of July 1 to March 31. 498 The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of undertaking to provide minor revisions-to engineering and planting /restoration drawings to the satisfaction of TRCA staff; dated June 11, 2008; received June 11, 2008; prepared by Town of Markham. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the removal of an existing gabion basket headwall and the construction of a.concrete headwall, south of Elgin Street, in the Town of Markham, Regional Municipality of York. The works include bed and bank restoration using armourstone and the implementation of vegetated rip -rap. These works will address current scour, bank erosion and gabion basket failure immediately downstream of a concrete outfall culvert on the south side of Elgin Street and west of 59 Elgin Street. All works will take place on property owned by the Town of Markham. • Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion control measures (silt/sediment fencing, rock flow check dam, erosion control blanket) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the wetland /watercourse Dynamic Beaches: Not applicable Erosion: The proposal is to conduct instream works to address current scour problems and gabion failure. Staff has reviewed the proposal and has no channel stability or erosion concerns with the proposed works. Conservation of Land: There will be in stream works, however, with erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO) Plantings All disturbed areas will be restored with native non - invasive species following construction. In addition to restoration of the disturbed areas, approximately 170 live stakes will be planted in the study area. 499 Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40423 - Application #: 065 /08 /MARK Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: June 4, 2008 8.1.52 TOWN OF MARKHAM To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on 19th Avenue over the East Tributary of the Little Rouge Creek (approximately 700 metres east of Highway 48), in the Town of Markham, Rouge River Watershed as located on the property owned by Town of Markham. The purpose is to construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse to facilitate the construction of a bridge replacement on 19th Avenue, Town of Markham, Regional Municipality of York. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of Undertaking to provide minor revisions to engineering drawings and planting /restoration drawings to the satisfaction of TRCA staff; dated June 11, 2008; received June 11, 2008; prepared by the Town of Markham. RATIONALE . The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves a bridge replacement on 19th Avenue, east of Highway 48, in the Town of Markham, Regional Municipality of York. The existing 6.2m wide span bridge structure is to be replaced with a 12m wide span structure. The road will be graded and paved approximately 50m east and west of the new bridge structure in order to match the existing road. River run . stone (600mm, 500mm) will be placed on the creekbank and overbank to protect the bridge abutments. The existing channel alignment will be maintained upstream and downstream of the new structure. These works are subject to the coldwater fisheries timing window of July 1 to September 15. TRCA staff reviewed this project during the Municipal Class Environmental Assessment process. Control of Flooding: The proposed project will have no negative impacts on the storage or conveyance of floodwaters. 500 Pollution: Standard erosion control measures (silt/sediment fencing, rock flow check dam, dam and pump) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to-prevent construction generated sediment from entering the wetland /watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). Plantings All disturbed areas will be restored with native non - invasive species following construction. Live willow stakes will be planted �n creek overbanks resulting in a net gain of vegetation Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40571 - Application #: 163 /08 /MARK Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: June 4, 2008 8.1.53 YORK REGION DISTRICT SCHOOL BOARD To construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Block O /R, Plan 7686, 7695, (120 Royal Orchard Boulevard), in the Town of Markham, Don River Watershed as located on the property owned by York Region District School Board. The purpose is to undertake works within the Don River Watershed to facilitate the construction of a stormwater outfall associated with the replacement of an existing school. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of Undertaking prepared by Stafford Haensli Architects, dated June 11, 2008, to address all outstanding ecology related issues. 501 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within the Don River Watershed to facilitate the construction of a Storm Water Outfall associated with the replacement of an existing school in the town of Markham. The outfall structure is required in order to convey stormwater runoff from the school site. All Stormwater released into the valley corridor will be adequately treated according to TRCA Guidelines. The outfall has been designed in accordance with TRCA Guidelines. Therefore, the headwall is sufficiently setback from the watercourse and flows have been designed to dissipate via sheet flow to prevent erosion. An extensive planting plan has been submitted with this project. The majority of plantings are to be located at the outlet location in order to provide a biofilter in order to provide further dissipation measures. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: . Appropriate sediment and erosion controls will be installed and maintained throughout all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this project. Plantings Although no significant vegetation will be removed as a result of the proposed works, the applicant has proposed significant plantings in accordance with TRCA Guidelines. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream corridor Management Program (VSCMP). • CFN: 40639 - Application #: 212 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 502 8.1.54 344 19TH AVENUE To construct, reconstruct, erect or place a building or structure at 344 19th Avenue, in the Town of Richmond Hill, Rouge River Watershed. The purpose is - to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a deck onto the rear of an existing residential dwelling. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Site Plan and Lot Survey, stamped received by TRCA Planning & Development staff on May 16, 2008; • Site Plan, stamped received by TRCA Planning & Development staff on May 16, 2008; • Detailed Plan, stamped received by TRCA Planning & Development staff on May 16, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order.to facilitate the construction of a deck onto the rear of an existing residential dwelling. The rear of the subject property is located adjacent to a valley corridor of the Rouge River Watershed. TRCA staff has conducted-a site inspection and confirm that.the proposed works are sufficiently setback from the valley corridor feature. The area to which this application applies is currently a manicured lawn and is void of any significant vegetation. The proposed works are located outside of the Regional Storm Floodplain. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters is anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as result of construction. Plantings As no vegetation will be removed, no additional plantings are required. 503 Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40896 - Application #: 397/08/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 TOWN OF RICHMOND HILL 8.1.55 75 NORTH LAKE ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 2, Plan 570, (75 North Lake Road), in the Town of Richmond Hill, Humber River Watershed. The purpose is to recognize the unlawful construction of an addition to an existing dwelling within a TRCA Regulated Area of the Humber River Watershed. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Drawing ID -1, prepared by the Birkshire Group, dated March 24, 2008, stamped received by TRCA Planning and Development in May 2, 2008; • Drawing ID -2, prepared by the Birkshire Group, dated March 24, 2008, stamped received by TRCA Planning and Development in May 2, 2008; • Drawing ID -3, prepared by the Birkshire Group, dated March 24, 2008, stamped received by TRCA Planning and Development in May 2, 2008; • Drawing ID -4, prepared by the Birkshire Group, dated March 24, 2008, stamped received by TRCA Planning and Development in May 2, 2008; • Drawing ID -5, prepared by the Birkshire Group, dated March 24, 2008, stamped received by TRCA Planning and Development in May 2, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of the application is to recognize the unlawful construction of an addition t� an existing dwelling within a TRCA Regulated Area of the Humber River Watershed. The property is located within an established • residential subdivision in the Town of Richmond Hill and currently contains an existing residential dwelling with an unrecognized rear addition constructed without appropriate permits approximately five years ago. Although the subject property is partially located within the Regional Storm Floodplain, the existing residential dwelling and rear addition are above the Regional Storm Elevation. Additionally, all no grades were changed as a result of the unlawful • construction. Control of Flooding: The works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. 504 Pollution: As no development is proposed at this time, no sediment and erosion controls are required. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation was removed as a result of construction. There are no fisheries related concerns associated with this project. Plantings No significant vegetation was removed as a result of construction. As such, no additional plantings are required. Policy Guidelines: The proposal is consistent with Section 4.2.2 (C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40814 - Application #: 325/08/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 8.1.56 DELPARK HOMES (BOND BROOKE) LTD. To site grade on Part Lot 11, 12, Plan 163, (Douglas Road), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Delpark Homes (Bond Brooke) Limited. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate grading and servicing and the construction of a stormwater outfall structure related to an approved subdivision. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of Undertaking, prepared by M. Hall, Condeland Engineering Ltd., dated June 11, 2008, to address all outstanding engineering and ecology related concerns. RATIONALE The application was reviewed by staff on the basis of the following information: 505 Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate grading and servicing and the construction of a stormwater outfall structure related to an approved 34 residential lot subdivision (19T[R] -0004) at 210, 212, 214, 224 and 230 Douglas Road, in the Town of Richmond Hill. The subject lands are located within the planning boundaries of Official Plan Amendment (OPA) 129. The rear of the subject property is located adjacent to a stream corridor of the Rouge River Watershed.. Through the related subdivision review, appropriate buffers between the natural area and the residential lots have been incorporated. As a component of this project, an extensive enhancement planting plan has been submitted to provide an ecological net gain for this reach of the Rouge River Watershed. Through the subdivision review, the stream corridor portion of the subject lands, including the buffer area, will be placed into public ownership and appropriately zoned (i.e., Open Space) to ensure the long -term protection of the natural area. The proposed stormwater outfall structure has been designed in accordance with TRCA guidelines and is sufficiently setback from the watercourse feature. Flows from the outlet structure have been designed to dissipate via sheet flow to prevent localized erosion. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters is anticipated. Pollution: Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this application... Conservation of Land: No significant vegetation will be removed as a result of construction. The proposed works are not anticipated to result in the Harmful Alteration, Disruption or Destruction (HADD) of fish habitat. As such, a Letter of Advice (LOA) on behalf of Fisheries and Oceans Canada (DFO) will be issued with the future permit to ensure compliance with the Federal Fisheries Act. Plantings Although no significant vegetation will be removed as a result of construction, an extensive enhancement planting plan has been submitted with this application to provide an ecological net gain for this site. All plant species are native and non - invasive consistent with TRCA guidelines. Policy Guidelines: The proposed works are in conformity with Section 4.1 - New Development and 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program (VSCMP). 506 CFN: 39511 - Application #: 484/07/RH Report Prepared by: Adam Miller, extension 5244 For information contact: Adam Miller, extension 5244 Date: June 4, 2008 8.1.57 NORTH ELGIN CENTRE INC. To construct, reconstruct, erect or place a building or structure and site grade on Block 30, Plan 65M -2819, (Bernard Avenue and Yorkland Street), in the Town of Richmond Hill,'Rouge River Watershed as located on the property owned by North Elgin Centre Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a seniors retirement residence (130 suites) with a total gross floor area (GFA) of 11,548 square metres. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of Undertaking, prepared by J. Gesualdi, DCMS GP (Richmond Hill) Inc., dated June 11, 2008, to address all outstanding ecology related concerns. RATIONALE . The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a senior's retirement residence (130 suites) with a total gross floor area (GFA) of 11,548 square metres. The subject property is located at the northwest corner of Bernard Avenue and Yorkland Street, in the Town of Richmond Hill. The northern limit of the subject property is located immediately adjacent to a valley corridor of the Rouge River Watershed. Basbd on updated topographic mapping and a hydraulic analysis completed as part of this application, it has been confirmed that the Regional Storm Floodplain is contained within the embankments of the valley feature and flood waters will not spill onto the tableland portion of the site, where the development is proposed. The proposed works are sufficiently setback from the valley corridor. An extensive enhancement planting plan has been incorporated into the design of this project for the buffer area, which will improve the ecological condition of the adjacent valley corridor. As an element of the related planning applications for the proposed development (i.e., Zoning By -law Amendment and Site Plan Application), the valley corridor portion of the site, including the buffer area, will be placed into public ownership and appropriately zoned (i.e., Open Space and /or Hazard Land) in order to ensure the long -term protection and enhancement of the valley corridor in this area. As a component of the proposed stormwater management scheme for this development, a stormwater outfall structure is proposed within the valley corridor. Runoff conveyed through the outfall will be treated from a quality and quantity standpoint prior to the release back into the valley corridor. The proposed stormwater outfall structure has been designed in accordance with TRCA guidelines. 507 Control of Flooding: As confirmed through the submission of a hydraulic report and additional topographic information for this site, the proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters is anticipated as a result of development. Pollution: Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. As an element of this application, an enhancement planting plan has been submitted to improve the ecological condition of this area. To address fisheries related concerns, a Letter of Advice (LOA) on behalf of Fisheries and Oceans Canada (DFO) will be provided with the TRCA permit to ensure compliance with the Federal Fisheries Act. Plantings • All proposed plantspecies will be native and non - invasive consistent with TRCA guidelines. Policy Guidelines: The proposed works are in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40825 - Application #: 341/08/RH Report Prepared by: Adam Miller, extension 5244 For information contact: Adam Miller, extension 5244 Date: June 4, 2008 8.1.58 TOWN OF RICHMOND HILL To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere at the corner of Bathurst Street and Weldrick Road West, in the Town of Richmond Hill, Don River Watershed as located on the property owned by Town of Richmond Hill. The purpose is to undertake works within a TRCA Regulated Area of the Don River watershed in order to facilitate the improvement and usability of an existing trail system at Richvale Greenway Park. The permit will be issued for the period of June 13, 2008 to June 12, 2010. 508 • Letter of Undertaking, provided by Town of Richmond Hill, dated June 11, 2008, to address all outstanding ecology and engineering related concerns. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the improvement and usability of the existing Richvale Greenway trail system along several tributaries of the East Don River. Richvale Greenway Park is a fragmented system bounded on the West by Bathurst St., Major Mackenzie Drive to the north, and Richmond Hill Golf and Country Club to the south. This project is considered to be the first of a two- staged process. Phase 1 focuses on the East Don River and Patterson Creek between Carrville Road and the area north of Castle Rock Drive. The works involve realigning and resurfacing several sections of the trail that have been eroded by the meandering watercourses, and providing bank stabilization to several small sections of the East Don River and Patterson Creek, through the use of various bioengineering techniques. Although some of works are proposed within the .Regional Storm Floodplain, all excavated fill will be removed from the floodplain, and no major grade changes are proposed. In order to complete the proposed works, it is necessary for several sections of riparian vegetation to be removed. To mitigate the impacts of vegetation removal, an•extensive enhancement planting plan has been incorporated into the design to provide for an ecological net gain. Control of Flooding: No significant grading changes are. proposed and all excavated material will be removed from the floodplain. As such, TRCA staff do not anticipate any impacts to the storage and /or conveyance of flood waters. Pollution: Sediment and erosion controls will be provided and maintained through all phases of construction in accordance with TRCA guidelines. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: As a result of the proposed works, several sections of riparian vegetation will be removed. To mitigate the impacts of the proposed removals an extensive enhancement planting plan has been submitted with this project. Plantings All plantings are native and non - invasive in accordance with TRCA Guidelines. 509 Policy Guidelines: This proposal is consistent with Section 4.2.2 (H) - Existing Resource Based Uses - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40257 - Application #: 952/07/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 8.1.59. VOMANO VALLEY DEVELOPMENTS LTD. To alter a watercourse on Part Lot 65, Concession 1, (South East Corner of Bathurst Street and King Road Intersection), in the Town of Richmond Hill, Humber River Watershed as located on the property owned by Vomano Valley Developments Ltd.. The purpose is to construct a permanent stormwater management outfall associated with a proposed new stormwater management pond. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of undertaking provided by Cindy Esliger, Valdor Engineering Inc., dated June 11, 2008, to address outstanding TRCA requirements, prior to the issuance of the permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The Vomano Valley subdivision is located southeast of King Road and Bathurst Street in the Town of Richmond Hill. The subject property does not contain any significant natural features •or valley or stream corridors. However, the proposed stormwater management pond, located on the south side of King Road, will outlet to the north through a culvert under King Road to a tributary of the East Humber River. This tributary has been highly altered in the past, and within this area predominantly provides a flow conveyance function to a downstream stormwater management pond (Elmway Pond), which outlets into the East Humber River. TRCA staff have reviewed the proposed stormwater management pond, and are satisfied with the design proposed. The proposed pond and outfall have been designed to meet TRCA stormwater management criteria. Additionally, water balance measures are being provided on -site to provide for additional groundwater infiltration, and to minimize any potential future downstream erosion issues. Control of Flooding: The proposed works are not located within the Regulatory Floodplain, and have been designed in accordance with TRCA requirements. No impacts to flood storage and conveyance are anticipated with the works associated with this permit. Pollution: • Appropriate sediment and erosion control measures are to be installed and maintained during all phases of construction.. 510 Dynamic Beaches: Not applicable Erosion: There are no slope stability and /or erosion related concerns with this application: Erosion control measures, based upon TRCA's Sediment and Erosion Control Guidelines, will be applied as applicable. Conservation of Land: The subject works are being completed within an approved plan of subdivision, in an area in which no significant natural features are located. Plantings Stormwater management pond plantings will be implemented through the plan of subdivision, in accordance with Town of Richmond Hill stormwater pond planting standards. Policy Guidelines: This proposal is consistent with Section 4.3 - Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40862 - Application #: 365/08/RH Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 TOWN OF WHITCHURCH - STOUFFVILLE 8.1.60 TOWN OF WHITCHURCH - STOUFFVILLE To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a waterway on Main Street (between Hwy 48 and Ninth Concession), in the Town of Whitchurch - Stouffville, Regional Municipality of York in the Rouge River Watershed as located on property owned by Town of Whitchurch - Stouffville. The purpose is to construct, reconstruct, erect or.place a building or structure, site grade, temporarily or permanently place, dump or remove any material originating on the site or elsewhere and alter a waterway on Main Street, east of Highway 48, in the Town of Whitchurch- Stouffville, Regional Municipality of York, in order to facilitate the construction of road improvements. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of Undertaking to provide minor revisions to engineering and planting /restoration drawings to the satisfaction of TRCA staff; dated June 11, 2008; received June 11, 2008; prepared by the Town of Whitchurch - Stouffville. 511 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The entire proposal involves the widening of Main Street from 9th Concession to Highway 48. The works will include the addition of two lanes and a median, storm sewer, the extension of an existing culvert located east of Highway 48 and the elimination of Tributary 4 located on the south side of Main Street (240m east of Sandiford Drive and 60m west of Sandiford Drive). The destruction of Tributary 4 is a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat and requires appropriate compensation in order to acquire the Authorization from Fisheries and Oceans Canada (DFO). TRCA approval of these works has been divided into three phases in order to facilitate the construction of the road improvements. Phase I (Sta. 1 +185 to east construction limit) involves road improvement works outside the Regulated Area. Under TRCA's level III agreement with Fisheries and Oceans Canada (DFO), staff issued a Letter of Advice (LOA) to ensure that the appropriate sediment and erosion control measures were implemented in order to protect fish habitat. This application is for Phase II. Phase II (Sta. 0 to Sta. 0 +800) involves road improvement works within the Regulated Area and requires TRCA permit approval and an additional LOA. Phase II road works include the construction of a storm sewer and north and south extensions to the existing culvert located east of Highway 48. The culvert extensions involve in water works and are subject to the coldwater fisheries timing window of July 1 to September 15. Phase III (Sta. 0 +800 to 1 +185) involves works within the Regulated Area, the HADD (elimination of Tributary 4) and associated compensation (SWM Pond) for the HADD. These works will be approved under a separate permit application (CFN 40820). The project was reviewed through the Municipal Class Environmental Assessment process. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion control measures (silt/sediment fencing, rock check dam, dam and pump) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the wetland /watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). 512 Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 36834 - Application #: 327/05/WS Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: June 3, 2008 8.1.61 TOWN OF WHITCHURCH - STOUFFVILLE To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Park Drive, in the Town of Whitchurch - Stouffville, Regional Municipality of York, Duffins Creek Watershed as located on the property owned by Town of Whitchurch - Stouffville. The purpose is to construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material originating on the site or elsewhere on Park Drive, in the Town of Whitchurch - Stouffville, Regional Municipality of York in order to facilitate the construction of the road extension and watermain. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Letter of Undertaking to provide minor revisions to engineering and planting /restoration plans to the satisfaction of TRCA staff; dated June 11, 2008; received June 11, 2008; prepared by the Town of Whitchurch- Stouffville. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the extension of Park Drive from Hoover Park Drive to Burkholder Street in two phases. Phase I will extend from Hoover Park Drive to the north limit of the Lebovic Centre and Phase II will extend from the Lebovic Centre to Burkholder Street, in the Town of Whitchurch Stouffville, Regional Municipality of York. This application is for Phase I of the project. The road works associated with this application include the construction of part of the ,road extension, interim stormwater management (drainage ditch) and the installation of a 400mm dia. PVC watermain. 513 Phase II will include the installation of a bridge structure, installation of the remaining section of watermain, site grading, review of possible restoration of a historically altered watercourse, permanent stormwater management and the implementation of a forest edge management plan and restoration. Some of these works are proposed to be constructed on TRCA property. TRCA archaeological staff are currently scheduled to complete their investigation on TRCA lands this summer. This project was reviewed by TRCA through the Municipal Class Environmental Assessment process. • Control of Flooding: The proposed project will have no impacts on the storage•or conveyance of floodwaters. Pollution: Standard erosion control measures (silt /sediment fencing, rock flow check dam) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the watercourse. • Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO) Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40537 - Application #: 137/08/WS Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: June 3, 2008 514 TOWNSHIP OF KING 8.1.62 150 ELMPINE TRAIL To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 124, Plan 280, (150 Elmpine Trail), in the Township of King, Humber River Watershed. The purpose is to allow development within a Regulated Area of the Humber River Watershed to facilitate the replacement of a septic system at 150 Elmpine Trail in the Township of King. The permit will be issued for the period of June 13, 2008 to June 12, 2010. • Septic System Plan, prepared by Burns Bros. Ex. Ltd., dated November 2007, received by the TRCA on May 20, 2008, redline revised to edit the street address and to indicate that sediment control fencing will be erected and maintained for the duration of construction until the site has stabilized and that all excess fill material will be removed from the property. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant proposes to replace the existing septic system at 150 Elmpine Trail with a new Ecoflo biofilter system. The existing septic system is failing and a new system is required to service the existing single family home on the property. The majority of the site is situated within the East Humber River valley corridor. The new septic system will be installed generally in the same location as the existing septic system, on a manicured portion of the rear yard. The proposed works will be situated within the valley corridor, but approximately, 73 metres from the watercourse and 41 metres from the Regional Storm flood plain. No trees will be removed to facilitate the installation of the new septic system. Control of Flooding: The proposed development will not be located within the Regional Storm flood plain: There will be no impact on the storage or conveyance of floodwaters. Pollution: Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from entering the adjacent natural features. Dynamic Beaches: Not applicable. Erosion: There will be no geotechnical /slope stability issues associated with the proposed development: In addition, the implementation of the aforementioned sediment and erosion control measures will minimize erosion on the site. 515 Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings The proposed works will not affect any significant natural features. All disturbed areas will be restored upon completion of the project. Policy Guidelines: The proposal is consistent with Section 4.2 - Existing Development - of the Authority's Valley and Stream Corridor Management Program. CFN: 40887 - Application #: 382 /08 /KING Report Prepared by: Coreena Smith, extension 5269 For information contact: Coreena Smith, extension 5269 Date: June 3, 2008 PERMIT APPLICATIONS 8.1.63 - 8.1.69 ARE PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS: RES. #B62/08 - PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Ron Moeser Maja Prentice THAT permission for routine infrastructure granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.63 - 8.1.69), which are listed below, be received. CITY OF VAUGHAN 8.1.63 CARRIED REGION OF YORK To undertake drainage structure general maintenance on Keele Street - 1529 Metres North of Teston Road, in the City of Vaughan, Don River Watershed as located on the property owned by Region of York. The purpose is to construct a structure (by relining existing 30m length x 1200mm diameter corrugated steel pipe (CSP) with a 30 m length x 900 mm diameter High Density Polyethylene (HDPE) pipe and by grouting the annular space) within a Regional Storm Floodplain; to excavate and place fill (for sediment basirron west side, to expose culvert on west end) in a Regulated Area; to temporarily alter a watercourse (tributary of Don River) during the warmwater timing window (July • 1 to March 31) through a dam and pump around method in order to isolate the works from the watercourse during liner installation. The permit will be issued for the period of May 14, 2008 to May 13, 2010 in accordance with the following documents and plans which form part of this permit: 516 • Plan - Keele Street Culvert Relining - 1529 Metres North of Teston Road; dated May 8, 2008; received May 14, 2008; prepared by Regional Municipality of York; • Drawing Notes - #1 to #17 - Keele Street Culvert Relining - 1529 Metres North of Teston Road; received April 29, 2008; prepared by Regional Municipality of York; • Pea Gravel Filled Bag Barriers Notes- Keele Street Culvert Relining - 1529 Metres North of Teston Road; ; received April 29, 2008; prepared by Regional Municipality of York; • Seed Mix Specifications for 2008 Culvert Works; Keele Street Culvert Relining - 1529 Metres North of Teston Road; received April 29, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.130 - Heavy Duty Silt Fence Barrier; dated November 2006; received March 11, 2008; prepared by Regional Municipality.of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.150 - Sandbag Barrier; dated November 2006; received May 9, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.200 - Sandbag Flow Check Dam; dated November 2006; received May 9, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.220 - Excavated Sediment Trap in Ditch; dated November 2006; received March 11, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 221.020 - Pumping and Piping; dated November 2000; received March 11, 2008; prepared by Regional Municipality of York; • Plunge Pool Sketch; received May 14, 2008; prepared by Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the installation of a liner within an existing 30m length x 1200mm diameter corrugated steel pipe (CSP). The proposed liner will be .a 30 m length x 900 mm diameter High Density Polyethylene (HDPE) pipe and there will be grouting of the annular space. The site is within a Regional Storm Floodplain. Works will involve the excavation and fill placement for a sediment basin on the west side in order to catch the debris within the culvert. As well, fill will be removed to expose the culvert for launching from the west to east in a Regulated Area. A plunge pool will also be constructed on the west end since this culvert acts as the outfall from the stormwater management pond on the east side of Keele Street. If there are flows during the two day work window during the summer, the tributary of Don River will also be altered temporarily during the coldwater timing window (July 1 to September 15) through a dam and pump around method in order to isolate the works from the watercourse during liner installation. The Regional Municipality of York staff classify this project as a Schedule A Environmental Assessment. This project has been reviewed under the Environmental Assessment Act, Ontario Regulation 166 and under the Fisheries Act for the tests and best management practices. 517 Control of Flooding: Staff has reviewed the hydraulics for the proposed liner and has determined that there will not be any negative impacts to flooding. Pollution: Standard erosion control measures (pea gravel coffer dam, pump, conduit, filter bag, sediment basin, silt fence) will'be implemented to ensure that the construction - generated sediments do not enter the watercourse. Dynamic Beaches: Not applicable Erosion: There will be no slope stability issues related to the works. Conservation of Land: There will be in stream works associated with this project. The watercourse will be temporarily altered with a dam and pump around method (if there is flow during installation in the summer months) in order to isolate the construction works from the watercourse during the relining of the existing culvert. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The proposed works will impact no significant terrestrial resource features. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 — Infrastructure and Servicing of the Authority's Valley and Stream Corridor.Management Program. CFN: 40441 - Application #: 079 /08NAUG Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: May 14, 2008 TOWN OF MARKHAM 8.1.64 REGION OF YORK To undertake drainage structure general maintenance on York - Durham Line - 1258 metres north of Bethesda Sideroad, in the Town of Markham, Duffins Creek Watershed as located on the property owned by Region of York. The purpose is to excavate and place fill (for frost tapering a culvert) in a Regulated Area; to temporarily alter a watercourse (tributary of Duffins) during the coldwater timing window (July 1 to September 15) through a dam and pump around method in order to isolate the works from the watercourse during the frost tapering installation. 518 The permit will be issued for the period of May 22, 2008 to May 21, 2010 in accordance with the following documents and plans which form part of this permit: • Plan - York Durham Line Culvert - Installation of Frost Taper- 1258 Metres North of Bethesda Sideroad; dated April 28, 2008; received April 29, 2008; prepared by Regional Municipality of York; • Drawing Notes - #1 to #15 -York Durham Line Culvert - Installation of Frost Taper ; received May 1, 2008; prepared by Regional Municipality of York; • Pea Gravel Filled Bag Barriers Notes- York Durham Line Culvert - Installation of Frost Taper; received April 29, 2008; prepared by Regional Municipality of York; • Seed Mix Specifications for 2008 Culvert Works; York Durham Line Culvert - Installation of Frost Taper; received April 29, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.130 - Heavy Duty Silt Fence Barrier; dated November 2006; received March 11, 2008; prepared. by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.150 - Sandbag Barrier; dated November 2006; received March 11, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.200 - Sandbag Flow Check Dam; dated November 2006; received March 11, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 221.020 - Pumping and Piping; dated November 2000; received March 11, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 803.030 - Frost Treatment Pipe Culverts; dated November 2005; received March 11, 2008; prepared by Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves excavation and placement of fill to frost taper an existing culvert to prevent future heaving. If there are flows during the two day work window during the summer, the tributary of Duffins Creek will be altered temporarily during the coldwater timing window. (July 1 to September 15) through a dam and pump around method in order to isolate the works from the watercourse during frost tapering. The site is within a Regional Storm Floodplain and a Regulated Area. This section of York Durham Line between Bethesda Sideroad and Bloomington Road is also located in the Greenbelt and on the Oak Ridges Moraine with the "Natural Core" area. All watercourses on the Oak Ridges Moraine have been identified as hydrologically sensitive features. Section 41 of the Oak Ridges Moraine Conservation Plan indicates in Subsection 5 that transportation and infrastructure may be permitted to cross hydrologically sensitive features (i.e. watercourses) subject to the tests and best management practices described in section 41(5)(a to e). The Regional Municipality of York staff classify this project as a Schedule A Environmental Assessment. This project has been reviewed under the Environmental Assessment Act, Ontario Regulation 166 and under the Fisheries Act for the tests and best management practices. 519 Control of Flooding: The existing grade within the Regional Storm Floodplain will be maintained therefore there will not be any negative impacts to flooding. Pollution: Standard erosion control measures (pea gravel coffer dam, pump, conduit, filter bag, silt fence) will be implemented to ensure that the construction - generated sediments do not enter the watercourse. Dynamic Beaches: Not applicable Erosion: There will be no slope stability issues related to the works. Conservation of Land: There will be in stream works associated with this project. The watercourse will be temporarily altered with a dam and pump around method (if there is flow during installation in the summer months) in order to isolate the construction works from the watercourse during the frost tapering of the existing culvert. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The proposed works will impact no significant terrestrial resource features. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 40643 - Application #: 220 /08 /MARK Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: May 22, 2008 8.1.65 REGION OF YORK To undertake drainage structure general maintenance on York - Durham Line - 472 metres north of 16th Avenue, in the Town of Markham, Duffins Creek Watershed as located on the property owned by Region of York. The purpose is to excavate and place fill (to remove the existing 13m length x 610m diameter corrugated steel pipe (CSP) culvert and to replace with 13m length by 610m diameter CSP) in a Regulated Area; to temporarily alter a watercourse (tributary of Duffins Creek) during the coldwater timing window (July 1 to September 15) through a dam and pump around method in order to isolate the works from the watercourse during culvert removal and replacement. 520 The permit will be issued for the period of May 23, 2008 to May 22, 2010 in accordance with the following documents and plans which form part of this permit: • Plan - York - Durham Line Culvert Removal and Replacement - 472 metres north of 16th Avenue ; dated April 28, 2008; received April 29, 2008; prepared by Regional Municipality of York; • Drawing Notes - #1 to #14 - York - Durham Line Culvert Removal and Replacement - 472 metres north of 16th Avenue ; received May 1, 2008; prepared by Regional Municipality of York; • Pea Gravel Filled Bag Barriers Notes- York - Durham Line Culvert Removal and Replacement - 472 metres north of 16th Avenue ; received April 29, 2008; prepared by Regional Municipality of York; • Seed Mix Specifications for 2008 Culvert Works; York - Durham Line Culvert Removal and Replacement - 472 metres north of 16th Avenue; received April 29, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.130 - Heavy Duty Silt Fence Barrier; dated November 2006; received March 11, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.150 - Sandbag Barrier; dated November 2006; received March 11, 2008; prepared by Regional Municipality. of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.200 - Sandbag Flow Check Dam; dated November 2006; received March 11, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 221.020 - Pumping and Piping; dated November 2000; received March 11, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 802.010 - Flexible Pipe - Embedment and Backfill Earth Excavation; dated November 2005; received March 11, 2008; prepared by Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the removal of the existing 13m length x 610m diameter corrugated steel pipe (CSP) culvert and replacement with an equivalent sized CSP) in a Regulated Area. The site is within a Regulated Area associated with a wetland, but is not located within a Regional Storm Floodplain. Works will involve the excavation and fill placement for the removal and replacement of the•culvert. If there are flows during the two day work window during the summer, the tributary of Duffins Creek will be altered temporarily during the coldwater timing window (July 1 to September 15) through a dam and pump around method in order to isolate the works from the watercourse culvert removal and replacement. The site is located within the Greenbelt. The Regional Municipality of York staff classify this project as a Schedule A Environmental Assessment. This project has been reviewed under the Environmental Assessment Act, Ontario Regulation 166 and under the Fisheries Act for the tests and best management practices. 521 Control of Flooding: The site is not located within the Regional Storm Floodplain, therefore, there will not be any implications to flooding. Pollution: Standard erosion control measures (pea gravel coffer dam, pump, conduit, silt fence) will be implemented to ensure that the construction - generated sediments do not enter the watercourse. Dynamic Beaches: Not applicable Erosion: There will be no slope stability issues related to the works. ' Conservation of Land: There will be in stream works associated with this project. The watercourse will be temporarily altered with a dam and pump around method (if there is flow during construction in the , summer months) in order to isolate the construction works from the watercourse during the culvert removal and replacement. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a -Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The proposed works will impact no significant terrestrial resource features. If there is any disturbance to the wetland during removal and replacement, the wetland will be restored to pre- construction conditions. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 40644 - Application #: 221/08/MARK Report Prepared by: June Murphy, extension 5304 • . For information contact: June Murphy, extension 5304 Date: May 23, 2008 522 8.1.66 REGIONAL MUNICIPALITY OF YORK To undertake drainage structure general maintenance on York Durham Line - 324m north of Highway 7, in the Town of Markham, Duffins Creek Watershed as located on the property owned by Regional Municipality of York. The purpose is to construct a structure (remove existing 12 m length x 760mm diameter corrugated steel pipe (CSP) and replace with 12 m length x 760 mm diameter (CSP) within a Regional Storm Floodplain; to excavate and place fill (for culvert removal and culvert replacement) in a Regulated Area; to interfere with a wetland (temporarily during installation of culvert); to alter a watercourse temporarily (tributary of West Duffins Creek) during the coldwater timing window (July 1 to September 15) through a dam and pump around method in order to isolate the works from the watercourse during construction. The permit will be issued for the period of May 8, 2008 to May 7, 2010 in accordance with the following documents and plans which form part of this permit: • Plan - York Durham Line Culvert Remove and Replace - 324 Metres North of Highway 7; dated April 28, 2008; received April 29, 2008; prepared by Regional Municipality of York; • Drawing Notes - #1 to #14 - York - Durham Line Culvert Remove and Replace - 324 Metres North of Highway 7; received April 29, 2008; redlined May 8, 2008 by TRCA staff with permission of YR staff to change to the dates to coincide with the July 1 to September 15 coldwater window; prepared by Regional Municipality of York; • Pea Gravel Filled Bag Barriers Notes -- York - Durham Line Culvert Remove and Replace - 324 Metres North of Highway 7; received April 29, 2008; prepared by Regional Municipality of York; • Seed Mix Specifications for 2008 Culvert Works- York - Durham Line Culvert Remove and Replace - 324 Metres North of Highway 7; received April 29, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 802.010 - Flexible Pipe Embedment and Backfill Earth Excavation; dated November 2005; received April 29, 2008; prepared by Regional Municipality of York.; • Ontario Provincial Standard Drawing (O.P.S.D) 219.130 - Heavy Duty Silt Fence Barrier; dated November 2006; received April 29, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.150 - Sandbag Barrier; dated November 2006; received April, 29, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.200 - Sandbag Flow Check Dam; dated November 2006; received April 29, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 221.020 - Pumping and Piping; dated November 2000; received April 29, 2008; prepared by Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: 523 Proposal: The proposal involves the removal of the existing degraded 12 m length x 760mm diameter corrugated steel pipe (CSP) and replacement with a 12 m length x 760 mm diameter (CSP) within a Regional Storm Floodplain. Works will involve the excavation and placement of fill in a Regulated Area and a temporary disturbance of a wetland during installation of culvert which will be restored post installation. The tributary of West Duffins Creek will be altered temporarily during the coldwater timing window (July 1 to September 15) through a dam and pump around method in order to isolate the works from the watercourse during construction. The Regional Municipality of York staff has indicated that the duration of the works would be two working days. The project is classified by the Regional Municipality of York as a Schedule A Environmental Assessment. This section of York Durham Line is located in the Greenbelt and York Region is required to comply with the Greenbelt legislation. The works associated with this project have been reviewed under Ontario Regulation 166 and under the Fisheries Act for the tests and best management practices. Control of Flooding: Staff has reviewed the hydraulics for the proposed structure and has determined that there will not be any negative impacts to flooding. Pollution: Standard erosion control measures (pea gravel coffer dam, pump, conduit, splash pad, silt • fence) will be implemented to ensure that the construction - generated sediments do not enter . the watercourse. Dynamic Beaches: Not applicable Erosion: There will be no slope stability issues related to the works. Conservation of Land: There will be in stream works associated with this project. The watercourse will be temporarily altered with a dam and pump around method in order to isolate the construction works from the watercourse during the removal and replacement of the culvert over the course of two days. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Fisheries and Oceans Canada (DFO). The proposed works will impact no significant terrestrial resource features. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. 524 CFN: 37861 - Application #: 307 /06 /MARK Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: May 8, 2008 TOWN OF WHITCHURCH - STOUFFVILLE 8.1.67 REGION OF YORK To undertake drainage structure general maintenance on York - Durham Line - 900 metres north of Stouffville Road, in the Town of Whitchurch- Stouffville, Duffins Creek Watershed as located on the property owned' by Region of York. The purpose is to construct a structure (by removing existing twin 11 m length x .450mm diameter corrugated steel pipes (CSPs) and replacing with a 11 m length x 600 mm diameter High Density Polyethylene (HDPE) pipe) within a Regional Storm Floodplain; to excavate and place fill (to remove and replace culverts) in a Regulated Area; to temporarily alter a wetland during removal and replacement of culverts; to temporarily alter a watercourse (tributary of Duffins Creek) during the coldwater timing window (July 1 to September 15) through a dam and pump around method in order to isolate the works from the watercourse during culvert removal and replacement. The permit will be issued for the period of May 15, 2008 to May 14, 2010 in accordance with the following documents and plans which form part of this permit: • Plan - York - Durham Line Culvert Removal and Replacement - 900 Metres North of Stouffville Road; dated April 25, 2008; received April 29, 2008; prepared by Regional Municipality of York; • Drawing Notes - #1 to #15 - York - Durham Line Culvert Removal and Replacement - 900 Metres North of Stouffville Road; received May 1, 2008; prepared by Regional Municipality of York; • Pea Gravel Filled Bag Barriers Notes- York - Durham Line Culvert Removal and Replacement - 900 Metres North of Stouffville Road; received April 29, 2008; prepared by Regional Municipality of York; • Seed Mix Specifications for 2008 Culvert Works; York - Durham Line Culvert Removal and Replacement - 900 Metres North of.Stouffville Road; received April 29, 2008; prepared by Regional Municipality of York; • Manning's N Chart; received April 29, 2008; prepared by the Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D)' 219.130 - Heavy Duty Silt Fence Barrier; dated November 2006; received March 11, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.150 - Sandbag Barrier; dated November 2006; received March 11, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.200 - Sandbag Flow Check Dam; dated November 2006; received March 11, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 221.020 - Pumping and Piping; dated November 2000; received March 11, 2008; prepared by Regional Municipality of York; 525 • Ontario Provincial Standard Drawing (O.P.S.D) 802.010 - Flexible Pipe Embedment and Backfill Earth Excavation; dated November 2006; received March 11, 2008; prepared by Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves removing the existing twin 11 m length x 450mm diameter corrugated steel pipes (CSPs) and replacing with one 11 m length x 600 mm diameter High Density Polyethylene (HDPE) pipe) within a Regional Storm Floodplain. Works will involve the excavation and fill placement for the culvert removal and replacement in the Regulated Area. The wetland will be altered temporarily during removal of the culverts and replacement, however,all disturbed areas will be restored post construction. If there are flows during the two day work window during the summer, the tributary of Duffins Creek will also be altered temporarily during the coldwater timing window (July 1 to September 15) through a dam and pump around method in order to isolate the works from the watercourse during liner installation. . This section of York Durham Line between Stouffville Road and Bethesda Road is located in the Greenbelt and on the Oak Ridges Moraine with the "Settlement" area on the west and the "Countryside" area on the east. All watercourses on the Oak Ridges Moraine have been identified as hydrologically sensitive features. Section 41 of the Oak Ridges Moraine Conservation Plan indicates in Subsection 5 that transportation and infrastructure may be permitted to cross hydrologically sensitive features (i.e. watercourses) subject to the tests and best management practices described in section 41(5)(a to e). The Regional Municipality of York staff classify this project as a Schedule A Environmental Assessment. This project has been reviewed under the Environmental Assessment Act, Ontario Regulation 16.6 and under the Fisheries Act for the tests and best management practices. Control of Flooding: Staff has reviewed the hydraulics for the proposed culvert and has determined that there will not be any negative impacts to flooding. Pollution: Standard erosion control measures (pea gravel coffer dam, pump, conduit, filter bag, silt fence) will be implemented to ensure that the construction - generated sediments do not enter the watercourse. Dynamic Beaches: Not applicable Erosion: There will be no slope stability issues related to the works. 526 Conservation of Land: There will be in stream works associated with this project. The watercourse will be temporarily altered with a dam and pump around method (if there is flow during installation in the summer months) in order to isolate the construction works from the watercourse during the-culvert removal and replacement. With erosion and sedimentation plans in effect, the.potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The proposed works will impact no significant terrestrial resource features. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 40642 - Application #: 219/08/WS Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: May 15, 2008 TOWNSHIP OF KING 8.1.68 REGION OF YORK To undertake drainage structure general maintenance on Keele Street - 833 metres North of King- Vaughan Road, in the Township of King, Humber River Watershed as located on the property owned by Region of York. The purpose is to construct a structure (by relining existing 30m length x 900mm diameter corrugated steel pipe (CSP) with a 30m length x 675 mm diameter High Density Polyethylene (HDPE) pipe and by grouting the annular space) within a Regional Storm Floodplain; to excavate and place fill (for sediment basin on west side, to expose culvert on both ends) in a Regulated Area; to temporarily interfere with a wetland ( during installation of liner); to temporarily alter a watercourse (tributary of Humber River) during the coldwater timing window (July 1 to September 15) through a dam,and pump around method in order to isolate the works from the watercourse during liner installation. The.permit will be issued for the period of May 13, 2008 to May 12, 2010 in accordance with the following documents and plans which form part of this permit: • Plan - Keele Street Culvert Relining - 833 Metres North of King- Vaughan Sideroad; dated April 30, 2008; received May 1, 2008; prepared by Regional Municipality of York; • Drawing Notes - #1 to #17 - Keele Street Culvert Relining - 833 Metres North of King - Vaughan Sideroad; received May 1, 2008; prepared by Regional Municipality of York; 527 • Pea Gravel Filled Bag Barriers Notes - Keele Street Culvert Relining - 833 Metres North of King- Vaughan Sideroad; received April 29, 2008; prepared by Regional Municipality of York; • Seed Mix Specifications for 2008 Culvert Works; Keele Street Culvert Relining - 833 Metres North of King- Vaughan Sideroad; received April 29, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.130 - Heavy Duty Silt Fence Barrier; dated November 2006; received March 11, 2008; prepared by Regional •.Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.150 - Sandbag Barrier; dated November 2006; received May 9, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.200 - Sandbag Flow Check Dam; dated November 2006; received May 9, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.220 - Excavated Sediment Trap in Ditch; dated November 2006; received March 11, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 221.020 - Pumping and Piping; dated November 2000; received March 11, 2008; prepared by Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the installation of a liner within an existing 30m length x 900mm diameter corrugated steel pipe (CSP). The proposed liner will be a 30 m length x 675 mm diameter High Density Polyethylene (HDPE) pipe and there will be grouting of the annular space. The site is within a Regional Storm Floodplain. Works will involve the excavation and fill placement for a sediment basin on the west side in order to catch the debris within the culvert. As well, fill will be removed to expose the culvert for launching from the east to the west in a Regulated Area. The wetland will be altered temporarily during installation of the liner and the wetland will be restored post construction. If there are flows during the two day work window during the summer, the tributary of Humber River will also be altered temporarily during the coldwater timing window (July 1 to September 15) through a dam and pump around method in order to isolate the works from the watercourse during liner installation. This section of Keele Street between King- Vaughan Road and King Road is located in the . Greenbelt and on the Oak Ridges Moraine within the "Settlement Area." All watercourses on the Oak Ridges Moraine have been identified as hydrologically sensitive features. Section 41 of the Oak Ridges Moraine Conservation Plan indicates in Subsection 5 that transportation and infrastructure may be permitted to cross hydrologically sensitive features (i.e. watercourses) subject to the tests and best management practices described in section 41(5)(a to e). The Regional Municipality of York staff classify this project as a Schedule A Environmental Assessment. This project has been reviewed under the Environmental Assessment Act, Ontario Regulation 166 and under the Fisheries Act for the tests and best management practices. 528 Control of Flooding : Staff has reviewed the hydraulics for the proposed liner and has determined that there will not be any negative impacts to flooding. Pollution: Standard erosion control measures (pea gravel coffer dam, pump, conduit, filter bag, sediment basin, silt fence) will be implemented to ensure that the construction - generated sediments do not enter the watercourse. Dynamic Beaches: Not applicable Erosion: There will be no slope stability issues related to the works. Conservation of Land: There will be in stream works associated with this project. The watercourse will be temporarily altered with a dam and pump around method (if there is flow during installation in the summer months) in order to isolate the construction works from the watercourse during the relining of the existing culvert. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The proposed works will impact no significant terrestrial resource features. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 40443 - Application #: 078 /08 /KING Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: May 13, 2008 529 8.1.69 . REGION OF YORK To undertake drainage structure general maintenance on Weston Road - 1330 metres north of 15th Sideroad, in the Township of King, Humber River - Watershed as located on the property owned by Region of York. The purpose is to construct a structure (by relining existing 12m length x 1200mm diameter corrugated steel pipe (CSP) with a 13 m length x 900 mm diameter High Density Polyethylene (HDPE) pipe and by grouting the annular space) within a Regional Storm Floodplain; to excavate and place fill (for sediment basin on west side, to expose culvert on west end) in a Regulated Area; to temporarily interfere with a wetland ( during installation of liner); to temporarily alter a watercourse (tributary of Humber River) during the coldwater timing window (July 1 to September 15) through a dam and pump around method in order to isolate the works from the watercourse during liner installation. The permit will be issued for the period of May 9, 2008 to May 8, 2010 in accordance with the following documents and plans which form part of this permit: • Plan - Weston Road Culvert Relining - 1330 Metres North of 15th Sideroad; dated April 30, 2008; received May 1, 2008; prepared by Regional Municipality of York; • Drawing Notes - #1 to #17 - Weston Road Culvert Relining - 1330 Metres North of 15th Sideroad; received May 1, 2008; prepared by Regional Municipality of York; • Pea Gravel Filled Bag Barriers Notes- Weston Road Culvert Relining - 1330 Metres North of 15th Sideroad; received March 11, 2008; prepared by Regional Municipality of York; • Seed Mix Specifications for 2008 Culvert Works; Weston Road Culvert Relining - 1330 Metres North of 15th Sideroad; received March 11, 2008; prepared by Regional Municipality of York. • Ontario Provincial Standard Drawing (O.P.S.D) 219.130 - Heavy Duty Silt Fence Barrier; dated November 2006; received March 11, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.150 - Sandbag Barrier; dated November 2006; received May 9, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 219.200 - Sandbag Flow Check Dam; dated November 2006; received May 9, 2008; prepared by Regional Municipality of York; • • Ontario Provincial Standard Drawing (O.P.S.D) 219.220 - Excavated Sediment Trap in Ditch; dated November 2006; received March 11, 2008; prepared by Regional Municipality of York; • Ontario Provincial Standard Drawing (O.P.S.D) 221.020 - Pumping and Piping; dated November 2000; received March 11, 2008; prepared by Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: 530 Proposal: The proposal involves the installation of a liner within an existing 12m length x 1200mm diameter corrugated steel pipe (CSP). The proposed liner will be a 13 m length x 900 mm diameter High Density Polyethylene (HDPE) pipe and there will be grouting of the annular space. The site is within a Regional Storm Floodplain. Works will involve the excavation and fill placement for a sediment basin on the west side in order to catch the debris within the culvert. As well fill will be removed to expose the culvert for launching from the east to the west in a Regulated Area. The wetland will be altered temporarily during installation of the liner and the wetland will be restored post construction. If there are flows during the two day work window during the summer, the tributary of Humber River will also be altered temporarily during the coldwater timing window (July 1 to September 15) through a dam and pump around method in order to isolate the works from the watercourse during liner installation. This section of Weston Road between 15th Sideroad and 16th Sideroad is located in the • Greenbelt and on the Oak Ridges Moraine within the "Natural Core Area." All watercourses on the Oak Ridges Moraine have been identified as hydrologically sensitive features. Section 41 of the Oak Ridges Moraine Conservation Plan indicates in Subsection 5 that transportation and infrastructure may be permitted to cross hydrologically sensitive features (i.e. watercourses) subject to the tests and best management practices described in section 41(5)(a to e). The Regional Municipality of York staff classify this project as a Schedule A Environmental Assessment. This project has been reviewed under the Environmental Assessment Act, Ontario Regulation 166 and under the Fisheries Act for the tests and best management practices. Control of Flooding: Staff has reviewed the hydraulics for the proposed liner and has determined that there will not be any negative impacts to flooding. Pollution: Standard erosion control measures (pea gravel coffer dam, pump, conduit, filter bag, sediment basin, silt fence) will be implemented to ensure that the construction - generated sediments do not enter the watercourse. Dynamic Beaches: Not applicable Erosion: There will be no slope stability issues related to the works. Conservation of Land: There will be in stream works associated with this project. The watercourse will be temporarily altered with a dam and pump around method (if there is flow during installation in the summer months) in order to isolate the construction works from the watercourse during the relining of the existing culvert. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be.mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The proposed works will impact no significant terrestrial resource features. 531 Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 40641 - Application #: 218/08/KING Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: May 13, 2008 PERMIT APPLICATIONS 8.1.70 - 8.1.119 ARE MINOR WORKS LETTER OF APPROVAL: RES. #B63/08 - MINOR WORKS LETTER OF APPROVAL PURSUANT TO ONTARIO REGULATION 166/06 . Moved by: Seconded by: Ron Moeser Maja Prentice THAT minor works letter of approval granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.70 - 8.1.119, inclusive), which are listed below, be received. CARRIED CITY OF BRAMPTON 8.1.70 23 WILLIAM STREET To construct, reconstruct, erect or place a building or structure on Lot 22, Plan ' BR -24, (23 William Street), in the City of Brampton, Etobicoke Creek Watershed. CFN: 40855 - Application #: 357 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: May 23, 2008 8.1.71 22 BRIDGEND CRESCENT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 34, Plan 43M - 1467, (22 Bridgend Crescent), in the City of Brampton, Humber River Watershed. • CFN: 40711 - Application #: 264 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Jason Wagler, extension 5743 Date: May 1, 2008 532 8.1.72 18 HIBISCUS COURT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 9, Plan 06- B5356, (18 Hibiscus Court), in the City of Brampton, Humber River Watershed. CFN: 40822 - Application #: 333/08/BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: May 8, 2008 8.1.73 44 BRUNETTA WAY To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 529, Plan, (44 Brunette Way), in the City of Brampton, Humber River Watershed. CFN: 40874 - Application #: 371 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: May 23, 2008 8.1.74 10 BLACKCHERRY LANE To install a swimming pool on Lot 13, (10 Blackcherry Lane), in the City of Brampton, Humber River Watershed. CFN: 40808 - Application #: 320 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: May 7, 2008 . 8.1.75 10 INSPIRATION WAY To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part Lot 2, Plan 43M -1724, (10 Inspiration Way), in the City of Brampton, Humber River Watershed. CFN: 40792 - Application #: 308 /08 /BRAM Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: May 5, 2008 533 8.1.76 12 SPRING VALLEY COURT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on (12 Spring Valley Court), in the City of Brampton, Humber River Watershed. • CFN: 40864 - Application #: 366 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: May 21, 2008 8.1.77 21 RYCKMAN LANE To undertake minor landscaping involving the placement, removal or regrading of material of Tess than 30 cubic metres (equivalent to 3 truckloads) on Lot 5, Plan 43M -1521, (21 Rychman Lane), in the City of Brampton, Humber River Watershed. CFN: 40851 - Application #: 356 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: May 15, 2008 CITY OF PICKERING 8.1.78 3465 BALSAM ROAD, SIDELINE 4 To install a swimming pool, undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 26, Concession 4 , (3465 Balsam Road, Sideline 4), in the City of Pickering, Carruthers Creek Watershed. CFN: 40827 - Application #: 336/08/PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: May 12, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.79 5 ORCHARD CREST ROAD To install a swimming pool, undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 161, Plan 1582, (5 Orchard Crest Road), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. 534 CFN: 40875 - Application #: 373/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date:-May 26, 2008 8.1.80 44 RIDGEVALLEY CRESCENT To install a swimming pool on Lot 20, Plan 3515, (44 Ridgevalley Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 40849 - Application #: 354/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: May 16, 2008 8.1.81 56 BABY POINT ROAD To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on 56 Baby Point Road in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 40846 - Application #: 346/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: May 16, 2008 8.1.82 83 EDEN VALLEY DRIVE To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on 83 Eden Valley Drive in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 40868 - Application #: 369/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: May 21, 2008 8.1.83 69 KINGSWAY CRESCENT To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 3 AND PART OF LOT 2, Plan 40129, (69 Kingsway Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. 535 CFN: 40810 - Application #: 322/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: May 13, 2008 8.1.84 63 MONCRIEFF DRIVE To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 168, Plan 4605, (63 Moncrieff Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 40905 - Application #: 405/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 2, 2008 8.1.85 53 ROWNTREE MILL ROAD To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 32, Plan 2388, (53 Rowntree Mill Road), in the City of Toronto (Etobicoke • York Community Council Area), Humber River Watershed. CFN: 40658 - Application #: 227/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: May 12, 2008 8.1.86 166 HUMBERVALE BOULEVARD To construct a ground floor addition up to 50 sq. m (538 sq. ft) and change the . use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Part Lot 4, RANGE 1, KINGSMILL RESERVE, (166 Humbervale Boulevard), in the City of Toronto ( Etobicoke York Community Council Area), Mimico Creek Watershed. CFN: 40773 - Application #: 295/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: May 12, 2008 8.1.87 44 GOLF VALLEY LANE To install a swimming pool on Lot 216, Plan M -1082, (44 Golf Valley Lane), in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed. 536 CFN: 40884 - Application #: 387/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: May 26, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.88 22 CEDARBANK CRESCENT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 65, Plan 4544, (22 Cedarbank Crescent), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: 40891 - Application #: 394/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: May 27, 2008 8.1.89 24 CEDARBANK CRESCENT To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 66, Plan 4544, (24 Cedarbank Crescent), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: 40856 - Application #: 358/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: May 21, 2008 8.1.90 127 WHITBURN CRESCENT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 44, Plan 4503, (127 Whitburn Crescent), in the City of Toronto (North York Community Council Area), Humber River Watershed. CFN: 40903 - Application #: 403/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: June 3, 2008 8.1.91 SCENIC (ARH) DEVELOPMENTS LTD. To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Block D, Plan 66R- 16089, Part Block E, Plan 66R- 16089, (Brian Peck Crescent), in the City of Toronto (North York Community Council Area), Don • River Watershed as located on the property owned by Scenic (ARH) Developments Ltd.. 537 CFN: 40740 - Application #: 276/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: May 12, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.92 ' 57 FLORENS AVENUE To undertake minor landscaping involving the placement, removal or regrading of material of Tess than 30 cubic metres (equivalent to 3 truckloads) on Lot 12, 11, Plan 5205, (57 Florens Avenue), in the City of Toronto (Scarborough Community Council Area), Don River Watershed. CFN: 40832 - Application #: 340/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: May 12, 2008 8.1.93 21 FALLINGBROOK WOODS To undertake minor landscaping involving the placement, removal or regrading of material of Tess than 30 cubic metres (equivalent to 3 truckloads) and construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 28, Plan 4304, (21 Fallingbrook Woods), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. CFN: 40781 - Application #: 302/08/TOR Report Prepared by: Michelle Stafford, extension 5250 . For information contact: Steve Heuchert, extension 5311 Date: May 23, 2008 8.1.94 68 FISHLEIGH DRIVE To install a swimming pool on Lot 125, Plan 4035, (68 Fishleigh Drive), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. CFN: 40898 - Application #: 398/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: June 3, 2008 538 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.95 CANADIAN TIRE REAL ESTATE LIMITED To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on 1015 Lake Shore Boulevard East in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by Canadian Tire Real Estate Limited. CFN: 40671 - Application #: 236/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: May 27, 2008 8.1.96 16 NASHVILLE AVENUE To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Part Lot 532, 533, Plan 2008, (16 Nashville Avenue), in the City of Toronto (Toronto and East York Community Council Area), Humber River Watershed. CFN: 40697 - Application #: 259/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: May 27, 2008 8.1.97 18 BARBARA CRESCENT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on , (18 Barbara Crescent), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 40847 - Application #: 348/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: May 13, 2008 8.1.98 77 PARKVIEW HILL CRESCENT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) and construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 39, Plan 3434, (77 Parkview Hill Crescent), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 40813 - Application #: 326/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: May 16, 2008 539 8.1.99 71 PARKVIEW HILL CRESCENT To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on 71 Parkview Hill Crescent in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 40861 - Application #: 363/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 2, 2008 8.1.100 12 NOTLEY PLACE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 51, Plan M632, (12 Notley Place), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 40876 - Application #: 374/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: May 23, 2008 CITY OF VAUGHAN 8.1.101 229 FRANKLIN AVENUE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 9, Plan 65M, (229 Franklin Avenue), in the City of Vaughan, Don River Watershed. CFN: 40828 - Application #: 337 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: May 22, 2008 8.1.102 39 KNIGHT SHADE DRIVE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 11, Plan 65M -3618, (39 Knight Shade Drive), in the City of Vaughan, Don River Watershed. CFN: 40907 - Application #: 407 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: June 3, 2008 540 TOWN OF AJAX 8.1.103 54 PURDUE AVENUE To install a swimming pool on Lot 27, Plan 40R- 21214, (54 Purdue Avenue), in the Town of Ajax, Duffins Creek Watershed. CFN: 40945 - Application #: 437 /08 /AJAX Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: June 4, 2008 8.1.104 14 DEWFALL CRESCENT To install a swimming pool on Lot 56, Plan 40M - 2239, (14 Dewfall Crescent), in the Town of Ajax, Carruthers Creek Watershed. CFN: 40799 - Application #: 315 /08 /AJAX Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: May 5, 2008 8.1.105 21 ALDEN SQUARE To install a swimming pool on Lot 4, Plan, (21 Alden Square), in the Town of Ajax, Duffins Creek Watershed. CFN: 40872 - Application #: 375 /08 /AJAX Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: May 27, 2008 TOWN OF CALEDON 8.1.106 9270 CASTLEDERG SIDE ROAD To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on East Half Lot 16, Concession 7, (9270 Castlederg Side Road), in the Town of Caledon, Humber River Watershed. CFN: 40793 - Application #: 307 /08 /CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: May 1, 2008 8.1.107 46 GIBSON LAKE DRIVE To construct a non - habitable accessory'structure up to 50 sq. m (538 sq. ft) on Lot 27, Plan 943, (46 Gibson Lake Drive), in the Town of Caledon, Humber River Watershed. 541 CFN: 40831 - Application #: 342/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: May 9, 2008 8.1.108 2743 KING STREET To undertake minor landscaping involving the placement, removal or regrading of material of Tess than 30 cubic metres (equivalent to 3 truckloads) on 2743 King Street, in the Town of Caledon, Etobicoke Creek Watershed. CFN: 40801 - Application #: 318/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: May 1, 2008 TOWN OF MARKHAM 8.1.109 ANGUS GLEN GOLF CLUB To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 19, Concession 5 , (10060 Kennedy Road), in the Town of Markham, Rouge River Watershed as located on the property owned by Angus Glen Golf Club. CFN: 40829 - Application #: 338 /08 /MARK Report Prepared by: Chris Jones, extension 5718 For information contact: Chris Jones, extension 5718 Date: May 12, 2008 8.1.110 9 BUSHBERRY COURT To install a swimming pool on Lot 44, Plan 65M2926, (9 Bushberry.Court), in the Town of Markham, Rouge River Watershed. CFN: 40816 - Application #: 328 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: May 9, 2008 8.1.111 28 MARKHAVEN ROAD To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 230, Plan . 7566, (28 Markhaven Road), in the Town of Markham, Rouge River Watershed. CFN: 40883 - Application #: 376 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: June 4, 2008 542 8.1.112 235 RIVERWALK DRIVE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 13, Plan, (235 Riverwalk Drive), in the Town of Markham, Rouge River Watershed. CFN: 40789 - Application #: 311 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: May 5, 2008 8.1.113 249 RIVERWALK DRIVE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 19, , (249 Riverwalk Drive), in the Town of Markham, Rouge River Watershed. CFN: 40859 - Application #: 361/08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: May 15, 2008 TOWN OF RICHMOND HILL 8.1.114 69 RIDGEWOOD DRIVE To install a swimming pool on Lot 12, Plan 65M -2708, (69 Ridgewood Drive), in the Town of.Richmond Hill, Rouge River Watershed. CFN: 40819 - Application #: 331/08/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: May 9, 2008 8.1.115 25 HORNER COURT To install a swimming pool on Lot 194, Plan 65M -2683, (25 Horner Court), in the Town of Richmond Hill, Rouge River Watershed. CFN: 40790 - Application #: 310/08/RH _Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: May 5, 2008 543 TOWN OF WHITCHURCH - STOUFFVILLE 8.1.116 50 LITTLE ROUGE LOT #166 To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 166, Plan 65M -3880, (50 Little Rouge Lot # 166), in the Town of Whitchurch - Stouffville, Rouge River Watershed. CFN: 40852 - Application #: 352/08/WS Report Prepared by: Shannon McNeill, extension 5744 For information contact: Bill Kiru, extension 5306 Date: May 15, 2008 8.1.117 47 MAURO VISTA To install a swimming pool on Lot PART 3, Concession 9 Lot 37, Plan 65M -3862, (47 Mauro Vista), in the Town of Whitchurch- Stouffville, Rouge River Watershed. CFN: 40857 - Application #: 359/08/WS Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: May 15, 2008 TOWNSHIP OF KING 8.1.118 21 WOODHILL AVENUE To install a swimming pool and undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 2, Plan 65M -3545, (21 Woodhill Avenue), in the Township of King, Humber River Watershed. CFN: 40707 - Application #: 265/08/KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: May 22, 2008 8.1.119 42 GREENSIDE DRIVE To install a swimming pool and construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 40, Plan 562, (42 Greenside Drive), in the Township of King, Humber River Watershed. CFN: 40878 - Application #: 381 /08 /KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: May 26, 2008 544 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.120 296 RIVERSIDE DRIVE To construct, reconstruct, erect or place a building or structure on Lot 57, Plan M -451, (296 Riverside Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new two- storey single family detached dwelling. The existing dwelling is to be demolished. The permit will be issued for the period of June 13, 2008 to June 12, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Construction Notes, Site Plan and Statistics, prepared by Lorne Rose Architect, dated May 7, 2008, received on May 23, 2008, redlined by TRCA staff on May 26, 2008; • Drawing No. A4, East and South Elevations, prepared by Lorne Rose Architect, dated May 7, 2008, received on May 23, 2008; • Drawing No. A5, North and West Elevations, prepared by Lorne Rose Architect, dated May 7, 2008, received on May 23, 2008; • Drawing No. A6, Building Section "A"-"A", prepared by Lorne Rose Architect, dated May 7, 2008, received on May 23, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to allow for the construction of a new two- storey single family detached dwelling. The existing dwelling is to be demolished. The subject site is located within the TRCA Regulated Area of the Humber River Watershed, south of Bloor Street West and west of South Kingsway in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: This site is not located in the Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Temporary sediment control fencing is to be installed and maintained during construction in order to prevent construction debris from the slope. Dynamic Beaches: Not applicable. Erosion: • There are no geotechnical concerns associated with this proposal. Conservation of Land: The proposed building footprint is adequately setback from the top of slope. There will be no impact on significant natural features, riparian vegetation or fisheries. 545 • Plantings Native plantings will be provided as per the City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance will be implemented. Policy Guidelines: The proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established Communities /Highly Urbanized Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40055 - Application #: 875/07/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 11, 2008 RES. #B64/08 - Moved by: Seconded by: OUT OF COUNTRY TRAVEL Approval for staff to travel outside of Canada to attend a conference in London, England. Ron Moeser Maja Prentice THAT approval be granted for Laurian Farrell, Manger, Water Resources to attend the International Conference on Flood Recovery Innovation and Response in London, England, from July 2 -3, 2008, at a cost not to exceed $4,200, plus applicable taxes; AND FURTHER THAT a presentation be made at Executive Committee Meeting #7/08, to be held on September 5, 2008 with an overview of the conference. CARRIED BACKGROUND The Toronto and Region Conservation Authority (TRCA) policy on travel requires Executive Committee approval for staff travel outside of the country on TRCA business. TRCA members have requested that a presentation be made to the appropriate committee upon returning. RATIONALE The International Conference on Flood Recovery Innovation and Response will bring together researchers and practitioners to discuss the latest advances in flood management. The conference will address the following themes: Risk Management in Relation to Flood Events and Climate Change; Pre -event Planning & Business Continuity; Management of Major Events; Post Damage Restoration and Recovery; Victims of Flooding; and International & National Government Policy. 546 Laurian Farrell is a Manager, Water Resources in the Water Management section of the Ecology division at TRCA and is the Flood Forecasting and Warning Program Coordinator. In addition to attending the technical training sessions for professional development, Ms. Farrell will be presenting a paper which will be published in the conference proceedings. TRCA is responsible for providing flood messages to our member municipalities and to approximately 5 million residents of the Toronto region. The goal of the flood forecasting and warning system is to increase the level of service provided to the public in the future (by increasing access to information and by improving our understanding of the watershed's response to rain events). Current practices in the United Kingdom (UK) and other major cities provide excellent models on which TRCA may build an improved flood forecasting' and warning program. In addition to attending the conference, Ms. Farrell will be visiting the offices of the UK Environmental Agency to learn about their flood forecasting and warning program; including the UK's response to recent major flood events and their extensive public outreach programming. FINANCIAL DETAILS Cost to attend the conference including travel (by air), conference registration (at a reduced rate due to staff participation in the proceedings), meals and accommodations are estimated to be $4,200 plus applicable taxes. The funds are identified in the 2008 Capital Budget and will be charged to account 107 -02. Report prepared by: Laurian Farrell, extension 5601 Email: Ifarrell @trca.on.ca For Information contact: Laurian Farrell, extension 5601 Email: Ifarrell @trca.on.ca Date: June 05, 2008 RES. #B65/08 - PORT UNION WATERFRONT IMPROVEMENT PROJECT (PHASE 2) City of Toronto Tender RSD08 -13 for Supply and Delivery of 250 mm to 600 mm Riprap Stone. Award of Tender RSD08 -13 for the supply and delivery of approximately 3,800 tonnes of 250 mm to 600 mm riprap stone to the Port Union Waterfront Improvement Project (Phase 2), City of Toronto. Moved by: Seconded by: Ron Moeser Maja Prentice THAT Contract RSD08 -13 for the supply and delivery of approximately 3,800 tonnes of • 250 mm to 600 mm riprap stone to the Port Union Waterfront Improvement Project (Phase 2), City of Toronto, for the total amount not to exceed $104,994.00 plus applicable taxes be awarded to J.C. Rock Ltd., it being the lowest bid that meets Toronto and Region Conservation Authority (TRCA) specifications. CARRIED 547 BACKGROUND The Port Union Waterfront Improvement Project (Phase 2) is located south of Lawrence Avenue east, between Chesterton Shores.and the Rouge River in the City of Toronto. The project will consist-of approximately 1.6 km of shoreline protection, trails and parkland development. Shoreplan Engineering Limited has been retained as the coastal engineering consultant. The preferred option through the Class Environmental Assessment process calls for the construction of 6 headlands and 7 beach units. RATIONALE Tender RSD08 -13 was publicly advertised in the Daily Commercial News. Tender packages were sent to a total of twelve potential bidders. The Tender Opening Committee opened tenders received on May 23, 2008 with the following results: BIDDERS APPROXIMATE QUANTITY • (tonnes) TOTAL UNIT PRICE (per tonne) ESTIMATED VALUE OF CONTRACT (plus GST) J.C. Rock Ltd 3,800 $27.63 $104,994.00 Nelson Aggregate Co. 3,800 $31.18 $118,484.00 Dufferin Aggregates 3,800 $32.94 $125,172.00 Glenn Windrem Trucking 3,800 $35.38 $134,444.00 York Paving 3,800 $46.15 $175,370.00 Lafarge Aggregates 3,800 $48.00 $182,400.00 Based on the bids received, staff recommend award of Tender RSD08 -13 to J.C. Rock Ltd. for the total unit price of $27.63 per tonne and a total amount not to exceed $104,994.00 plus • GST, it being the lowest bid meeting TRCA specifications. FINANCIAL DETAILS Funds are available from Toronto Waterfront Revitalization Corporation within account #224 -70. Report prepared by: Joe DeIle Fave, 416 - 392 -9724 For Information contact: Joe Delle Fave, 416- 392 -9724 Email: jdellefave @trca.on.ca Date: May 27, 2008 RES.#B66/08 - Moved by: Seconded by: GREENING GREATER TORONTO • Participation in the "Greening Greater Toronto" initiative. Ron Moeser Maja Prentice 548 THAT the Toronto City Summit Alliance be advised that Toronto and Region Conservation Authority (TRCA) is pleased to participate in the proposal to establish a network of education and demonstration centres as part of the "Greening Greater Toronto" initiative. CARRIED SECTION IV - ITEMS FOR THE INFORMATION OF THE BOARD RES. #B67/08 - Moved by: Seconded by: LOWEST BID NOT ACCEPTED Replacement of Exterior Doors and One Window Former Jacobs Property, 9330 Pine Valley Drive, Woodbridge. Receipt of report approved by the Director, Finance and Businss Services on award of contract for the replacement of the exterior doors and one window for a Toronto and Region Conservation Authority rental home. Reenga Mathivanan Suzan Hall IT IS RECOMMENDED THAT the report. from the Director, Finance and Businss Services on award of contract to Weida Windows Industries, who was not the lowest bidder, be received. CARRIED BACKGROUND At Authority Meeting #5/05, held on June 24, 2005, Resolution #A124/05 approved the Purchasing Policy. As per Schedule 'A' of the policy, if the lowest bidder is not selected, a report shall be provided to the Executive Committee for their information at the next available meeting. In this regard, the report outlined in Attachment 1 that was approved by the Director, Finance and Business Services on May 26, 2008 is provided for information. Report prepared by: Kathy Stranks, extension 5264 Emails: kstranks @trca.on.ca For Information contact: Lori Colussi, extension 5303 Emails: Icolussi @trca.on.ca Date: May 27, 2008 Attachments: 1 549 Attachment 1 TO: Chair and Members of the Procurement Not Requiring Board Approval ' Meeting RFQ Lowest Bid Not Accepted ($10,000 to $25,000) - Jan 1 to June 30, 2008, June 30, 2008 FROM: James W. Dillane, Director, Finance and Business Services . RE: REPLACEMENT OF EXTERIOR DOORS AND ONE WINDOW Former Jacobs Property, 9330 Pine Valley Drive, Woodbridge KEY ISSUE Award of contract for the replacement of the exterior doors and one window for a Toronto and Region Conservation Authority rental home. RECOMMENDATION THAT the contract for the replacement of the exterior doors and one window at 9330 Pine Valley Drive, Woodbridge, be awarded to Weida Windows Industries for a cost not to exceed $9,939.05 plus applicable taxes. BACKGROUND The doors and one remaining window at the above -noted property are in need of replacement due to age. These doors are very drafty and are a cause for heat loss. The windows were replaced last year and Toronto and Region Conservation Authority (TRCA) staff proceeded to contact the same installer and one other installer to provide TRCA with prices to replace the doors and one remaining window. The contractors contacted were as follows: • George Kent Home Improvements Ltd. • Weida Windows Industries The quotations received were as follows: CONTRACTOR QUOTE George Kent Home Improvement Ltd. $7,580.95, plus applicable taxes Weida Windows Industries $9,939.05, plus applicable taxes FINANCIAL DETAILS After comparing the two quotes provided, staff is recommending that the contract be awarded to Weida Windows Industries at a cost not to exceed $9,939.05, plus applicable taxes. Staff is recommending this company because they did spend a considerable amount of time to record the style of doors requested by the tenant. They are also the installer that replaced all of the windows last year. They were very professional and demonstrated excellent workmanship. The lowest bidder would have to return to the site and sit down with the tenants to obtain this information. To avoid any further delay it is recommended that we award the contract to Weida Windows Industries. There is a 6 to 8 week delivery time and TRCA staff would like to have the windows installed before the fall. 550 Funds are available in the TRCA rental budget. Report prepared by: Lori Colussi, extension 5303 Emails: Icolussi @trca.on.ca For Information contact: Lori Colussi, extension 5303 Emails: Icolussi @trca.on.ca Date: May 20, 2008 551 TERMINATION ON MOTION, the meeting terminated at 10:13 a.m:, on Friday, June 13, 2008. Gerri Lynn O'Connor Brian Denney Chair Secretary- Treasurer /ks c. 'THE TORONTO AND REGION CONSERVATION AUTHORITY MEETING OF THE EXECUTIVE COMMITTEE #5/08 July 11, 2008 The Executive Committee Meeting • #5/08, was held in the Victoria Room, Black Creek Pioneer Village, on Friday, July 11, 2008. The Chair Gerri Lynn O'Connor, called the meeting to order at 9:38 a.m.. PRESENT Maria Augimeri Rob Ford Jack Heath Colleen Jordan Reenga Mathivanan Gerri Lynn O'Connor Anthony Perruzza Maja Prentice • Richard Whitehead PRESENT VIA CONFERENCE CALL Suzan Hall ABSENT David Barrow Ron Moeser RES. #B68/08 - Moved by: Seconded by: MINUTES Reenga Mathivanan •Colleen Jordan Vice Chair Member Member Member Member Chair Member Member Member Member Member Member THAT the Minutes of Meeting #4/08, held on June 13, 2008, be approved. CARRIED 553 PRESENTATIONS (a) A presentation by Moranne McDonnell, Project Manager, Environmental Engineering Projects, TRCA, and Patricia Newland, Supervisor, Project Planning and Monitoring, TRCA, in regard to the Stream Ecology and Restoration - Function Based Hydraulic Structure, Biological Assessment and Bioengineering Design workshop attended from June 9 - 13, 2008 in Amherst, New York, approved by Res. #B49 /08. RES.#B69/08 - PRESENTATIONS Moved by: Colleen Jordan Seconded by: Maja Prentice THAT above -noted presentation (a) be heard and received. CARRIED CORRESPONDENCE (a) A letter dated July 9, 2008, from Susan Self, Co- Chair, Duffins Carruthers Watershed Resource Group, in regard to item 8.3 - Growing Durham. (b) An email dated July 10, 2008, from Councillor Colleen Jordan, Town of Ajax, in regard to item 8.3 - Growing Durham. RES. #B70 /08 - CORRESPONDENCE Moved by: Seconded by: Maja Prentice Colleen Jordan THAT above -noted correspondence (a) and (b) be received. 554. CARRIED CORRESPONDENCE (A) July 9, 2008 Ms. Gerri Lynn O'Connor Chair, TRCA Board 5 Shoreham Drive Downsview, ON M3N 1S4 Dear Gerri Lynn As you are no doubt aware, I was the Co -Chair for the Duffins - Carruthers Watershed Resource Group and Implementation Committee. I have had an opportunity to review the TRCA response to the Growing Durham report which I understand is on the Executive agenda for this Friday. As committee members, we support a precautionary approach which would protect the headwaters of Carruthers. In particular, David Burnett points out that the environmental analysis done in 2003 for the downstream urbanized portions of Carruthers was based on the assumption that the headwaters would remain in its natural and agricultural state. Our committee supports the TRCA position that the draft OP amendment policies should support an update to the Watershed Plan as a prerequisite to the approval of any secondary plans. Yours truly ORIGINAL SIGNED BY Susan Self cc: Mr. Brian Denney — CAO, TRCA 555. CORRESPONDENCE (B) "Colleen Jordan" 07/10/2008 09:44 AM Hello Brian and Carolyn, Please see revised amended motion that I wish to put forward at the meeting on Friday. Kindly have copies available for committee members. I would also ask that some maps be available so that the Committee can see clearly the area being referred to. I will also be asking some questions such as downstream impacts of urbanization of these lands, potential costs for updating the plan and what the likely conclusions will be? It may be worthwhile to have a brief staff presentation so that members have a good understanding of the issues. Thanks for your consideration. See you Friday. Colleen Jordan Regional Councillor Wards 3 & 4 Please consider the environment before printing this email. RECOMMENDATION WHEREAS the Growing Durham report recommended /preferred growth scenario (Attachment 1) includes 1,454 hectares of new lands in the City of Pickering, much of which is located in the headwaters of the Carruthers Creek watershed; WHEREAS the scenario analysis evaluation excluded the previously defined environmental criteria from consideration in the scenario evaluation; WHEREAS it appears that the provincial Growth Plan targets for intensification within the existing urban boundary and for density targets within the proposed new greenfield lands are not being met by the required dates; WHEREAS A Watershed Plan for the Duffins Creek and Carruthers Creek (2003) watersheds identified the headwaters of the Carruthers Creek as an area of high sensitivity and the Duffins Creek and Carruthers Creek Task Force recommended a precautionary approach , however, as the Watershed Plan did not consider urbanization north of Ajax's urban boundary; THEREFORE LET IT BE RESOLVED THAT THE EXECUTIVE COMMITTEE RECOMMENDS TO THE AUTHORITY THAT Toronto and Region Conservation Authority (TRCA) take a precautionary approach to ufbanizatien -in the upper Carruthers Creek watershed in order to protect and enhance the remaining environmental attributes and to prevent potentially expensive infrastructure remediation projects in the lower reaches of the creek in the existing downstream Ajax community; THAT the City of Pickering be encouraged to carefully consider under its award - winning Sustainable Pickering Initiative, the full social, financial o oconemio and environmental implications of developing northeast Pickering; THAT TRCA supperts suggests the Growing Durham report be further refined ment to exclude the upper watershed of Carruthers Creek from of the recommended /preferred Scenario • 557 THAT - - staff analyze the information available for the upper Carruthers Creek watershed, including but not limited to the groundwater features and functions and the findings of the York - Durham -Peel- Toronto Groundwater Study, the objectives of the Provincial Drinking Water Source Protection Initiative with respect to protecting Lake Ontario -based water intakes, the opportunities to implement the 2005 Ontario Biodiversity Plan and the status of the Federal initiative to further protect the Redside Dace (as this watershed still supports such habitat), and prepare a report to the Executive Committee in September 2008 explaining the many reasons why this upper watershed should be protected from urbanization; AND FURTHER THAT a copy of this report be sent to the Region of Durham, the five .conservation authorities within Durham Region, the Town of Ajax, the City of Pickering, • the Environment Commissioner of Ontario and to the ministries of Municipal Affairs and Housing, Natural Resources and Public Infrastructure Renewal and Energy. 558 SECTION I - ITEMS FOR AUTHORITY ACTION RES.#B71/08 - GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Rouge River Watershed Lloyd E. Perryman and Ethel Perryman, CFN 39163. Purchase of a partial taking from a property, municipally known as 11751 and 11825 Leslie Street, north 19th Avenue, on the east side of Leslie Street, in the Town of Richmond Hill, in the Rouge River watershed. Moved by: Seconded by: Maria Augimeri Reenga Mathivanan THE EXECUTIVE COMMITTEE RECOMMENDS THAT a partial taking of 33.47 hectares (82.71 acres), more or less, consisting of an irregular shaped parcel of vacant land, said land being Part of Lot 33, Concession 3, Town of Richmond Hill, Regional Municipality of York, be purchased from Lloyd E. Perryman and Ethel Perryman; THAT the purchase price be $2,150,000; THAT acquisition by Toronto and Region Conservation Authority (TRCA) is conditional on all necessary funding being available from one or more of following sources: Oak Ridges Moraine Foundation, Regional Municipality of York, Town of Richmond Hill, City of Toronto and other potential funding sources; THAT TRCA receive conveyance of the land required free from encumbrance, subject to existing service easements; THAT Gardiner, Roberts, Barristers and Solicitors, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs and disbursements are to be paid; THAT the appropriate TRCA officials be authorized and directed to execute all necessary documentation required; AND FURTHER THAT the Rouge Park Alliance be so advised. BACKGROUND Resolution #A260/05 at Authority Meeting #9/05, held on November 25, 2005, approved the Greenlands Acquisition Project for 2006 -2010. 11781 and 11823 Leslie Street is owned by Ethel Perryman and the late Lloyd E. Perryman and directly abuts the north side of the Town of Richmond Hill's Phyllis Rawlinson Park. The property is 92.81 acres (37.56 hectares) in size and is located on the east side of Leslie Street between 19th Avenue and Stouffville Road. The property is improved with two residential dwellings and a ancillary barn. It is proposed that TRCA would acquire 33.47 hectares (82.71 acres) of the property leaving Mrs. Perryman with approximately 10 acres of land together with the improvements. . CARRIED 559 The subject property falls within the TRCA's approved master plan for acquisition. It is in the headwaters of the Rouge River and is designated as Countryside Area and Natural Linkage Area in the Oak Ridges Moraine Conservation Plan (ORMCP). Much of the property has been identified as a high aquifer vulnerability area by the ORMCP. The woodlands located on the property, identified by York Region's Significant Woodlands Study, are known to be pristine sugar maple forests that contain some interior forest conditions. The property also contains the provincially designated Rouge River Headwater Wetland Complex. This purchase will provide a unique opportunity for the expansion of Phyllis Rawlinson Park. • The agreement is conditional on the availability of funding. The offer at hand is supported by an appraised value based on independent valuations. Negotiations have been conducted with the owners. Attached is a plan showing the location of the subject lands. RATIONALE The subject property falls within TRCA's approved master plan for acquisition for the Rouge River watershed as outlined in the approved Greenlands Acquisition Project for 2006 -2010. The subject property is also included in the Pool of Priority Acquisition Sites for the Rouge Park approved by the Rouge Park Alliance (RPA). It is located in the headwaters of the Rouge River, contains the provincially designated Rouge River Headwater Wetland Complex and designated as Countryside Area and Natural Linkage Area in the ORMCP. The addition of the subject parcel will compliment the Town of Richmond Hill's holdings in this area. TAXES AND MAINTENANCE • Since this property contains a provincially significant wetland and is designated as Countryside Area and Natural Linkage Area in the ORMCP, it will be eligible to receive a property tax exemption. It is proposed that the Town of Richmond Hill will manage the property in . conjunction with Phyllis Rawlinson Park. The Town of Richmond Hill will be preparing a management plan for the property in consultation with the RPA and TRCA. FINANCIAL DETAILS The subject property was identified on the list of properties approved by the City of Toronto to be funded from the city's Land Acquisition for Source Water Protection Reserve. The city will fund up to 33% of the costs of the acquisition for properties on the list located outside of the city boundaries. The Town of Richmond Hill supports the purchase of the property and has agreed to contribute up to 25% of the cost of acquisition. Regional Municipality of York and Oak Ridges Moraine Foundation staff have indicated during preliminary discussions that they would support a contribution to this purchase. 560 Expenditures related to this acquisition will be charged to account 004 -11 -502. Report prepared by: Mike Fenning, extension 5223 Emails: mfenning @trca.on.ca For Information contact: Mike Fenning, extension 5223 or Ron Dewell, extension 5245 Emails: mfenning @trca.on.ca, rdewell @trca.on.ca Date: June 23, 2008 Attachments: 1 561 Attachment 1 GREEN DS ACQUISITION PROJECT FOR 2046 -2010 Flood Plain and. Conservation Component, Rouge River 1 latershed Lloyd E. Perryman and Ethel Perryman CFN 39163 a ser at on for The Living City TRCA LANDS SUBJECT PROPERTY 562 PHYLLIS RAWLINSON PARK RES. #B72/08 - GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 • Flood Plain and Conservation Component, Don River Watershed Joseph Wojdat, CFN 41028. Purchase of property located north of Sheppard Avenue, east of Bathurst Street (rear of 21 Roycrest Avenue), City of Toronto (North York Community Council Area), under the "Greenlands Acquisition Project for 2006 - 2010," Flood Plain and Conservation Component, Don River watershed. Moved by Seconded by: Maria Augimeri Reenga Mathivanan THE EXECUTIVE COMMITTEE)RECOMMENDS THAT 0.008 hectares (0.02 acres), more or less, of vacant land, being Part of Lot 9 on Plan 3722, designated as Part 3 on a Plan of Survey prepared by Avanti Surveying Inc., under their Project No. 07 -045, dated April 4, 2007, .City of Toronto (North York Community Council Area), located north of Sheppard Avenue, east of Bathurst Street (rear of 21 Roycrest Avenue), be purchased from Joseph Wojdat; THAT the purchase price be $2.00; THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land free from encumbrance, subject to existing service easements; THAT the firm of Gardiner Roberts LLP, Barristers & Solicitors, be instrudted to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid; AND FURTHER THAT "the appropriate TRCA officials be authorized and directed to execute all necessary documentation required. CARRIED BACKGROUND Resolution #A260/05 at Authority Meeting #9/05, held on November 25, 2005, approved the Greenlands Acquisition Project for 2006 -2010. Negotiations have been conducted with Mr. Joseph Wojdat, the owner of 21 Roycrest Avenue. Attached is a plan showing the location of the subject lands. •RATIONALE - The subject property falls within TRCA's approved master plan for acquisition for the Don River watershed as outlined in.the approved Greenlands Acquisition Project for 2006 -2010. Through the review of.an Application for Consent to sever the subject lands, TRCA staff established the limits of the open spaceparcel (i.e. Part 3 on Plan of Survey) which is comprised of,a portion of the valley corridor of a tributary of the West Don River at this location. TAXES AND MAINTENANCE It is proposed that the lands be turned over to the City of Toronto for management. 563 FINANCIAL DETAILS Funds for the costs related to this purchase are available in the TRCA land acquisition capital account. Report prepared by: George Leja, extension 5342 Emails: gleja @trca.on.ca For Information contact: George Leja, extension 5342 or Ron Dewell, extension 5245 Emails: gleja @trca.on.ca or rdewell @trca.on.ca Date: June 24, 2008 Attachments: 1 564 Attachment 1 GREENLANDS ACOUISITKYN PROJECT FOR 200&.2010 Flood Plain and Conservation Component, Don River Watershed Joseph Wojdat CFN 41028 565 RES. #873/08 - GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Humber River Watershed .Speirs Farm Corporation, CFN 39980. Donation of a portion of a property• municipal known as 12412 Dixie Road, located north of Mayfield Road, - west of Dixie Road, City of Brampton, Regional Municipality of Peel, under the "Greenlands Acquisition Project for 2006 - 2010 ", Flood Plain and Conservation Component, Humber River watershed. Moved by: Maria Augimeri Seconded by: Reenga Mathivanan THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation Authority (TRCA) accept the donation from Speirs Farm Corporation of 8.276 hectares (20.450 acres), more or less, of vacant land being Part of Lot 19, Concession 3, designated as Part 1 on Plan 43R- 31988, City of Brampton, Regional Municipality of Peel, being a portion of their property municipal known as 12412 Dixie Road, located north of Mayfield Road, west of Dixie Road; THAT an income tax receipt be issued for the Fair Market Value of the Ecological Gift as determined by Environment Canada in accordance with the guidelines as set out by Canada Customs and Revenue Agency; THAT TRCA receive conveyance of the land required free from encumbrance, subject to existing service easements: THAT the firm of Gardiner Roberts LLP, Barristers and Solicitors, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs and disbursements are to be paid; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to execute all necessary documentation required. CARRIED BACKGROUND Resolution #A260/05 at Authority Meeting #9/05, held on November 25, 2005, approved the Greenlands Acquisition Project for 2006 -2010. Recently the Town of Caledon adopted Official Plan Amendment 208, which is the Mayfield West Secondary Plan. The plan is the result of a comprehensive exercise that began in the mid- 1990's and was conducted concurrently with the development of the Region of Peel's Official Plan. Both plans anticipate development in Mayfield West to accommodate planned population and employment growth to 2021. The Mayfield West area is approximately 444 hectares in size with an anticipated population of approximately 9,000 in 2,845 dwelling units. The land being donated is designated as Environmental Policy Area in the plan and the land being retained by Speirs Farm Corporation is designated as General Industrial and Greenway Corridor. Attached is a plan showing the location of the subject lands. 566 Two other reports are part of the agenda package for consideration of adjacent properties. RATIONALE The subject property falls within TRCA's approved master plan for acquisition for the Humber River watershed as outlined in the approved Greenlands Acquisition Project for 2006 -2010. The subject property is part of a mature forest which is the largest wooded area in the Mayfield West Community Secondary Plan study area. Sugar maple is the dominant canopy species. Other notable tree species included, white ash, American beech, ironwood, white elm, blue beech and white birch.. The upland portion of the woodlot gives way to a red maple mineral deciduous swamp with silver maple as an associate. DETAILS OF WORK TO BE DONE Obtained Notice of Determination of Fair Market Value of an Ecological Gift from Environment Canada in compliance with the Ecological Gift Program. TAXES AND MAINTENANCE Based on our preliminary review of the environmental criteria for lands that are eligible to receive a property tax exemption under the provincial Conservation Land Tax Incentive Program, it would appear that all of the subject property would be eligible for exemption for the 2009 taxation year. Staff will prepare a management strategy for the woodlot once the conveyances have been completed. Funding is available in the Region of Peel land care account. FINANCIAL DETAILS Expenditures related to this acquisition will be charged to account 004 -11 -502. Funding is available in TRCA's land acquisition capital account. Report prepared by: Mike Fenning, extension 5223 Emails: mfenning @trca.on.ca For Information contact: Mike Fenning, extension 5223 or Ron Dewell, extension 5245 Emails: mfenning @trca.on.ca or rdewell @trca.on.ca Date: June 25, 2008 Attachments: 1 567 Attachment 1 11:100140 awscre-N- onservation for The Living City TRCA LANDS �� Ca GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Humber River Watershed Speirs Farm Corporation (FN 39980 568 ,' SUBJECT PROPERTY RES. #B74/08 - GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Humber River Watershed Patricia Dale Cation, John Gordon Cation and William Everard Cation, CFN 39980. Donation of a portion of a property municipal known as 12505 Heart Lake Road, located north of Mayfield Road, east of Heart Lake Road, City of Brampton, Regional Municipality of Peel, under the "Greenlands Acquisition Project for 2006 - 2010 ", Flood Plain and Conservation Component, Humber River watershed. Moved by: Seconded by: Maria Augimeri Reenga Mathivanan THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation Authority (TRCA) accept the donation from Patricia Dale Cation, John Gordon Cation and William Everard Cation of 4.520 hectares (11.170 acres), more or less, of vacant land being Part of Lot 20, Concession 3, designated as Part 1 on Plan 43R- 31987, City of Brampton, Regional Municipality of Peel, being a portion of their property municipal known as 12505 Heart Lake Road, located north of Mayfield Road, east of Heart Lake Road; THAT an income tax receipt be issued for the Fair Market Value of the Ecological Gift as determined by Environment Canada in accordance with the guidelines as set out by Canada Customs and Revenue Agency; THAT TRCA receive conveyance of the land required free from encumbrance, subject to existing service easements: THAT the firm of Gardiner Roberts LLP, Barristers and Solicitors, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs and disbursements are to be paid; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to execute all necessary documentation required. CARRIED BACKGROUND Resolution #A260/05 at Authority Meeting #9/05, held on November 25, 2005, approved the Greenlands Acquisition Project for 2006 -2010. Recently the Town of Caledon adopted Official Plan Amendment 208, which is the Mayfield West Secondary Plan. The plan is the result of a comprehensive exercise that.began in the mid- 1990's and was conducted concurrently with the development of the Region of Peel's Official Plan. Both plans anticipate development in Mayfield West to accommodate planned population and employment growth to 2021. The Mayfield West area is approximately 444 hectares in size with an anticipated population of approximately 9,000 in 2,845 dwelling units. The land being donated is designated as Environmental Policy Area in the plan and the land being retained by Patricia Dale Cation, John Gordon Cation and William Everard Cation is designated as General Industrial and Greenway Corridor. 569 Attached is a plan showing the location of the subject lands. Two other reports are part of the agenda package for consideration of adjacent properties. RATIONALE The subject property falls within TRCA's approved master plan for acquisition for the Humber River watershed as outlined in the approved Greenlands Acquisition Project for 2006 -2010. The subject property is part of a mature forest which is the largest wooded area in the Mayfield West Community Secondary Plan study area. Sugar maple is the dominant canopy species. Other notable tree species included, white ash, American beech, ironwood, white elm, blue beech and white birch. The upland portion of the woodlot gives way to a red maple mineral deciduous swamp with silver maple as an associate. DETAILS OF WORK TO BE DONE Obtained Notice of Determination of Fair Market Value of an Ecological Gift from Environment Canada in compliance with"the Ecological Gift Program. TAXES AND MAINTENANCE Based on our preliminary review of the environmental criteria for lands that are eligible to receive a property tax exemption under the provincial Conservation Land Tax Incentive Program, it would appear that all of the subject property would be eligible for exemption for the 2009 taxation year. Staff will prepare a management strategy for the woodlot once the conveyances have been completed. Funding is available in the Region of Peel land care account. FINANCIAL DETAILS • Expenditures related to this acquisition will be charged to account 004 -11 -502. Funding is available in TRCA's land acquisition capital account. • Report prepared by: Mike Fenning, extension 5223 Emails: mfenning @trca.on.ca For Information contact: Mike Fenning, extension 5223 or Ron Dewell, extension 5245 Emails: mfenning @trca.on.ca or rdewell @trca.on.ca Date: June 25, 2008 Attachments: 1 570 Attachment 1 y < 2 § � ND ACOU1SMON PROJECT \O,2006-2010 ... .:�.: .a,. Flood Plain and Conaervalion ¥ n Humber fi Re r wheel %cam a 2a 4n Gordon ko % o d §a %er\ Cation CVN 39980 571 rya Living Cit TRCA LAS SUBJECT PERT\ RES. #B75/08 - GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Humber River Watershed • Patricia Dale Cation, William Everard Cation, John Robert Cation and David Hunter Cation, CFN 39980. Donation of a portion of a property, located north of Mayfield Road, east of Heart Lake Road, City of Brampton, Regional Municipality of Peel, under the "Greenlands Acquisition Project for 2006 - 2010 ", Flood Plain and Conservation Component, Humber. River watershed. Moved•by: • Maria Augimeri Seconded by: Reenga Mathivanan THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation Authority (TRCA) accept the donation from Patricia Dale Cation, William Everard Cation, John Robert Cation and David Hunter Cation of 4.416 hectares (10.910 acres), more or less, of vacant land being Part of Lot 19, Concession 3, designated as Part 2 on Plan 43R- 31989, City of Brampton, Regional Municipality of Peel, being a portion of their property located north of Mayfield Road, east of Heart Lake Road; • THAT an income tax receipt be issued for the Fair Market Value of the Ecological Gift as determined by Environment Canada in accordance with the guidelines as set out by Canada Customs and Revenue Agency; THAT TRCA receive conveyance of the land required free from encumbrance, subject to existing service easements: THAT the firm of Gardiner Roberts LLP, Barristers and Solicitors, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs and disbursements are to be paid; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to - execute all necessary documentation required. CARRIED BACKGROUND Resolution #A260/05 at Authority Meeting #9/05, held on November 25, 2005, approved the Greenlands Acquisition Project for 2006 -2010. • Recently the Town of Caledon adopted Official Plan Amendment 208, which is the Mayfield West Secondary Plan. The plan is the result of a comprehensive exercise that began in the mid- 1990's and was conducted concurrently with the development of the Region of Peel's • Official Plan. Both plans anticipate development in Mayfield West to accommodate planned population and employment growth to 2021. The Mayfield West area is approximately 444 hectares in size with an anticipated population of approximately 9,000 in 2,845 dwelling units. The land being donated is designated as Environmental Policy Area in the plan and the land being retained by Patricia Dale Cation, William Everard Cation, John Robert Cation and David Hunter Cation is designated as General Industrial, Prestige Industrival and Greenway Corridor. 572 Attached is a plan showing the location of the subject lands. Two other reports are part of the agenda package for consideration of adjacent properties. RATIONALE The subject property falls within TRCA's approved master plan for acquisition for the Humber River watershed as outlined in the approved Greenlands Acquisition Project for 2006 -2010. The subject property is part of a mature forest which is the largest wooded area in the Mayfield West Community Secondary Plan study area. Sugar maple is the dominant canopy species. Other notable tree species included, white ash, American beech, ironwood, white elm, blue beech and white birch. The upland portion of the woodlot gives way to a red maple mineral deciduous swamp with silver maple as an associate. DETAILS OF WORK TO BE DONE Obtained Notice of Determination of Fair Market Value of an Ecological Gift from Environment Canada in compliance with the Ecological Gift Program. TAXES AND MAINTENANCE Based on TRCA's preliminary review of the environmental criteria for lands that are eligible to receive a property tax exemption under the provincial Conservation Land Tax Incentive Program, it would appear that all of the subject property would be eligible for exemption for the 2009 taxation year. Staff will prepare a management strategy for the woodlot once the conveyances have been completed. Funding is available in the Region of Peel land care account. FINANCIAL DETAILS Expenditures related to this acquisition will be charged to account 004 -11 -502. Funding is available in TRCA's land acquisition capital account. Report prepared by: Mike Fenning, extension 5223 Emails: mfenning @trca.on.ca For Information contact: Mike Fenning, extension 5223 or Ron Dewell, extension 5245 Emails: mfenning @trca.on.ca or rdewell @trca.on.ca Date: June 25, 2008 Attachments: 1 573 Attachment 1 r9,A servo 1011 for 'Tire Living City TRCA LAND S` OBJECT PROPERTY .REENi ANt?S ACQUISITION. PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Humber River Watershed Patricia Dale Cation, William Everard Cation, John Robert Cation and David Hunter Cation CFN 39980 574 RES. #B76 /08 - Moved by: Seconded by: GROWING DURHAM Recommended /Preferred Growth Scenario for the Region of Durham. Providing comments on the Recommended /Preferred Growth Scenario for the Region of Durham Maja Prentice Colleen Jordan THAT item 8.3 - Growing Durham be referred to staff for report to Authority Meeting #6/08, to be held on July 25, 2008. CARRIED SECTION II - ITEMS FOR EXECUTIVE ACTION RES. #B77 /08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Development, Interference with Wetlands and Alterations to Shorelines and Watercourses. Pursuant to Ontario Regulation 166/06, written permission from,the Authority is required for: a) straightening, changing, diverting or interfering in any way with the existing channel of a river, creek, stream or watercourse, or for changing or interfering in any way with a wetland; b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development. A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected. Moved by: Seconded by: Colleen Jordan Maja Prentice THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.1 - 8.1.30 and 8.1.90 - 8.1.93, with the exception of 8.1.6 - Empire (Beyond the Sea) Ltd., 8.1.13 - Oakdale Golf and Country Club, 8.1.14 - Toronto Transit Commission, 8.1.21 - City of Toronto and 8.1.26 - Regional Municipality of Peel) which are listed below. RES. #678/08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Jack Heath Colleen Jordan 575 CARRIED THAT a permit be granted in accordance with Ontario Regulation 166/06 for application 8.1.6 - Empire (Beyond the Sea) Ltd., which is listed below. RES. #B79 /08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Jack Heath Suzan Hall CARRIED THAT a permit be granted in accordance with Ontario Regulation 166/06 for application 8.1.13 - Oakdale Golf and Country Club, which is listed below. RES. #B80 /08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Anthony Perruzza Jack Heath CARRIED THAT a permit be granted in accordance with Ontario Regulation 166/06 for application 8.1.14 - Toronto Transit Commission, which is listed below. RES. #B81 /08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Jack Heath Richard Whitehead CARRIED THAT a permit be granted in accordance with Ontario Regulation 166/06 for application 8.1.21 - City of Toronto, which is listed below. RES. #B82 /08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Jack Heath Maja Prentice CARRIED THAT a permit be granted in accordance with Ontario Regulation 166/06 for application 8.1.26 - Regional Municipality of Peel, which is listed below. 576 CARRIED CITY OF BRAMPTON 8.1.1 SUNLIFE ASSURANCE COMPANY OF CANADA To construct, reconstruct, erect or place a building or structure on Block 8, 10, Plan 43M -1604, Part Block 22, Plan 43M -1604, (815 Intermodal Drive), in the City of Brampton, Mimico Creek Watershed as located on the property owned by Sunlife Assurance Company of Canada. The purpose is to undertake works within a.TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a 14, 310 square metre (154, 035 sq. ft) industrial warehouse on a vacant property located at 815 Intermodal Drive, in the City of Brampton. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Erosion and Sediment Control Plan, Drawing No. ESC, prepared by Urbacon Buildings Group, dated March 2007, Revision No. 1, revised on April 22, 2008, stamped received by TRCA Planning & Development staff on June 13, 2008; • Site Servicing and Grading Plan, Drawing No. SSG1, prepared by Urbacon Buildings Group, dated March 2007, Revision No. 7, revised on September 28, 2Q08, stamped received by TRCA Planning & Development staff on June 13, 2008; • Landscape Plan, Dwg. No. L-1 of 2, prepared by J. Marten Landscape Architect, dated January 31, 2007, Revision No. 9, revised on April 29, 2008, stamped received by TRCA Planning & Development staff on June 13, 2008; • Landscape Details, Dwg. No. L -2 of 2, prepared by J. Marten Landscape Architect, dated January 31, 2007, Revision No. 9, revised on April 29, 2008, stamped received by TRCA Planning & Development staff on June 13, 2008; RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to facilitate the construction of a 14, 310 square metre (154, 035 sq. ft.) industrial warehouse on a vacant property located at 815 Intermodal Drive, in the City of Brampton. The subject property is located adjacent to a stream corridor associated with the Mimico Creek Watershed. The proposed development is sufficiently setback from the stream corridor. Additionally, there are no flooding, geotechnical, or ecology related concerns with this application. An existing stormwater management facility, approved through the related subdivision, will provide quality and quantity controls for the subject development. An enhancement planting plan has been included as part of this proposal to improve the ecological functions of the adjacent stream corridor. .Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. 577 Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of this project. There are no fisheries related concerns associated with this project. Plantings Enhancement plantings are proposed as part of this application in order to enhance the stream corridor. All plant species are native and non - invasive consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1. - New Development - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 41036 - Application #: 497 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: July 2, 2008 CITY OF PICKERING 8.1.2 CITY OF PICKERING To construct, reconstruct, erect or place a building or structure and alter a watercourse on Lot 29, Concession 2, (623 Sunbird Trail), in the City of Pickering, Duffins Creek Watershed as located on the property owned by Toronto and Region Conservation Authority. The purpose is to construct and interfere with a watercourse within a Regulated Area of the Duffins Creek Watershed in order to facilitate the construction of a walkway. The permit will be issued for the period of July 11, 2008 to July 10; 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. L1, Site Plan and Cross Section, dated March 2008, prepared by the City of Pickering, received June 20, 2008; • . Drawing No. L2, Details, dated May 2008, prepared by the City of Pickering, received June 20, 2008; • • Drawing No. El, Lighting Plan, dated May 25, 2008, prepared by the City of Pickering, received June 20, 2008. 578 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the installation of a culvert within a tributary of the Duffins Creek Watershed in order to facilitate the construction of a walkway for the Sunbird Subdivision. The purpose of the walkway is to connect the subdivision to a temporary bus loop located on Dixie Road. This walkway will ensure safe access to the residents who use public transit. Control of Flooding: The culverts have been sized accordingly to convey the 100 year storm. TRCA technical staff have reviewed the sizing and are satisfied that the culvert will not impact the storage or conveyance of flood waters. Pollution: Sediment fencing will be in place throughout the duration of construction to ensure that no sediment will enter the watercourse. - Dynamic Beaches: Not applicable Erosion: There are no erosion issues associated with this proposal. Conservation of Land: There will no removal of vegetation as part of this - application however, the City will be providing restoration planting along the bank of the watercourse once the works are complete. Plantings All plantings will be consistent with TRCA's Seed Mix Guidelines. Policy Guidelines: This proposal is consistent with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40835 - Application #: 344/08/PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: June 25, 2008 8.1.3 HIGHGLEN HOMES LIMITED To construct, reconstruct, erect or place a building or structure and site grade on Lot PART 5, Plan 40R- 24517, (1995 Woodview Avenue), in the City of Pickering, Petticoat Creek Watershed as located on the property owned by Highglen Homes Limited. The purpose is to construct a new home within .a Regulated Area of the Petticoat Creek Watershed. 579 The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. SG -1, Site Grading Plan, dated October 2006, prepared by D.G. Biddle & Associates Ltd., received June 3, 2008; • . Drawing No. 107218 -SP -2, dated May 30, 2008, prepared by D.G. Biddle & Associates Ltd., received June 3, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This proposal consists of constructing a new home on-a vacant lot on Woodview Avenue in Pickering. The property is located in the Area of Interference of the Townline Swamp Wetland Complex. However, all works are at least 35 metres from the wetland. During the review of a Land Division in 2004 that created these lots, an Environmental Impact Statement (EIS) was completed and approved by TRCA. The recommendations of this EIS, such as sediment fencing, preservation of trees and infiltration of stormwaterwere suggested as mitigation measures. All of these proposed mitigation measures have been incorporated into the current proposal. Control of Flooding: The proposed works are not located within the Regional Storm Floodplain. Pollution: Sediment fencing will be in place throughout the duration of construction to ensure that no sediment will enter the wetland. Dynamic Beaches: Not applicable ■ Erosion: There are no geotechnical issues associated with this application. Conservation of Land: Some vegetation will be removed as part of this application. The applicant has agreed to maintain a 10 metre vegetated buffer on the easterly portion of the lot. . Plantings All plantings will be consistent with TRCA's Seed Mix Guidelines Policy Guidelines: This proposal is consistent with Section 4.2.2 G, Infilling, of TRCA's Valley and Stream Corridor Management Program. 580 CFN: 40989 - Application #: 464/08/PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: June 24, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.4 268 INDIAN ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 9, Concession M -253, (268 Indian Road), in the City of Toronto (Etobicoke York Community Council Area), Waterfront Watershed. The purpose is to develop within a TRCA Regulated Area of the Waterfront Watershed in order to facilitate the installation of an inground pool, hot tub and associated landscaping. Also proposed is the construction of a cabana /garage structure within the existing footprint of the detached garage. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. L01, Backyard Layout Plan, prepared by Griffin Koerth, dated May 7, 2008, received on June 24, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Waterfront Watershed in order to facilitate the installation of an inground pool, hot tub and associated landscaping. Also proposed is the construction of a cabana/garage structure within the existing footprint of the detached garage. The subject property is located south of Bloor Street West and east of Parkside Drive in the City of Toronto (Etobicoke York). Control of Flooding: This site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment and erosion control fence will be installed in order to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. 581 Erosion: A geotechnical investigation and slope stability assessment has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. The proposed building footprint will be adequately setback from the top of bank. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2. Development Guidelines within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 4097.1 - Application #: 447/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 30, 2008 8.1.5 47 KINGSWAY CRESCENT To construct, reconstruct, erect or place a building or structure on Part Lot 18, Plan 1686, (47 Kingsway Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the reconstruction of an existing retaining wall in the rear yard of the existing • single family detached dwelling. The existing retaining wall is to be removed. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Figure 6A, Addendum No. 1: Proposed Retaining Wall Replacement, prepared by Terraprobe Limited, dated March 17, 2008, received on June 4, 2008, redlined revised on June 30, 2008; • Drawing unnumbered, Landscape Plan, prepared by J. Mosher Landscape Plus Ltd., dated May 20, 2008, received on June 4, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 582 Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the reconstruction of an existing retaining wall in the rear yard of the existing single family detached dwelling. The existing retaining wall is to be- removed. The subject property is located south of Dundas Street West and east of Royal York Road in the City of Toronto (Etobicoke York). Control of Flooding: This site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment and erosion control fence will be installed in order to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: A geotechnical investigation and slope stability assessment has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: The proposal is not located closer to the top of bank than the existing structure. The appropriate tree protection fencing will be implemented. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations in the Arborist Report pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's ValIey and Stream Corridor Management Program. CFN: 40061 - Application #: 881/07/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 30, 2008 8.1.6 EMPIRE (BEYOND THE SEA) LTD. To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 370, Plan 164, (2242 and 2246 Lakeshore Boulevard West), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed as located on the property owned by Empire (Beyond The Sea) Ltd.. 583 The purpose is t� excavate and install shoring to facilitate the first phase of construction of an underground parking garage and foundation for a multi- storey mixed use development. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. ESC, Construction Management, Erosion and Sediment Control Plan, prepared by Al Underhill Associates Ltd., dated April 2008, stamped June 16, 2008, received June 17, 2008; • Drawing SH -1, Shoring Plan, Schedule Detail and General Notes, prepared by Tarra Engineering Inc., dated January 2008, Revision No. 3, Revised May 14, 2008, received June 26, 2008; • Drawing SH -2, Shoring Plan, Schedule Detail and General Notes, prepared by Tarra Engineering Inc., dated January 2008, Revision No. 3, Revised May 14, 2008, received June 26, 2008; • Drawing SH -3, Sections, prepared by Tarra Engineering Inc., dated January 2008, Revision No. 3, Revised May 14, 2008, received June 26, 2008; • Drawing SH -4, Sections, prepared by Tarra Engineering Inc., dated January 2008, Revision No. 1, Revised May 14, 2008, received June 26, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to excavate and install foundation shoring to facilitate the.first phase of construction of a mixed use development. The subject property is located on the north side of Lake Shore Boulevard West, east of Legion Road, west of Mimico Creek and south of the City -owned recently demolished "Sonar" treatment facility site. The "Bonar" site is currently subject to an on -going Environmental Assessment to identify a preferred alternative for a water quality treatment facility and recreation uses. The mixed use development (not part of this permit) is subject to on -going City of Toronto and TRCA review and approvals. The subject property is appropriately zoned for the use, was until recently developed with an industrial building, and is located within the spill area of the Mimico Creek floodplain. The zoning approval was based upon a comprehensive flood remediation program approved by TRCA staff that would remove this and other nearby sites from the spill area. The review of the proposed mixed use development has included a further detailed comprehensive flood remediation plan and this plan includes detailed grading for the subject property, Legion Road and a portion of the "Bonar" site in order to remove the subject property from the spill area. This plan has been substantially approved by TRCA staff. However, the proposed flood remediation works need to be secured prior to moving forward with the permit for the mixed use development. TRCA staff are comfortable that the approval of this permit for excavation and shoring will not compromise any further TRCA permit applications or City approvals, both of which are imminent, and will be consistent with City's excavation and shoring permit. The. development of the foundations and remainder of the mixed use development will be subject to a separate TRCA permit at a later date. 584 Control of Flooding: The proposal for excavation and installation of foundation shoring will result in the lowering of grades on the subject property. As such, the proposal will have no impact on the storage or conveyance of flood waters. Pollution: Temporary erosion control has been provided per the Greater Golden Horseshoe Area Conservation Authorities, Erosion and Sediment Control Guideline for Urban Construction. There are no geotechnical issues with the proposal. Dynamic Beaches: Not applicable. Erosion: The subject property is in immediate proximity to Lake Ontario and erosion of the watercourse is not of concern. Conservation of Land: The subject property was, until recently, fully developed with an industrial building in an urban context. The proposal will have no impact on the conservation of land. Plantings Off site renaturalization has been secured by the City of Toronto. • Policy Guidelines: The proposal is consistent with Section 4.2.2., Development within Non - Established /Highly Urbanized Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40453 - Application #: 084/08/TOR Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: June 26, 2008 8.1.7 9 KINGSWAY CRESCENT To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 204, Plan 1686, (9 Kingsway Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a front and rear two-storey addition to the existing single family detached dwelling. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A1.2, Site Plan, prepared by Richard Wengle Architect Inc., dated May 13, 2008, Revision No. 1, revised on June 11, 2008, received on June 25, 2008; 585 • Drawing unnumbered, Lot Drainage & House Siting Control Plan, prepared by R. G. McKibbon Limited, dated June 19, 2008, received on June 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a front and rear two- storey addition to the existing single family detached dwelling. The subject property is located north of Bloor Street West and east of Royal York Road in the City of Toronto (Etobicoke York). Control of Flooding: This site is not located within a Regional Storm Floodplain and. the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment and erosion control fence will be installed in order to prevent construction debris from entering the watercourse. • Dynamic. Beaches: Not applicable. Erosion: A geotechnical investigation and slope stability assessment has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: The proposed building footprint will be adequately setback from the top of bank. The • appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. ' Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41065 - Application #: 527/08/TOR Report Prepared by: Nicole. Moxley, extension 5284 For information contact: Mark Rapus, extension 5259 Date: June 30, 2008 586 8.1.8 41 HUMBERCREST BOULEVARD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and temporarily or permanently place, dump or remove any material, originating on-the site or elsewhere on Lot 19, 20, Plan 241, (41 Humbercrest Boulevard), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a sunroom and partially replace an existing deck to the rear of the existing single family detached dwelling. This proposal also involves the removal of an existing shed and retaining wall. The slope in the rear yard is to be restored. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Perma -Wood Solariums, dated March 22, 2007, Revision No. 1, revised on December 14, 2007, received on June 11, 2008; • Drawing No. A3, Elevations, prepared by Perma -Wood Solariums, dated January 2, 2007, Revision No. 4, revised on April 14, 2007, received on June 11, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a sunroom and partially replace an existing deck to the rear of the existing single family detached dwelling. This proposal also involves the removal of an existing shed and retaining wall. The slope in the rear yard is to be restored. The subject site is located west of Jane Street and north of Bloor Street West in the City of Toronto (Etobicoke York). Control of Flooding: This site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment and erosion control fence will be installed in order to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: .A geotechnical investigation and slope stability assessment has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. 587 Conservation of Land: The proposal is not located closer to the top of the bank than the existing structure. The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented and a Ravine Stewardship Plan will be implemented for the slope. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 39758 - Application #: 677/07/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Mark Rapus, extension 5259 Date: June 30, 2008 8.1.9 45 KINGSWAY CRESCENT To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 19, Plan 1948, (45 Kingsway Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new two- storey single family detached dwelling and a live crib slope stabilization structure which is to be installed at the base of the existing retaining wall in order to provide reinforced stability. The existing dwelling is to be demolished. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Culmone & Associates Ltd., dated March 2008, Revision No. 5, revised on April 30, 2008, received on June 3, 2008; • Drawing No. L2 of 4, Landscape Plan, prepared by Sunarts Design, dated March 2008, Revision No. 4, revised on March 31, 2008, received on April 15, 2008; • Drawing No. R2 of 4, Ravine Stewardship Plan, prepared by Sunarts Design, dated March 2008, Revision No. 4, revised on March 31, 2008, received on April 15, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 588 Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new ,two- storey single family detached dwelling and a live crib slope stabilization structure which is to be in stalled at the base of the existing retaining wall in order to provide reinforced stability. The existing dwelling is to be demolished. The subject property is located south of Dundas Street West and east of Royal York Road in the City of Toronto (Etobicoke York). Control of Flooding: This site is not located within a Regional Storm Floodplain and the proposal will have no impact on, the storage and /or conveyance of floodwaters. Pollution: A temporary sediment and erosion control fence will be installed in order to prevent construction debris.from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: A geotechnical investigation and slope stability assessment has been reviewed and approved by TRCA geotechnical engineering. staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: The 'proposed building footprint will be adequately setback from the top of bank: The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to:tree protection and maintenance during construction will be implemented and a Ravine Stewardship Plan will be implemented for the slope. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for. Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 39615 .- Application #: ,567/07/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert,'extension 5311 Date: June 30, 2008 . 8.1.10 182 ELLIS AVENUE To construct, reconstruct, erect or place a building or structure on Part Lot 64, 65, 66, 67; Plan REGISTERED PLAN M -663 BEING PARTS 3, 4.ON PLAN R -3060, (182 Ellis Avenue), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. 589 The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the reconstruction of a first floor sunroom addition and balcony to the rear of the existing one - storey single family detached dwelling. The existing covered porch area is to be demolished. - The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1, North and South Elevations, prepared by Bellissimo Architectural Designs, dated June 20, 2007, received on April 18, 2008, redlined by TRCA staff on June 30, 2008; • Drawing No. 6, Site Plan, prepared by Bellissimo Architectural Designs, dated February 25, 2008, received on April 18, 2008; • Drawing No. 9, Existing and Proposed Roof Plans, prepared by Bellissimo Architectural Designs, dated June 20, 2007, received on April 18, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the reconstruction of a first floor sunroom addition and balcony to the rear of the existing one - storey single family detached dwelling. The existing covered porch area is to be demolished. The subject property is located north of The Queensway, east of South Kingsway, on the west side of Ellis Avenue in the City of Toronto (Etobicoke York). Control of Flooding: This site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment and erosion control fence will be installed in order to prevent construction debris from entering the ravine. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The proposal does not project any further into the valley corridor than the existing dwelling. The appropriate tree protection fencing will be installed. 590 Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. _ Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40743 - Application #: 284/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 30, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.11 HUNTINGTON 1900 BAYVIEW INC. To site grade on 1900 Bayview Avenue, in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by Huntington 1900 Bayview Inc.. The purpose is to perform site grading within a Regulated Area of the Don River Watershed to facilitate servicing rehabilitation. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. S -002, Existing Service Reconstruction Servicing Plan, dated January 2008, prepared by RV Anderson Associates, received January 24, 2008; • Drawing No. S -003, Existing Service Reconstruction Grading & Erosion Control Plan, dated January 2008, prepared by RV Anderson Associates, received January 24, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of replacing a section of sanitary and storm sewer pipes and two manholes at the upper portion of the valley wall of the Burke Brook Ravine. The works are required in order to service a future residential condominium development that will be constructed on the tableland portion of the property. TRCA staff have reviewed the proposed works and anticipate a net ecological gain after the works are complete as the owner has entered into an extensive ravine stewardship program with the City of Toronto. Control of Flooding: The proposed works are not located within the Regional Storm Floodplain. As such, there are flooding concerns. 591 . Pollution: Appropriate sediment controls will be in place throughout the duration of construction to ensure that no sediment will enter the watercourse. Dynamic Beaches: Not applicable Erosion: All grades will be restored to a maximum 3:1 slope once works are complete. TRCA technical staff have reviewed the proposal and do not anticipate any erosion issues as a result of the rehabilitation. Conservation of Land: There will be removal of vegetation as part of this application. However, the applicant has entered into an extensive ravine stewardship program with Urban Forestry. The applicant will be providing a large area of restoration in the valley to compensate for the loss of vegetation as part of the proposal. Plantings All planting will be native and will be consistent with TRCA Seed Guidelines. Policy Guidelines: This proposal is consistent with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40429 - Application #: 070 /08/TOR Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: June 24, 2008 8.1.12 21 DON RIDGE DRIVE • To construct, reconstruct, erect or place a building or structure and site grade on Lot 14, Plan 3549, (21 Don Ridge Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of an in- ground pool and spa. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. L.1, Site Plan, prepared by Halyna Godzyk Landscape Architect, dated April 7, 2008, received by TRCA May 28, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 592 Proposal: The proposed works include. construction) of an in- ground pool and spa in the rear yard at 21 Don Ridge Drive in the City of Toronto. The site is located north -of York Mills Road, east of Yonge Street. Control of Flooding: The site is not located in a Regional Storm Floodplain. Pollution: Sediment control fencing will be installed prior to commencement of any construction activities and will remain in place until any exposed areas have been stabilized. Dynamic Beaches: Not applicable Erosion: A geotechnical report has been reviewed and approved by TRCA geotechnical engineering staff and the proposed works will be adequately setback from the Top of Bank, and will have no impact on slope stability. Conservation of Land: No significant vegetation will be removed to facilitate construction and the appropriate tree . protective fencing will be installed. Plantings Native tree shrubs and, seed mix will be planted. .Policy Guidelines: This proposal is consistent with Section 4.2.2.E, Property . Improvements and Ancillary Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 40751 - Application #: 272/08/TOR Report Prepared by:'Michelle-Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July, 2, 2008 8.1.13 OAKDALE GOLF AND COUNTRY CLUB To construct, reconstruct, erect or place a building or structure and site grade on 2388 Jane. Street, in the City of Toronto (North York - Community Council Area), Humber River Watershed as located on the property'owned by Oakdale Golf and Country Club. The purpose is to construct an addition within a Regulated Area of the Humber River Watershed. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: 593 • Drawing No. A102, Site Plan, dated March 17, 2008, prepared by Core Architects Inc., received June 3, 2008; • Drawing No. A100, Pool and Cabana Site Plan, dated March 17, 2008, prepared by Core Architects Inc., received June 3, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of construction an addition to an existing building on a golf course within a Regulated Area of the Humber River Watershed. The existing building and proposed addition are located in a tableland portion of the property. Although most of the golf course is located within the valley, the building are adequately set back from top of bank. It is also proposed to demolish the existing inground swimming pool and construct a larger inground pool adjacent to the main clubhouse. Control of Flooding: The proposed works are not located within the Regional Storm Floodplain. Pollution: As the works are adequately set back from the feature, sediment fencing is not required. • Dynamic Beaches: Not applicable Erosion: TRCA technical staff have reviewed the application and been on site. They have determined • that there are no erosion issues associated with this proposal. Conservation of Land: There will be some vegetation removed as part of this application. The applicant will be • providing 3:1 compensation for any vegetation removed. Plantings All plantings will be in accordance with TRCA Seed Mix Guidelines. Policy Guidelines: This proposal is consistent with Section 4.2.2.C, Minor Additions, of TRCA's Valley and Stream Corridor Management Program. CFN: 40867 - Application #: 368/08/TOR Report Prepared by: Shannon McNeill; extension 5744 For information contact: Steve Heuchert, extension 5311 Date: June 26, 2008 594` 8.1.14 TORONTO TRANSIT COMMISSION To construct reconstruct; erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Dufferin Street, from Finch Avenue West to approximately 400 metres North, in the City of Toronto (North York Community ' Council Area), Don River Watershed as located on the property owned by City of Toronto.. The purpose is to construct a bus only lane from Downsview Station to York University Keele Campus. The permit will be issued for the period of July 11, 2008 to.July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to provide revisions to drawings and documentation, and Landowner Authorizations for works outside the Busway right -of -way, dated June 27, 2008; `received June 27, 2008; prepared by the TTC. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to construct exclusive bus only lanes from Downsview Station to York University Keele Campus. The proposed is being constructed in phases /sections. The sections that require TRCA permit include Area A, (Hydro Corridor.from Dufferin to Keele Avenue), Area B /C /D (Intersection of Finch and Dufferin and the Jug Handle) and Area E (York University). This permit involves sections B /C /D which consists of exclusive bus -only lanes northbound and southbound on Dufferin,Street,.exclusive bus -way across the Hydro One. Transmission corridor, the "Jug - Handle" and the bus -only lanes on Dufferin Street from the intersection of Finch Avenue to 350 m north, ending at the Hydro Corridor. Control of Flooding: Staff has reviewed the geotechnical reports and has no concerns with the flooding. Pollution: Standard sediment and erosion control measures will be implemented and maintained for the duration of construction and until the site is stabilized and restored in order to prevent construction generated.sediment from entering any watercourse. Sediment and'erosion control has been provided per the Greater Golden Horseshoe Area Conservation Authorities, Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: Staff has reviewed the proposal and has no slope stability or geotechnical concerns with the proposed works. 595 • Conservation of Land: With erosion and sedimentation plans in effect the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40557 - Application #: 150/08/TOR Report Prepared by: Renee Afoom, extension 5714 For information contact: Renee Afoom, extension 5714 Date: June 30, 2008 8.1.15 TORONTO TRANSIT COMMISSION To construct, reconstruct, erect or place a building or structure on York University Campus, 4700 Keele Street , in the City of Toronto (North York Community Council Area), Humber River Watershed as located on the property owned by York University. The purpose is to construct a portion of the York University Busway from Murray Ross Parkway to York Boulevard on the York University Keele Campus. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance.with the following documents and plans which form part of this permit: • • Letter of Undertaking to provide revisions to drawings and documentation, and Landowner Authorizations for works outside the Busway right -of -way, dated June 27, 2008; received June 27, 2008; prepared by the TTC. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the construction of a portion of the new busway that will link Downsview Station and York University. This application is for the construction of new two -lane, bi- directional, exclusive busway through York University, extending from Murray Ross Parkway to York Boulevard. The proposed is being constructed in phases /sections. The sections that require TRCA permit include Area A (Hydro Corridor from Dufferin to Keele Avenue), Area B /C /D (Intersection of Finch and Dufferin and the Jug Handle) and Area E (York University). This permit includes Section E which covers the York University area. The busway will run adjacent and parallel to a proposed road and development directly to the west of the campus. A section of the busway just south of Pond Road traverses the area of interference of a regulated wetland associated with the Boynton Woodlot. 596 Control of Flooding: Staff has reviewed the Stormwater Management Report for the busway, and confirms that no adverse impacts to the storage or conveyance of flood waters are anticipated as a result of this project. Pollution: Appropriate controls will be implemented and maintained throughout construction to prevent sediment and other deleterious substances from impacting adjacent natural features. Dynamic Beaches: Not applicable. Erosion: There are no slope stability or geotechnical concerns with the proposed works. Conservation of Land: Staff has reviewed the proposal and has not concerns regarding the conservation of land. Plantings Some tree removals will be required to the edge of an existing woodlot, outside the Regulation Limit. Upon request by the land owner, the proponent will undertake restoration plantings along the edge of the Boynton Woodlot to enhance the existing ecological system in compensation for the removals that will be occurring further south. Policy Guidelines: The proposal complies with Section 4.3, Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program. CFN: 40558 - Application #: 151/08/TOR Report Prepared by: Renee Afoom, extension 5714 For information contact: Renee Afoom, extension 5714 Date: June 30, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.16 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 3, 4, 5, 6, Plan 1404, (4331 Lawrence Avenue East), in the City of Toronto (Scarborough Community Council Area), Highland Creek . Watershed as located on the property owned by City of Toronto. The purpose is to install a sanitary sewer connection, expand an existing stormwater outfall and install a gravel pedestrian trail to facilitate the development of a residential subdivision. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: 597 • Figure No. 2, Proposed Site and Siltation Control Plan, Tree Inventory and Preservation Plan, prepared by Kuntz Forestry Consulting Inc., dated August 20, 2007, Revision No. 4, revised June 1, 2008, received June 12, 2008; • Drawing No. L -4, Edge Management Planting Plan, prepared by Terraplan, Revision No. 6, Revised June 2, 2008, received June 12, 2008; • Drawing No. L -5, Landscape Details, prepared by Terraplan, Revision No. 6, Revised June 2, 2008, received June 12, 2008; Drawing No..9, Storm and Sanitary Outfall, prepared by David Schaeffer Engineering, dated April 2007, stamped May 22, 2008, received June 12, 2008; • Drawing No. 10, Siltation and Erosion Control Plan, prepared by David Schaeffer Engineering, dated April 2007, stamped May 22, 2008, received June 12, 2008; • Drawing No. 10A, Siltation Control Plan for Outfall, prepared by David Schaeffer Engineering, dated June 2008, received June 12, 2008, redlined by TRCA Staff; • Drawing No. S1, Extension of Ex. Headwall Plan, prepared by G. D. Jewell Engineering Inc., dated June 2007, received June 12, 2008; • Drawing No. S2, Extension of Ex. Headwall Sections, prepared by G. D. Jewell Engineering Inc., dated June 2007, received June 12, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to install a sanitary sewer connection, expand an existing stormwater outfall and install a gravel pedestrian trail to facilitate the development of a residential subdivision located south of Lawrence Avenue East and Manse Road in the Highland Creek Watershed in the City of Toronto. The subdivision is to be constructed by a non - profit agency specializing in affordable home - ownership on a site that was part of the former "Scarborough Expressway" lands deemed surplus by the City of Toronto. The subdivision, which is located outside of the TRCA's regulated area, has been subject to both Zoning By -law Amendment and Draft Plan of Subdivision approvals at the municipal level. The following works on the remaining City-owned valley lands are required in order to service the proposed development: 1) a sanitary sewer connection to an existing sanitary sewer located north of the tributary of Highland Creek; 2) the installation of an new 600 mm diameter concrete storm sewer alongside an existing storm sewer; 3) expansion of an existing storm headwall; and 4) installation of a gravel pedestrian path overtop of the sanitary and storm infrastructure. • Control of Flooding: The proposal will have no.impact on the control of flooding. Pollution: Temporary erosion control has been provided per the Greater Golden Horseshoe Area Conservation Authorities, Erosion and Sediment Control Guideline for Urban Construction. There are no geotechnical issues with the proposal. Dynamic Beaches: Not applicable. 598 Erosion: The subdivision includes a stormwater management pond designed to control the flows to TRCA staff satisfaction. Conservation of Land: The proposal will involve open cut construction in an existing sewer easement as this was deemed the least intrusive construction methodology. The removal of two trees is required and there is potential for injury to one other tree. A significant planting plan for the subdivision and infrastructure works has been secured through the municipality with the assistance of TRCA staff. With erosion and sedimentation plans in effect the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). Plantings The planting plan has taken place in another portion of the valley. In addition, an edge management and planting plan will be implemented around the infrastructure and the southern portion of the subdivision. Policy Guidelines: The proposal complies with Section 4.3, Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. CFN: 39828 - Application #: 729/07/TOR Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: June 23, 2008 8.1.17 109 SYLVAN AVENUE To construct, reconstruct, erect or place a building or structure on Lot 56, Plan 4351, (109 Sylvan Avenue), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to develop within a Regulated Area of the Lake Ontario Waterfront to facilitate construction of a new two- storey dwelling with deck and in- ground pool. The existing dwelling is to be demolished. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -1, Site Plan, unknown author, dated January 2008, received by TRCA February 8, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 599 Proposal: The proposed works include construction of a new two- storey dwelling, deck and in- ground • pool at 109 Sylvan Avenue in the City of Toronto. The site is located in the Scarborough Bluffs section of Toronto's Waterfront, south of Kingston Road, east of Markham Road. The existing dwelling is to be demolished. Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: Sediment control fencing will be erected before commencement of any construction or grading works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. Dynamic Beaches: Not applicable Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposed works will be adequately set back from the Long- Term - Stable Top -of -Bank. Conservation of Land: No significant vegetation will be removed as a result of construction and appropriate tree protection fencing will be installed. Plantings Native tree shrub and seed mix will be planted. Policy Guidelines: • The proposal is consistent with Section 4.2.2.D, Replacement Structures, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40454 - Application #: 085/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 2, 2008 8.1.18 7 LYNNDALE ROAD To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 40, Plan 3169, (7 Lynndale Road), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to develop within a Regulated Area of the Lake Ontario Waterfront to facilitate construction of a new two- storey dwelling, deck, in- ground pool and patio. The existing dwelling and.detached garage are to be demolished. 600 The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. TRC 2, Site Plan, prepared by Moss Sund, dated December 2007, received by TRCA May 20, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: . The proposed works include construction of a new two - storey_ dwelling with deck, in- ground pool and patio at 7 Lynndale Road in the City of Toronto. The site is located south of Kingston Road, east of Victoria Park Avenue. The existing dwelling and detached garage are to be demolished. Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: Sediment fencing is not required as the proposed works are adequately setback from the valley feature. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed to facilitate construction. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent.with Section 4.2.2.D, Replacement Structures, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40890 - Application #: 389/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 2, 2008 8.1.19 5 FENWOOD HEIGHTS To construct, reconstruct, erect or place a building or structure on Part Lot 59, Plan 3757, (5 Fenwood Heights), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. 601 The purpose is to develop within a Regulated Area of the Lake Ontario Waterfront to facilitate construction of a new two- storey dwelling. The existing in- ground pool is to be retained and the existing dwelling is to be demolished. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Lot Drainage & House Siting Control Plan, prepared by R.G. . McKibbon Limited, dated April 29, 2008, received by May 12, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a new two- storey dwelling at 5 Fenwood Height8 in the City of Toronto. The site is located south of Kingston Road, east of Brimley Road. The existing dwelling is to be demolished. Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: Sediment fencing is not required as the proposed works are adequately setback from the valley feature. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed to facilitate construction. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.D, Replacement Structures, of the TRCA's Valley • and Stream Corridor Management Program. CFN: 40885 - Application #: 385/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 2, 2008 602 8.1.20 9 CLEMES DRIVE To construct, reconstruct, erect or place a building or structure on Part Lot 12, Plan 3167, (9 Clemes Drive), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. The purpose is to develop within a Regulated Area of the Highland Creek Watershed to facilitate construction of a new two- storey dwelling. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Lot Grading and House Siting Plan, prepared by Ivan B. Wallace, dated January 30, 2008, received by TRCA June 27, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include the construction of a new two- storey dwelling and landscaping retaining wall at 9 Clemes Drive in the City of Toronto. The site is located north of Lawrence Avenue East, west of Port Union Road. Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: A sediment control fence will be erected before commencement of any construction or grading works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. Dynamic Beaches: Not applicable Erosion: A geotechnical report of slope stability has been reviewed and approved by TRCA geotechnical engineering staff and the proposed works will be setback a minimum of 7.5 metres from the Long- Term - Stable Top -of- Slope. Conservation of Land: No significant vegetation will be removed as a result of construction and appropriate tree fencing will be installed. Plantings Native tree shrub and seed mix will be planted. Policy Guidelines: The proposal is consistent with Section 4.2.2.G, Infilling, of TRCA's Valley and Stream Corridor Management Program. 603 CFN: 40553 - Application #: 141/08/TOR • Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 2, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.21 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on (Reid Manor Park), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by City of Toronto. The purpose is to construct, site grade, permanently place material within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of the Rosemount Heights Combined Sewer Replacement on property owned by the City of Toronto and Toronto and Region Conservation Authority (TRCA) The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • • Drawing Number U- 101 -001 to U -101 -011; City of Toronto; Rosemount Heights Combined Sewer; prepared by R.V. Anderson Associates Limited; stamped by Engineer August 28, 2006; received August 29, 2006; • Drawing Number U- 115 -001 to U- 115 -002; City of Toronto; Rosemount Heights Combined Sewer; prepared by R.V. Anderson Associates Limited; stamped by Engineer August 28, 2006; received August 29, 2006; • Drawing Number U- 263 -003 to U- 263 -004; City of Toronto; Rosemount Heights Combined Sewer; prepared by R.V. Anderson Associates Limited; stamped by Engineer August 28, 2006; received August 29, 2006. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This is a re- issuance of an existing permit which expires in September 2008, in order to allow the City to complete the works. The purpose of the project is to replace the Rosemount Heights Combined Sewer in the City of Toronto from Douglas Crescent to the North Toronto Sanitary Trunk Sewer. Construction methods will include both open cut and directional drilling. The existing Rosemount Heights combined sewer was constructed in the 1930's to service the surrounding developed areas, the sewer crosses under the Don River and is difficult to maintain. It is presently in poor condition, and a number of failures have occurred in recent years. A Class Environmental Assessment for this project was conducted in 1996 to evaluate :alternatives for replacing the combined sewer, the City of Toronto updated this Class EA in 2005. The combined sewer will ultimately function as a sanitary sewer following the development and implementation of stormwater management in the Rosemount Heights area. 604 A portion of the proposed sewer will be installed across Toronto and Region Conservation Authority (TRCA) property and will run through Reid Manor Park within the Lower Don River parklands. The Reid Manor Park lands are owned by TRCA and managed by the City of Toronto Parks, Forestry and Recreation Department. The City of Toronto has formally requested a permanent easement from TRCA for the sewer, between Bayview Avenue and Millwood Road, west of Don Valley Parkway. An archaeological investigation has been completed by TRCA's Archaeology staff. Control of Flooding: TRCA Water Management staff have reviewed the proposal and are satisfied that there will be no impact on the storage or conveyance of flood waters. Pollution: Standard erosion control measures (sediment fence, temporary rock check dam) will be maintained for the duration of construction and until the site is stabilized and restored. Dynamic Beaches: Not applicable Erosion: There are no geoteclinical /slope stability issues associated with the development. Conservation of Land: As watercourses will not be impacted by the development, no fisheries concerns will result. Plantings All lands disturbed by construction will be stabilized and, where deemed appropriate by TRCA staff, revegetated with native woody and herbaceous plant material in accordance with existing TRCA landscaping guidelines. The landscape and planting plan will be coordinated by The City of Toronto Parks Department. A net ecological gain will be achieved for this site, which will include invasive species management. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 40998 - Application #: 472/08/TOR Report Prepared by: Laura Richards, extension 5723 For information contact: Laura Richards, extension 5723 Date: June 26, 2008 CITY OF VAUGHAN 8.1.22 11290 KEELE STREET To construct, reconstruct, erect or place a building or structure on Part Lot 29, Concession 4, (11290 Keele Street), in the City of Vaughan, Don River Watershed. 605 The purpose is to replacement an attached garage with a 2 storey addition as well as construct a 1 storey addition to an existing dwelling within a Regulated Area of the Don River Watershed. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. A2, prepared by the applicant, dated June 1, 2008, received by the TRCA June 13, 2008, redline revised to indicate the removal of excess fill material; • • Ground Floor Plan, Drawing No. A3, prepared by the applicant, dated June 1, 2008, received by the TRCA June 13, 2008. RATIONALE The.application was reviewed by staff on the basis of the following information: Proposal: The purpose is construct a two storey addition to replace an existing attached garage as well as a one storey addition to an existing dwelling within a Regulated Area of the Don River Watershed. The subject property is in close proximity to a tributary of the West Don River and is partially within the Regional Storm Flood Plain. The proposed works are located outside of the Regional Storm Flood Plain (approximately 10 metres from the edge of the flood plain) and will not encroach further towards the flood plain. Based upon the site plan provided by the applicant and a site visit conducted by TRCA staff June 27, 2008, the proposed works are located within a sodded area approximately 15 metres away from a gentle slope which form a part of the stream corridor. . Control of Flooding: TRCA water resources staff are satisfied that the proposed works will not impact the storage or conveyance of flood waters as the works are located outside of the flood plain. Pollution: The area of disturbance is surrounded by a flat sodded area. TRCA staff are satisfied that sediment will not be transported to the stream corridor located approximately 15 metres away from the area of disturbance. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: - As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings • All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. 606 Policy Guidelines: The proposal is consistent with Section 4.2.2 C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program. CFN: 41038 - Application #: 500 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: June 30, 2008 8.1.23 11 OLDFIELD STREET To construct, reconstruct, erect or place a building or structure and site grade on Lot 43, Plan 4626, (11 Oldfield Street), in the City of Vaughan, Don River Watershed. The purpose is to construct a replacement home within a Regulated Area of the Don River Watershed. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. S.P., prepared by Georgio Lolos, dated June 17, 2008; received by the TRCA June 18, 2008 redline revised to indicate the erection of sediment control fencing and removal of excess fill material; • Landscape Plan, Drawing No. L.P., prepared by Georgio Lolos, dated June 17, 2008; received by the TRCA June 18, 2008; • Basement Plan, Drawing No. A -1, prepared by Georgio Lolos, dated June 17, 2008; received by the TRCA June 18,2008; • First Floor Plan, Drawing No. A -2, prepared by Georgio Lolos, dated June 17, 2008; received by the TRCA June 18, 2008; • Second Floor Plan, Drawing No. A -3, prepared by Georgio Lolos, dated June 17, 2008; received by the TRCA June 18, 2008; • Front (West) Elevation, Drawing No. A -4, prepared by Georgio Lolos, dated June 17, 2008; received by the TRCA June 18, 2008; • Rear (East) Elevation, Drawing No. A -5, prepared by Georgio Lolos, dated June 17, 2008; received by the TRCA June 18, 2008; • Right (South) Elevation, Drawing No. A -6, prepared by Georgio Lolos, dated June 17, 2008; received by the TRCA June 18, 2008; • Left (North) Elevation, Drawing No. A -7, prepared by Georgio Lolos, dated June 17, 2008; received by the TRCA June 18, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 607 Proposal: The purpose is to construct a replacement dwelling with rear porch.within a Regulated Area of the Don River Watershed. According to our mapping, the proposal is located within the Regional Storm Flood Plain. The Regional Flood Elevation for the subject property is 229.9 metres above sea level (m.a.s.I.). A Topographical Survey produced by David Horwood Limited, dated July 25, 2007 indicates that the entire property may be outside of the Regional Storm Flood Plain; however, the surveyed elevation is within the 0.5 metre margin of error inherent within TRCA floodmapping. As such, the replacement dwelling has been built to a floodproofing level of the Regional Flood Elevation plus 0.3 metre freeboard (230.2 m.a.s.I.) and limited to an overall expansion in floor area of 50% over the existing dwelling. As no grading works will occur and excess fill material will be removed from the subject .property as redlined on the Site Plan, there will be no impacts on flood storage and conveyance capacity. Control of Flooding: According to our mapping, the proposed works are located within the Regional Storm Flood Plain; however, given the Topographical Survey produced by the applicant and the margin of error on TRCA floodmapping, TRCA water resources engineering staff are satisfied that the proposed development will not have a impact on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be installed and maintained during the duration of demolition of the existing dwelling and construction of the replacement dwelling to prevent sediment from entering the adjacent watercourse and stormwater drainage system. Dynamic Beaches: Not applicable. . Erosion: There are no geotechnical issues associated with this application. Conservation of Land: • As the watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be .negatively impacted by the project. Plantings All disturbed area will be restored to the existing sodded condition or enhanced over existing conditions with shrubs or trees and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program. 608 CFN: 41031 - Application #: 490 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: June 30, 2008 - TOWN OF AJAX 8.1.24 RIO -CAN REAL ESTATE INVESTMENT TRUST To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 11, Concession 3, (1943, 1945, 1947, 1949, 1951, 1953 Ravenscroft Road), in the Town of Ajax, Duffins Creek Watershed as located on the property owned by Rio -Can Real Estate Investment Trust. The purpose is to alter a watercourse, fill, regrade and develop to facilitate the construction of a commercial plaza, stormwater management pond and wetland treatment facility. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking from RioCan Real Estate Investment Trust, committing to completing all outstanding TRCA technical requirements and completion and registration of a Hydro One easement to satisfaction of TRCA staff, dated June 24, 2008, received June 26, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to alter a watercourse, fill, regrade and develop to facilitate the construction of a commercial plaza, stormwater management pond and wetland treatment facility. The subject property is located on the south west corner of Taunton Road and Westney Road in the Duffins Creek Watershed in the Town of Ajax. The property is currently undeveloped and clear of vegetation. The site includes a small intermittent drainage feature tributary of Miller's Creek that accommodates upstream drainage and provides contribution to and supports downstream fish habitat in Miller's Creek. The feature is open upstream of Taunton Road but piped downstream before reappearing at Miller's Creek. The subject property is designated for development in the Ajax Official Plan and was subject to a Zoning Amendment and Site Plan review at the municipality for the proposed commercial plaza. The site is not identified in TRCA's Regulation Mapping, but the drainage feature and associated 15 metre offset meets the criteria for regulation. The proposal is to pipe the drainage feature to accommodate upstream drainage and provide an innovative enhanced swale on an easement over Hydro One lands downstream of a new stormwater management pond to mitigate the impacts. The proponent has also committed to an on -going monitoring program to measure the planned effectiveness of the enhanced swale. 609 Conditional Approval: TRCA staff are satisfied with the technical merits of the proposal (i.e. no impact to the control of flooding, pollution, erosion or conservation of land) but have not had a chance to review the final details. In addition, the proponent has not secured the appropriate legal easement over Hydro One lands, although an agreement in principal has been reached with Hydro One. As such, staff is requesting permission from the Executive Committee to allow staff to approve the • issuance of the Ontario Regulation 166/06 permit for this project subject to TRCA's Ecology staff confirming that the details of the plan are acceptable and the proponent obtaining an easement over the Hydro One lands for the enhanced swale works. Control of Flooding: The stormwater pipe and facilities are designed to convey storm flows and will have no impact on up or down - stream flooding. Pollution: The proposed enhanced swale includes variable geometry for the low flow channel to replicate a natural swale or intermittent channel system and a series of pocket wetland /wet meadow features. These features will provide additional riparian diversity, improve sediment and flow - retention and detention and increase opportunity for infiltration. As such, the proposal, along with other stormwater management facilities, will provide the appropriate water quality treatment and will have no impact on pollution. Dynamic Beaches: Not applicable. Erosion: The proposed enhanced swale draws upon the principals of fluvial geomorphology and involves an assessment of existing corridor conditions. The main objective is to create a stable corridor that replicates and enhances the current corridor function. In addition, the stormwater management facility for the site is designed to meet the TRCA's erosion control requirements. The proposal will therefore have no impact on erosion. Conservation of Land: The proposed enhanced swale will maintain the integrity and continuity of the channel form, provide a source of organic materials to downstream fisheries, mimic and enhance retention and detention functions for flow, enhance infiltration to provide water balance for the development, and provide for increase in riparian and terrestrial biodiversity. The proposal will provide the appropriate mitigation to avoid a Harmful Alteration, Disruption or Destruction of fish habitat. TRCA staff will issue a.Letter of Advice on behalf of DFO. Plantings Both the storrriwater management facility and enhanced swale /wetlands will include native trees, shrubs and grasses. . Policy Guidelines: The proposal complies with Section 4.1, New Development, and Section 4.3., Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. 610 CFN: 41041 - Application #: 505 /08 /AJAX Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: June 26, 2008 - 8.1.25 RUNNYMEDE DEVELOPMENT CORPORATION LTD. To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 5, Concession 1, (Kingston Road and Salem Road), in the Town of Ajax, Carruthers Creek Watershed as located on the property owned by Runnymede Development Corporation Ltd.. The purpose is to place and regrade fill and develop to facilitate the construction of a residential subdivision and retrofit an existing stormwater management pond. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking committing to address all TRCA detailed comments, prepared by Sabourin Kimble and Associates Ltd., on behalf of Runnymede Development Ltd., dated June 16, 2008, received June 19, 2008. RATIONALE � The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to place and regrade fill and develop to facilitate the construction of a residential subdivision and retrofit an existing stormwater management pond in an area located south of Kingston Road, west of Carruthers Creek and north of Highway 401. The Draft Plan of Subdivision, referred to as the "Pickering Beach Road Subdivision," has been approved with conditions and an earlier TRCA permit (No. C- 07360) has been approved for a temporary access road and stockpile fill. The following works are required in order to proceed with construction: 1) provide a cut and fill balance along the edge of the floodplain that was disturbed a number of years ago by filling; 2) retrofit an existing stormwater management pond to today's standards; 3) install wetland habitat restoration; and 4) develop residential lots. Conditional Approval: TRCA staff has met with the proponent and Town of Ajax representatives to coordinate the conditions of Draft Plan of Subdivision approval. Draft Plan Conditions that must be satisfied include the development of a monitoring program for the pond retrofit in order to monitor the effectiveness of best management practices such as infiltration facilities, and conveyance of the valley lands to public ownership, among others. TRCA staff are satisfied with the technical merits of the proposal (i.e. no impact to the control of flooding, pollution, erosion or conservation of land) but have not had a chance to review the final details. As such, staff is requesting permission from the Executive Committee to allow staff to approve the issuance of the Ontario Regulation 166/06 permit for this project subject to TRCA's.Ecology staff confirming that the details of the plan are acceptable. 611 Control of Flooding: The subject property was historically filled in places and includes an old stormwater pond in the valley. Given the disturbed nature of the site and the fact that there is little native vegetation along the outer edges of the stream corridor, the proposal includes a cut and fill balance, with some cut and fill on the west side of Carruther's Creek stream corridor and some cutting on the east side, along with a comprehensive retrofit of the pond. The cut and fill is located in excess of 80 metres from the edge of the creek. A satisfactory flood study was provided and confirms that there will be no impact on the storage and conveyance of flood waters. Pollution: • Temporary sediment control has been provided per the Greater Golden Horseshoe Area Conservation Authorities, Erosion and Sediment Control Guideline for Urban Construction. There are no geotechnical issues with the proposal. Dynamic Beaches: Not applicable. Erosion: The stormwater management pond, infiltration devices and wetland treatment facilities are designed to meet the erosion control requirements for the Carruther's Creek watershed. Conservation of Land: The area of cut and fill does not include•any significant vegetation and will be fully restored. The development Tots are set back a minimum of 10 metres from the floodplain limits. Plantings The western cut and fill area will be renaturalized with native trees, shrubs and seed mix along with the pond retrofit, wetland treatment facilities and the remainder of the stream corridor to be conveyed to public ownership. The eastern cut and fill area is currently used for agriculture and will continue to be until such time as the adjacent lands designated for employment uses are granted approval. Policy Guidelines: This proposal complies with Section 4.3., Infrastructure and Servicing, and Section 4.1, New Development, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40472 - Application #: 091 /08 /AJAX Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: June 25, 2008 612 CITY OF BRAMPTON AND TOWN OF CALEDON 8.1.26 REGIONAL MUNICIPALITY OF PEEL To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and interfere with a wetland at Mayfield Road and Kennedy Road in the City of Brampton and Town of Caledon,' Etobicoke Creek Watershed as.Iocated on the property owned by the Regional Municipality of Peel, the City • of Brampton and the Town of Caledon. The purpose is to construct, reconstruct, erect or place a building or structure•(road widening, stormwater management pond, retaining walls, watermain, sanitary sewer; stormsewer), site •grade,'temporarily-or permanently place, dump or remove any material; originating on site or elsewhere and interfere with a wetland (road widening) at Mayfield Road and Kennedy Road in the City of Brampton and Town of Caledon, Etobicoke Creek Watershed. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the • ,following documents and plans which form part of this permit: • Letter of Undertaking to provide revisions to the engineering drawings to the ' satisfaction of TRCA; dated June 26, 2008; received June 26, 2008; prepared by Region of Peel. RATIONALE . The application was reviewed by staff on the basis of the following information: Proposal: • This proposal consists of widening Mayfield Road from 2 lanes to 4.Ianes from approximately Inder Heights Drive to east of Kennedy Road and constructing a stormwater management pond (SWM) on the northeast corner of Mayfield Road and Kennedy Road. The road widening will be constructed with curb and gutter including an asphalt sidewalk on the south side of • Mayfield Road up to approximately Stonegate Drive. Additional milling will. take place along Mayfield Road from east of Summer Valley Drive to approximately. Etobicoke Creek. Watermains will be constructed. along Mayfield Road and continue north on Kennedy Road. A 525mm diameter sanitary sewer will be constructed along,Mayfield Road, west of Kennedy and then north on Kennedy Road.. Storm sewers will be located throughout the project limits. A gabion retaining wall will be constructed on the north side of Mayfield Road at Inder Heights Drive, and: west.of Kennedy Road. Another retaining wall will be constructed on the south side of Mayfield Road from just east.of Kennedy Road to just east of Stonegate Drive. 613 A sheet pile retaining wall will be installed on the northeast side of Mayfield Road and Kennedy Road to protect the Provincially Significant Wetland (PSW) during widening of the road and construction of the SWM pond. The inlet to the SWM pond will be located off Mayfield Road where a concrete headwall will be constructed at the entrance to the forebay. A second concrete headwall will be constructed on the northeast corner of Mayfield Road and Kennedy Road. The outlet to the SWM pond will be constructed such that the treated water will discharge into the adjacent PSW. During construction of the road a temporary sedimentation pond will be constructed in the area of the future SWM pond and envirotanks will be located on site to allow for treatment of any dewatered material. A maintenance access road will be located across the forebay overflow weir. A green gabion wall will be constructed along the east side of the SWM pond between the SWM pond and the PSW, and a second gabion wall will be constructed on the west side of the SWM pond between the SWM pond and Kennedy Road. Control of Flooding: There will be no impacts to the control of flooding. Pollution: Standard erosion control measures (heavy duty silt fence, silt soxx, rock flow check dam, ditch chexx) will be implemented for the duration of construction, and until the site is restored, in order to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There will be no geotechnical /slope stability issues associated with the proposal: Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). This application is subject to the Ministry of Natural Resources (MNR) warmwater fisheries timing window. All in or near water works must be completed between July 1 and March 31. Plantings All disturbed areas will be restored with native /non- invasive species.- A net ecological gain will be achieved at the location of the SWM pond (62 trees, 472 shrubs, 760 emergent plants) and along Mayfield Road*(105 trees, 702 shrubs, 31 perennials, plantings beds for annuals). Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. . CFN: 36211 - Application. #: 038/05 /CAL Report Prepared by: Sharon Lingertat, extension 5717 For information contact: Sharon Lingertat, extension 5717 Date: June 26, 2008 614 TOWN OF WHITCHURCH - STOUFFVILLE 8.1.27 REGIONAL MUNICIPALITY OF YORK To construct, reconstruct, erect or place a building or structure, site grade and alter a watercourse on West side of Kennedy Road at #12900 Kennedy, South of Bethesda Sideroad, in the Town of Whitchurch - Stouffville, Rouge River Watershed as located on the property owned by Regional Municipality of York. The purpose is to construct a structure ( remove 800mm dia. x 13 m length Corrugated Steel Pipe (CSP) driveway culvert and replace with same size CSP) within a Regional Storm Floodplain; to excavate and place fill (during culvert removal and replacement) in a Regulated Area; to temporarily alter a watercourse (Kennedy Road Tributary) during the coldwater timing window (July 1 to September 15) through a dam and pump around method in order to work in the dry. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Letter,of Undertaking (to provide revisions to engineering and landscape drawings and to provide landowner authorization) dated Friday June 27, 2008; received Wednesday July 2, 2008; prepared by the Regional Municipality of York RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the removal of the existing 800m diameter x 13m length corrugated steel pipe (CSP) driveway culvert and replacement with an equivalent sized CSP in a. Regulated Area and within a Regional Storm Floodplain. This driveway culvert is a unique situation since the Kennedy Road Tributary follows the western ditch and fish arealso evident in the watercourse. Works will involve the excavation and fill placement for the removal and replacement of the culvert as well the watercourse will be altered temporarily during the coldwater timing window (July 1 to September 15) through a dam and pump around method in order to work in the dry. The Regional Municipality of York staff classify this project as a Schedule A Environmental Assessment. The site is located on the Oak Ridges Moraine (ORM) and within the Greenbelt. The ORM legislation prevails in this instance. This section of Kennedy Road south of Bethesda Sideroad is designated in the ORM as "Natural Linkage ". All watercourses on the Oak Ridges Moraine have been identified as hydrologically sensitive features. Section 41 of the Oak Ridges Moraine Conservation Plan indicates in Subsection 5 that infrastructure may be permitted to cross hydrologically sensitive features (i.e. watercourses) subject to the tests and best, management practices described in section 41(5)(a to e). This project has been reviewed under the Environmental Assessment Act, Ontario Regulation 166 and under the Fisheries Act for the tests and best management practices 615 Control of Flooding: Staff has reviewed the hydraulics for the proposed structure and has determined that there will not be any negative impacts to flooding. The size of the proposed structure is the same as the existing and there are no current issues with the existing culvert. Pollution: Standard erosion control measures (pea gravel coffer dam, pump, conduit, silt fence) will be implemented to ensure that the construction - generated sediments do not enter the watercourse. Dynamic Beaches: Not applicable Erosion: There will be no slope stability issues related to the works. Conservation of Land: There will be in stream works associated with this project. The watercourse in the ditch will be temporarily altered with a dam and pump around method in order to work in the dry. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The proposed works will impact no significant terrestrial resource features. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 -, of the Authority's Valley and Stream Corridor Management Program CFN: 40712 - Application #: 266/08/WS Report Prepared by: Ben .Krul, extension 5769 For information contact: June Murphy, extension 5304 Date: June 27, 2008 8.1.28 80 CEDAR RIDGE ROAD To construct, reconstruct, erect or place a building or structure on Lot 4 (80 Cedar Ridge Road), in the Town of Whitchurch- Stouffville, Rouge River Watershed. The purpose is to construct a new home within a Regulated Area of the Rouge River Watershed. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: 616 • Lot Drainage & House Siting Control Plan, dated February 13, 2008, prepared by RG McKibbon Ltd., received June 10, 2008; • Drawing No. L1, Landscape Plan, dated March 2008, prepared by M +S Landscape Architects, received June 10, 2008; • Drawing No. L2, Landscape Details, dated March 2008, prepared by M +S Landscape Architects, received June 10, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of constructing a new one and half storey single family residential home at 80 Cedar Ridge Road. The subject property is located adjacent to the Rouge River valley and a Provincially Significant Wetland. Through discussion with the applicant and review of a geotechnical report the house has be sited in a location that is satisfactory to TRCA staff. The house is situated on the tableland portion of the property and it is approximately 12 metres from the top of bank. There are no anticipated affects to the adjacent valleyland and wetland. Control of Flooding: The subject property is not located within the Regulatory Floodplain. As such, there are no flooding concerns. Pollution: Sediment fencing will be in place throughout the duration of construction to ensure that no sediment will enter the adjacent valleyland or wetland. Dynamic Beaches: Not applicable Erosion: TRCA technical staff have reviewed a geotechnical report prepared for the applicant. The house has been situated on the tableland portion of the property with an adequate buffer to ensure that there will be no erosion issues. Conservation of Land: There will be no significant vegetation removed as part of this application. The lot has an existing tableland portion that has been previously cleared. Plantings No plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 G, Infilling, of TRCA's Valley and Stream Corridor Management Program. CFN: 40032 - Application #: 865/07/WS Report Prepared by: Shannon McNeill, extension 5744 For information contact: Bill Kiru, extension 5306 Date: June 24, 2008 617 TOWNSHIP OF KING 8.1.29 REGIONAL MUNICIPALITY OF YORK To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on south west quadrant of King Road and Jane Street - Phase II, in the Township of King, Humber River Watershed as located on the property owned by Regional Municipality of York. The purpose is to construct structures (west and east outfalls, asphalt paving, steel beam guard rail) in'a Regional Storm Floodplain; to excavate and place fill (for access routes on the west and east sides of the Humber River; for removing sediment plume on the west bank; for removing and replacing the west outfall; for removing and replacing east storm sewer pipes and outfall) in a Regulated Area; to temporarily alter a watercourse (Humber River) during the coldwater timing window (July 1 to September 15) through the use of turbidity curtains and coffer dams in order to isolate the sediment removal works and the outfall works from the watercourse. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking (to provide revisions to engineering drawings and landscape drawings); dated June 26, 2008; received July 2, 2008; prepared by Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: Both Phase I and Phase II of this project are classified as "Emergency Works" since the King Road infrastructure and the storm sewer infrastructure as well as the Humber River water quality are at risk. This file focuses on Phase II works which involve the removal of the sediment from the Humber River on the west banks, caused from the storm sewer failure, the removal and replacement of the west outfall, the removal and replacement of the east storm sewer and east outfall. Access for.Phase II works will be from either the west banks or the east banks. The watercourse will not be crossed to conduct any works. Phase I works, which were completed in May and June 2008, encompassed the dry land works and involved removing and replacing the west storm sewer and restoring the failed west bank. An "Authorization for Phase II Emergency Works" letter was issued on June 26, 2008 in order for Regional Municipality of York staff to proceed with the Phase II in water works on July 1, 2008 when the coldwater window opened. The "Authorization for Phase I Emergency Works" letter was issued on May 22, 2008, and those works were completed as of June 27, 2008. 618 Background: A failed storm sewer pipe at the south west quadrant of King Road and Jane Street caused an erosion scar (approximately 10 m wide by 25 metres long) on the west side of Kinghorn Bridge. The Regional Municipality of York needed to implement Phase I of the emergency works to remove the failed storm sewer and to stabilize the west bank starting the week of May 26, 2008 which continued for approximately 3 weeks into June 2008. These Emergency Works are required in order to prevent further damage to existing road and storm sewer infrastructure (in Phase I) as well as to reduce the extension of the sediment plume into the Humber River (in Phase II). A five metre section of steel beam guide rail at the bridge structure approach was completely undermined and provided no protection of the fill embankment or bridge. Public safety continues to be a concern. The Regional Municipality of York's submission of May 15, 2008 indicated that the storm outfall failure on the west side of the bridge is believed to have resulted from leakage of water from the buried corrugated steel pipe (CSP) outfall, subsurface erosion of soil from below and adjacent to the pipe, and subsequent collapse of the pipe and overlying soil. The submission also - indicated that the cause of the leakage has not been confirmed but may involve corrosion of the CSP or separation of the joints due to creep movements in the slope. Phase I The recently completed Phase I of the Emergency Works involved removing the failed west sewer pipes, replacing with suitable backfill material and new pipes, restoring the curb, gutter, asphalt pavement and stabilizing the west slopes with a temporary erosion control blanket Machinery accessed from the west side only and did not need to cross the river during Phase I. There were no in water works associated with Phase I and the duration was approximately 3. weeks from the week of May 22, the date the TRCA Emergency Works letter was issued. Enforcement staff has indicated that Phase I has proceeded smoothly. Phase II Phase II of the Emergency Works, the focus of this file, involves removing the sediment plume from the Humber River on the west bank as well as removing and replacing the west outfall. The east storm sewer which has suffered some slumping, and the east outfall also need replacement. Phase II requires in water works to remove the sediment from the river and to work on the west and east outfalls with turbidity curtains and coffer dams in place for isolation measures. The duration of Phase II will be 3 to 4 weeks starting July 1, 2008 during the coldwater window restriction due to the presence of redside dace. The entire project site is located within a Regional Storm Floodplain and a Regulated Area. Landowner authorization has been allocated for works outside the Regional Right -of -Way. Control of Flooding: The existing grades within the Regional Storm Floodplain will be maintained, therefore, there will be no implications to flooding. Pollution: Standard erosion control measures (turbidity curtains on west and east banks, coffer dam on east bank, silt fence between slope and watercourse, plugging manhole and diverting flows for storm sewer works) will be implemented to ensure that the construction - generated sediments do not enter the watercourse during the proposed works. 619 Dynamic Beaches: Not applicable Erosion: There will be no slope stability issues related to the works. Upon completion of the works, all disturbed slopes will be stabilized with an erosion control blanket and will be seeded and vegetated. Conservation of Land: There will be in stream works associated with this project. The Humber River will be temporarily altered with turbidity curtains on the west in order to remove the sediments from the river. On the east bank the turbidity curtain and a pea - gravel coffer dam will be utilized to isolate the outfall works from the watercourse. TRCA staff imposed a contingency plan should the turbidity curtain not be effective at containing sediments. Pea gravel bags will weigh down the curtain, or a coffer dam of pea gravel bags will be instituted if their is are turbidity curtain seal problems. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). The proposed works will impact no significant terrestrial resource features. Plantings All disturbed slopes will be stabilized and restored with an erosion control blanket. Ultimate restoration of all disturbed areas with native /non- invasive species will occur during this Phase II of the works which will initiate July 1 during the coldwater timing window and will continue for 3 to 4 weeks. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. • CFN: 40870 - Application #: 370 /08 /KING Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: June 27, 2008 8.1.30 12994 WESTON ROAD To construct, reconstruct, erect or place a building or structure and site grade on Lot 7, Plan 542, (12994 Weston Road), in the Township of King, Humber River Watershed. The purpose is to construct a new home and septic system within a Regulated Area of the Humber River Watershed. The permit will be issued for the period.of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: 620 • Site Plan, Drawing No. G -1, prepared by Gunnell Engineering Ltd., dated June 4, 2008, received by the TRCA June 20, 2008, redline revised to indicate the removal of excess fill material. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a new home and septic system within a Regulated Area of the Humber River Watershed. The subject property is partially within a well vegetated, shallow valley feature which contains an intermittent watercourse that connects to a wetland outside of the subject property. As part of the associated King Township consent file (File No. 07- B -06), TRCA staff staked the dripline on the subject property December 7, 2006. The majority of the proposed works are located a minimum 7.5 metres away from the TRCA staked dripline. A portion of the septic system mantle is located closer to the staked line but is a minimum 3 .0 metres away from the staked line. TRCA technical staff are satisfied with the proposed setbacks subject to the following mitigation measure which has been incorporated into the applicants Site Plan drawing: restoration planting of native, non - invasive trees are provided within a 3.0 metre buffer from the staked dripline. The restoration planting will provide an enhanced buffer between the valley system and the manicured sodded area and residential uses. According to a geotechnical brief prepared by Haddad Geotechnical Inc., dated June 18, 2008, the proposed dwelling is approximately 27.6 metres from the long term stable slope for the shallow valley. The long term stable slope as identified in the brief is located beyond the TRCA staked dripline and well away from the proposed works. Control of Flooding: The proposed works are not located within the Regional Storm Flood Plain. There will be no impacts on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be installed and maintained during construction of the dwelling and septic system to prevent sediment from entering the adjacent valley and watercourse features. Dynamic Beaches: Not applicable. Erosion: TRCA Geotechnical Staff are satisfied that the proposed works will not result in the erosion of the valley wall / slope. , 621 Conservation of Land: As the watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. The edge of the vegetated shallow valley feature will be enhanced with a 3.0 metre planting buffer. Based upon the Site Plan and a site visit conducted by TRCA staff May 27, 2008, TRCA ecology staff are satisfied that no significant natural features on or adjacent to the . site will be negatively impacted by the project. Plantings The adjacent vegetated shallow valley feature will be buffered from the proposed residential use through a planted buffer consisting of native non - invasive trees. All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 G) - Infilling.- of the Authority's Valley and Stream Corridor Management Program. CFN: 41002 - Application #: 476/08/KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: June 27, 2008 THE FOLLOWING PERMIT APPLICATIONS WERE ERRATA ITEMS: RES. #B83 /08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS Moved by: Seconded by: Colleen Jordan Maja Prentice THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.31 - 8.1.59, with the exception of 8.1.40 - Block 12 Properties Inc., 8.1.53 - 26 Prince William Drive and 8.1.56 - Regional Municipality of York, the latter two being withdrawn), that had been scheduled on the agenda as errata applications for which all the required information was received and finalized as listed below. RES. #B84 /08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS Moved by: Seconded by: Jack Heath . Maja Prentice • CARRIED THAT a permit be granted in accordance with Ontario Regulation 166/06 for application 8.1.40 - Block 12 Properties Inc., that had been scheduled on the agenda as errata applications for which all the required information was received and finalized as listed below. 622 CARRIED CITY OF BRAMPTON 8.1.31 FENY COMPANY INC. / OURAY DEVELOPMENTS INC. To construct, reconstruct, erect or place a, building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 5, Concession 10, N.D.S., (Intersection of Fogal Road and Regional Road 50), in the City of Brampton, Humber River Watershed as located on the property owned by City of Brampton. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an outfall structure on the west side of Highway 50, south of Ebenezer Road, on lands owned by the City of Brampton. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Letter of Undertaking, prepared by Ouray Developments Inc., dated July 8, 2008, to address all outstanding engineering and ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an outfall structure on the west side of Highway 50, south of Ebenezer Road, on lands owned by the City of Brampton. The proposed works are located adjacent to a tributary of the Humber River Watershed. A separate application for the proposed commercial development on the adjacent lands is•being reviewed in tandem with this application. The proposed outfall will formalize the outlet for the current stormwater drainage ditch that traverses the adjacent commercial lands and outlets into the above noted tributary: The outfall will drain a portion of the stormwater runoff from the Block 57/58 lands located within the City of Vaughan as well as a portion of Highway 50. The-outfall has been designed to prevent any further erosion or future erosion to the adjacent valley slope and has also been designed to dissipate flows prior to entering the adjacent tributary. Currently, an Environmental Assessment (EA) is being completed for the widening of Highway 50. Once the Highway 50 widening works begin, a stormceptor unit will be installed to provide additional stormwater quality treatment for the Highway 50 drainage prior to entering the proposed outfall. Additionally, appropriate stormwater quantity and quality controls will be implemented at such time when future development on the Block 57/58 lands occurs. The proposed works are located within the Regional Storm Floodplain. However, TRCA staff has confirmed that the proposed works will not impact the storage and /or conveyance of flood waters. As such, there are no flooding or ecology related concerns associated with this application. Enhancement plantings to improve the ecological functions of this area are proposed as part of this application. Control of Flooding: Although the proposed works are located within the Regional Storm Floodplain, TRCA staff has reviewed this proposal and do not anticipate any adverse impacts to the storage and /or conveyance of flood waters. 623 Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. • Erosion: As mentioned above, no geotechnical issues are anticipated with this project upon the implementation of slope stability works, as outlined in the submitted engineering /environmental report. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings All proposed plantings will be native and non - invasive consistent with TRCA's guidelines. Policy Guidelines: The proposed works are in conformity with Section 4.3 Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program (VSCMP). • CFN: 40948 - Application #: 435 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: July 2, 2008 CITY OF MISSISSAUGA 8.1.32 1926 BURNHAMTHORPE ROAD EAST To construct, reconstruct, erect or-place a building or structure on Concession 1, 2, Plan 7962, (1926 Burnhamthorpe Road East), in the City of Mississauga, Etobicoke Creek Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a 78.5 square metre (845.0 sq. ft.) addition to the rear of an existing residential dwelling located at 1926 Burnhamthorpe Road, in the City of Mississauga. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Letter of Undertaking, prepared by Charles Schwenger Architect Inc., dated July 8, 2008, to address all outstanding ecology related issues. . RATIONALE The application was reviewed by staff on the.basis of the following information: 624 Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a 78.5 square metre (845.0 sq. ft.) addition to the rear of an existing residential dwelling located at 1926 Burnhamthorpe Road, in the City of Mississauga. The existing dwelling is located within the valley corridor. However, TRCA staff has confirmed that both the existing structure and the proposed works are located outside of the Regional Storm Floodplain. Based on our review of a submitted geotechnical report, there are no geotechnical concerns associated with this project. Additionally, there are no ecology related concerns with this application. An enhancement planting plan has been incorporated into the design of this project. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. There are no fisheries related concerns associated with this proposal. Plantings Enhancement plantings are proposed between the proposed development and the valley corridor. All plant species are native, non - invasive and consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40920 - Application #: 414/08/MISS Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: July 2, 2008 625 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.33 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure on Part Lot 1, 2, Block C, D, Plan R 548 -1055, (The Humber Treatment Plant - 130 The Queensway), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by City of Toronto. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the installation of a back -up generator for the Humber Wastewater Treatment. Plant. The permit will be issued for the period of July 11, 2008 to July. 10, 2010. • Drawing No. C1, Site Plan, prepared by B. E. Buchanan, dated May 2007, Revision No. 1, revised on June 3, 2008, received on June 10, 2008; • Drawing No. S2, Layout Plan, Sections and Details, prepared by B. E. Buchanan, dated May 2007, Revision No. 1, revised on June 4, 2008, received on June 10, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the installation of a back -up generator for the Humber Wastewater Treatment Plant. The subject site is located in a Regulated Floodplain north of The Queensway and west of South Kingsway in the City of Toronto (Etobicoke York Community Council Area). • Control of Flooding: The subject property is located within a Regulatory Floodplain of the Humber River Watershed. However, TRCA staff have determined the proposed works will not adversely impact the storage and /or conveyance of floodwaters. The proposed generator has been flood - proofed to . the extent technically possible. Pollution: • • Sediment fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: . No significant vegetation will be removed as a result of construction. 626 Plantings No plantings are required as part of this application. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Property Improvements and Ancillary Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41048 - Application #: 511/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: July 2, 2008 8.1.34 16 LOUVAIN STREET To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Lot 1, 2, 3, 4, 5, Plan 2142, (16 Louvain Street), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single- storey addition and deck to the rear of the existing single family detached dwelling. The existing rear deck and single- storey addition are to be demolished. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Drawing Al, Site Plan, prepared by Mario Farrone, dated January 30, 2008, received on May 9, 2008; • Drawing No A2, Elevations, prepared by Mario Farrone, dated January 30, 2008, received on May 9, 2008, redline revised by TRCA staff on June 30, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single- storey addition and deck to the rear of the existing single family detached dwelling. The existing rear deck and single- storey addition are to be demolished. The subject site is located in a Regulated Floodplain of the Black Creek Special Policy Area south of Weston Road and west of Black Creek Drive in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding:. The subject property is located within a Regulatory Floodplain of the Humber River Watershed. However, TRCA staff have determined the proposed works will not adversely impact the storage and /or conveyance of floodwaters, and the proposed addition is adequately flood - proofed. . 627 Pollution: Sediment fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are.no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this application. Policy Guidelines: This proposal is consistent with Section 4.2.1.(B) - Development Guidelines for Development /Redevelopment within Designated Two -Zone Areas or Special Policy Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40880 - Application #: 379/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 30, 2008 8.1.35 4 LOOKOUT PLACE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 160, Plan 3244, (4 Lookout Place), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the reconstruction of an existing porch to the rear of the existing dwelling. The proposed works involve a portion of the existing porch to be redeveloped with a sunroom addition. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Drawing No. A -01, Site Plan, prepared by Suriano Design Consultants Inc., dated June 11, 2008, received on June 25, 2008. RATIONALE • The application was reviewed by staff on the basis of the following information: 628 Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the reconstruction of an existing porch to the rear of the existing dwelling. The proposed works involve a portion of the existing porch to be redeveloped with a sunroom addition. The subject site is located east of Keel Street and north of Lawrence in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The site is not located with in a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The proposal is not located closer to the top of bank than the existing dwelling. No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this application. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41060 - Application #: 520/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: July 2, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.36 20 CONNAUGHT AVENUE To change a building or structure so.that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 42, Plan 426E, (20 Connaught Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. 629 The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a two- storey rear addition and partial second - storey addition to the existing single family semi - detached dwelling. The existing rear addition is to be demolished. The permit will be issued for the period of July 11, 2008 to July 10, 2010. . • Drawing No. A001, Site Plan & Roof Plan, prepared by Janice Sebastian, dated, May 16, 2007, received on June 25, 2008; • Drawing No. A005, Elevations, prepared by Janice Sebastian, dated, May 16, 2007, received on June 25, 2008; RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a two- storey rear addition and partial second - storey addition to the existing single family semi - detached dwelling. The existing rear addition is to be demolished. The subject site is located in a Regulated Floodplain of the Lower Don Special Policy Area north of Eastern Avenue and west of Coxwell Avenue in the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: The subject property is located within a Regulatory Floodplain of the Don River Watershed. However, TRCA staff have determined the proposed works will not adversely impact the storage and /or conveyance of floodwaters, and the proposed addition is adequately flood proofed. Pollution: Sediment fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this application. Policy Guidelines: This proposal is consistent with Section 4.2.1.(B) - Development Guidelines for Development/Redevelopment within Designated Two -Zone Areas or Special Policy Areas of the TRCA's Valley and Stream Corridor Management Program. 630 CFN: 41072 - Application #: 532/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 30, 2008 8.1.37 42 LEWIS STREET To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on 42 Lewis Street in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a single- storey addition including a roof -top deck to the rear of the existing single family semi - detached dwelling. The existing rear deck is to be demolished. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Drawing No A -0, Site Plan, prepared by Peter Manos, dated August 27, 2007, received on June 24, 2008; • Drawing No. A -4, West Elevation, prepared by Peter Manos, dated August 27, 2007, received on June 24, 2008; • Drawing No. A -5, South Elevation, prepared by Peter Manos, dated August 27, 2007, received on June 24, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a single- storey rear addition including a roof -top deck to the existing single family semi - detached dwelling. The existing rear deck is to be demolished. The subject site is located in a Regulated Floodplain of the Lower Don Special Policy Area north of Queen Street East and east of Broadview Avenue in the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: The subject property is located within a Regulatory Floodplain of the Don River Watershed. However, TRCA staff have determined the proposed works will not adversely impact the storage and /or conveyance of floodwaters, and the proposed addition is adequately flood proofed. - Pollution: Sediment fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. 631 Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. - Plantings No plantings are required as part of this application. Policy Guidelines: This proposal is consistent with Section 4.2.1.(6) - Development Guidelines for Development /Redevelopment within Designated Two -Zone Areas or Special Policy Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41068 - Application #: 521/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 30, 2008 CITY OF VAUGHAN 8.1.38 93 GRANDVISTA CRESCENT To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 24, Plan 65M -3812, (93 Grandvista Crescent), in the City of Vaughan, Humber River Watershed. The purpose is to construct an inground pool, patio and recognize an existing retaining wall within a Regulated Area of the Humber River Watershed at 93 Grandvista Crescent in the City of Vaughan. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Site Plan, prepared by Landscape Planning Limited, revise dated July 8, 2008, received by the TRCA July 8, 2008, redline revised to indicate the removal of excess fill material and the erection and maintenance of sediment control fencing for the duration of construction. RATIONALE The application was reviewed by staff on the basis of the following information: 632 Proposal: The purpose is to construct an inground pool and patio and recognize a retaining wall structure constructed within a Regulated Area of the Humber River Watershed. The subject property is partially within a remnant draw feature which contains a watercourse that forms part of a tributary of the Humber River. Based upon a site visit conducted by TRCA staff on June 27, 2008, the existing top of bank of a mild slope is located at the edge of the property boundary. The proposed pool and patio are setback a minimum 5.0 metres away from the property boundaries. The existing retaining wall is located along the northern boundary of the subject property and rises in height from 0.5 metres to 1.85 metres from the front of the property to the halfway point of the northern property line. According to the applicant, the retaining wall was required to permit the construction of the home and the homeowner was not aware that a permit under Ontario Regulation 166/06 was required. Based upon the site visit, TRCA staff are satisfied that the completed works will not have an impact on the portion of the remnant draw feature that is located adjacent to the northern boundary of the subject property. The 5.0 metre setback area is to be vegetated with native, non - invasive plants and trees and will create an enhanced buffer between the existing and proposed residential uses with the adjacent valley / stream corridor / remnant draw feature. Control of Flooding: The proposed works are located outside of the Regional Storm Flood Plain. There will be no impacts on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be erected and maintained during construction to prevent sediment from entering the adjacent valley / stream corridor / draw feature. Dynamic Beaches: Not applicable. Erosion: TRCA geotechnical staff are satisfied that the proposed works and the existing retaining wall will not have an adverse impact on the adjacent slope features. Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings A 5.0 metre buffer will be created between the adjacent valley / stream corridor / draw feature and the existing and proposed residential uses. This buffer Fs composed of native, non - invasive plant species and will provide enhanced protection for the adjacent natural feature. 633 Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41047 - Application #: 512 /08NAUG Report Prepared by: Anthony Sun, extension 5724 , For information contact: Bill Kiru, extension 5306 Date: June 30, 2008 8.1.39 59 CROMARTY PLACE To construct, reconstruct, erect or place a building or structure and site grade on Lot 12, Plan 65M -2592, (59 Cromarty Place), in the City of Vaughan, Don River Watershed. The purpose is to construct an inground swimming pool and patio as well as recognize an existing porch extension within a Re gulated Area of the Don River Watershed at 59 Cromarty Place in the City of Vaughan. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Site Plan, prepared by the applicant, received by the TRCA June 30, 2008, redline revised to indicate the erection and maintenance of Sediment Control Fencing for the duration of construction and the removal of excess fill material; • Letter of Undertaking, prepared by the applicant, dated July 1, 2008; received by the TRCA July 2, 2008 agreeing to remove rubble and debris placed over the top of bank and immediate stabilization through plantings. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct an inground swimming pool and patio as well as recognize a porch extension constructed in a Regulated Area of the Don River Watershed. A partially channelized • tributary of the West Don River traverses the rear portion of the subject property and a large part of the property is within the Regional Storm Flood Plain. The watercourse is located within an 8.0 metre easement which extends into the subject property from the rear lot line. Based upon a site visit conducted by TRCA staff June 17, 2008, the western bank of the channelized watercourse is composed of a vegetated steep slope containing some debris and is located approximately 1 metre into the easement. The eastern bank, located at the eastern • property line, has been hardened with a retaining wall, constructed approximately 25 years ego. As part of the permit, debris located along the slope is to be removed and the exposed slope is to be immediately stabilized with native plantings. The proposed inground swimming pool and patio are located within the Regional Storm Flood Plain but outside of the hydraulic floodway. The proposed works and located 4.0 metres away from the 8.0 metre easement (5.0 metres from existing top of bank). The 4.0 metre setback is 10 be sodded. 634 The existing porch extension is located at the front of the existing home and is outside of the Regional Storm Flood Plain and will not affect any significant natural features. Control of Flooding: TRCA water resources staff are satisfied that the proposed inground pool and patio will not significantly impact the storage or conveyance of flood waters. Pollution: Sediment control fencing will installed and maintained for the duration of construction to prevent sediment from entering the watercourse located on the subject property. Dynamic Beaches: Not applicable. Erosion: TRCA geotechnical staff are satisfied that the 5 metre'setback from the existing 'top of bank is adequate in ensuring the stability of the slope. Conservation of Land: As the watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the proposal. Plantings All disturbed areas will be restored to a sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 40745 - Application #: 280 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: June 30, 2008 8.1.40 BLOCK 12 PROPERTIES INC. To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and interfere with a wetland on Lot 23, Concession 2, northeast of Major MacKenzie Drive and Dufferin Street, in the City of Vaughan, Don River Watershed as located on the property owned by Block 12 Properties Inc.. The purpose is to conduct site grading, temporarily or permanently place, dump or remove any material within a Regulated Area of the East Don River and to interfere with a wetland, in order to relocate and enhance the Castan Pond/Wetland in Planning Block 12, in the City of Vaughan. 635 The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Letter of Undertaking, prepared by Schaeffers Consulting Engineers, dated July 8, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to conduct site grading, temporarily or permanently place, dump or remove fill material within a Regulated Area of the East Don River and to interfere with a wetland in order to relocate and enhance the Castan Pond/Wetland in Planning Block 12, in the City of Vaughan. The proposed works were approved as part of the overall Block 12 Master Environmental Servicing Plan(MESP) and subsequently as part of the associated draft plans of subdivision for the area (19T -00V02 - Mayvon Investments & 19T -99V08 - Andridge Homes Limited (formerly Castan)). Planning Block 12 is bounded by Major Mackenzie Drive to the south, Dufferin Street to the west, Teston Road to the north and to the east by Bathurst Street The proposed works are located east of Dufferin Street and north of Major Mackenzie Drive. The existing pond /wetland, commonly referred to as the Castari Wetland, is approximately 0.57 ha (1.4 ac) in size with a catchment area of 3.0 ha (with no other surface inlets or outlets). The pond is fed primarily by surface runoff from surrounding lands with relatively limited groundwater recharge. The existing wetland area is not a Provincially Significant Wetland (PSW), although it does provide limited wildlife habitat. The current wetland is located on tableland and is surrounded by lands that are currently being used for agricultural purposes. However, retention of the wetland is its current configuration is not favourable as the wetland will be surrounded by future residential development and will be largely isolated from the adjacent forest and valley lands. The proposed wetland will be located further west of the current wetland area and closer towards the forested /valley area. The new wetland will be approximately 2.4 ha including the vegetated restoration and enhancement area. A seasonal pond is included in this area and will include features such a bolder clusters, fallen Togs, mud flats, multiple vegetation communities and other varying habitats. It will be surrounded by native vegetation including trees, shrubs and multiple aquatic areas and wetland /upland vegetation. Like the existing wetland, the new wetland will be primarily fed by runoff from surrounding lands. A grassed swale outlet will be constructed at the southeast corner of the site to provide an overland flow route. This swale leads to a tributary of the East Don River. In order.to ensure the Tong -term success of the new wetland, the applicant has proposed several measures including the salvaging of hydric soils, shrubs and rocks from the old wetland area. A geosynthetic /clay liner with organic materials will be installed on the bottom of the new pond and covered by a layer of hydric top soil. Tree and shrub plantings will take place along the wetland and surrounding field. Finally, a three year monitoring program will be in place, to ensure project success and to collect biological information and inventory. 636 Control of Flooding: The proposed wetland area is located outside of the Regional Storm Flood Plain of the East Don River.. As such, the storage or conveyance of flood waters will not be impacted by the proposed works. Pollution: Erosion and sediment control fencing has already been erected around the work site given that topsoil grading has taken place on nearby lands proposed for future residential development. Additional sedimentfencing will be installed near the existing and proposed work site to ensure that the migration of sediment to the East Don River tributary is minimized. Dynamic Beaches: Not applicable. Erosion: Sediment will be minimized through the implementation of the aforementioned sediment control measures. There are no geotechnical /slope stability issues associated with the proposed works. Conservation of Land: There are no direct in -water works associated with the proposed works (the current wetland does not have an outlet to a watercourse). However, given the proposed connection of the new wetland via a grassed swale, a Letter of Advice will be issued on behalf of Fisheries and Oceans Canada (DFO). Plantings Extensive plantings of native species including shrub and wetland vegetation will be implemented as part of the permitted works. Policy Guidelines: This proposal complies with Section 4.2.2(F) - Opportunities for Regeneration, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40036 - Application #: 870 /07NAUG Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5.307 Date: July 2, 2008 8.1.41 12340 BATHURST STREET To construct, reconstruct, erect or place a building or structure on Part Lot 1, Concession 2, (12340 Bathurst Street), in the City of Vaughan, Humber River Watershed. The purpose is to construct a single storey addition to an existing dwelling within a Regulated Area of the Humber River Watershed. The permit will be issued for the period of July 11, 2008 to July 10, 2010. 637 • Site Plan Drawing, prepared by Bennett Yonge Limited, dated June 23, 2008, received by the TRCA June 24, 2008; • Foundation Plan Drawing, Drawing No. A2, prepared by DreamSpace, received by the TRCA June 24, 2008; _ • West Elevation Drawing, Drawing No. A5, prepared by DreamSpace, received by the TRCA June 24, 2008; • ,North Elevation Drawing, Drawing No. A6, prepared by DreamSpace, received by the TRCA June 24, 2008; • East Elevation Drawing, Drawing No. A7, prepared by DreamSpace, received by the TRCA June 24, 2008; • Landscape Plan, prepared by the applicant, received by the TRCA July 2, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a single story addition including a single storey attached garage to an existing dwelling within a Regulated Area of the Humber River Watershed. The subject property is partially covered by two Provincially Significant Wetlands (PSWs) which form part of the Philips- Bond - Thompson Wetland Complex and is entirely within the Wetland Area of Interference of these two wetlands. The smaller of the two PSWs is located along Bathurst Street and is located over 170 metres away from the proposed works while the larger PSW is located at the rear property and is also within an area identified by the Ministry of Natural Resources as an Area of Natural and Scientific Interest (ANSI). The proposed addition is located within a sodded area between an existing dwelling and existing garage and is approximately 57 metres away from the PSW located at the rear of the subject property. The area between the proposed works and the nearest PSW is in a highly altered state as a sodded lawn and contains an existing inground swimming pool, which is closer to the PSW than the proposed addition. Based upon the drawings submitted by the applicant and a Natural Heritage Evaluation (NHE) (prepared by LGL Limited, dated June 2008, received by the TRCA June 24, 2008) as well as site visit conducted by TRCA staff May 14, 2008, TRCA staff are satisfied that the proposed works are sufficiently setback from the significant natural features onsite. A single ornamental tree, not contiguous with any natural features, will be removed as part of the proposed work and will be replaced with three native trees as recommended by the NHE. In addition, in order to create a buffer between the wetland and the existing residential uses, an area around the wetland feature is to be designated as a "no mow" zone to allow natural wetland vegetation to develop along the bank of the wetland. Control of Flooding: The proposal is not located with the Regional Storm Flood Plain, there will be no impact on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be erected and maintained for the duration of construction and temporary storage of fill and materials will be located away from the wetland and tarped. 638 Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this project. Conservation of Land: As the watercourse and wetland will not be significantly impacted by the proposal, no fisheries concerns will result. The PSWs and ANSI on the subject property are sufficiently setback from the proposed works and will not be impacted. A new buffer area between the PSW located at the rear of the subject property and the existing residential uses will be created to provide additional wetland habitat and enhanced protection for the wetland. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41057 - Application #: 517 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: June 30, 2008 8.1.42 EAST HALF OF 207 RANCH TRAIL ROAD To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 9, Plan 65R- 30478, PART 2, (East Half of 207 Ranch Trail Road), in the City of Vaughan, Humber River Watershed. The purpose is to construct a new home and septic system within a Regulated Area of the Humber River Watershed. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Site Plan, Drawing No. Al, prepared by Thomas Marzotto Architect, dated July 2008, received by the TRCA July_ 8, 2008 redline revised to indicate the erection of sediment control fencing; • Front Elevation Drawing, Drawing No. A8, prepared by Thomas Marzotto Architect, dated April 2008, received by the TRCA June 23, 2008; • Side Elevations Drawing, Drawing No. A9, prepared by Thomas Marzotto Architect, dated April 2008, received by the TRCA June 23, 2008; • Rear Elevation Drawing, Drawing No. A10, prepared by Thomas Marzotto Architect, dated April 2008, received by the TRCA June 23, 2008; 639 • Grading Plan, prepared by Jones Consulting Group Ltd., dated May 2008, received by the TRCA July 8, 2008. RATIONALE - The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a new dwelling and septic system within a Regulated Area of the Humber River Watershed. Based upon a site visit conducted by TRCA staff May 26, 2008 , . TRCA staff determined that the subject property is located along the edge of a wide, gently sloped valley system and contains a highly altered shallow draw feature with a drainage swale. This draw feature is located on the east side of the subject property. The rear of the property backs onto a valley / stream corridor. The subject property does not contain any significant natural vegetation or any significant natural feature. The proposed dwelling is located near the front of the property and over 130 metres away from the valley / stream corridor located beyond the rear property line. The majority of the proposed dwelling is located on table land with the remainder of the dwelling and the septic system located along the edge of the shallow and altered draw feature. Restoration plantings are being provided at the rear of the property to enhance the buffer between the valley / stream corridor and the proposed residential uses. Control of Flooding: The proposed works are not located within the Regional Storm Flood Plain, there will be no impacts on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be installed and maintained for the duration of construction. Dynamic Beaches: Not applicable. Erosion: Based upon the site visit conducted by TRCA staff and a Geotechnical Brief prepared by Jacques Whitford, dated June 17, 2008, TRCA Geotechnical staff are satisfied that the proposed works will not adversely impact the already highly altered shallow draw feature or the adjacent wide valley feature. In addition, there will be no impacts on the valley / stream corridor located beyond the rear lot line. . Conservation of Land: As a watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Restoration plantings of native, non - invasive species are being provided at the rear of the property to enhance the buffer between the valley / stream corridor and the proposed residential uses. 640 Policy Guidelines: The proposal is consistent with Section 4.2.2 G) - Infilling - of the Authority's Valley and Stream Corridor Management Program. CFN: 41046 - Application #: 514 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: June 27, 2008 8.1.43 21 CARTANYA COURT To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 123, Plan 65M -3068, (21 Cartanya Court), in the City of Vaughan, Humber River Watershed. The purpose is to construct an inground swimming pool within a Regulated Area of the Humber River Watershed at 21 Cartanya Court in the City of Vaughan. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Site Plan, prepared by the applicant, dated June 27, 2008, received by TRCA June 27, 2008, redline revised to indicate the removal of excess fill material and the erection of Sediment Control Fencing; • Landscape Plan, prepared by the applicant, received by the TRCA July 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct an inground pool, patio and pool equipment pad within a Regulated Area of the Humber River Watershed. The subject property backs onto a valley / stream corridor and the associated Regional Storm Flood Plain. The existing top of bank and flood plain are located approximately 1 metre away from the rear property line. The proposed works are located 5.0 metres from the rear lot line within an existing sodded lawn (6 metres from the existing top of bank). As part of the permit, plantings consisting of native, non - invasive trees and shrubs are proposed within the 5.0 metre buffer area to create an enhanced buffer between the existing and proposed residential uses with the valley / stream corridor. Control of Flooding: The proposed works are located outside of the Regional Storm Flood Plain, there will be no impacts on the storage or conveyance of floodwaters. Pollution: Sediment control fencing will be installed and maintained during construction to prevent sediment from entering the valley and watercourse located beyond the rear property line. 641 Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There will be no significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings A portion of the 5.0 metre buffer between the proposed works and the adjacent valley / stream corridor will be planted with native, non - invasive plants and trees and will provide enhanced protection for the adjacent natural feature. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program CFN: 41073 - Application #: 533 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: June 30, 2008 TOWN OF AJAX 8.1.44 ROSSLAND ROAD EAST AND AUDLEY ROAD To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lot 3, 4, Concession 2, (Rossland Road East and Audley Road), in the Town of Ajax, Carruthers Creek Watershed. The purpose is to undertake site grading, permanently place fill material and alter a watercourse in order to commence site preparation for a 67 hectare plan of subdivision. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Drawing No. ERO, Overall Erosion And Sedimentation Control Plan, prepared by MMM Group, dated May 2008, received by TRCA on June 30, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 642 Proposal: The applicant seeks permission to undertake site grading, permanently place fill material and alter a watercourse in order to commence site preparation works for a 67 hectare (1400 unit) plan of subdivision known as Mulberry Meadows (File No. S -A- 2007 -03). The site is located between the Carruthers Creek Valleylands and Audley Road south of Rossland Road in the northeast portion of the Town of Ajax urban area. A portion of the proposed works are to take place within the TRCA Regulated Area associated with the Carruthers Creek valleylands, which frame the western edge of the draft plan. Works will include the establishment of the sediment and erosion controls necessary to allow for stripping and stockpiling of topsoil and the creation of the rough grades for the roads and lots within the draft plan. In addition to the erection of sediment control fencing along the valleylands, two temporary sediment control ponds are to be established. These ponds will capture surface drainage during the construction phase via a series of swales. Suspended solids in the drainage will be settled in the pond prior to release into the Carruthers Creek. Control of Flooding: The proposed works are not located within the Regional Storm Flood Plain. The storage and control of flooding will not be affected by this proposal. Pollution: The sediment and erosion control measures that form part of this proposal have been designed to prevent sedimentation of the Carruthers Creek and associated valleylands. Measures include: temporary sediment control ponds with flow spreaders and plunge pools for the outfalls, heavy duty silt fences, cut -off swales, rock check dams, and mud mats. Dynamic Beaches: Not applicable Erosion: There are no slope stability or geotechnical concerns with this proposal. The measures described above seek to control erosion on the table land portions of the site. Conservation of Land: The proposed works are to take place outside of the Carruthers Creek valleylands and all natural areas defined by TRCA staff. Plantings Due to the nature of the proposal, no plantings will be provided. However, during a future stage of development, restoration plantings will be provided within the buffer lands adjacent to the Carruthers Creek. Policy Guidelines: This proposal is consistent with Section 4.3, Infrastructure and Servicing, of TRCA's Valley and Stream Corridor Management Program. 643 CFN: 41030 - Application #: 493 /08 /AJAX Report Prepared by: Chris Jones, extension 5718 • For information contact: Chris Jones, extension 5718 Date: June 27, 2008 TOWN OF CALEDON 8.1.45 66 STRAWBERRY HILL COURT To construct, reconstruct, erect or place a building or structure on Lot 12, Plan 43M -1369, (66 Strawberry Hill Court), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an inground swimming pool at the rear of an existing residential dwelling located at 66 Strawberry Hill Court, in the Town of Caledon. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Letter of Undertaking, prepared by A. Stirpe, dated July 8, 2008, to address all outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an inground swimming pool at the rear of an existing dwelling located at 66 Strawberry Hill Court, in the Town of Caledon. The rear yard of the existing dwelling is located adjacent to a valley corridor. Through the previous subdivision approvals, a retaining wall structure was installed at the property boundary of the subject property. Based on our review of the submitted geotechnical report, no impacts to the adjacent valley slope and /or retaining wall are anticipated during or after construction of the proposed swimming pool. Additionally, there are no flooding or ecology related concerns with this application. An enhancement planting plan has been submitted with this application in order to improve the ecological condition of the adjacent valley corridor and to achieve an ecological net gain for this area. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. 644 Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings The proposed pool is located within an existing manicured lawn. No significant vegetation will be- removed as a result of the construction. However, a planting plan incorporating a variety of native and non - invasive species is proposed with this application in accordance with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41039 - Application #: 499/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: July 2, 2008 8.1.46 12407 CHINGUACOUSY ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on East Half Lot 20, Concession 3, (12407 Chinguacousy Road), in the Town of Caledon, Etobicoke Creek Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of an addition to an existing barn. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Letter of Undertaking, provided by N. Post, dated July 9, 2008, stamped received by TRCA Planning and Development July 9, 2008, to address all outstanding engineering related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of an addition to an existing barn. The works are located within the Regional Storm Floodplain. However, the proposed development has been adequately flood protected and all existing grades will be maintained. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. The area to which this application applies is void of any significant vegetation. 645 Control of Flooding: TRCA Water Resources staff has reviewed this proposal and do not anticipate any impacts to the storage and /or conveyance of flood waters. The addition is located outside of the hydraulic floodway and will be adequately flood proofed. All excavated fill will be removed from the floodplain. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings As the proposed development is located within a manicured lawn, additional plantings are not required. Policy Guidelines: The proposal is consistent with Section 4.2.2 (C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40681 - Application #: 249/08/CAL Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: July 2, 2008 TOWN OF MARKHAM 8.1.47 1170531 ONTARIO LIMITED To construct, reconstruct, erect or place a building or structure at 95 Clegg Road, in the Town of Markham, Rouge River Watershed as located on the property owned by 1170531 Ontario Limited. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a 2,777 square metre (29,891 sq. ft.) addition to an existing industrial building located at 95 Clegg Road, in the Town of Markham. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Letter of Undertaking, prepared by R.V. Anderson Associates Limited, dated July 8, 2008, to address all outstanding ecology related issues. 646 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: It is our Understanding that the purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a 2,777 square metre (29,891 sq. ft.) addition to an existing industrial building located at 95 Clegg Road, in the Town of Markham. The proposed development is adjacent to a valley corridor. However, the proposed development is sufficiently setback from the valley lands. There are no geotechnical issues associated with this application. Additionally, there are no flooding or ecology related concerns associated with this application. An enhancement planting plan has been incorporated into the design of this project in order to improve the ecological condition of this area. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings . All proposed plantings will be native and non - invasive consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40764 - Application #: 290 /08 /MARK Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: July 2, 2008 647 8.1.48 8 CUMBERLAND COURT To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on 8 Cumberland Court in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an addition to an existing dwelling, septic tank and in ground swimming pool. The permit will be issued for the period of July 11, 2008 to July 10, 2010. Sheet Al , Proposed Addition and Alteration, Prepared by Hunt Design Assoc. Inc., dated April 16, 2008; • Plan Index No. D 12, Topographic Survey, Prepared by David B.Searles Surveying Ltd. dated 2007; • Drawing No. 1 to 7, Floor Plan, Elevations and Cross Sections, Prepared by Hunt Design Assoc. Inc. dated April 16, 2008; • Letter of undertaking provided by Tony Dicarlo of Hunt Design Assoc. Inc., dated Wednesday July 9, 2008, to address outstanding TRCA Ecology issues, prior to the issuance of the permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an addition to an existing dwelling, the construction of a new septic tank and in ground swimming pool. The proposed works are all located outside of the Regional Storm Floodplain. Although the subject property is located in the nearby vicinity of a wetland complex, TRCA staff have confirmed that all grading and proposed structures will not adversely impact the noted wetlands and function. This property was issued a permit for a separate application on August 10, 2007 (Permit No. C- 07544) in order to demolish and construct a new residential dwelling, resolve an outstanding TRCA violation and restore disturbed areas on the subject property. The enhancement works for this site along with erosion and sediment control measures are included with the approved permit, and will continue to apply to this permit application. Control of Flooding: The subject property is located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters are anticipated. Pollution: Appropriate erosion and sediment controls will be installed and maintained on thesubject property throughout all phases of construction as according to approved drawings from Permit No. C- 07544. Dynamic Beaches: Not applicable 648 Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. However, an extensive enhancement planting plan was provided with issued Permit No. C- 07544. Additional plantings will also be provided with this application. Plantings Through the works, a variety of native and non - invasive species will be planted on the subject lands consistent with TRCA's guidelines. Policy Guidelines: The proposal is consistent with Section 4.2.2 (C) - Minor Additions, of the Authority's Valley and Stream Corridor Management Program (VSCMP) and Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40943 - Application #: 432 /08 /MARK Report Prepared by: Uton Samuels, extension 5386 For information contact: Uton Samuels, extension 5386 Date: July 2, 2008 8.1.49. 33 MUMBERSON COURT To construct, reconstruct, erect or place a building or structure at 33 Mumberson Court, in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction,of a new, single - family dwelling located at 33 Mumberson Court, in the Town of Markham. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Letter of Undertaking, prepared by M +S Landscape Architects, dated July 8, to address all outstanding ecology related issues. RATIONALE The application .was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a new, single - family dwelling located at 33 Mumberson Court, in the Town of Markham. The subject property is currently vacant and a portion of the property abuts a stream corridor associated with the Rouge River Watershed. The proposed works are adequately setback from the abutting valley corridor. As such, there are no flooding, geotechnical, or ecology related concerns with this application. 649 Additionally, an enhancement planting plan has been included with this application to improve the ecological condition of the abutting valley corridor. _Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters is anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. There are no fisheries related concerns associated with this proposal. Plantings Enhancement plantings are proposed between the proposed development and the valley corridor. All plant species are native, non - invasive and consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40908 - Application #: 408 /08 /MARK Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: July 2, 2008 8.1.50 THE CROWN OF MARKHAM INC. To site grade and alter a watercourse on Part Lot 23, 24, Concession 3, (Woodbine Avenue and Elgin Mills Road), in the Town of Markham, Rouge River Watershed as located on the property owned by The Crown of Markham Inc. The purpose is to alter a watercourse, and develop within a Regulated Area in order to establish a temporary diversion channel, to facilitate separate permanent channel and culvert works. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Letter of undertaking provided by Joanne Barnett, Kerbel Group Inc., dated July 9, 2008, to address all outstanding TRCA and DFO issues prior to the issuance of the permit. 650 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: . - This permit is one of two presently before the Executive Committee at the July 11, 2008 meeting pertaining to works proposed on the subject property. The subject property is located between Highway 404 and Woodbine Avenue, north of Major Mackenzie Drive in the West Cathedral Community, Town of Markham. As part of the West Cathedral Secondary Plan and Master and Environmental Servicing Plan, the portion of East Carleton Creek that traverses the plan area is to be restored. This restoration is to take the form of a widened valley corridor and the realignment of the entire watercourse within the West Cathedral community based upon natural channel design principles. Currently, the watercourse is highly altered due to the former agricultural use adjacent to it. This work requires several permits from TRCA for different phases of the work, the initial permits for which were previously issued by the TRCA. This permit is to allow for the construction of the permanent `enhanced' East Carleton Creek corridor, as well as the connections for the extension of the existing temporary diversion channel. In accordance with the Environmental Servicing Plan, the enhanced corridor will be constructed to provide for a 55 metre wide corridor, with a realigned and restored watercourse, .incorporating natural channel design. A related permit application for a temporary diversion channel associated with the proposed works (CFN 41078) is also being brought forward to this Executive Committee meeting for consideration, which will allow for all sections of the permanent channel to be constructed in the dry, once a TRCA permit has been issued for the permanent channel works. The permanent channel works proposed under this permit (which form one component of the larger channel works that will extend onto adjacent properties) will constitute a Harmful Alteration Disruption or Destruction (HADD) of Fish Habitat pursuant to the Fisheries Act (Canada) and will require Authorization from the Department of Fisheries and Oceans Canada (DFO). Additionally; all in- stream works — as well as those adjacent will be subject to the Cold Water Fisheries Timing Window restrictions. While the design drawings for the permanent channel have only been recently submitted for the review of TRCA staff, and staff have not had the opportunity to determine whether the proposed works will satisfy TRCA and DFO requirements, due to the short duration of the Cold Water Timing Window, this permit application is being brought forward at this time, such that it can be released once all outstanding TRCA and DFO issues have been resolved. The TRCA permit will not be issued for the proposed works until such time as TRCA staff are satisfied with the works proposed, and an Authorization from DFO has been issued. Control of Flooding: The proposed corridor has been designed to contain Regional Storm flows, and thus will maintain or enhance the storage and conveyance of flood waters. Pollution: Appropriate Sediment and Erosion control measures will be put in place and maintained during all construction phases. Dynamic Beaches: Not applicable 651 Erosion: Sediment and erosion control measures will remain in place throughout the construction phases. Additionally all channel areas shall be stabilized prior to receiving stream flows. There are no geotechnical concerns associated with this proposal. Conservation of Land: Fisheries concerns are to be addressed through the Ministry of Natural Resources' fisheries timing window and the DFO Authorization review process. Landscape and enhancement plans, which meet TRCA's requirements will be required prior to the issuance of this permit. Plantings The proposed corridor will be planted in accordance with TRCA's planting guidelines, which will result in a net enhancement of riparian and natural cover within this corridor and this community. Policy Guidelines: The proposed works are consistent with Section 4.3 Infrastructure and Servicing - of TRCA's Valley and Stream Corridor Management Program. CFN: 40612 - Application #: 188 /08 /MARK Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: July 2, 2008 8.1.51 THE CROWN OF MARKHAM INC. To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 23, 24, Concession 3, (Woodbine Avenue & Elgin Mills Road), in the Town of Markham, Rouge River Watershed as located on the property owned by The Crown of Markham Inc. The purpose is to alter a watercourse and construct within the Regulatory Floodplain to facilitate the construction of an enhanced watercourse corridor on the subject property. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Temporary Diversion Channel, drawing number NC201, prepared by Marshall Macklin Monaghan, received by TRCA on May 1, 2006; • Temporary Diversion Channel, drawing number NC202, prepared by Marshall Macklin Monaghan, received by TRCA on May 1, 2006; • Temporary Diversion Channel, drawing number NC203, prepared by Marshall Macklin Monaghan, received by TRCA on May 1, 2006; • Temporary Diversion Channel, drawing number NC204, prepared by Marshall Macklin Monaghan, received by TRCA on May 1, 2006; • Temporary Diversion Channel, drawing number NC205, prepared by Marshall Macklin Monaghan, received by TRCA on May 1, 2006; • Landscape Plan Temporary Diversion Channel, drawing number L -201, prepared by Marshall Macklin Monaghan, received by TRCA on May 1, 2006; 652 • External Improvements - Block 146 Landscape Plan, drawing number L -202, prepared by Marshall Macklin Monaghan, received by TRCA on May 1, 2006; • Cathedral Town Ltd. and 404 Developments Inc. Cathedraltown - Phase 2, Betty Roman Boulevard STA 0 +411.88 to STA 0 +600, produced by Marshall- Macklin Monaghan, revised to November 23, 2006, stamped received by TRCA, April 11, 2007; • Cathedral Town Ltd. and 404 Developments Inc. Cathedraltown - Phase 2, Grading Plan, produced by Marshall Macklin Monaghan, revised to April 4, 2007, stamped received by TRCA, April 11, 2007; • Cathedral Town Ltd. and 404 Developments Inc. Cathedraltown - Phase III Temporary Diversion Channel, drawing number 1309, produced by MMM Group, dated May 2008, revised to June 5, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This permit is one of two presently before the Executive Committee at the July 11, 2008 meeting pertaining to the works proposed on the subject property. The subject property is located between Highway 404 and Woodbine Avenue, north of Major Mackenzie Drive in the West Cathedral Community, Town of Markham. As part of the West Cathedral Secondary Plan and Master and Environmental Servicing Plan, the portion of East Carleton Creek that traverses the plan area is to be restored. This restoration is to take the form of a widened valley corridor and the realignment of the entire watercourse within the West Cathedral community based upon natural channel design principles. Currently, the watercourse is highly altered due to the former agricultural use adjacent to it. This work requires several permits from TRCA for different phases of the work as the project moves forward, the initial permits for which were previously issued by the TRCA. Previous permits have been issued for works for a temporary diversion of East Carleton Creek, and adjacent works within a TRCA Regulated area. The permit for the construction of a temporary diversion channel (approved at the September 8, 2006 Executive Committee meeting, and subsequently issued) was to set the stage for future permits for the construction of the Woodbine By -pass crossing, proposed local street crossings, and to allow the new re- aligned permanent channel to be constructed in the dry. This diversion channel was subsequently constructed under this permit. Due to a recent change in land ownership (as TRCA permits are non - transferable), as well as the need to extend the permit and make minor revisions, the new owners of the property must apply for a permit to complete any remaining works under this permit that have not to date been completed. As these works are consistent (and largely identical) to those that were previously approved and constructed, this new permit application is largely required to allow for a permit to be issued to the current landowner for the works. An extension of the diversion channel, which has been designed to the same standards as the original diversion channel is also proposed to allow for all sections of the permanent channel to be constructed in the dry, once a TRCA permit has been issued for the permanent channel works. An additional permit is being brought forward (under CFN 40612) for the consideration of the Executive Committee for the construction of the permanent channel, as well as the connections for the extension of the temporary diversion channel. 653 Control of Flooding: The diversion swale has been sized to accommodate minor storm events in accordance with TRCA requirements. Pollution: Appropriate Sediment and Erosion control measures will be put in place and maintained during construction and operational phases. Dynamic Beaches: Not applicable Erosion: Sediment and erosion control measures will remain in place throughout the construction and operation of the temporary diversion channel. There are no geotechnical concerns associated with this proposal. Conservation of Land: Fisheries concerns are to be addressed through the Ministry of Natural Resources' fisheries timing window and the DFO Authorization review process. Landscape plans have been provided to ensure that the swale is well vegetated while in.use. Plantings Landscape plans have been provided which will ensure that the swale is well vegetated. . Policy Guidelines: The proposed works are consistent with Section 4.3 - Infrastructure and Servicing - of TRCA's Valley and Stream Corridor Management Program. CFN: 41078 - Application #: 539/08 /MARK Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: July 2, 2008 8.1.52 TOWN OF MARKHAM To construct, reconstruct, erect or place a building or structure and temporarily • or permanently place, dump or remove any material, originating on the site or elsewhere on Village Parkway, Highway 7 and Main Street, in the Town of Markham, Rouge River Watershed as located on the property owned by Town of Markham. The purpose is to construct - reconstruct - erect or place a building or structure, temporarily or permanently place - dump or remove any material - originating on the site or elsewhere in order to install a sanitary sewer along Village Parkway south to Highway 7 to north on Main Street, Unionville, in the Town of Markham, Regional Municipality of York in the Rouge River Watershed. The permit will be issued for the period of July 11, 2008 to July 10, 2010. 654 • Letter of Undertaking to provide minor revisions to erosion and sediment plans to the satisfaction of TRCA staff; dated July 4, 2008; received July 7, 2008; prepared by the Town of Markham. - RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal- involves the installation of a 250mm to 600mm sanitary sewer along Village Parkway, south to Highway 7, east on Highway 7 to Main Street (Unionville) and approximately 180m south on Main Street to connect with an. existing manhole located on the east side of Main Street, in the Town of Markham. The existing manhole is located more than 50m from the watercourse. The sanitary sewer will be installed through open cut except for four locations (GO /CNR tracks and underneath Highway 7 at Village Parkway, Sta. 0 +850 and Sciberras .Road, ) that will be installed by trenchless technology. The project was reviewed through the Municipal Class Environmental Assessment process. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion control measures (silt/sediment fencing, rock flow check dam, sediment control filterbag) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: As there will be no in stream work associated with the project there will be no concerns related to fish habitat Toss. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Fisheries and Oceans Canada (DFO) Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. 655 CFN: 39096 - Application #: 184 /07 /MARK Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: June 27, 2008 8.1.53 26 PRINCE WILLIAM DRIVE To construct, reconstruct, erect or place a building or structure at 26 Prince William Drive, in the Town of Markham, Rouge River Watershed. The purpose is to recognize the unlawful construction of a deck at the rear of an existing dwelling located within a TRCA Regulated Area of the Rouge River Watershed. • Withdrawn TOWN OF RICHMOND HILL 8.1.54 YORKDALE CENTRES To construct, reconstruct, erect or place a building or structure, site grade and alter a watercourse on Lot 57, Concession 1, (11685 Yonge Street), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Yorkdale Centres. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a stormwater outfall for a new commercial development block. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Letter of undertaking provided by David Kellershon of Schaeffers Consulting Engineers, dated Wednesday July 9, 2008, to address outstanding TRCA Ecology and . Engineering issues, prior to the issuance of the permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a stormwater outfall for a new commercial development block. The outfall structure is required in order to convey stormwater runoff from the commercial site. All stormwater released into the valley corridor will be adequately treated according to TRCA Guidelines which includes clean water from the roof tops, bio - swales, infiltration galleries and biofilters. The outfall has been designed in accordance with TRCA Guidelines. Therefore, the headwall is sufficiently setback from the watercourse and flows have been designed to dissipate via the provision of riprap and enhanced plantings surrounding the headwall to prevent erosion. As this area is within a major groundwater recharge zone, the bio - swales and infiltration galleries were added to this project in order to maintain current groundwater infiltration rates. A planting plan has been submitted with this project. The plantings are located at the outlet location and within the valley. 656 Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. - Pollution: Appropriate sediment and erosion controls will be installed and maintained throughout all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this project. Plantings Although no significant vegetation will be removed as a result of the proposed works, the applicant has proposed significant plantings in accordance with TRCA Guidelines. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream corridor Management Program (VSCMP). CFN: 40484 .- Application #: 100 /08 /RH Report Prepared by: Uton Samuels, extension 5386 For information contact: Uton Samuels, extension 5386 Date: July 2, 2008 TOWN OF WHITCHURCH - STOUFFVILLE 8.1.55 MEADOWBROOK GOLF AND COUNTRY CLUB To construct, reconstruct, erect or place a building or structure and site grade on Lot 32, 33, Concession 5, (11939 Warden Avenue), in the Town of Whitchurch - Stouffville, Rouge River Watershed as located on the property owned by Meadowbrook Golf and Country Club. The purpose is to site grade and construct within a Regulated Area of the Rouge River Watershed in order to facilitate renovations on an existing golf course. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Letter of Undertaking, dated June 25, 2008, prepared by Daniel Miller - RJ Burnside, received June 25, 2008. 657 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of reconstructing the existing 11th tee deck of the Meadowbrook Golf and Country Club. The works consist of grading and filling in order to recreate the 11th tee deck in a new location, as well as resurfacing of existing cart paths with asphalt. Control of Flooding: The deck grading and filling will be located outside of the floodplain. The cart resurfacing will be located within the floodplain however, it is a replacement of existing asphalt. There will be no further encroachment into the valleylands. TRCA technical staff have reviewed the proposal and are satisfied that there'will be no impacts to the storage or conveyance of flood waters. Pollution: Appropriate sediment fencing will be in place throughout the duration of construction to ensure that no sediment will enter the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As the property is an existing golf course there will be no removal of significant vegetation." Plantings No plantings are required. Policy Guidelines: • This proposal is consistent with Section 4.2.2 (H), Existing Resource -based Uses, of TRCA's Valley and Stream Corridor Management Program. CFN: 40983 - Application #: 458/08/WS Report Prepared by: Shannon McNeill, extension 5744 For information contact: Bill Kiru, extension 5306 Date: June 26, 2008 8.1.56 REGIONAL MUNICIPALITY OF YORK - To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 1, Concession 7, 8, (East Little Rouge Creek Crossing - Tributary runs adjacent to Highway 48, crossing at the Highway 48 and Stouffville Road Intersection), in the-Town of Whitchurch - Stouffville, Rouge River Watershed as located on the property owned by Regional Municipality of York. 658 The purpose is to construct and temporary /permanently remove /place fill /material in a regulated area and Regional Storm Flood plain to facilitate the construction of a watermain and sanitary sewer on the north side and centre of Stouffville Road, crossing beneath the East Little Rouge Creek which crosses at the intersection of Highway 48 and Stouffville Road, within the fisheries cold -water timing window of June 15 to September 15. The method for construction beneath the watercourse is by Jacking and Boring. Alternate construction method(s) will only be approved by TRCA staff through a revision to this permit if York Region submits a proposal to the satisfaction of TRCA staff. • Withdrawn 8.1.57 TOWN OF WHITCHURCH- STOUFFVILLE To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lot 5, Concession 9, (6301 Bethesda Road), in the Town of Whitchurch - Stouffville, Duffins Creek Watershed as located on the property owned by Town of Whitchurch- Stouffville. The purpose is to undertake site grading, permanently place fill material and alter a watercourse in order to develop a major active recreation park adjacent to the Stouffville Creek. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Drawing No. L6, Planting Plan, prepared by Basterfield & Associates, dated December 2007, Revision No. 4, revised on June 10, 2008, received by TRCA on June 23, 2008; .• Drawing No. L10, Details, prepared by Basterfield & Associates, dated December 2007, Revision No. 4, revised on June 10, 2008, received by TRCA on June 23, 2008; • Drawing No. 1829SS01, Site Servicing Plan, prepared by Basterfield & Associates and D.M. Wills Associates Limited, dated June 10, 2008, Revision No. 4, revised on June 10, 2008, received by TRCA on June 23, 2008; • Drawing No. 1829SS03, Stormwater Management Details, prepared by Basterfield & Associates and D.M. Wills Associates Limited, dated June 10, 2008, Revision No. 4, revised on June 10, 2008, received by TRCA on June 23, 2008; • Drawing No. 1829SS04, Stormwater Management Pond Details, prepared by Basterfield & Associates and D.M. Wills Associates Limited, dated June 10, 2008, Revision No. 4, revised on June 10, 2008, received by TRCA on June 23, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 659 Proposal: The applicant seeks permission to undertake site grading, permanently place fill material and alter a watercourse in order to develop a major active recreation park adjacent to the Stouffville Creek. The proposed park, known as Bethesda Park, is located on the south side of Bethesda Side Road east of the Ninth Line within a rural area of the Town of Whitchurch- Stouffville immediately north of the community of Stouffville and the Stouffville Reservoir Conservation Area. The lands to be developed into the park are located on the south slope of the Oak Ridges Moraine and are approximately 20 hectares in size. The lands were formally used as a sod farm. The headwaters of the Stouffville Creek and associated valleylands transect the west side of the site. The creek and valleylands contain woodlands and wetlands in addition to riparian vegetation and fisheries resources. The Stouffville Creek and associated lands previously described are designated as a 'Natural Linkage Area' in the Oak Ridges Moraine Conservation Plan. Only passive recreational uses and conservation and ecological restoration uses are permitted within the Natural Linkage Area. TRCA staff have assisted in ensuring that the park plan provides for only passive recreation and restoration uses within the sensitive areas of the Natural Linkage Area. A minor exception was permitted for the continued use of an existing works yard and shed that is located in the Linkage Area. The balance of lands are designated as a 'Countryside Area' pursuant to the Oak Ridges Moraine Conservation Plan and are to contain the major active recreational portion of the parklands including the associated servicing infrastructure. This includes: three baseball diamonds, four mini soccer pitches and three full size soccer pitches, a recreational trail system. Supporting infrastructure includes: access roads and parking lots, washroom and change room facilities, irrigation, stormwater management, lighting and sanitary sewer services. With respect to stormwater management, an extensive naturalized vegetated swale system is to be constructed that will lead to a stormwater management pond to be constructed on table lands outside of the Natural Linkage Area. The stormwater management pond will have an . outfall leading to the Stouffville Creek and will be used for irrigation of the sports fields. Control of Flooding: The stormwater management system has been designed to safely convey flood flows in accordance with all relevant technical criteria. No new structures or playfields are to be constructed within lands subject to flooding under a Regional Flood event. Thus, the storage and conveyance of flood waters will not be affected by this proposal. Most parking areas and driveways are to be constructed with impervious surfaces providing for the maintenance of groundwater infiltration. Pollution: Sediment and erosion controls are to be in place prior to construction. Dynamic Beaches: Not applicable Erosion: There are no slope stability or geotechnical concerns with this proposal. 660 Conservation of Land: TRCA staff have ensured that the requisite environmental studies were undertaken in order to ensure that all sensitive features within the Natural Linkage Area are protected and adequately buffered. A 30 metre Minimum Vegetation Protection Zone has been provided, as required by the Oak Ridges Moraine Conservation Plan, adjacent to all key natural and hydrologically sensitive features. Previous dumping of fill within the Natural Linkage Area portion of the site is to be removed. Plantings Riparian and buffer plantings of natural, self sustaining, shrubs and trees are to be provided within the Natural Linkage Area. Large portions of the site within the Countryside Area will be allowed to regenerate into a natural meadow and will not be actively manicured with mowing. Policy Guidelines: This proposal is consistent with Policies 4.1.1, New Urban Development and 4.3, Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40619 - Application #: 197/08/WS Report Prepared by: Chris Jones, extension 5718 For information contact: Chris Jones, extension 5718 Date: June 27, 2008 8.1.58 TOWN OF WHITCHURCH- STOUFFVILLE To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Main Street (Sta. 0 +800 and Sta. 1 + 185) in the Town of Whitchurch - Stouffville, Rouge River Watershed as located on the property owned by Town of Whitchurch - Stouffville. The purpose is to construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a waterway on Main Street (between Highway 48 and 9th Line) and at an existing stormwater management pond south of Main Street, in the Town of Whitchurch - Stouffville, Regional Municipality of York in the Rouge River Watershed as located on property owned by Town of Whitchurch- Stouffville. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Letter of undertaking to provide minor revisions to erosion and sediment, planting and engineering plans to the satisfaction of TRCA staff; dated July 3, 3008; received July 4, 2008; prepared by the Town of Whitchurch- Stouffivlle. RATIONALE The application was reviewed by staff on the basis of the following information: 661 Proposal: The entire proposal involves the widening of Main Street from 9th Concession to Highway 48. The works will include the addition of two lanes and a median, storm sewer, the extension of an existing culvert located east of Highway 48 and the elimination of Tributary 4 located on the south side of Main Street (240m east of Sandiford Drive and 60m west of Sandiford Drive). The destruction of Tributary 4 is a Harmful Alteration, Disruption. or Destruction (HADD) of fish habitat and requires appropriate compensation in order to acquire the Authorization from Fisheries and Oceans Canada (DFO). TRCA approval of these works has been divided into three phases in order to facilitate the construction of the road improvements. Phase I (Sta. 1 +185 to east construction limit) involves road improvement works outside the Regulated Area. Under TRCA's level III agreement with Fisheries and Oceans Canada (DFO), staff issued a Letter of Advice (LOA) to ensure that the appropriate sediment and erosion control measures were implemented in order to protect fish habitat. Phasell (Sta. 0 to Sta. 0 +800) involves road improvement works within the Regulated Area and requires TRCA permit approval and an additional LOA. Phase II road works include the construction of a storm sewer and north and south extensions to the existing culvert located east of Highway 48. The culvert extensions involve in water works and are subject to the coldwater fisheries timing window of July 1 to September 15. Phase II works were approved under permit C- 08459. This application is for Phase III (Sta. 0 +800 to 1+185) and involves works within the Regulated Area, the HADD (elimination of Tributary 4) and associated compensation (SWM Pond) for the HADD. The project was reviewed through the Municipal Class Environmental Assessment process. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: . Standard erosion control measures (silt/sediment fencing, rock check dam, dam and pump) will be implemented and 'maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the wetland /watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: • There will be in stream works associated with this project. All works will be conducted in the dry. Approximately 300m of a roadside watercourse will be enclosed to accommodate the proposed road widening. This permanent watercourse alteration will constitute a harmful alteration, disruption or destruction (HADD) of fish habitat and will require an authorization from Fisheries and Oceans Canada (DFO). As outlined in the Letter of Intent, the compensation for the HADD will include the retrofit and.upgrade of an existing stormwater management pond. 662 The retrofit would upgrade the facility for water quality control (it currently operates as a quantity control structure only), separate storm flows from baseflow and partition fish habitat from the facility. An upgraded channel with floodplain pools is proposed to compensate for the net spatial loss of habitat length in the watercourse to be lost When the DFO authorization has been received, TRCA staff will be in a position to issue a "Development, Interference with Wetlands, and Alterations to Shorelines and Watercourses (Ontario Regulation 166/06) permit. The proposed works will impact no significant terrestrial resource features. Plantings All disturbed areas will be restored with native non - invasive species following • construction associated with road works. Additional plantings will be implemented as outlined in.TRCA's Stormwater Management Facility Planting Guidelines as part of the retrofit to the existing stormwater management pond. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40820 - Application #: 332/08/WS Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: June 27, 2008 • TOWNSHIP OF KING . 8.1.59 MARY LAKE ESTATES INC. To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Keele Street from McClure Crescent (N. Leg) to 15th Side Road, in the Township of King, Humber River Watershed as located on the property owned by Mary Lake Estates Inc.. The purpose is to construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material originating on the site or elsewhere to facilitate the construction of a sanitary sewer and watermain; Township of King, York Region; Humber Watershed. The permit will be issued for the period of July 11, 2008 to July 10, 2010. • Letter of Undertaking to provide revisions to the engineering drawings and further details on the dewatering activities to the satisfaction of TRCA; dated June 25, 2008; received July 9, 2008; prepared by Mary Lake Estates Inc. RATIONALE The application was reviewed by staff on the basis of the following information: 663 Proposal: The King City Sanitary Sewer project was reviewed by TRCA staff during the Environmental Assessment process. King City is being serviced with sanitary sewers and local pumping stations to take existing residents off sewage septic systems and to plan for future growth. All sewage will ultimately discharge to the York Durham Sewage System (YDSS) on Yonge Street once all servicing has been constructed. There are a total of 13 contract areas of which nine (9) have already been constructed or are currently being constructed. This project is a continuation of the Township of King Contract Area 6A1, approved by TRCA on June 1, 2007 under permit number C- 07407. This application will involve the crossing of an existing 1200mm CSP culvert by a proposed 300mm diameter sanitary sewer and a 250mm diameter watermain by open -cut methodology in the municipal road right -of -way of Keele Street. Minimum culvert clearance distances are 0.5 m for the sanitary sewer and 2.0 m for the watermain. A portion of the works is located within the regulated area on Keele Street. Restoration of Keele Street is proposed and will match existing grades and profile. During construction effective erosion and sediment control (ESC) measures will be implemented to protect all natural features (aquatic and terrestrial). Any water derived from groundwater dewatering or pumping of open cut trench excavations will be managed to prevent impacts to surrounding natural environmental features. Control of Flooding: The proposed project will not impact storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (silt /sediment fence, rock check dams catchbasin silt control filter, etc.) will be implemented and maintained for the duration of construction and until the site is stabilized and restored to prevent construction generated sediment from entering any wetland /watercourse. Dynamic Beaches: Not applicable Erosion: There are no slope stability concerns with the proposed project. Conservation of Land: There will be no in stream work associated with this project. Both the sanitary and watermain crossings are covered under a Department of Fisheries and Oceans (DFO) operational statement (OPS). If the works are carried out in accordance with the relevant OPS, a letter of advice will not be required. The locatiori of the proposed works is within the Oak Ridges Moraine (ORM) and Greenbelt. Section 41 of the Oak Ridges Moraine Conservation Plan indicates in Subsection 5 that transportation'and infrastructure may be permitted to cross hydrologically sensitive features (i.e. watercourses) subject to the tests and best management practices described in section 41(5)(a to e). This project has been reviewed for the tests and best management practices. Where a project is located within the ORM and the Greenbelt, the ORM legislation prevails. 664 Plantings Not applicable Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. The location of the works is within the Oak Ridges Moraine (ORM) and Greenbelt. The project has been reviewed for the tests and best management practices described in Section 41(5) (a to e) of the Oak Ridges Moraine Conservation Plan and complies with the Greenbelt Plan. CFN: 40756 - Application #: 286/08/KING Report Prepared by: Jennifer Draper, extension 5715 For information contact: Jennifer Draper, extension 5715 Date: July 2, 2008 PERMIT APPLICATIONS 8.1.60 - 8.1.62 ARE PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS: RES. #B85/08 - PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Colleen Jordan Maja Prentice THAT permission for routine infrastructure granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.60 - 8.1.62), which are listed below, be received. CARRIED CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.60 CITY OF TORONTO To undertake road /pathway resurfacing or reconstruction at Lake Promenade at Long Branch Avenue, in the City of Toronto (Etobicoke York Community Council Area), along the Lake Ontario Waterfront, as located on the property owned by City of Toronto. The purpose is to undertake road /pathway resurfacing or reconstruction (reducing the curb radius) at Lake Promenade at Long Branch Avenue, in the City of Toronto (Etobicoke York Community Council Area), along the Lake Ontario Waterfront, as located on the property owned by City of Toronto. The permit will be issued for the period of June 27, 2008 to June 26, 2010 in accordance with the following documents and plans which form part of this permit: • Sheet 1 of 1; P -11153 -001; Lake Promenade - Intersection Improvement; by the City of Toronto; Dated April 29, 2008; Received June 24, 2008; Red -line revised June 26, 2008. 665 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of reducing the curb radius at the south west corner by removing the asphalt, relocating the curb and adding fill. No in -water works are anticipated. Control of Flooding: There will be no impacts to the control of flooding. • Pollution: Standard sediment and erosion controls (Silt control fence, silt control filter on the catch basins) will be in place for the duration of construction and until the site is restored to prevent construction generated sediment from entering the lake. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With the erosion and sedimentation controls in effect, the potential for a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice (LOA) will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). There is no timing window. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure.and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 40373 - Application #: 034/08/TOR Report Prepared by: Scott Smith, extension 5758 For information contact: Beth Williston, extension 5217 Date: June 27, 2008 8.1.61 CITY OF TORONTO To undertake road /pathway resurfacing or reconstruction at Bloor Street and Riverside Drive, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by City of Toronto. 666 The purpose is to undertake road /pathway resurfacing or reconstruction (reconstructing a median island) at Bloor Street and Riverside Drive, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by City of Toronto. The permit will be issued for the period of June 27, 2008 to June 26, 2010 in accordance with the following documents and plans which form part of this permit: • Sheet 1 of 1; P- 842 -003; Riverside Drive - Island Improvement at Riverside Drive and Bloor Street West; By the City of Toronto; Dated March 4, 2008; Received June 24, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of reconstructing the existing median island at Bloor Street and Riverside Drive in the City of Toronto, Humber River Watershed. No in -water works are anticipated. Control of Flooding: There will be no impact to the control of flooding. Pollution: There are no sediment and erosion control issues associated with the proposal. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With no sediment and erosion control issues, there is no potential for a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat and a Letter of Advice (LOA) is not required. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 40374 - Application #: 035/08/TOR Report Prepared by: Scott Smith, extension 5758 For information contact: Beth Williston, extension 5217 Date: June 27, 2008 667 TOWN OF RICHMOND HILL 8.1.62 TOWN OF RICHMOND HILL To undertake road /pathway resurfacing or reconstruction on Elgin Mills Greenway (Elgin Mills Road West, North to Canyon Hill Crescent), Harding Park (Weldrick Road East, North of Lennox Avenue), Don German Mills Greenway (Observatory Lane, North to Weldrick Road)), in the Town of Richmond Hill, Don River Watershed as located on the property owned by Town of Richmond Hill. The purpose is to implement road /pathway resurfacing or reconstruction on the Elgin Mills Greenway, in Harding Park and German Mills Greenway, Town of Richmond Hill, Regional Municipality of York in the Don River Watershed on property owned by the Town of Richmond Hill. The permit will be issued for the period of June 30, 2008 to June 29, 2010 in accordance with the following documents and plans which form part of this permit: • Sheet L -2, B -Elgin Mills Greenway; Sheet L -3, C- Harding Park; Sheet L -4, D- German Mills Greenway Context Plan; Sheet L -4A, D- German Mills Greenway; Sheet L4 -B, German Mills Greenway; dated March 5, 2008; received May 20, 2008; prepared by the Town of Richmond Hill; • Sheet FN -101, Tree Protection Fence; Sheet FN -201; dated April 2007; received May 20, 2008; prepared by Town of Richmond Hill. RATIONALE The application was reviewed by staff on the basis of the following information: • Proposal: The proposal is to resurface existing park pathways with light duty asphalt paving in various locations (Elgin Mills Greenway, Harding Park, and German Mills Greenway) in the Town of Richmond Hill, Regional Municipality of York. The existing pathways will not be widened or extended as part of these works. . Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion control measures (silt /sediment fencing) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the wetland /watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. 668 Conservation of Land: As there will be no in stream work associated with the project there will be no concerns related to fish habitat Toss. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40999 - Application #: 473/08/RH Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: June 30, 2008 PERMIT APPLICATIONS 8.1.63 - 8.1.89 ARE MINOR WORKS LETTER OF APPROVAL: RES. #B86/08 - MINOR WORKS LETTER OF APPROVAL PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Colleen Jordan Maja Prentice THAT minor works letter of approval granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.63 - 8.1.89, inclusive), which are listed below, be received. CARRIED CITY OF BRAMPTON 8.1.63 49 OCEAN RIDGE DRIVE To install a swimming pool on Lot 119, Plan 43M -1667, (49 Ocean Ridge Drive), in the City of Brampton, Humber River Watershed. CFN: 40984 - . Application #: 461/08/BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: June 10, 2008 8.1.64 42 SWALES CRESCENT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 278, Plan 43M -1691, (42 Swales Crescent), in the City of Brampton, Humber River Watershed. 669 CFN: 40991 - Application #: 466 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: June 11, 2008 CITY OF PICKERING 8.1.65 1790 FINCH AVENUE, UNIT 44 To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 44, Plan 40M2261, (1790 Finch Avenue, Unit 44), in the City of Pickering, Duffins Creek Watershed. CFN: 40990 - Application #: 465/08 /PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: June 12, 2008 , 8.1.66 1894 BOWLER DRIVE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on , (1894 Bowler Drive), in the City of Pickering, Frenchman's Bay Watershed. CFN: 40988 - Application #: 463/08/PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: June 12, 2008 • CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.67 CITY OF TORONTO To undertake a municipal or utility project on 919 Scarlett Road in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by City of Toronto. CFN: 40973 - Application #: 449/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 11, 2008 8.1.68 49 WOODGATE DRIVE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 9, Concession 3 Lot 28, Plan 3366, (49 Woodgate Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. 670 CFN: 40978 - Application #: 457/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 24, 2008 8.1.69 48 VARSITY ROAD To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 34, Plan 4655, (48 Varsity Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 40919 - Application #: 413 /08/TOR Report Prepared by: Nicole Moxley, extension 5284 • For information contact: Steve Heuchert, extension 5311 Date: June 11, 2008 8.1.70 52 FOREST PATH To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on , (52 Forest Path), in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed. CFN: 41018 - Application #: 482/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 30, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.71. 81 GILTSPUR DRIVE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 18, Plan 5390, (81 Giltspur Drive), in the City of Toronto (North York Community Council Area), Humber River Watershed. CFN: 40912 - Application #: 412/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: June 20, 2008 8.1.72 80 THE BRIDLE PATH To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on , (80 The Bridle Path), in the City of Toronto (North York Community Council Area), Don River Watershed. 671 CFN: 40676 - Application #: 241/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: June 6, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.73 27 CHERRYHILL AVENUE To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 11, Plan 1193, (27 Cherryhill Avenue), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. CFN: 40824 - Application #: 335/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: June 26, 2008 13.1 .74 154 BATHGATE DRIVE To install a swimming pool on Part Lot 64, Plan 66R- 17163, (154 Bathgate Drive), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. CFN: 41016 - Application #: 480/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: June 26, 2008 8.1.75 15 BRIARSCROSS BOULEVARD • To construct, reconstruct, erect or place a building or structure on Lot 1209, Plan M -1470, (15 Briarcross Boulevard), in the City of Toronto (Scarborough Community Council Area), Humber River Watershed. CFN: 40949 - Application #: 438/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: June 20, 2008 .CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.76 32 CARLAW AVENUE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 29, Plan 423, (32 Carlaw Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. 672 CFN: 40897 - Application #: 399/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 9, 2008 - 8.1.77 GENERIC GENERAL PARTNER INC. SOBARA GROUP To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on 68 Broadview Avenue, Unit 69 of TSCC 1831 in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by Generic General Partner Inc. Sobara Group. CFN: 41014 - Application #: 478/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 23, 2008 8.1.78 20 EASTMOUNT AVENUE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) and construct a ground floor addition up to 50 sq. m (538 sq. ft) on 20 Eastmount Avenue in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 40953 - Application #: 439/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 27, 2008 8.1.79 55 BINSCARTH ROAD To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on 55 Binscarth Road in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 40940 - Application #: 424/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 24, 2008 8.1.80 191 LONSMOUNT DRIVE To install a swimming pool on Lot 26, 27, Plan 1688Y, (191 Lonsmount Drive), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. 673 CFN: 40879 - Application #: 380/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: June 13, 2008 TOWN OF AJAX 8.1.81 88 NOAKE CRESCENT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 56, Plan 40M1575, (88 Noake Crescent), in the Town of Ajax, Duffins Creek Watershed. CFN: 40987 - Application #: 462/08 /AJAX Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 • Date: June 12, 2008 TOWN OF CALEDON 8.1.82 93 VALLEYVIEW COURT To install a swimming pool on Lot 93, Plan 988, (93 Valleyview Court), in the Town of Caledon, Humber River Watershed. CFN: 40952 - Application #: 440 /08 /CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: June 4, 2008 8.1.83 15 JACK KENNY COURT To install a swimming pool on (15 Jack Kenny Court), in the Town of Caledon, Humber River Watershed. CFN: 41006 - Application #: 486/08 /CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: June 20, 2008 8.1.84 29 PINEBROOK CIRCLE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 42, Plan 43M -1217, (29 Pinebrook Circle), in the Town of Caledon, Etobicoke Creek Watershed. . 674 CFN: 40979 - Application #: 455/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: June 11, 2008 - 8.1.85 8 VALLEYGREEN CRESCENT . To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 37, Plan 43M -569, (8 Valleygreen Crescent), in the Town of Caledon, Humber River Watershed. CFN: 41032 - Application #: 489/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: June 25, 2008 8.1.86 17886 GORE ROAD To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 29, 30, Concession 3, (17886 Gore Road), in the Town of Caledon, Humber River Watershed. CFN: 40992 - Application #: 467/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: June 11, 2008 TOWN OF MARKHAM 8.1.87 211 RIVERWALK DRIVE To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and • construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) at 211 Riverwalk Drive, in the Town of Markham, Rouge River Watershed. CFN: 40994 - Application #: 469/08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: June 12, 2008 TOWN OF RICHMOND HILL 8.1.88 30 VITLOR DRIVE To install a swimming pool on Lot 24, Plan 65M -3291, (30 Vitlor Drive), in the • Town of Richmond Hill, Humber River Watershed. 675 CFN: 40882 - Application #: 377/08/RH . Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: June 6, 2008 TOWNSHIP OF UXBRIDGE 8.1.89 386 UXBRIDGE PICKERING TOWN LINE To undertake minor landscaping involving the placement, removal or regrading of material of Tess than 30 cubic metres (equivalent to 3 truckloads) and construct a ground floor addition up to 50 sq. m (538 sq. ft) on Part Lot 1, 2, 'Concession 3 Plan N98- 102 -1, (386 Uxbridge Pickering Town Line), in the Township of Uxbridge, Duffins Creek Watershed. CFN: 41020 - Application #: 484/08/UXB Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: June 26, 2008 CITY OF MISSISSAUGA 8.1.90 GLOBAL VILLAGE DEVELOPMENTS INC. To construct, reconstruct, erect or place a building or structure at 1055 and 1065 Sisbro Court, in the City of Mississauga, Etobicoke Creek Watershed as located on the property owned by Global Village Developments Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a 20,460.5 square metre (220,289 sq. ft.) industrial condominium complex located at 1055 and 1065 Sisbro Court, in the City of Mississauga. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking, prepared by Skira & Associates Ltd., dated July 8, 2008, to . address all outstanding engineering and ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: 676 Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a 20,460.5 square metre (220,289 sq. ft.) industrial condominium complex located at 1055 and 1065 Sisbro Court, in the City of Mississauga. The subject property is located adjacent to a valley corridor. Through past planning reviews (December 2006), the limits of development for the subject property were established by TRCA staff. The proposed works are setback 10 metres from this established limit of development in accordance with TRCA's policies. As such, the proposed works are setback sufficiently from the valley corridor. As a component of this project, innovative biofiltration strips will be installed on the subject property in order to incorporate additional on -site stormwater quality controls. Although there are no flooding, geotechnical, or ecology related concerns with this application, an extensive planting plan is proposed within the valley corridor and buffer area in order to provide an ecological net gain with this application. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this proposal. Plantings . All proposed plantings will be native and non - invasive consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41099 - Application #: 558/08/MISS Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: July 9, 2008 677 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.91 12 FALLINGBROOK DRIVE To construct, reconstruct, erect or place a building or structure on Block E, F, Plan 2836, (12 Fallingbrook Drive), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to develop within a Regulated Area of the Lake Ontario Waterfront to facilitate construction of a concrete retaining wall and gazebo. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1, Site Plan, prepared by Axiis Architects Inc., undated, received by TRCA May 23, 2008; • Drawing No. 2, Plan, prepared by Axiis Architects Inc., undated, received by TRCA May 23, 2008; • Drawing No. 3, Elevation, prepared by Axiis Architects Inc., undated, received by TRCA May 23, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include the construction of a replacement retaining wall and gazebo at 12 Fallingbrook Drive in the City of Toronto. The site is located south of Kingston Road, east of Victoria Park Avenue. The retaining wall was built without a permit and a violation was issued by TRCA enforcement staff. Control of Flooding: The site is not located in a Regional Storm Floodplain. Pollution: A sediment control fence has been erected and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. Dynamic Beaches: Not applicable Erosion: An engineering letter of opinion stating that the retaining wall is long- term - stable has been reviewed and approved by TRCA geotechnical engineering staff. The wall prevents sediment and debris resulting from slope erosion from damaging the existing in- ground pool. Conservation of Land: No significant vegetation will be removed as a result of construction and appropriate tree protection fencing will be installed. 678 Plantings • Native tree shrubs and seed mix will be planted. Policy Guidelines: - This proposal is consistent with Section 4.2.2.D, Replacement Structures, of TRCA's Valley and 'Stream Corridor Management Program. CFN: 40921 - Application #: 415/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 8, 2008 CITY OF VAUGHAN 8.1.92 CITY OF VAUGHAN To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Roe Road, King and Vaughan Road, Kipling Avenue and Kirby Road, in the City of Vaughan, Humber River Watershed as located on the property owned by City of Vaughan. The purpose is to site grade, temporarily or permanently place - dump or remove any material - originating on the site or elsewhere, alter a watercourse in order to re- surface sections of King- Vaughan Road, Kipling Avenue, Kirby Road and Roe Road in the-City of Vaughan, Regional Municipality of York in the Humber River Watershed on property owned by the City of Vaughan. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to revise erosion and sediment drawings to the satisfaction of TRCA staff; dated July 7, 2008; received July 7, 2008; prepared by City of Vaughan RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: . The.entire proposal involves re- surfacing of King- Vaughan Road (Highway 27 to Kipling - Avenue), Kipling Avenue (King- Vaughan Road to Kirby Road), Kirby Road (Kipling Avenue to Highway 27) and Roe Road in the City of Vaughan, Regional Municipality of York. The proposal has been divided into two separate applications. This application is for the proposed works from Sta. 10 +683 to Sta. 10 +749 on King- Vaughan Road. The proposed works at this location involve minor ditch grading, paving and a 2.0m extension of an existing 1.0m wide csp culvert and a concrete headwall. The remainder of works will be approved under approval of Permission for Routine Infrastructure Works (CFN 41076). Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. 679 Pollution: Standard erosion control measures (silt /sediment fencing, rock flow check dam) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the wetland /watercourse. Dynamic Beaches: Not applicable Erosion: There are -no geotechnical /slope stability issues associated with the proposal. Conservation of Land: As there will be no in stream work associated with the project there will be no concerns related to fish habitat loss. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41074 - Application #: 535 /08NAUG Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: July 8, 2008 TOWN OF MARKHAM 8.1.93 19 CIRCLE COURT To site grade on Lot 21, Plan 65M -2348, (19 Circle Court), in the Town of Markham, Don River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Don River Watershed • in Order to facilitate the construction of an in ground swimming pool. The permit will be issued for the period of July 11, 2008 to July 10, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by E. Basso, dated June 20, 2008, stamped received by TRCA Planning and Development on June 24, 2008, redline revised by TRCA Staff on July 11, 2008. 680 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: - The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of an in ground pool. The works are located within the Regional Storm Floodplain however, the proposed development has been adequately flood protected and all existing grades will be maintained. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. In addition, the rear of the subject property is located adjacent to a valley corridor of the Don River Watershed. TRCA staff has conducted a site inspection and confirm that the proposed works appear to be sufficiently setback from the valley corridor feature. The area to which this application applies is currently a manicured lawn and is void of any significant vegetation, however the applicant has prepared a planting plan, in accordance with TRCA guidelines, to mitigate the impacts of development on the valley corridor. Control of Flooding: TRCA Water Resources staff has reviewed this proposal and do not anticipate any impacts to the storage and /or conveyance of flood waters. The proposed pool is located outside of the hydraulic floodway. All excavated fill will be removed from the floodplain. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as result of construction. Although no vegetation will be removed, the applicant has proposed extensive plantings along the rear of the property, abutting the valley corridor. There are no fisheries related concerns associated with this application. Plantings All plant species are native and non - invasive, consistent with TRCA's guidelines. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41024 - Application #: 488 /08 /MARK • Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: July 7, 2008 681 RES. #B87/08 - Moved by: Seconded by: DERRYDOWNS PEDESTRIAN BRIDGE CONSTRUCTION PROJECT Tender RSD08 -21. Award of Contract RSD08 -21 for the construction of a pedestrian bridge. Anthony Perruzza • Reenga Mathivanan THAT Contract RSD08 -21 be awarded to McPherson - Andrews Contracting Limited for a total cost not to exceed $164,016.00 plus applicable taxes and including $20,000 contingency amount, it being the lowest bid that meets Toronto and Region Conservation Authority (TRCA) specifications. CARRIED BACKGROUND Watercourses and adjacent park areas within the City of Toronto sustained a significant amount of damage as a result of the August 19, 2005 storm event. In response to the damage caused, the City of Toronto Parks, Recreation and Forestry Department entered into a sole source agreement with TRCA (February 20, 2007) to complete the repairs and remedial works required to ensure protection of life and property within the City of Toronto parks systems. The sites requiring remedial and repair work were identified specifically in reports from Engineering Management Systems Inc. and Chisholm Fleming Ltd; engineering firms retained by the City of Toronto Parks department to conduct damage inventories for all of the parks networks, to be prioritized by TRCA. Based onihe findings of the report from Engineering Management Systems, TRCA and the City of Toronto Parks, Recreation and Forestry Department have developed a short-list of priority repairs to be completed as part of the City of Toronto Storm Damage Repair Project The bridge identified as BN47PC203 -253: Derrydowns Parkland South Pedestrian Bridge 3, was destroyed during the storm event, and replaced with a temporary bridge by the City of Toronto for the purpose of pedestrian movement through the park system. Service vehicles have been using a concrete fjord currently located downstream of the bridge for access during this time. The new bridge will accommodate pedestrian and service vehicle access through the park system, and the fjord and the temporary bridge will be removed off -site. BIDDERS TOTAL • (excluding G.S.T.) McPherson - Andrews Contracting Ltd. $164,016.00 Dig -Con International Limited $171,638.00 R -Chad General Contracting Ltd. $219,300.00 Aplus General Contractor $223,750.00 Bob Hendricksen Construction Ltd. $287,740.00 Based on a review of the bids received by staff and an assessment of the lowest bidder's experience and ability to undertake similar projects, staff recommend that Contract RSD08 -21 be awarded to McPherson - Andrews Contracting Limited for the total bid amount of $164,016.00, plus applicable taxes, as they are the lowest bidder that meets TRCA specifications. 682 FINANCIAL DETAILS Funds are available within account #185 -10 of the City of Toronto Storm Damage Budget. Project amount recommended includes a $20,000 contingency provision. The contingency amount is released only with approval of TRCA staff. Report prepared by: Patricia Newland, 416- 392 -9690 Emails: pnewland @trca.on.ca For Information contact: Joe Delle Faye, 416- 392 -9724 Emails: jdellefave @trca.on.ca Date: June 26, 2008 SECTION IV - ITEMS FOR THE INFORMATION OF THE BOARD RES.#B88/08 - Moved by: Seconded by: LOWEST BID NOT ACCEPTED Bob Hunter Lands. Receipt of reports approved by the Chief Administrative Officer on award of contracts for interior renovations for two Toronto and Region Conservation Authority rental homes. Maja Prentice Richard Whitehead IT IS RECOMMENDED THAT the report from the Chief Administrative Officer on award of contract to Nova Decore Construction, who was not the lowest bidder, be received; AND FURTHER THAT the report from the Chief Administrative Officer on award of contract to Benaqua Contracting, who was not the lowest bidder, be received. RECORDED VOTE Maria Augimeri Yea Rob Ford Nay Suzan Hall Yea Jack Heath Nay Colleen Jordan Yea Reenga Mathivanan Yea Gerri Lynn O'Connor Yea Anthony Perruzza Yea Maja Prentice Yea Richard Whitehead Yea THE MOTION WAS CARRIED 683 BACKGROUND At Authority Meeting #5/05, held on June 24, 2005, Resolution #A124/05 approved the Purchasing Policy. As per Schedule 'A of the policy, if the lowest bidder is not selected, a report shall be provided to the Executive Committee for their information at the next available meeting. In this regard, the reports outlined in Attachments 1 and 2 that were approved by the Chief Administrative Officer on June 9, 2008 are provided for information. Report prepared by: Kathy Stranks, extension 5264 Emails: kstranks @trca.on.ca For Information contact: Lori Colussi, extension 5303 Emails: Icolussi @trca.on.ca Date: June 10, 2008 Attachments: 2 684 Attachment 1 TO: Chair and Members of the Procurement Not Requiring Board Approval Meeting RFQ Lowest Bid Not Accepted ($10,000 to $25,000) - Jan 1 to June 30, 2008, June 30, 2008 FROM: James W. Dillane, Director, Finance and Business Services RE: BOB HUNTER LANDS 7669 Reesor Road, Markham KEY ISSUE Award of contract for the interior renovations for a Toronto and Region Conservation Authority rental home RECOMMENDATION THAT the contract for the interior renovations of the main floor bathroom, kitchen and side entrance at 7669 Reesor Road, Markham, be awarded to Nova Decor Construction for a cost not to exceed $19,750.00, plus applicable taxes. BACKGROUND On March 31, 2007, the Ontario Realty Corporation transferred lands to Toronto and Region Conservation Authority (TRCA), these lands being known as the Bob Hunter Lands. A number of rental tenancies were transferred to TRCA with the transfer of these lands. An assessment was carried out prior to the transfer of each of these residential units to determine the extent of repair. Accordingly, since there was a considerable amount of maintenance work to be carried out, funds were also provided to TRCA by the Ontario Realty Corporation to carry out these necessary repairs. A Request for Quotation was prepared and distributed to several contractors to carry out this work at 7669 Reesor Road, Markham as the second floor bathroom, bedrooms, hallway, basement and flooring are at the end of their useful life and in a state of disrepair. The contractors who received the Request for Quotation were as follows: • B.W. Doucette • Benaqua Contracting • Nova Decor Construction Ltd. • Benvenuto Bros. • Tri -Star General Contracting • Frontier Group of Companies ■ • Dreamscapes Renovations A site visit was arranged for the contractors to meet TRCA staff to examine the extent of the work. Of the seven contractors invited to quote, only three made arrangements to attend and submitted a quote. The quotations received were as follows: 685 CONTRACTOR QUOTE (Plus Applicable Taxes) B.W. Doucette $17,142.90 Benaqua Contracting $21,300.00 Nova Decor Construction Ltd $19,750.00 After comparing the three quotes provided, staff is recommending that the contract be awarded to Nova Decor Construction Ltd. who is not the lowest bidder. Nova Decor Construction Ltd. has carried out work for TRCA and is a reputable contractor. TRCA is finding it difficult to find new contractors and staff wishes to distribute the work in an effort to keep contractors interested in quoting on jobs for TRCA. Staff also feel that by awarding all of the work to B.W. Doucette it may make it difficult for him to meet our deadline. FINANCIAL DETAILS The project cost is not to exceed $19,750.00, plus applicable taxes. Funds for this work are available from Ontario Realty Corporation in TRCA's Bob Hunter capital account. Report prepared by: Lori Colussi, extension 5303 Emails: Icolussi @trca.on.ca For Information contact: Lori Colussi, extension 5303 Emails: Icolussi @trca.on.ca Date: June 03, 2008 686 Attachment 2 TO: Chair and Members of the Procurement Not Requiring Board Approval Meeting RFQ Lowest Bid Not Accepted ($10,000 to $25,000) - Jan 1 to June 30, 2008, June 30, 2008 FROM: James W. DiIlane, Director, Finance and Business Services RE: BOB HUNTER LANDS 7733 14th Avenue, Markham, Bob Hunter Lands KEY ISSUE Award of contract for interior renovations for a Toronto and Region Conservation Authority rental home RECOMMENDATION THAT the contract for the basement bathroom renovations and general repairs at 7733 14th Avenue, Markham, be awarded to Benaqua Contracting for a cost not to exceed $14,300.00, plus applicable taxes. BACKGROUND On March 31, 2007, the Oritario Realty Corporation transferred lands to Toronto and Region Conservation Authority (TRCA), these lands being known as the Bob Hunter Lands. A number of rental tenancies were transferred to TRCA with the transfer of these lands. An assessment was carried out prior to the transfer of each of these residential units to determine the extent of repair. Accordingly, since there was a considerable amount of maintenance work to be carried out, funds were also provided to TRCA by the Ontario Realty Corporation to carry out these necessary repairs. A Request for Quotation was prepared and distributed to several contractors to carry out this work at 7733 14th Avenue, Markham as the basement bathroom is at the end of its useful life and in a state of disrepair, and the house in general requires repairs to amend certain deficiencies. The contractors who received the Request for Quotation were as follows: • B.W. Doucette • Benaqua Contracting • Nova Decor Construction Ltd. • Benvenuto Bros. • Tri -Star General Contracting • Frontier Group of Companies . • Dreamscapes Renovations A site visit was arranged for the contractors to meet TRCA "staff to examine the extent of the work. Of the seven contractors invited to quote, only three made arrangements to attend and submitted a quote. The quotations received were as follows: 687 CONTRACTOR QUOTE (plus applicable taxes) B.W. Doucette _ $12,139.05 Benaqua Contracting $14,300.00 Nova Decor Construction Ltd $17,300.00 After comparing the three quotes provided, staff is recommending that the contract be awarded to Benacqua Contracting, who is not the lowest bidder. TRCA is finding it difficult to find new contractors and staff wishes to distribute the work in an effort to keep contractors interested in quoting on jobs for TRCA. Staff also feel that by awarding all of the work to B.W. Doucette it may make it difficult for him to meet our deadline. Benacqua Contracting has not done any work for TRCA, but has been highly recommended. FINANCIAL DETAILS The project cost is not to exceed $14,300.00, plus applicable taxes. Funds for this work are available from Ontario Realty Corporation in TRCA's Bob Hunter capital account. Report prepared by: Lori Colussi, extension 5303 Emails: Icolussi @trca.on.ca For Information contact: Lori Colussi, extension 5303 Emails: Icolussi @trca.on.ca Date: June 04, 2008 688 TERMINATION ON MOTION, the meeting terminated at 11:20 a.m.., on Friday, July 11, 2008. Gerri Lynn O'Connor Brian Denney Chair Secretary- Treasurer /ks 689 ■ THE TORONTO AND REGION CONSERVATION AUTHORITY MEETING OF THE EXECUTIVE COMMItTEE #6/08 August 8, 2008 The Executive Committee Meeting #6/08, was held by conference call, on Friday, August 8, 2008. The Chair Gerri Lynn O'Connor, called the meeting to order at 9:38 a.m.. PRESENT Rob Ford Member PRESENT VIA CONFERENCE CALL Suzan Hall Member Colleen Jordan Member Reenga Mathivanan Member Ron Moeser Member Gerri Lynn O'Connor Chair Anthony Perruzza Member Richard Whitehead Member ABSENT Maria Augimeri Vice Chair David Barrow Member Jack Heath Member Maja Prentice Member RES. #B89/08 - MINUTES Moved by: Seconded by: Richard Whitehead Colleen Jordan THAT the Minutes of Meeting #5/08, held on July 11, 2008, be approved. CARRIED 690 SECTION II - ITEMS FOR EXECUTIVE ACTION • RES. #B90/08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Development, Interference with Wetlands and Alterations to Shorelines and Watercourses. Pursuant to Ontario Regulation 166/06, written permission from the Authority is required for: a) straightening, changing, diverting or interfering in any way with the existing channel of a river, creek, stream or watercourse, or for changing or interfering in any way with a wetland; b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development. A permit maybe refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected. Moved by: Seconded by: Ron Moeser Suzan Hall THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.1 - 8.1.34, inclusive and 8.1.83 - 8.1.86, inclusive), which are listed below. CARRIED CITY OF BRAMPTON 8.1.1 42 PACIFIC WINDS CRESCENT • To construct, reconstruct, erect or place a building or structure at 42 Pacific Wind Crescent, in the City of Brampton, Etobicoke Creek Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a replacement deck structure located at the rear of an existing residential dwelling at 42 Pacific Wind Crescent, in the City of Brampton. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by T. Patel, stamped received by TRCA Planning & Development staff on July 4, 2008; ,• East Elevation, prepared by T. Patel, stamped received by TRCA Planning & Development staff on July 4, 2008. RATIONALE • The application was reviewed by staff on the basis of the following information: 691 , Proposal: - The purpose of this application' is to undertake works within a TRCA.Regulated Area, of the Etobicoke Creek Watershed in order to facilitate the construction of a replacement deck • structure located at the rear of an existing residential dwelling at'42 Pacific•Wind Crescent, in the City of Brampton. The rear of the subject property is adjacent to a tributary of the Etobicoke Creek Watershed. The proposed works are located outside of the Regional Storm Floodplain and are sufficiently setback. As such, there are no flooding, geotechnical, or ecology related concerns with this application. Control of Floodinq: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. - Pollution: . Appropriate erosion and sediment controls (silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. • Conservation of Land: -No significant vegetation will be removed-as a result of this project. There are no fisheries related concerns associated with this proposal. Plantings - • The proposed deck replacement is located within an existing manicured lawn. As such, no planting are required as'an element of this application. Policy Guidelines: This proposal,is in conformity with Section 4.2.2 (E) - Property Improvements and Ancillary Structures -of the Authority's Valley and Stream Corridor Management Program (VSCMP). • CFN: 41095 - 'Application #: 553 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact Quentin Hanchard, extension 5324 - Date: July 30, 2008 CITY OF PICKERING 8.1.2 1984 ROYAL ROAD To construct, reconstruct, erect or place a building or structure on,Lot 15, Plan 185,-0984 Royal Road), in the City of Pickering, Duffins Creek Watershed. The purpose is to reconstruct a small addition to a residential development within a Regulated Area of the Duffins Creek Watershed. 692 The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan submitted by the applicant, received July 14, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of reconstructing a small addition to a residential development within a Regulated Area of the Duffins Creek Watershed. The subject property is located within the Regulatory Floodplain of the Duffins Creek and also the Pickering Special Policy Area. Control of Flooding: All the windows associated with this addition are approximately 1. 3 metres above the existing grade. As the flooding is minimal in this area, and the windows are no lower than the existing door and windows, TRCA staff are not concerned that there is any additional flood risk to this property. Pollution: . Sediment fencing is not required as part of this application as the works are adequately setback from the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As the proposed addition is a reconstruction of an existing sunroom, there will be no vegetation removed as part of this application. • Plantings No plantings are required. Policy Guidelines: This proposal is consistent.with Section 4.2.2 C, Minor Additions, of TRCA's Valley and Stream Corridor Management Program. CFN: 41159 - Application #: 608 /08 /PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: July 28, 2008 693 • 8.1.3 366 DYSON ROAD To construct, reconstruct, erect or place a building or structure on Lot 43, Plan 283, (366 Dyson Road), in the City of Pickering, Rouge River Watershed. The purpose is to construct a two storey addition to an existing house within a Regulated Area of the Rouge River Watershed. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1, Site Plan, dated July 2, 2008, received July 7, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of constructing a two storey addition to an existing house within a Regulated Area of the Rouge River Watershed. The subject property abuts the Rouge River in the rear yard. The existing house is located approximately 15 metres from top of bank. As the proposed addition is located in the front yard, there will be no further encroachment into the valleylands. Control of Flooding: The proposed addition is no located within the Regulatory Storm Floodplain. As such, there are no flooding concerns. Pollution: No sediment fencing is required as part of this application as the works are adequately setback from the valleylands. Dynamic Beaches: Not applicable Erosion: As the proposed addition is located 15 meters from the top of bank, TRCA technical staff are satisfied that there will be no geotechnical issues. Conservation of Land: There will be no removal of significant vegetation however the applicant will be providing some plantings along the top of bank. This will result in a net ecological gain. Plantings All plantings will be in accordance with TRCA's Seed Mix Guidelines. Policy Guidelines: This proposal is consistent with Section 4.2.2 C, Minor Additions, of TRCA's Valley and Stream Corridor Management Program. 694 CFN: 41100 - Application #: 557/08/PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: July 28, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) • . 8.1.4 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure and site grade on Lakeshore Boulevard West, in the City of Toronto (Etobicoke York Community Council Area), Humber River and Waterfront Watershed as located on the property owned by City of Toronto. The purpose is to upgrade the existing playground area including constructing a new playground surface and sub - drainage tiles, new concrete border, playground equipment and site furnishings. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing # L1 of 2, Existing Features /Demolition and Grading /Planting Plan; received by TRCA July 8, 2008; prepared by Harrington and Hoyle Limited, dated May 7, 2008, revised July 7, 2008; • Drawing #.L2 of 2, Layout Plan and Details; received by TRCA July 8, 2008; prepared by Harrington and Hoyle Limited, dated May 7, 2008,,revised July 7, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: • The proposal constitutes Phase 1 upgrades of the Sir Casimir Growski Playground. The - proposed work involves upgrading sections of the existing Sir Casimir Growski Playground including constructing a new playground surface and sub - drainage tiles, new concrete border, playground equipment and site furnishings. The area is located along the Lake Ontario Waterfront area, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed area and the proposed work will occur on property owned by City of Toronto. Control of Flooding: There will be no impacts to the control of flooding, storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering any watercourse or the lake. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. 695 Dynamic Beaches: Not applicable Erosion: There are no geotechncial engineering issues associated with the proposed works. Conservation of Land: With erosion and sediment control plans in effect, the potential for a Harmful Alteration, Disruption or Destruction (HADD) to fish habitat will be mitigated. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal is consistent with Section 4.2 - Existing Development, of the TRCA's Valleys and Stream Corridor Management Program. CFN: 40981 - Application #: 453/08/TOR Report Prepared by: Renee Afoom, extension 5714 For information contact: Renee Afoom, extension 5714 Date: July 29, 2008 8.1.5 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere in the Regulated Area in High Park, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by City of Toronto. The purpose is to restore existing trails in High Park including paving the existing trial system, installing armourstone retaining walls, bio- engineering, fencing and 2 metal staircases on ravine valley walls. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to provide revisions to drawings and documentation, and Landowner Authorizations for works outside the Regulated Area, dated July 29, 2008; received July 29, 2008; prepared by the City of Toronto. • RATIONALE The application was reviewed by staff on the basis of the following information: 696 Proposal: The proposal is to restore and rehabilitate several trails within High Park. The proposed work includes various trail upgrades and restoration, paving, installation of armourstone retaining walls, wooden hand rails, bio- engineering, new fencing, and installation of 2 metal staircases on ravine valley walls. Control of Flooding: There will be no impacts to the control of flooding, storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering nearby watercourses. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: There are no geotechncial engineering issues associated with the proposed works. Conservation of Land: With erosion and sediment control plans in effect, the potential for a Harmful Alteration, Disruption or Destruction (HADD) to fish habitat will be mitigated and Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). . Plantings • All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal is consistent with Section 4.2 Existing Development, of the TRCA's Valleys and Stream Corridor Management Program. CFN: 40980 - Application #: 454/08/TOR _ Report Prepared by: Renee Afoom, extension 5714 For information contact: Renee Afoom, extension 5714 Date: July 29, 2008 8.1.6 36 HAWTHORNE ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 6, Plan 7108, (36 Hawthorne Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. 697 The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a partial second - storey addition above the garage of the existing single family detached dwelling. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al of 3, Site. and Floor Plans, prepared by Architectural CADD Studio, dated July 1, 2008, received on July 10, 2008; • Drawing No. A2 of 3, Exterior Elevations, prepared by Architectural CADD Studio, dated July 1, 2008, received on July 10, 2008; • Drawing No. A3 of 3, Site and Floor Plans, prepared by Architectural CADD Studio, dated July 1, 2008, received on July 10, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a partial second - storey addition (236 square feet) above the garage of the existing single family detached dwelling. The subject property is located east of Kipling Avenue and south of Dixon Road in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The subject property is partially located within the Regional Storm Floodplain of the Humber River Watershed. However, TRCA staff have determined that the proposed works are not located in the floodplain and will not adversely.impact the storage and /or conveyance of floodwaters. Pollution: Sediment control fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: The proposal is not located any closer to the top of bank than the existing structure. No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. 698 Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41153 - Application #: 601/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: July 30, 2008 8.1.7 EGLINTON FLATS TENNIS To construct, reconstruct, erect or place a building or structure on 3651 Eglinton Avenue West, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by Parks City of Toronto. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the erection of a temporary air - supported dome structure over the six existing outdoor tennis courts at Eglinton Flats Park. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1 of 2, Floor Plan Layout, prepared by The Farley Group, dated January 31, 2008, received on July 2, 2008; • Drawing No. 2 of 2, Elevations, prepared by The Farley Group, dated January 31, 2008, received on July 2, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: • The purpose of this application is to develop within a Regulated Area of the Humber River Watershed in order to facilitate the erection of a temporary air - supported dome structure to enclose six existing outdoor tennis courts at Eglinton Flats Park. An existing temporary • air - supported dome structure is located immediately north of the proposed works. The subject lands are located south of Eglinton Avenue and east of Jane in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The subject property is partially located within a regional storm floodplain of the Humber River Watershed. However, TRCA staff have determined that the proposed works will not adversely impact the storage and /or conveyance of floodwaters. Pollution: Sediment and erosion control fencing is not required as the proposed works are adequately setback from the watercourse. 699 Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: The proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the Authority's Valley and Stream Corridor Management Program. CFN: 41201 - Application #: 637/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: July 30, 2008 8.1.8 98 THOMPSON AVENUE To construct, reconstruct, erect or place a building or structure on Lot 4, Plan 3451,,(98 Thompson Avenue), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a shed and proposed landscaping works in the rear yard of the existing single - family detached dwelling. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit • Drawing unnumbered, Proposed Garden and Woodshed Plan, dated June 20, 2008, Revision No. 1, Revised on June 23, 2008, received on June 28, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a woodshed (approximately 8 feet by 10 feet) and proposed landscaping works in the rear yard of the existing single family detached dwelling. The subject property backs onto the Mimico Creek, west of Royal York Road and south of Bloor Street West in the City of Toronto (Etobicoke York Community Council Area). 700 Control of Flooding: The subject property is located in the Regional.Storm Floodplain of the Mimico Creek Watershed. However, TRCA staff have determined that the proposed works will not adversely impact the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed in order to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Guidelines. Policy Guidelines: This proposal is consistent with Section 4.2.2.(E) - Development Guidelines for Property Improvements and Ancillary Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41033 - Application #: 494/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date:July30, 2008 8.1.9 39 LONEY AVENUE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 212, Plan 3855, (39 Loney Avenue), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is.to develop within TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a concrete slab porch and cold cellar to the front of the existing single family detached dwelling. The existing front porch is to be demolished. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Alpha Design and Construction, undated, received on July 7, 2008; 701 • Drawing No. A2, Basement Floor Plan, prepared by Alpha Design and Construction, undated, received on July 7, 2008; • Drawing No. A4, Front Elevation, prepared by Alpha Design and Construction, undated, received on July 7, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Are of the Humber River Watershed in order to facilitate the construction of a new concrete slab porch with a below -grade excavated cold cellar to the front of the existing single family detached dwelling. The existing front porch is to be demolished. The subject property is located north of Highway 401 and east of Highway 400 in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The subject property is located in the Regional Storm Floodplain of the Humber River Watershed. However, TRCA staff have determined that the proposed works will not adversely impact the storage and /or conveyance of floodwaters. Pollution: Sediment control fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41155 - Application #: 612/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: July 30, 2008 702 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.10 22 IVOR ROAD To construct, reconstruct, erect or place a building or structure and site grade on Lot 8 & PART OF LOT 5, Plan 2343, (22 Ivor Road), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a new two- storey dwelling with rear terrace and patio. The existing dwelling, outdoor fireplace with counter and sink, and shed in the rear yard are to be demolished and restored to natural vegetation. . The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Peter Higgins Architect, dated November 2007, received by TRCA June 23, 2008; • Drawing No. L1, Landscape Plan, prepared by Peter Higgins Architect, dated November 2007, received by TRCA June 23, 2008; • Drawing No. A -1.1, Survey Lot Grading Plan, prepared by Peter Higgins Architect, dated November 2007, received by TRCA June 23, 2008; • Drawing No. A -9, Front - South Elevation, prepared by Peter Higgins Architect, dated November 2007, received by TRCA June 23, 2008; • Drawing No. A -10, Side - West Elevation, prepared by Peter Higgins Architect, dated November 2007, received by TRCA June 23, 2008; • Drawing No. A -11, Rear - North Elevation, prepared by Peter Higgins Architect, dated November 2007, received by TRCA June 23, 2008; • Drawing No. A -12, Side - East Elevation, prepared by Peter Higgins Architect, dated November 2007, received by TRCA June 23, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a new two- storey dwelling with walk -out basement and rear deck and patio at 22 Ivor Road in the City of Toronto. The site is located south of York Mills Road, east of Yonge Street. The existing dwelling is to be demolished, as well as the existing shed, outdoor fireplace, benches, and counter with sink. The rear portion of the yard is to be renaturalized. Control of Flooding: The site is not located in a Regional Storm Floodplain. Pollution: A sediment control fence will be erected before commencement of any construction or grading works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. 703 Dynamic Beaches: Not applicable Erosion: A geotechnical investigation has been reviewed and approved by geotechnical engineering staff and the proposed works will be adequately set back from the top of bank. Conservation of Land: No significant vegetation will be removed as a result of construction and the rear portion of the yard will be renaturalized. Plantings Native tree shrubs and seed mix will be planted at the rear portion of the yard and along the top of bank. Policy Guidelines: This proposal is consistent with Section 4.2.2.D, Replacement Structures, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40818 - Application #: 330 /08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 30, 2008 8.1.11 29 TUDOR GATE To construct, reconstruct, erect or place a building or structure on Lot 21, Plan M1290, (29 Tudor Gate), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a deck at the rear of the existing dwelling. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit • Drawing No. Al, Site Plan, prepared by Gervais Design -Build Ltd., dated October 26, 2007, received by TRCA January 18, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of a deck at the rear of the existing dwelling at 29 Tudor Gate in the City of Toronto. The site is located south of York Mills Road, east of Bayview Avenue. 704 Control of Flooding: The site is not located in a Regional Storm Floodplain. Pollution: Sediment fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable Erosion: A slope stability assessment has been reviewed and approved by TRCA geotechnical engineering staff and the proposed works will be adequately set back from the top of bank. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: The proposal is consistent with Section 4.2.2.E, Property Improvements and Ancillary Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 40475 - Application #: 088 /08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 30, 2008 8.1.12 SAM PRIMUCCI HOLDINGS INC. To construct, reconstruct, erect or place a building or structure on Part Block D, Plan 3991, (2210 Jane Street), in the City of Toronto (North York Community Council Area), Humber River Watershed as located on the property owned by Sam Primucci Holdings Inc.. The purpose is to construct a new addition to an existing building within a Regulated Area of the Humber River Watershed. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No Al, Proposed Dry Storage Room for Unit 1, prepared by Desmond Roychaudhuri, dated February 2008, received June 26, 2008. • RATIONALE The application was reviewed by staff on the basis of the following information: 705 Proposal: The proposal is to construct a new addition to an existing building within a Regulated Area of the Humber River Watershed. The subject property is within the Jane and Wilson - Black Creek Special Policy Area (SPA). All works will be sufficiently setback from significant natural features. . Control of Flooding: TRCA technical staff have concluded that the proposal will not affect the storage or conveyance of flood waters. Further, the proposed addition will be floodproofed to the 350 year storm flood event. Pollution: Sediment fencing will be in place throughout the duration of construction to ensure that no sediment will enter the watercourse. Dynamic Beaches: Not applicable Erosion: There are no erosion issues associated with this application. Conservation of Land: There will be no significant vegetation removed as part of this application. Plantings No plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 C, Minor Additions, of TRCA's Valley and Stream Corridor Management Program. CFN: 41091 - Application #: 548/08/TOR Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: July 28, 2008 8.1.13 42 HEATHVIEW AVENUE To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the•site or elsewhere on Lot 122, Plan 5482, (42 Heathview Avenue), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of an in- ground pool, cabana and patio at 42 Heathview Avenue in the City of Toronto. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit 706 • Drawing No. Al, Site Plan Site Schedule, prepared by Toivo Vahi Design, dated December 2007, received by TRCA July 29, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include construction of an in- ground swimming pool, cabana and patio at 42 Heathview Avenue in the City of Toronto. The site is located east of Bayview Avenue, south of Finch Avenue East. Control of Flooding: The site is not located in a Regional Storm Floodplain. . " Pollution: Sediment fencing is not required as the proposed works are adequately setback from the watercourse. • Dynamic Beaches: Not applicable Erosion: A geotechnical assessment has been reviewed and accepted by TRCA geotechnical engineering staff. The proposed works will be adequately setback from the top -of- slope. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Native tree shrub and seed mix will be planted. Policy Guidelines: This proposal is consistent with Section 4.2.2.E, Property Improvements & Ancillary Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 40865 - Application #: 364/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 30, 2008 707 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.14 1841 NEILSON ROAD LTD. C/O HALLSTONE GROUP OF COMPANIES To site grade, and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 4, Concession 4, (1841 Oasis Drive (former Neilson Road)), in the City of Toronto (Scarborough Community Council Area), Rouge River Watershed as located on the property owned by 1841 Neilson Road Ltd. c/o Hailstone Group of Companies. The purpose is to site grade and remove and place fill to facilitate the grading and servicing of new residential lots, the construction of a pedestrian trail and the grading and renaturalization of a open space block within an approved Draft Plan of Subdivision. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. GR -1, Grading Plan, prepared by Schaeffers, dated July 2007, Fourth Submission April 1, 2008, received on June 13, 2008; • Drawing No. SC -1, Remediation Plan for Blocks 62 and 63 and Siltation Control Plan Phase 1, prepared by Schaeffers, dated July 2007, Fourth Submission April 1, 2008, received on June 13, 2008; • Drawing No. SC -2, Remediation Plan for Blocks 62 and 63 and Siltation Control Plan Phase 2, prepared by Schaeffers, dated July 2007, Fourth Submission April 1, 2008, received on June 13, 2008; • Drawing No. SC -3, Remediation Plan for Blocks 62 and 63 and Siltation Control.Plan Phase 3, prepared by Schaeffers, dated July 2007, Fourth Submission April 1, 2008, received on June 13, 2008; • Drawing No. DT -1, Construction Details, prepared by Schaeffers, dated July 2007, Fourth Submission April 1, 2008, received on June 13, 2008; • Drawing No. DT -2, Construction Details, prepared by Schaeffers, dated July 2007, Fourth Submission April 1, 2008, received on June 13, 2008; • Drawing No. L1, Landscape Plan, prepared by SBK, Revision No. 3, revised on June 5, 2008, received on June 13, 2008; • Drawing No. L2, Landscape Plan, prepared by SBK, Revision No. 3, revised on June 5, 2008, received on June 13, 2008; • Drawing No. L3, Landscape Plan, prepared by SBK, Revision No. 3, revised on June 5, 2008, received on June 13, 2008; • Drawing No. V1, Tree Inventory, Preservation Plan and Arborist Report, prepared by SBK, Revision No. 3, revised on June 5, 2008, received on June 13, 2008; • Drawing No. V2, Arborist Report/Preliminary Tree Preservation Plan, prepared by SBK, Revision No. 2, revised on November 30, 2007, received on June 13, 2008: RATIONALE The application was reviewed by staff on the basis of the following information: 708 Proposal: The proposal is to site grade and remove and place fill to facilitate the grading and servicing of new residential lots, the construction of a pedestrian trail and the grading and renaturalization of a open space block within an approved residential Draft Plan of Subdivision. The Subdivision is located on the east side of Oasis Drive (formerly Neilson Road), south and west of the Morningside Creek, and north of the existing Morningside Heights residential development in the City of Toronto. The Draft Plan of Subdivision was approved with a 10 metre renaturalized buffer from the edge of the significant vegetation associated with the Morningside Creek Valley system. The buffer and the remaining valley lands will be conveyed to the City of Toronto as a condition of Draft Plan approval. Included in these lands is an area that was filled by the previous owner. Fill will be removed, replaced with clean fill and renaturalized. The pedestrian trail will be located in the 10 metre buffer and will connect to the existing Morningside Heights trail to the south. Conditional Approval: TRCA staff are satisfied with the technical merits of the proposal (i.e. no impact to the control of flooding, pollution, erosion or conservation of land) but have not yet received final confirmation that the quality of the fill in the open space block is satisfactory to the City of Toronto. If the quality of the fill is not satisfactory then some modifications to the amount of fill to be removed and replaced may be necessary. As such, staff is requesting permission from the Executive Committee to allow staff to approve the issuance of the Ontario Regulation 166/06 permit for this project subject to the City of Toronto confirming that the quality of the fill is acceptable. Control of Flooding: The proposal is not located within the Regional Storm Floodplain and will have no impact on the storage or conveyance of flood waters. Pollution: Temporary sediment control has been provided per the Greater Golden Horseshoe Area Conservation Authorities, Erosion and Sediment Control Guideline for Urban Construction. These controls include a temporary sediment pond and a phased sediment fence installation. Dynamic Beaches: Not applicable. Erosion: The appropriate erosion control criteria has been incorporated into the temporary sediment and erosion control plan. Conservation of Land: The entire valley corridor has been redesignated as open space and will be conveyed to the City of Toronto. Areas previously disturbed by the former owner will be renaturalized. Plantings A significant amount of native trees, shrubs and seed mixture will be installed in the disturbed portions of the open space lands. • 709 Policy Guidelines: The proposal is consistent with Policy 4.1.1, New Urban Development, of the TRCA's Valley and Stream Corridor Management Program. CFN: 39978 - Application #: 830/07/TOR Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: July 29, 2008 8.1.15 CENTRE FOR INFORMATION AND COMMUNITY SERVICES To construct, reconstruct, erect or place a building or structure on Lot 27, Concession 2, (2330 Midland Avenue), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by . The purpose is to reconstruct and change the use-of an existing building within a Regulated Area of the Highland Creek. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit • Drawing No. Al, Site Plan, dated May 27, 2008, prepared by Simon Ng Architect, received July 24, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of reconstructing and changing the use of an existing building within a Regulated Area of the Highland Creek. The subject property is partially located within the Regulatory Storm Floodplain. The applicant proposes to change the use of an existing industrial warehouse to an immigrant resource center. In order to make the building conform to the building code the applicant will need to create additional entrances t� the building. Control of Flooding: TRCA technical staff-have concluded that the proposal will not affect the storage or conveyance of flood waters. Further, the new entrances required will be floodproofed to the 350 year storm flood event and will not increase the risk of flooding within the building. Pollution: No sediment fencing is required as the works are adequately setback from the natural features. Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues associated with this application. 710 Conservation of Land: There will be no significant vegetation removed as part of this application. Plantings No plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 E, Property Improvements and Ancillary Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 41176 - Application #: 619/08/TOR Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: July 29, 2008 • 8.1.16 233 BIRKDALE ROAD To construct, reconstruct, erect or place a building or structure on Lot 75, Plan 5645, (233 Birkdale Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. • The purpose is to develop within a Regulated Area of the Highland Creek Watershed to facilitate construction of a replacement deck. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • • Drawing No. Al, prepared by Cutting Edge Construction & Design, dated May 26, 2008; received by TRCA June 13, 2008, redlined by TRCA staff July 28, 2008 to indicate sediment control fencing; . • Drawing No. A0, prepared by Cutting Edge Construction & Design, dated May 26, 2008, received by TRCA June 13, 2008; • Drawing No. A3, prepared by Cutting Edge Construction & Design,.dated May 26, '2008, received by TRCA June 13, 2008; • Drawing No. A4, prepared by Cutting Edge Construction & Design, dated May 26, 2008, received by TRCA June 13, 2008; • • Drawing No. A5, prepared by Cutting Edge Construction & Design, dated May 26, 2008, received by TRCA June 13, 2008; • Drawing No. A6, prepared by Cutting Edge Construction & Design, dated May 26, 2008, received by TRCA June 13, 2008; • Drawing No. A7, prepared by Cutting Edge Construction & Design, dated May 26, 2008, received by TRCA June 13, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 711 Proposal: The proposed works include construction of a replacement deck at the rear of the existing dwelling at 233 Birkdale Road in the City of Toronto. The subject property is located south of Ellesmere Road, west of Brimley Road. The existing deck is to be demolished. Control of Flooding: The site is partially located in a Regional Storm Floodplain, but the proposed works are located outside of the floodplain portion of the site. Pollution: A sediment control fence will be erected before commencement of any construction or grading works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. The proposed works will be in the same location and same dimensions as the existing deck. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.D, Replacement Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 41115 - Application #: 568/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 30, 2008 8.1.17 ST. ANDREWS PRESBYTERIAN CHURCH To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 23, Concession 1, (115 St. Andrew's Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by St. Andrews Presbyterian Church. The purpose is to develop within a Regulated Area of the Highland Creek Watershed to facilitate replacement of two septic systems with sanitary sewer servicing, and concurrent upgrading of water servicing at St. Andrew's Church in the City of Toronto. 712 The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. PP -01, Water and Sanitary Services Plan and Profile, prepared by R.V. Anderson Associates Limited, dated October 2007, received by TRCA June 12, 2008. Redlined by TRCA staff to indicate an expansion to the sediment control fencing area to include the slope in the rear of the rectory. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include removal of two septic systems and replacement with sanitary services, along with upgraded water servicing at St. Andrew's Church in the City of Toronto. The site is located north of Lawrence Avenue East, west of McCowan Road. The existing septic field and equipment are to be removed and regraded to existing condition, and the new infrastructure will be located under an existing asphalt driveway that will be repaved at the conclusion of the project. Control of Flooding: The proposed works are not located in a Regional Storm Floodplain. Pollution: • A sediment control fence will be erected before commencement of any construction or grading works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. . Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction and the appropriate tree protection fencing will be installed. The new sewer and water lines will be located under an existing asphalt driveway. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.E, Property Improvements and Ancillary Structures, of TRCA's Valley and Stream Corridor Management Program. .CFN: 41019 - Application #: 483/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 30, 2008 713 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.18 BMW TORONTO To site grade on Lot 15, Concession FRONT, Lot P, Plan 165 - E, (11 Sunlight Park Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by BMW Toronto. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to accommodate an expansion to the existing parking lot at the existing BMW automobile dealership through the installation of new asphalt and storm drainage. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. a100, Site Plan Statistics, prepared by Raw Design, dated May 9, 2008, received on May 12, 2008; • Drawing No. GR1, Site Grading Plan, prepared by MMM Group, dated April 2008, Revision No. 2, revised on May 7, 2008, received on May 12, 2008; • Drawing No. SS1, Site Servicing Plan, prepared by MMM Group, dated April 2008, Revision No. 1, revised on May 7, 2008, received on May 12, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to accommodate an expansion to the existing parking lot at the existing BMW automobile dealership through the installation of new asphalt and storm drainage. The proposed asphalt area is 6,681.2 square metres which will accommodate the automobile dealership's inventory parking of up to 245 cars. The subject property is located on the south side of Sunlight Park Road, north of the Canadian National Railway (CNR) and is within the Lower Don Special Policy Area (SPA). The site is located entirely within the SPA and is separated from the watercourse by Don Valley Parkway to the west Control of Flooding: The subject property is located within the Lower Don Special Policy Area. However, TRCA staff have determined that the proposed works will not adversely impact the storage and /or conveyance of floodwaters. A Stormwater Management Plan and Floodplain Analysis prepared for the proposed Mini BMW dealership to the north of the subject lands has been reviewed and approved by TRCA water resource staff. An addendum to this report addressing the subject site has also been reviewed and approved by TRCA water resource staff and the proposal will be constructed in accordance with the recommendations of this report. Pollution: The works are not adjacent to the watercourse. Temporary fencing will be erected at the perimeter of the site during construction. 714 Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: There are no natural heritage features on the subject lands and no significant vegetation will be removed as part of this project. Plantings As no vegetation removals are required to accommodate the proposed development, no additional plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.1.(B) - Development Guidelines for Development /Redevelopment within Designated Two -Zone Areas or Special Policy Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40900 - Application #: 400 /08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: July 30, 2008 8.1.19 BMW TORONTO To construct, reconstruct, erect or place a building or structure and site grade on Lot 15, Concession FRONT, Lot P, Plan 165 - E, (20 Sunlight Park Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by BMW Toronto. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a new two- storey automobile dealership building. The permit will be issued for the period of August 8;2008 to August 7, 2010 in accordance with the following documents and plans which form.part of this permit: • Drawing No. A100, Site Plan Statistics, prepared by Raw Design, dated April 4, 2008, Revision No. 3, revised on June 2, 2008, received on June 10, 2008; • Drawing No. A401, Elevations, prepared by Raw Design, dated April 4, 2008, Revision No. 2, revised on June 2, 2008, received on June 10, 2008; • Drawing No. A402, Elevations, prepared by Raw Design, dated April 4, 2008, Revision No. 2, revised on June 2, 2008, received on June 10, 2008; • Drawing No. A451, Building Cross Sections, prepared by Raw Design, dated April 4, 2008, Revision No. 3, revised on June 2, 2008, received on June 10, 2008; • Drawing No. A452, Building Cross Sections, prepared by Raw Design, dated April 4, 2008, Revision No. 3, revised on June 2, 2008, received on June 10, 2008; • Drawing No. A453, Building Cross Sections, prepared by Raw Design, dated April 4, 2008, Revision No. 2, revised on June 2, 2008, received on June 10, 2008; 715 • Drawing No. L- 0,.Tree Removal Plan, prepared by Raw Design, dated April 4, 2008, Revision No. 2, revised on May 22, 2008, received on June 10; 2008; • . Drawing No. L -1, Layout Plan, prepared by Raw Design; dated April 4, 2008, Revision No. 2, revised on May 22, 2008, received on June 10, 2008; ' •. Drawing No. L -2, Details, prepared by Raw Design, dated April 4, 2008, Revision No. 2, revised on May 22, 2008, received on June 10, 2008; • Drawing'No. SG1, Site Grading Plan, prepared by MMM Group, dated April 2008, Revision; No. 2, revised on May 28, 2008, received-on June 10, 2008; • Drawing No. SS1, Site Servicing Plan, prepared by MMM Group; dated April -2008, Revision.No. 4, revised on. May. 28, 2008, received on June 10, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to accommodate an expansion to the existing BMW automobile dealership site located immediately south of the subject site through the construction of a new two-storey BMW Mini automobile dealership building. The footprint of the proposed building is 1,596 square metres with:a total gross floor area of 1,851 square metres. The subject property is located on the north side of Sunlight Park Road, south of Eastern Avenue Extension, within the -Lower Don Special Policy Area ,(SPA). The site is located entirely within the SPA and is • separated from the watercourse by .Don Valley Parkway to the west. Control of Flooding: The subject property is located in•a Regional Storm Floodplain of the Lower Don Special Policy . Area. A Stormwater-Management Plan and Floodplain Analysis has been'reviewed and approved by TRCA water resource staff and the proposal will be constructed in accordance with the recommendations of this report. • Pollution: The works are not adjacent to the watercourse. Temporary fencing will be erected at the perimeter of the site during construction. Dynamic Beaches: Not applicable. Erosion: There "are no geotechnical concerns associated with this application. Conservation of Land: There are no natural heritage- features on the subject lands and no significant vegetation will be removed as part of this project. Plantings As no vegetation removals are required to accommodate the proposed development, no additional plantings are required. 716 Policy Guidelines: This proposal is consistent with Section 4.2.1.(B) - Development Guidelines for Development /Redevelopment within Designated Two -Zone Areas or Special Policy Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40901 - Application #: 401/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: July 30, 2008 8.1.20 71 ROXBOROUGH DRIVE To construct, reconstruct, erect or place a building or structure on Lot K 21116-0053, Plan 928 -Y, (71 Roxborough Drive), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to reconstruct and repair the existing cantilevered deck and retaining walls to the rear of the existing single family detached dwelling. The current condition of the existing deck and retaining walls are in advanced degree of degradation. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -002, Basement Floor Site Plan & Project Stats, prepared by Kohn Shnier Architects, dated June 25, 2007, Revision No. 7, revised on July 7, 2008, received on July 8, 2008; • Drawing No. X -002, Exg. /Basement Floor Site Plan & Stats, prepared by Kohn Shnier Architects, dated June 25, 2007, Revision No. 7, revised on July 7, 2008, received on July 8, 2008; • Drawing No. A -010, Existing /Demolition Basement Plan, prepared by Kohn Shnier Architects, dated November 19, 2007, Revision No. 7, revised on July 7, 2008, received on July 8, 2008; • Drawing No. A -100, Basement Floor Plan, prepared by Kohn Shnier Architects, dated November 19, 2007, Revision No. 7, revised on July 7, 2008, received on July 8, 2008; • Drawing No. A -400, South Elevation & North Elevation, prepared by Kohn Shnier Architects, dated November 19, 2007, Revision No. 7, revised on July 7, 2008, received on July 8, 2008; • Drawing No. A -401, West Elevation, prepared by Kohn Shnier Architects, dated November 19, 2007, Revision No. 7, revised on July 7, 2008, received on July 8, 2008; • Drawing No. A -402, East Elevation, prepared by Kohn Shnier Architects, dated November 19, 2007, Revision No. 7, revised on July 7, 2008, received on July 8, 2008;- • Drawing No. A -403, Partial Exterior Elevations, prepared by Kohn Shnier Architects, dated November 19, 2007, Revision No. 7, revised on June 2008, received on July 8, 2008; • Drawing No. A -750, Deck Balustrade Typical Section, prepared by Kohn Shnier Architects, dated June 25, 2007, Revision No. 7, revised on July 7, 2008, received on July 8, 2008. 717 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: • The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to reconstruct and repair the existing cantilevered deck and retaining walls to the rear of the existing single family detached dwelling. The current condition of the existing deck and retaining walls are in advanced degree of degradation. The subject property is located east of Mount Pleasant Road and south of St Clair Avenue East in the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: The subject site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: A geotechnical letter of opinion has been reviewed and approved by TRCA geotechnical engineering staff and the proposed works are located no further than the existing limit of development. Conservation of Land: No sighificant vegetation will be removed as a result of construction and appropriate tree protection fencing will be installed. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41177 - Application #: 621/08/TOR Report Prepared by Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: July 30, 2008 718 8.1.21 8 GLEN ROBERT DRIVE To construct, reconstruct, erect or place a building or structure on Lot 45, Plan M -605, (8 Glen Robert Drive), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the reconstruction of .a rear deck and stairway to the existing single family detached dwelling. The existing deck acid stairway are to be removed. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -2, Demolition Plan, prepared by Lauren Brown, dated June 30, 2008, Revision No. 3, revised July 2008, received on July 29, 2008; • - Drawing No. A -3, Deck Plan, prepared by Lauren Brown, dated June 30, 2008, Revision No. 3, revised July 2008, received on July 29, 2008; • Drawing No. A -4, Foundation Plan, prepared by Lauren Brown, dated June 30, 2008, Revision No. 3, revised July 2008, received on July 29, 2008; • Drawing No. A -7, Deck Section, prepared by Lauren Brown, dated June 30, 2008, Revision No. 3, revised July 2008, received on July 29, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the reconstruction of a rear deck and stairway to the existing single family detached dwelling. The existing deck and stairway are in a state of disrepair and are to.be removed. The subject property is located south of St. Clair Avenue East and west of Victoria Park Avenue in the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: •The site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of flood waters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. Erosion: • A geotechnical brief has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. A letter of intent has been provided by the property owner insuring that they will retain a geotechnical consultant during construction. 719 Conservation of Land: The proposal is not located any closer to the top of bank than the existing structure. No significant vegetation will be removed as a result of construction. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41192 - Application #: 635/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: July 30, 2008 8.1.22 41 INDIAN GROVE To construct, reconstruct, erect or place a building or structure on Lot 21, 22, 23, 24, Plan M -253, (41 Indian Grove), in the City of Toronto (Toronto and East York Community Council Area), Waterfront Watershed. The purpose is to develop within a TRCA Regulated Area of the Waterfront Watershed in order to facilitate the construction of a one - storey addition to the side of the existing 2.5- storey single family detached dwelling. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit • Drawing No. A -1, Site Plan, prepared by D'Arcy L. Dunal Architect, dated April 11, 2008, Revision No. 1, revised on May 5, 2008, received on July 22, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Waterfront Watershed in order to facilitate the construction of a 1- storey addition (44 square feet) to the side of the existing 2.5- storey single family detached dwelling. Control of Flooding: The subject site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. 720 Pollution: Sediment control fencing is not required as the proposed works are adequately setback from the watercourse. • Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: No significant vegetatiori will be removed as a result of construction and appropriate tree protection fencing will be installed. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41171 - Application #: 615/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: July 30, 2008 CITY OF VAUGHAN 8.1.23 9683 HIGHWAY 27 To construct, reconstruct, erect or place a building or structure and site grade on Part Lot 18, Concession 8, (9683 Highway 27), in the City of Vaughan, Humber River Watershed. The purpose is to construct a replacement home and septic system within a Regulated Area of the Humber River Watershed at 9683 Highway 27, in the City of Vaughan. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by Three Apple Design, dated June 2008, received by the TRCA June 25, 2008 redline revised to indicate the erection of sediment control fencing and the removal of excess fill material; • Basement Plan, drawing No. 1P, prepared by Three Apple Design, revise dated July 24, 2008, received by the TRCA July 28, 2008; • - First Floor Plan, drawing No. 2P, prepared by Three Apple Design, dated June 16, 2008, received by the TRCA June 25, 2008; 721 • Second Floor Plan, drawing No. 3P, prepared by Three Apple Design, dated June 16, 2008, received by the TRCA June 25, 2008; • Front Elevation, drawing No. 4P, prepared by Three Apple Design, dated June 16, 2008, received by the TRCA June 25, 2008; • North Elevation, drawing No. 5P, prepared by Three Apple Design, dated June 16, 2008, received by the TRCA June 25, 2008; • Rear Elevation, drawing No. 6P, prepared by Three Apple Design, dated June 16, 2008, received by the TRCA June 25, 2008; and • South Elevation, drawing No. 7P, prepared by Three Apple Design, dated June 16, 2008, received by the TRCA June 25, 2008; RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a replacement home and septic system within a Regulated Area of the Humber River Watershed. The subject property is a disturbed open area surrounded by forested areas and a small wetland feature north of the property. The proposal is located within the Regional Storm Flood Plain and the Regional Flood Elevation for the subject property is approximately 167.17 metres above sea level ( m.a.s.l.). The proposed works are located outside of the floodway and have been floodproofed to the Regional Storm Elevation plus 0.3 metres freeboard (167.47 m.a.s.l.) by ensuring all openings are above this elevation. The replacement home is to be built on top of the existing basement and increases the footprint of the home but will not have a significant impact on the storage and conveyance of flood waters. The existing basement windows are to remain; however, the basement windows are already above the Regional Flood Elevation and are at 167.51 m.a.s.l. The majority of the • existing basement is to be partially filled in to become a crawl space and as a result, the proposal will not exceed the 50% additional total floor area as prescribed for replacement structures under Valley and Stream Corridor Management Program (VSCMP). The proposed septic system is located in an already disturbed area (manicured lawn), and will not result in a loss of vegetation. Control of Flooding: TRCA water resources staff are satisfied that the proposed replacement home is flood proofed to the Regional Flood Elevation and will not significantly impact the storage and conveyance of flood waters. Pollution: Sediment control fencing will be installed and maintained during the construction of the dwelling to prevent sediment transport onto adjacent properties and into nearby natural features. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this proposal. 722 Conservation of Land: As the watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. The proposed works do not extend the building envelope or the area of disturbance closer to the small wetland feature located north of the subject property. All footprint expansions are located along the southern half of the existing dwelling, away from any significant natural features. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project.. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41061 - Application #: 522 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: July 28, 2008 8.1.24 " • 125 GREEN MANOR CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 12, Plan . . 65M -3609, (125 Green Manor Crescent), in the City of Vaughan, Humber River Watershed. The purpose is to construct a pool, patio, cabana and sunroom addition to an existing home within a Regulated Area of the Humber River Watershed at 125 Green Manor Crescent in the City of Vaughan. The'permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with • the following documents and plans which form part of this permit: • Site Plan prepared by RN Design, dated June 16, 2008, received by the TRCA July 18, 2008 redline revised to indicate the removal of all excess fill material RATIONALE The application was reviewed by staff on the basis of the following information: 723 Proposal: The purpose.is to construct a pool, patio, cabana and sunroom addition to an existing home within a Regulated Area of the Humber River Watershed. The proposed pool, patio and cabana ■ are located withinfa manicured lawn and the proposed sunroom addition is located on an - existing deck attached to the existing dwelling. The subject property and surrounding area do not contain any significant natural features or vegetation. Weston'Road is adjacent to the rear of the property:to the east and. a commercial plaza is'located north of the property. The property is regulated due to the proximity of a•channelized portion of Black Creek, which is located on the - opposite side of Weston Road. Control of Flooding: TRCA water resources engineers are satisfied that the proposed works are not located within the .Regional Storm Flood Plain and there will be no impact on the storage or conveyance of flood waters. Pollution: Based upon a site visit conducted by TRCA staff on July 23, 2008, staff determined that the area of disturbance is surrounded by a flat sodded area and,partially'enclosed by a brick privacy wall between the subject property, Weston Road and the adjacent commercial plaza. . TRCA staff are satisfied that'sediment will not be transported to Black Creek or onto neighbouring properties. Dynamic Beaches: Not applicable. Erosion: There -are no geotechnical issues associated with this application. Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management, Program. CFN: 41149 Application #: 597 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact Bill Kiru, extension 5306 Date: July 28, 2008' 724 8.1.25 REGIONAL MUNICIPALITY OF YORK To construct, reconstruct, erect or place a building or structure and site grade on Lot 6, Concession 4, (Immediately East of 120 McCleary Court), in the City of Vaughan, Don River, Humber River Watershed as located on the property owned by Regional Municipality of York. The purpose is to construct a recycling depot/waste transfer facility within a Regulated Area of the Don River Watershed at the east end of McCleary Court in the City of Vaughan. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. 7, prepared by SNC Lavalin Inc., received by the TRCA July 28, 2008; • Site Grading Plan, Drawing No. 1, prepared by SNC Lavalin Inc., received by the TRCA July 18, 2008; • Stormwater Management Plan - Details 1, Drawing No. 2, prepared by SNC Lavalin Inc., received by the TRCA July 18, 2008; • Stormwater Management Plan - Cross Sections, Drawing No. 3, prepared by SNC Lavalin Inc., received by the TRCA July 18, 2008; • Facility Servicing Plan, Drawing No. 4, prepared by SNC Lavalin Inc., received by the TRCA July 18, 2008; • Planting Plan, Drawing No. 5, prepared by Johnson Sustronk Weinstein & Associates, received by the TRCA July 18, 2008; • Erosion and Sediment Control Plan, Drawing No. 6, prepared by SNC Lavalin Inc., received by the TRCA July 18, 2008; • Stormwater Management Plan - Details 2, Drawing No. 7, prepared by SNC Lavalin Inc., received by the TRCA July 18, 2008: RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a recycling depot / waste transfer facility within a Regulated Area of the Don River Watershed. The subject property is currently vacant and void of any significant vegetation or significant natural features. A highly altered watercourse is located east of the subject property and the subject property is partially located within the Regional Storm Flood Plain; however, all permanent building structures and storage areas are located outside of the flood plain area. A proposed paved truck access driveway not open to the public partially encroaches into the 10 metre buffer for. the Regional Storm Flood Plain but is outside of the flood plain. A significant portion of the proposed works involves stormwater retention and treatment as well as increasing flood storage onsite to alleviate flooding up and downstream. Control of Flooding: TRCA water resources engineers are satisfied that the proposed works will not adversely affect the storage or conveyance of flood waters and will improve existing conditions on and adjacent . to the subject property. 725 Pollution: Sediment control fencing is to erected and maintained around the area of disturbance for the duration of construction. Additionally, a dedicated construction access / entry point has been provided and filter fabric is to be installed at existing grates on and adjacent to the subject property to prevent the migration of sediment off the subject property and into the storm sewer system during construction. Stormwater runoff during construction is to be directed through ditches and swales with rock check dams to two of the proposed retention ponds which are to be maintained as sedimentation ponds throughout the construction process. Upon the completion of construction, these two retention ponds will continue to treat stormwater runoff prior to release into the nearby watercourse. Also upon completion of construction, a third retention pond will treat stormwater runoff from another portion of the site prior to entering the local storm sewer system. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this proposal. Conservation of Land: As a watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings Landscaping strips within the proposal are to be planted with native, non - invasive plant species, the primary stormwater/ bio- retention pond is to be planted with a native seed mix and is to be surrounded by native woody plants. This shallow retention pond will create wildlife habitat currently nonexistent an or near the subject property. Policy Guidelines: The proposal is consistent with Section 4.2.2 G) - Infilling - of the Authority's Valley and Stream Corridor Management Program. CFN: 40853 - Application #: 349 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: July 29, 2008 8.1.26 25 CARTANYA COURT To construct, reconstruct, erect or place a building or structure and site grade on Lot 122, Plan 65M -3068, (25 Cartanya Court), in the City of Vaughan, Humber" River Watershed. The purpose is to construct a pool, patio and cabana within a Regulated Area of the Humber River Watershed at 25 Cartanya Court in the City of Vaughan. 726 The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by the applicant, received by the TRCA July 29, 2008, redline revised to indicate the removal of excess fill material. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a pool, patio and cabana within a Regulated Area of the Humber River Watershed. The subject property is adjacent to a stream corridor that is subject to flooding within a contained valley system. The existing top of bank and flood plain are located approximately 1 metre away from the southwest corner of the property, gradually increasing in distance from the rear lot line toward the northwest corner of the property. The proposed works are located approximately 2.7 metres from the rear lot line within an area currently devoid of vegetation (approximately 3.7 to 4 .0 metres away from the existing top of bank). A buffer between the proposed works and the rear lot line has been created as part of this permit. The buffer is 2.7 metres in depth for the majority of its length but increases to 5 metres as it approaches the southern property Tine where it lines up with another buffer area set at 5 metres. As part of the permit, plantings consisting of native, non - invasive trees and shrubs are proposed within the buffer area to create an enhanced buffer between the existing and proposed residential uses with the stream corridor. Control of Flooding: The proposed works are located outside of the Regional Storm Flood Plain, there will be no impacts on the storage or conveyance of floodwaters. Pollution: Sediment control fencing will be installed and maintained during construction to prevent sediment from entering the valley and watercourse located beyond the rear property line. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no significant natural features on or adjacent to the site that may be negatively impacted by the project. • Plantings A portion of the buffer between the proposed works and the adjacent stream corridor will be planted with native, non - invasive trees and shrubs and will provide enhanced protection for the adjacent natural feature. 727 Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program CFN: 41052 - Application #: 507 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: July 29, 2008 TOWN OF AJAX 8.1.27 7 MAKIN COURT To construct, reconstruct, erect or place a building or structure on 7 Makin Court, in the Town of Ajax, Duffins Creek Watershed. The purpose.is to construct a inground swimming pool within,a Regulated Area of the Duffins Creek Watershed. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan submitted by the applicant, received June 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to construct an inground swimming pool within a Regulated Area of the Duffins Creek Watershed. The proposed swimming pool will be located. approximately 20 metres from the watercourse however it is located within the Regulatory Storm Floodplain. Control of Flooding: TRCA technical staff have concluded that the proposal will not affect the storage or conveyance of flood waters. Pollution: Sediment will be in place throughout the duration of construction to ensure that no sediment enters the watercourse. Dynamic Beaches: Not applicable Erosion: There are no erosion issues associated with this proposal. 728 Conservation of Land: There will be no significant vegetation removed as part of this application as the site is a . manicured rear yard. Plantings No plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 E, Property Improvements and Ancillary Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 41102 - Application #: 556 /08 /AJAX Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: July 28, 2008 TOWN OF MARKHAM 8.1.28 121 MAIN STREET To construct, reconstruct, erect or place a building or structure on Lot 15, Plan 401, (121 Main Street), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the replacement and the construction of a shed. The permit will be issued for the period of August 8; 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Topographical Sketch, prepared by R. McKibbon, dated June 20, 2008, stamped received by TRCA Planning and Development July 11, 2008. RATIONALE •The application was reviewed by staff on the basis of the following information: Proposal: • The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the replacement of a shed. The subject property is located within an established residential subdivision in the Town of Markham and currently contains an existing residential dwelling and shed. The existing shed is to be demolished, and replaced with a new shed structure. Although the subject property is partially located within the Regional Storm Floodplain, the proposed shed is located outside the Regional Storm Elevation. All existing grades will be maintained. Control of Flooding: The works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. 729 Pollution: Appropriate sediment and erosion controls will be erected and maintained throughout all phases of construction as per TRCA's guidelines. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation was removed as a result of construction. There are no fisheries related concerns associated with this project. Plantings No significant vegetation was removed as a result of construction. As such, no additional plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41172 - Application #: 616 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: July 30, 2008 TOWN OF RICHMOND HILL 8.1.29 94 DOUGLAS ROAD To construct, reconstruct, erect or place a building or structure on Part Lot 15, Plan 163, (94 Douglas Road), in the Town of Richmond Hill, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single family dwelling on an existing lot of record located at 94 Douglas Road, in the Town•of Richmond Hill. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit • Proposed Grading and Servicing Plan, prepared by Condeland Engineering Ltd., dated July 24, 2008, stamped received by TRCA Planning & Development staff on July 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 730 Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single - family dwelling located at 94 Douglas Road, in the Town of Richmond Hill. The rear of the subject property is located adjacent to the East Humber River. The proposed works are located outside of the Regional Storm Floodplain associated with the rear of the subject property and are sufficiently setback. In addition, there are no geotechnical, or ecology related concerns with this application. However, as an element of this application, enhancement plantings are,proposed adjacent to the watercourse at the rear of the property to provide a net ecological gain. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable.' Erosion:' There are no geotechnical and /or slope stability concerns anticipated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. There are no fisheries related concerns associated with this proposal. Plantings Enhancement plantings are proposed between the proposed development and the valley corridor. All plant species are native, non - invasive and consistent with TRCA's guidelines. • Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41064 - Application #: 526/08/RH Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: July 30, 2008 • 8.1.30 49 CORAL CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 55, Plan 65M -3439, (49 Coral Crescent), in the Town of Richmond Hill, Humber River Watershed. 731 The.purposeis to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an in ground swimming pool. The permit will.be issued for the period of August 8, 2008 to August 7, 2010 in accordance with • the following•documents and plans which form part of this permit: • Site Plan, prepared. by R.D. Tomlinson Limited, dated June 25, 2008, stamped received by TRCA Planning and Development June 27, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: • The purpose of this proposal is to undertake works within a TRCA'Regulated Area of the Humber River Watershed in order to facilitate the construction of an,in ground pool. The works are located within the Regional Storm Floodplain however, the proposed development has been adequately flood protected and all existing grades will be maintained..As such, nb impacts to the storage and /or conveyance of flood waters are anticipated. In' addition, the rear of the subject property is, located adjacent to a valley corridor of the Humber River Watershed. TRCA staff has conducted a site inspection and confirm that the proposed works appear to be sufficiently setback from the valley corridor feature: The area to which this application applies is currently a manicured lawn and,is void of any significant vegetation. . Control of Flooding: Given that existing grades will be maintained, TRCA Water Resourcesstaff has reviewed this proposal and do not anticipate any impacts to the storage and /or conveyance of flood waters. .The proposed pool is located outside of the hydraulic floodway. All excavated fill will be 'removed from the floodplain. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No.significant vegetation will be removed as result of construction. Plantings As no significant plantings will be removed, no additional plantings are required: Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). 732 CFN: 41094 - Application #: 554/08/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: July 30, 2008 8.1.31 124 SELWYN ROAD To construct, reconstruct, erect or place a building or structure and site grade on Lot 133, Plan 65M -3829, (124 Selwyn Road), in the Town of Richmond Hill, Don River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a garden shed and minor landscaping to the rear of an existing dwelling. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Landscape Concept Plan, prepared by T. Lau, dated September 2007, stamped received by TRCA Planning and Development June 27, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a garden shed and minor landscaping, including the creation of garden beds and the addition of interlocking stone, to the rear of an existing dwelling located at 124 Selwyn Road in the Town of Richmond Hill. The subject property is located within an approved subdivision adjacent to a stream corridor associated with the Don River Watershed. Although the subject property is partially located within the Regional Storm Floodplain, the garden shed appears to be sufficiently setback from the Regional Storm Floodplain, and all existing grades will be maintained. The subject site is currently a manicured lawn, as such no significant vegetation will be removed as a result of this 'application. Control of Flooding: The proposed works appear to be located outside of the Regional Storm Flooplain. As such, no impacts to the storage and /or conveyance of flood waters is anticipated as a result of this application. Pollution: Appropriate erosion and sediment controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. 733 • Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: • No significant vegetation will be removed as a result of construction. Plantings As the proposed development is located within a manicured lawn, additional plantings are not required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41083 -. 'Application #:,542/08/RH Report Prepared 'by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: July 30, 2008 TOWN OF WHITCHURCH - STOUFFVILLE 8.1.32 36" MARKET STREET To construct, reconstruct, erect or place a building or structure on Lot 9, Plan 972; (36 Market Street), in the Town of Whitchurch- Stouffville, Rouge River Watershed. The purpose is to construct a deck within a Regulated Area of the Rouge River Watershed. The•permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, dated June 2008, prepared by C.P. Wood, received June•26, 2008. RATIONALE The application was reviewed by staff on 'the basis of the following information: Proposal: The proposal consists of constructing a deck within a Regulated, Area of the Rouge River Watershed. The subject property is partially located within the Regulatory Storm Floodplain. • However, the proposed.works are located outside of the floodplain. Further, the works are adequately setback from the watercourse by approximately 35 metres: Control of Flooding: As the works are located outside of the floodplain, there are no flooding.concerns. Pollution: Sedimentfencing will not be required as the works are adequately setback from the watercourse. 734 Dynamic Beaches: Not applicable Erosion: There are no erosion concerns associated with this application. Conservation of Land: No significant vegetation will be removed as part of this application. Plantings • No plantings required. Policy Guidelines: This proposal is consistent with Section 4.2.2 E, Property Improvements and Ancillary Structures, of TRCA's Valley and Stream Corridor Management Program. . CFN: 41090 - Application #: 547/08/WS Report Prepared by: Shannon McNeill, extension 5744 For information contact: Bill Kiru, extension 5306 Date: July 30, 2008 8.1.33 REGIONAL MUNICIPALITY OF YORK To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 1, Concession 7, 8, (East Little Rouge Creek Crossing - Tributary runs adjacent to Highway 48, crossing at the Highway 48 and Stouffville Road Intersection), in the Town of Whitchurch- Stouffville, Rouge River Watershed as located on the property owned by Regional Municipality of York. . The purpose is to construct a watermain and sanitary sewer on Stouffville Road with a crossing beneath the East Little Rouge Creek. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of undertaking to provide minor revisions to engineering drawings to the satisfaction of TRCA staff; dated July 21, 2008; received July 24, 2008; prepared by the Town of Whitchurch- Stouffville. RATIONALE The application was reviewed by staff on the basis of the following information: 735 Proposal: Background The Town of Whitchurch- Stouffville (TOWS) currently receives its water supply from groundwater,sources. A Municipal Class Environmental Assessment (EA) - Schedule B was filed' by the Regional Municipality of York in 2006 that identified the preferred solution for additional water supply to meet future growth in the TOWS. Additional water supply is required by 2009:, The preferred solution is to extract additional water supply from Lake Ontario via the York Water System (YWS) and use it in combination with the existing groundwater supply. The additional lake- based supply will provide approximately 25% of the Town's water supply. The additional water supply extraction will be undertaken by constructing a connection and booster station at the existing Markham Reservoir located south of Stouffville Road and east of McCowan Road. A watermain will then be constructed from the booster station to McCowan Road, where it will extend along the east side of McCowan Road north to Stouffville;Road, at which point itwill run east along the north side of Stouffville Road and connect to an existing distribution system at Ringwood Drive. This application is for approval for the Regional Municipality of York to construct approximately 530 m of watermain and,470 m of sanitary sewer from Highway 48 westward along .Stouffiville Road. The Town of Whitchurch- Stouffville will be submitting a detailed design package in the future for a permit application to complete the watermain connection eastward from the limit of the Regional Municipality of York's contract. Watermain works were approved by TRCA throughissuance of an Ontario Regulation 166/06 permit ( #C- 07464) to the TOWS in 2007 for connection to the existing system at Ringwood Drive and north on Highway 48 to Millard Street. Regulated Construction Works Proposed works within the regulated area include construction of the watermain and sanitary sewer on Stouffville Road where it crosses beneath the East Little Rouge Creek on the north side (watermain) and centre (sanitary) of the intersection with Highway 48. The crossing of the watermain and sanitary sewer will be constructed by Jacking and Boring approximately 1.0 m (sanitary) and 2.1 m (watermain) below the creek's concrete culvert. All other works apart from the jacking and boring procedure will be constructed by open -cut methodology. During construction effective erosion and sediment control (ESC) measures will be implemented to protect all natural features (aquatic and terrestrial). Any water derived from groundwater dewatering or pumping of open cut trench excavations, will be managed to prevent impacts to surrounding natural environmental features. Control of Flooding: . The storage or conveyance of floodwaters will not be impacted by the proposed works as final grades are to match existing grades in the flood plain. Pollution: Standard erosion and sediment control measures (silt/sediment fence; rock check dams, etc.) will be implemented and maintained for,the duration of construction and until the site is stabilized and restored to prevent construction generated sediment from entering any , watercourse. Dvnamic.Beaches: Not applicable 736 Erosion: There will be no slope stability concerns with the proposed project. Conservation of Land: With erosion and sedimentation control plans in effect, impacts to the aquatic environment are not anticipated. Plantings Not applicable. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. The location of the works is within the Oak Ridges Moraine (ORM) and Greenbelt. The project has been reviewed for the tests and best management practices described in Section 41(5)(a to e) of the Oak Ridges Moraine Conservation Plan and complies with the Greenbelt Plan. CFN: 39185 - Application #: 242/07/WS' Report Prepared by: Jennifer Draper, extension 5715 For information contact: Jennifer Draper, extension 5715 • Date: July 28, 2008 TOWNSHIP OF KING 8.1.34 178 MARTIN STREET • To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 30, Plan 416, (178 Martin Street), in the Township of King, Humber River Watershed. The purpose is to construct a basement level garage with a main floor addition to an existing dwelling as well as a tapered retaining wall and driveway widening within a Regulated Area of the Humber River Watershed at 178 Martin Street, in the Township of King. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with . the following documents and plans.which form part of this permit: • Site Plan, Drawing S -0 prepared by Seberras Professional Services Ltd., revise dated May 22, 2008, received by the TRCA July 10, 2008, redline revised to indicate the erection of Sediment Control Fencing and the removal of excess fill material; • Garage Floor Plan, Drawing S -1 prepared by Seberras Professional Services Ltd., revise dated May 19, 2008, received by the TRCA July 10, 2008; • , Ground Floor Plan, Drawing S -2 prepared by Seberras Professional Services Ltd., revise dated May 19, 2008, received by the TRCA July 10, 2008; • North Elevation, Drawing S -3 prepared by Seberras Professional Services Ltd., revise dated May 19, 2008, received by the TRCA July 10, 2008; 737 • South Elevation, Drawing S -4 prepared by Seberras Professional Services Ltd., revise dated May 19, 2008, received by the TRCA July 10, 2008; • East Elevation, Drawing S -5 prepared by Seberras Professional Services Ltd., revise dated May 19, 2008, received by the TRCA July 1 -0,2008; and • West Elevation, Drawing S -6 prepared by Seberras Professional Services Ltd., revise dated May 19, 2008, received by the TRCA July 10, 2008. RATIONALE The application was reviewed 'by staff on the basis of the following information: Proposal: The purpose, is to construct a, basement level garage with a main floor addition to an existing dwelling as well as a tapered retaining wall and driveway widening•within.a Regulated Area of the Humber River Watershed. The proposed works,are located entirely, within an existing sodded area As part of the works, some fill will be removed to accommodate the basement level garage and,a tapered retaining wall with a maximum height of 3.25 will be constructed to accommodate the driveway widening, these works are not located near any natural features. The subject property is partially within a Regulated Area as a portion of the subject property is within a valley /stream corridor and within two Wetland Areas of.Interference. Based upon the drawings submitted by the applicant and a site visit conducted by TRCA staff July 9, 2008, TRCA geotechnical - staff are.satisfied that the proposed works will not have an adverse impact on the stability of the existing slope on.the' property. In.addition;-TRCA'ecology staff are satisfied that the proposed works will not impact the natural features on and adjacent to the subject property as.the project is located within an already,disturbed and sodded area and' do not encroach further towards any significant natural features located on and adjacent to the subject property than currently existing development. 'Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain, there will be no impacts on the storage or conveyance of floodwaters. Pollution: Sediment control fencing will be installed and maintained during the construction of the addition, retaining wall and driveway widening. Dynamic Beaches: Not applicable. Erosion: TRCA geotechnical staff are satisfied that the proposed works and slope alteration will not • adversely affect the stability of the existing gentle slope on and adjacent to the subject property. Conservation of Land: As 'a watercourse will not be impacted by the proposal, no fisheries concerns will result. All significant natural features on and adjacent to the site will not be adversely impacted by the project. • 738 Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 - Development & Redevelopment within Highly Urbanized Areas - of the Authority's Valley and Stream Corridor Management Program. CFN: 41122 - Application #: 575/08/KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: July 30, 2008 THE FOLLOWING PERMIT APPLICATIONS WERE ERRATA ITEMS: RES.#B91/08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS Moved by: Seconded by: Ron Moeser Suzan Hall THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.37 - 8.1.58, with the exception of 8.1.39 - 139 Whitburn Crescent, which was withdrawn) that had been scheduled on the agenda as errata applications, for which all the required information was received and finalized as listed below (Applications 8.1.35 - Bell Canada & 8.1.36 - 76 High Street were withdrawn). • CITY OF BRAMPTON CARRIED 8.1.35 BELL CANADA To site grade along the side of (Queen Street East [Etobicoke Creek]), just west of Centre Street, in the City of Brampton; Etobicoke Creek Watershed as located on the property owned by the Toronto and Region Conservation Authority. •' Withdrawn CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.36 76 HIGH STREET To construct, reconstruct,.-erect or place a building or structure and site grade on Lot 21, Plan 548, (76 High Street), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. • Withdrawn 739 8.1.37 139 CLEARBROOKE CIRCLE To construct, reconstruct, erect or place a building or structure on Lot 64, Plan 4411, (139 Clearbrooke Circle), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the reconstruction of a detached garage within the existing footprint. The existing detached garage is to be demolished. The permit will be issued for the period of August 8, 2008 to August 7, 2010. • Drawing unnumbered, Site Plan, prepared by Thomas Tetzlaff, undated, received on July 14, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the reconstruction of a detached garage in the rear yard of the existing single family detached dwelling. The existing detached garage is in a state of disrepair and is to be demolished. The subject property is located north of Rexdale Boulevard and west of Islington Avenue in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of flood waters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: The proposal is not located any closer to the top of bank than the existing structure. No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. 740 Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41135 - Application #: 584/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: July 30, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.38 31 VIAMEDE CRESCENT To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 12, Plan 5482, (31 Viamede Crescent), in the City of Toronto (North York Community • Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a second - storey addition over the existing garage, extension of the rear deck, and replacement of stairs on both sides of the existing dwelling. The permit will be issued for the period of August 8, 2008 to August 7, 2010. • A -106 Proposed: Elevations, Prepared by Gaea Creations Inc, dated February 11, 2008, received by TRCA April 22, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: . The proposed works include the construction of a second - storey addition over the existing garage, extension of the rear deck, and replacement of both side stairs at the existing dwelling at.31 Viamede Crescent in the City of Toronto. The property is located south of Finch Avenue East, east of Bayview Avenue. • Control of Flooding: The site is not located in a Regional Storm Floodplain. Pollution: A sediment control fence will be erected before commencement of any construction or grading works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. 741 Dynamic Beaches: Not applicable Erosion: - A geotechnical brief has been reviewed and accepted by TRCA geotechnical engineering staff and the proposed works are within the existing limit of development. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Native tree shrubs and seed mix will be planted. Policy Guidelines: This proposal is consistent with Section 4.2.2.C, Minor Additions, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40782 - Application #: 300 /08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 30, 2008 8.1.39 139 WHITBURN CRESCENT To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 50, Plan 4503, (139 Whitburn Crescent), in the City of Toronto (North York Community Council Area), Humber River Watershed. • Withdrawn CITY OF VAUGHAN 8.1.40 2019625 ONTARIO INC. To construct, reconstruct, erect or place a building or structure and site grade on Part Lot 17, Concession 5 Part Block 1, Plan 65M -3766, (111 Auto Vaughan Drive, 101 Auto Vaughan Drive, 233 Sweetriver Boulevard), in the City of Vaughan, Don River Watershed as located on the property owned by 2019625 Ontario Inc. The purpose is to construct a vehicle parking area with a retaining wall which is associated with the development of three commercial buildings within a Regulated Area of the Don River . Watershed. The permit will be issued for the period of August 8, 2008 to August 7, 2010. • Site Plan, Drawing No. Al, prepared by Wes Surdyka Architect Inc., revise dated January 15, 2008, received by the TRCA May 16, 2008; 742 • Site Grading and Servicing Plan, Drawing No. 06107 G -1, prepared by V.A. Piscione & Associates Inc., dated July 19, 2006, received by the TRCA May 16, 2008; Details Drawing, Drawing No. 06107 G -2, prepared by V.A. Piscione & Associates Inc., dated July 19, 2006, received by the TRCA May 16, 2008; • Landscape Plan, Drawing No. L -1, prepared by Juhan Marten, (Revision No. 13) revised July 31, 2008, received by the TRCA August 5, 2008; • Landscape Details, Drawing No. L -2, prepared bu Juhan Marten, Revision No. 13) revised July 31, 2008, received by the TRCA August 5, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a vehicle parking area within a Regulated Area of the Don River Watershed. The proposed works on the subject property consist of three automotive dealerships and associated vehicle parking area. A portion of the parking area is located within a Regulated Area due to the proximity of a watercourse and associated Regional Storm Floodplain south of the subject property. The floodplain area is partially within the subject property but is contained within a 9.0 metrelandscape buffer. The proposed parking area and retaining wall within the Regulated Area of the subject property are outside of the Regional Storm Floodplain and approximately 8 metres at its closest point to this hazard. TRCA water resources staff are satisfied that the proposed works will not have an impact on the storage and conveyance of flood waters. As part of the TRCA review of the associated Site Plan Application (Application No. DA.06.092), TRCA staff are satisfied with the proposed stormwater management plan. The stormwater management plan includes the implementation of green technologies such as permeable pavers and other onsite infiltration measures. The 9.0 metre landscape buffer is composed of native, non - invasive species and will create an enhanced buffer between the stream corridor and the proposed commercial development. Control of Flooding: • • The proposed parking area and retaining wall are located outside of the Regional Storm Floodplain. Works within the floodplain area are limited to plantings as part of the 9.0 metre landscape buffer. TRCA water resources engineers are satisfied that there will be no impact on .the storage or conveyance of floodwaters as a result of the proposed works. Pollution: Sediment control fencing will be installed and maintained for the duration of construction to ensure there will be no sediment transport into the adjacent watercourse and stream corridor. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this project. 743 Conservation of Land: As the watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. - Plantings A 9.0 metre landscape buffer composed of native, non - invasive species will be created between the proposed parking area / retaining wall and the adjacent stream corridor. The landscape buffer will create an enhanced buffer between the stream corridor and the proposed commercial uses. Policy Guidelines: The proposal is consistent with Section 4.2.2 G) - Infilling - of the Authority's Valley and Stream Corridor Management Program. CFN: 40886 - Application #: 383 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: July 30, 2008 8.1.41 BLOCK 12 PROPERTIES INC. To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse, northeast of Major Mackenzie Drive and Dufferin Street, in the City of Vaughan, Don River Watershed as located on the property owned by Block 12 Properties Inc. The purpose is to conduct site grading, to temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a tributary of the Humber River, in order to complete restoration works to the existing Mayvon East Pond, culvert and berm, within Planning Block 12, in the City of Vaughan. The permit will be issued for the period of August 8, 2008 to August 7, 2010. • Letter of Undertaking, prepared by Gaetano Franco, Block 12 Properties Inc., dated July 16, 2008, received July 17, 2008. RATIONALE The application was reviewed by staff on the basis of the following,information: Proposal: The proposal is to conduct site grading works, to temporarily or permanently place, dump or remove material within a Regulated Area and to alter the East Don River, in order to conduct restoration works to the existing Mayvon East Pond along with its associated culvert and berm stabilization within Planning Block 12, in the City of Vaughan. 744 Location: Planning Block 12 is bounded by Major Mackenzie Drive to the south, Dufferin Street to the west, Teston Road to the north and to the east by Bathurst Street. The proposed work site is located on lands that are part of Draft Approved Plan of Subdivision ,19T -00V02 (Mayvon Investments Limited). The lands are located east of Dufferin Street and north of Major Mackenzie Drive. There are two existing online ponds on the'property: a shallow pond (East Mayvon Pond) and a deeper offline pond (West Mayvon Pond). There is an approved Master Environmental Servicing Report (MESP) in place for Block 12. As part of the MESP process, the two ponds on the Mayvon lands were identified for restoration works in the area including opportunities to improve aquatic habitat linkages through the removal of stream barriers in the Mayvon draft plan area. To be consistent with the Don Watershed Fisheries Management Plan (1996), a recommendation was made to restore the watercourse in this area and improve connectivity of fish habitat through the removal of the two online ponds in this area. Background: In order to improve habitat linkages to the headwaters of the Don River, the initial treatment with respect to the two Mayvon ponds was to remove the deeper off -line pond (West Mayvon Pond) and regrade in this area. The stream channel would then be relocated through the former pond location and reconnected. The East Mayvon pond would be removed but would receive periodic flows from the re- designed stream channel during high flow periods and events. This would provide both terrestrial and aquatic habitat opportunities. The TRCA conduct these works while the developments within the Block Plan area will fund all costs of the works. At the October 13, 2006 TRCA Executive Meeting (Meeting # 08/06), authorization was given to TRCA staff to enter into final negotiations with the applicant to come to an agreement on the rehabilitation of Mayvon Pond and that a state -of- the -art channel rehabilitation program be implemented. Early investigations of the proposed work plan (i.e., removing the berm creating the East and West Ponds and the construction of a new channel alignment to connect the East Don River upstream and downstream of the Mayvon lands) identified risk and potential complications associated with the active removal and de- watering of sediments from the East Mayvon Pond. This included comprehensive soil testing and hydrogeological analysis. Additional investigations into the removal of the berm showed that there would be difficulties with dewatering and the construction of the channel through the West Pond. Based on these findings, TRCA staff entered into additional discussions to explore the opportunity to construct a fishway to provide aquatic habitat connectivity through West Mayvon Pond. However, based on the technical submissions provided, TRCA staff expressed concerns with the extent of the construction disturbance required to complete the works and that the overall strategy did not meat our long -term vision for fish passage at this location. Furthermore, sediment release downstream could prove problematic given that downstream lands and ponds are in private ownership; thereby leading to potential liability issues. 745 Finalized Agreement: This noted, further discussions were held whereby a new phased approach was developed to achieve the long term goal of achieving fish passage; the applicant, Block 12 Properties would complete necessary restoration works to the existing East Mayvon Pond culvert and berm through the use of Tess intrusive construction techniques. This will ensure the Tong -term stability of the crossing. The first phase of this work includes the repair of the deteriorated concrete on the concreteidrop inlet structure; re- lining of the existing 1050 mm.diameter culvert with•a new pipe_and a downstream pipe extension in order to accommodate the proposed stabilizing berm along with the remediation of the existing berm and the addition of a 1.5 metre stabilizing berm. Measures'to provide erosion 'protection at the outlet of the culvert will also be provided along with the - construction of an overflow spillway. Additional,sampling will also be carried out on both ponds to confirm potential sediment quality concerns which would require special remediation measures should any sediment material be excavated from the ponds in the,future. Upon satisfactory completion of these works, the open • space block including .the remediated pond area will be transferred into the ownership of the "TRCA. In order to achieve the long -term goal of providing fish passage through. the Mayvon Pond area, future culvert and berm decommissioning works are to be completed by the TRCA. This will only take place once downstream lands are in public ownership (TRCA). This is expected to take place once the lands downstream (which are part of a draft approved plan of subdivision - 19T-03V13 (Helmhorst Investments)) proceeds to registration. To assist in this initiative, Block 12 Properties Inc. has committed to provided TRCA with a financial contribution towards these future works. . Control of Floodinq: TRCA staff has reviewed technical submissions relating to the proposed remediation works and is satisfied that the storage and conveyance of flood waters will not be negatively impacted. Pollution: Environmental /sediment fencing will be erected around the work site to prevent sediment migration into the East Don River. The fencing will be erected prior to the initiation of the work and maintained during construction. Dynamic Beaches: Not applicable. Erosion: Erosion will be. minimized throughtthe implementation of the aforementioned sediment control measures. There proposed works will stabilize the berm /culvert and allow its Tong- term,function. Conservation of Land: While the works will be conducted in the dry, a temporary diversion of streamflow around the crossing will be required. As such, a Letter of Advice will be issued on behalf of Fisheries and Oceans Canada (DFO). 746 Plantings A comprehensive restoration planting plan will be implemented for the first phase of works, consisting of native, non - native species. These will be planted along the regraded slope berm area. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing and Section 4.2.2 (F) - Opportunities for Regeneration, of the TRCA's Valley and Stream Corridor-Management Program. CFN: 40533 - Application #: 130 /08NAUG Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date: July 30, 2008 8.1.42 CITY OF VAUGHAN To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse in a Regulated Area at 208 Centre Street between Oakbank Road and Thornbank Road, in the City of Vaughan, Regional Municipality of York, Don River Watershed as located on the property owned by City of Vaughan. The purpose is to replace an existing 1.78 metre span concrete culvert with.a 2.4 metre span concrete box culvert within a warm water fisheries timing window. A Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO) for this project. • The permit will be issued for the period of August 8, 2008 to August 7, 2010. • Drawing ENV -1, Centre Street Bridge Rehabilitation /Reconstruction, Environmental Details; Drawing S5, Details; Drawing S6, General Arrangement, Structure 707; dated June 2008; received June 26, 2008; red line revised August 6, 2008; prepared by SRM Associates. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The entire proposal involves the replacement of an existing 1.78 metre span concrete culvert with a 2.4 metre span concrete box culvert (structure 707) and repair of 8 existing smaller culverts (structures 601, 701, 7-02, 703, 704, 705, 706 and 708) along Centre Street between Oakbank Road and Thornbank Road, in the City of Vaughan. This application is for the replacement of culvert 707 at 208 Centre Street. As part,of this project, vegetated buttresses will be installed as bank protection. The remaining culverts repairs will be approved through. Routine Infrastructure Works approval' under CFN 41,163 and CFN 41168. The repair works will consist of maintenance and embankment protection. • • Control of Flooding: The proposediproject.will have no impacts on-the storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (silt/sediment fencing, cofferdam) will be implemented prior to construction and maintained for the duration of construction, and until the site is.stabilized and restored, in order to prevent the generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in • accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: _ There are no geotechnical /slope stability issues associated with the proposal. Conservation of land: With erosion'and sedimentation plans in effect, the potential for a Harmful,,Alteration Disruption or Destruction (HADD) of fish•habitat will be mitigated and a Letter of Advice will be provided by TRCA staff on. behalf of the Department of Fisheries and Oceans (DFO). No significant vegetation will be removed as a result of construction. Plantings All disturbed areas will be restored with native non- invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41069 - Application, #:524 /08/VAUG Report Prepared• by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: July 30; 2008 748 8.1.43 CITY OF VAUGHAN To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere in a Regulated Area on James Street from Woodbridge Avenue to William Street and on William Street from James Street to Kipling Avenue, in the City of Vaughan, HumberRiver Watershed as located on the property owned by the City of Vaughan. The purpose is to replace an existing watermain. The permit will be issued for the period of August 8, 2008 to August 7, 2010. • Letter of Undertaking to revise sediment and erosion control drawings to the satisfaction of TRCA staff; dated August 6, 2008; received August 6, 2008; prepared by the City of Vaughan. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to replace an existing 150mm diameter watermain with 150mm to 300mm diameter PVC watermain and resurface the existing road on James Street and William Street in the City of Vaughan, Regional Municipality of York. The new watermain will be installed underneath the existing Canadian Pacific Railway using jack and bore method. All works to take place within the existing road right -of -way. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (sediment fencing) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. 749 Conservation of Land: There will be no in stream works associated with this project. All works will be conducted in the dry. The proposed works will have no impact on natural heritage features. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41210 - Application #: 644 /08NAUG Report Prepared by: Louise Monaghan, extension 5756 For information contact: Suzanne Bevan, extension 5759 Date: July 30, 2008 8.1.44 METRUS DEVELOPMENT INC To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 14, Concession 10, Block 64, southwest of Hungtington Road and Rutherford Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Metrus Development Inc. The purpose is to construct, reconstruct, erect or place a building or structure, conduct site grading, to temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a tributary of the Humber River, in order to construct a stormwater management pond (SWM Pond No. 3) and associated outfall, within Planning Block 64 (north of Langstaff Road, west of Huntington Road), in the City of Vaughan. The permit will be issued for the period of August 8, 2008 to August 7, 2010. • Letter of Undertaking, prepared by David Kellershohn, Schaeffers Consulting Engineers, dated July 31, 2008, received August 1, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 750 Proposal: The proposal is construct - erect or place a structure, conduct site grading, to temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a tributary of the Humber River, in order to facilitate the construction of a stormwater - management pond and its associated outfall (SWM Pond No. 3) within Planning Block 64, in the City of Vaughan. The proposed servicing works will facilitate the development of an industrial subdivision on surrounding lands in Block 64. . Planning Block 64 is located on the west side of the City of Vaughan; bounded by Rutherford Road to the north, Huntington Road to the east, Langstaff Road to the south and to the west by Highway 50. The proposed stormwater facility is located south of West Rainbow Creek and west of Huntington Road. The contributing drainage area to SWM Pond 3 will be composed of commercial and industrial developments (approximately 50.4 ha (124.6 ac)). SWM Pond 3 is located on the south side of the watercourse and its associated valley corridor. • The works will be carried in accordance with the approved Block 64 Master Environmental Servicing Plan (MESP) and will fulfill a condition of draft approval for the associated Draft Approved Plan of Subdivision (19T- 06V13). TRCA staff has received and reviewed detailed technical submissions relating to the proposed works and has provided comments. The agent, Schaeffers Consulting Engineers, is in the process of addressing TRCA comments. At this time, minor issues relating to erosion and sediment controls and landscape plans remain • outstanding. TRCA technical staff is confident that these issues can be resolved shortly. These issues in no way affect the location of the proposed works which were determined at the MESP stage. The permit will not be released until such time as these issues are resolved. Control of Flooding: The proposed stormwater management facility is located outside of the Regional Storm Flood Plain of the Humber River. While the proposed stormwater outfall is located in the flood plain, TRCA staff is satisfied that the works will not impact the storage or conveyance of flood waters. Pollution: Erosion and sediment control measures including sediment fencing will be implemented prior to construction of the proposed works and will be maintained for the duration of construction. This will ensure that sediment does not enter the nearby valley system and watercourse. Dynamic Beaches: • Not applicable. Erosion: Erosion will be minimized through the implementation of the aforementioned sediment control measures. There are no geotechnical /slope stability issues associated with the proposed works. Conservation of Land: Treated stormwater flows from the pond will be discharged into the adjacent watercourse /valley system of the Humber River. As such, a Letter of Advice will be issued on behalf of Fisheries and Oceans Canada (DFO). 751 Plantings Extensive plantings consisting of native, non - invasive species will be carried out and around the proposed pond and storm outfall, in accordance with TRCA's Planting Guidelines. - Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40603 - Application #: 183 /08NAUG Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date: July 29, 2008 8.1.45 METRUS DEVELOPMENT INC To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 13, Concession 10, Huntington Road and south of Rutherford Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Metrus Development Inc. • The purpose is to conduct site grading, to temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a tributary of the Humber River, in order to install a sanitary sewer line along Huntington Road, where it crosses West Rainbow Creek, in Planning Block 64, in the City of Vaughan. The permit will be issued for the period of August 8, -2008 to August 7, 2010. • Letter of Undertaking, prepared by David Kellershohn, Schaeffers Consulting Engineers, dated July 31, 2008, received August 1, 2008. RATIONALE • The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to conduct site grading works and to temporarily or permanently place, dump or remove any material within a Regulated Area and to alter a tributary of the Humber River (West Rainbow Creek), in order to install a sanitary sewer line within the Huntington Road right -of -way, where it crosses the watercourse, in Planning Block 64, in the City of Vaughan. The proposed servicing works will facilitate the development of an industrial subdivision on adjacent lands in Block 64. 752 Planning Block 64 is located on the west side of the City of Vaughan; bounded by Rutherford Road to the north, Huntington Road to the east, Langstaff Road to the south and to the west by Highway 50. The proposed sanitary sewer line will be installed under the Huntington Road right -of -way where it bisects the West Rainbow Creek, a tributary of the Humber River. The _ watercourse exhibits low flows and mud substrate during the summer months. It is considered to, be intermittent in nature while the streambed is dry in the summer. • At this time, flows from the watercourse are conveyed through an existing CSP culvert under Huntington Road. The sanitary sewer line is to be installed a minimum of 2 metres below the existing culvert. Dewatering works are not expected for the proposed works, as groundwater is located well below the sanitary sewer line. The crossing will be completed using the open -cut method. The existing culvert will be supported during construction and will continue to convey flows across Huntington Road. A contingency plan has been submitted should the culvert fail. . In order to minimize impacts to the watercourse, works will not be conducted during the warmwater fisheries timing window (April 1.- June 30). Control of Flooding: The proposed works will be located under the Huntington Road right -of -way and outside of the Regional Storm Flood Plain. TRCA technical staff is satisfied that the works will not negatively impact the storage or conveyance of flood waters. Pollution: Environmental /sediment fencing is proposed as an erosion and sediment control measure around the construction work site in order to isolate the area from the watercourse. This will ensure that sediments from construction activities are not deposited in the nearby watercourse. Dynamic Beaches: Not applicable. Erosion: Erosion will be minimized through the implementation of the aforementioned sediment control measures. There are no geotechnical /slope stability issues associated with the proposed works. Conservation of Land: . While there will be no direct in -water works, the proposed contingency plan (should the culvert fail) involves the use of a pump by -pass system. This includes the use of a temporary coffer dam and pump by -pass within the watercourse. As such, a Letter of Advice will be issued on behalf of Fisheries and Oceans Canada (DFO). . Plantings No vegetation will be removed as part of the proposed works. As such, plantings will not be required for this application. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. . 753 CFN: 40977 - Application #: 451 /08NAUG Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date:.July 29, 2008 8.1.46 METRUS DEVELOPMENT INC. To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 13, Concession 10, Block 64 - southwest of Huntington Road and Rutherford Road, in the City of Vaughan, •Humber•River Watershed as located on the property owned by Metrus Development Inc. The purpose is to construct, reconstruct, erect or place a building or structure, conduct site grading, to temporarily or permanently place, dump or removeany material within a Regulated Area and to alter a.tributary of.the Humber River, in order to construct a stormwater management pond (SWM Pond No. 2) and associated outfall, within Planning Block 64 (south of Rutherford Road, west of Huntington Road), in the City of Vaughan. The permit will be issued for the period of August 8, 2008 to August 7, 2010. . • , Letter of. Undertaking, prepared by David Kellershohn, Schaeffers Consulting Engineers, dated July 31,2008, received August 1, 2008. RATIONALE. The•application was reviewed by staff on the basis of the following, information: Proposal: The proposal is to construct - erect or place a structure, conduct site grading, to temporarily or permanently place, dump orremove any material within a Regulated Area and to alter a tributary of the Humber River, in order to facilitate the construction of a stormwater management pond and its associated outfall (SWM Pond No. 2) within Planning Block 64, in the City of Vaughan. The proposed servicing works will facilitate the development of an industrial subdivision on surrounding lands-in Block 64. Planning Block 64 is located on the west side of the City of Vaughan; bounded by Rutherford Road to the north, Huntington Road•to the east, Langstaff Road to the south and to the west by Highway 50. The proposed stormwater facility is located north of,West Rainbow Creek and'east of Street 1 (within proposed Draft Approved Plan of Subdivision-19T- 06V13). The contributing drainage area:to SWM Pond 2 will be composed of commercial and industrial developments (approximately 67.4 ha (166.6 ac)). SWM•Pond 2 is located on the north side of the watercourse and its,associated valley corridor. 754 1 The works will be carried in accordance with the approved Block 64 Master Environmental • Servicing Plan (MESP) and will fulfill a condition of draft approval for the associated Draft Approved Plan of Subdivision. TRCA staff has received and reviewed detailed technical submissions relating to the proposed works and has provided comments. The agent, _ Schaeffers Consulting Engineers, is in the process of addressing TRCA comments. At this time, minor issues relating to erosion and sediment controls and landscape plans remain outstanding. TRCA technical staff is confident that these issues can be resolved shortly. These issues in no way affect the location of the proposed works which were determined at the MESP stage. The permit will not be released until such time as these issues are resolved. Control of Flooding: The proposed stormwater management facility is located outside of the Regional Storm Flood Plain of the Humber River. While the proposed stormwater outfall is located in the flood plain, TRCA staff is satisfied that the works will not impact the storage or conveyance of flood waters. Pollution: Erosion and sediment control measures including sediment fencing will be implemented prior to construction of the proposed works and will be maintained for the duration of construction. This will ensure that sediment does not enter the nearby valley system and watercourse. Dynamic Beaches: Not applicable. Erosion: Erosion will be minimized through the implementation of the aforementioned sediment control measures. There are no geotechnical /slope stability issues associated with the proposed ' works. Conservation of Land: • Treated stormwater flows from the pond will be discharged into the adjacent watercourse /valley system of the Humber River. As such, a Letter of Advice will be issued on behalf of Fisheries and Oceans Canada (DFO). Plantings Extensive plantings consisting of native, non - invasive species will be carried out and around the proposed pond and storm outfall, in accordance with TRCA's Planting Guidelines. . Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40604 - Application #: 182 /08NAUG Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date: July 29, 2008 755 8.1.47 112 MONSHEEN DRIVE To construct, reconstruct, erect or place a building or structure and site grade on Lot,12, Plan 5081, (112 Monsheen Drive), in the City of Vaughan, Humber River - Watershed. The purpose is to construct a replacement home; new patio and new pool within a Regulated Area of the, Humber River Watershed at 112 Monsheen Drive in the City of Vaughan. The permit will be issued for the period of August 8, 2008 to August 7, 2010. • Letter of,Undertaking indicating that any and all minor revisions will be made to the • plans to the' satisfaction of the TRCA, signed by the landowners, dated August 5, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a replacement home, new patio and new pool within a Regulated Area of the Humber River Watershed. The proposed works-are partially located along the edge of a valley corridor. Based upon a site visit conducted by TRCA staff July 15, 2008, the subject property contains a well vegetated, steep slope down to Islington Avenue and a smaller slope midway through the already developed portion of the property which allows for the existing walk -out basement. According to a Geotechnical.Report prepared by Chih S. Huang & Associates Inc., dated July 3,2008, received by the TRCA July 8, 2008, the existing top of bank of the large slope can be . considered the stable top of bank. Based upon the site visit the existing top of bank coincides with the edge of the manicured lawn. A review of,the drawings indicates that the edge of the new patio is setback 5.0 metres and the-proposed pool is setback 6.0 metres from the existing / stable top of bank. The proposed 'replacement home is setback 9.75 metres at its closest to the existing / stable top of bank. As part of this permit, plantings consisting of native, non - invasive species are provided between the existing top of bank and the edge of the patio. These plantings will create an enhanced buffer between the valley system and the existing and proposed residential uses. In addition, these plantings will provide increased slope stability. Control of Flooding: . • The proposal is not located within the Regional Storm Flood Plain, there will be no impact on the storage or conveyance of flood waters. Pollution: Sediment control ,fencing will be erected and maintained for the duration of construction to prevent the transport of sediment into the valley system. • Dynamic Beaches: Not applicable. 756 Erosion: TRCA geotechnical staff are satisfied the proposed works are sufficiently setback from the existing top of bank and will not have an adverse impact on the stability of the slope. . Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. . Plantings Plantings consisting of native, non - invasive species are to be provided along the 4 metre buffer between the valley system and proposed patio area and will provide an enhance buffer between the valley and residential uses as well as increase the stability of the slope. Policy Guidelines: The proposal is consistent with Section 4.2.2 D) - Replacement Structures, and Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41110 - Application #: 564 /08/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru,'extension 5306 Date: July 29, 2008 TOWN OF CALEDON 8.1.48 HYDRO ONE NETWORKS INC. To site grade along the north side of (Ann Street), just west of Highway 50, in the Town of Caledon, Humber River Watershed as located on the property owned by the Town of Caledon. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the installation of an underground utility conduit line located at -the end of Ann Street (north side), just west of Highway 50, in the Town of Caledon. The permit will be issued for the period of August 8, 2008 to August 7, 2010. • Letter of Undertaking, prepared by Safeline Utility Services Inc., dated August 5, 2008, to address all outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: 757 Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an underground utility conduit located at the end of Ann Street, just west of Highway 5.0, in the Town of Caledon. The utility corridor is necessary to provide service to a recently approved condomium building. The proposed underground conduit is located adjacent to the Humber River and is located between an existing parking lot and outfall structure. The works do not involve any tributary crossings. The proposed conduit line will be installed via open trench method and will be stabilized immediately. The location of the proposed works is void of any significant vegetation. As such, there are no flooding, geotechnical, or ecology related concerns with this application. Control of Flooding: No excavated material is to be stockpiled within the Regional Storm Floodplain and all existing grades are to be maintained. As such, there will be no impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. The controls are to surround the bore pit locations to impede the overland migration of construction generated sediments. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this proposal. Plantings As no vegetation is to be removed by the proposed works, plantings are not required. Policy Guidelines: This proposal is in conformity with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 41063 - Application #: 525 /08 /CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: July 30, 2008 758 8.1.49 I. O. INVESTMENTS To temporarily or permanently place, dump or remove any material, originating . on the site or elsewhere on West Half Lot 18, Concession 6 EHS, (Northeast Corner of Mayfield Road and Torbram Road West (Former Township of Chingacousy)), in the Town of Caledon, Humber River Watershed as located on the property owned by I. O. Investments. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the re- establishment and the restoration of.a valley corridor. The permit will be issued for the period of August 8, 2008 to August 7, 2010. • Letter of Undertaking prepared by UMA Engineering, dated August 6, 2008, to address all outstanding ecology and engineering related concerns. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the re- establishment and the restoration of a valley corridor. Historically, fill was removed from this site in the mid- 1990's altering the form of the valley corridor. The proposed works involve re- establishing the pre- excavation contours of the valley corridor to be consistent with TRCA's floodplain mapping. Although the proposal involves a small amount of fill placement within the Regional Storm Floodplain, the intent of this application is to restore floodlines to be consistent with TRCA's floodplain mapping. Additionally, the proposed works will not result in any adverse flooding impacts on upstream and /or downstream neighbouring properties. Although no significant vegetation will be removed as a result of this proposal, the applicant has provided an extensive planting plan to enhance the valley corridor to improve the ecological condition of this area. • Control of Flooding: The proposal involves fill placement within the Regional Storm Floodplain to restore floodlines to be consistent with TRCA's floodplain mapping. As such, TRCA staff do not anticipate any impacts to the storage and /or conveyance of floodwaters. No adverse impacts to upstream and /or downstream neighbouring properties is anticipated. Pollution: Sediment and erosion controls will be provided and maintained through all phases of construction in accordance with TRCA guidelines. Dynamic Beaches: . Not applicable. . Erosion: There are no geotechnical and /or slope stability concerns related to this application. 759 Conservation of Land: Although no significant vegetation will be, removed as a result of- construction, the applicant has proposed an extensive planting plan to enhance the valley corridor. • Plantings AU plantings are native and non - invasive in accordance with TRCA Guidelines. Policy Guidelines: This proposal is in conformity with Section 4.4.2 (F) - Opportunities for Regeneration - of the Authority's Valley and Stream• Corridor Management Program (VSCMP). CFN: 40873 - Application/#: 372 /08 /CAL Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 . Date: July 30, 2008 8.1.50 TOWN OF CALEDON -To site gradeand alter a watercourse on Part Lot 3, 'Concession 6, E.H.S., (junction of Airport Road and Caledon Trailway), in the Town of Caledon, Humber River Watershed as located on the property owned by Town of Caledon. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in.order to.faciliitate the replacement of culverts at the Caledon Trail immediately upstream of Airport Road, in the'Town of Caledon. ■ The permit will be issued for the period of August,8,'2008 to August 7, 2010. • Letter of Undertking, prepared by A. Kroess, IBI' Group, dated August 6, 2008, to address all outstanding planning ecology concerns. RATIONALE , The application was reviewed by staff on the basis of the following information: r Proposal: The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the replacement of two parallel closed bottom culverts at the.Caledon Trail immediately upstream of Airport Road in the Town of Caledon. The works are necessary given that this area experiences significant flooding due to the existing undersized and submerged culverts under the Caledon Trail, particularly after rainfall events. The proposed,works aim to reduce and /or eliminate the flooding concerns for this area. The replacement structure involves an open bottom bridge structure design: The,structure will - be a 2.4 metres .wide, by' 6 metres long steel bridge with a douglas fir wood deck. Additionally, the replacement bridge will be situated approximately 6 metres upstream of the existing crossing to provide for a better alignment with the watercourse. The bridge will be iristalled on helical piers to avoid the need for dewatering and /or instream work /for the footing installation. 760 As a component of this project, the embankment downstream of the proposed bridge will be • • excavated and lined with river stone to provide a tie -in with the existing channel and to provide additional natural bottom area. A total of 20 metres of channel bottom will be created and a total of 9 metres of channel bottom will be backfilled, resulting in a net gain of 11 metres of creek channel. Additionally, as an element of this project, an enhancement planting plan has been submitted to provide an ecological net gain for this reach of the Humber River Watershed. Control of Flooding: Based on our review of a hydraulic analysis completed by the proponent, it is anticipated that the proposed works will improve flooding conditions for this area. Additionally, no adverse impacts to the storage and /or conveyance of flooding waters are anticipated as a result of this proposal. Pollution: Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this project. Conservation of Land: Although the proposed works will involve the removal of existing vegetation in this area, an enhancement planting plan has been incorporated into the design of this project. As well, the overall length of the stream for this reach of the Humber River Watershed will be increased. Based on our review, it is our opinion that the proposed enhancement plantings, as well as the proposed increase in channel length, will result in an overall ecological net gain for this area. The watercourse is classified as a coldwater fish habitat, and as such, no works will occur between September 15 to June 15 of any given year. However, based on the plans submitted and mitigation measures incorporated into the design of this application, the proposed works do not constitute a Harmful Alteration Disruption or Destruction (HADD) of fish habitat in accordance with the Federal Fisheries Act. As such, a Letter of Advice (LOA) on behalf of Fisheries and Oceans Canada (DFO) will be issued with this permit. Plantings All proposed plant species will be native and non - invasive consistent with TRCA's planting guidelines. Policy Guidelines: The proposed works are in conformity with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 39464 - Application #: 461/07/CAL Report Prepared by: Adam Miller, extension 5244 For information contact: Adam Miller, extension 5244 Date: July 30, 2008 761 TOWN OF MARKHAM 8.1.51 ANGUS GLEN DEVELOPMENT (2003) LTD. To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 19, 20, Concession 5, (Kennedy Road and Major Mackenzie Drive), in the Town of Markham, Rouge River Watershed as located on the property owned by Angus Glen Development (2003) Ltd.. The purpose is to undertake site grading, temporary placement of fill material and alter a watercourse in order to decommission an on -line pond. The permit will be issued for the period of August 8, 2008 to August 7, 2010. • Letter of Undertaking from Jo -Anne Lane, agent of the owner, dated August 6, 2008, committing to revise all plans to the satisfaction of TRCA staff. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to undertake site grading, temporarily place fill material and alter a watercourse in order to commence the first phase of decommissioning of an on -line pond. The 2.57 hectare pond, known as Stollery Pond, is located within the Angus Glen West Village landholdings: a major residential development in the Town of Markham south of Major Mackenzie Drive and west of the Bruce Creek valleylands. Stollery Pond is an artificial pond. The pond was created by means of a dam by a previous land owner as part of the former farming operation on the subject lands. Stollery Pond is an 'on -line' pond to a tributary of the Bruce Creek. As the pond is 'on-line,' all stream flows from the Bruce Tributary travel through the pond prior to flowing downstream to the remainder of the Bruce Creek subwatershed. The pond has several negative ecological impacts: it disrupts the natural hydrologic and geomorphic regime of the tributary, it acts as a barrier to the movement of fish and other aquatic species up and down stream and it alters the thermal regime of the watercourse by increasing downstream water temperatures. As a condition to the draft approval of the Angus Glen West Village plan of subdivision (Subdivision File No. 19TM- 030004), the owner agreed to decommission Stollery Pond and restore the Bruce Creek tributary, which traverses it, to a more natural state by creating a natural channel. In return, blocks for two future stormwater management ponds were included in the draft plan of subdivision on a portion of the Stollery Pond footprint Should this proposal be approved, it would represent the first phase of work in the decommissioning of the pond by authorizing the draw down of the pond and the creation of a bypass diversion channel. The bypass diversion will allow the Bruce Creek tributary flows to continue through the work area while the pond bed is dried out and work begins on the construction of a permanent natural channel. It is proposed that the permanent natural channel design would be accommodated through a revision to the initial permit once the detailed design drawings have been reviewed and found to be satisfactory to TRCA staff. 762 Control of Flooding: The proposed bypass channel will be designed to convey the 5 year storm, whereas the permanent natural channel design will be designed to convey flows up to the Regional Storm event. Pollution: A Dewatering Program and Construction Staging Plan has been submitted in support of the proposal. A goal of this proposal is to provide sediment free clean water discharge through careful draw down of the Stoliery Pond that minimizes disturbance of suspension of pond bed sediments. Dynamic Beaches: Not applicable Erosion: The design of staging plans and sediment and erosion control and prevention measures are to be included on the plans to ensure that all erosion associated with construction of the bypass channel and permanent natural channel is prevented or minimized. Conservation of Land: This proposal will result in the restoration of a tributary of the Bruce Creek, part of the Rouge River watershed, to a more natural state and will contribute to the restoration of the Bruce Creek as a coldwater fishery. In support of the application, a Stollery Pond Characterization report has been submitted. This report catalogues the existing environmental conditions of Stoliery Pond and environs. One key observation of the report was that of a Heronry. As part of the decommissioning of the pond a portion of the heronry will be removed, as it is located on an . island within the pond. The removal of the heronry will take place pursuant to the requirements . of the federal Migratory Birds Convention Act. Issues associated with the management of fish habitat are to be evaluated pursuant to the TRCA's Level III Agreement, TRCA staff will issue a Letter of Advice or refer the proposal to the Department of Fisheries and Oceans Canada for an Authorization pursuant to the requirements of the Fisheries Act prior to issuance of the permit. Plantings The permanent natural channel design is to be fully vegetated with a riparian planting plan once the project proceeds to that phase. Policy Guidelines: This proposal is consistent with Section 3.3 C), Policies and Procedures for Identifying Watercourses and Alterations, of TRCA's Valley and Stream Corridor Management Program. CFN: 41205 - Application #: 640 /08 /MARK Report Prepared by: Chris Jones, extension 5718 For information contact: Chris Jones, extension 5718 Date: July 30, 2008 763 8.1.52 FOREST BAY HOMES LTD. To construct, reconstruct, erect or place a building or structure on Block 157, Plan 65M -3669, (southeast corner of Elson Street and Markham Road), in the Town of Markham, Rouge River Watershed as located on the property owned by Forest Bay Homes Limited. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a townhouse condominium complex consisting of 40 semi - detached residential units and 1 single - family dwelling located at southeast corner of Elson Road and Highway 48, in the Town of Markham. The permit will be issued for the period of August 8, 2008 to August 7, 2010. • Letter of Undertaking, prepared by Forest Bay Homes Ltd., dated August 5, 2008, to address all outstanding engineering and ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of the application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a townhouse condominium complex consisting of 40 semi - detached residential units and 1 single detached residential unit on a 1.4 hectare (4 acre) parcel located at the southeast corner of Elson Road and Highway 48, in the Town of Markham. The subject property is a planned medium - density residential block located within the approved Villages of Fairtree Subdivision (Draft Plan 19TM- 95030), which TRCA staff previously reviewed and approved. The southeast portion of the property is adjacent to a public walkway block and an existing, online stormwater management facility. The proposed development limits were established during the above noted subdivision review. In addition, stormwater management quantity and quality controls will be provided by the existing stormwater management facility. As such, there are no geotechnical, flooding, or ecology related concerns with this proposal. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this application. 764 Conservation of Land: No significant vegetation will be removed as a result of this project. There are no fisheries related concerns associated with this proposal. - Plantings Enhancement plantings are proposed between the proposed development and the adjacent stormwater management facility. All plant species are native, non - invasive and consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40665 - Application #: 232 /08 /MARK Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: July 30, 2008 8.1.53 TOWN OF MARKHAM .To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse in a Regulated Area on Enterprise Drive (new road from Connection Road to Main Street), Unionville Gate (2 lane widening from Main Street to Kennedy Road) and Main Street (2 vehicular lane narrowing and addition of 2 bike lanes from Highway 7 to Unionville Gate), in the Town of Markham, Rouge River Watershed as located on the property owned by Town of Markham. The purpose is to construct a new road, widen an existing road and extend a culvert and narrow a road and replace an existing bridge deck within a warm water fisheries timing window. A Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO) for this project. The permit will be issued for the period of August 8, 2008 to August 7, 2010. • Letter of Undertaking to provide minor revisions to engineering and sediment and erosion control drawings to the satisfaction of TRCA staff; dated July 25, 2008; received July 25,2 008; prepared by the Town of Markham. RATIONALE The application was reviewed by staff on the basis of the following information: 765 Proposal: The proposal involves the construction of Enterprise Drive from Connection Road to Main Street, the widening of Unionville Gate from Main Street to Kennedy Road and the narrowing of Main Street from Highway 7 to Unionville gate. The widening of Unionville gate requires an 8 metre extension of an existing open foot 3 metre by 1.8 metre concrete culvert. The culvert extension will be installed in the dry by dam and pump method. Main Street is proposed to be altered in order to change the road characteristics to reduce the number of vehicular lanes from 4 to 2 and add to add 2 bicycle lanes and reduce the width of the roadway by approximately 1.5 metres. These works will include the removal of the existing 10 metre road width bridge deck to be replaced by a 7.3 metre road width bridge deck. The bridge abutments will remain in place. The project was reviewed through the Municipal Class Environmental Assessment process. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters Pollution: Standard erosion and sediment control measures (silt/sediment fencing, cofferdam) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable • Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice (LOA) will be provided by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). No significant vegetation will be removed as a result of construction. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 36962 - Application #: 411 /05 /MARK Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: July 30, 2008 766 8.1.54 26 PRINCE WILLIAM DRIVE To construct, reconstruct, erect or place*a building or structure at 26 Prince William Drive, in the Town of Markham, Rouge River Watershed. The purpose is to recognize the unlawful construction of a deck at the rear of an existing dwelling located within a TRCA Regulated Area of the Rouge River Watershed. The permit will be issued for the period of August 8, 2008 to August 7, 2010. • Drawing A0, prepared by Cutting Edge Construction and Design, dated May 3, 2008, stamped received by TRCA Planning and Development June 25, 2008; • Drawing Al, prepared by Cutting Edge Construction and Design, dated May 3,2008, stamped received by TRCA Planning and Development June 25, 2008; • Drawing A2, prepared by Cutting Edge Construction and Design, dated May 3, 2008, stamped received by TRCA Planning and Development June 25, 2008; • Drawing A3, prepared by Cutting Edge Construction and Design, dated May 3, 2008, stamped received by TRCA Planning and Development June 25, 2008; _ • Drawing A4, prepared by Cutting Edge Construction and Design, dated May 3, 2008, stamped received by TRCA Planning and Development June 25, 2008; • Drawing A5, prepared by Cutting Edge Construction and Design, dated May 3, 2008; stamped received by TRCA Planning and Development June 25, 2008; • Drawing A6, prepared by Cutting Edge Construction and Design, dated May 3, 2008, stamped received by TRCA Planning and Development June 25, 2008. RATIONALE • The application was reviewed by staff on the basis of the following information: Proposal: The purpose of the application is to recognize the unlawful construction of a deck at the rear of an existing dwelling located within a TRCA Regulated Area of the Humber River Watershed. The property is located within an approved residential subdivision which is located within the • Regional Storm Floodplain. The subject lands currently contain an existing residential dwelling with an unrecognized deck constructed without appropriate permits approximately two months *ago. Although the deck is located within the Regional Storm Floodplain, no grades were altered. As such, no impacts to the storage and /or conveyance of flood waters are anticipated'. No significant vegetation was removed as a result of construction as the area to which this application applies is manicured lawn. Control of Flooding: TRCA Water Resources staff has reviewed this proposal and do not anticipate any impacts to • the storage and /or conveyance of flood waters. The deck is located outside of the hydraulic floodway. All excavated fill was removed from the Regional Storm Floodplain. Pollution: As no development is proposed at this time, no sediment and erosion controls are required. 767 Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No.significant vegetation was removed as a result of construction. There are no fisheries related concerns associated with this project. Plantings No significant vegetation was removed as a result of construction. As such, no additional plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41056 - Application #: 518/08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: July 30, 2008 TOWN OF RICHMOND HILL 8.1.55 TOWN OF RICHMOND HILL To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere in a Regulated Area adjacent to the St Mark's Apartments located north of Major Mackenzie Drive East east of Pugsley Avenue, in the Town of Richmond Hill, Regional Municipality of York, Don River Watershed as located on the property owned by Town of Richmond Hill and Richmond Hill Ecumenical Homes (easement granted to the Town of Richmond Hill for • proposed works) . The purpose is to construct a pedestrian bridge and asphalt pathway in a Regulated Area within a warm water fisheries timing window. A Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO) for this project. The permit will be issued for the period of August 8, 2008 to August 7, 2010. • Letter of Undertaking to provide minor revisions to engineering and sediment and erosion control drawings to the satisfaction of TRCA staff; dated July 31, 2008; received July 31, 2008; prepared by Town of Richmond Hill. RATIONALE The application was reviewed by staff on the basis of the following information: 768 Proposal: The proposal consists of the construction of a 45 metre span pedestrian bridge and approximately 375 metres of a 1.8 metre wide light duty asphalt pathway. This project proposes to address community requests to the Town to provide safe passage across German Mills Creek from Unity Park to the St. Mark's Apartments, in the Town of Richmond Hill, . Regional Municipality of York. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (sediment fencing) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering any watercourse or the lake. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. • Conservation of Land: There will be no in stream work associated with the project and no concerns related to fish • habitat loss. With the erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). Plantings All disturbed areas will be restored with native non - invasive species following construction. The Town of Richmond Hill will be planting an_additional 20 trees and approximately 130 shrubs as part of this project. Policy Guidelines: The proposal complies with Section 4.1.2 -New Resource Based Uses- of the Authority's Valley and Stream Corridor Management Program. CFN: 40692 - Application #: 254/08/RH Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: July 30, 2008 769 8.1.56 YORK REGION DISTRICT SCHOOL BOARD To construct, reconstruct, erect or place a building or structure on Lot 54, Concession 1, (201 Yorkland Street), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by York Region District School Board. • The purpose is to undertake works within a TRCA Regulated Area of the Rouge River .Watershed in order to facilitate the construction of an alternate access driveway for the Richmond Hill High School, located at 210 York Boulevard, in the Town of Richmond Hill. The permit will be issued for the period of August 8, 2008 to August 7, 2010. • Letter of Undertaking, prepared by Cole Engineering, dated August 5, 2008, to address all outstanding engineering issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an alternate access driveway for the Richmond Hill High School, located at 210 York Boulevard, in the Town of Richmond Hill. Currently, the existing school access is shared by both the school buses and passenger vehicles, which has resulted in traffic congestion and safety concerns. The proposed secondary access is necessary in order to separate car and bus traffic and alleviate traffic congestion and safety concerns at the high school. The proposed secondary access is located adjacent to a tributary of the Rouge River. Although the works are sufficiently setback from the watercourse, a portion of the proposed works are located within the Regional Storm Floodplain. However, based on our review of the submitted hydraulic analysis, the proposed works will not impact the storage /conveyance of flood waters. A significant enhancement plan is proposed as an element of this application in order to achieve a net ecological gain. Control of Flooding: There will be no adverse impacts to the storage or conveyance of flood waters as a result of this project. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this application. 770 Conservation of Land: No significant vegetation will be removed as a result of this project. There are no fisheries related concerns associated with this proposal. Plantings Enhancement plantings are proposed between the proposed development and the valley corridor. All plant species are native, non - invasive and consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 41147 - Application #: 595/08/RH Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: July 30, 2008 TOWN OF WHITCHURCH - STOUFFVILLE 8.1.57 FAWN RIDGE HOLDINGS LTD. To construct, reconstruct, erect or place a building or structure on Lot 9, Plan 65M -2841, (16 Wilderness Trail), in the Town of Whitchurch- Stouffville, Rouge River Watershed as located on the property owned by Fawn Ridge Holdings Ltd.. The purpose is to construct a new home within a Regulated Area of the Rouge River Watershed. The permit will be issued for the period of August 8, 2008 to August 7, 2010. • Drawing No. 1, Sewage System and Grading Plan, dated April 2008, prepared by Rural Development Consultants, received July 29, 2008; • Drawing No. 3, Restoration Plan, dated July 24, 2008, prepared by Bird and Hale Ltd., received July 29, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of constructing a new home within a Regulated Area of the Rouge River Watershed. This property is located on the Oak Ridges Moraine within the headwaters of the Bruce Creek. The subject property is an existing lot within a registered plan of subdivision that has been zoned for residential uses. The residential zoning was enacted in 1987 and the lot registered in 1990, well in advance of today's more rigorous planning requirements. As a result the western portion of the lot contains a valleyland. Further, the lot is entirely wooded and is within an area of wetland interference to a wetland. 771 At the request of TRCA staff and in support of this proposal, the applicant has completed an Environmental Impact Statement in order to determine best efforts at reducing environmental impacts and the appropriate location and mitigation measures for development. There will be a 10 metre buffer from the valleylands that will be renaturalized. Impacts to the natural feature will be reduced to the greatest extent possible in keeping with the previously established development rights to the subject lands. Control of Flooding: There are no flooding concerns associated with this application. ' Pollution: Sediment fencing will be in place throughout the duration of construction to ensure that no sediment will enter the watercourse. Dynamic Beaches: Not applicable Erosion: There are no erosion issues associated with this application. Conservation of Land: The subject property is currently well vegetated and most of the vegetation will be removed as part of this application. However, the applicant has proposed a renaturalized 10 meter buffer from the valleylands. Plantings All plantings will be in accordance with TRCA's Seed Mix Guidelines. Policy Guidelines: This proposal is consistent with Section 4.2.2 G, Infilling, of TRCA's Valley and Stream Corridor Management Program. CFN: 40062 - Application #: 883/07/WS Report Prepared by: Shannon McNeill, extension 5744 For information contact: Bill Kiru, extension 5306 Date: July 30, 2008 PERMIT APPLICATION 8.1.58 IS PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS: RES. #B92/08 - PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Ron Moeser Suzan Hall 772 THAT permission for routine infrastructure granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the application 8.1.58 - City of Vaughan, which is listed below, be received. CITY OF VAUGHAN 8.1.58 CARRIED CITY OF VAUGHAN To undertake road /pathway resurfacing or reconstruction on King- Vaughan Road (Highway 27 to Kipling Avenue), Kipling Avenue (King- Vaughan Road to Kirby Road), Kirby Road (Kipling Avenue to Highway 27) and Roe Road, in the City of Vaughan, Humber River Watershed as located on the property owned by City of Vaughan. The purpose is to implement road /pathway resurfacing or reconstruction in a regulated area to facilitate site preparation, minor ditch grading and paving along King- Vaughan Road (Highway 27 to Kipling Avenue), Kipling Avenue (King- Vaughan Road to Kirby Road), Kirby Road (Kipling Avenue to Highway 27) and Roe Road in the City of Vaughan, Regional Municipality of York, in the Humber River Watershed on property owned by the City of Vaughan. The permit will be issued for the period of July 14, 2008 to July 13, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing 1 of 30, New Construction from Sta. 10 +000 to Sta. 10 +250; • Drawing XX of XX, Sta. 10 +000 to Sta. 10 +250; Drawing 2, Sta. 10 +250 to Sta. 10 +550; Drawing XX of XX, Sta. 10 +250 to Sta. 10 +550; Drawing 4, Sta.10 +850 to Sta. 11 +060; Drawing 5, Sta. 11+060 to Sta. 11 +280; Drawing 6, Sta. 11 +280 to Sta. 11 +540; Drawing 7, Sta. 11 +540 to Sta. 11 +760; Drawing 8, Sta. 11 +760 to Sta. 12 +000; Drawing 9, Sta. 12 +000 to Sta. 12 +260; Drawing XX of XX, Sta. 12 +000 to Sta. 12 +260; Drawing 10, Sta. 12 +260 to Sta. 12 +400; Drawing XX of XX, Sta. 12 +260 to Sta. 12 +400; Drawing 11, Sta. 10 +000 to Sta. 10 +240; Drawing 12, Sta. 10 +240 to Sta. 10 +540; Drawing 13, Sta. 10 +540 to Sta. 10 +840; Drawing XX of XX, Sta. 10 +540 to Sta. 10 +840; Drawing 14, Sta. 10 +840 to Sta. 11+140; Drawing XX of XX, Sta. 10 +840 to Sta. 11 +140; Drawing 15, Sta. 11 +140 to Sta. 11 +440; Drawing 16, Sta. 11+440 to Sta. 11+660; Drawing 17, Sta. 10 +000 to Sta. 10 +200; Drawing 18, Sta. 10 +200 to Sta. 10 +500; Drawing 19, Sta. 10 +500 to Sta. 10 +780; Drawing 20, Sta. 10 +780 to Sta. 11+080; Drawing 21, Sta. 11+080 to Sta. 11+380; Drawing 22, Sta. 11+380 to Sta. 11 +680; Drawing 23, Sta. 11 +680 to Sta. 11 +980; Drawing 24, Sta. 11 +980 to Sta. 12 +280; Drawing 25, Sta. 12 +280 to Sta. 12 +420; Drawing 26, Sta. 10 +000 to Sta. 10 +240; Drawing 27, Sta. 10 +240 to Sta.10 +30; Drawing 28, Typical Sections and Details; Drawing 29, Typical Sections and Details; Sheet 30, Typical Sections and Details; all dated March 13, 2008; all received April 21, 2008; red line revised July 14, 2008; prepared by URS RATIONALE The application was reviewed by staff on the basis of the following information: 773 Proposal: The entire proposal involves re- surfacing of King- Vaughan Road (Highway 27 to Kipling Avenue), Kipling Avenue (King- Vaughan Road to Kirby Road), Kirby Road (Kipling Avenue to Highway 27) and Roe Road in the City of Vaughan, Regional Municipality of York. The proposal has been divided into two separate applications. This application is for site preparation, minor ditch grading and paving in the above described study area except for works proposed from Sta. 10 +683 to Sta. 10 +749 located on King- Vaughan Road approximately 725 metres west of Highway 27. The proposed works at Sta. 10 +683 to Sta. 10 +749 involve minor ditch grading, paving and a 2.0 metre extension of an existing 1.0 metre wide csp culvert and a concrete headwall and will be approved under a separate application (CFN 41074). Control of Flooding: The proposed project will not have significant impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion control measures (silt/sediment fencing, rock flow check dam) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the wetland /watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal Conservation of Land: As there will be no in stream work associated with the project there will be no concerns related to fish habitat Toss. With erosion and sedimentation plans in effect, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO) Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41076 - Application #: 538 /08NAUG Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: July 14, 2008 774 PERMIT APPLICATIONS 8.1.59 - 8.1.82 ARE MINOR WORKS LETTER OF APPROVAL: RES. #893/08 - MINOR WORKS LETTER OF APPROVAL PURSUANT TO ONTARIO REGULATION 166/06_ Moved by: Seconded by: Ron Moeser Suzan Hall THAT minor works letter of approval granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.59 - 8.1.82, inclusive), which are listed below, be received. CARRIED CITY OF BRAMPTON 8.1.59 1 VINTONRIDGE DRIVE • To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 13, Plan 43M -1713, (1 Vintonridge Drive), in the City of Brampton, Humber River Watershed. CFN: 41054 - Application #: 515/08/BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: July 7, 2008 CITY OF. PICKERING 8.1.60 1790 FINCH AVENUE, UNIT 31 • To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on , (1790 Finch Avenue, Unit 31), in the City of Pickering, Duffins Creek Watershed. CFN: 41119 - Application #: 573/08 /PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: July 17, 2008 8.1.61 .3245 GREENBURN PLACE - To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 5, Plan 40M -1383, (3245 Greenburn Place), in the City of Pickering, Duffins Creek Watershed. CFN: 41045 - Application #: 510 /08 /PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: July 9, 2008 775.. 8.1.62 2528 LINWOOD STREET To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on, (2528 Linwood Street), in the City of Pickering, Duffins Creek Watershed. CFN: 41066 - Application #: 529/08/PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: July 4, 2008 8.1.63 1790 FINCH AVENUE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on , (1790 Finch Avenue, #40), in the City of Pickering, Duffins Creek Watershed. CFN: 41178 - Application #: 623 /08 /PICK Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: July 29, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.64 19 LONDON GREEN COURT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on , (19 London Green Court), in the City of Toronto (North York Community Council Area), Humber River Watershed. CFN: 41044 - .Application #: 502/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 14, 2008 8.1.65 81 CHATSWORTH DRIVE To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but Tess than 150 sq. m (1614 sq. ft) on Part Lot 197, 198, Plan 605E, (81 Chatsworth Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: 41104 - Application #: 561/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 17, 2008 8.1.66 21 WYVERN ROAD To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 33, Plan M981, (21 Wyvern Road), in the City of Toronto (North York Community Council Area), Don River Watershed. 776 CFN: 41109 - Application #: 565/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 11, 2008 8.1.67 55 DIANA DRIVE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on , (55 Diana Drive), in the City of Toronto (North York Community Council Area), Humber River Watershed. CFN: 41077 - Application #: 537/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 2, 2008 8.1.68 14 EASTVIEW CRESCENT To install a swimming pool on Block 2, Plan 5217, (14 Eastview Crescent), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: 41103 - Application #: 563/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 11, 2008 • 8.1.69 4 GWENDOLEN CRESCENT . To install a swimming pool on Lot 117 -120, Plan M -442, (4 Gwendolen Crescent), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: 41117 - Application #: 569/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 17, 2008 8.1.70 13 BRENTWOOD AVENUE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 4, Plan 2069, (13 Brentwood Avenue), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: 41105 - Application #: 560/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert; extension 5311 Date: July 11, 2008 • 777 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.71 46 GOLDENE WAY To install a swimming pool on Lot 10, Plan 66M -2372, (46 Goldene Way), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. CFN: 41101 - Application #: 555/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 11, 2008 8.1.72 77 BONNYDON CRESCENT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 41, Plan 66M -2410, (77 Bonnydon Crescent), in the City of Toronto (Scarborough Community Council Area), Rouge River Watershed. CFN: 41142 - Application #: 590/08./TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 25, 2008 8.1.73 50 GRACKLE TRAIL To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on , (50 Grackle Trail), in the City of Toronto (Scarborough Community Council Area), Rouge River Watershed. CFN: 41037 - Application #: 501/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: July 10, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.74 11 CASTLE FRANK CRESCENT To construct a ground floor addition up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on 11 Castle Frank Crescent in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 41015 - Application #: 479/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: July 2, 2008 778 8.1.75 • 31 SOUTH DRIVE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 20, 21, Plan 104 YORK, (31 South Drive), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 41086 - Application #: 546/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: July 25, 2008 8.1.76 73 MATHERSFIELD DRIVE To construct a non - habitable accessory structure up to 50 sq.. m (538 sq. ft) on Lot 29, Plan 66M -2314, (73 Mathersfield Drive), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 41062 - Application #: 523/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Mark Rapus, extension 5259 Date: July 7, 2008 • CITY OF VAUGHAN BLUEWINTER INVESTMENT' NVESTMENTS LIMITED To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Block 26, Plan 65M -3001, (Abbruzze Court), in the City of Vaughan, Humber River Watershed as located on the property owned by Bluewinter Investments-Limited. 8.1.77 CFN: 40527 - Application #: 131 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 . Date: July 21, 2008 •.8.1.78 56 VAUGHAN MILLS ROAD To install a swimming pool on Lot 8, Plan 65M 2871, (56 Vaughan Mills Road), in the City of Vaughan, Humber River Watershed. CFN: 40798 - Application #: 316 /08NAUG • Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: July 7, 2008 779. TOWN OF AJAX 8.1.79 23 WOOLF CRESCENT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 62, Plan 40M -1985, (23 Woolf Crescent), in the Town of Ajax, Carruthers Creek Watershed. CFN: 41162 - Application #: 605 /08 /AJAX Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: July 29, 2008 TOWN OF CALEDON 8.1.80 14650 HEART LAKE ROAD To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 .sq. m (1614 sq. ft) on Lot 31, Concession 2E, (14650 Heart . Lake Road), in the Town of Caledon, Humber River Watershed. CFN: 41067 - Application #: 530/08 /CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: July 7, 2008 TOWN OF MARKHAM 8.1.81 17 GATSBY COURT To install a swimming pool on Lot 16, Plan 65M -3051, (7 Gatsby Court), in the Town of Markham, Rouge River Watershed. CFN: 41071 - Application #: 531 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: July 3, 2008 TOWN OF RICHMOND HILL 8.1.82 12 PLATINUM AVENUE To install a swimming pool on Lot 83, Plan 65M -3829, (12 Platinum Avenue), in the Town of Richmond Hill, Humber River Watershed. CFN: 41144 - Application #: 592/08/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: July 23, 2008 780 CITY OF BRAMPTON 8.1.83 917003 ONTARIO LIMITED To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 15, Concession 9 NDS, (southwest corner of Countryside Drive and The Gore Road), in the City of Brampton, Humber River Watershed as located on the property owned by 917003 Ontario Limited. The purpose is to site grade within a Regulated area adjacent to a valley and stream corridor, and to provide restoration plantings within a valley corridor, associated with a residential plan of subdivision. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking, prepared by M. Presutti, MEP Design Inc., dated August 6, 2008, to address all outstanding engineering and planning ecology concerns. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate grading operations and the installation of servicing related to a draft approved estate plan of subdivision (21T- 92004B) located at the southwest corner of Countryside Drive and The Gore Road, in the City of Brampton. The development consists of 11 estate residential lots. All grading operations, as well as the residential development, will occur on the tableland portion of the subject property. The natural areas related to this development through the subdivision review will be placed into public ownership. An extensive enhancement plantings plan has been submitted with this application to improve the form and function of the natural features on the subject property. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, the storage and /or conveyance of flood waters will not be impacted as a result of this development Pollution: Appropriate erosion and sediment controls will be installed and maintained during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnicaf and /or slope stability concerns related to this application. 781 Conservation of Land: No significant vegetation will be removed as a result of construction. An enhancement planting plan incorporating a variety of native and non - invasive species is proposed with this project. Plantings All proposed plant species are native and non - invasive consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development and 4.2.2 (F) - Opportunities for Regeneration - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41197 - Application #: 629 /08 /BRAM Report Prepared by: Adam Miller, extension 5244 For information contact: Adam Miller, extension 5244 Date: August 6, 2008 CITY OF MISSISSAUGA 8.1.84 CITY OF MISSISSAUGA To site grade on Part Lot 10, Concession 7 EHS, (3430 Derry Road East and Goreway Drive), in the City of Mississauga, Etobicoke Creek Watershed as located on the property owned by City of Mississauga. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the repair of a municipal trail. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit • . Restoration of Settlement Areas prepared by Mississauga Community Services, dated July 2008, stamped received by TRCA Planning and Development July 28, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the repair of a section of the Wildwood Park Trail. The works involve the repair of two areas of the pedestrian trail that have settled in an area that was previously altered as part of the decommissioning of a former sewage treatment plant The proposed works involve the removal of existing soils and debris in the affected areas, and for these areas to be filled with compacted engineered fill. The site will be resodded and the asphalt trail restored. Although the works are located within the Regional Storm Floodplain, all existing grades will be maintained and all stockpile locations will be located outside of the floodplain. The subject site is currently manicured lawn and asphalt trail, as such no plantings are required. 782 Control of Flooding: No significant grading changes are proposed and all excavated material will be removed from the floodplain. As such, TRCA do not anticipate any impacts to the storage and /or conveyance of flood waters. Pollution: Sediment and erosion controls will be provided and maintained through all phases of construction in accordance with TRCA guidelines. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of this proposal. Plantings As no vegetation will be removed as a result of this application, no additional plantings are required. • Policy Guidelines: This proposal is consistent with Section 4.2.2 (H) - Existing Resource Based Uses - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41137 - Application #: 585/08/MISS Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: August 6, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.85 TORONTO DISTRICT SCHOOL BOARD To construct, reconstruct, erect or place a building or structure on Block D -M -972, B -M -985, Plan, (85 Mount Olive Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by Toronto District School Board. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the temporary relocation of six portable classrooms and the permanent • relocation of three portable classrooms to accommodate the proposed future construction of a 12- classroom school wing addition to the south side of the existing school building. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: 783 • A1.03, Site Plan and Grading Plan, prepared by Taylor_Smyth Architects, dated June 2008, Revision No. 04, revised on July 25, 2008, received on July 30, 2008. RATIONALE • The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the temporary relocation of six portable classrooms and the permanent relocation of three portable classrooms. The temporary relocation of the six portable classrooms is required to accommodate the existing student population during the proposed future construction of a 12- classroom school wing addition to the south side of the existing building. Both the existing and proposed temporary portable classrooms (12 in total) will be removed upon completion of the new school wing. The three permanent portable buildings will be used to accommodate the school's Enrichment Program. The subject site is located north of Finch Avenue West, west of Kipling Avenue in the City of Toronto (Etobicoke York Community Council Area). The Albion Creek transects the perimeter of the existing school site adjacent to the play field and the western edge of the parking lot It is the flood plain associated with the creek that places the subject lands within the TRCA Regulated Area. This application is the first in a series of permit applications required as per Ontario Regulation 166/06 in order to comprehensively redevelop the site through a future site plan application. Control of Flooding: The subject property is partially located within the Regional Storm Flood plain of the Humber River Watershed. However, TRCA staff have determined that the proposed works are not located in the flood plain and will not adversely impact the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. • Conservation of Land: No significant vegetation will be removed as a result of construction. 784 Plantings The proposed development involves a later phase whereby the proponent proposes to renaturalize a wetland and redevelop the existing parklands located immediately south of the subject site. The Toronto District School Board and the City of Toronto will work in collaboration to implement these proposed works on lands owned by City of Toronto and managed by the City's Parks, Forestry & Recreation Division. The City of Toronto will be submitting an permit application as per Ontario Regulation 166/06 for these proposed works at a later date. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D), Development and Redevelopment/Intensification within Non - Established Communities /Highly Urbanized Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41222 - Application #: 653/08/TOR - Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 6, 2008 TOWN OF RICHMOND HILL 8.1.86 ENBRIDGE GAS DISTRIBUTION INC. To temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on 19th Avenue (west of Bayview Avenue) and Bayview Avenue (south of 19th Avenue), in the Town of Richmond Hill, Regional Municipality of York, Rouge River Watershed as located on the property owned by the Regional Municipality of York under a Franchise Agreement with Enbridge Gas Distribution Inc. , The purpose is to undertake borehole investigations in order to assess the suitability of the subsoil for the proposed alignment of a gas pipeline in a Regulated Area within a cold water fisheries timing window. A Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO) for this project. The permit will be issued for the period of August 8, 2008 to August 7, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of undertaking to provide minor revisions to drawings and contingency plans in order to address TRCA comments regarding typical notes, restoration, sediment control and dewatering concerns, all to the satisfaction of TRCA; dated August 5, 2008; received August 5, 2008; prepared by Enbridge Gas Distribution Inc. RATIONALE The application was reviewed by staff on the basis of the following information: 785 Proposal: The proposal is to undertake a borehole investigation in order to examine the suitability of the subsoil for open trench installation of a NPS 12 gas pipeline east along 19th Avenue from the CNR tracks to Bayview Avenue and south along Bayview Avenue to the Enbridge Gate Station in the Town of Richmond Hill. The pipeline installation is part of another application under CFN 37504. This application is for a total of 14 boreholes proposed to be put down to a depth of . about 4.5 metres along the proposed pipeline alignment (West Option); two boreholes along the south shoulder of 19th Avenue (west of Bayview Avenue), eight boreholes along the west shoulder of Bayview Avenue (south of 19th Avenue), and four boreholes along the entrance to the Richmond 'Hill Gate Station. In the event that the findings of the borehole investigation indicate that the West Option'would be unsuitable for open trench pipe installation, an additional seven contingency boreholes are proposed to be drilled along the east shoulder of Bayview Avenue (south of 19th Avenue) (East Option). Control of Flooding: The proposed project will 'have ho impact on the storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (silt /sediment fencing) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: • There are no geotechnical /slope stability issues associated with the proposal. •Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be provided by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). This application is - subject to the cold water fisheries timing window. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management. Program. CFN: 39553 - Application #: •522%07/RH Report Prepared by: Suzanne Bevan, extension 5759 .For information•contact: Suzanne Bevan, extension 5759 Date: August 5, 2008 786 RES. #B94/08 - Moved by: Seconded by: INVAR (FRESHWAY) LIMITED Ontario Municipal Board Hearing. Authorization for party status and to appear before the Ontario Municipal Board on referrals related to a Draft Plan of Subdivision application, a Zoning By -law Amendment application and an Official Plan Amendment application to permit the development of a plan of subdivision consisting of 16 blocks for employment uses, 1 block for a sewer and access easement, 2 blocks for open space purposes, 1 block for stormwater management, 1 block for a private road and 1 block for a future transitway on Part of Lots 2 and 3, Concession 4 (east of Jane Street and south of Highway 407), in the City of Vaughan. Colleen Jordan Reenga Mathivanan THAT authorization be given to Toronto and Region Conservation Authority (TRCA) staff to appear before the Ontario Municipal Board (OMB) regarding a Draft Plan of Subdivision application, a Zoning By -law Amendment application and an Official Plan Amendment application on Part of Lots 2 and 3, Concession 4 (east of Jane Street and south of Highway 407), in the City of Vaughan (File Nos. 19T- 06V09, Z.06.054 and OP.06.024); THAT staff advises the OMB that TRCA has outstanding issues relating to the proposed Draft Plan of Subdivision application, Zoning By -law Amendment application and Official Plan Amendment application; THAT staff continues to work cooperatively with our municipal partners and the appellant to ensure that the requirements of the Valley and Stream Corridor Management Program and Provincial Policy Statement are met; • THAT staff be authorized to retain legal counsel to pursue this appeal before the OMB, if required; AND FURTHER THAT the OMB and all parties and participants to the hearing be so advised. • • • CARRIED BACKGROUND The subject property is approximately 10.11 hectares in size (24.98 acres) and is located east of Jane Street and south of Highway 407 in the City of Vaughan. The lands are currently • vacant. There are existing industrial uses to the east and south, a cemetery to the west and Highway 407 to the north. A tributary of the Humber River traverses the western boundary of the subject property. There is a 2.5 hectare (6.2 acre) tableland woodlot on the southeast portion of the site. 787 The owner submitted an application to amend the Official Plan from General Complementary Use under the Parkway Belt West Plan to Employment Area General under OPA 450. The owner has also submitted an application to rezone the lands from PB1(S) Parkway Belt Linear Facilities Zone and PB2 Parkway Belt Complementary Use Zone to PB1(S)(H) Parkway Belt Linear Facilities Zone to permit outside storage uses, EM2(H) General Employment Area Zone to permit employment uses, and 0S1(H) Open Space Conservation Zone for landscaped buffers and stormwater management uses, and to allow for the required exceptions to facilitate the proposed uses. A Draft Plan of Subdivision application has also been submitted to facilitate the development on the 10.11- hectare site. The applications have been appealed to the OMB by the proponent based on the City of Vaughan's failure to render a decision on the proposed Plan of Subdivision and Council's refusal or neglect to enact the proposed Zoning By -law Amendment and Official Plan Amendment, pursuant to the Planning Act. The applications were initially circulated to TRCA on September 8, 2006. TRCA staff has submitted written comments on the applications to the City and the applicant on three occasions (November 12, 2007, December 4, 2007 and July 24, 2008). These comments were provided upon completion of the review of technical documents and associated re- submissions. TRCA staff has also met with the applicant, its consultants, and staff from the City of Vaughan, Regional Municipality of York and Ministry of Natural Resources on numerous occasions. RATIONALE Based on staff review of the applicant's submissions to date, there are six outstanding issues relating to the Draft Plan of Subdivision, Zoning By -law Amendment and Official Plan Amendment applications submitted by Invar (Freshway) Limited. i) Functional Servicing Report The applicant needs to submit a revised functional servicing report to the satisfaction of TRCA, which speaks to matters such as stormwater management, water balance, and erosion and sediment control. ii) Watercourse Realignment As was noted previously, a tributary of the Humber River traverses the western boundary of the subject property. As a condition of sale of the subject property from the Mount Pleasant Group of Cemeteries to Invar (Freshway) Limited, the applicant agreed to construct a berm to separate their new lot from the existing cemetery and to improve the condition of the watercourse that traverses the two properties. The existing channel has been highly altered by previous construction and earthmoving activities. A new channel design has been proposed, which will enhance aquatic and riparian habitat while also conveying flood flows. As part of the channel improvements, Invar (Freshway) Limited proposes to realign the channel entirely onto the lands owned by the Mount Pleasant Group of Cemeteries. These works require approval from TRCA pursuant to the Development, Interference with Wetlands and Alterations to Shorelines and Watercourses Regulation (Ontario Regulation 166/06). TRCA's Executive Committee approved the permits for the proposed watercourse alteration on October 12, 2007 (Permit Nos. C -07768 and C- 07767). 788 These previous permit approvals need to be accurately reflected and incorporated into the current planning proposals. iii) .Designation /Zoning The applicant needs to demonstrate that the stream corridor on the subject property (the natural feature and hazards plus the requisite buffer) will be designated /zoned in an Open Space category. iv) Restoration The applicant must ensure that the proposed restoration /re- naturalization of the open space areas, including the realigned stream corridor, stormwater management pond and landscape buffer, will be to the satisfaction of TRCA: v) Woodlot TRCA staff identified the 2.5 hectare (6.2 acre) tableland woodlot on the subject property as an important feature in the landscape and one that provides habitat functions and ecological services in a portion of Vaughan that has very little natural cover. The woodlot also contains an endangered tree species, Butternut. The feature has been identified as a Regionally Significant Woodlot in the 2005 York Region Significant Woodlands Study because of the presence of Butternut and its proximity to the adjacent watercourse. Due to the ecological functions the woodlot provides and the policies regarding the protection of Butternut habitat, the initial position of TRCA staff was that this woodlot should be protected. However, the woodlot is currently being impacted by flooding (due to historical drainage issues) and other influences that are significantly reducing its function. Staff notes that the long -term protection of this woodlot and its functions is highly dependant on the appropriate management of this feature. This includes the resolution of the current flooding on the property, the establishment of appropriate buffers and the woodlot's management for Butternut regeneration. TRCA staff recognizes that an intense level of management is required on this site and that this level of management is not necessarily practical, nor is the applicant obligated to undertake such measures. TRCA staff has also been in contact with staff from the City of Vaughan, the Regional Municipality of York and the Ministry of Natural Resources (MNR) regarding the woodlot. With respect to the issue of Butternut, MNR has concluded that "Given the worsening condition of the trees, the decline in suitable Butternut habitat, and the lack of recovery habitat in surrounding lands, it is the opinion of MNR staff that the Butternut at this location do not contribute to the long term survival or recovery of the Butternut species in any substantive manner, in the current planning context" (MNR, Letter re. Invar (Freshway) Limited, dated June 23, 2008). • The Regional Municipality of York has opted to proceed with an approach that would allow for the removal of the woodlot, but would require the applicant to prepare a Forested Area Compensation Plan to the satisfaction'of York Region Natural Heritage and Forestry Services and TRCA. "The described plan shall outline specific measures to provide a sustainable forest environment for the Butternut trees" (Regional Municipality of York, Letter re. Invar (Freshway) Limited, dated October 11, 2007). 789 TRCA staff has carefully considered the arguments for both the removal and the retention of the • woodlot. Technical staff supports the approach put forward by the Regional Municipality of York.. However,•we have first recommended that a terms of reference for the Forested Area. Compensation Plan, including a conceptual site plan, be provided to TRCA for review and approval. Only once a satisfactory Terms of Reference and conceptual site plan have been ( submitted, will .TRCA staff be in a position to make a recommendation to the City of Vaughan about the removal of the woodlot. Thus, TRCA's issue at the OMB is whether or not an adequate Terms of Reference for a Forested Area Compensation Plan, including a conceptual site plan, has been prepared by the applicant as it relates to the proposed removal of the woodlot on the subject property. vi) Resolution of the Existing Violation TRCA Enforcement staff issued a violation notice to the property owner under Ontario Regulation 166/06 on ,July 22, 2008 (File No. V2388) because the sediment control fences on the site were not being properly maintained, which caused sedimentation in the watercourse. TRCA staff seeks to ensure that this violation is resolved or commitments have been made to ensure its timely resolution through our continued discussions with the applicant on the planning applications. In'Iight of these issues, TRCA staff attended an OMB pre - hearing for these files on June 26, 2008. • Due to the short notice for the pre- hearing and the scheduling of the TRCA's Executive Committee meetings, TRCA staff attended the pre- hearing in order to, secure our presence in this matter. This. ensured that the TRCA had party status since the first pre- hearing usually sets out the parties, which is done at the request of the hearing chair person. A'second pre- hearing is scheduled for July 30, 2008. DETAILS OF WORK TO BE DONE TRCA staff is requesting the . authorization of the Executive Committee to attend the OMB hearing scheduled to commence in October to ensure that TRCA interests are protected and addressed. Staff will retain legal counsel for the hearing should it be deemed necessary. Report prepared by: Coreena Smith, extension 5269 Email: csmith @trca.on.ca For Information contact Coreena Smith, extension 5269 Email: csmith @trca.on.ca Date: July 29; 2008 .Attachments: 1 790 Attachment 1 791 RES. #B95/08 - Moved by: Seconded by: COATSWORTH CUT DREDGING PROJECT Tender RSD08 -19. Award of Contract RSD08 -19 for channel maintenance dredging of the navigation channel at Coatsworth Cut, Ashbridge's Bay Park, City of Toronto. Ron Moeser Suzan Hall THAT Contract RSD08 -19 for the channel maintenance dredging of Coatsworth Cut be awarded to Galcon Marine for the total cost not to exceed $165,372.50 plus applicable taxes, which includes a contingency amount of $5,000.00 to be expended as authorized by Toronto and Region Conservation Authority (TRCA) staff, it being the lowest tender meeting TRCA specifications. CARRIED BACKGROUND Maintenance dredging at Coatsworth Cut, Ashbridge's Bay Park was last completed in 2007 with the removal of approximately 5,500 cubic metres of material. The dredged material was tested and deemed to meet open water and parkland quality guidelines for disposal at Tommy Thompson Park (TTP) for use in the construction of habitat projects within the park. TRCA performed an updated sounding survey of the channel in June 2008, which indicated that additional material had been deposited within portions of the channel since completion of dredging operations in 2007. Due to the high water levels during the spring and summer seasons, sufficient water depths were maintained within the channel to allow for continued safe navigation. With lower water levels expected during the late summer and early fall, maintenance dredging has been scheduled to commence in early September to provide for continued safe navigation for the balance of the 2008 boating season and into 2009. RATIONALE Due to the redistribution of material within the channel and additional deposition, portions of the channel have become narrowed, limiting safe navigation for local boaters for the remainder of the 2008 season and into 2009. As a.result, TRCA proposes to dredge approximately 4,250 cubic metres of material using a combination of water and land based equipment for dredging and off site disposal to TTP for use in the construction of on site habitat projects as part of the master plan implementation. Tender RSD08 -19 was publicly advertised in the Daily Commercial News on June 26;2008 with a site information meeting held on July 3, 2008. A total of 3 potential bidders requested tender documents with the following bids submitted: BIDDER Mobilization/ Demobilization Dredging Contingency Total Contract Value (Plus GST) Galcon Marine $34,360.00 $126,012.50 $5,000.00 $165,372.50 Ontario Construction Company $66,150.00 $153,000.00 $5,000.00 $224,150.00 McNally Construction $257,000.00 $191,250.00 $5,000.00 $453,250.00 792 The bidders mobilization /demobilization estimates are predominately based on the location of their equipment and the costs incurred in transporting equipment to and from a site. McNally Construction's dredging equipment is stationed in Halifax and this is reflected in the variance of their mobilization /demobilization estimate in comparison with the other bidders. Based on the bid results staff recommend Contract RSD08 -19 be awarded to Galcon Marine for . a total cost of $165,372.50, plus GST, as they are the lowest bidder that meets TRCA specifications. FINANCIAL DETAILS Funding is available under the City of Toronto Waterfront Development 2008 budget, within account number 211 -16. Report prepared by: Aaron D'Souza, 416 - 393 -6336 Emails: ajdsouza @trca.on.ca For Information contact: Mark Preston, 416- 392 -9722 Emails: mpreston @trca.on.ca Date: July 18, 2008 RES. #B96/08 - Moved by: Seconded by: MIMICO WATERFRONT LINEAR PARK PROJECT Pathway Lighting Assembly. To enter into a purchase agreement for the supply and delivery of lighting assemblies with King Luminaire. Colleen Jordan Reenga Mathivanan THAT the supply and delivery of lighting assemblies as part of the installation of pathway lighting for the Mimico Waterfront Linear Park Project be awarded as a sole source contract to King Luminaire at a total cost not to exceed $56,178.00 plus applicable taxes. CARRIED BACKGROUND The Mimico Waterfront Linear Park Project is located at the south end of Superior Avenue south of Lake Shore Boulevard West in the City of Toronto. Implementation of phase one of the Mimico Waterfront Linear Park Project commenced,on July 4, 2006 with an anticipated completion date of July 2008. Part of the phase one project includes the incorporation of a lighting system along the newly constructed pedestrian trail connecting Norris Crescent in the west to Superior Avenue at the east phase 1 project limit. The design of the lighting system is to provide functionality as well as a decorative appeal to compliment the many newly constructed features of the waterfront park. The installation of park lighting for the Mimico Waterfront Linear Park Project will provide safe public access and allow for increased visibility along the pedestrian trail and within the vicinity of the waterfront park. 793 RATIONALE The City of Toronto Parks staff provided the specification for this proposed Tight pole and luminaire assembly required for the park lighting. This same lighting system is presently installed at other various waterfront park locations including The Lakeshore Grounds at Colonel Samuel Smith Park and the Prince of Wales Park at 2nd Street and Lakeshore Drive. The use of this type of lighting at these waterfront parks has been found to be practical while enhancing the attributes of the overall park. In addition, the manufacturer of the specified light pole and luminaire assembly utilizes only one local distributor, King Luminaire, and as a result only one quotation could be obtained. In keeping with the Toronto and Region Conservation Authority's Purchasing Policy, the authorization to enter into negotiations without formal competitive bids is justified as per Criteria 1 that permits obtaining goods and services from King Luminaire based on a need for compatibility with previous goods and services acquired for the aforementioned waterfront parks. As they are the only distributor for this manufactured product, staff is recommending to engage with King Luminaire on a sole source basis to supply and deliver the light pole and luminaire assembly to the Mimico Waterfront Linear Park Project site for a total cost not to exceed $56,178.00, plus applicable taxes. Sole Source contracts between $50,000 and $200,000 requires Executive Committee approval. FINANCIAL DETAILS Cost of the project is not to exceed $56,178.00, plus applicable taxes. Funds are available within account #206 -90 from Toronto Waterfront Revitalization Corporation. Report prepared by: Aaron D'Souza For information contact: Mark Preston 416 - 392 -9722 Email: mpreston @trca.on.ca Date: July 25, 2008 Attachments: 1 794 Attachment 1 MOD. •FN CAP PAINT: BLACK 13 1l2- HET AT Cr 3 7- M00. AUBURN MACK ARM PAIN ROB BATCLUTE LUMINAIRE PAINT. RACK PHOTO BUTTON CELL COATINS$S REQUIRED: .2 COATS VEx4HSFTACRYLIC FURL LENGTH 21ldxe•ZINC CAT C OPPER G U1 C/VI eB COPPER Gf!<xACHItE & ROBERTSON SCREWS 1. NAMEPLATE 18. 21'tD +i 6' . 2VTstr TNRU APERTURE �— 10' 0 REV. ALTERATION DATE BY LUMI'IMRE SPCC ICATIONS CATALOGUE NO: K201)EPS411-100(I0:1 ! Am- 20APLIOPBC OUANTRV: ID OPTICAL 8 . TES CLASS: WATTAGE SOGoEr TYPE: LIGHT SOURCE LUKE VOLTAGE OPII@tT EXTERNAL POLYCARBONATE PRISMATIC TYPE 11 100W MEDIUM METAL HALIDE 120V 10.10 LEVELING DEVICE PHOTO BUTTON CELL ANN Moo MMP BY OTHERS BALLAST SPECTRCAT10N8 &OrfilED BALLAST TYPE HX.HPF BAUA3T W1M1_ UNIVERSAL CATALOGUE NO_ M180MLTTLI11 ALTERNATE PP ADVANCE TtASS0 OPTIMA MACK DISCO18•F_CT CiIRFJl5E SELECT ONE TERMINAL BLOC( DO OTTER ARM SPECIFICATIONS CATALOGUE yp�,� MOO. KABS4-30' QUANTITY: U W.TLR DAL• ALUTAIMAI PARR: BLACK ME SPECIFICATIONS CATALOGUE NO.: KK16CE1l r'•'\ CPI FC $IF KASTSS QUANTITY: (� BLCTIOft caaoMRt FRRSIt POLE TOP. POMP BUR: POLE L.ENOTH: APPROx %SIGHT: ROUND EC PPE ETCHED 8 9 to.O 2J0. IAEA IN. HHOOX NAMEPLATE TRW APERTURE TOP VIFV CUSTOMER APPROVAL 8 DATE: CUSTOMER ORDER No: 7788-00 STRESSCRETE ORDER No: 51271 KONG CANADA ORDER No: 12592 2 4 THRU I10LES WBWO HOLE A79 Ludraar • SbmG.a • Est 1DSI STRESSCRETE GROUP Manufaawing Locations' Sliengton, on1A'*i 1. 80026$.7609 Nall(oort Alabama 1-800-4354,563 Attison Kansas 1. 800837 -1024 Jelfbv3Tn. Ohio 1.800,268 -7809 PROJECT/CUSTOMETt MAPLE BLVD. - ETOBICOKE DRAWN BY: AT: -CAE LTY: DATE: REV17ilON: M.L. I SCI l NOV. 19, 2007 KING U.S. ORDER No: 36507 DRAWING TYPE: APPROVAL DRAWING DRAWING NUMBER: 12592 -1 795 RES. #B97/08 - OUT OF COUNTRY TRAVEL Freshwater Algae Sampling and Identification Workshop, Warrensburg, New York, August 25 - 29, 2008. Approval for Toronto and Region Conservation Authority staff to travel outside Canada to attend a seminar in the United States of America. Moved by: Seconded by: Colleen Jordan Ron Moeser THAT approval be granted for Cheryl Goncalves, Algae Biomonitoring Biologist, to attend a Freshwater Algae Sampling and Identification Workshop in Warrensburg, New York from August 25 - 29, 2008, at an estimated cost of $1,800.00 plus applicable taxes; AND FURTHER THAT a presentation be made at Authority Meeting #8/08, to be held on October 24, 2008 with an overview of the workshop. CARRIED BACKGROUND Under a partnership agreement with the Ministry of the Environment (MOE), Toronto and Region Conservation Authority (TRCA) has agreed to conduct a Benthic Algae Biomonitoring project in conjunction with the Regional Watershed Monitoring Program at a number of sites within TRCA's watersheds. This project will involve the refinement and field testing of benthic algae sampling protocols, data collection and analysis and the sharing /transfer of information gained through the program with other conservation authorities and interested partners. A biologist has been hired to facilitate.this work over the next 15 months. This freshwater algae workshop will provide specific knowledge and training that will applied through this program, in TRCA's watersheds. It is hoped that this program will promote the use of Algae as a biomonitoring and water quality assessment tool in Southern Ontario, and that TRCA and MOE will be leaders in this initiative. RATIONALE This workshop will provide specific training related to sample collection, specimen preparation and taxonomic identification of benthic algae samples. This training will assist TRCA in fulfilling the deliverables outlined in the partnership agreement with the Ministry of the Environment. Staff from MOE has reviewed the workshop outline and description and agree that this training is both applicable and beneficial to the overall development and implementation of the algae biomonitoring project. 796 FINANCIAL DETAILS Cost to attend this training workshop including registration, travel (mileage), meals, accommodation is estimated at $1,800.00 plus applicable taxes. Funding is available in account 124 -60 to support this training. Overall funding for the program in the amount of $100,000.00 has been provided by the Ministry of the Environment. Report prepared by: Scott Jarvie, extension 5312 Emails: sjarvie @trca.on.ca For Information contact: Scott Jarvie, extension 5312 Emails: sjarvie @trca.on.ca Date: July 22, 2008 SECTION IV - ITEMS FOR THE INFORMATION OF THE BOARD RES. #B98/08 - Moved by: Seconded by: LOWEST BID NOT ACCEPTED Health and Safety Training. Receipt of reports approved by the Chief Administrative Officer on award of contracts for interior renovations for two Toronto and Region Conservation Authority rental homes. Suzan Hall Colleen Jordan IT IS RECOMMENDED THAT the report from-the Chief Administrative Officer on award of contract to Municipal Health and Safety Association, who was not the lowest bidder, be received. CARRIED BACKGROUND At Authority Meeting #5/05, held on June 24, 2005, Resolution #A124/05 approved the Purchasing Policy. As per Schedule 'A' of the policy, if the lowest bidder is not selected, a report shall be provided to the Executive Committee for their information at the next available meeting.. In this regard, the report outlined in Attachment 1 that was approved by the Chief • Administrative Officer on July 21, 2008 are provided for information. Report prepared by: Kathy Stranks, extension 5264 Emails: kstranks @trca.on.ca For Information contact: Kathy Stranks, extension 5264 Emails: kstranks @trca.on.ca Date: July 18, 2008 Attachments: 1 797 Attachment ,1 ■ TO: Chair a0 Members of the Procurement Not Requiring Board Approval • Meeting RFQ Lowest Bid Not Accepted ($10,000 up to $100,000) - July 1 to Dec 31, 2008, December 31, 2008 FROM: Catherine MacEwen, Senior Manager, HR, Safety, Marketing and Communications RE: HEALTH AND SAFETY TRAINING KEY ISSUE , .Award of contract for Health and Safety Training for Toronto and Region Conservation Authority staff for 2008. RECOMMENDATION THAT the, contract be awarded to Municipal Health and Safety Association (MHSA) for health and.safety training for Toronto and Region Conservation Authority (TRCA) staff for 2008 at a "cost not to exceed $28,500.plus applicable taxes. RATIONALE:, ' The TRCA is.'required to provide safety training for new, returning and existing staff as it is an important legal responsibility. to protect the health and of our employees. Training will be provided'for Supervisors and Managers in two separate two day sessions, and a two day session formembers of the TRCA Joint Health and Safety Committee. Staff received quotations from two vendors as follows: VENDOR ) BID AMOUNT (Plus GST) Municipal Health & Safety Association ' $28,500 Association of Ontario Road Supervisors $23,650 TRCA has used MHSA for previous health and safety training for TRCA staff with positive _ results. MHSA provides health and safety training for municipalities in Ontario and several conservation ;authorities. MHSA offerered a more comprehensive training package covering more topics relevant to TRCA. As a result, after reviewing both proposals, TRCA staff recommend that MHSA be awarded the contract. While they are not the lowest bidder, they are more familiar with our specific training needs and topics to be covered. FINANCIAL DETAILS The cost to provide the training is $28,500 plus GST. -Funds are identified in the 2008 Operating and Capital budget in account 018 -25. Report prepared by: Victoria Kinniburgh, extension 5288 Emails: vkinniburgh @trca.on.ca For Information contact: Victoria Kinniburgh, extension 5288 Emails: vkinniburgh @trca.on.ca Date: July 18, 2008 799 TERMINATION ON MOTION, the meeting terminated at 9:48 a.m., on Friday, August 8, 2008. Gerri Lynn O'Connor Brian Denney Chair Secretary- Treasurer /ks 800 THE TORONTO AND REGION CONSERVATION AUTHORITY MEETING OF THE EXECUTIVE COMMITTEE #7/08 September 5, 2008 The Executive Committee Meeting #7/08, was held in the Victoria Room, Black Creek •Pioneer Village, on Friday, September 5, 2008. The Chair Gerri Lynn O'Connor, called the meeting to order at 10:37 a.m.. PRESENT Maria Augimeri Vice Chair Rob Ford Member Ron Moeser Member Gerri Lynn O'Connor Chair Anthony Perruzza Member Maja Prentice Member Richard Whitehead Member VIA CONFERENCE CALL Colleen Jordan Member ABSENT David Barrow Member Suzan Hall Member Jack Heath Member Reenga Mathivanan Member RES. #899/08 - MINUTES Moved by: Seconded by: Ron Moeser Colleen Jordan THAT the Minutes of Meeting #6/08, held on August 8, 2008, be approved. CARRIED 801 SECTION I - ITEMS FOR AUTHORITY ACTION RES. #B100/08 - Moved by: Seconded by: GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Carruthers Creek Watershed Lajiter Property, CFN 41232. Donation of a parcel of land located on the east side of Shoal Point Road, south of Bayly Street, Town of Ajax, Regional Municipality of Durham, under the "*Greeniands Acquisition Project For 2006 - 2010 ", Flood Plain and Conservation Component, Carruthers Creek watershed. Maja Prentice Rob Ford THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation Authority (TRCA) accept the donation from Ann and Janine Lajiter of 15.40 hectares (38.06 acres), more or less, consisting of an irregular shaped parcel of vacant •ecologically sensitive land, said land being Part of Lot 4, Range 3, Broken Front Concession, Town of Ajax, in the Regional Municipality of Durham, as shown on a Draft . Plan of Subdivision prepared by J. D. Barnes Limited, Ontario Land Surveyors, under their Project No. TUN 623 -1, dated July 2008, situated on the east side of Shoal Point Road, south of Bayly Street; THAT the acquisition of the donation is to be on the following basis: (a) the purchase price is to be $2.00; (b) an income tax receipt is to be made available to Ann and Janine Lajiter for the appraised value of the ecologically sensitive land, in accordance with the guidelines set out by Canada Customs and Revenue Agency; (c) Toronto and Region Conservation Authority is responsible for appraisal, • environmental and reasonable legal fees; THAT TRCA extend their appreciation and thanks to Ann and Janine Lajiter for their generous donation; THAT TRCA receive conveyance of the land free from encumbrance, subject to existing service easements; THAT the firm of Gardiner Roberts LLP, Barristers and Solicitors, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs and disbursements are to be paid; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to execute all necessary documentation required. 802 CARRIED 1' BACKGROUND Resolution #A260/05 at Authority Meeting #9/05, held on November 25, 2005, approved the Greenlands Acquisition. Project for 2006 -2010. - The subject property is located on the east side of Shoal Point Road, south of Bayly Street within the Town of Ajax. TRCA-staff has been approached by representatives of Liza Communities, who are acting as agents on behalf of Ann and Janine Lajiter (the current landowners);in accordance with an executed Offer to Purchase agreement, regarding the donation of 15.40 hectares (38.06 acres), more or less, of ecologically sensitive land which is comprised of a portion•of the Warbler's Swamp. Liza Communities is in the process of purchasing the entire land holdings from the Lajiters in order to develop a residential subdivision on the developable portion of the property (i.e. outside the Regional Storm flood plain of the Carruthers Creek arid Warblers Swamp); a smaller buffer area within the flood plain and abutting :Warbler's Swamp will be conveyed to TRCA for nominal consideration at a later date by Liza Communities as part otthe subdivision approval process. Attached is a sketch showing the location-of the subject lands. . RATIONALE • As mentioned previously, the Lajiter property contains a portion of Warbler's Swamp which has been classified as a Provincially Significant Wetland (PSW) and an Area of Natural and Scientific Interest (ANSI) by the Ontario Ministry of Natural Resources; it is also connected to - the TRCA classified Carruthers Creek Marsh and Carruthers Creek Forest Environmentally Significant Areas. The acquisition of this portion of the Warblers Swamp will result in significant environmentally sensitive lands being conveyed to TRCA as protected greenspace, will provide long -term protection to the PSW /ANSI and will also help to protect the natural heritage features previously acquired by TRCA.in this area. DETAILS OF WORK TO,,BE DONE Certification and approval otan appraisal is to be obtained from Environment Canada in compliance with the Ecological Gifts Program. • TAXES AND MAINTENANCE On December, 10, 2004, the Ontario government announced a regulation that expands the environmentalicriteria for lands that are eligible to receive a property tax exemption.. Based on a preliminary review.of the new criteria,it would appear that the subject lands would be.eligible for exemption for the 2009 taxation year. TRCA maintains lands in this vicinity and it is expected that the 'subject parcel of land will not significantly impact TRCA's maintenance costs since these types of lands require a low degree of maintenance. ( 803 J FINANCIAL DETAILS All expenditures for this acquisition including appraisal, environmental and legal fees are to be charged to the TRCA land acquisition capital account. • Report prepared by: George Leja, extension 5342 Emails: gleja @trca.on.ca For Information contact: George Leja, extension 5342 or Ron Dewell, extension 5245 Emails: gleja @trca.on.ca or rdewell @trca.on.ca Date: August 12, 2008 Attachments: 1 804 Attachment1 GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Carruthers Creek Watershed Caajiter Property CFN 41232 o ery on for Me Living City 111 CA LANDS INZ4- SUBJECT PROPERTY 805 RES. #B101/08 - Moved by: Seconded by: REFORESTATION SEEDLING PROCUREMENT 2009 - 2011. To authorize staff to negotiate with Somerville Nurseries Inc. for the supply of reforestation seedlings to supply anticipated Toronto and Region Conservation Authority program and project demand for the three year period to ensure an uninterrupted supply of stock through 2011. . Maja Prentice Rob Ford THAT staff be authorized to negotiate terms satisfactory to Toronto and Region Conservation Authority (TRCA) staff with Somerville Nurseries Inc. to ensure an uninterrupted supply of reforestation seedlings based on TRCA seedling demand forecasts to provide for program and project needs to December 31, 2009; AND FURTHER THAT TRCA officials be authorized and directed to take such action as may be necessary to implement the seedling procurement including signing of documents. CARRIED BACKGROUND Since 1995, with the closure of the Ontario Ministry of Natural Resources forest tree nursery program, TRCA and other Greater Toronto Area.(GTA) conservation authorities (Credit Valley, Nottawasaga Valley: Lake Simcoe Region and Halton Region) have been coordinating the purchase of reforestation seedlings as a means of supplying their individual program requirements. While each conservation authority forecasts it own requirements independently, Somerville Nurseries offers equivalent unit pricing (below market list) to the conservation authorities, providing each the benefit of combined purchase pricing. Somerville Nurseries Inc., located in Everett (near Alliston), Ontario, effectively took over the supply of reforestation stock following the provincial governments decision to transfer the propagation and production to the private sector. TRCA's annual seedling demand forecast is based on TRCA's experience with facilitating internal reforestation needs for TRCA and private landowner planting programs. In recent years, TRCA's demand has increased and forecasts reflect this. However, recent project initiatives have come forward in an accelerated-fashion and have created a shortfall between anticipated demand and actual orders. TRCA's initial 5 year seedling demand forecast was provided t� Somerville Seedlings Inc. in 2004 and was updated in 2007 to assist them in directing seed collection and seeding targets as it takes up to 3 years to produce a marketable seedling. Forecasted demand was based on historical orders and on program information available in 2004. At that time staff had anticipated a base level of demand at 50,000- 60,000 seedlings per year to address reforestation needs. Annual demand for the 2004 -2006 period has averaged 62,000 seedlings, with demand spiking in 2007 to just under 100,000 units. 806 A :combination of new programming, special projects and enhanced funding initiatives by the Regional Municipality of Peel have now left TRCA's forecasted demand in a seedling deficit • position. In Spring 2008, TRCA acquired more than 200,000 reforestation seedlings from Somerville Nurseries Inc. to supply reforestation programs and projects including: • Private Landowner Reforestation Assistance; • Claireville Restoration project; • York Region /Slokker Property reforestation project; • Oak Ridges Corridor Park reforestation (Phase 1); • Rouge Park /Little Rouge Corridor reforestation (Pike/Tompion). To ensure an uninterrupted supply is available on an ongoing basis, staff now need to provide and confirm seedling demand targets for the three year period.ending in 2011. In each successive year, staff will be requested to provide an updated-demand forecast for a'period 3 years hence. Somerville Nurseries Inc. continues to offer us the best combination of: •: consistent seedling quality; • seed zone and genetic source control; • excellent unit pricing; • ability t� provide for identified stock - species, size, type, age- class; • flexibility to meet last minute demand for additional stock; • •- convenience as the most local supplier; and • • willingness to work with conservation authorities to achieve seedling target demand. Staff recommend that TRCA negotiate a mutually acceptable supply agreement that will address the shortfall in seedling inventories that is expected in the`supply chain. Failure to take such action would result in scheduling delays and /or cancellation of orders for reforestation stock. The net result could mean a reduction in planting effort FINANCIAL DETAILS All costs associated with the procurement of reforestation stock are recovered from the end user program or project in the year in which the seedlings arapurchased and delivered. Funds have been-allocated in individual project/program budgets for the 2009 year. Based on an average unit cost of $0.54 per tree (2008 pricing, applicable taxes extra), the anticipated,annual cost of seedling supply is expected to be on the order of $55,000 per year. It is anticipated that Somerville Nurseries Inc.•will require a 25% deposit (standard terms) to confirm the Spring; 2009 seedling order by late January, 2009. Charges'are assigned to 116 -09 -230. . Report prepared by: Dave Rogalsky, extension 5378 '- Email: drogalsky @trca.on.ca For Information contact: Dave Rogalsky, extension 5378 Email: drogalsky @trca.on.ca Date: August 18, 2008 807 RES. #B102/08 - Moved by: Seconded by: RYERSON UNIVERSITY Memorandum of Agreement. Approval to enter into a memorandum of agreement with Ryerson University for a strategic partnership on research and development in sustainable technologies and sustainable community development. Maja Prentice Rob Ford WHEREAS THE EXECUTIVE COMMITTEE RECOMMENDS THAT the vision for The Living City Campus at Kortright includes the development of a post- secondary sustainable technologies education and research centre; WHEREAS Ryerson University's Strategic Research Areas on Energy and Environment and Technology Innovation are complementary to the vision for The Living City Campus at Kortright; THEREFORE LET IT BE RESOLVED THAT Toronto and Region Conservation Authority (TRCA) enter into a Memorandum of Agreement (MOA) with Ryerson University in a collaborative strategic partnership on research and development in sustainable technologies and sustainable development, for a period of two years effective the date of signing; AND FURTHER THAT TRCA designated signing officers be authorized and directed to take such action as is necessary to execute the MOA including obtaining all necessary approvals and signing of documents. • CARRIED BACKGROUND TRCA has a long standing relationship with Ryerson University going back to 2000 when at Authority Meeting #6100, held on June 23, 2000, Resolution #A134/00 was approved as follows: THAT The Toronto and Region Conservation Authority enter into a Memorandum of Understanding (attached) with Ryerson Polytechnic University (Department of Civil Engineering and the School of Applied Geography). At Authority Meeting #3/08, held on April 25, 2008, Resolution #A95/08 was approved as follows: WHEREAS the vision for The Living City Campus at Kortright includes the development of a post- secondary sustainable technologies education and research centre; THEREFORE LET IT BE RESOLVED THAT staff be directed to negotiate an agreement with Ryerson University to further the development of a strategic education and research partnership around innovative sustainable technologies at The Living City Campus at Kortright; THAT the agreement be on terms and conditions satisfactory to Toronto and Region Conservation Authority (TRCA) staff and solicitors; 808 AND FURTHER THAT any agreement be subject to Authority approval. TRCA Staff and Ryerson staff.have since developed a Memorandum of Agreement that is believed to meet the needs of both organizations. RATIONALE TRCA has been working with Ryerson since 2000 on a variety of very successful projects, from stormwater management to analysis of mechanical systems for the Archetype Sustainable House at Kortright. The new agreement builds on these successes and puts TRCA in a position to be able to achieve a key goal for The Living City Campus at Kortright: • to foster on -site research collaborative with academics, business, and government that supports sustainable living issues. PROVISIONS OF THE MEMORANDUM OF AGREEMENT • TRCA will allow Ryerson University access to their existing research infrastructures for educational and research purposes. • Ryerson University will form a committee with TRCA and local municipalities to explore possible opportunities, both internal and external: to obtain maximum potential with regard to the creation of Sustainable Technologies Research Centre at The Living City Campus at Kortright. • Ryerson. University will assist in technology monitoring and verification of the TRCA Archetype Sustainable House project that is under development at the Kortright Centre. TRCA and Ryerson University will jointly seek Ontario Centre of Excellence funding to support student research and development activities at Ryerson University. The agreement shall commence.upon the effective date it is signed by all parties and shall continue for two years hence. Report prepared by: Bernie McIntyre, extension 5326 Emails: bmcintyre @trca.on.ca For Information contact: Bernie McIntyre, extension 5326 Emails: bmcintyre @trca.on.ca Date:Aug 20, 2008 RES.#B103/08 - Moved by: Seconded by: WORLD GREEN BUILDING COUNCIL Relationship with Toronto and Region Conservation Authority. Annual update on the World Green Building Council relationship with Toronto and Region Conservation Authority through the World Green Building Council Secretariat. Ron Moeser Maja Prentice 809 THE EXECUTIVE COMMITTEE RECOMMENDS THAT the World Green Building Council (WorldGBC) continue to receive support and assistance from Toronto and Region Conservation Authority (TRCA) staff and associates where required. CARRIED • BACKGROUND At Authority Meeting #7/07, held on September 28, 2007, Resolution #A199/07 was approved, in part, as follows: ...AND FURTHER THAT staff be directed to report back to the Business Excellence Advisory Board on an annual basis with an update on the status of the business relationship. Interest in green building councils has been growing rapidly over the past year. TRCA and WorldGBC staff are working to ensure the resources required to support the development of new councils are in place to respond to the growing demand. The following list of 2008 accomplishments demonstrates the effectiveness of the partnership between WorldGBC and TRCA. 1. World Green Building Council Secretariat Anniversary On May 6, 2008 staff celebrated the one year anniversary of the WorldGBC Secretariat with dignitaries from TRCA, the Province of Ontario, The Canada Green Building Council (CaGBC) and more. The event took place at the Gardner Museum in Toronto and was the first public launch of the new WorldGBC website. Guest speakers included Minister of • Natural Resources Donna Cansfield and former Minister of Finance Greg Sorbara. The event was sponsored by Autodesk and Colliers International. 2. Building Environmental Assessment Methods: A Review of International Developments Following the February, 2008 WorldGBC board meeting in London, England, Dr. Raymond J. Cole, Professor and Director of the School of Architecture, University of British Columbia, delivered the final draft of his report to WorldGBC for review. Over the past several months the WorldGBC Executive Committee, as well as various other board members with a strong background in rating tool development, adaptation and adoption have been reviewing the . report for final comments and sign -off. It is expected that this report will be released by the .end of 2008 3. Global Green Trends SmartMarket ReportTM WorldGBC has partnered with McGraw -Hill Construction (MHC) to investigate the size and scope of the green building marketplace worldwide. The resulting Global Green Trends Building SmartMarket Report"' will offer an assessment of the global green building marketplace. Built around the results of the WorldGBC /MHC survey of regional green building market trends, the report will also summarize the state of green building across different regions of the world, feature country and project case studies and include interviews with green building leaders. This report will be part of MHC's SmartMarket Report" series, which offers comprehensive information on the latest construction trends based upon original research. 810 A Chinese - language version of the report will be released at MHC's upcoming China Green Building and Energy Efficiency Conference in September and the English- language version will be released immediately following, in time for the Sustainable Buildings 2008 (SB08) Conference in Melbourne, Australia. 4. Council Development In February 2008 the WorldGBC held its Annual International Congress and board meeting in London; England., During the event the Board of Directors welcomed the German, Sustainable. Building Council (GeSBC) as a full- member of the WorldGBC, as well as -the • ColombiaGBC and PolandGBC as emerging members. The congress program was designed to provide both developing and more established councils with adequate forums to discuss current issues and identify how the WorldGBC can better provide support. Tailored half -day workshops were also organized with SpainGBC and ChinaGBC. Delegates of over 20 countries were in attendance. WorldGBC Secretariat staff met with many groups in London, and focused efforts in helping countries in theEuropean Union. Below are•some of the advancements seen: Netherlands: a strong DutchGBC is emerging. The DutchGBC enjoys good private sector support, with close to 40 founding members (May, 2008). In preparing the DutchGBC for membership, the WorldGBC has reviewed theirbylaws to ensure the Board of Directors (BOD) .is elected by members and that the BOD's composition is balanced. The official incorporation of the DutchGBC occurred on June 1, 2008. The first election of a BOD will occur in October, 2008. • Italy: There are a number of regional groups in Italy engaged in green buildings. Two have expressed interest in, joining the WorldGBC: one is led by Andrea'Moro (iiSBE Italia) and the ' other by.Mario Zoccateli (Trento). WorldGBC•visited Italy in June, 2008 to.meetwith all interested parties. The goal of the trip was to bring all interested parties together and to perform due diligence. Romania: Romania is at the very early stages of forming a council. WorldGBC met with Steve Borncamp in London in February 2008 as he is leading efforts to establish acouncil. The group`of initiators has achieved impressive progress over the past couple of months. WorldGBC, has supported Mr. Borncamp's effort by arranging for Dr. Boschi from Bovis Lend Lease to participate in the first green building conference in Romania, where a formal 'green building 'council initiative was launched. Spain: Over the last few months; WorldGBC worked closely with the members developing SpainGBC including revisions to their bylaws (April, 2008) and governance structure (May, 2008). Poland: WorldGBC admitted PolandGBC as an emerging member in February, 2008 on the condition -it would amend and review: • bylaws (draft); • board composition; • elections (set a realistic time frame for elections). • 811 The PolandGBC confirmed that all WorldGBC requirements would be met in due course. PolandGBC needs to expand its board to include industry in a more representative way. Overall funding should not be a barrier, and an aggressive staffing plan should ensure dynamism and quick results. WorldGBC is working to support the PolandGBC to structure. its operations in time for the Kyoto meetings taking place in Poland in December. Other Efforts - WorldGBC efforts over the last 16 months are coming to fruition in Latin America. Solid green building council activity is now occurring in Argentina, Brazil, Chile, Colombia and Costa -Rica. The green building councils in the region are coordinating their activities and starting to form a support structure for sharing experiences, resources and members. WorldGBC expects to review the membership applications of the following countries over the next few months: Full- Member Status: Argentina Colombia South Africa Emerging Member Status: Netherlands • Israel Singapore 5. United Nations Framework Convention on Climate Change - Poland Earlier this year the WorldGBC submitted its application for observation status to the United Nations Framework Convention on Climate Change (UNFCCC) Secretariat. The UNFCCC is an international treaty which enables countries to consider what can be done to reduce global warming and to cope with inevitable temperature increases. The Conference of the Parties (COP) is the prime authority of the convention. It is an association of all member countries (or 'parties) and usually meets annually for a period of two weeks. The next session is in Poland. These sessions are attended by several thousand government . delegates, observer organizations and journalists. It is at these sessions that the WorldGBC can be most effective by providing advice on policies and information on _ emerging /available green building technologies and how necessary this work is to mitigating climate change. In order to attend the convention, international and non - government organizations (NGOs) are encouraged to apply for observer status which permits their attendance and enables these groups to speak but not to participate in decision - making. The term 'observer' is somewhat misleading as it implies a quiet- sounding group which is not necessarily the intended role of WorldGBC at the convention. Some groups with observer status include several of the WorldGBC partners, such as the United Nations Development Programme (UNDP), the United Nations Environment Programme (UNEP), the Organization for Economic Cooperation and Development (OECD), as well as the World Meteorological Organization (WMO), the International Energy Agency and the Organization of Petroleum Exporting Countries (OPEC). To date, over 50 intergovernmental agencies and • international organizations attend sessions of the Conference of Parties. 812 NGOs are also encouraged to obtain observers status; currently, more than 600 NGOs are accredited to participate in meetings related to the convention. WorldGBC was granted conditional acceptance, with final approval anticipated at the next United Nations Climate Change Conference in Poland on December 1-12,2008. With the conditional approval, WorldGBC-is able to submit a request to host a side event at this conference; this application is due 10 weeks prior to the conference (September 24th, 2008). A side event provides, an excellent forum for discussion of the important work the WorldGBC and what its members are doing, as well as showcasing the green building agenda and its contributions to mitigating climate change on an influential and international scale. 6. WorldGBC Website The new WorldGBC website design is now in place and will continue to evolve over the next year. Below is a quick summary of activity to date and expected targets for completing unfinished tasks: Phase One, Activity to Date - December to August, 2008 a. Soft launch on Friday, May 2, 2008; new website functioning b. Public launch on Tuesday, May 6, 2008 at WorldGBC Secretariat First Anniversary celebration at Gardner Museum c. .Minor edits and functionality (i.e. webmail, etc) completed week of May 6; 2008 d. Phase One of website project complete - includes website design; major content written, edited and presented for key audiences; smooth functionality, etc. Phase Two, Expected Targets- August to December, 2008 Minor content improvements: a. Events section b. Contact information for emerging and active contacts c. Council development section improvements d. New photos for Board of Directors e. Content projects: • Resource section: includes re- instating information regarding various rating tools and the sharing of Internet protocol of these tools with other GBCs; articles and press releases from GBCs announcing activities and projects with international significance or relevance to other merribers.. • Market transformation section • Calendar,of.events • E- Newsletter creation • • 1Speakers roster guidelines and request form • Frequently Asked Questions Phase Three, Next Steps - December to March, 2009 a. Community forum instructions and plans to engage /orient directors and members so that everyone gains the confidence to rely on the website forregular communications and updates. b. To support new GBCs, website framework replication process will begin so that developing GBCs can.have a template to use in creating their own websites. This will dramatically increase a new GBC's ability to establish internet presence without all the work or costs traditionally associated with this process. 813 7. Province of Ontario a. Funding Status WorldGBC received a commitment from the Premier of Ontario's office to continue WorldGBC funding for the next 3 years for a total of $700,000. With this commitment comes a number of restrictions that were not in place in the original grant provided in 2007 that was awarded to secure secretariat operations for Ontario. Overview of restrictions are as follows: • New funding must be used to directly support Secretariat activities /operations and projects that would give direct benefit to the Province of Ontario. • Funds cannot be used to cover board expenses, travel, council development, events outside of Ontario (except the WorldGBC Congress as money can be used to support this annual event). b. University Pilot Program As one of the initiatives designed to provide a benefit to the Province of Ontario, a formal Memorandum of Understanding was signed on May 21, 2008 between .WorldGBC and York University to begin a pilot program for green building council support. The ceremonial signing was attended by WorldGBC Secretariat, York University, Ontario Centres of Excellence staff and others. WorldGBC's Honorary Patron, the.Honourable Donna Cansfield, Ontario's Minister of Natural Resources, also attended to share a few words and offer support to this new partnership. York University is a member of the International Network of Universities. This new pilot program will be developed over the next 1 -2 years, and will then be packaged and shared within the International Network of Universities so that schools will be able conduct the program within their countries. This program has the potential to grow to a substantial scale and. engage graduating students from around the world in the effectiveness of green building design and development. Funding for this program is under development with the York University Foundation, The Schad Foundation and Ontario Centres of Excellence. Currently there are 4 main components under development for this program: 1. Research & Knowledge Mobilization York University graduate students and /or faculty will collaborate with WorldGBC, • green building councils, or industry partners to conduct research on topics related to green building, sustainable development and climate change. A research help desk will be set up that will link parties with a need for research on a specific topic with a graduate student or faculty member suitable to carry out the research. York University Libraries has offered to work with WorldGBC to develop an indexing strategy for an online resource library. 814 2. International Council Support Through the York International Undergraduate Internship Program, York University undergraduate students, paired with undergraduate students from York University's partner universities, will have the opportunity to work with established and emerging international green building councils: Participants for these opportunities will be drawn from a range of disciplines such as Business, Administrative Studies, Environmental Studies and Engineering. Ten internship sites will be chosen, each receiving two interns: one York University intern and one from a local university. These 3 -month internships will commence May, 2009. 3. WorldGBC Secretariat Support York University students will gain practical work experience as interns with the Secretariat. 4. International School for Sustainable Design and Development The WorldGBC.and York University will partner to create a 3 -week summer study program for academic credit, taught by York University faculty, which focuses on the fundamentals ofsustainable design and development from an international perspective. A portion of the course will focus on the importance and function of green building councils. This course will be open to students from the International Network of Universities. The course will be held at The Living City Campus at Kortright in Ontario. c. Region of Peel Climate Change Funding The WorldGBC has been fortunate to be included in Toronto and Region Conservation Authority's climate.change initiative with the Regional Municipality of Peel. Peel Region provides TRCA with substantial capital grants to create projects that help Peel Region meet local goals to address climate change. For the second year in a row, the WorldGBC Secretariat has received $25,000 to support WorldGBC.efforts. As a result, the WorldGBC is,able to conduct the major research projects outlined above. 10. Funding Task Force / Global Partners Initiative The new WorldGBC Funding Task Force held its first conference call on May 2, 2008. Chaired by Paul.King of United KingdomGBC, participants discussed how the WorldGBC could fulfil its annual budget projections without appearing to compete with member councils for sponsorship. These discussions are at a very crucial time for WorldGBC as interest in, green buildings continue to grow. Strategies are under review including a 100% membership funded model and a diversified funding model to include support from foundations. As requested by the WorldGBC Boardrof Directors at the meeting in London, the WorldGBC Secretariat provided an initial framework for discussions•on how WorldGBC could approach corporate leaders that would best support green building council ' members. Titled the 'Global Partners Initiative' (GPI), the first draft of this framework demonstrates how funding collected by WorldGBC would be divided into 3 parts: • 45% direct funding to new councils; • 35 %idedicated to supporting projects and events (WorldGBC & members); • 20% applied to WorldGBC overhead. 815 FINANCIAL DETAILS One of the primary efforts of the WorldGBC Secretariat over the past year has been to review past financial records and engage professional auditors to ensure records have been appropriately managed and filed. It is important that all financial records are kept in accordance with the American, and now Canadian, Generally Accepted Accounting Principles (GAAP). WorldGBC has completed gathering the back -up and history related to all financial transactions related to WorldGBC Business for the 2006 and 2007 calendar years. Staff at the Secretariat and in the TRCA accounting department have now prepared the financial statements for these two years. Review of Internal Revenue Service (IRS) filings have been completed by an auditor in the United States of America. The Secretariat and the TRCA accounting department are now re- assessing the set up of accounts to create a more efficient and streamlined way of financial reporting. It is expected that formal financial reports will be audited and ready for the WorldGBC Board of Directors to review before the WorldGBC SB08 conference in Melbourne, Australia on September 21, 2008. Following the completion of the financial audits, WorldGBC Secretariat staff will be coordinating and preparing the not - for - profit WorldGBC tax returns in Ontario, Canada. Report prepared by: Andrew Bowerbank, 289 - 268 -3902 Email: abowerbank @worldgbc.org For Information contact: Andrew Bowerbank, 289 - 268 -3902 Email: abowerbank @worldgbc.org Date: August 18, 2008 SECTION II - ITEMS FOR EXECUTIVE ACTION RES. #6104/08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Development, Interference with Wetlands and Alterations to Shorelines and Watercourses. Pursuant to Ontario Regulation 166/06, written permission from the Authority is required for: a) - straightening, changing, diverting or interfering in any way with the existing channel of a • river, creek; stream or watercourse, or for changing or interfering in any way with a wetland; b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected. 816 Moved by: Seconded by: Ron Moeser Maja Prentice THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.1 - 8.1.34, inclusive, and 8.1.83 - 8.1.90, inclusive) which are listed below. CARRIED CITY OF BRAMPTON 8.1.1 CASA -NORTH INVESTMENTS INC. To construct, reconstruct, erect or place a building or structure on Part Lot 14, Concession 6 EHS, Block 10, Plan 43M -1667, (Airport Road and Yellow Avens Boulevard), in the City of Brampton, Humber River Watershed as located on the property owned by Casa -North Investments Inc.. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a pedestrian bridge. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing Bridge Crossing Details, prepared by The MBTW Group, revised July 24, 2008, stamped received by TRCA Planning and Development July 25, 2008; • Drawing Bridge Crossing Restoration Planting Plan, prepared by The MBTW Group, revised July 24, 2008, stamped received by TRCA Planning and Development July 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a clear span pedestrian bridge across the H4 Tributary of the West Humber River. This application is part of the Klondike Trail system which links the Springdale neighbourhood (City of Brampton File 21T- 02- 006B -D). Although the works are proposed within the Regional Storm Floodplain, the span of the proposed bridge will allow the passage of flood flows and will nqt affect the limits of the Regional Storm Floodplain. In addition, all existing grades will be maintained and all excavated fill will be removed from the Regional Storm Floodplain. In order to complete the proposed works, it is necessary for several sections of vegetation to be removed. To mitigate the impacts of vegetation removal, an extensive enhancement planting plan has been incorporated into the design to provide for an ecological net gain. Control of Flooding: TRCA Water Resources staff have reviewed the application and do not anticipate any impacts to the storage and /or conveyance of floodwaters. 817 Pollution: Sediment and erosion controls will be provided and maintained through all phases of construction in accordance with TRCA guidelines, Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: As a result of the proposed works, several sections of riparian vegetation will be removed. To mitigate the impacts of the proposed removals an extensive enhancement planting plan has been submitted with this project. In the opinion of TRCA Staff, the proposed plantings will achieve an ecological net gain for this area. Plantings All plantings are native and non - invasive in accordance with TRCA Guidelines. Policy Guidelines: This proposal is consistent with Section 4.1.2 - New Resource -Based Uses - of the Authority's Valley.and Stream Corridor Management Program (VSCMP). CFN: 41317 - Application #: 724 /08 /BRAM Report Prepared by: Lisa Stern, extension 5370 • For information contact: Quentin Hanchard, extension 5324 Date: August 27, 2008 8.1.2 CITY OF BRAMPTON *To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere along Bramalea Road between Countryside Drive and Mayfield Road, in the City of Brampton, Humber River Watershed, as located on property owned by the City of Brampton. The purpose is to construct a 400 mm diameter watermain under the H3 tributary of the Humber River, located on Bramalea Road between Countryside Drive and Mayfield Road. A • Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO) for this project. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans'which form part of this permit: • Letter of Undertaking to provide revisions to the engineering drawings to the satisfaction of TRCA; dated August 21, 2008; received August 22, 2008; prepared by City of Brampton. 818 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of constructing a 400 mm diameter watermain along the east side of Bramalea Road. The watermain will be constructed within the existing road allowance by jacking and boring under an existing culvert at the H3 tributary of the Humber River. The remainder of the watermain within this regulated area will be constructed by open cut. Control of Flooding: There will be no impacts to the control of flooding. Pollution: Standard erosion control measures (silt fencing, rock check dams) will be implemented for the duration of construction, and until the site is restored, in order to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). This application is subject to the Ministry of Natural Resources (MNR) coldwater fisheries timing window. All in or near water works must be completed between June 15 and September 15. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 38424 - Application #: 689 /06 /BRAM Report Prepared by: Sharon Lingertat, extension 5717 For information contact: Sharon Lingertat, extension 5717 Date: August 25, 2008 8.1.3 CITY OF BRAMPTON To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse from approximately Sandalwood Parkway to north of Countryside Drive, in the City of Brampton, Humber River Watershed, as located on property owned by the City of Brampton. 819 The purpose is to widen Bramalea Road to 4 lanes between approximately Sandalwood Parkway and Countryside Drive. Works will include construction of multi -use bicycle /pedestrian paths, construction of a watermain along Bramalea Road, construction of a sanitary sewer at the intersection of Countryside Drive and Bramalea Road and replacing an existing culvert at a branch of the H2 tributary located just north of Dewside Drive. A Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO) for this project. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to provide revisions to the engineering drawings to the satisfaction of TRCA; dated August 21, 2008; received August 22, 2008; prepared by City of Brampton. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of widening Bramalea Road, replacing an existing culvert at a branch of the H2 tributary and constructing a watermain. Bramalea Road will be widened to 4 lanes and will be constructed with multi -use bicycle /pedestrian paths on both sides. The road will be constructed with an urban cross - section including curb and gutters and storm sewers from approximately Sandalwood Parkway to just north of Countryside Drive. A 400 mm diameter watermain will be constructed along the east side of Bramalea Road, and a 300 mm diameter watermain will be constructed from the intersection of Bramalea Road and Countryside Drive west along Countryside Drive by open cut for approximately 70 metres. An existing culvert at a branch of the H2 tributary will be replaced with a larger culvert to accommodate the road widening. A 450 mm diameter sanitary sewer will also be constructed north of Countryside Drive, through the intersection at Countryside Drive and Bramalea Road and then east along Countryside Drive. Control of Flooding: There will be no impacts to the control of flooding. Pollution: Standard erosion control measures (silt fencing, rock check dams, cofferdams) will be implemented for the duration of construction, and until the site is restored, in order to prevent construction generated sediment from entering .the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. 820 Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). This application is subject to the Ministry of Natural Resources (MNR) Coldwater fisheries timing window. All in or near water works must be completed between June 15 and September 15. Plantings All disturbed areas will be restored with native non - invasive species following construction. A net ecological gain will be achieved for this site. Policy Guidelines: This proposal complies with Section.4.3 - Infrastructure and Servicing - of the Authority's Valley • and Stream Corridor Management Program. CFN: 40144 - Application #: 912 /07 /BRAM Report Prepared by: Sharon Lingertat, extension 5717 For information contact: Sharon Lingertat, extension 5717 Date: August 25, 2008 CITY OF PICKERING 8.1.4 CITY OF PICKERING To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse within a Regulated Area on Lot 415, Concession 5 (Sideline 4 between Concession 5 and Highway 7), in the City of Pickering, Carruthers Creek Watershed as located on the property owned by City of Pickering. The purpose is to replace an existing 600 mm culvert on Sideline 4 within the cold water fisheries timing window. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit • Drawing C -5 - Sideline 4, prepared by D.G. Biddle & Associates Limited, dated July 22, 2008, received August 1, 2008; • Drawing C -7 - Sideline 4, prepared by D.G. Biddle & Associates Limited, dated July 22, 2008, received August 1, 2008; • Drawing C -7A - Sideline 4 Culvert Crossing, prepared by D.G. Biddle & Associates Limited, dated July 22, 2008, received August 1, 2008, revised by TRCA August 26, 2008; • Drawing L1 - Sideline 4 Culvert Replacement Restoration Plan, prepared by D.G. Biddle & Associates Limited, dated July 22, 2008, received August 1, 2008, red -line revised by TRCA August 26, 2008. 821 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to replace an existing 600 mm culvert in order to facilitate the reconstruction of Sideline 4 from Concession 5 to 1100m south of Highway 7. . Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. • Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be provided by TRCA staff on behalf of the Fisheries and Oceans Canada (DFO). Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program.. CFN: 40866 - Application #: 367 /08 /PICK Report Prepared by: Laura Richards, extension 5723 For information contact: Laura Richards, extension 5723 Date: August 26, 2008 8.1.5 ENBRIDGE GAS DISTRIBUTION INC. To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere in a Regulated Area on Lot 18, Concession 2, (Brock Road and Ganatsekiagon Creek), in the City of Pickering, Duffins Creek Watershed as located on the property owned by the Regional Municipality of Durham under a Franchise Agreement with Enbridge Gas Distribution Inc. 822 The purpose is to relocate the existing gas pipeline under Ganatsekiagon-Creek.within the cold water fisheries timing window. The pipeline will be installed using trenchless technology under the watercourse. A Letter of Advice will be written by TRCA staff on behalf of the Fisheries and Oceans Canada (DFO) for this project. The permit will be'issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing 1 of 1; dated July 25, 2008; received July 30, 2008; red line revised August 25, 2008; prepared by.Enbridge Gas Distribution Inc.; • Contingency Plan for Horizontal Directional Drilling (HDD), received August 12, 2008; prepared by Enbridge Gas Distribution Inc.. - RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed relocation of the existing NPS 12 ST HP gas main crossing of Ganatsekiagon Creek with a NPS 12 ST YJ HP on the east side of Brock Road, in advance of and in order to facilitate the reconstruction.and widening of Brock Road, in the City of Pickering, Regional Municipality of Durham. The pipeline will be installed using trenchless technology under the watercourse, a small portion of. the project south of the creek will be completed by open cut. Following.the,reconstruction.of Brock Road, all restoration works will be completed by the Regional Municipality of Durham. Control of Flooding: The storage or conveyance of floodwaters will not be impacted with the proposed works.. Pollution: Standard sediment and erosion control measures will be iniplemented and maintained for the duration of construction and until the site is stabilized and restored in order to prevent -construction generated sediment from entering any watercourse. Sediment and erosion control has been provided per the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: There are no slope stability concerns associated with the proposed works. Conservation of Land: With erosion and sedimentation plans in.effect the potential for a, harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be- written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The fisheries timing window for in and near water works is July. 1 to September 15. 823 Plantings All disturbed areas will be restored with native /non- invasive species by the,Region of Durham following reconstruction of Brock Road. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41146 - Application #: 594/08/PICK Report Prepared by: Laura Richards, extension 5723 For information contact: Laura Richards, extension 5723 Date: August 26, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.6 BATES DESIGN AND BUILD LTD. To construct, reconstruct, erect or place a building or structure on Part Lot 110, Plan 2155, (359 Lake Promenade), in the City of Toronto (Etobicoke York Community Council Area), Waterfront Watershed as located on the property owned by Bates Design and Build Ltd.. The purpose is to develop within,a TRCA Regulated Area of the Waterfront Watershed in order to facilitate the construction of a new two- storey single family detached dwelling inclusive of a rear deck and attached garage. The existing single- storey dwelling is to be demolished. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -1, Site Plan, prepared by Epic Designs Inc., dated July 28, 2007, revised January 25, 2008, received on March 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Waterfront Watershed in order to facilitate the construction of a new two- storey single family detached dwelling inclusive of a rear deck and attached garage. The existing single- storey dwelling is to • be demolished. The subject site is located south of Lakeshore Boulevard West, east of Etobicoke Creek and abuts Lake Ontario t� the south. Control of Flooding: This site is not located in the Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. • . 824 Pollution: Temporary sediment control fencing is to be installed and maintained during construction in order t� prevent construction debris from entering Lake Ontario. Dynamic Beaches: Not applicable. Erosion: There are no.geotechnical concerns associated with this proposal.. Conservation of Land: The proposed building footprint is adequately setback from the existing shoreline and there is no proposed change to the existing grading of the site. The entire property is located within a developed community along this portion of the lakefront and is consistent with the surrounding development. There will be no impact on significant natural features, riparian vegetation or fisheries. Plantings No plantings are required as part of this application. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) = Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas.of the TRCA's.Valley and Stream Corridor Management Program. CFN: 40565 - Application #: 159/08/TOR Report Prepared by: Nicole Moxley, extension 5284 Forinformation contact: Steve Heuchert, extension 5311 Date: August 27, 2008 8.1.7 CITY OF TORONTO To construct; reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere in a Regulated Area within the South Kingsway Ramps, in the City of Toronto_(Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by City of Toronto. The purpose,is to undertake improvements and reconstruct the South* Kingsway on and off ramps, reconstruct the sidewalks and, paths in the adjacent parks including light upgrades, and install new concrete seat walls and water heritage plaques. A Letter of Advice "regarding • . mitigation of erosion and sediment will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: 825 • Drawing, Temporary Silt Control Filter for Catchbasin; • Sheet P- 2603 -041, Road Reconstruction, Bike Path and Sidewalk Construction from the Humber River Bridge to 50m West of Southport Street; prepared by City of Toronto Technical Services, May 20, 2008, received by TRCA on July 16, 2008; • Sheet P- 2603 -042, Road Reconstruction (west bound) from the Humber River Bridge to 50m West of Southport Street; prepared by City of Toronto Technical Services, May 20, 2008, received by TRCA on July 16, 2008; • Sheet P- 2603 -043, Road Reconstruction (west bound) from the Humber River Bridge to 50m West of Southport Street; prepared by City of Toronto Technical Services, May 20, 2008, received by TRCA on July 16, 2008; • Sheet P- 2603 -044, Road Reconstruction (west bound) from the Humber River Bridge to 50m West of Southport Street; prepared by City of Toronto Technical Services, May 20, 2008, received by TRCA on July 16, 2008; • Sheet P- 4422 -012, Road Reconstruction - North East Ramps; prepared by City of Toronto Technical Services, May 20, 2008, received by TRCA on July 16, 2008; • Sheet P- 4422 -013, Road Reconstruction - Ramps 'A' & 'B'; prepared by City of Toronto Technical Services, May 20, 2008, received by TRCA on July 16, 2008; • Sheet P- 4422 -014, Road Reconstruction - Ramp `D'; prepared by City of Toronto Technical Services, May 20, 2008, received by TRCA on July 16, 2008; RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the reconstruction of all 4 ramps of the South Kingsway.and the Queensway intersection. The proposed works is located adjacent to the Humber River, just north of the Gardiner Expressway and Lakeshore Boulevard West. Sections of the sidewalk will be reconstructed as part of the improvements. New Tight stands will be installed along the park path and within the ramps area. The path located within the adjacent park (west of the ramps) will be reconstructed and new concrete seat walls will be installed. Four new water heritage plaques on posts will be installed. The proposed works are all located on lands owned by the City of Toronto. Control of Flooding: There will be no impacts to the control of flooding, storage•or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order . to prevent the generated sediments from entering into the Humber River. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. •Dynamic Beaches: Not applicable Erosion: • There are no geotechncial engineering issues associated with the proposed works 826 Conservation of Land: There are no:in -water works associated with the project. With erosion and sediment control plans in effect, the potential for a Harmful Alteration, Disruption or Destruction (HADD) to fish habitat will be mitigated. A Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). Plantings All disturbed areas will be•restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with,Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 39784 - Application #: ,703/07/TOR Report Prepared by: Renee Afoom, extension 5714 For information'contact:'Renee Afoom, extension 5714 Date: August 25, 2008 8.1.8 • 1 BRULE GARDENS To construct, reconstruct, erect or place a building or structure on 1 Brule Gardens in the City of Toronto (Etobicoke York Community Council Area), • Humber River Watershed. The'purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a deck, reconstruction of an existing stairway and other appurtenant structures to the rear of the existing single family detached dwelling. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the'following documents and plans which form part of this permit: • Drawing unnumbered, Proposed Site Plan, prepared by D. A. Gracey & Associates Ltd., undated, received on June 13, 2008; • Drawing. unnumbered, Design. Details, prepared by D. A. Gracey & Associates Ltd., undated,'received on;June 13, 2008; • Drawing uiinumbered,Sections 'A-A', 'B-B' and'C -C', prepared by D..A. Gracey & Associates Ltd., undated, received on June 13, 2008. . RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: _ The proposalris to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a deck, reconstruction of an existing stairway and other appurtenant structures to the rear of the existing single family detached dwelling. The subject property is located east of South Kingsway and north of Bloor Street West in the City of Toronto (Etobicoke York). 827 Control of Flooding: The proposal is not located within a Regional Storm Floodplain and therefore will not impact the storage or conveyance of flood waters. Pollution: A sediment control fence will be installed to prevent construction debris from entering the adjacent ravine. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report and letter of opinion has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. The proposed works are located no further than the existing limit of development. Conservation of Land: No significant vegetation will be removed as a result of construction and appropriate tree protection fencing will be installed. Plantings No plantings are required as part of this project. An approved planting plan associated with the recent rear addition to the existing dwelling will be implemented following the construction of the proposed deck.. Policy Guidelines: The proposal is consistent with Section 4.2.2.(E) - Development Guidelines for Property Improvements and Ancillary Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41009 - Application #: 485/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 27, 2008• 8.1.9 18 CLAY COURT To construct, reconstruct, erect or place a building or structure on Lot 46, Plan M -963, (18 Clay Court), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new two- storey single family detached dwelling. The existing dwelling is to be demolished. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: 828 • Drawing No. Al, Site Plan; prepared by Cunha Design Consultants Ltd., dated July • 2008, received on July 21, 2008; , •, Drawing No. A4, Elevations; prepared by Cunha Design Consultants Ltd., dated July • 2008, received on July 21, 2008. RATIONALE The application was reviewed by•staff on the basis of the following information: Proposal: The purpose.of this application is to construct a new two- storey single family.detached dwelling with an attached garage on the property located at 18 Clay Court in the City of Toronto (Etobicoke York): The existing-dwelling and in- ground pool are to be demolished. The subject site is located west of.Scarlett Road and south of Eglinton Avenue west within the Humber River Watershed. Control of Flooding: This site is 'not located within the Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment controls are not necessary as the site is removed from Humber River. Dynamic Beaches: Not applicable: Erosion: There are no geotechnical concerns associated with this application. Conservation.of Land: No significant vegetation-will be removed as a result of construction. There will be no impact on significant- natural features, riparian vegetation or fisheries. Plantings No plantings are required as part of this application. Policy Guidelines: `The proposal,is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41173 - ;Application #:.617/08/TOR Report Prepared.by: Nicole Motley, extension 5284 For information contact: Steve Heuchert, extension 5311 . Date: August 27, 2008 , 829 8.1.10 7 SPRING GARDEN ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 5, Plan, (7 Spring Garden Road), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to develop within the TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a second - storey addition above the existing single- storey detached dwelling and a single- storey ground floor addition to the side and rear of the existing dwelling. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -0, Site Plan, prepared by Valeriy Gopka, dated April 2008, received on August 6, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to construct a second - storey addition above the existing single- storey detached dwelling at 7 Spring Garden Road in the City of Toronto (Etobicoke York Community Council Area). This proposal also includes the construction of a single- storey ground floor addition to the side and rear of the existing dwelling. The subject site is located south of Bloor Street West and west of Royal York Road, backing on to Mimico Creek and within a Regulated Area of the Mimico Creek Watershed. Control of Flooding: The proposal is not located within a Regional Storm Floodplain and therefore will not impact the storage or conveyance of flood waters. Pollution: • A sediment control fence will be installed to prevent construction debris from entering the adjacent watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The proposal is adequately setback from the top of bank. The appropriate tree protection fencing will be installed. 830 Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41247 - Application #: 671/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 27, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.11 26 ALDERBROOKE DRIVE To construct, reconstruct, erect or place a building or structure on Lot 18, Plan 5455, (26 Alderbrook Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. . The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a new two- storey dwelling. The existing in- ground pool is to be retained, and the existing dwelling is to be demolished. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit • Drawing No. SP2, Site Plan, prepared by VAS Engineering, dated July 22, 2008, received by TRCA August 7, 2008; • Drawing No. SP3, Grading, prepared by VAS Engineering, dated July 10, 2008, received by TRCA August 7, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works involve construction of a replacement two- storey dwelling at 26 Alderbrook Drive in the City of Toronto. The subject property is located west of Leslie Street, north of Lawrence Avenue East. The existing in- ground pool is to be retained, but the existing dwelling is to be demolished. Control of Flooding: The site is not located in the Regional Storm Floodplain. 831 Pollution: Sediment control fencing is not required as the proposed works are located in approximately the same location as the existing development, and are adequately setback from the watercourse. Dynamic Beaches: • Not applicable Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction and the appropriate tree protection fencing will be installed. Plantings No plantings are required. Policy Guidelines: The proposal is consistent with Section 4.2.2.D, Replacement Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 41320 - Application #: 728/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: August 26, 2008 • 8.1.12 33 DON RIVER BOULEVARD To construct, reconstruct, erect or place a building. or structure on Part Lot 13, • Plan 2069, (33 Don River Boulevard), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a detached garage. • The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -1, Site Plan, prepared received by TRCA July 23, 2008; • Drawing No. A -2, Floor Plan, Elevt'ns received by TRCA July 23, 2008. by R.G. McKibbon Ltd., dated June 2008, & Sect'n, no known author, dated August 2007, RATIONALE The application was reviewed by staff on the basis of the following information: 832 Proposal: The proposed works include construction of a detached garage at 33 Don River Boulevard in the City of Toronto. The site is located north of Sheppard Avenue West, east of Bathurst Street. Control of Flooding: The site is located in the regional storm floodplain. The proposed works will be wet floodproofed to the 350 Year Storm Event as floodproofing to the Regional Storm Event is technically infeasible. Pollution: Sediment control fencing is not required as the proposed works are located in the valley and adequately setback from the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Native.tree shrubs and seed mix will be planted. Policy Guidelines: This proposal is consistent with Section 4.2.2.E, Property Improvements & Ancillary Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 40319 - Application #: 008 /08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: August 26, 2008 8.1.13 UNIVERSITY OF TORONTO To construct, reconstruct, erect or place a building or structure, site grade and alter a watercourse on Lot 24, Concession 2 WYS, (4905 Dufferin Street), in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by University of Toronto. The purpose is to replace an existing stormwater outfall, install a new stormwater treatment chamber and a new rip -rip overflow drainage channel, and re -grade around the installation. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. ST -01, General Notes, prepared by UMA / AECOM dated December 22, 2006, Revision No. 4, revised July 2008, received August 1, 2008; 833 • Drawing No. ST -02, Overland Storm Drainage Plan, prepared by UMA / AECOM dated December 22, 2006, Revision No. 4, revised July 2008, received August 1, 2008; • Drawing No. ST -03, Storm System Proposed Remedial Works, prepared by UMA / AECOM dated December 22, 2006, Revision No. 4, revised July 2008, received August 1, 2008; • Drawing No. ST -04, Storm Outlet Plan and Profile, prepared by UMA / AECOM dated December 22, 2006, Revision No. 4, revised July 2008, received August 1, 2008; • Drawing No. ST -10, Existing Vegetation and Erosion Control Plan, prepared by UMA / AECOM dated December 22, 2006, Revision No. 4, revised July 2008, received August 1, 2008; • Drawing No. STD -01, Standard Details, prepared by UMA / AECOM dated December 22, 2006, Revision No. 4, revised July 2008, received August 1, 2008; • Drawing No. STD -02, Standard Details, prepared by UMA / AECOM dated December 22, 2006, Revision No. 4, revised July 2008, received August 1, 2008; • Drawing No. STD -03, Standard Details, prepared by UMA / AECOM dated December 22, 2006, Revision No. 4, revised July 2008, received August 1, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to replace an existing stormwater outfall, install a new stormwater treatment chamber and a new rip -rap overflow drainage channel, and regrade around the installation on lands owned by the University of Toronto. The lands are located east of the Environment Canada building on the east side of Dufferin Street, south of Steeles Avenue West and north of • G. Ross Lord Park in the City of Toronto. The project is part of a larger stormwater management system retrofit on the Environment Canada lands. The retrofit is designed to address frequent localized flooding of the Environment Canada building while improving water quality and avoiding downstream erosion of the Don River. The proposed outfall will drain the site more effectively, while adding a water quality treatment component. The design capacity of the system is limited as it must also accommodate stormwater runoff from Dufferin Street while retaining the existing building and parking. Any storm runoff over and above the design capacity will be conveyed to the vegetated rip -rap overflow channel and this channel will provide some quality treatment. Control of Flooding: The works are not located within a Regional Storm Floodplain and will have no impact on the storage or conveyance of flood waters. Pollution: Temporary sediment control has been provided per the Greater Golden Horseshoe Area Conservation Authorities, Erosion and Sediment Control Guideline for Urban Construction. There are no geotechnical issues with the proposal. Dynamic Beaches: Not applicable. 834 Erosion: The stormwater management system proposed for the Environment Canada and the University of Toronto lands is designed not to exacerbate erosion of the downstream channel and the Don River. Conservation of Land: Some tree removal and ground cover will be removed to facilitate construction. However, the removals are not significant and will have no impact on the conservation of land. Plantings Native tree, shrub and seed mix will be installed on the restored areas. Policy Guidelines: The proposal is in conformity with Section 4.3., Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Plan (VSCMP). CFN: 40348 - Application #: 023/08/TOR Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: August 20, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.14 75 BOW.VALLEY DRIVE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 49, Plan 4888, (75 Bow Valley Drive), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. The purpose is to develop within a Regulated Area of the Highland Creek Watershed to facilitate construction of an addition and deck to the side of the existing dwelling. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Drawing No. 20F 14, prepared by Uni- vative Designs Inc., undated, received by TRCA June 19, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include the construction of an addition and deck to the side of the existing dwelling at 75 Bow Valley Drive in the City of Toronto. The site is located west of Morningside Avenue, north of Lawrence Avenue East. 835 Control of Flooding: The site is not located in a.Regional Storm Floodplain. Pollution: Sediment control fencing is not required as the site is adequately set back from the watercourse. Dynamic Beaches: Not applicable Erosion: A geotechnical letter of opinion has been reviewed and approved by TRCA geotechnical engineering staff. The proposed works will be adequately setback from the top of bank. Conservation of Land: No significant vegetation will be removed as a result of construction. • Plantings No plantings are required as part of this project. Policy Guidelines: The proposal is consistent with Section 4.2.2.C, Minor Additions, of TRCA's Valley and Stream Corridor Management Program. CFN: 41080 - Application #: 541/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Mark Rapus, extension 5259 Date: August 26, 2008 8.1.15 429 GUILDWOOD PARKWAY To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 416, Plan M -60, (429 Guildwood Parkway), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to develop within a Regulated Area of the Lake Ontario Waterfront to facilitate construction of a sunroom addition to the rear of the existing dwelling. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Solar Sunrooms Ltd., dated May 2008, received by TRCA May 27, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 836 Proposal: • The proposed works include the construction of a sunroom addition to the rear of the existing dwelling at 429 Guildwood Parkway in the City of Toronto. The site is located in the .Scarborough Bluffs, south of Kingston Road, east of Galloway Road. • Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: A sediment control fence will be erected before commencement of any construction or grading works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. Dynamic Beaches: Not applicable Erosion: A geotechnical assessment has been reviewed and approved by TRCA geotechnical . engineering staff and the proposed works will be adequately set back from the top of slope. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.C, Minor Additions, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40944 - Application #: 433/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: August 26, 2008 8.1.16 178 RIDGEWOOD ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 20, 21, Plan 275, (178 Ridgewood Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. The purpose is to develop within a Regulated Area of the Highland Creek Watershed to facilitate construction of an addition and deck to the rear of the existing dwelling. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: 837 • Drawing No. 08- 05 -04, prepared by New Castle Drafting & Design Inc., dated May 21, 2008, received by TRCA July 3, 2008. RATIONALE The-application was reviewed by staff on the basis of the following information: Proposal: The proposed works involve the construction of an addition and deck to the rear of the existing dwelling in the City of Toronto. The site is located east of Port Union Road, north of Lawrence Avenue East. Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: A sediment control fence will be erected before commencement of any construction or grading works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. Dynamic Beaches: Not applicable Erosion: A geotechnical letter of opinion has been reviewed and approved d by TRCA geotechnical . engineering staff and the proposed works will be adequately set back from the top of bank. • Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: The proposal is consistent with Section 4.2.2.C, Minor Additions, of TRCA's Valley and Stream Corridor Management Program. CFN: 41111 - Application #: 566/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: August 26, 2008 8.1.17 UNIVERSITY OF TORONTO SCARBOROUGH To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on , (130 Old Kingston Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by University of Toronto Scarborough. 838 The purpose is to construct a baseball diamond for the University of Toronto Scarborough Campus within a Regulated Area of the Highland Creek Watershed. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. prepared by • Drawing No. prepared by • Drawing No. 13, 2008. L1, Existing Conditions and Tree Protection Plan, dated April 2008, TSH, received June 13, 2008; L2, Grading, Erosion and Sediment Control Plan, dated April 2008, TSH, received June 13, 2008; L3, Landscape Plan, dated April 2008, prepared by TSH, received June RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The 'proposal is to construct a baseball diamond for the University of Toronto Scarborough Campus within the Highland Creek Valley. The campus is located on the north side of Old Kingston Road and south -west of Military Trail. The proposed baseball diamond is to be located in an area of manicured lawn in an elevated flat portion of the valley floor. The applicant submitted a flood plain analysis for a similar permit in 2005. This analysis showed that the proposed development is not located within the floodplain. Further, additional plantings will be provided to buffer the facility from the adjacent forest. Control of Flooding: The subject property is located outside of the regional storm floodplain. Pollution: Appropriate sediment and erosion controls will be provided during the development to ensure that no sediment will enter the adjacent watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues with the proposal. Conservation of Land: The area to be developed is currently manicured open space and does not include any significant vegetation. Plantings The proposal will include additional native plantings adjacent to the baseball diamond to buffer the use from the diverse vegetation community to the south. 839 Policy Guidelines: The proposal is consistent with Section 4.1.2, New Resource Based Uses, of TRCA's Valley and Stream Corridor Management Program. CFN: 41089 - Application #: 550/08/TOR Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: August 13, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.18 66 INGLEWOOD DRIVE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Lot 1, Part Block A, Plan 524E, (66 Inglewood Drive), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a two- storey addition and walk -out deck to the rear of the existing single family detached dwelling. The existing single- storey frame rear addition is to be demolished. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing unnumbered, Site.Plan, prepared by Yadollah A. Balderlou, undated, received on August 14, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a two - storey addition and walk -out deck to the rear of the existing single family detached dwelling. The existing single- storey frame rear addition is to be demolished. Control of Flooding: This site is not located within a Regional Storm Floodplain and the-proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. 840 Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The proposed works are located no further than the existing limit of development. The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41297 - Application #: 707 /o8/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 27, 2008 8.1.19 266 INDIAN ROAD To construct, reconstruct, erect or place a building or structure on Lot 8, Plan 66R -9917, (266 Indian Road), in the City of Toronto (Toronto and East York Community Council Area), Waterfront Watershed. The purpose is to develop within a TRCA Regulated Area of the Waterfront Watershed in order to facilitate the reconstruction of an existing detached garage in the rear yard of the existing single family detached dwelling. The existing detached garage is to be demolished. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing unnumbered, Proposed Site Plan, prepared by Urban Proportions Incorporated, undated, received on July 10, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to reconstruct the detached garage in the rear yard of the existing single family detached dwelling at 266 Indian Road in the City of Toronto (Toronto & East York Community Council Area). The existing detached garage is to be demolished. The subject site is located south of Bloor Street West and east of High Park within a Regulated Area of the Waterfront Watershed. 841 Control of Flooding: The proposal is not located within a Regional Storm Floodplain and therefore will not impact the storage or conveyance of flood waters. Pollution: Sediment fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: 'There are no geotechnical concerns associated with this application. Conservation of Land: • The proposed works are located no further than the existing limit of development. The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: The proposal is consistent with Section 4.2.2.(E) - Development Guidelines for Property Improvements and Ancillary Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor. Management Program. CFN: 41124 - Application #: 583/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 27, 2008 8.1.20 58 SAULTER STREET To construct, reconstruct, erect or place a building or structure on Lot 131, Plan D135, (58 Saulter Street), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a front porch to the existing single family dwelling. The existing front porch is to be demolished. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1 of 4, Site Plan, prepared by F. Fabella, undated, received on August 19, 2008; 842 • Drawing No. 3 of 4, Elevations, prepared by F. Fabella, undated, received on August 19, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a front porch to the existing single family dwelling. The existing porch is to be demolished. The subject site is located in a Regulated Floodplain of the Lower Don Special Policy Area, south of Queen Street East and east of Broadview Avenue in the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: The subject property is located within a Regulatory Floodplain of the. Don River Watershed. However, TRCA staff have determined the proposed works will not adversely impact the storage and /or conveyance of floodwaters, and the proposed addition is adequately flood proofed. Pollution: Sediment fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this application. Policy Guidelines: This proposal is consistent with Section 4.2.1.(B) - Development Guidelines for Development/Redevelopment within Designated Two -Zone Areas or Special Policy Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41305 - Application #: 712/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 27, 2008 843 8.1.21 LIVE NATION INC. To construct, reconstruct, erect or place a building or structure on 909 Lakeshore Boulevard West, in the City of Toronto (Toronto and East York Community Council Area), Waterfront Watershed as located on the property owned by Live Nation Inc. . The purpose is to construct a second and third storey addition to the existing building within a Regulated Area of the Waterfront watershed. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -500 Elevations, prepared by Stantec Architecture Ltd., dated June 17, 2008, received by TRCA staff July 21, 2008; • Drawing No. A -100 Site Plan /Context Plan, prepared by Stantec Architecture Ltd., dated June 17, 2008, received by TRCA staff July 21, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the construction of a two- storey addition to an existing concert amphitheatre, in order to create more administrative office space. The proposed office addition is located within the shoreline hazard area, adjacent to Lake Ontario. Only two columns supporting the proposed works will disturb the existing grade. The proposed works will be constructed over an existing loading dock that is entirely paved. Control of Flooding: The proposed development will not be located within the Regional Storm flood plain. There will be no impact to the storage or conveyance of flood waters. Pollution: • A concrete wall currently separates the area of the proposed works and the lake shore. This will be adequate for ensuring sediment does not enter Lake Ontario during construction. Should this wall be disturbed or damaged at all, sediment control fencing will be installed and maintained throughout construction to prevent sediment from entering the lake. Dynamic Beaches: Not applicable Erosion: There will be no geotechnical issues associated with the proposed development. Conservation of Land: No in -water works are proposed on the already- disturbed site. As such no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. • 844 Plantings The proposed works will not affect any significant natural features. All disturbed areas will be restored upon completion of the project. Policy Guidelines: The proposal is consistent with Section 4.2.2. C) - Development & Redevelopment/Intensification Within Non - Established Communities /Highly Urbanized Areas - Minor Additions. CFN: 41202 - Application #: 638/08/TOR Report Prepared by: Leah Weller, extension 5618 For information contact: Steve Heuchert, extension 5311 Date: August 26, 2008 8.1.22 45 HIGHLAND AVENUE To construct, reconstruct, erect or place a building or structure on Lot 18, Plan 342E, (45 Highland Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the reconstruction of the existing retaining walls including the installation of an in- ground swimming pool in the rear yard of the existing single family detached dwelling. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. RP -1, Landscaping Plan and Ravine Planting Plan, prepared by John Lloyd & Associates, dated December 21, 2007, Revision No. 2, revised on August 21, 2008, received on August 21, 2008; • Drawing No. 1 B, Retaining Wall Profile - Upper Wall, prepared by Peto MacCallum Ltd., dated August 26, 2008, Revision No. 2, revised August 2008, received on August 27, 2008; • Drawing No. 1 B, Retaining Wall Profile - Bottom Wall, prepared by Peto MacCallum Ltd., dated August 26, 2008, Revision No. 2, revised August 2008, received on August 27, 2008; • Drawing No. 2, Maximum Terraced Cross Section, prepared by Peto MacCallum Ltd., dated February 14, 2008, Revision No. 3, revised August 2008, received on August 27, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 845 Proposal: The purpose of this application is to reconstruct the existing retaining walls in the rear yard of the existing single family detached dwelling at 45 Highland Avenue in the City of Toronto (Toronto & East York Community Council Area). This proposal includes the installation of an in- ground swimming pool. The subject site is located south of St..Clair Avenue East and west of Mount Pleasant Road within a Regulated Area of the Don River Watershed. • Control of Flooding: The proposal is not located within a Regional Storm Floodplain and therefore will not impact the storage or conveyance of flood waters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report and letter of opinion has been reviewed and approved by TRCA geotechnical engineering staff and the proposal•will be constructed in accordance with the recommendations of this report. The proposed works are located no further than the existing limit of development. Conservation of Land: • The appropriate tree protection fencing will be implemented. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented and a Ravine Stewardship Plan will be implemented for the slope. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) and (E) - Development Guidelines for Replacement Structures and Property Improvements and Ancillary Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor 'Management Program. - CFN: 40772 - Application #: 294/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 27, 2008 8.1.23 625 RUSHTON ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 10, Plan 2612, (625 Rushton Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. 846 The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a second - storey addition, a two- storey side addition and a rear deck to the existing single family detached dwelling. The permit will be issued for the period of September 5, 2008 to September 4, 201.0 in accordance with the following documents and plans which form part of this permit: • Drawing unnumbered, Site Plan, prepared by Drew Laszlo Architect, undated, received on July 29, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to construct a second - storey addition, a two- storey side addition and a rear deck to the existing single family detached dwelling at 625 Rushton Road in the City of Toronto (Toronto & East York Community Council Area). The subject site is located north of Vaughan Road, west of Bathurst Street and backs onto Cedarvale Ravine within a Regulated Area of the Don River Watershed. Control of Flooding: The proposal is not located within a Regional Storm Floodplain and therefore will not impact the storage or conveyance of flood waters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the adjacent ravine. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: The appropriate tree protection fencing will be implemented. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction. Policy Guidelines: • This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. 847 CFN: 41218 - Application #: 649/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August_27, 2008 8.1.24 67 MORSE STREET To construct, reconstruct, erect or place a building or structure on 67 Morse Street in the City of Toronto (Toronto and East York Community Council Area), Don. River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a basement walk -out to the front of the existing semi - detached dwelling. The door will replace the existing basement window. The permit will be issued for the period of September 5, 2008 to September 4;2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1/5, Site Plan, prepared by Tomasz Debowski, dated February 10, 2007, received on July 30, 2008; • Drawing No. 4/5, Section A -A, prepared by Tomasz Debowski, dated February 10, 2007, received on July 30, 2008; • Drawing No. 5/5, Section B -B, prepared by Tomasz Debowski, dated February 10, 2007, received on July 30, 2008. • RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to acknowledge the construction of a basement walk -out to the front of an existing dwelling within a TRCA Regulated Area of the Don River Watershed. The subject works have already been completed and were built without the benefit of a municipal or TRCA permit: The subject site is located in a Regulated Floodplain of the Lower Don Special Policy Area north of Queen Street East and east of Broadview Avenue in the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: The subject property is located within the Lower Don Special Policy Area (SPA) of the Don River Watershed. The basement walk -out cannot be flood proofed because it is below the flood elevation of a regional storm. However, TRCA staff have determined that the flood depths are minimal in this area as it is a spill zone and the new opening does not increase the risk to the existing dwelling over that which existed. Pollution: Sediment fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. 848 Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The site is fully urbanized and is not a significant area. Plantings No plantings are required as part of this application. Policy Guidelines: This proposal is consistent with Section 4.2.1.(B) - Development Guidelines for Development/Redevelopment within Designated Two -Zone Areas or Special Policy Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41226 - Application #: 659/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 27, 2008 CITY OF VAUGHAN 8.1.25 28 NIGHTFALL COURT To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 10, Plan 65M 3747, (28 Nightfall Court), in the City of Vaughan, Humber River Watershed. The purpose is to construct a 2- storey single detached dwelling along with a septic system and a pool /cabana in the rear yard. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. L -2 Back Landscape Plan, prepared by 3 -D Exteriors Ltd., dated April 2008, received by TRCA on August 13, 2008; • Drawing No. Al Siting and Grading Plan, prepared by Hunt Design Associates Inc., dated May 9, 2008, received by TRCA on August 13, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 849 Proposal: The applicant seeks permission to construct a new 2- storey single family dwelling with landscaped areas, a pool and cabana, to be serviced by private septic system on the site. The proposed works are located adjacent to a valley feature, however are primarily outside of the regulated area. The applicant has agreed to ensure that the septic system will be constructed outside of an Open Space Zone designated under the City of Vaughan Zoning By -law, and approximately 8 metres from the functional top of slope. Control of Flooding: The subject property is not located within a flood plain. As such, the storage or conveyance of flood waters will not be impacted by the proposed works. Pollution: Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from entering the watercourse. • Dynamic Beaches: • Not applicable. Erosion: There are no geotechnical or slope stability'concerns associated with this proposal. Conservation of Land: There is no significant vegetation present on the portion of the currently vacant site to be disturbed. Plantings: Since no vegetation will be removed as part of this proposal, no plantings have been required as part of this permit. Policy Guidelines: This proposal is consistent with Policy 4.2.2 G) - Infilling. CFN: 40927 - Application #: 421 /08NAUG_ Report Prepared by: Leah Weller, extension 5618 For information contact: Bill Kiru, extension 5306 Date: August 26, 2008 8.1.26 38 OXBOW COURT To construct, reconstruct, erect or place a building or structure on Lot 19, Concession 5 Lot 25, Plan 65M -3542, (38 Oxbow Court), in the City of Vaughan, Don River Watershed. The purpose is to allow the maintenance of an existing rear yard deck in a Regulated Area of the Don River watershed. • The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: 850 • Unnumbered Site Plan on survey, survey prepared by Young & Young Surveying Inc., undated, received by TRCA on June 20, 2008; • Unnumbered Rear Elevation, Prepared author unknown, undated, received by TRCA on June 20, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the maintenance of an existing rear -yard elevated deck, supported on four 42" deep footings. The existing deck is located adjacent to the flood fringe of a tributary of the West Don River, which runs through an open space corridor to the rear of the property. The Deck is attached to an existing single detached dwelling in a regulated area of the West Don River watershed. The property backs onto TRCA property to the east of Oxbow Court. Neither a TRCA permit nor a municipal building permit were obtained for the deck structure because the applicant did not realize that it was necessary. The applicant contacted the TRCA to initiate the permit process as soon as he realized that it was necessary. Control of Flooding: The existing development is not located within the Regional Storm flood plain. There will be no impact on the storage or conveyance of flood waters. Pollution: Not applicable. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical /slope stability issues associated with the existing development. Conservation of Land: The watercourse will not be impacted by the existing development. The development is located on an existing manicured landscape, and no natural features have been impacted by the subject works. Plantings The proposed works will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures. CFN: 41139 - Application #: 587/08NAUG Report Prepared by: Leah Weller, extension 5618 For information contact: Bill Kiru, extension 5306 Date: August 26, 2008 851 8.1.27 15 OLDFIELD STREET To construct, reconstruct, erect or place a building or structure on Lot 44, Plan 65R -9533, (15 Oldfield Street), in the City of Vaughan, Don River Watershed. The purpose is to construct a rear yard deck on an existing home located within the flood plain of the Don River. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 44 Custom, Prepared by RN Design July 9, 2008, Received by TRCA July 11, 2008; • Drawing No. A5 Untitled Drawing, Prepared by RN Design July 9, 2008, Received by TRCA July 11, 2008; • Drawing No. A4 Untitled Drawing, Prepared by RN Design July 9, 2008, Received by TRCA July 11, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to permanently place or remove fill material, within the Regulated Area to facilitate the construction of a rear yard deck attached to a home currently being constructed in a Regional Storm flood Plain. The construction of the new home was approved by the City of Vaughan without consultation with the TRCA. The Home and proposed rear deck are located south west of Major Mackenzie Drive and Keele Street in the City of Vaughan. A tributary of the West Don River is located to the south of the site. Due to the proximity of the watercourse to the site, the area is currently subject to flooding in the event of a Regional Storm, and is therefore within the Regional Storm Flood Plain. An analysis of flood elevations on the site has determined that, while the home may be located within the flood plain, the proposed rear yard deck is located outside of the floodplain. Control of Flooding: The Proposed rear yard deck is located outside of.the flood plain. As such, the storage or conveyance of flood waters will not be impacted by the proposed works. Pollution: A sediment and erosion control fence is to surround the site during all construction activity. The site is separated from the watercourse by Naylon Street. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical or slope stability concerns associated with this proposal. The proposed deck is located more than 50 metres from the valley /stream corridor. 852 Conservation of Land: There is no significant vegetation present within the vicinity of the proposed works. Plantings No plantings are required. Policy Guidelines: This proposal is consistent with Policy 4.2.2 E) Property Improvements /Ancillary Structures CFN: 41126 - Application #: 580 /08NAUG Report Prepared by: Leah Weller, extension 5618 For information contact: Bill Kiru, extension 5306 Date: August 26, 2008 8.1.28 123 SALAMANDER COURT To construct, reconstruct, erect or place a building or structure on Lot 253, Plan 65M -3878, (123 Salamander Court), in the City of Vaughan, Don River Watershed. The purpose is to construct a minor addition to an existing dwelling within a Regulated Area of the Don River Watershed at 123 Salamander Court, in the City of Vaughan. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in • accordance with the following documents and plans which form part of this permit • Site Plan, Drawing No. A -01, prepared by Enar Associates, dated June 2008, received by the TRCA August 18, 2008, redline revised to indicate the erection of sediment control fencing and removal of excess fill material; • Basement and First Floor Plan, Drawing No. A -03, prepared by Enar Associates, dated June 2008, received by the TRCA August 18, 2008; • Second Floor Plan & Elevations, Drawing No. A -04; prepared by Enar Associates, dated June 2008, received by the TRCA August 18, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a 2- storey minor addition to an existing dwelling within a Regulated Area of the Don River Watershed. The proposal is located within the rear yard of the subject property which is currently devoid of vegetation. The proposed works are located within a Wetland Area of Interference and approximately 125 metres from a Locally Significant Wetland feature which forms a part of the Keele Wetland Complex. In addition, the proposed addition backs onto a Ministry of Natural Resources identified Area of Natural and Scientific Interest (ANSI) and TRCA designated Environmentally Significant Area (ESA). These features are located approximately 28 metres from the proposed works. 853 As part of the Draft Plan of Subdivision for the subject lot (19T -02V08 - Dreamworks Subdivision), a 10 metre buffer conveyed to the City of Vaughan was created around the Locally Significant Wetland and a minimum 20 metre buffer / linkage corridor was created .around the ANSI / ESA to protect these natural features from the residential uses. Control of Flooding: The subject property is not within the Regional Storm Flood Plain, there will be no impacts on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be erected and maintained for the duration of construction to prevent sediment from entering the adjacent buffer areas and nearby ANSI / ESA. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this project. Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. TRCA ecology staff are satisfied that the proposed works are sufficiently setback from nearby natural features and the features will not be adversely impacted by the proposal. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to a sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 C) - Minor Additions.- of the Authority's Valley and Stream Corridor Management Program. CFN: 41293 - Application #: 704 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: August 25, 2008 TOWN OF MARKHAM 8.1.29 BOX GROVE HILL DEVELOPMENTS INC. To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 6, Concession 9, (Southwest Corner of Donald Cousens Parkway and Copper Creek Drive), in the Town of Markham, Rouge River Watershed as located on the property owned by Box Grove Hill Developments Inc.. 854 The purpose is to construct a structure, undertake site grading and permanently place fill material in order to establish the long -term grades for a valleyland system and build a pedestrian. bridge. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing,No. 401,-Grading Plan, prepared by SCS Consulting Group Ltd., dated August , 2008, received by TRCA on August 13, 2008; • Drawing No. 402, Grading Plan, prepared by SCS Consulting Group Ltd., dated August 2008, received by TRCA on August 13, 2008; , • Drawing No. 403, Grading Plan, prepared by SCS Consulting Group Ltd., dated August 2008, received by TRCA on. August 13, 2008; • • Drawing,No. 404, Grading Plan, prepared by SCS Consulting Group Ltd., dated August 2008, received by TRCA on August 13, 2008; • Drawing No. 405; Grading-Plan 5, prepared by SCS Consulting Group Ltd., dated August 2008, received by TRCA on August 13, 2008; • Drawing!No: 503, Grading Plan 3, prepared by Stantec; Consulting Ltd., dated April 2007, Revision No. 1, revised'on September 7, 2007, received by TRCA on August 13, 2008; • Drawing No. 504, Grading Plan 4, prepared by Stantec Consulting, Ltd., dated April 2007, Revision No. 1, revised on September 7, 2007, received by TRCA on August 13, 2008; • ' Drawing,No. 508, Grading Plan 8, prepared by Stantec Consulting. Ltd., dated June 2006, Revision No. 1, revised on October 12, 2005, received by TRCA on August 13, 2008; RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to undertake site grading and permanently place fill material in order to establish theiong -term grades for the 'Tributary B' valleyland system within the developing residential community known as Box Grove within the southeast portion of the Town of Markham's urban area. Permission is also sought in order to construct a structure, a pedestrian bridge, in order to provide.pedestrian connectivity between two portions of the Box Grove community over the Tributary B valleylands. Tributary B is a tributary to the Little. Rouge Creek, which fransects the eastern portion of the Box Grove Secondary Plan Area from the north at Highway 407 to the south at 14th Avenue. 855 As part of the functional design of the community, proposals were made within the Environmental Master Drainage Plan (EMDP) for Box Grove to undertake selective cut - and -fill works to manipulate the Regional Storm Flood Plain associated with Tributary B in order to provide a more rational valleyland configuration for development purposes. Policy 3.2.2 C 2) of TRCA's Valley and Stream Corridor Management Program contemplates permitting the filling of portions of the Regional Storm Flood Plain in order to accommodate development when a stream corridor has an unusually wide flood plain with shallow depths of infrequent flooding. The proponent was required to submit an analysis that met several criteria. It was determined that the stream corridor characteristics of Tributary B met the criteria set out in policy 3.2.2 C 2) and an analysis has been provided in the EMDP which has been reviewed and approved by TRCA staff. This proposal contains the detailed grading plans that would implement the cut - and -fill works proposed in the EMDP document. A second component of this permit proposal is the construction of a pedestrian crossing over Tributary B. The crossing would provide a clear span over Tributary B 16.5 metres long and 4 metres wide. No alteration of Tributary B is required in order to implement the proposed design, which also includes two approach slopes on each side of the crossing and in addition to wing walls upon which the bridge structure is to rest. It is proposed that the issuance of a permit for this proposal, if approved by the Executive Committee, would be in two phases with Phase 1 for the cut - and -fill works whereas the second phase would approve the pedestrian crossing. Control of Flooding: TRCA Water Resource staff have reviewed the grading plans for the proposed cut - and -fill works and have determined that a minimum freeboard of 0.20 metres has been provided from the . Regional Storm Flood Plain for all residential lots that abut the Tributary B valleylands. This means that all residential lots would be at least 0.20 metres above the Regional Storm Flood Plain when such an event occurs. The proposed pedestrian bridge will cause some hydraulic impacts to the flood plain, however this will not affect the residential lots mentioned previously. Pollution: Sediment and erosion control works are to be in place prior to all grading activities to avoid the sedimentation of the tributary. Dynamic Beaches: Not applicable Erosion: There are no slope stability or geotechnical concerns associated with this proposal. Conservation of Land: No mature vegetation is to be removed within the Tributary B valleylands in order to accommodate the cut - and -fill works. An extensive restoration plan will form part of these works, which will restore and enhance the vegetation within the Tributary B valleyland system. Plantings • Plantings will be provided, as discussed above. 856 Policy Guidelines: This proposal is consistent with Section 3.2.2 C) 2, Policies & Procedures For Establishing Corridor Boundaries & Alterations, of TRCA's Valley and Stream Corridor Management Program. CFN: 41212 - Application #: 643 /08 /MARK Report Prepared by: Chris Jones, extension 5718 For information contact: Quentin Hanchard, extension 5324 Date: August 22, 2008 TOWN OF RICHMOND HILL 8.1.30 285 LENNOX AVENUE To construct, reconstruct, erect or place a building or structure on Lot 32, Plan 3801, (285 Lennox Avenue), in the Town of Richmond Hill, Don River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a porch enclosure structure at the front of an existing residential dwelling located at 285 Lennox Avenue, in the Town of Richmond Hill. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A0, Existing Elevations, prepared by Arch.Dwg Inc., dated August 21, 2008, stamped received by TRCA Planning & Development staff on August 22, 2008; • Drawing No. Al, Site Plan, prepared by Arch.Dwg Inc., dated August 21, 2008, stamped received by TRCA Planning & Development staff on August 22, 2008; • Drawing No. A2, Basement Plan & Ground Floor Plan, prepared by Arch.Dwg Inc., • dated August 21, 2008, stamped received by TRCA Planning & Development staff on August 22, 2008; • Drawing No. A3, New Elevations, prepared by Arch.Dwg Inc., dated August 21, 2008, stamped received by TRCA Planning &Development staff on August 22, 2008; • Drawing No. A4, Existing Elevations, prepared by Arch.Dwg Inc., dated August 21, 2008, stamped received by TRCA Planning & Development staff on August 22, 2008; • RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a porch enclosure structure at the front of an existing residential dwelling located at 285 Lennox Avenue, in the Town of Richmond Hill. The proposed porch enclosure is located within proximity of the Regional Storm Floodplain associated with a tributary of the Don River Watershed. However, the proposed works are located outside of the floodplain and are sufficiently setback. The proposed works are proposed on top of an existing, above -grade concrete foundation. As such, there are no flooding, geotechnical, or ecology related concerns with this proposal. 857 Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be installed and maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns with this application. Plantings • The proposed enclosure is located within an existing manicured lawn. No significant vegetation will be removed as a result of the construction. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program (VSCMP).. CFN: 41307 - Application #: 718/08/RH Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: August 27, 2008 TOWN OF WHITCHURCH - STOUFFVILLE • .8.1.31 40 WILLIAM AVENUE To construct, reconstruct, erect or place a building or structure on Lot 1, Plan 65M -2260, (40 William Avenue), in the Town of Whitchurch- Stouffville, Rouge River Watershed. The purpose is to construct a floating dock within a Regulated Area of the Rouge River Watershed. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing submitted by applicant, received June 24, 2008; • Landscape Plan, dated July 28, 2008, prepared by Sheridan Nurseries, received July .31, 2008. • 858 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the installation of a floating dock within a Regulated Area of the Rouge River Watershed, on Preston Lake. The applicant has previously applied for a permit for a new home on this property. Through the construction of the house there has been some disturbance along the slope leading to the lake. TRCA enforcement and ecology staff have been on site and requested that a restoration plan be submitted. During this permit review we have received and approved a landscape plan to deal with this slope disturbance. Control of Flooding: The subject property is not located with the Regional Storm Floodplain therefore there are no floodplain issues associated with this application. Pollution: Sediment and erosion control fencing is not required for the installation of a floating dock. Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues associated with this application. Conservation of Land: The applicant has submitted a restoration plan to deal with disturbance along the slope of this property. Plantings All plantings are in accordance with TRCA's Seed Mix Guidelines. Policy Guidelines: This proposal is consistent with Section 4.2.2 E, Property Improvements and Ancillary Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 41079 - Application #: 519/08/WS Report Prepared by: Shannon McNeill, extension 5744 For information contact: Bill Kiru, extension 5306 Date: August 13, 2008 8.1.32 2471 BETHESDA ROAD To construct, reconstruct, erect or place a building or structure and site grade on Lot 5, Concession 4, (2471 Bethesda Road), in the Town of Whitchurch - Stouffville, Rouge River Watershed. The purpose is to construct a building and undertake site grading in order to establish a new residential dwelling. 859 The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. SP -1, Site Plan, prepared by The Gregory Design Group, dated August 21, 2008, received by TRCA on August 22, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to construct a building and undertake site grading in order to establish a new residential dwelling. The property is located within the headwaters of the Bruce Creek on the Oak Ridges Moraine within the central- western portion of the Town of Whitchurch- Stouffville. A tributary of the Bruce Creek and associated valleylands transect the well vegetated lot, portions of which are considered to be an Environmentally Significant Area. The subject lot was created in the 1980's by a land division prior to the enactment of the stringent environmental planning policies contained within the Oak Ridges Moraine Conservation Plan. Consequently, TRCA staff worked with the owner to site the proposed dwelling on a portion of the lot that would have the least impact to the natural environment To that end, a Natural Heritage Evaluation report was prepared to evaluate potential building envelopes on the lot. The area selected does not contain mature vegetation and impacts due to grading are expected to be minimal. Development will consist of a residential dwelling, driveway, shed and sceptic field on the table land portions of the lot. Control of Flooding: No development is proposed within the Regional Storm Flood Plain. Pollution: Sediment and erosion control fencing has been delineated on the site plan to prevent sedimentation and site alteration within the environmentally significant portions of the. lot Dynamic Beaches: Not applicable Erosion: There are no slope stability or geotechnical concerns with this proposal Conservation of Land: No. mature vegetation is to be removed as part of this proposal. Development, as described -above, was sited in order to have the least impact on the natural environment. Plantings • No plantings have been made a requirement of this proposal. Policy Guidelines: This proposal is consistent with Section 4.1.1, New Urban Development, of TRCA's Valley and Stream Corridor Management Program. 860 CFN: 41303 - Application #: 710/08/WS Report Prepared by: Chris Jones, extension 5718 For information contact: Chris Jones, extension 5718 Date: August 22, 2008 8.1.33 SECOND GORMLEY INDUSTRIAL INVESTMENTS LIMITED To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 35, Concession 4, (2379 Stouffville Road), in the Town of Whitchurch - Stouffville, Rouge River Watershed as located on the property owned by Second Gormley.Industrial Investments Limited. The purpose is to undertake site grading and permanently place fill materials in order to develop a commercial site plan. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. GR -1, Grading, prepared by Feherty and Associates Ltd., dated April, 2008, received by TRCA on August 20, 2008, red -line revised by TRCA staff on August 22, 2008. RATIONALE The application was reviewed by staff on the basis of the.following information: . Proposal: The applicant seeks permission to undertake site grading and permanently place fill materials in order to begin site preparation (preliminary grading and filling) for a commercial site plan. The site is located in the southeast quadrant of the Community of Gormley within the Town of Whitchruch- Stouffville. The site, which fronts Stouffville Road, is located on the Oak Ridges Moraine at the headwaters of the Berczy Creek, a tributary of the Rouge River. An intermittent watercourse, within an ill- defined stream corridor, has been identified west of the proposed site. plan. This watercourse is considered a Hydrologically Sensitive Feature within the Oak Ridges Moraine Plan. Accordingly, a 30 metre buffer has been established between the watercourse and the area to be developed for the site plan. The site plan drawings provide for the restoration of this 30 metre buffer, which was previously an agricultural field, with extensive plantings of native self- sustaining trees and shrubs. The site is to be developed as a vehicle rental facility with associated parking. Control of Flooding: The Regional Storm Flood Plain associated with the intermittent tributary is located within the stream corridor established through the site planning process. No development or placement of fill is to take place within the Regional Storm Flood Plain. The stormwater management system proposed for the site meets TRCA's criteria for water quantity and quality. 861 Pollution: Sediment and erosion control fencing is to be established a minimum of 30 metres away from the watercourse in order to prevent sedimentation. Dynamic Beaches: Not applicable Erosion: • There are no slope stability or geotechnical concerns with this proposal. Conservation of Land: The protection of a 30 metre buffer from the stream corridor ensures that a robust valleyland will be protected from urbanization, consistent with the provisions of the Oak Ridges Moraine Conservation Plan. Plantings The proposed planting plan contains extensive plantings of native, self sustaining, trees and shrubs within the 30 metre buffer. Implementation of the planting plan will enhance and restore the existing riparian vegetation adjacent to the watercourse. Policy Guidelines: This proposal is consistent with Section 4.1.1, New Urban Development, of TRCA's Valley and Stream Corridor Management Program. CFN: 41127 - Application #: 579/08/WS Report Prepared by: Chris Jones, extension 5718 For information contact: Chris Jones, extension 5718 Date: August 22, 2008 TOWNSHIP OF KING 8.1.34 54 HOLDEN DRIVE To construct, reconstruct, erect or place a building or structure on Lot 60, Plan 65M -2535, (54 Holden Drive), in the Township of King, Humber River Watershed. The purpose is to construct a minor addition to an existing dwelling within a Regulated Area of the Humber River Watershed at 54 Holden Drive in the Township of King. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by Cadtec Technology Group, revise dated August 5, 2008, received by the TRCA August 19, 2008, redline revised to indicate the erection of sediment control fencing and removal of excess fill material; • Basement Floor Plan, prepared by Cadtec Technology Group, revise dated August 5, 2008, received by the TRCA August 19, 2008; • Ground Floor Plan, prepared by Cadtec Technology Group, revise dated August 5, 2008, received by the TRCA August 19, 2008. • 862 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a minor addition to an existing dwelling within a Regulated Area of the Humber River Watershed. The proposed works'are located within the 120 metreWetland Area of Interference of a Provincially Significant Wetland (PSW) which forms a part of the Black Duck Wetland Complex. The proposed addition is located within an already disturbed, manicured lawn area and does not extend the developed area closer to the PSW. In addition, the proposed works are approximately 60 metres from the rear lot line and approximately 67 metres from the PSW. The area between the proposed addition and rear lot line is currently a manicured lawn and the area between the rear lot line and the PSW is well vegetated. TRCA ecology staff are satisfied that the proposed works are sufficiently setback from the PSW and will not adversely affect the natural feature. Control of Flooding: The subject property is not within the Regional Storm Flood Plain. There will be no impact on the storage or conveyance of flood waters from this project. Pollution: Sediment control fencing will be erected and maintained for the duration of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnicalissues associated with this project. Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. The proposed works are sufficiently setback from the PSW with a manicured lawn and a heavily vegetated area and will not have an impact on the PSW. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program. CFN: 41316 - Application #: 720 /08 /KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: August 26, 2008 863 THE FOLLOWING PERMIT APPLICATIONS WERE ERRATA ITEMS: RES. #B105/08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS 'Moved by: Seconded by: Ron Moeser Maja Prentice THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.35 - 8.1.60, with the exception of 8.1.39 - 28 Beaucourt Road, 8.1.41 - 76 High Street, 8.1.43 - 38 Gracefield Avenue and 8.1.47 - Confderation Business Park - MPL Inc., which were withdrawn) that had been scheduled on the agenda as errata applications, for which all the required information was received and finalized as listed below (Application 8.1.60 - Seneca College was withdrawn). • CARRIED CITY OF BRAMPTON 8.1.35 CASTLEPOINT 7 -50 INC. To site grade at the northwest corner of Regional Road 50 and Queen Street, in the City of Brampton, Humber River Watershed as located on the property owned by Castlepoint 7 -50 Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate site grading and servicing for the related office, retail and industrial uses proposed on the subject property. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • Letter of Undertaking, prepared by D. Mhango, Schaeffers Consulting Engineers, dated September 3, 2008, to address all outstanding engineering and ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate site grading and servicing works for the related office, retail and industrial land uses proposed on the subject property. The subject property is located at the northwest corner of Regional Road 50 and Queen Street, in the City of Brampton. Additionally, the western property boundary abuts a valley corridor of the Humber River Watershed. The subject property currently receives external drainage from a portion of the Block 57/58 lands located east of Regional Road 50, in the City of Vaughan, by way of three (3) existing culverts located beneath Regional Road 50. This stormwater is conveyed through this site to the receiving Clarkway Tributary by way of existing swales. Culvert One, the most northern of the culverts (1000 mm diameter) extends through the site to discharge directly into the Clarkway Tributary valley. Culvert Two, south of Culvert One, discharges to a ditch along the side of Regional Road 50 and follows a swale to the valley lands. The southern -most culvert, Culvert Three, discharges to a ditch on the north side of Queen Street, which flows to the valley corridor. 864 To provide a more comprehensive stormwater management scheme for the future development on the subject property and the external lands, this proposal involves constructing two (2) storm sewers located within the Regional Road 50 right -of -way that will pick -up flows from existing culverts and combine them with flows associated with the future widening of Regional Road 50. In this regard, Culverts One and Two (drainage area of 18.25 hectares) will discharge to the northern of the two pipe systems. This system will discharge from to the Clarkway Tributary valley lands approximately 500 metres north of Queen Street. Culvert Three (drainage area of 4.75 hectares) will connect to the southern pipe system and discharge to an existing ditch north of Queen Street. The northern storm system which is designed to collect drainage from Culverts One and Two is designed to discharge into the Clarkway Tributary valley lands through the subject property. The proposed outfall structure is designed to minimize erosion potential. A scour pool is proposed at the storm outfall to dissipate the flow energy and prevent erosion. As noted above, the subject property abuts a valley corridor of the Clarkway Tributary. Through a previous Official Plan and Zoning By -law Amendment Application (City File No. C10E4.2) for the subject property to permit commercial, office and industrial land uses, the valley corridor including a 5 metre inland buffer was gratuitously dedicated to the City of Brampton. Therefore, the proposed outfall structure is to be constructed on lands owned by the City of Brampton. As such, a separate TRCA permit application has been submitted to facilitate the proposed stormwater management works located on the adjacent property owned by the municipality. The works located on lands owned by the City of Brampton are currently before the TRCA Executive Committee and on this agenda. As an element of the above noted Official Plan and Zoning By -law Amendment Application, at the detailed design stage, the proponent agreed to provide an extensive enhancement planting plan for the valley lands and the buffer area between the valley corridor and the proposed development. Through this permit application, the enhancement planting plan has been submitted, which in our opinion provides an ecological net gain for this reach of the Humber River Watershed. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, the storage and /or conveyance of flood waters will not be impacted as a result of this development. Pollution: Erosion and sediment controls have been incorporated into the construction sequencing for this project. As a result, appropriate erosion and sediment controls will be installed and maintained for all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this proposal. 865 Conservation of Land: No significant vegetation will be removed as a result of construction. However, an extensive enhancement planting plan has been submitted with this application to improve the ecological condition of this area. There are no fisheries related concerns associated with this project. Plantings All proposed plant species are native and non - invasive consistent with TRCA's guidelines. Policy Guidelines: This proposal is consistent with Section 4.1.1 - New Urban Development and Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41152 - Application #: 600 /08 /BRAM Report Prepared by: Adam Miller, extension 5244 For information contact: Adam Miller, extension 5244 Date: August 27, 2008 8.1.36 CITY OF BRAMPTON To site grade at the northwest corner of Regional Road 50 and Queen Street, in the City of Brampton, Humber River Watershed as located on the property owned by City of Brampton. The purpose is to undertake works within a TRCA Regulated Area of the Humber River . Watershed in order to facilitate the construction of a storm sewer and outfall structure. The permit will be issued for the period ofSeptember 5, 2008 to September 4, 2010. • Letter of Undertaking, prepared by D. Mhango, Schaeffers Consulting Engineers, dated September 3, 2008, to address all outstanding engineering and ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a storm sewer and outfall structure at the northwest corner of Regional Road 50 and Queen Street, in the City of Brampton. The proposed works are related to a proposed office, retail and industrial development that is currently before the TRCA Executive Committee and on this agenda. The proposed works on the subject property are intended to connect to the proposed northern storm sewer system associated with the Castlepoint 7 -50 Incorporated project. The outfall structure is designed to drain stormwater from the Castlepoint 7 -50 Incorporated lands and drain into to Clarkway Tributary valley corridor. A scour pool is proposed at the stormwater outfall in an effort to dissipate the flow energy and prevent erosion. As part of the Castlepoint 7 -50 Incorporated development application, an extensive enhancement planting plan is proposed for the valley lands. 866 Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters is anticipated. Pollution: Appropriate erosion and sediment controls are proposed with this application and will be installed and maintained during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this project. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns related to this project. As noted, an extensive enhancement planting plan has been submitted with the Castlepoint 7 -50 Incorporated application, which is currently on this TRCA Executive Committee agenda. Plantings The proposed plantings associated with the Castlepoint 7 -50 Incorporated development are all native and non - invasive consistent with TRCA's planting guidelines. Policy Guidelines: This proposal is in conformity with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41148 - Application #: 596 /08 /BRAM Report Prepared by: Adam Miller, extension 5244 For information contact: Adam Miller, extension 5244 Date: August 27, 2008 8.1.37 WOODSPRING HOMES LTD. To construct, reconstruct, erect or place a building or structure and site grade on Part Lot 1, Concession 9, N.D.S., Lot 5, Plan 43R- 22720, in the City of Brampton, Humber River Watershed as located on the property owned by Woodspring Homes.Limited. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in.order to facilitate the construction of a commercial plaza. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • Letter of Undertaking, prepared by D. Horgan, Candevcon Limited, dated September 3, 2008, to address all outstanding engineering and ecology related issues. 867 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a commercial plaza, including a supermarket, retail buildings, office buildings and a hotel. The subject property is located within the planning boundaries of the Bram East Secondary Plan. Through the Secondary Plan review, a Master Environmental Servicing Plan (MESP) was completed for this area, which provides environmental and servicing recommendations for the subject property. In this regard, the subject lands are located within the planning boundaries of the approved Bram East Area 'C' MESP, which is used to guide development for this area. In conjunction with this application, please be advised that the TRCA is also reviewing an Official Plan and Zoning By -law Amendment Application (City File No. C09E05.020) to facilitate the above. noted proposal. The eastern portion of the subject property is located within a valley corridor and is also traversed by a tributary of the Humber River Watershed. Through a separate planning process (Draft Plan of Subdivision 21T-03011B), the boundary of the valley corridor was delineated. As recommended by the approved MESP, a centralized stormwater management facility (Pond No. 7) is proposed and is designed to collect and treat stormwater from this 5.84 hectare site. The proposed pond will also collect and treat runoff from areas to the north already developed and from existing road infrastructure (i.e., Ebenezer Road) with a contributing drainage area of 4.76 hectares. As an element of the above noted Official Plan and Zoning By -law Amendment Application being reviewing concurrently with this application, the valley lands located at the eastern_ portion of the site will be placed into public ownership in an effort to foster local and regional environmental linkages. The proposal includes an extensive enhancement planting plan for the valley corridor portion of the subject property. The proposed plantings will improve the ecological condition of this reach of the Humber River Watershed. Recently, TRCA staff has approved rough grading operations for the subject property. The approved grading works are located completely outside of TRCA's Regulated Area. As such, a TRCA permit was not required. However, TRCA staff reviewed the proposed grading works and confirm that appropriate erosion and sediment controls were incorporated into the design of the rough grading operations (i.e., temporary sediment basin, rock check dams and seeding of disturbed soils). Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, storage and /or conveyance of flood waters is not anticipated. - Pollution: Appropriate erosion and sediment controls are proposed with this project and will be installed and maintained throughout all phases of construction. 868 Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project.. Conservation of Land: No significant vegetation will be removed as a result of construction. Additionally, there are no fisheries related concerns associated with this proposal. In an effort to improve the ecological condition of this reach of the Humber River Watershed, an extensive enhancement planting plan has been incorporated into the project design. Plantings All proposed plant species are native and non - invasive consistent with TRCA's planting guidelines. Policy Guidelines: The proposed works are consistent with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41021 - Application #: 487 /08 /BRAM Report Prepared by: Adam Miller, extension 5244 For information contact Adam Miller, extension 5244 Date: August 27, 2008 CITY OF PICKERING 8.1.38 REGIONAL MUNICIPALITY OF DURHAM To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove ariy material, originating on the site or elsewhere and alter a watercourse in a Regulated Area on Lot 33, Concession 2 (road allowance between Lots 32 AND 33 - Heska Road and Altona Road), in the City of Pickering, 'Petticoat Creek Watershed as located on the property owned by Regional Municipality of Durham. The purpose is to alleviate the flooding occurring on Heska Road through restoration of the unnamed tributary of Petticoat Creek adjacent to the road, by removing the dense growth of vegetation and creating a low flow channel, within the warm water fisheries timing window. A Letter of Advice will be written by TRCA staff.on behalf of the Fisheries and Oceans Canada (DFO) for this project. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • Drawing 1 of 4 - Planform & Profile - Altona Road at Heska Road Petticoat Creek Tributary Restoration, prepared by Geomorphic Solutions, received on August 28, 2008; 869 • Drawing 2 of 4 - Sections and Details - Altona Road at Heska Road Petticoat Creek Tributary Restoration, prepared by Geomorphic Solutions, received on August 28, 2008; • Drawing 3 of 4 - Phasing /ESC - Altona Road at Heska Road Petticoat Creek Tributary Restoration, prepared by Geomorphic Solutions, revised on August 27, 2008, received on August 28, 2008; • Drawing 4 of 4 - Planting Plan - Altona Road at Heska Road Petticoat Creek Tributary Restoration, prepared by Geomorphic Solutions, revised on August 27, 2008, received on August 28, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal includes the restoration of an unnamed tributary of Petticoat Creek in order to alleviate seasonal flooding on Heska Road. A section of Heska Road in the City of Pickering is flooded annually by overbank flows from the tributary. The flooding occurs towards the upstream end of a straightened channel section between Heska Road and Altona Road. The flooding causes damage to the pavement necessitating frequent repairs to the road. Restoration of the tributary will be achieved through removal of the dense growth of vegetation, and the creation of a low flow channel providing an opportunity to restore channel form and processes. Control of Flooding: TRCA Water Resources staff have reviewed and approved this proposal. Pollution: Standard erosion and sediment control measures (silt /sediment fencing, cofferdam) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect the potential for a harmful alteration, disruption • or destruction (HADD) of fish habitat-will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). Plantings All disturbed areas will be restored with native non - invasive species following construction. 870 Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41313 - Application #: 723 /08 /PICK Report Prepared by: Laura Richards, extension 5723 For information contact: Laura Richards, extension 5723 Date: August 26, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.39 28 BEAUCOURT ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 19, Plan 3648, 28 Beaucourt Road, in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. • Withdrawn 8.1.40 8 RAVENSCREST DRIVE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 7, Plan 4532, 8 Ravenscrest Drive, in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of additions to the front and rear of the existing single family detached dwelling. The proposal includes the construction of a rear deck. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • Drawing No. L -1, Site Plan / Grading - Landscaping, prepared by A. H. Design, dated January 2008, Revision No. 1, revised on January 22, 2008, received on January 22, • 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this proposal is to construct additions to the front and rear of the existing single family detached dwelling at 8 Ravenscrest in the City of Toronto. The proposal includes the construction of a rear deck. The subject site is located north of Rathburn Road, west of Kipling Avenue and backs on to Ravenscrest Park within a TRCA Regulated Area of the Mimico Creek Watershed. 871 Control of Flooding: This site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment and erosion control fence will be installed in order to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: • A geotechnical investigation and slope stability assessment has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: The proposed building footprint will be adequately setback from the top of bank. The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40417 - Application #: 059/08/TOR • , Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 27, 2008 8.1.41 76 HIGH STREET To construct, reconstruct, erect or place a building or structure and site grade on Lot 21, Plan 548, 76 High Street, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. • • Withdrawn 8.1.42 53 CYNTHIA ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 25, Plan 4283, (53 Cynthia Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. 872 The purpose is to develop within TRCA Regulated Area of the Humber River Watershed in order to facilitate the reconstruction and expansion of the existing porch and cold cellar to the front of the existing single family detached dwelling. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • Drawing unnumbered, Basement Floor Plan, prepared by Peter Smeal, undated, received on July 31, 2008; • Drawing unnumbered, First Floor Plan, prepared by Peter Smeal, undated, received on July 31, 2008; • Drawing unnumbered, West Elevation, prepared by Peter Smeal, undated, received on July 31, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new porch with a below -grade excavated cold cellar to the front of the existing single family detached dwelling. The existing front porch is to be demolished. The subject property is located east of Scarlett Road and south of Eglinton Avenue in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The subject property is located in the Regional Storm Floodplain of the Humber River Watershed. However, TRCA staff have determined that the proposed works will not adversely impact the storage and /or conveyance of floodwaters. Pollution: Sediment control fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. 873 CFN: 41220 - Application #: 651/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 27, 2008 8.1.43 38 GRACEFIELD AVENUE To construct, reconstruct, erect or place a building or structure on Part Lot B, C, Plan 3540, (38 Gracefield Avenue), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. • Withdrawn CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.44 47 COUNTRY LANE To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove.any material, originating on the site or elsewhere on 47 Country Lane, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a retaining wall and a generator in the rear yard of the existing dwelling. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • Drawing No. L100, Layout Plan, prepared by Janet Rosenberg + Associates Landscape Architects, Revision No. 12, revised August 26, 2008, received August 29, 2008; • Drawing No. L200, Grading Plan, prepared by Janet Rosenberg + Associates Landscape Architects, Revision No. 9, revised August 26, 2008, received August 29, 2008; • Drawing No. L300, Planting Plan, prepared by Janet Rosenberg + Associates Landscape Architects, Revision No. 10, revised August 26, 2008, received August 29, 2008; • Drawing No. L400, Landscape Details, prepared by Janet Rosenberg + Associates Landscape Architects, Revision No. 3, revised August 26, 2008, received August 29, 2008; • Drawing No. L401, Landscape Details, prepared by Janet Rosenberg + Associates Landscape Architects, Revision No. 3, revised August 26, 2008, received August 29, 2008; • Drawing No. L402, Fence Details, prepared by Janet Rosenberg + Associates Landscape Architects, Revision No. 5, revised August 26, 2008, received August 29, 2008. 874 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works involve the construction of a retaining wall and a generator in the rear yard of the existing dwelling at 47 Country Lane in the City of Toronto. The site is located south of York Mills Road and east of Bayview Avenue. The retaining wall was originally constructed without an Ontario Regulation 166/06 permit, partially on TRCA property and partially over the top of bank. The proposed works involve relocating a portion of the retaining wall such that the entire wall will be located on private property and set back from top of bank. Control of Flooding: The site is not located in a Regional Storm Floodplain. Pollution: A sediment control fence will be erected before commencement of any construction or grading works and will remain in place until the proposed works have been completed and any exposed areas have been stabilized. Dynamic Beaches: Not applicable. Erosion: A geotechnical report has been reviewed and approved by TRCA geotechnical engineering staff and the proposed works will be adequately setback from the top of bank. Conservation of Land: No significant vegetation will be removed to facilitate construction and appropriate tree protection fencing will be installed. The site is currently subject to a ravine stewardship agreement with the City of Toronto. Plantings Native tree shrubs and seed mix will be planted. Policy Guidelines: • The proposal is consistent with Section 4.2.2.E, Property Improvements & Ancillary Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 40894 - Application #: 396/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: August 27, 2008 8.1.45 27 DONWOODS DRIVE To construct, reconstruct, erect or place a building or structure and site grade on Part Lot 60, 61, 75, 76, Plan 2343, 27 Donwoods Drive, in the City of Toronto (North York Community Council Area), Don River Watershed. 875 •The purpose is to develop within a Regulated Area of the Don River Watershed to facilitate construction of a replacement two- storey dwelling with basement. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • A -1 Site Plan, prepared by J. Kosick, dated June 13, 2008, received by TRCA staff ' August 26, 2008. . RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works include the construction of a replacement two- storey dwelling at 27 Donwoods Drive in the City of Toronto. The site is located south of York Mills Road, east of Yonge Street. The existing dwelling is to be demolished. • Control of Flooding: The site is not located in the Regional Storm Floodplain. Pollution: Sediment control fencing is not required as the proposed works are in the same location as the • existing dwelling and adequately setback from the watercourse. Dynamic Beaches: Not applicable Erosion: A geotechnical report has been received and reviewed by TRCA geotechnical engineering staff. The proposed works will be constructed in accordance with the reports recommendations. Conservation of Land: . . No significant vegetation will be removed as a result of construction.. Plantings Native tree shrub and seed mix will be planted. Policy Guidelines: The proposal is consistent with Section 4.2.2.D, Replacement Structures, of TRCA's Valley and Stream Corridor Management Program. CFN: 41053 Application #: 506/08/TOR Report Prepared by: Michelle Stafford, extension 5250 For information contact: Mark Rapus, extension 5259 Date: August 27, 2008 876 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.46 METROGATE INC. To construct, reconstruct, erect or place a building or structure, site grade and . temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on (2055 Kennedy Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by Metrogate Inc.. The purpose is to place fill and regrade for the purpose of servicing and constructing a new multi -block residential subdivision. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • Drawing No. ESP, Erosion Control Plan, Proposed Residential Development Metrogate, prepared by Al Underhill Associates Ltd., dated July 24, 2008, received September 2, 2008; • Drawing No. GR. Grading Plan, Proposed Residential Development Solaris, Toronto, Ontario, prepared by Al Underhill Associates Ltd., dated April 30, 2008, received September 2, 2008; • Drawing No. GR, Grading Plan, Proposed Residential Development Metrogate, prepared by Al Underhill Associates Ltd., dated July 24, 2008, received September 2, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: Final development plans are currently being completed for a major condominium complex at 2055 Kennedy Road, Toronto which is parcel of land 6. 8 hectares in area. These plans will be part of a major redevelopment of the former Toronto Sufferance Truck Terminal site. The first phase of development will focus on the construction of Village Green Square (formerly Sufferance Road) and the Solaris high -rise condominium complex (Block 1). Future phases will include a large TTC public railway facility. Part of the initial site work is to begin in the fall of 2008 including regrading.of the site for the purpose of establishing new roadways and site services. 877 Control of Flooding: In 2006 redevelopment plans were prepared with the understanding that there were no Regulatory storm flood hazard issues associated with the property. Recent updates to Regulatory flood hazard mapping (2007) completed by the TRCA however has identified new flood risks exist. This flooding may occur from the spill of flood waters from Highland Creek during a Regional storm event, however a very small portion of the overall site would be affected. Prior to this update the subject site was not located within the Regulatory flood hazard area. The proposed site grading works will protect the subject property from any hazards associated with the regulatory storm event. TRCA staff requested the applicant undertake a floodplain analysis of the Highland Creek in order to assess the impacts of the proposed fill placement upon the floodplain. TRCA staff are in agreement with the conclusions of the floodplain analysis which reveal that there will be no significant impacts to the upstream and downstream storage or conveyance of flood waters. The applicant has been required to update the Regulatory Flood Hazard Mapping and hydraulic model based on the proposed fill and development for 2055 Kennedy Road. Pollution: A silt fence will be secured around all construction areas to prevent the migration of construction generated sediment into the watercourse. Dynamic Beaches: Not applicable Erosion: Not applicable. Conservation of Land: The proposed works are well separated from the watercourse by the embankment of the CN Rail line and a row of industrial properties which flank the subject property to the east thereby mitigating direct impacts on the existing creek bank. No significant resource features will be impacted by the proposed works. Plantings The City will require new plantings as part of the overall redevelopment of the site. Policy Guidelines: The proposal complies with Section 4.2.2 - Development and Redevelopment/Intensification Within Non - Established Communities /Highly Urbanized Areas, of the Authority's Valley and Stream Corridor Management Program. CFN: 40995 - Application #: 470/08/TOR Report Prepared by Mark Rapus, extension 5259 For information contact: Mark Rapus, extension 5259 Date: August 27, 2008 878 CITY OF VAUGHAN 8.1.47 CONFEDERATION BUSINESS PARK - MPL INC. To construct,. reconstruct, erect or place a building or structure and site grade on Part Lot 3, Plan 65M -2623, (200 Confederation Parkway), in the City of Vaughan, Don River Watershed as located on the property owned by Confederation Business Park - MPL Inc.. • Withdrawn 8.1.48 21 WATERSIDE CRESCENT To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere at 21 Waterside Crescent, in the City of Vaughan, Don River Watershed. The purpose is to construct an inground pool, patio and cabana within a Regulated Area of the Don River Watershed at 21 Waterside Crescent in the City of Vaughan. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • Letter of Undertaking prepared by the applicant, dated September 2, 2008, agreeing to revise the final drawings to the satisfaction of the TRCA. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct an inground pool, patio and cabana within a Regulated Area of the Don River Watershed. The subject property backs onto a well- vegetated gentle slope feature which forms a part of the West Don River stream corridor. The proposed works are not located in the Regional Storm Flood Plain and are approximately 26 metres away from the flood plain area. The proposed works are setback from the rear lot line a minimum of approximately 2.0 metres with small portions of landscaping located 1.5 metres away from the rear lot line. The area between the proposed works and the rear lot line is to be heavily vegetated with native, non - invasive species planting to provide an enhanced buffer between the proposed and existing residential uses and the adjacent stream corridor. Control of Flooding: The proposed works are not located within the Regional Storm Flood Plain. There will be no impact on the storage or conveyance of floodwaters. Pollution: Sediment control fencing will be erected and maintained for the duration of construction. Dynamic Beaches: Not applicable. 879 Erosion: TRCA geotechnical staff are satisfied that the proposed works are sufficiently setback and there will be no impact on the gentle slope. Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural heritage feature on or adjacent to the site that may be negatively impacted by the project. Plantings All plantings within the 2 metre buffer are composed of native, non - invasive species. This planted area provides an enhanced buffer between the stream corridor / valley system and the residential uses. Policy Guidelines: •The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. . CFN: 41235 - Application #: 666 /08NAUG • Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: August 27, 2008 TOWN OF AJAX 8.1.49 PICOV DOWNS INC To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on 388 Kingston Road East, in the Town of Ajax, Carruthers Creek Watershed as located on the property owned by Picov Downs Inc. The purpose is to undertake site grading, permanently place fill material and alter a watercourse in order to facilitate the expansion of a race track facility and install a new outfall to the adjacent Carruthers Creek valleylands. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • Letter of Undertaking, prepared by Stantec, dated August 22, 2008, received August 22, 2008, committing to providing any and all minor revisions to the documents to meet TRCA requirements. RATIONALE The application was reviewed by staff on the basis of the following information: 880 Proposal: The applicant seeks permission to undertake site grading, permanently place fill material and alter a watercourse in order to facilitate the expansion of a race track facility and improvements to the adjacent Carruthers Creek valleylands. The works constitute a second phase of development and expansion at Picov Downs in eastern Ajax. Picov Downs is a race track, casino and entertainment facility located on the north side of Kingston Road immediately east of the Carruthers Creek valleylands. This phase of development includes the construction of a full size race track and ancillary structures such as horse barns, walkers and access roads. The existing stormwater management pond is to be expanded to its ultimate configuration to accommodate the current phase and future phases of development. A public trail route is to be constructed along the eastern edge of the Carruthers Creek valleylands from Kingston Drive in the south to Kerrison Drive in the north. An extensive riparian planting plan is to be implemented in order to improve and restore the reach of the Carruthers Creek adjacent to the project. The portions of the project that require approval from TRCA pursuant to Ontario Regulation 166/06 include design of the western side slope of the enlarged race track and associated filling, grading and landscaping; the enlargement of the stormwater management pond; and, the construction of the trail system. Control of Flooding: Portions of the race track side slope, the horse trail access point to the valleylands, the stormwater management pond and trail system are located within the valleylands and Regional Storm Flood Plain. TRCA water management staff have ensured that the works within the Regional Storm Flood Plain will not affect the storage and conveyance of flood waters. This has required the manipulation of the Regional Storm Flood Plain through a cut - and -fill exercise. Specifically, due to the volume of fill required for the stormwater management pond berms a corresponding cut will be made along the opposing valley wall to ensure that the storage and conveyance of flood waters is not affected by the .proposal. The proposed stormwater management system has been designed to safely convey flood waters. Pollution: Sediment and erosion control measures, including siltation fencing, are to be established to isolate all disturbed areas from the Carruthers Creek. Dynamic Beaches: Not applicable Erosion: There are no slope stability or geotechnical concerns associated with this proposal. 881 Conservation of Land: The valleylands below the 100 -year flood elevation are to be conveyed into public ownership as part of this proposal. This will allow the core of the Carruthers Creek valleylands and the proposed trail system to be contained within publicly -owned lands. No works associated with the valleylands are proposed within mature vegetation. A Letter of Advice will be issued by TRCA staff pursuant to our Level III agreement with Fisheries and Oceans Canada for the works associated with Fish Habitat, including the construction of a new outfall for the expanded stormwater management pond. Plantings An extensive planting plan forms part of this proposal and, when implemented, will result in the restoration of riparian vegetation along the Carruthers Creek, the new valleyland trail and the side slopes of the expanded race track. Policy Guidelines: .This proposal is consistent with Section 4.1.2, New Resource -based Uses and Section 4.3, Infrastructure and Servicing, of TRCA's Valley and Stream Corridor Management Program. CFN: 39366 - Application #: 382 /07 /AJAX Report Prepared by: Chris Jones, extension 5718 • For information contact: Chris Jones, extension 5718 Date: August 27, 2008 TOWN OF CALEDON 8.1.50. 5318 OLD SCHOOL ROAD To construct, reconstruct, erect or place a building or structure on Part Lot 23, Concession 5 EHS, 5318 Old School Road, in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, single - family dwelling located at 5318 Old School Road, in the Town of Caledon. The permit will .be issued for the period of September 5, 2008 to September 4, 2010. • Site Plan, prepared by J.W., dated April 10, 2008, Revision No. 1, revised on August 12, 2008, stamped received by TRCA Planning & Development staff on August 15, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 882 Proposal: The purpose of this proposal is to•undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, single - family dwelling . located at 5318 Old School Road, in the Town of Caledon. The subject property is located adjacent to a valley corridor. The proposed works are sufficiently setback (i.e., 10 metres) from the staked top of bank associated with the adjacent valley corridor. As such, there are no flooding, hydrological, geotechnical or ecology related concerns associated with this proposal. An extensive enhancement planting plan is proposed with this application for the area adjacent to the top of bank in order to achieve a net ecological gain for this site. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation, will be removed as a result of this project. However an extensive enhancement planting plan has been provided with this application in order to achieve an ecological net gain for this area. Additionally, there are no fisheries related concerns associated with these works. Plantings All plantings are native and non - invasive species as per TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41017 - Application #: 481/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: August 27, 2008 8.1.51 LOT #35 COOLIHANS SIDEROAD To construct, reconstruct, erect or place a building or structure on Part Lot 35, Concession 3 (ALB), Lot 35 Coolihans Sideroad, in the Town of Caledon, Humber River Watershed. 883 The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 521.6 square metre (5,614.0 sq. ft.) single - family dwelling at Lot 35, Concession 3, Coolihans Sideroad, in the Town of Caledon. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • Letter of Undertaking, prepared by M. Chiarot, dated September 2, 2008, to address all outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: . Proposal: The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, 521.6 square metre (5,614.0 sq. ft.) single - family dwelling on Lot 35, Concession 3, Coolihans Sideroad, in the Town of Caledon. The subject property is located in the nearby vicinity of an Oak Ridges Moraine (ORM) wetland feature and is also located adjacent to an intermittent watercourse of the Humber River Watershed. The proposed works are setback approximately 28 metres from the intermittent watercourse and are sufficient setback from the wetland feature. As such, no impacts to the wetland feature or tributary are anticipated. Additionally, there are no flooding, hydrological, geotechnical or ecology related concerns associated with this proposal. However, enhancement plantings are proposed with this application adjacent to the watercourse in order to achieve an ecological net gain with this application. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: Although no significant vegetation will be removed as a result of this project, enhancement plantings are proposed adjacent to the watercourse features in order to provide an ecological net gain for this site. Additionally, there are no fisheries related concerns associated with these works. Plantings . All plantings are native and non - invasive species as per TRCA's guidelines. 884 Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41001 - Application #: 475/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: August 27, 2008 8.1.52 3646 KING STREET To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 28, Concession 2 EHS, (3646 King Street), in the.Town of Caledon, Humber River Watershed. The purpose is to is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a residential addition located at 3646 King . Street, in the Town of Caledon. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • Letter of Undertaking, prepared by T. Milligan, dated September 2, 2008, to address all outstanding engineering related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a residential addition located at 3646 King Street, in the Town of Caledon. The subject property is located adjacent to a tributary of the Humber River. The proposed works do not involve additional encroachment towards the watercourse feature which traverses the eastern portion of the subject property. The proposed addition is located. partially within the Regional Storm Floodplain and will be floodproofed in accordance with TRCA's floodproofing requirements. TRCA Water Resources staff has confirmed that the proposed addition will not significantly impact the conveyance and /or storage of flood waters. As well, the proposed addition constitutes less than 50% of the total GFA of the existing residential dwelling. Additionally, there are no ecological or geotechnical concerns associated with this application. Control of Flooding: The proposed works are partially located within the Regional Floodplain. In accordance with TRCA's policies regarding minor additions within floodprone areas, an addition of this size and nature is acceptable to TRCA staff. TRCA staff has confirmed that this proposal will not have any significant impacts to the storage and /or conveyance of flood waters. In addition, the development will be adequately flood protected. 885 Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: The construction area is currently a manicured lawn. As such, no significant vegetation will be removed as a result of this project. There are no fisheries related concerns associated with this project. Plantings As no vegetation is to be removed by the proposed works, additional plantings are not required. Due to the small scale of the project, opportunities for plantings on other areas of the property could not be considered through this project. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41174 - Application #: 620/08 /CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: August 27, 2008 8.1.53 25 DEER HOLLOW COURT To coristruct, reconstruct, erect or place a building or structure on Lot 22, Plan 43M -1159, 25 Deer Hollow Court, in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an in- ground swimming pool at the rear of an existing dwelling located at 25 Deer Hollow Court., in the Town of Caledon. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • Site Plan, prepared by R.M., dated July 2008, stamped received by TRCA Planning & Development staff on August 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 886. { Proposal: The purpose of this application is to undertake,works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an in- ground swimming pool at the rear of'an existing dwelling located at 25 Deer Hollow Court, in the Town of Caledon. The rear of the subject property is adjacent to the toe of a valley slope. The proposed pool is located on a flat portion,of the site and is setback sufficiently.from the toe of the valley slope. As such, no geotechnical concerns are anticipated with_this•proposal.' Additionally, there are no ecology or flooding`related concerns with this proposal. However, a planting plan is provided with this project in order to achieve an ecological. gain for this area. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (silt fence) have been proposed with this application, and will be maintained throughout all phases of construction.. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed•as a result of construction. Plantings The proposed pool is located within an existing manicured lawn. As such, no significant vegetation will be removed as a result of the construction. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (E) — Property Improvements and Ancillary Structures — of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41322 - Application*: 729/08/CAL Report Prepared.by: Jason Wagler, extension 5743 For information contact:'Ouentin'Hanchard, extension 5324 - Date: August 27, 2008 TOWN OF MARKHAM 8.1.54 17 EAST DRIVE To construct; reconstruct, erect or place a building or structure on Lot 45 - 47, Plan 2926, (17 East•Drive),-in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an addition to an existing dwelling. 887 The permit will be issued for the period of September 5, 2008 to September 4, 2010. • SP -1, prepared by the Gregory Design Group, dated August 20, 2008, stamped . received by TRCA Planning and Development August 22, 2008; • A -1, prepared by the Gregory Design Group, dated August 20, 2008, stamped received by TRCA Planning and Development August 22, 2008; • A -2, prepared by the Gregory Design Group, dated August 20, 2008, stamped received by TRCA Planning and Development August 22, 2008; • A -3, prepared by the Gregory Design Group, dated August 20, 2008, stamped received by TRCA Planning and Development August 22, 2008; • A -4, prepared by the Gregory Design Group, dated August 20, 2008, stamped received by TRCA Planning and Development August 22, 2008; • 'A -5, prepared by the Gregory Design Group, dated August 20, 2008, stamped received by TRCA Planning and Development August 22, 2008; • A -6, prepared by the Gregory Design Group, dated August 20, 2008, stamped received by TRCA Planning and Development August 22, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal:. The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an addition to an existing residential dwelling at 17 East Drive in Markham. The property is located within an established residential subdivision and currently contains an existing residential dwelling and in ground swimming pool. Although the subject property is partially located within the Regional Storm Floodplain, the existing residential dwelling and proposed addition are located outside of the Regional Storm Floodplain. The area to which this application applies is currently manicured lawn. As such no significant vegetation will be removed as a result of construction. Control of Flooding: The works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i:e.e, silt fencing) will be erected and maintained throughout all phases 'of construction in accordance with TRCA Guidelines. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation was removed as a result of construction. There are no fisheries related concerns associated with this project. 888 Plantings No significant vegetation will be removed as a result of construction. As such, no additional plantings are required. Policy Guidelines: The proposal is consistent with Section 4.2.2 (C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41239 - Application #: 670 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: August 27, 2008 8.1.55 MARKHAM CONGREGATION OF JEHOVAH'S WITNESSES TRUSTEES To construct, reconstruct, erect or place a building or structure on Part Lot 9, • Concession 7, (8205 McCowan Road), in the Town of Markham, Rouge River Watershed as located on the property owned by Markham Congregation of Jehovah's Witnesses Trustees. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a deck. The permit will be issued. for the period of September 5, 2008 to September 4, 2010. • Letter of undertaking provided by Markham Congregation of Jehovah's Witnesses Trustees, dated September 3, 2008, to address all outstanding engineering related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of the application is to facilitate construction of a deck at the rear of an existing dwelling located within a TRCA Regulated Area of the Rouge River Watershed. The subject lands currently contain an existing residential dwelling located within the Regional Storm Floodplain. Although the deck is located within the Regional Storm Floodplain, all existing grades will be maintained. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. the area to which this application applies is currently manicured lawn, as such no significant vegetation was removed as a result of construction. Control of Flooding: TRCA Water Resources staff has reviewed this proposal and do not anticipate any impacts to the storage and /or conveyance of flood waters. The proposed deck is located outside of the hydraulic floodway. All excavated fill will be removed from the Regional Storm Floodplain. The proposed deck will be properly anchored to the ground and has been designed to withstand the flows of the Regional Storm Event. 889 Pollution: Sediment and erosion controls (i.e. silt fence) will be erected prior to construction taking place and will be maintained throughout all phases of construction in accordance with TRCA guidelines. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation was removed as a result of construction. There are no fisheries related concerns associated with this project. Plantings No significant vegetation was removed as a result of construction. As such, no additional plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41274 - Application #: 690 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 • For information contact: Quentin Hanchard, extension 5324 Date: August 27, 2008 8.1.56 REGIONAL MUNICIPALITY OF YORK To construct, reconstruct, erect or place a building or structure, site grade and alter a watercourse on Lot 64R, Plan 4290, (Northwest Corner of Bayview Avenue and Steeles Avenue), in the Town of Markham, Don River Watershed as located on the property owned by Regional Municipality of York. The purpose is to facilitate the construction of a odour control facility at the northwest corner of Bayview Avenue and Steeles Avenue within a regulated area, and subject to a warmwater fisheries timing window, on property owned by the Regional Municipality of York. A Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO) for this project.. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • Letter of undertaking to provide revisions to engineering drawings to the satisfaction of the TRCA; dated August 25, 2008; received August 27, 2008; prepared by the Regional Municipality of York. _ 890 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The Regional Municipality of York is working to address a localized odour nuisance by replacing the temporary carbon canister odour alleviation system with a permanent facility. The class of undertaking under which this project has been submitted is Schedule A in accordance with the Municipal Engineers Association Class EA document. The works include the construction of a 7.3m L x 4.3 m W x 4.0m H housing enclosing a carbon odour control system on the northern end of the property and the connection of a 900 mm CSP pipe from an existing diversion chamber manhole at the southwest corner of the property to the proposed facility. This connection pipe will be buried for the majority of its run with the exception of a crossing over an existing culvert to which the CSP pipe will be affixed. All of the worksare within the regulation limit and the odour control system structure will be located above the 100 year floodline but within the Regional floodline. The structure will be designed to meet floodproofing requirements. The works include the decommissioning of the existing carbon canister odour control system and involve the removal of an existing housing and concrete pad. Landscaping activities, using native species and naturalization techniques, will be utilized to beautify the works and result in a natural net gain for the site. During construction effective erosion and sediment control (ESC) measures will be implemented to protect all natural features (aquatic and terrestrial). No dewatering activities are anticipated for the open cut trench excavation works. Control of Flooding: The proposed project will not impact storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (silt/sedimentation fence, rock check dams, catchbasin silt control filter, etc.) will be implemented and maintained for the duration of construction and until the site is stabilized and restored to prevent construction - generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There are no slope stability concerns with the proposed project. Conservation of Land: There will be no in- stream work associated with this project however near -water activities, including the CSP pipe installation and culvert crossing works, will be subject to a warm water fisheries timing window of April 1 to June 30. A letter of advice will be issued for this project. Plantings Brush removal is anticipated and will be compensated for in a planting plan designed to generate a net benefit. All plantings will be native and non - invasive. 891 Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. , CFN: 40982 - Application #: 452 /08 /MARK Report Prepared by: Jennifer Draper, extension 5715 For information contact: Jennifer Draper, extension 5715 Date: August 25, 2008 8.1.57 RICHMOND HILL JEFFERSON FOREST LTD. To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and interfere with a wetland on Lot 56, Concession 1, (Yonge Street and Jefferson Forest Drive), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Richmond Hill Jefferson Forest Ltd.. The purpose is to undertake works within a Regulated area in order to facilitate the construction of a temporary stormwater management pond and an associated temporary outlet structure associated with a new residential subdivision. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • Letter of undertaking provided by Schaeffers Consulting Engineers, dated September • 3, 2008, to address all outstanding TRCA Engineering and Ecology issues prior to the issuance of the permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This permit application is to facilitate the construction of a temporary stormwater management pond and outfall associated with a proposed residential subdivision on the subject property. The subject property is located west of Bayview Avenue, north of 19th Avenue in the Town of Richmond Hill. The works proposed under this permit are associated with the initial site preparation works for the Jefferson Forest Subdivision (Phase 1) which was draft approved by the Ontario Municipal Board in 2002. Although there are on -going discussions pertaining to future phases of this subdivision, Phase 1 of the subdivision - which are the lands effected by this application - are proceeding in accordance with the approved subdivision design. The subject property is directly adjacent to the Jefferson Forest, which is located to the north of the future subdivision, and to the west of a valley feature associated with a tributary of the Rouge River. Buffers have been integrated into the plan of subdivision, and only a small portion of the property adjacent to the Rouge River tributary - in which the temporary SWM pond is to be located - is Regulated by the TRCA. This Regulated area is associated with a wetland area of interference that extends onto the table lands, on which this subdivision is located. 892 Sediment and erosion control measures have been integrated into the proposed plan in accordance with TRCA's guidelines. Control of Flooding: The proposed works will not be located within the mapped Regulatory Floodplain, and are being completed in accordance with the approved Master Environmental Servicing Plan. Consequently, no impacts to flood storage or conveyance are anticipated. Pollution: Appropriate sediment and erosion control measures are to be installed and maintained during all phases of construction. No in -water works are proposed with the subject permit. Dynamic Beaches: Not applicable Erosion: There are no slope stability concerns with this application. Erosion control measures, based upon TRCA's Sediment and Erosion Control Guidelines, will be applied as applicable. Conservation of Land: The subject works are being completed within an approved plan of subdivision, in accordance with an approved Master Environmental Servicing Plan. Plantings A comprehensive planting plan and management plan will be implemented through subsequent phases of this subdivision, which will be considered at a later time. Policy Guidelines: This proposal is consistent with Section 4.3 - Infrastructure and Servicing, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41347 - Application #: 731/08/RH Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: August 27,.2008 8.1.58 . TOWN OF RICHMOND HILL To site grade on Lot 56, 57, Plan 65M3465, 65R25942, 65R23366, (Rollinghill Road E /S), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Town of Richmond Hill. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an asphalt trail. The permit will be issued for the period of September 5, 2008 to September 4, 2010. 893 • Letter of Undertaking, prepared by Northwood Associates, dated September 3, 2008, to address all outstanding ecology and engineering related concerns. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of the application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a 1.5 to 2.4 metre wide asphalt pedestrian,trail system along a tributary of the Rouge River. The area to which the application applies is bounded by Rolling Hill Road on the west, Yonge Street on the east, Gamble Road to the south, and Tower Hill Road to the north, in the Town of Richmond Hill. The proposed works will consist of creating new sections of asphalt trail to link existing communities and parks, provide a boardwalk crossing of the Rouge River Tributary, and formalizing existing informal pathways. Although some of works are proposed within the Regional Storm Floodplain, all excavated fill will be removed from the floodplain, and no major grade changes are proposed. As such, no adverse impacts to the storage and /or conveyance of floodwaters is anticipated. In order to complete the proposed works, it is necessary for several sections of vegetation to be removed. To mitigate the impacts of vegetation removal, an extensive enhancement planting plan has been incorporated into the design of this project to provide for an ecological net gain for this reach of the Rouge River Watershed. Control of Flooding: No significant grading changes are proposed and all excavated material will be removed from the floodplain. As such, TRCA staff do not anticipate any impacts to the storage and /or conveyance of flood waters. Pollution: Sediment and erosion controls will be provided and maintained through all phases of construction in accordance with TRCA guidelines. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: As a result of the proposed works, several sections' of riparian vegetation will be removed. To mitigate-the impacts of the proposed removals an extensive enhancement planting plan has been submitted with this project. It is the opinion of TRCA Staff that the proposed mitigation plantings will achieve an ecological net gain for this area. Plantings All plantings are native and non - invasive in accordance with TRCA Guidelines. 894 Policy Guidelines: This proposal is consistent with Section 4.1.2 - New Resource -Based Uses - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41156 - Application #: 603/08/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: August 27, 2008 8.1.59 26 NEWMAN AVENUE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 11, Plan 253, (26 Newman Avenue), in the Town of Richmond Hill, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the replacement of an existing residential dwelling. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • Drawing A0 -01, prepared by Bijan Homes, dated May 2008, stamped received by TRCA Planning and Development on July 28, 2008; • Landscape Plan, prepared by Bijan Homes, dated May 20, 2008, stamped received by TRCA Planning and Development on July 28, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the replacement of an existing residential dwelling at 26 Newman Ave. in the Town of Richmond Hill. The subject property is located in an established residential subdivision in the Town of Richmond Hill, adjacent to a wetland associated with the provincially significant Wilcox St. George Wetland Complex (PSW). TRCA staff do not anticipate any negative impacts to the wetland complex as all existing setbacks to the wetland will be maintained and no encroachments are to occur. In addition, no significant vegetation will be removed as a result of this proposal, the applicant has provided an extensive planting plan in association with this project in order to improve the ecological function of this area. • Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fence) will be erected and maintained throughout all phases of construction in accordance with TRCA Guidelines. 895 Dynamic Beaches: Not applicable. Erosion:. There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. However, the applicant has proposed an extensive planting plan for the subject property. There are no fisheries related concerns associated with this project. Plantings All plantings will be native and non - invasive in accordance with TRCA's guidelines Policy Guidelines: The proposed works are consistent with Section 4.2.2, D) - Replacement Structures - of the Authority's Valley and Steam Corridor Management Program. CFN: 41221 - Application #: 652/08/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: August 27, 2008 TOWN OF WHITCHURCH - STOUFFVILLE 8.1.60 TOWN OF WHITCHURCH - STOUFFVILLE To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse in a Regulated Area on Sherrick Drive, in the Town of Whitchurch - Stouffville, Rouge River Watershed as located on the property owned by Town of Whitchurch - Stouffville and TRCA. The purpose is to replace existing twin culverts that are in poor condition within the cold water fisheries timing window. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project. The permit will be issued for the period of September 5, 2008 to September 4, 2010. • Letter of Undertaking to provide minor revisions to engineering drawings to the satisfaction of TRCA staff; dated September 3, 2008; prepared by the Town of - Whitchurch- Stouffville. RATIONALE The application was reviewed by staff on the basis of the following information: 896 Proposal: The proposal involves replacing twin culverts on Sherrick Drive in the Town of Whitchurch- Stouffville. The existing culverts are 24 metres long, 3.1 metres wide and 1.98 metres high and are constructed from corrugated metal structural plate. The culverts are 20 years old, in poor condition and have settled and deflected significantly in the centre impacting the road above. In order to address this problem the culverts are proposed to be replaced with twin culverts 24 metres long, 3.3 metres wide and 2.0 metres high. The culvert foundation is • also proposed to be reinforced as part of this project. The sub -soil condition will be improved by excavating approximately 1 metre and installing reinforced 50 mm crusher run limestone with two layers of geogrid under the culverts. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (silt/sediment fencing, coffer dam) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediment from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be provided by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41108 - Application #: 562/08/WS Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: August 26, 2008 897 TOWNSHIP OF KING 8.1.61 SENECA COLLEGE To construct, reconstruct, erect or place a building or structure on Recreation Island, (13990 Dufferin Street, North), in the Township of King, Humber River Watershed as located on the property owned by Seneca College. • Withdrawn PERMIT APPLICATION 8.1.62 IS PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS: RES.#B106/08 - PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Ron Moeser Maja Prentice THAT permission for routine infrastructure granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the application 8.1.62 - City of Brampton, which is listed below, be received. CARRIED CITY OF BRAMPTON •8.1.62 CITY OF BRAMPTON The purpose is to undertake sewer and watermain or utility installation or maintenance within an existing roadway in order to facilitate the construction of a watermain in a regulated area on Queen Street East between Scott Street and Centre Street, in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by City of Brampton. This permit is cross - referenced to Permit C- 08450, issued June 20, 2008, with the approved drawing: Sheet No. 1 of 6; Queen Street Bridge - Proposed Rehabilitation General Arrangement; dated April 14, 2005; Received June 6, 2008; Red -line revised June 20, 2008; Red -line revised June 27, 2008. The permit will be issued for the period of August 1, 2008 to July 31, 2010 in accordance with the following documents and plans which form part of this permit: • Sheet No. 6 of 6; Queen Street Bridge Rehabilitation 300 Watermain W/S Transfers; - Dated April 2008; Received July 2008. RATIONALE • The application was reviewed by staff on the basis of the following information: 898 Proposal: The proposal consists of replacing an existing 300mm watermain through an open -cut on Queen Street from Scott Street to Centre Street, and under the bridge that spans the Etobicoke Creek. This will be done in conjunction with the bridge rehabilitation works, issued as permit C- 08450. Control of Flooding: There will be no impacts to the control of flooding. Pollution: Standard sediment and erosion controls (scaffolding) will be in place for the duration of construction and until the site is restored to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With the erosion and sedimentation controls in effect, the potential for a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated. Plantings No natural vegetation is proposed to be disturbed. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 41107 - Application #: 559 /08 /BRAM Report Prepared by: Scott Smith, extension 5758 For information contact: Sharon Lingertat, extension 5717 Date: August 1, 2008 PERMIT APPLICATIONS 8.1.63 - 8.1.82 ARE MINOR WORKS LETTER OF APPROVAL: RES. #B107/08 - MINOR WORKS LETTER OF APPROVAL PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Ron Moeser Maja Prentice THAT minor works letter of approval granted by Toronto and Region Conservation Authority staff in accordance with .Ontario Regulation 166/06 for the applications (8.1.63 - 8.1.82, inclusive), which are listed below, be received. CARRIED 899 CITY OF BRAMPTON 8.1.63 42 MOLDOVAN DRIVE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on 42 Moldovan Drive, in the City of Brampton, Humber River Watershed. CFN: 41254 - Application #: 678/08/BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: August 19, 2008 8.1.64 18 BLUEBIRD COURT To install a swimming pool on Lot 179, Plan 43M -520, (18 Bluebird Court), in the City of Brampton, Etobicoke Creek Watershed. CFN: 41237 - Application #: 668 /08 /BRAM Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: August 8, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.65 45 CORNELIUS PARKWAY To install a swimming pool on Lot 146, Plan 3244, (45 Cornelius Parkway), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 41161 - Application #: 604/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 13, 2008 8.1.66 72 JELLICOE AVENUE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 7, Plan 4075, (72 Jellicoe Avenue), in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed. CFN: 41265 - Application #: 686/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 20, 2008 900 8.1.67 36 PUCKERIDGE CRESCENT To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but Tess than 150 sq. m (1614 sq. ft) on Lot 22, Plan 5057, (36 Puckeridge Crescent), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. CFN: 41189 - Application #: 633/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 18, 2008 8.1.68 4 ELLIS GARDENS To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 48, Plan 3001, (4 Ellis Gardens), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 41194 - Application #: 628/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 20, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.69 21 WOODCLIFF PLACE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 1, Block F, Plan (64R -2659) 4544, (21 Woodcliffe Place), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: 41191 - Application #: 626/08/TOR Report Prepared by: Leah Weller, extension 5618 For information contact: Leah Weller, extension 5618 Date: August 18, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.70 12 FALLINGBROOK WOODS To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Block D, Plan 2836, (12 Fallingbrook Woods), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. CFN: 41258 - Application #: 682/08/TOR Report Prepared by: Leah Weller, extension 5618 For information contact: Steve Heuchert, extension 5311 Date: August 18, 2008 901 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.71 62 PINE CRESCENT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on 62 Pine Crescent in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 41070 - Application #: 528/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 21, 2008 8.1.72 412 LAKE FRONT To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Part Lot 1, 2, Plan 732, (412 Lake Front), in the City of Toronto (Toronto and East York Community Council Area), Waterfront Watershed. CFN: 41251 - Application #: 676/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 12, 2008 8.1.73 146 FERRIS ROAD To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 36, Plan M -598, (146 Ferris Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 41236 - Application #: 667/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 13, 2008 8.1.74 15 CAROLINE AVENUE To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on 15 Caroline Avenue in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 41219 - Application #: 650/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 13, 2008 902 CITY OF VAUGHAN 8.1.75 28 HURONIA PLACE To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on , (28 Huronia Place), in the City of Vaughan, Humber River Watershed. CFN: 41248 - Application #: 672 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: August 21, 2008 TOWN OF AJAX 8.1.76 6 HOLMES CRESCENT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on 6 Holmes Crescent, in the Town of Ajax, Carruthers Creek Watershed. CFN: 41240 - Application #: 669 /08 /AJAX Report Prepared by: Shannon McNeill, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: August 8, 2008 TOWN OF CALEDON 8.1.77 19 HARVEST MOON DRIVE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) at 19 Harvest Moon Drive, in the Town of Caledon, Humber River Watershed. CFN: 41253 - Application #: 677/08/CAL Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: August 12, 2008 8.1.78 7413 OLD CHURCH ROAD To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft), but less than 150 sq. m (1614 sq. ft) on Lot 20, Concession 3, (7413 Old Church Road), in the Town of Caledon, Humber River Watershed. CFN: 41241 - Application #: 663/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: August 8, 2008 903 8.1.79 41 KIRKWOOD CRESCENT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 33, Plan 43M -1143, (41 Kirkwood Crescent), in the Town of Caledon, Etobicoke Creek Watershed. CFN: 41160 - Application #: 609 /08 /CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: July 25, 2008 8.1.80 6 VALLEYGREEN CRESCENT To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but Tess than 150 sq. m (1614 sq. ft) on Lot 38, Plan 43R- 11844, (6 Valleygreen Crescent), in the Town of Caledon, Humber River Watershed. CFN: 41217 - Application #: 648/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: August 5, 2008 TOWN OF MARKHAM 8.1.81 4150 19th AVENUE . To install a swimming pool at 4150 19th Avenue, in the Town of Markham, Rouge River Watershed. CFN: 41214 - Application #: 645 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: August 6, 2008 . TOWN OF WHITCHURCH - STOUFFVILLE 8.1.82 30 WARDEN LANE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 1, Concession 4 , (30 Warden Lane), in the Town of Whitchurch- Stouffville, Rouge River Watershed. CFN: 41257 - Application #: 681/08/WS Report Prepared by: Shannon McNeill, extension 5744 For information contact: Bill Kiru, extension 5306 Date: August 13, 2008 904 CITY OF BRAMPTON 8.1.83 REGIONAL MUNICIPALITY OF PEEL To construct, reconstruct, erect or place a building or structure on Part Lot 1, 17, Plan 43R- 18513, (Southwest Corner of Mayfield Road and Highway 50), in the City of Brampton, Humber River Watershed as located on the property owned by Regional Municipality of Peel. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a commuter parking lot at the southwest corner of Highway 50 and Mayfield Road in the City of Brampton. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking, prepared by the Regional Municipality of Peel, dated September 2, 2008, to address all outstanding engineering related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of the application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a commuter parking lot at the • southwest corner of Highway 50 and Mayfield Road in the City of Brampton. The works are proposed in conjunction with the reconstruction of the Regional Road 50 and Mayfield Road intersection and to promote increased transit usage and ridesharing. The site is planned to be served by GO Transit in the future. The subject property contains a tributary of the Humber River Watershed that flows south through a culvert under Mayfield Road; traversing the eastern portion of the property and entering a culvert under Highway 50. The proposed parking lot is setback greater than 10 metres from the Regional Storm Floodplain. Stormwater quality control will be provided through a treatment train approach incorporating an oil /grit separator and a biofiltration swale. In addition, infiltration trenches are incorporated into the parking lot design to encourage groundwater recharge and stormwater quantity controls. There are no flooding, geotechnical, or ecology related concerns with this application. Appropriate plantings are proposed within the biofiltration swale in order to provide an ecological net gain with this application. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. 905 Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Although there are no fisheries related concerns associated with this proposal, a Letter of Advice (LOA) will be issued on behalf of Fisheries and Oceans Canada for the proposed works. Plantings All proposed plantings will be native and non - invasive consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41275 - Application #: 693 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: September 3, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.84 216 THREE VALLEYS DRIVE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 335, Plan 5112, (216 Three Valleys Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a single- storey addition to the rear of an existing semi- detached dwelling. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Figure 3 Site and Photo Location Plan, prepared by Terraprobe, undated, received by .TRCA staff September 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information:- Proposal: The proposal involves the construction of a single- storey addition, approximately 53 square metres in size, to the rear of the existing dwelling. The rear wall of the proposed addition will be set back 8 metres from the existing top of slope. 906 Control of Flooding: The proposed development will not be located within the Regional Storm flood plain. There will therefore be no impact on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be installed and maintained throughout construction to prevent sediment from entering the adjacent valley system. Dynamic Beaches: Not applicable. Erosion: There will be no geotechnical /slope stability issues associated with the proposed development. Conservation of Land: There are no significant natural features on or adjacent o the site that may be negatively impacted by the project. Plantings The proposed works will not affect any significant natural features, therefore no plantings are required. Policy Guidelines: The proposal is consistent with Section 4.2.2. C) - Minor Additions - of TRCA's Valley and Stream Corridor Management Program. CFN: 40922 - Application #: 416/08/TOR Report Prepared by: Leah Weller, extension 5618 For information contact: Steve Heuchert, extension 5311 Date: September 3, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.85 7 LAKEEHILL CRESCENT To site grade on Lot 67, Plan 3757, (7 Lakehill Crescent), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to construct a terraced retaining wall and other landscaping works to facilitate the construction of an in- ground pool. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Unnumbered Pool Plan, prepared by Birk's Landscaping, dated August 28, 2008, received by TRCA staff August 31, 2008. 907 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the construction of a retaining wall, at -grade patio, and other . • landscaping works surrounding a partially in- ground pool. Based on soil engineering studies provided for both adjacent properties, no geotechnical issues are present for the proposed works on this Scarborough Bluffs property. Control of Flooding: The subject property is not located within a Regional Storm flood plain. Therefore no impacts to the storage and /or conveyance of flood waters is anticipated. Pollution: Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: Geotechnical and slope stability concerns have been addressed for the proposed works. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries - related concerns associated with this proposal. Plantings As no significant vegetation will be removed,-plantings are not required. Policy Guidelines: This proposal is in conformity with Section 4.2.2. E) - Property Improvements and Ancillary Structures - of the TRCA's Valley and Stream Corridor Management Program. CFN: 39731 - Application #:. 655/07/TOR • Report Prepared by: Leah Weller, extension 5618 For information contact: Steve Heuchert, extension 5311 Date: September 3, 2008 8.1.86 132 WOODFERN DRIVE To construct, reconstruct, erect or place a building or structure on Lot 24, Plan M -668, (132 Woodfern Drive), in the City of Toronto (Scarborough Community Council Area), Don RiverWatershed. The purpose is to construct a two- storey rear addition with a basement on an existing semi - detached dwelling. 908 The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • A1.0 Site Plan, Project Data, prepared by Creasor Building Design, dated July, 2008, received by TRCA staff August 18, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the construction of a two- storey rear addition with a basement. The proposed addition will be set back a minimum of 13.85 metres from the rear lot line, approximately 12.5 metres from an existing retaining wall at the top of slope. The entire rear yard is table land. Control of Flooding: The proposed works are not located in a Regional Storm flood plain and therefore will have no impacts on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be installed and maintained throughout construction to prevent sediment from entering the adjacent valley system. Dynamic Beaches: Not applicable. Erosion: There will be no geotechnical issues associated with the proposed development. Conservation of Land: No significant natural resource features will be impacted by the proposed works. All excavated material will be removed from and disposed of off the site. Plantings Plantings are not required as part of this permit. Policy Guidelines: The proposal is consistent with Section 4.2.2 C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program. CFN: 41295 - Application #: 703 /08 /SCAR Report Prepared by: Leah Weller, extension 5618 For information contact: Steve Heuchert, extension 5311 Date: September 2, 2008 909 CITY OF VAUGHAN 8.1.87 BLOCK 39 (NORTH WEST) DEVELOPERS GROUP INC. To construct, reconstruct, erect or place.a building or structure, site grade and alter a watercourse near Pine Valley Drive and Major Mackenzie Drive, in the City of Vaughan, Humber River Watershed as located on the property owned by . Block 39 (North West) Developers Group Inc.. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the construction of a stormwater management pond (SWM Pond M3), two outfalls and associated road works on Pine Valley Drive to service new residential subdivisions within the northwest corner of Block 39 in the City of Vaughan. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • • Drawing No. PP -14, Plan and Profile of Proposed 1050 Sanitary Sewer, prepared by Schaeffers Consulting Engineers, dated May 2008, revised August 27, 2008, received by the TRCA on August 28, 2008; • Drawing No. PP -16, Plan and Profile of Proposed 1200 Storm-Sewer at Pine Valley Drive, prepared by Schaeffers Consulting Engineers, dated May 2008, revised August 27, 2008, received by the TRCA on August 28, 2008; • Drawing No. RP -1, Storm Outfall Restoration Planting (At Pine Valley Drive), prepared by Landscape Planning Limited, dated May 12, 2008, revised August 27, 2008, redline revised by Schaeffers Consulting Engineers to include a rock check dam and temporary coffer dam, received by the TRCA on August 28, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the construction of a stormwater management pond (SWM Pond M3), two outfalls andassociated road works on Pine Valley Drive to service new residential subdivisions within the northwest corner of Block 39 in the City of Vaughan. Stormwater Management Pond M3 will be constructed on the east side .of Pine Valley Drive, within the Block 39 lands. The two storm sewer outfalls will be constructed within the road right -of -way on the west side of Pine Valley Drive, just west of Block 39. The first structure will serve as the permanent outlet for Stormwater Management Pond M3. The second structure will act as an outlet for stormwater collected at the western end of Davos Road. The applicant requires permission to enter TRCA lands in order to construct the outfalls. Pine Valley Drive has been closed since August 11, 2008 and will remain closed until September 15, 2008 to accommodate these and other works, including alterations to the road itself. Due to the timing of these works, the closure of Pine Valley Drive and the need to complete the works within the coldwater fisheries timing window (July 1 to September 15), emergency authorization to start this project will be given by the Director of Planning and Development at the TRCA prior to the Executive Committee meeting on September 5, 2008. 910 Staff further note that the project commenced prior to receipt of a permit from the TRCA A violation notice was issued by TRCA Enforcement staff (Violation No. V2393) and all work within the TRCA regulated area has stopped. The applicant is awaiting approval from the TRCA before recommencing these works. As this project originally started prior to the issuance of the necessary permit, the applicant was required to pay an additional administrative fee. Control of Flooding: The proposed development will not be located within the Regional Storm flood plain. There will be no impact on the storage or conveyance of floodwaters. Pollution: Sediment and erosion control measures have been installed and will be maintained throughout construction to prevent sediment from entering the adjacent natural features. Dynamic Beaches: Not applicable. Erosion: There will be no geotechnical /slope stability issues associated with the development. In addition, the implementation of the aforementioned sediment and erosion control measures will minimize sedimentation and erosion on the site. Conservation of Land: The project does not constitute a Harmful Alteration, Destruction, or Disruption of fish habitat and, therefore, an Authorization from Fisheries and Oceans Canada (DFO) is not required. Staff will issue a Letter of Advice to the proponent on behalf of DFO. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings The stormwater management pond and outfalls will be planted with native, non - invasive . species to the satisfaction of TRCA staff. Policy Guidelines: This proposal is consistent with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40522 - Application #: 124 /08NAUG Report Prepared by: Coreena Smith, extension 5269 For information contact: Coreena Smith, extension 52.69 Date: September 3, 2008 911 • 8.1.88 BLOCK 39 (NORTH WEST) DEVELOPERS GROUP INC. To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 19, Concession 6, (Block 39, Along Pine Valley Drive, South of Major Mackenzie Drive), in the City of Vaughan, Humber River Watershed as located on the property owned by Block 39 (North West) Developers Group Inc.. The purpose is to allow development within a Regulated Area of the Humber River Watershed to facilitate the installation of a watermain and sanitary sewer by jack and bore auguring beneath a twin CMP culvert,conveying Marigold Creek. These works will be carried out within the road right -of -way on the east side of Pine Valley Drive, south of Major Mackenzie Drive, within the City of Vaughan. These works will service new residential subdivisions within the northwest corner of Block 39. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. PP -22, Plan and Profile of Pine Valley Drive, prepared by Schaeffers Consulting Engineers, dated May 2008, revised August, 20, 2008, redline revised by Mladen Ninkovic of Schaeffers Consulting Engineers on August 26, 2008, received by the TRCA on August 26, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to allow development within a Regulated Area of the Humber River Watershed to facilitate the installation of a watermain and sanitary sewer by jack and bore auguring beneath a twin CMP culvert conveying Marigold Creek. These works will be carried out within the road right -of -way on the east side of Pine Valley Drive, south of Major Mackenzie Drive, within the City of Vaughan. These works will service new residential subdivisions within the northwest corner of Block 39. Pine Valley Drive has been closed since August 11, 2008 and will remain closed until September 15, 2008 to accommodate these and other works. Due to the timing of these works, the closure of Pine Valley Drive and the need to complete the works within the coldwater fisheries timing window (July 1 to September 15), emergency authorization to start this project was provided on August 27, 2008 by the Director of Planning and Development at the TRCA. Staff further note that the project commenced prior to receipt of a permit from the TRCA A violation notice was issued by TRCA Enforcement staff (Violation No. V2393) and all work within the TRCA regulated area stopped. The applicant waited for authorization from the TRCA before recommencing the works. As this project originally started prior to the issuance of the necessary permit, the applicant was required to pay an additional administrative fee. 912 Control of Flooding: The development is not located within the Regional Storm flood plain. There will be no impact on the storage or conveyance of floodwaters. Pollution: Sediment and erosion control measures have been installed and will be maintained throughout construction to prevent sediment from entering the adjacent natural features. Dynamic Beaches: Not applicable. Erosion: There will be no geotechnical /slope stability issues associated with the development. In addition, the implementation of the aforementioned sediment and erosion control measures will minimize sedimentation and erosion on the site. Conservation of Land: The project does not constitute a Harmful Alteration, Destruction, or Disruption of fish habitat and, therefore, an Authorization from Fisheries and Oceans Canada (DFO) is not required. By following the conditions and measures set out in the Punch and Bore Crossings Ontario Operational Statement (Version 3.0), the proponent will be in compliance with subsection 35(1) of the Fisheries Act. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored with topsoil and sod upon completion of the works. Policy Guidelines: This proposal is consistent with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41272 - Application #: 688 /08NAUG Report Prepared by: Coreena Smith, extension 5269 For information contact: Coreena Smith, extension 5269 Date: September 3, 2008 TOWN OF MARKHAM . 8.1.89 11194 KENNEDY ROAD To site grade on Lot 28, Concession 5, (11194 Kennedy Road), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the replacement of an existing septic system. 913 The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by J. Larkin, dated.August 27, 2008, stamped received by TRCA Planning and Development August 27, 2008, redline revised by TRCA staff on September 5, 2008. RATIONALE The application was reviewed by staff on the.basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the replacement of an existing malfunctioning septic system. The subject lands currently contain an existing residential dwelling. Although the septic system is located within the Regional Storm Floodplain, all existing grades will be maintained. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. The area to which this application applies is currently a manicured lawn. As such no significant vegetation will be removed as a result of construction. Control of Flooding: TRCA Water Resources staff has reviewed this proposal and do not anticipate any impacts to the storage and /or conveyance of flood waters. The proposed septic system is located outside of the hydraulic floodway. All excavated fill will be removed from the Regional Storm Floodplain. Pollution: Sediment and erosion controls (i.e. silt fence) will be erected prior to construction taking place and will be maintained throughout all phases of construction in accordance with TRCA guidelines. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this project. Plantings No significant vegetation will be removed as a result of construction. As such, no additional plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). 914 CFN: 41371 - Application #: 740 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: September 3, 2008 TOWN OF RICHMOND HILL 8.1.90 1133373 ONTARIO LTD. To construct, reconstruct, erect or place a building or structure and alter a watercourse on Part Lot 64, Concession 1, (12461 -12775 Yonge Street), in the Town of Richmond Hill, Humber River Watershed as located on the property owned by 1133373 Ontario Limited. The purpose is to undertake works within a TRCA Regulated Area in order to facilitate the construction of a 99 -unit townhouse development block that includes amphibian crossings and a stormwater outfall. The permit will be issued for the period of September 5, 2008 to September 4, 2010 in accordance with the following documents and plans which form part of this permit: • A Letter of Undertaking provided by Larry Hennigar of Cole Engineering, dated Wednesday September 3rd, 2008, to address outstanding TRCA Ecology and Engineering issues, prior to the issuance of the permit RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed, just north of Bond Lake, in order to facilitate the construction of a stormwater outfall for a new 99 -unit townhouse development block that includes amphibian crossings. The proposed townhouse block is located on the Oak Ridges Moraine (ORM) and north of a Provincially Significant Wetland (PSW) (Bond Lake). The lands south of the property (Bond Lake) have been conveyed to the Province through a land exchange agreement. All stormwater runoff from the proposed townhouse block will be directed into the existing stormwater system and will not runoff into the sensitive wetland area south of the subject site. The stormwater outfall will be constructed and directed into an existing stormwater management pond to provide stormwater treatment. All the stormwater functions have been designed using TRCA guidelines. 915 There are two amphibian crossings proposed for this site on the east and west sides of the site. These crossings are located beneath the proposed roads within the site and are an extension of existing crossings north of this site that provides a corridor of amphibian movement from a wetland north of the subject site to Bond Lake. The crossing located on the west side of the site required grading within the buffer area, that has been conveyed to the Province in order to prevent stormwater from entering into the sensitive area south of the site. Grading within the buffer is also required by the east entrance on the proposed site to accommodate the road and lot configuration. Restoration and enhancement plantings are proposed for the disturbed areas that are to be graded. It is our opinion that the proposed restoration and enhancement plantings will provide an overall ecological net gain for this area of the Humber River Watershed. All grading has been approved by the Ontario Realty Corporation (ORC) acting on behalf of the Ministry of Public Infrastructure and Renewal (MPIR). Control of Flooding: The proposed works, are located within the Regional Storm Floodplain, however, mitigative measures are to be implement to maintain storage capacity and /or conveyance of flood waters. As such, TRCA Water Resources staff do not anticipate any significant impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate sediment and erosion controls will be installed and maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this project. Plantings Although no significant vegetation will be removed as a result of the proposed works, the applicant has proposed significant plantings in accordance with TRCA guidelines for the amphibian crossing and for restorative works within the buffer area. Policy Guidelines: The proposal complies with Section 4.1. - New Development and Section 4.3 - Infrastructure and Servicing, of the Authority's Valley and Stream corridor Management Program (VSCMP). CFN: 37197 - Application #: 514/05/RH Report Prepared by: Uton Samuels, extension 5386 For information contact: Uton Samuels, extension 5386 Date: September 3, 2008 916 RES. #B108/08 - Moved by: Seconded by: CLAIREVILLE CONSERVATION AREA Topsoil Placement. West of Regional Road 50 and North of Highway 407, City of Brampton. Proposal to Toronto and Region Conservation Authority from Metrus Development Inc. requesting permission to place approximately 90,000 cubic metres of topsoil at three locations within •Claireville Conservation Area. Ron Moeser Maja Prentice THAT Toronto and Region Conservation Authority (TRCA) enter into an agreement with Metrus Development Inc. (herein "Metrus ") to accept placement of clean surplus topsoil on lands within Claireville Conservation Area to enhance three existing landforms, subject to municipal approvals; THAT the fee for accepting the soil will be $3.10/m3; THAT in addition to the tipping fee, Metrus will be responsible for all costs of sediment control, placing topsoil and fine grading; THAT the funds received as compensation for receiving the surplus soil be set aside exclusively for project costs, for future restoration and habitat enhancement of the property, and for general TRCA purposes; THAT TRCA staff work together with the Humber Watershed Alliance and Claireville Advisory Committee to revise conceptual plans for the restoration of the area of the soil placement; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to execute all the necessary documentation required. CARRIED BACKGROUND The topsoil will be deposited in three previously disturbed locations. Location #1: Staff, in consultation with the public, have agreed that an existing berm, completed in 2002, should be extended in length and height as a means to further mitigate the sound and visual attenuation impacts of the adjacent Highway 407. The extension would allow for the placement of 36,000 cubic metres of topsoil without diminishing the value of the property. It is the opinion of staff that the project is an opportunity to preserve and enhance the restoration potential of the proposed site by creating the foundation for diverse habitat and public interpretation features. Staff completed an archaeological assessment of the proposed area prior to soil placement in 2002. 917 Location #2: As per Executive Resolution #B95/05, the committee approved placement of soils to create landforms along Regional Road 50. The project is nearing completion with the application of a 0.5 metre topsoil cap. In reviewing the recent work, staff determined that an additional one (1) metre of topsoil would be beneficial in specific areas to -allow for future tree and shrub planting. The proposed design modifications will allow for approximately 20,000 cubic metres of additional topsoil to be placed at this site. Location #3: As per Executive Resolution #B15/05, the committee approved placement of soils to create landforms along an industrial complex at Intermodal Drive. The project is nearing completion with the application of a 0.5 metre topsoil cap. In reviewing the recent work, staff determined that an additional one (1) metre of topsoil would be beneficial in specific areas to allow for future tree and shrub planting. The proposed design modifications will allow for approximately 40,000 cubic metres of additional topsoil to be placed at this site. It is the opinion of staff that this is an opportunity to strategically enhance the restoration potential of the three existing structures. TRCA staff will implement a soils quality control program to ensure and confirm that all soil placed on site meets Ministry of Environment parkland criteria. RATIONALE Because of the proximity of the topsoil source (Regional Road 50, south of Rutherford Road) to the deposition location, it is the opinion of staff that the compensation package offered by Metrus would not be matched by other top soil suppliers. In addition, it is proposed that the entire project will be completed by the spring of 2009, with Site #1 being completed this fall. TRCA staff has completed similar projects in other areas with considerable success. Examples of these successful projects include: the recently completed berm on the Kortright Centre for Conservation tablelands off Pine Valley Drive in the City of Vaughan; Boyd North Pit rehabilitation off Rutherford Road in the City of Vaughan; berming along Intermodal Drive and Highway 407 within Claireville Conservation Area in the City of Brampton; the berming along the new Markham By -Pass east of Ninth Line in the Town of Markham; and the berming and wetland complex development at Boyd North (along Islington Avenue north of Rutherford Road) in the City of Vaughan. Staff sees this regeneration work as a benefit to all involved as the surplus.soil, along with the financial compensation, will allow for the creation of habitat opportunities and public features on the property. DETAILS OF WORK TO BE DONE TRCA staff will continue to work with the Humber Watershed Alliance.and Claireville Advisory Committee to revise the approved conceptual plans for the restoration of the areas of soil placement. Various municipal permits will be obtained prior to beginning fill placement. 918 . FINANCIAL DETAILS The potential gross revenue from this project is approximately $279,000. The direct project operating and restoration costs will be deducted from this revenue. Report prepared by: David Hatton, 416 661 -6600 extension 5365 Email: dhatton @trca.on.ca For Information contact: David Hatton, 416 661 -6600 extension 5365 Email: dhatton @trca.on.ca Date: August 26, 2008 Attachments: 1 919 920 TERMINATION ON MOTION, the meeting terminated at 9:46 a.m., on Friday, September 5, 2008. Gerri Lynn O'Connor Brian Denney Chair Secretary- Treasurer /ks 921 c. THE TORONTO AND REGION CONSERVATION AUTHORITY MEETING OF THE EXECUTIVE COMMITTEE #8/08 October 3, 2008 The Executive Committee Meeting #8/08, was held in the Victoria Room, Black Creek Pioneer Village, on Friday, October 3, 2008. The Chair Gerri Lynn O'Connor, called the meeting to order at 9:44 a.m.. PRESENT Maria Augimeri Vice Chair Rob Ford Member Jack Heath Member Reenga Mathivanan Member Gerri Lynn O'Connor Chair Richard Whitehead Member PRESENT VIA CONFERENCE CALL Colleen Jordan Member Ron Moeser Member ABSENT David Barrow Member Suzan Hall Member Anthony Perruzza Member Maja Prentice Member RES. #8109/08 - MINUTES Moved by: Seconded by: Richard Whitehead Maria Augimeri THAT the Minutes of Meeting #7/08, held on September 5, 2008, be approved. CARRIED 922 PRESENTATIONS (a) A presentation by Laurian Farrell, Manager, Water Resources, TRCA, in regard to the International Conference on Flood Recovery Innovation and Response attended from July 2 -3, 2008, in London, England, approved by Res. #B64 /08. (b) A presentation by Cheryl Goncalves- Martin, Algae Biomonitoring Biologist, TRCA, in regard to the Freshwater Algae Sampling and Identification Workshop attended from August 25 - 29, 2008, in Warrensburg, New York, approved by Res. #B97 /08. PRESENTATIONS Above -noted presentations (a) and (b) were received, but quorum was not present during the presentations. SECTION I - ITEMS FOR AUTHORITY ACTION RES. #8110/08 - Moved by: Seconded by: GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Port Union Waterfront Improvement Project Josephine and Lawrence Daley, CFN 12173. Settlement of compensation for rights expropriated for the Port Union Waterfront Improvement Project - Phase 2. Ron Moeser Reenga Mathivanan THE EXECUTIVE COMMITTEE RECOMMENDS THAT confidential item 7.1 - Greenlands Acquisition Project for 2006 -2010, be approved; AND FURTHER THAT staff report back when the item is completed and can be made public. RES. #B111 /08 - Moved by: Seconded by: CARRIED WEBSITE REDEVELOPMENT Award of contract for the redevelopment of the Toronto and Region Conservation Authority website and a content management system. Ron Moeser Reenga Mathivanan 923 THE EXECUTIVE COMMITTEE RECOMMENDS THAT the contract for the redevelopment of the Toronto and Region Conservation Authority (TRCA) website be awarded to The Jonah Group Inc., at a cost not to exceed $210,000.00, plus applicable taxes, it being the bid that best met TRCA specifications; THAT award of the contract be subject to terms and conditions satisfactory to TRCA staff and legal advisers, including but not limited to determination of the final contract cost not to exceed the approved amount; AND FURTHER THAT authorized TRCA officials be directed to take such actions as are necessary to implement the contract including the signing and execution of documents. CARRIED BACKGROUND Since its inception in 1994, the TRCA website has grown rapidly and now . contains in excess of 2,500 pages that are visited by 35,000 to 50,000 web users each month. The current website structure and design was created in 2002. Though much of the website content is updated regularly, the effectiveness of the site is now constrained by outdated information architecture, technical limitations and a deficient content management system. These issues make the site difficult to navigate by users and difficult to update by staff. Web technologies and standard practices have progressed so that the current TRCA website cannot effectively take advantage of the opportunities offered by the internet. In 2007, TRCA engaged Sideren Inc. to conduct a gap analysis of the Watershed section of the TRCA website. Sideren recommended a comprehensive redevelopment of the TRCA website to engage stakeholders more effectively. Specifically, Sideren's recommended that the TRCA website be redeveloped to: • focus content around audience needs and interests; • simplify messaging and streamline navigation; • clarify what TRCA is and connect all its activities to its central mission; • facilitate development of communities of interest around TRCA initiatives; • optimize customer service and .efficiency through web - enabled delivery (e.g. sale of information, registrations, online surveys, etc.); and • encourage partner retention and loyalty through partner-focussed information. Staff prepared a request for proposals for the redevelopment of the TRCA website. The deadline for submission of proposals was September 5, 2008 at noon. In response, TRCA received 17 proposals. Staff evaluated the proposals based on: • experience on similar - scaled projects; • strength of the proposed work plan; • cost projection; • credentials of staff to be assigned to the project; • ability to meet timing requirements to complete the project; • experience with non - profit, community and government organizations; and • compliance with the requirements outlined in the Request for Proposals. Five companies were invited to present their proposals to staff: Applinx; eSolutions Group; Inorbital Inc; Moveable /Public Good; and The Jonah Group Ltd.. 924 ANALYSIS Based on the evaluation criteria, staff concluded that the proposal submitted by The Jonah Group meets all requirements set out in the Request for Proposal documents and offers solutions and an implementation plan best suited to meet TRCA's needs. In particular, the Jonah Group offers: • An open source platform for the web content management system and custom web applications that is available for anyone to see and use. This mitigates the business risks inherent in building a site on a proprietary platform owned by an external organization. • A highly adaptable content management system that allows non - technical users to easily add and update content. • Expertise in web design, as well as software development, allowing for full customization of web tools to meet TRCA's specific needs. • Experience in developing content -rich websites that integrate a range of web tools and applications such as dynamic event calendars, online surveys and e- newsletters. • Experience completing web projects for community- oriented, not - for - profit and government organizations. • Demonstrated support for environmental organizations and sustainable practices. • A cost proposal that is in line with available funds for the project. • Experience in working with a website and organization of TRCA size and complexity. FINANCIAL DETAILS Funds required to support and complete this project are available in the 2008 Operating and Capital Budget and identified in the 2009 Preliminary Operating and Capital Budget. Funds allocated to this project will not exceed $152,550, plus applicable taxes in 2008, and $57,060, plus applicable taxes in 2009. • Report prepared by: Rick Sikorski, extension 5414 Email: rsikorski @trca.on.ca For Information contact: Rick Sikorski, extension 5414 Email: rsikorski @trca.on.ca Date: September 23, 2008 SECTION 11 - ITEMS FOR EXECUTIVE ACTION RES. #B112/08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 .Development, Interference with Wetlands and Alterations to Shorelines and Watercourses. Pursuant to Ontario Regulation 166/06, written permission from the Authority is required for: a) straightening, changing, diverting or interfering in any way with the existing channel, of a river, creek, stream or watercourse, or for changing or interfering in any way with a wetland; 925 b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development. A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected. Moved by: Seconded by: Jack Heath Reenga Mathivanan THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.1 - 8.1.21, inclusive) which are listed below. RES. #B113/08 - APPLICATIONS OFR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Jack Heath Reenga Mathivanan THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.75 - 8.1.78, inclusive) which are listed below. CITY OF MISSISSAUGA CARRIED CARRIED 8.1.1 CITY OF MISSISSAUGA To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 14, Concession 8 S.D., 3545 Brandon Gate Drive (Mimico Creek runs parallel to Goreway Drive through Brandon Gate Park), in the City of Mississauga, Mimico Creek Watershed, as located on the property owned by City of Mississauga. The purpose is to stabilize the banks, remove in- stream deposition and realign a watercourse to reduce erosive forces on the banks within a warm water timing window. A Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO) for this project. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to provide revisions to the engineering drawings to the satisfaction of TRCA staff; dated September 22, 2008; received September 22, 2008; prepared by the City of Mississauga. RATIONALE The application was reviewed by staff on the basis of the following information: 926 Proposal: The proposal consists of regrading and stabilizing the banks along Mimico Creek at an outlet located just south of the Canadian National Railway, east of Goreway Drive, through the placement of fill and rip -rap toe protection. In- stream deposits will be removed and the watercourse realigned to reduce erosive forces on the banks where an existing Region of Peel sanitary sewer is at risk of exposure. A secondary channel will also be manually cleared of debris. • Control of Flooding: There will be no impact to the control of flooding. . Pollution: Standard sediment and erosion controls (sediment fencing, straw bales, coir cloth) will be in place for the duration of construction and until the site is restored to prevent construction - generated sediment from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: Once the area has been stabilized, the works will alleviate geotechnical /slope stability issues associated with the banks. Conservation of Land: With the erosion and sedimentation controls in effect, the potential for a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice (LOA) will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). Construction activity will only be carried out during the warm water timing window of July 1 to March.31. Plantings All disturbed areas will be restored with native /non- invasive species following • construction. Policy Guidelines: This proposal complies with Section 4.3, Infrastructure and Servicing, of TRCA's Valley and Stream Corridor Management Program. CFN: 41025 - Application #: 491/08/MISS Report Prepared by: Scott Smith, extension 5758 For information contact: Sharon Lingertat, extension 5717 Date: September 24, 2008 927 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA 8.1.2 24 MEADOWCREST ROAD To construct, reconstruct, erect or place a building or structure on Lot 18, Plan 3451, (24 Meadowcrest Road), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a new two- storey single family detached dwelling. The existing split -level detached dwelling is to be demolished. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing unnumbered, prepared by Rowan - Stanciu Ltd., dated June 30, 2008, received August 29, 2008; • Drawing No. A -6, Front /Rear Elevations, prepared by De Sousa Designs, dated July 2, 2008, Revision No. 4, revised on August 17, 2008, received on August 29, 2008; • Drawing No. A -7, Right /Left Side Elevations, prepared by De Sousa Designs, dated July 2,2008, Revision No. 4, revised on August 17, 2008, received on August 29, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a new two- storey single family detached dwelling. The existing split -level detached dwelling is to be demolished. The subject property is located south of Bloor Street West and west of Royal York Road in the City of Toronto (Etobicoke York). Control of Flooding: The subject site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The proposed works are located no further than the existing limit of development. The appropriate tree protection fencing will be installed. 928 Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41373 - Application #: 739/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: September 24, 2008 8.1.3 30 OLD MILL DRIVE To construct, reconstruct, erect or place a building or structure on 30 Old Mill Drive in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new verandah to the front of the existing two- storey detached single - family dwelling. The existing verandah is to be demolished. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Escala Designs Ltd., dated July 2008, Revision No. 2, revised on September 2008, received on September 10, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to facilitate the construction of a new verandah to the front of the existing two- storey detached single - family dwelling. The existing verandah is to be demolished. The subject property is located north of Bloor Street West and west of Jane Street within a TRCA Regulated Area of the Humber River Watershed. Control of Flooding: - The subject site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment fencing is not required as the proposed works are adequately setback from the watercourse. 929 Dynamic Beaches: Not applicable. • Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The site is fully urbanized and the proposed works are not expected to impact any significant resource features. There will be no impacts on fisheries and there are no further slope stability issues. Plantings No plantings are required as part of this application. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41452 - Application #: 800 /08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: September 24, 2008 8.1.4 33 DODDINGTON DRIVE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 17, Plan 3365, (33 Doddington Drive), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a one - storey rear addition and deck to the rear of the existing single storey detached dwelling. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Culmone & Associates Ltd., dated May 30, 2008, Revision No. 2, revised on August 28, 2008, received on September 2, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 930 Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a one - storey addition and deck to the rear of the existing single family detached dwelling. The existing concrete slab porch is to be removed. The subject property is located north of The Queensway and west of Park Lawn Road in the City of Toronto (Etobicoke York). Control of Flooding: The subject site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment fencing is not required as the_ proposed works are adequately setback from the . watercourse. Dynamic Beaches: . Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The proposed works are located no further than the existing limit of development. The appropriate tree protection fencing will be installed. . Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41422 - Application #: 776/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: September 24, 2008 8.1.5 38 GRACEFIELD AVENUE To construct, reconstruct, erect or place a building or structure on Part Lot B, C, Plan 3540, (38 Gracefield Avenue), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the installation of an in- ground swimming pool in the rear yard of the existing single family detached dwelling. 931 The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing unnumbered, Site Plan, prepared by Solda Pools, undated, received on September 16, 2008. • RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this"application is to install an in- ground swimming pool in the rear yard of the existing single family detached dwelling at 38 Gracefield Avenue in the City of Toronto (Etobicoke York Community Council Area). The subject site is located north of Lawrence Avenue West and west of Keele Street within a Regulated Area of the Humber River Watershed. Control of Flooding: The proposal is not located within a Regional Storm Floodplain and therefore will not impact the storage or conveyance of flood waters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable Erosion: A geotechnical letter of opinion has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.(E) - Development Guidelines for Property Improvements and Ancillary Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41193 - Application #: 627/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: September 24, 2008 932 8.1.6 . 81 MORSE STREET To construct, reconstruct, erect or place a building or structure on Part Lot 55, Plan 423, (81 Morse Street), in the City of Toronto (Etobicoke York Community Council Area), Don River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a new detached garage in the rear yard of the residential property. The existing detached garage is to be demolished. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1, Site Plan Part I, prepared by Graham Caswell, undated, received on September 18, 2008; • Drawing No. 5, East Elevation - Laneway, prepared by Graham Caswell, undated, received on September 18, 2008; • Drawing No. 6, West Elevation - To House, prepared by Graham Caswell, undated, received on September 18, 2008; • Drawing No. 7, South Elevation, prepared by Graham Caswell, undated, received on September 18, 2008; • • Drawing No. 8, North Elevation, prepared by Graham Caswell, undated, received on September 18, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to allow for the construction of a new detached garage (30' x 15') in the rear yard of the residential property. The existing detached garage is in poor condition and is to be demolished. The subject site is located in a Regulated Floodplain of the Lower Don Special Policy Area north of Queen Street East and east of Broadview Avenue in . the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: • • The entire property is located within the flood- fringe portion of the Regional Storm Floodplain of the Don River and within the Lower Don Special Policy Area. The proposed structure will be located outside of the hydraulic floodway and is not expected to impact on the storage and /or conveyance of flood waters. TRCA staff have determined that the flood depths are minimal in this area as it is a spill zone and the new ancillary structure does not increase the risk over that .which existed. Pollution: Sediment fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. 933 Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The subject property is located more than 400 metres from the Don River and the proposed works are not expected to cause any sedimentation of any watercourse. All excess fill will be removed from the site and the site is to be stabilized and restored. No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.1.(B) - Development Guidelines for Development/Redevelopment within Designated Two -Zone Areas or Special Policy Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41464 - Application #: 810/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: September 24, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.7 CITY OF TORONTO - LONG TERM CARE HOMES AND SERVICES To construct, reconstruct, erect or place a building or structure on 306 Finch Avenue East, in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by City of Toronto - Long Term Care Homes and Services. The purpose is to replace an existing raised wood deck structure. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A2.07B Site Plan, dated July 8, 2008, prepared by Montgomery.Sisam Architects Inc., received by TRCA staff September 16, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the replacement of an existing wooden deck structure with a new wooden deck structure of the same dimensions on new poured concrete footings in order to meet building code requirements.. 934 Control of Flooding: The proposed works are not located within the Regional Storm flood plain, and therefore no impacts on the conveyance and /or storage of flood waters is anticipated. Pollution: Appropriate erosion and sediment controls.will be installed and maintained throughout all phases of construction. 'Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. . Conservation of Land: . No significant vegetation will be removed as a result of construction. Plantings • As no significant vegetation will be removed, plantings are not required. . Policy Guidelines: This proposal is in conformity with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program CFN: 41455 - Application #: 803/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: September 24, 2008 8.1.8 6 HOCKLEY PLACE To•change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 193, Plan • 5544, (6 Hockley Place), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a ground floor addition to the west side of the existing dwelling and a garage addition. • . The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1.0 Site Plan, dated October 4, 2007, prepared by Antaegon Design Inc., received by TRCA staff march 19, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 935 Proposal: The proposed works involve the construction of a ground -floor addition over an existing basement and an at -grade addition to an existing garage. The proposed works "do not extend closer towards the top of the ravine slope than the existing limit of development. Control of Flooding: The subject property is located outside of the Regional Storm flood plain. As such, no impacts . to the storage and /or conveyance of flood waters is anticipated. Pollution: Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings As no significant vegetation will be removed, plantings are not required. Policy Guidelines: This proposal is in conformity with Section 4.2.2 C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program. CFN: 40622 - Application #: 194/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: September 24, 2008 8.1.9 46 PARK LANE CIRCLE To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Block A, Plan 2584, (46 Park Lane Circle), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to demolish an existing swimming pool and septic tank, restore the slope in the area of the former pool and tank, and construct a new single family dwelling and associated landscaping. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: 936 • Drawing No. A -1, Site Plan Notes, prepared by Makow Associates Architects, dated December 21, 2007, received May 26, 2008; • Drawing No. A -2, Basement Floor Plan, prepared by Makow Associates Architects, issued May 23, 2008, received May 26, 2008; • Drawing No. A -3, First Floor Floor Plan, prepared by Makow Associates Architects, issued May 23, 2008, received May 26, 2008; • Drawing No. A -4, Second Floor Floor Plan, prepared by Makow Associates Architects, issued May 23, 2008, received May 26, 2008; • Drawing No. A -5, Roof Floor Plan, prepared by Makow Associates Architects, issued May 23, 2008, received May 26, 2008; • Drawing No. A -6, Front (North) Elevation, prepared by Makow Associates Architects, issued May 23, 2008, received May 26, 2008; • Drawing No. A -7, Side (West) Elevation, prepared by Makow Associates Architects, issued May 23, 2008, received May 26, 2008; • Drawing No. A -8, Rear (South) Elevation, prepared by Makow Associates Architects, issued May 23, 2008, received May 26, 2008; • Drawing No. A -9, Side (East) Elevation, prepared by Makow Associates Architects, issued May 23, 2008, received May 26, 2008; • Drawing No. SCP -1, Sediment and Erosion Control Plan, prepared by Jordan Designs, dated April 2008, Revision No. 3, revised August 8, 2008, received August 20, 2008; • Drawing No. TP -1, Tree Preservation and Protection Plan, prepared by Jordan Designs, dated April 2008, Revision No. 3, revised August 9, 2008, received August 20, 2008; • Drawing No. TP -2, Tree Preservation and Protection Plan, prepared by Jordan Designs, dated April 2008, Revision No. 3, revised August 9, 2008, received August 20, 2008; • Drawing No. R1, Stable Slope Crest, prepared by Trafalgar Engineering, dated July 31, 2008, received September 19, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to demolish and existing swimming pool and septic tank, restore a stable slope in the area of the former pool and septic tank and construct a new single family dwelling and associated landscaping. The subject property is an existing lot of record located on the south side of Park Lane Circle, in the Bridle Path area of the City of Toronto. The site includes remnants of an existing single family dwelling foundation, driveway, swimming pool and septic tank, all of which will be demolished. The new dwelling and all hard landscaping will be constructed a minimum of 10 metres from the stable top of bank. The 10 metre buffer and the remainder of the valley is now subject to a conservation easement in favour of the TRCA and the entire vegetated portion of the subject property is subject to a secured ravine stewardship plan with the City of Toronto. • Control of Flooding: The subject property is not located in a Regional Storm Floodplain. 937 Pollution: Temporary sediment control has been provided and will be adjusted in phases once the dwelling is constructed and the slope remediation works begin. The subject property is well removed from the watercourse. Dynamic Beaches: Not applicable. Erosion: Temporary sediment control has been provided and will be adjusted as the various phases of development proceed. A portion of the slope where the existing swimming pool and septic tank is located will be restored with a 3:1 stable slope and renaturalized. The geotechnical slope stability of the existing and remediated slope has been reviewed and approved by TRCA's geotechnical engineering staff. Conservation of Land: The proposal is not located within and will not impact the adjacent Environmentally Significant Area. The proposed dwelling and landscaping is located a minimum of 10 metres from the top of bank. Plantings A ravine stewardship plan has been secured by the City of Toronto and will result in the removal of non - native and /or invasive species, and extensive replanting with native species in the buffer, on the slope and within the tableland portion of the property itself. Policy Guidelines: The proposal complies with Section 4.2.2., Development and Redevelopment /Intensification Within Non - Established Communities /Highly Urbanized Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40942 - Application #: 426/08/TOR Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: September 23, 2008 8.1.10 25 MONTRESSOR DRIVE To construct, reconstruct, erect or place a building or structure and site grade on Lot 380, Plan M -866, (25 Montressor Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to demolish the existing two- storey dwelling and construct a new two- storey dwelling with a walk -out basement and rear -yard deck and patio. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -1 Site Plan, dated August 2008, prepared by M -Arch Design Group Inc., received by TRCA staff May 30, 2008. 938 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works involve the demolition of an existing two- storey dwelling and the construction of a replacement two - storey dwelling. The minimum setback of the proposed rear deck from the top of the slope is approximately 5.4 metres, while the rear wall of the dwelling will maintain a minimum setback of approximately 7.9 metres. • Control of Flooding: • The subject property is located outside of the Regional Storm flood plain. As such, no impacts to the storage and /or conveyance of flood waters is anticipated. Pollution: Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings As no significant vegetation will be removed, plantings are not required. Policy Guidelines: This proposal is in conformity with Section 4.2.2 D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 40972 - Application #: 448/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: September 24, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.11 106 CELESTE DRIVE To construct, reconstruct, erect or place a building or structure on Lot 36, Plan M -746, (106 Celeste Drive), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. The purpose is to allow the maintenance of an existing sunroom and carport in the rear and side yards of an existing home. 939 The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Unnumbered Site Plan, date not shown, prepared by unknown author, received by TRCA staff July 18, 2008; • Unnumbered Elevation, date not shown, prepared by unknown author, received by TRCA staff September 15, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to maintain an existing rear sunroom addition and side yard carport, built onto an existing home in 2007 without the benefit of a municipal or TRCA permit. The valley feature at the rear of the property is located approximately 8 metres from the back wall of the sun room, and is currently supported by two tiers of timber retaining walls. The valley slope is heavily vegetated. Control of Flooding: The existing works are not located within a flood plain and will therefore have no effect upon the control of flooding. Pollution: The completed works are located within an already disturbed area, and soils have been stabilized. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical or slope stability concerns associated with this proposal. Conservation of Land: There is no significant vegetation located on the site of the works. Plantings Since no vegetation will be removed as part of this proposal, no plantings have been required as part of this permit. Policy Guidelines: This proposal is consistent with Policy 4.2.2 C) - Minor Additions, and Policy 4.2.2 E) - Property Improvements and Ancillary Structures. CFN: 41249 - Application #: 673/08/TOR Report Prepared by: Leah Weller,.extension 5250 For information contact: Steve Heuchert, extension 5311 Date: September 23, 2008 940 8.1.12 134 CENTENNIAL ROAD To construct, reconstruct, erect or place a building or structure on Lot 3, Plan 3167 - PART 3, (134 Centennial Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. The purpose is to construct a two- storey detached dwelling on a vacant lot. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1 of 1 Site Plan, dated June 23, 2008, prepared by Dero Building Design Consultants Inc., received by TRCA staff August 6, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the infill construction of a two- storey detached dwelling with a rear yard deck and walk -out basement on a vacant lot. The existing top of the ravine slope is set back more than 15 metres from the rear extent of the proposed development, however the proposed rear wall an deck of the dwelling are within approximately 10 metres of the drip line of vegetation contiguous to the ravine feature: Control of Flooding: The proposed development is not located within the Regional Storm flood plain and therefore will not impact the storage or conveyance of flood waters. Pollution: Sediment control fencing will be installed and maintained throughout construction to prevent • sediment from entering the adjacent valley system. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical /slope stability issues associated with the proposed development. Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings No plantings are required. Policy Guidelines: The proposal is consistent with Section 4.2.2 G) - Infilling - of the Authority's Valley and Stream Corridor Management Program. 941 CFN: 41234 - Application #:, 665/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: September 24, 2008 8.1.13 27 SEARS STREET Tochange, a building or structure so that it alters its use-or potential use, increases; its size or increases the number of dwelling units on Lot 12, Plan 214 -Y, (127 Sears'Street), in the'City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose'is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a rear deck and sunroom addition off of the second floor of the existing two- storey detached dwelling. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plaris which form part of this permit: • Drawing No. L1, Lot Layout, prepared by Patio Enclosurev Inc., dated April 2008, received on September 3, 2008; • .Drawing 'No. Al, Floor Plans, prepared by Patio Enclosures Inc., dated April 2008, received' on September 3, 2008; • • Drawing No.,A2, Rear Elevation, prepared by Patio Enclosures Inc., dated April 2008, received on September 3, 2008; • Drawing No. A3, Right Elevation, prepared by Patio Enclosures Inc'., dated April 2008, received on September 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: , The purpose of this application is to develop within a TRCA Regulated_Area of the Don River Watershed in order to facilitate the construction of a rear deck and sunroom addition off of the second floor of,the existing two- storey detached dwelling. The subject property is located within the Lower Don Special Policy Area (SPA)`east of Leslie Street and north of Eastern Avenue in the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: The proposed 'deck 'and sunroom addition will be located outside of the hydraulic floodway and above the 350 year flood eleva tion'of the Don River, within.the Lower Don SPA. The proposed works are not expected to impact on the storage or conveyance of flood waters. Pollution: Sediment fencing is not required as the proposed works are adequately setback from the watercourse: 942 Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The site is fully urbanized and the proposed works are not expected to impact any significant resource features. There will be no impacts on fisheries and there are no further slope stability issues. Plantings No plantings are required as part of this application. Policy Guidelines: This proposal is consistent with Section 4.2.1.(B) - Development Guidelines for Development /Redevelopment within Designated Two -Zone Areas or Special Policy Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41384 - Application #: 749/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: September 24, 2008 CITY OF VAUGHAN 8.1.14 CONFEDERATION BUSINESS PARK - MPL INC. To construct, reconstruct, erect or place a building or structure and site grade on Part Lot 3, Plan 65M -2623, (200 Confederation Parkway), in the City of Vaughan, Don River Watershed as located on the property owned by , Confederation Business Park - MPL Inc.. The purpose is to construct a parking area and retaining wall and perform minor grading works, related to a building addition, within a Regulated Area of the Don River Watershed at 200 Confederation Parkway in the City of Vaughan. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Site Grading and Servicing Plan, prepared by V.A. Piscione & Associates, revised dated September 9, 2008, received by the TRCA September 10, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 943 Proposal: The purpose is to construct a parking area, stormwater outfall, retaining wall and perform minor grading works within a Regulated Area of the Don River Watershed. The works that form this permit are related to a proposed addition to an existing industrial building. The associated expansion does not extend the existing industrial building closer to the feature and is not within a TRCA Regulated Area. The subject property is devoid of significant vegetation and has already been graded as part of the development of the subdivision (Draft Plan of Subdivision No.19T -84063 - Confederation Business Park). The proposed works are in close proximity to Westminster Creek and are located within the feature's meanderbelt but outside of the creek's Regional Flood Plain, approximately 7 metres from the flood plain area. Control of Flooding: The proposed works are located outside of the Regional Storm Flood Plain. There will be no impact on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be erected and maintained in order to prevent sediment from entering the adjacent watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As the watercourse will not be significantly impacted by the proposal and no in- stream works are proposed, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to a sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program. CFN: 41266 - Application #: 687 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: September 24, 2008 8.1.15 32 IRISH MOSS COURT To construct, reconstruct, erect or place a building or structure on Lot 41, Plan 65M -2140, (32 Irish Moss Court), in the City of Vaughan, Humber River Watershed. 944 The purpose is to construct a two storey addition (enclosure) to an existing dwelling within a Regulated Area of the Humber River Watershed. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan & Section Drawing, Drawing No. A -1, prepared by MP Design & Associates, dated June 2008, received by the TRCA June 23, 2008, redline revised to indicate the erection of sediment control fencing; • Floor Plans, Drawing No. A -2, prepared by MP Design & Associates, dated June 2008, received by the TRCA June 23, 2008; • Elevations Drawing, Drawing No. A -3, prepared by MP Design & Associates, dated June 2008, received by the TRCA June 23, 2008. RATIONALE The application was reviewed by staff.on the basis of the following information: Proposal: The purpose is to construct an enclosure around an existing basement walkout patio and ground floor level balcony attached to a dwelling within a Regulated Area of the Humber River Watershed. Based upon our mapping, the proposed works are located within an estimated Regional Storm Flood Plain area where the flood plain elevation is approximately 187.46 m.a.s.l. (metres above sea level). Based upon the As -Built construction drawing prepared by Fred Schaeffer & Associates Ltd. (dated July 1981), the basement floor elevation for the • existing home is 188.00 m.a.s.l. Since the proposed basement walk -out patio enclosure is at the same grade as the existing basement and is slightly higher than the estimated Regional . Storm Flood elevation, TRCA Water Resources staff are satisfied that the proposed works are outside of the Regional Storm Flood Plain. Control of Flooding: The proposed works are located outside of the Regional Storm Flood Plain, there will be no impacts on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be erected and maintained around the area of disturbance for the duration of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively , impacted by the project. 945 Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program. CFN: 41050 - Application #: 508 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: September 18, 2008 8.1.16 *17 COOK'S MILL CRESCENT To construct, reconstruct, erect or place a building or structure at 17 Cook's Mill Crescent in the City of Vaughan, Don River Watershed. The purpose is to recognize an existing deck constructed within a Regulated Area of the Don River Watershed. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with.the following documents and plans which form part of this permit: • Site Plan, prepared by the applicant, received by the TRCA August 15, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to recognize an existing deck constructed within a Regulated Area of the Don River Watershed. According to.TRCA mapping, the subject property is partially within the valley and a small corner of the property is within the Regional Storm Flood Plain. The existing deck is located approximately 5.5 metres away from the flood plain area. Based upon a site visit conducted by TRCA staff on September 9, 2008, the deck is located approximately 5 metres from an existing top of bank. Through the Draft Plan of Subdivision process (Woodvalley Developments - 19T- 95062) a 2.5 metre buffer was created around the TRCA staked natural feature and conveyed to the TRCA. The deck is located approximately 3.6 metres away from this buffer. Control of Flooding: The existing deck is not located within the Regional Storm Flood Plain. There will be no impact on the storage or conveyance of flood waters. Pollution: The works have already been completed and the site has been stabilized. In addition, a low earthen berm had been constructed as part of the subdivision which prevents the transport of sediment beyond the property boundary. 946 Dynamic Beaches: Not applicable. Erosion: TRCA geotechnical staff are satisfied that the completed works will not impact the stability of the existing slope. Conservation of Land: As a watercourse was not impacted by the proposal, there are no fisheries concerns. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas have been restored to the previously existing sodded condition and no significant natural features will be affected. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41369 - Application #: 737 /08/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: September 23, 2008 TOWN OF AJAX 8.1.17 MARSHALL HOMES (RIVERSIDE) LTD. To construct, reconstruct, erect or place a building or structure on Lot 14, 17, Concession 2, (732 -768 Riverside Drive and 84 -85 Birchmount Road), in the Town of Ajax, Duffins Creek Watershed as located on the property owned by Marshall Homes (Riverside) Ltd. The purpose is to site grade and construct a temporary storm outfall and sediment pond on property located west of Riverside Drive, south of Rossland Road in the Town of Ajax. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking, from Marshall Homes (Riverside) Limited, to provide any outstanding details to TRCA satisfaction RATIONALE The application was reviewed by staff on the basis of the following information: 947 Proposal: The proposal is to site grade and construct a temporary storm outfall and sediment pond for the purpose of pre - servicing a proposed townhouse development. The subject property is located on the west side of Riverside Drive and south of Rossland Road in the Town of Ajax. The subject property is currently developed with rural estate lots and includes a number of single family dwellings and accessory structures. The Zoning Amendment and Conditions of Draft Plan of Subdivision have been approved by TRCA staff and the Town of Ajax. This is the first of three TRCA permits that will be required to facilitate The development. The second (Application No. 742 /08 /AJAX on this agenda) is for the sanitary sewer connection under the East Duffins Creek. The third to be considered at a later date is for the development of the townhouses, a permanent storm outfall and an infiltration cell. Control of Flooding: The majority of the subject property is not located within the Regional Storm Floodplain. The proposed temporary sediment pond is located in the upper reaches of the floodplain. However, the proposal will have no impact on the storage or conveyance of flood waters. Pollution: Temporary sediment control has been provided per the Greater Golden Horseshoe Area Conservation Authorities, Erosion and Sediment Control Guideline for Urban Construction. These controls include the temporary pond, energy dissipation unit, sediment control.fencing, a phasing plan, and a mud mat. Dynamic Beaches: Not applicable. Erosion: Temporary erosion control has been provided per the Greater Golden Horseshoe Area Conservation Authorities, Erosion and Sediment Control Guideline for Urban Construction. There are no geotechnical issues with the proposal. • Conservation of Land: The proposal is not located in a significant area and will not impact the conservation of land. Tree protection fencing will be installed to protect the valley vegetation. Restoration plantings in the valley and buffers associated with the subdivision are included as a condition of Draft Plan.of Subdivision approval. Plantings Not required until the subdivision is constructed. Policy Guidelines: The proposal complies with Section 4.2.2., Development and Redevelopment /Intensification Within Non - Established Communities /Highly Urbanized Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41376 - Application #: 743 /08 /AJAX Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: September 23, 2008 948 ' 8.1.18 TOWN OF AJAX To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 14, 17, Concession 2, Plan M -1157, M -1200, (Riverside Drive south of Rossland Road), in the Town of Ajax, Duffins Creek Watershed as located on the property owned by Town of Ajax. The purpose is to site grade, temporarily or permanently place, dump or remove any material within a Regulated Area and alter a watercourse in order to install a sanitary sewer crossing of Duffins Creek on Riverside Drive in the Town of Ajax. The permit will be issued for the period of October 3, 2008 to October 2, 2010'in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking, from Marshall Homes (Riverside) Limited, to provide any outstanding details to TRCA satisfaction RATIONALE The application was reviewed by staff on the basis of.the following information: Proposal: The proposal is to conduct site grading works, alter a watercourse and temporarily or permanently place, dump or remove fill material within a Regulated Area and Regional Storm Flood Plain of the East Duffins Creek. The proposed works involve the installation of a sanitary sewer crossing via directional drilling under the Creek on Riverside Drive south of Rossland Road in the Town of Ajax. The proposed crossing will allow for the servicing of a new townhouse residential development proposed for the west side of Riverside Drive (see Application No. 743 /08 /AJAX on this agenda). The sanitary/watermain crossing will traverse a cold water creek. Geotechnical investigation has revealed that the proposed crossing route will be through tight till soils and the risk of frac -out due to the collapse of soils under the bed of the watercourse is minimal. A previous permit for the directional drilling of a Region of Durham watermain in a similar location under the creek was implemented in 2001 without difficulty. The proposed sanitary crossing is located a minimum of 2.0 metres below the existing watercourse channel. Conditional Permit As a precaution, the applicant will submit a contingency plan for the proposed directional drilling operation to address the risk of a frac -out on the work.site. Should a frac -out occur, TRCA staff will be notified immediately and works will be completed by implementing the contingency plan. Monitoring of the site will also be carried out should the contingency plan be required. This plan will be reviewed and.approved by TRCA technical staff prior to the issuance of the permit. As such, staff is requesting permission from the Executive Committee to allow staff to approve the issuance of the Ontario Regulation 166/06 permit for this project subject to TRCA's Ecology staff confirming that the details of the contingency plan are acceptable. 949 Control of Flooding: The proposed works will be located below grade and will not negatively impact the storage or conveyance of flood waters. Pollution: Erosion.and sediment control measures will be implemented prior to the initiation of construction and maintained for the duration of the works. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical /slope stability issues associated with the proposed works. Erosion on site will be minimized through the implementation of the aforementioned erosion and sediment control measures. Conservation of Land: No significant natural features will be impacted as the works will take place entirely on the . paved portion of the road right -of -way. Given the proximity of the works to the watercourse, a Letter of Advice will be issued on behalf of Fisheries and Oceans Canada (DFO). • A fisheries timing window extension will be granted based on the limited risk of a frac -out and the implementation of the contingency plan. Plantings Plantings are not be required as vegetation removal is not proposed. Policy Guidelines: This proposal is consistent with Section 4.3., Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41375 . - Application #: 742/08 /AJAX Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: September 23, 2008 TOWN OF CALEDON 8.1.19 88 KING STREET WEST To construct, reconstruct, erect or place a building or structure on 88 King Street West, in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the repair and addition to an existing storage garage at the rear of an existing residential dwelling located at 88 King Street West, in the Town of Caledon. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: 950 • Proposed Repair & Addition to Existing Frame Garage, prepared by T.E.B., dated-July 7, 2008, stamped received by TRCA Planning & Development staff on September 2, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the repair and addition to an existing storage garage at the rear of an existing residential dwelling located at 88 King Street West, in the Town of Caledon. The subject property is located at the bottom of The Main Humber Valley Corridor, away from the toe of slope, in the Town of Bolton. As such, there are no geotechnical concerns anticipated with this application. In addition, the location of the proposed addition is void of any significant natural features and there are no ecology related concerns with this application. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no adverse impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: • Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: The location of the garage addition is void of any significant vegetation. As such, no significant vegetation will be removed as a result of this project. There are no fisheries related concerns associated with this project. Plantings No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries related concerns associated with these works. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41391 - Application #: 759/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: September 24, 2008 951 TOWNSHIP OF KING 8.1.20 14380 DUFFERIN STREET To construct, reconstruct, erect or place a building or structure on Part Lot 15., Concession 3, (14380 Dufferin Street), in the Township of King, Humber River Watershed. The purpose is to construct a replacement home with replacement septic system and new caretaker's residence with new septic system within a Regulated Area of the Humber River Watershed. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Site Grading Plan, Drawing No. 1 of 3, prepared by Valdor Engineering Inc., revise dated March 31, 2008, received by the TRCA August 19, 2008; • Site Grading Plan, Drawing No. 2 of 3, prepared by Valdor Engineering Inc., revise dated March 31, 2008, received by the TRCA August 19, 2008; • General Notes, Drawing No. 3 of 3, prepared by Valdor Engineering Inc., revise dated March 31, 2008, received by the TRCA August 19, 2008; and • Planting Plan, Drawing No. L1, prepared by Stantec Consulting Ltd., dated June 4, 2008, received by the TRCA September 2, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a replacement dwelling and associated replacement septic system as well as a new caretaker's residence with a septic system within a Regulated Area of the Humber River Watershed. The proposal is located within the Wetland Area of Interference of two Provincially Significant Wetlands (PSWs) that form part of the Eaton Hall- Mary- Hackett Lakes Wetland Complex. It is also within an area identified as "Natural Core Area" under the Oak Ridges Moraine Conservation Plan (ORMCP). In addition, the replacement dwelling is in close proximity to an Area of Natural and Scientific Interest (ANSI), as identified by the Ministry of Natural Resources. The entire project is located in areas that have been cleared or disturbed even though they are within a significant woodlot that is a Key Natural Heritage Feature under the ORMCP. As part of the associated Site Plan Approval process (Application No. SPD- 07 -77), a Natural Heritage Evaluation (NHE) was prepared by Ages Consultants Limited to demonstrate conformity with the ORMCP. TRCA ecology staff are satisfied with the NHE, subsequent addendums and the conclusions drawn from the report. As part of this permit, restoration plantings have been provided along the edge of the area of disturbance for the replacement dwelling to create an enhanced buffer between the proposed residential uses and the edge of the significant woodlot and ANSI. Control of Flooding: The proposed works are not located within the Regional Storm Flood Plain, there will be no impact on the storage or conveyance of flood waters. 952 Pollution: Sediment control fencing is to be erected around the areas of disturbance for both the replacement dwelling and the new caretaker's residence. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. The proposed works are located within existing disturbed areas and will minimize any potential impact the development may have on the existing Significant Woodlot, nearby ANSI and PSWs. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. - Plantings A minimum 5 metre planting buffer composed of native, non - invasive species has been provided around the edge of the area of disturbance closest to the ANSI. These plantings provide an enhanced buffer between the nearby ANSI and Significant Woodlot to the proposed development. Policy Guidelines: The proposal is consistent with Section 4.2 - Existing Development - of the Authority's Valley and Stream Corridor Management Program. CFN: 41306 - Application #: 713/08/KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: September 18, 2008 8.1.21 5842 15TH SIDEROAD To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 9, Plan 463, (5842 15th Sideroad), in the Township of King, Humber River Watershed. The purpose is to recognize the placement of 12 truckloads of clean fill within a Regulated Area of the Humber River Watershed at 5842 15th Sideroad, in the Township of King. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by the applicant, received by the TRCA August 13, 2008, redline revised to indicate a maximum of 12 standard dump truck loads of clean fill only and the fill is to be leveled off and vegetated. 953- RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to recognize the placement of 12 truckloads of clean fill material within a Regulated Area of the Humber River Watershed. The subject property is partially within a stream / valley corridor and is in close proximity to the associated Regional Storm Flood Plain and a Provincially Significant Wetland (PSW) that forms a part of the Black Duck Wetland Complex. The flood plain is located approximately 7 metres away from the property boundary and the PSW is located approximately 40 metres away from the property boundary. Based upon a site visit conducted by TRCA September 3, 2008, the area that has been filled is along the edge of a shallow valley feature. There are no significant natural features in close proximity to the area that can be impacted by the placement of the fill. Control of Flooding: The fill has been placed outside of the Regional Storm Flood Plain, there are no impacts on the storage or conveyance of flood waters. Pollution: The area surrounding the fill placement is well vegetated and gently sloped, sediment will not be transported off site and will not impact the nearby watercourse or PSW. Dynamic Beaches: Not applicable. Erosion: TRCA geotechnical staff are satisfied that the works completed will not impact the stability of the slope and there are no erosion concerns. Conservation of Land: As the watercourse was not impacted by the fill placement, no fisheries concerns resulted. There are no other significant natural features on, or adjacent to the site that have been or will be negatively impacted by the fill placement. . Plantings All disturbed areas will be restored to the previously existing vegetated condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41304 - Application #:.711/08/KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: September 23, 2008 954 THE FOLLOWING PERMIT APPLICATIONS WERE ERRATA ITEMS: RES. #B114/08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS Moved by: Seconded by: Jack Heath Reenga Mathivanan THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.22 - 8.1.51, with the exception of 8.1.24 - Sorbara Group, 8.1.30 - 68 Hil!dale Road, 8.1.35 - Scarborough Golf and Country Club, which were withdrawn) that had been scheduled on the agenda as errata applications, for which all the required information was received and finalized as listed below. CARRIED CITY OF BRAMPTON 8.1.22 BELL CANADA To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or . elsewhere along the north side of Amberside Drive, west of Main Street South, in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by Bell Canada. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of an underground Bell Canada utility conduit by directional bore method. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Plan No. 406, prepared by Plantec Consulting Engineers, Revision No. 5, revised on September 29, 2008, stamped received by TRCA Planning & Development staff on October 1, 2008; • Plan No. 407, prepared by Plantec Consulting Engineers, Revision No. 5, revised on September 29, 2008, stamped received by TRCA Planning & Development staff on October 1, 2008; • Plan No. 701, prepared by Plantec Consulting Engineers, Revision No. 5, revised on September 29, 2008, stamped received by TRCA Planning & Development staff on October 1, 2008. • RATIONALE The application was reviewed by staff on the basis of the following information: 955 Proposal: The project involves the installation of an underground utility conduit within a TRCA Regulated Area of the Etobicoke Creek Watershed along the north side of Amberside Drive, west of Main Street South, in the City of Brampton. The underground conduit will run under the watercourse and will be installed by directional bore method. The proposed works will be constructed a minimum 2.0 metres below the watercourse bottom (warm water stream). The entry and exit locations will be appropriately setback from the valley corridor feature and the work areas will be isolated and contained with sediment & erosion control fencing. Control of Flooding: No excavated material is to be stockpiled within the Regional Storm Floodplain and all existing grades are to be maintained. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. All disturbed areas will be restored with a native, non - invasive seed mix in accordance with TRCA's guidelines. Plantings As no vegetation is to be removed by the proposed works, plantings are not required. The proposed seed mix composition is native and non - invasive. Policy Guidelines: This proposal is in conformity with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 40767 - Application #: 292 /08 /BRAM Report Prepared by: Jason Wagter, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: September 24, 2008 8.1.23 REGIONAL MUNICIPALITY OF PEEL To construct, reconstruct, erect or place a building or structure in a Regulated area on Steeles Avenue east of Airport Road (Mimico Creek runs parallel to Airport Road, crossing Steeles Avenue), in the City of Brampton, Mimico Creek Watershed as located on the property owned by Regional Municipality of Peel. 956 The purpose is to perform bridge rehabilitation works within a warm water fisheries timing window. A Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO) for this project. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Letter of Undertaking to provide revisions to the engineering drawings to the satisfaction of TRCA staff; dated September 30, 2008; received September 30, 2008; prepared by Morrison Hershfield. RATIONALE The application was reviewed. by staff on the basis of the following information: Proposal: The proposal consists of the rehabilitation of an existing bridge deck (repaving, concrete repairs, and replacing sections of the sidewalks), and repairs to the soffit and abutment walls (concrete patch repairs). The bridge is on Steeles Avenue, east of Airport Road. Control of Flooding: There will be no impact to the control of flooding. Pollution: Standard sediment and erosion controls (silt fence, scaffolding debris containment system) will be in place for the duration of construction, and until the site is restored, to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With the erosion and sedimentation controls in effect, the potential for a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice (LOA) will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). All • construction activity will only be carried out during the warm water timing window of July 1 to March 31. Plantings • All disturbed areas will be restored with native seed mix following construction. 957 Policy Guidelines: This proposal complies with Section 4.3, Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41255 - Application #: 679 /08 /BRAM Report Prepared by: Scott Smith, extension 5758 For information contact: Sharon Lingertat, extension 5717 Date: September 24, 2008 8.1.24 SORBARA GROUP To site grade on Lot 4, Concession 9 NDS Plan 21T-05038B, (Gore Road and Queen Street), in the City of Brampton, Humber River Watershed as located on the property owned by Sorbara Group. • Withdrawn CITY OF MISSISSAUGA 8.1.25 CITY OF MISSISSAUGA To construct, reconstruct, erect or place a building or structure in a regulated area on Lot 2, Concession 3 EHS on Matheson Boulevard East between Tomken Road and Maingate Drive (Little Etobicoke Creek runs parallel to Tomken road, crossing Matheson Boulevard East), in the City of Mississauga, Etobicoke Creek Watershed, as located on the property owned by the City of Mississauga. The purpose is to perform bridge rehabilitation works within a warm water fisheries timing window. A Letter. of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO) for this project. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Letter of Undertaking to provide revisions to the engineering drawings to the satisfaction of TRCA staff; dated September 25, 2008; received September 26, 2008; prepared by Giffels Associates Limited. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the rehabilitation of an existing bridge deck (repaving, replacing the sidewalks and replacing the parapet walls), and repairs to the soffit, abutment walls, and retaining walls (concrete patching, and epoxy injection of cracks). Control of Flooding: There will be no impact to the control of flooding. 958 Pollution: Standard sediment and erosion controls (silt fence) will be in place for the duration of construction, and until the site is restored, to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With the erosion and sedimentation controls in effect, the potential for a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice (LOA) will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). All construction activity will only be carried out during the warm water timing window of July 1 to March 31. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 41200 - Application #: 636/08/MISS Report Prepared by: Scott Smith, extension 5758 For information contact: Sharon Lingertat, extension 5717 Date: September 24, 2008 8.1.26 REGIONAL MUNICIPALITY OF PEEL To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 11, Concession 3, (Dixie Road), in the City of Mississauga, Etobicoke Creek Watershed as located on the property owned by Regional Municipality of Peel. The_purpose is to perform bridge rehabilitation works and construct scour protection within a warm water fisheries timing window. A Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO) for this project. The permit will be issued for the period of October 3, 2008 to October 2, 2010: • Letter of Undertaking to provide revisions to the engineering drawings to the satisfaction of TRCA staff; dated September 30, 2008; received September 30, 2008; prepared by Morrison Hershfield. 959 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of the rehabilitation of an existing bridge deck (repaving, concrete repairs, and replacing sections of the sidewalks), repairing the existing gabion baskets on the northwest side of the bridge, and filling in the scour void against the existing northwest gabion wall with rip -rap and riverstone. Control of Flooding: There will be no impact to the control of flooding. Pollution: Standard sediment and erosion controls (silt fence, bridge deck debris containment system) will be in place for the duration of construction and until the site is restored to prevent construction - generated sediment from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With the erosion and sedimentation controls in effect, the potential for a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice (LOA) will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). All construction activity will only be carried out during the warm water timing window of July 1 to March 31. Plantings All disturbed areas will be restored with native seedmix following construction. Policy Guidelines: This proposal complies with Section 4.3, Infrastructure and Servicing, of TRCA's Valley and Stream Corridor Management Program. CFN: 41059 - Application #: 516/08 /MISS Report Prepared by: Scott Smith, extension 5758 For information contact: Sharon Lingertat, extension 5717 Date: September 24, 2008 960 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.27 28 RIVERDALE DRIVE To construct, reconstruct, erect or place a building or structure on Lot 50, Plan M 433, (28 Riverdale Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a deck to the rear of the existing two- storey single family detached dwelling. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • A -3, First Floor Plan, prepared by Architectural Design Co. Inc., dated November 2005, Revision No. 3, revised on June 26, 2008, received on September 5, 2008; • A -5, Front and Right Side Elevations, prepared by Architectural Design Co. Inc., dated November 2005, Revision No. 4, revised on June 26, 2008, received on September 5, 2008; • A -6, Rear and Left Side Elevations, prepared by Architectural Design Co. Inc., dated November 2005, Revision No. 4, revised on June 26, 2008, received on September 5, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to allow for the construction of a deck to the rear of the existing two- storey single family detached dwelling. The existing dwelling did not require a permit as per Ontario Regulation 158 and was issued clearance on April 16, 2006. The ' drawings reviewed in April 2006 included a rear deck. However, the current proposal is for a larger deck than what was previously reviewed and cleared. The subject site is located east of Islington Avenue and south of Albion Road in the City of Toronto (Etobicoke-York Community Council Area). Control of Flooding: • The subject site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A sediment control fence will be installed to prevent construction debris from entering the watercourse. • Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. 961 Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(E) - Development Guidelines for Property Improvements and Ancillary Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41431 - Application #: 791/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: September 24, 2008 8.1.28 174 SOUTH KINGSWAY To construct, reconstruct, erect or place a-building or structure on Lot 42, Plan M523, (174 South Kingsway), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order tofacilitate the reconstruction of an existing retaining wall in the rear yard of the existing single family detached dwelling. The existing retaining wall is to be removed. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Drawing unnumbered, Site Plan, prepared by Avanti Surveying Inc., dated June 17, 2008, received on July 25, 2008; • Drawing unnumbered, Partial Site Plan, prepared by John Tickle, undated, received on July 25, 2008; • Drawing No. S -2.0, Option #2 Retaining Wall Section, prepared by M. A. Steelcon Engineering Limited, dated September 2, 2008, received on September 5, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the reconstruction of an existing retaining wall in the rear yard of the existing single family detached dwelling. The existing retaining wall is to be removed. The subject property is located south of Bloor Street West and west of Jane Street in the City of Toronto (Etobicoke York). 962 Control of Flooding: This site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment and erosion control fence will be installed in order to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: A geotechnical investigation and slope stability assessment has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: The proposal is not located closer to the top of bank than the existing structure. The appropriate tree protection fencing will be implemented. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41190 - Application #: 632/08/TOR Report Prepared by: Nicole Moxley, extension 5284 • For information contact: Steve Heuchert, extension 5311 Date: September 24, 2008 8.1.29 98 BABY POINT ROAD To construct, reconstruct, erect or place a building or structure on 98 Baby Point Road in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area•of the Humber River Watershed in order to facilitate the construction associated with repairing the existing failed retaining wall in the rear yard of the single family detached dwelling. The footings of the original retaining wall were damaged as a result of water being drained from the existing swimming pool over the top of bank. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Drawing unnumbered, Site Plan, prepared by Bruce A. Brown Associates Limited, dated October 1, 2008, received on October 1, 2008; 963 • Letter of Assurance, prepared by Bruce A. Brown Associates Limited, dated October 1, 2008, received on October 1, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to allow for the construction associated with repairs to the existing failed retaining wall in the rear yard of the single family detached dwelling. The existing retaining structure is failing due to damaged footings which may have been a result of pool Water being drained over the top of bank. It should be noted that the section of retaining wall to be repaired is approximately 6 metres (20 feet) in length. The subject site is located within a TRCA Regulated Area of the Humber River Watershed, south of Dundas Street W, west of Jane Street and backing onto Magwood Park and the Humber River in the City of Toronto. Control of Flooding: The subject site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: A slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance to the recommendations of this report. Further to this, the Applicant has agreed in writing to retain the services of a geotechnical consultant to be present on site during demolition and construction. The retained consultant will be provided progress reports during construction and 'as- built' drawings will be provided upon its completion. Conservation of Land: All excess fill will be removed from the site and the site is to be stabilized and restored. No significant vegetation will be removed as a result of construction and appropriate tree protection fencing will be installed. Plantings - Native plantings will be provided as per recommendations of the geotechnical report. Policy Guidelines: The proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the Authority's Valley and Stream Corridor Management Program. 964 CFN: 41216 - Application #: 647/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: September 24, 2008 8.1.30 68 HILLDALE ROAD To construct, reconstruct, erect or place a building or structure on Part Lot 6, 7, Plan 1982, (68 Hilldale Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. • Withdrawn CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.31 CITY OF TORONTO To alter a watercourse on Lot PART OF 2, 3, Concession 1 EYS, ( Bayview Avenue near Eglinton Avenue), in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by City of Toronto. The purpose is to install a vegetated buttress along eroded bank sections in Sunnydene Park; to establish a more natural channel bed gradient between the service road crossing in Sunnydene Park and Bayview Avenue; to treat bank erosion south of the service road culvert with a vegetated buttress including backfill, and to realign target flows directly into the culvert; and, to excavate the creek bed at two sites and install bed treatment (subsurface riffle) along the channel. A Letter of Advice regarding mitigation of negative impacts will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Letter of Undertaking to provide revisions to drawings and documentation, and landowner authorizations for work outside the Regulated Area, dated September 26, 2008; received by TRCA on September 26, 2008; prepared by the City of Toronto. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves restoration works along Sherwood Creek and Burke Creek in the City of Toronto. The proposed work includes installing a vegetated buttress along eroded sections of the creek bank in Sunnydene Park; establishing a more natural channel bed gradient between the service road crossing in Sunnydene Park and Bayview Avenue; treating the bank erosion south of the service road culvert with a vegetated buttress including backfill, and realigning the creek to target flows directly into the culvert; and, excavating the creek bed at two sites and installing bed treatment (subsurface riffle) along the channel. 965 Control of Flooding: There will be no impacts to control of flooding, storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures will be implemented prior to construction and maintained for the.duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering into the creek. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: There are no geotechncial engineering or slope stability issues associated with the proposed works. Conservation of Land: With erosion and sediment control measures in place, the potential for Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice regarding mitigation of negative impacts will be.written by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). The proposed works will be subject to the cold water fisheries timing window. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40578 - Application #: 167/08/TOR Report Prepared by: Renee Afoom, extension 5714 For information contact: Renee Afoom, extension 5714 Date: September 24, 2008 8.1.32 R. J. MCARTHUR PROPERTIES INC. - CORAM DEVELOPMENT INC. To construct, reconstruct, erect or place a building or structure and site grade on Lot 7, Concession 3, (701 Don Mills Road), in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by R. J. McArthur Properties Inc. - Coram Development Inc. The purpose is to grade a portion of the site to construct an asphalt visitor's parking lot. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: 966 • Drawing No. SW -1 Site Plan, dated August 25, 2008, prepared by Pitura Husson Limited, received by TRCA staff September 24, 2008; • Drawing No. SW -2 Grading Plan, dated August 25, 2008, prepared by Pitura Husson Limited, received by TRCA staff September 24, 2008; • Drawing No. T1 Tree Preservation Plan, dated June 20, 2008, prepared by Urban Forest Innovations Inc., received by TRCA staff September 24, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed grading works will facilitate the construction of an at -grade parking lot, to be setback a minimum of 10 metres from the existing top of the ravine slope. A retaining wall is proposed to border a portion of the parking lot. This wall will be set back a minimum of approximately 35 metres from the existing top of the ravine slope. Control of Flooding: The proposed works are not located within a Regional Storm flood plain. As such, no impact to the conveyance /storage of flood waters is anticipated. Pollution: • Sediment and erosion control measures will be installed and maintained throughout construction. • Dynamic Beaches: Not applicable. Erosion: There will be no geotechnical /slope stability issues associated with the proposed development. Conservation of Land: No significant valley vegetation will be affected by the proposed works. Plantings No plantings are required. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 39898 - Application #: 774/07/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: September 24, 2008 967 8.1.33 SANOFI PASTEUR LIMITED To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 5, Concession 2 WYS, (1755 Steeles Avenue West), in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by Sanofi Pasteur Limited. The purpose is to construct an addition to an existing building within a Regulated Area of the Don River Watershed. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Drawing No. A1.1, New Site Plan, prepared by G +G Partnership Architects, revised May 12, 2008, received May 13, 2008; • Drawing No. B96 -LP -1, Building 94 Compensation Plan Landscape Plan, revised August 14, 2008, received September 23, 2008, red -line revised by TRCA on September 30, 2008; Drawing No. B96 -LP -2, Building 96 Compensation Plan, dated September 19, 2008, received September 23, 2008, red -line revised by TRCA on September 30, 2008. . RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of a 2,471 sq.m. (21,500 sq.ft.) addition to an existing research building within a Regulated Area of the Don River Watershed. The addition is known as "Building 96" and is considered an extension of "Building # 94 ". The subject building and proposed addition is located on the Sanofi Pasteur property which is a large (20 hectare) pharmaceutical research and production facility in the area east of Dufferin Street and south of Steeles Avenue West in the City of Toronto. The campus includes a portion of the Don River Valley on the west and south. The proposed addition will be constructed within a highly disturbed draw feature associated with the valley. This feature was previously disturbed with the installation of an oil /grit separator. During the installation, the draw feature was stripped of vegetation and has not been restored to date. Given that the oil /grit separator installation took place without a TRCA permit and the proposal is to develop partially within the draw feature, Sanofi Pasteur Limited has agreed to provide an extensive compensation planting plan. The planting compensation will be implemented entirely on Sanofi Pasteur lands within the reach of the subject proposal. Conditional Approval: As a result of negotiations between the proponent, TRCA and the City of Toronto it became apparent that a comprehensive redevelopment master plan is needed to identify future site planning, technical and policy issues. 968 Sanofi Pasteur Limited has agreed to begin a Master Site Planning process in consultation with the City of Toronto and TRCA in order to ensure that future development on site will maintain and enhance the integrity of the Don River valley system. An objective of the Master Site Plan will be to provide a net gain to the natural heritage system and include technical requirements for significant vegetation, stable top of bank, enhancements to the terrestrial natural heritage system and improvements to water quality and quantity controls for the entire campus. A Master Site Plan process will be required as a condition of the City of Toronto's Site Plan approval for the current proposal. As such, staff is requesting permission from the Executive Committee to allow the issuance of the Ontario Regulation 166/06 permit for this project subject to written confirmation that Sanofi has entered into a Site Plan Agreement with the City of Toronto which includes a condition requiring a Master Site Plan Approval for the entire property prior to any future development taking place. Issuance of future permits will rely on an approved Master Site Plan that addresses TRCA issues. Control of Flooding: The proposed building is not located within the Regional Storm Floodplain, therefore there are no flooding concerns. Pollution: Appropriate sediment fencing will be in place throughout the duration of construction to ensure that no sediment will enter the watercourse. Dynamic Beaches: Not applicable Erosion: A geotechnical report was submitted in support of the application. TRCA technical staff have reviewed this report and determined that there will be no erosion issues associated with this proposal. . Conservation of Land: A compensation planting plan will be implemented elsewhere on site. TRCA technical staff are of the opinion that the proposed planting plan will provide a net gain to the terrestrial natural heritage system on site. This mitigation coupled with a Master Site Plan for the campus will ensure that the integrity of the natural heritage system is maintained and enhanced for the future. Plantings All plantings will be in accordance with TRCA's Post - Construction Restoration Guidelines and Seed Mix Guidelines. Policy Guidelines: This policy is consistent with Section 4.2.2.0 - Minor Additions - of this Authority's Valley and Stream Corridor Management Program. CFN: 39625 - Application #: 576/07/TOR Report Prepared by: Mark Rapus, extension 5259 For information contact: Mark Rapus, extension 5259 Date: September 23, 2008 969 8.1.34 111 MILDENHALL ROAD To construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 46, Plan 2335, (111 Mildenhall Road), in the City of Toronto (North York Community Council Area), DonRiver Watershed. The purpose is to demolish an existing two- storey dwelling and construct a replacement two- storey dwelling with a walk -out basement, a rear yard pool /spa and terraces. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -1.0 Site Plan, dated August 15, 2008, prepared by Wayne Swadron, Received by TRCA staff August 26, 2008; • Drawing No. L -1.0 Landscape Layout and Grading Plan, dated August 15, 2008, prepared by Wayne Swadron, Received by TRCA staff August 26, 2008; • Drawing No. G -1.1 Erosion and Sediment Control Plan, dated August 15, 2008, prepared by Wayne Swadron, Received by TRCA staff August 26, 2008; • Drawing No. G -1 Site Servicing, Grading & Stormwater Management, dated August 14, 2008, prepared by A.M. Candaras Associates Inc., Received by TRCA staff August 26, 2008." RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the demolition of an existing two- storey, detached dwelling and the construction of a new two- storey, detached dwelling with a walk -out basement and pool /spa structures and associated terraces in the rear yard. All proposed works are set back a minimum of 1.4 metres from the identified Tong -term stable top -of -slope line. Extensive vegetative buffer plantings are proposed for the slope feature. Control of Flooding: The proposed works are not located within a Regional Storm flood plain and will therefore have no impact on the control or conveyance of flood waters. Pollution: The ravine feature is to be protected from erosion and sedimentation as per the approved Erosion and Sediment Control Plan. Dynamic Beaches: Not applicable. Erosion: As the proposed works are set back from the Tong -term stable top -of- slope, there are no slope stability or erosion concerns with this proposal. 970 Conservation of Land: The proposed works will have minimal impact on significant vegetation, and no impact on other natural heritage features. The applicant will obtain a permit from the City of Toronto Urban Forestry Services for any tree removals. Plantings Compensation plantings will be provided as per the City of Toronto Municipal Code Chapter 658, Ravine Protection By -Law. Policy Guidelines: This proposal is in conformity with Section 4.2.2 D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41388 - Application #: 755/08/TOR Report Prepared by: Diana Li, extension 5221 For information contact: Steve Heuchert, extension 5311 Date: September 24, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.35 SCARBOROUGH GOLF AND COUNTRY CLUB To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 16, Concession D, (321 Scarborough Golf Club Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. • • Withdrawn CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.36 2600 ST. CLAIR AVENUE EAST • To construct, reconstruct, erect or place a building or structure.on Part Block C, Plan 3629, (2600 St. Clair Avenue East), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a replacement retaining wall along the side (east) yard of the existing detached dwelling. The existing timber retaining wall is in poor condition and is to be removed. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Page 1, Borehole Location Plan, prepared by Terraprobe Limited, dated August 20, 2008, Revision No. 1, revised on September 25, 2008, received on September 25, 2008; 971 • Page 2, Partial Site Plan, prepared by Terraprobe Limited, dated August 20, 2008, Revision No. 1, revised on September 25, 2008, received on September 25, 2008; • Page 7, New Pre -cast Block with Reinforced Backfill Option, prepared by Terraprobe Limited, dated August 20, 2008, Revision No. 1, revised on September 25, 2008, received on September 25, 2008; • Page 8, New Timber Crib Wall Option, prepared by Terraprobe Limited, dated August 20, 2008, Revision No. 1, revised on September 25, 2008, received on September 25, 2008; • Page 9, New Armourstone Wall Option, prepared by Terraprobe Limited, dated August 20, 2008, Revision No. 1, revised on September 25, 2008, received on September 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to facilitate the construction of a replacement retaining wall along the side (east) yard of the existing detached dwelling at 2600 St. Clair East in the City of Toronto. The existing timber retaining wall is in poor condition and is to be removed. The subject property is located within a TRCA Regulated Area of the Don River Watershed, north of O'Connor Drive, on the east side of St. Clair Avenue East abutting Taylor Creek Park to the east. Control of Flooding: The subject site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A sediment control fence will be installed to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report and letter of opinion has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: The proposal islocated no further than the existing limit of development. The appropriate tree • protection fencing will be installed. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. 972 Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41381 - Application #: 748/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: September 24, 2008 CITY OF VAUGHAN 8.1.37 2170779 ONTARIO INC. To construct, reconstruct, erect or place.a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Block 172, Plan 65M -3935, Ivy Glen Drive and Dufferin Street, in the City of Vaughan, Don River Watershed as located on the property .owned by 2170779 Ontario Inc. The purpose is to site grade, develop and temporarily or permanently place, dump or remove any material within a Regulated Area of the Don River, in order to construct two commercial buildings within the Ivy Glen subdivision, in Planning Block 18, in the City of Vaughan. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Letter of Undertaking, prepared by Loreto Tersigni, F.J. Ternoway & Associates Limited, dated September 29, 2008, received September 29, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to site grade, develop and temporarily or permanently place, dump or remove • any material within a Regulated Area of the Don River, in order to construct a commercial development, consisting of two buildings, located within the existing Ivy Glen subdivision, in Planning Block 18, in the City of Vaughan. The subject property is located within Block 18, which is bounded by Dufferin Street to the east, Rutherford Road to the south, the Canadian National Railway to the west and to the north by Major Mackenzie Drive. The site is located on the west side of Dufferin Streef and on the north side of Ivy Glen Drive (south of Major Mackenzie Drive). The subject property is a part of Draft Approved Plan of Subdivision 19T -00V14 (Ivy Glen). This permit fulfils a condition of site plan approval for the subject site (Site Plan Application DA.08.028). 973 It is noted that Block 18 has an approved Master Environmental Servicing Plan (MESP) in place. The limits of the natural features, including the buffers within the Block and on the subject site were previously identified and delineated during the MESP process. Furthermore, the treatment of stormwater including water quality and quantity controls were reviewed as part of the MESP and the associated approved draft plan of subdivision. Additional details on stormwater management, including groundwater infiltration were provided as part of the associate site plan application and were found satisfactory. The subject site is located adjacent to a tributary of the East Don River, but located outside of the Regional Storm Flood Plain of this watercourse. A 2.5 metre buffer, consistent with the approved draft plan of subdivision and the rest of Block 18 is provided for the proposed development. A buffer landscape plan, along with an edge treatment plan for the site and Block 18 were submitted to TRCA staff and approved previously. Control of Flooding: The subject site located outside of the Regional Storm Flood Plain of the East Don River. As such, the storage or conveyance of flood waters will not be impacted. Pollution: Erosion and sediment controls including silt fencing will be erected prior to the initiation of grading and construction and maintained for the duration of the works to ensure sediment does not enter the adjacent valley system and watercourse. Dynamic Beaches: Not applicable. Erosion: Erosion on site will be minimized through the implementation of the aforementioned erosion and sediment control measures. Conservation of Land: There are no geotechnical /slope stability issues associated with the proposed works. No in -water works are proposed as part of this application. Plantings A landscape planting plan along with an edge management plan were submitted as part of this application and for the associated draft approved plan of subdivision. Landscape plantings on the site and within the buffer will be carried out in accordance with TRCA's Planting Guidelines. Policy Guidelines: This proposal complies with Section 4.1.1 - New Urban Development, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41383 - Application #: 750 /08NAUG Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date: September 24, 2008 974 8.1.38 64 HILLSIDE AVENUE To construct, reconstruct, erect or place a building or structure, site grade and • temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 24, Plan_2468, (64 Hillside Avenue), in the City of , Vaughan, Don River Watershed. The purpose is to construct an inground pool within a Regulated Area of the Don River Watershed at 64 Hillside Drive in the City of Vaughan. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Site Plan, prepared by the applicant, received by the TRCA July 22, 2008; • Topographical Survey / Grading Plan, prepared by P. Salna Company Ltd., received by the TRCA August 28, 2008; • Letter of Undertaking, dated October 1, 2008, prepared by the applicant stating that a revised Planting Plan will be submitted to the satisfaction of the TRCA. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to resolve an outstanding violation (Violation File No. V2390) for the commencement of the construction of an inground pool and associated grading works within a Regulated Area of the Don River Watershed. The works are located within the Regional Storm Flood Plain. As part of this permit, excess fill material excavated from the installation of the pool will be removed from the subject property and the previous existing grade, prior to development, will be restored in order to address flood water storage and conveyance issues resulting from the works already completed. In addition, restoration plantings are to be provided in order to stabilize the slope and provide an enhanced buffer between the residential uses, and the natural feature. Control of Flooding: TRCA water resources engineers are satisfied that the works proposed as part of this permit application will not adversely affect the storage or conveyance of flood waters within the floodplain area. Pollution: The subject property is to be immediately stabilized with plantings to prevent the transport of sediment into the adjacent watercourse. Dynamic Beaches: Not applicable. Erosiori: TRCA geotechnical staff are satisfied that the proposed works as part of this permit will not cause increased erosion of'the slope. 975 Conservation of Land: As the watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be • negatively impacted by the project. Plantings All disturbed areas around the pool and the majority of the rear yard is to be restored to the previously existing sodded condition. The sloped area between the pool and the vegetated around along the bank of the watercourse is to be planted with native, non - invasive species in order to stabilize the slope and create a buffer between the natural feature and the residential uses. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41154 - Application #: 602 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: September 23, 2008 8.1.39 UJA FEDERATION To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any Katerial, originating on the site or elsewhere on Lot 17/18, Concession 2, 9600 Bathurst Street - Quadrant 'B', in the City of Vaughan, Don River Watershed as located on the property owned by UJA Federation. The purpose is to site grade, develop and temporarily or permanently place, dump or remove any material within a Regulated Area of the Don River, in order to construct two school /synagogue buildings within Quadrant !B' of the Lebovic Jewish Community Campus, in Planning Block 11, in the City of Vaughan. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Quadrant 'B' - Site Servicing Plan (Phase I), Drawing No. SS -1, prepared by Schaeffers Consulting Engineers, Revision No. 4 (revised July 25, 2008), received August 15, 2008; • Quadrant 'B' - Site Grading Plan (Phase I), Drawing No. SG -1, prepared by Schaeffers Consulting Engineers, Revision No. 2 (revised July 25, 2008), received August 15, 2008; • Quadrant 'B' - Siltation Control Plan (Phase I), Drawing No. SC -1, prepared by Schaeffers Consulting Engineers, Revision No. 2 (revised July 25, 2008), received August 15, 2008; • Quadrant 'B' - Site Drainage Plan (Phase I), Drawing No. SD -1, prepared by Schaeffers Consulting Engineers, Revision No. 2 (revised July 25, 2008), received August 15, 2008; 976 • Quadrant 'B' - Site Servicing Plan (Phase II), Drawing No. SS -1, prepared by Schaeffers Consulting Engineers, Revision No. 4 (revised July 25, 2008), received August 15, 2008; • Quadrant 'B' - Site Grading Plan (Phase II), Drawing No. SG -1, prepared by Schaeffers Consulting Engineers, Revision No. 2 (revised July 25, 2008), received August 15, 2008; • Quadrant 'B' - Site Drainage Plan (Phase II), Drawing No. SD -1, prepared by Schaeffers Consulting Engineers, Revision No. 2 (revised July 25, 2008), received August 15, 2008; • Quadrant 'B' - Siltation Control Plan (Phase II), Drawing No. SC -1, prepared by Schaeffers Consulting Engineers, Revision No. 2 (revised July 25, 2008), received August 15, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to site grade, develop and temporarily or permanently place, dump or remove any material within a Regulated Area of the Don River, in order to construct two school /synagogue buildings within Quadrant 'B' of the Lebovic Jewish Community Campus, in Planning Block 11, in the City of Vaughan. The subject property is located within Planning Block 11, which is bounded by Dufferin Street to the west, Major Mackenzie Drive to the north, Bathurst Street to the east and Rutherford Road to the south. The subject site is located on the west side of Bathurst Street, south of Lebovic Campus Drive (north of Rutherford Road). The East Don River valley corridor is located to the west of the property. The site represents the second phase (Quadrant 'B') in the four - phased development on the Lebovic Jewish Community Campus. This permit fulfills a condition of site plan approval for the subject site (Site Plan Application DA.07.018). Development within each quadrant will be processed under separate planning applications. Previously, TRCA staff reviewed and approved a proposal for the development of the Quadrant 'A'.Iands (adjacent to Bathurst Street). Approvals under Ontario Regulation 166/06 were not necessary for the development of the Quadrant 'A' lands. In the future, TRCA staff will be reviewing details for the development of Quadrants 'C' and 'D' which are also located adjacent to the East Don River valley corridor. It is noted that as part of the Block 11 Master Environmental Servicing Plan (MESP) process, the limit of the natural.features within the site and for the remainder of Block 11 were previously identified and delineated during the MESP process. Additionally, the treatment of stormwater including water quality and quantity controls were reviewed as part of the MESP and associated site plan application process. While adjacent to the East Don River valley corridor, the site is located outside of the Regional Storm Flood Plain of the watercourse. A 2.5 metre ecological buffer and 7.5 metre landscape buffer, consistent with other development sites in Block 11 is provided for the subject site. This buffer has been re -zoned into an open space category and will be dedicated in public ownership. A landscape and edge management plan have also been submitted and found to be satisfactory by TRCA staff. 977 Control of Flooding: The subject site is located outside of the Regional Storm Flood Plain of the East Don River. As such, the storage or conveyance of flood waters is not impacted. Pollution: Erosion and sediment controls including silt fencing will be erected prior to the initiation of grading and construction and maintained for the duration of the works to ensure sediment does not enter the adjacent valley system and watercourse. Dynamic Beaches: Not applicable. Erosion: Erosion on site will be minimized through the implementation of the aforementioned erosion and sediment control measures. Conservation of Land: There are no geotechnical /slope stability issues associated with the proposed works. No in -water works are proposed as part of this application. Plantings A landscape planting plan along with an edge management plan were submitted as part of this application and for the associated Block 11 Plan area. Landscape plantings on the site and within the buffer areas will be carried out in accordance with TRCA's Planting Guidelines. Policy Guidelines: This proposal complies with Section 4.1.1 - New Urban Development, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41318 - Application #: 726 /08NAUG Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date: September 24, 2008 TOWN OF CALEDON 8.1.40 102 GREY PARK DRIVE To construct, reconstruct, erect or place a building or structure on Lot 69, Plan 43M -1374, (102 Grey Park Drive), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an in- ground swimming pool- at the rear of an existing single - family dwelling located at 102 Grey Park Drive, in the Town of Caledon. The permit will be issued for the period of October 3, 2008 to October 2, 2010. 978 • Letter of Undertaking, prepared by R. Arthur, dated October 1, 2008, to address all outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an in- ground swimming pool at the rear of an existing single - family dwelling located at 102 Grey Park Drive, in the Town of Caledon. The rear of the subject property is a manicured lawn, adjacent to a valley corridor. The proposed works are sufficiently setback from the valley corridor. As such, no geotechnical, engineering, or ecology related concerns are anticipated with this application. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries related concerns associated with these works. Plantings As no vegetation is to be removed by the proposed works, plantings have not been required at this time. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (E) — Property Improvements and Ancillary Structures — of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41287 - Application #: 700 /08 /CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: September 24, 2008 979 TOWN OF MARKHAM 8.1.41 10137 WOODBINE AVENUE To construct, reconstruct, erect or place a building or structure on Lot 21, Concession 4, (10137 Woodbine Avenue), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a new 2 storey medical /professional building and an addition to an existing building on a 3.855 hectare site, located at 10137 Woodbine Avenue, in the Town- of Markham. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Letter of Undertaking, prepared by the B. Rampersad, dated September 30, 2008, to address all outstanding engineering related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a new 2 storey medical /professional building and an addition to an existing building on a 3.855 hectare site, located at 10137 Woodbine Avenue, in the Town of Markham. The rear portion of the site is adjacent to a stream corridor that contains a tributary of the Rouge River Watershed and is located within the Regional Storm Floodplain. The stream corridor and 10 metre buffer will be dedicated into public ownership through an associated Zoning By -law Amendment Application (City File #ZA 07 127816) for conservation purposes. As such, all proposed works are located outside of the Regional Floodplain and are sufficiently setback. Stormwater quality and quantity controls will be provided onsite through a treatment train of methods (i.e., infiltration trench, etc.). In addition, there are no geotechnical or ecology related issues with this application. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no adverse impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this application. 980 Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns with this proposal. Plantings All disturbed areas will be re- vegetated with native and non - invasive enhancement plantings consistent with TRCA's guidelines. Policy Guidelines: The proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40545 - Application #: 145/08 /MARK Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: September 24, 2008 8.1.42 236 MAIN STREET To construct, reconstruct, erect or place a building or structure on Part Lot 13, Concession 5, (236 Main Street), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works.within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a 34.7 square metre (373.5 sq. ft) garage at the rear of an existing residential dwelling located at 236 Main Street, in the Town of Markham. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Letter of Undertaking, prepared by B. Hanson, dated October 1, 2008, to address all outstanding engineering related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a 34.7 square metre (373.5 sq. ft.) garage at the rear of an existing residential dwelling located at 236 Main Street, in the Town of Markham. The subject property is located within the Unionville Special Policy Area (SPA). The proposed garage will be floodproofed in accordance with the SPA criteria. In addition, the proposed structure will be designed to withstand water flow velocities expected during and up • to the Regional Storm event. The location of the proposed garage is void of any significant natural features, and there are no geotechnical or ecology related concerns with this application. 981 Control of Flooding: The proposed works are located within the Regional Storm Floodplain. TRCA Water Resources staff have confirmed that this proposal will not have any significant impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: The location of the proposed garage is void of any significant vegetation. As such, no significant vegetation will be removed as a result of this project. There are no fisheries related concerns associated with this project. Plantings As no vegetation is to be removed by the proposed works, plantings have not been required at this time. Policy Guidelines: This proposal is in conformity with Section 4.2.1. (B) - Development Guidelines for Development/Redevelopment within Designated Two Zone Areas or Special Policy Areas - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41300 - Application #: 706 /08 /MARK Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: September 24, 2008 8.1.43 4086 19TH AVENUE To construct, reconstruct, erect or place a building or structure on Lot 31, Concession 5, (4086 19th Avenue), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a garage. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Site Plan, prepared by M. Mikhail, dated September 18, 2008, stamped received by TRCA Planning and Development September 18, 2008; • Drawing 08 -1807, prepared by Future Steel Buildings Inc, dated July 24, 2008, stamped received by TRCA Planning and Development September 18, 2008. 982 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a garage. The subject property is located within an approved residential subdivision in the Town of Markham and currently contains an existing residential dwelling. Although the subject property is partially located within the Regional Storm Floodplain, the proposed garage is located outside the floodplain. The area to which this application applies is currently manicured lawn and all existing grades will be maintained. Control of Flooding: The.works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be erected and maintained throughout all phases of construction as per TRCA's guidelines. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this project. Plantings No significant vegetation will be removed as a result of construction. As such, no additional plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41465 - Application #: 811 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 53.24 Date: September 24, 2008 8.1.44 43 GLENBOURNE PARK DRIVE To construct, reconstruct, erect or place a building or structure at 43 Glenbourne Park Drive, in the Town of Markham, Rouge River Watershed. 983 The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a new dwelling on a vacant residential lot. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Letter of Undertaking, prepared by Gregory Design Group, dated October 1, 2008, received by TRCA Planning and Development October 1, 2008, to address all outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area,of the Rouge River Watershed in order to facilitate the construction of a new dwelling on a vacant residential lot. The subject lands are located within an approved subdivision in the Town of Markham which contains a portion of a valley corridor associated with a tributary of the Rouge River. TRCA'staff has reviewed a geotechnical report submitted with this application and confirm that the proposed dwelling is appropriately set back from the long term stable slope and there are no geotechnical and/or slope stability concerns related to the construction of the proposed dwelling. The proposed works are located in an area that contains some woody vegetation. As such the proponent has committed to providing an extensive enhancement planting plan to buffer the wooded area at the rear of the lot from the proposed development associated with this plan. Control of Flooding: The subject property is located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters are anticipated. Pollution: Appropriate erosion and sediment controls will be installed and maintained on the subject property throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: A geotechnical report has been reviewed with this application confirming that there are no geotechnical and /or slope stability concerns related to the development of the proposed dwelling. Conservation of Land: Some woody vegetation will be removed as a result of this proposal. The applicant completed an arborist report which stated that many of the trees to be removed are unhealthy, vegetation removals of existing healthy trees will be minimized. An extensive enhancement planting plan has been incorporated into the design of this proposal to achieve an ecological net gain for this reach of the Rouge River Watershed. 984 Plantings Through the works, a variety of native and non- invasive species will be planted on the subject lands consistent with TRCA's guidelines. Policy Guidelines: The proposal complies with Section 4.1 - New Development - of the Authority's Valley and Stream corridor Management Program (VSCMP). CFN: 41380 - Application #: 747 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: September 24, 2008 8.1.45 TOWN AND COUNTRY BMW To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 1, Concession 6,, (8111 Kennedy Road), in the Town of Markham, Rouge River Watershed as located on the property owned by Town and Country BMW. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the expansion of an existing parking lot associated with the adjacent BMW dealership located at 8111 Kennedy Road, in the Town of Markham. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Drawing No. S -1, Servicing Plan, prepared by SCS Consulting Group Ltd., dated September 2008, Revision No. 5, revised on September 2, 2008, stamped received by TRCA Planning & Development staff on September 8, 2008; • Drawing No. GR -1, Grading Plan, prepared by SCS Consulting Group Ltd., dated September 2008, Revision No. 5, revised On September 2, 2008, stamped received by TRCA Planning & Development staff on September 8, 2008; • Drawing No. ESC -1, Erosion and Sedimentation Control Plan, prepared by SCS Consulting Group Ltd., dated September 2008, Revision No. 3, revised on September 29, 2008, stamped received by TRCA Planning & Development staff on October 1, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the expansion of an existing parking lot associated with Town and Country BMW on the adjacent property to the west. The adjacent dealership currently utilizes the subject property as an overflow parking lot and is now proposing to expand the lot for anticipated growth. 985 The BMW dealership is located within the South Unionville Secondary Plan Area (OPA 22) within the Town of Markham. The approved Environmental Master Drainage Plan (EMDP) describes the proposed storm water drainage and the environmental management scheme based on the OPA 22 requirements. The Functional Servicing Plan (FSP) for the area is currently in review with TRCA staff. A recent Ontario Municipal Board (OMB) decision granted conditional approval to a Minor Variance Application (City File # A110 -07) for the subject property. The approval permits the expansion of the existing parking lot on -site and allows for the continuation of the outdoor storage of vehicles on the subject property, subject to TRCA's review and approval of the site - specific stormwater management analysis and that the applicant obtains approval of this application. Based on our review of the submitted stormwater management analysis, the works conform to the direction of the submitted FSP. Given the advanced stage in the review of the FSP and status related to the conditional approval of the Minor Variance Application, TRCA staff are amenable to allow this parking expansion in advance of the approval of the FSP. A portion of the proposed parking lot expansion is currently located within the estimated Regional Storm Floodplain. After reviewing the current hydrology, TRCA Water Resources staff are confident that the site will be located outside of the Regional Storm Floodplain once an engineered flood study is completed, which provides a more detailed analysis of current site conditions. Also, based on our review of the submitted FSP, the subject property would be removed from the Regional Storm Floodplain and TRCA Regulated Area upon completion of the works associated with the FSP. The proposed works will be completed without adversely affecting flood storage and conveyance capacity. In addition, there are no geotechnical or ecology related concerns.with this application. Control of Flooding: As indicated above, TRCA Water Resources staff are confident that the proposed works will be located outside of the Regional Storm Floodplain once a detailed engineering analysis is completed in conjunction with the FSP for the area. As such, no adverse impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns with this proposal. . Plantings All disturbed areas will be re- vegetated with native and non - invasive enhancement plantings consistent with TRCA's guidelines. 986 Policy Guidelines: The proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 39200 - Application #: 260 /07 /MARK Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: September 24, 2008 8.1.46 YORK REGION DISTRICT SCHOOL BOARD To construct, reconstruct, erect or place a building or structure on Lot 11, Concession 8 Part Lot 2, Plan 1445, (89 Church Street), in the Town of Markham, Rouge River Watershed as located on the property owned by York Region District School Board. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a stormwater outfall and a portion of running track associated with the replacement of an existing high school. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Letter of Undertaking prepared by EMC Group, dated October 1, 2008, received by TRCA Planning and Development October 1, 2008, to address all outstanding ecology and engineering related issues. RATIONALE The application Was reviewed by staff on the.basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a stormwater outfall and a portion of running track associated with the replacement of an existing high school. The outfall structure is required in order to convey stormwater runoff from the school site. All stormwater released into the valley corridor will be adequately treated. The outfall has been designed in accordance with TRCA guidelines. Therefore, the headwall is sufficiently setback from the watercourse and flows have been designed to dissipate via sheet flow to prevent erosion. An extensive planting plan has been submitted with this project. The majority of plantings are to be located at the outlet location in order to act as a biofilter in order to provide further dissipation measures. The proposed running track is located adjacent to the valley corridor, but is sufficiently setback. As well, the works are proposed within an area that is currently a manicured lawn. As such no significant vegetation will be removed as a result of construction. TRCA staff has reviewed a geotechnical report submitted with this application and confirm that there are no geotechnical and /or slope stability concerns related to the construction of the proposed track. 987 Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained throughout all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this project. Plantings Although no significant vegetation will be removed as a result of the proposed works, the applicant has proposed significant plantings in accordance with TRCA guidelines. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream corridor Management Program (VSCMP). CFN: 41151 - Application #: 599 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: September 24, 2008 TOWN OF RICHMOND HILL 8.1.47 BAYVIEW CONSTRUCTION To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 67, Concession 1 EYS, (252 North Lake Road), in the Town of Richmond Hill, Humber River Watershed as located on the property owned by Bayview Construction. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single family dwelling on a vacant lot of record located at 252 North Lake Road, in the Town of Richmond Hill. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Letter of Undertaking, prepared by Bayview Construction, dated September 30, 2008, to address all outstanding ecology related issues. 988 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, 164 square metre (1768 sq. ft.) single - family dwelling on 252 North Lake Road, in the Town of Richmond Hill. The property is located adjacent to a Provincially Significant Wetland and the proposed works are setback sufficiently from the wetland feature. As such, no impacts to the wetland feature are anticipated. Additionally, there are no flooding, hydrological, geotechnical or ecology related concerns associated with this proposal. However, enhancement plantings are proposed with this application surrounding the wetland feature in order to achieve a net ecological gain. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of this.project. Additionally, there are no fisheries related concerns associated with these works. Plantings All disturbed areas will be re- vegetated with native and non - invasive species as per TRCA's post- construction restoration guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40809 - Application #: 321/08/RH Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: September 24, 2008 989 8.1.48 DUKE OF RICHMOND DEVELOPMENTS INC. To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 58, 59, Concession 1, W.Y.S., (390 Gamble Road), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Duke of Richmond Developments Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of the proposed stormwater management facility related to the "Phase 3" Duke of Richmond development. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Letter of Undertaking, prepared by P. Slama, Stantec Consulting Ltd., dated October 1, 2008, to address all outstanding TRCA engineering and ecology concerns. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of the proposed stormwater management facility related to the "Phase 3" Duke of Richmond development (Draft Plan of Subdivision 19T- 99014). The subject property is municipally known as 390 Gamble Road, in the Town of Richmond Hill. The subject lands are bound by Gamble Road to the south, Bathurst Street to the west, Jefferson Sideroad to the north and the Duke Tributary of the Rouge River Watershed to the east. As background, please be advised that TRCA Enforcement staff has issued a violation pursuant to Ontario Regulation 166/06 for grading encroachment onto TRCA property and erosion and sedimentation of downstream natural areas, which are related to the 'Phase 1" works of the Duke of Richmond development. As a component of the "Phase 1" works, the subject lands were graded /stripped and a temporary sediment control pond was constructed. As a result of these works, natural areas downstream of the subject lands were significantly impacted as a result of improper erosion and sediment controls being installed on -site for the grading operations and temporary sediment control pond construction. Recognizing that this violation has yet to be fully resolved, as a component of this TRCA permit application, the proponent is required to satisfy all outstanding concerns related to the open violation noted above, prior to this TRCA permit application being supported by TRCA staff. In this regard, as a component of this permit application, the proponent has provided plans to stabilize, clean -up, and restore the disturbed areas and provide enhancement plantings for the larger development block prior to the works related to this TRCA permit application being initiated. The proposed restoration works on TRCA lands has been reviewed and approved by TRCA Archaeology staff, as well as TRCA Property Section. As such, a Permission to Entry (PTE) will be provided with this permit. Additionally, as a component of the violation resolution, the proponent has provided a $50,000 Letter of Credit (LOC), which is the cost estimate of all proposed works on TRCA property. 990 The proposed stormwater management facility (Pond No. 10) related to the "Phase 3" Duke of Richmond development is to be constructed at the same location as the current temporary sediment control pond. As a result, a construction staging plan has been proposed with this application in order to provide sufficient construction opportunity to resolve the above noted violations downstream of this area, as well as to incorporate proper erosion and sediment controls for the ultimate stormwater management pond in accordance with TRCA's guidelines. Specifically, the temporary outlet from the existing sediment control pond will be plugged to provided opportunity to clean -out the watercourse feature downstream of Pond 10 and dewater the temporary sediment control pond. With respect to the dewatering process, the proponent will mobilize Envirotanks on -site, which will be used to treat and filter all dewatered effluent. To minimize erosion from the dewatered effluent, the water will be discharged at the toe of the bank of the downstream channel at a suitable location and will be set at an angle such that the water is not discharged at a right angle to the opposite bank of the channel. Given the above noted violations, an extensive enhancement planting plan has been provided for the natural areas downstream of the subject lands currently owned by the TRCA. In our opinion, the proposed plantings will achieve an ecological net gain for this reach of the Rouge River Watershed. Control of Flooding: The proposed ultimate stormwater management facility is located outside of the Regional Storm Floodplain. With respect to the works related to the downstream natural areas that are located within the Regional Storm Floodplain, TRCA staff has reviewed the plans and do not anticipate any impacts to the storage and /or conveyance of flood waters. In fact, the proposed remediation works designed to resolve the active violation, in our opinion, will re- establish the flood storage and conveyance functions of downstream natural areas. Pollution: Appropriate erosion and sediment controls have been proposed with this application and will be installed and maintained throughout all phases of construction. Additionally, the proposed . works will resolve the erosion and sedimentation concerns identified above. Dynamic Beaches: Not applicable. Erosion: The proposed works have been designed to resolve and /or prevent any erosion on the subject lands and /or the downstream natural areas. There are no geotechnical and /or slope stability concerns.related to this project. • Conservation of Land: No significant vegetation will be removed as a result of construction. However, an extensive enhancement planting plan has been incorporated into the design of this project, which is required in order t� mitigate the impacts related to the active violation pursuant to Ontario Regulation 166/06. Plantings All proposed plant species are native and non - invasive consistent with TRCA guidelines. 991 Policy Guidelines: The proposed works are in conformity with Section 4.3 - Infrastructure and Servicing and Section 4.2 (F) - Opportunities for Regeneration - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 39680 - Application #: 615/07/RH Report Prepared by: Adam Miller, extension 5244 For information contact: Adam Miller, extension 5244 Date: September 24, 2008 8.1.49 TOWN OF RICHMOND HILL To construct, reconstruct, erect or place structure on a parcel of land bounded by Queensborough Court and Bayswater Avenue on the west, Woodrim Drive on the east, North Lake Road to the south, and Wothington Avenue to the north, in the Town of Richmond Hill, Humber River Watershed as located on the property owned by Town of Richmond Hill. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 2.4 metre wide asphalt trail in the Town of Richmond Hill. The permit will be issued for the period of October 3, '2008 to October 2, 2010. • Letter of Undertaking, prepared by S. Ng, Town of Richmond Hill, dated October 1, 2008, to address all outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 2.4 metre wide asphalt pedestrian trail system around a wetland feature connected with the Humber River Watershed. The area to which the application applies is bounded by Queensborough Court and Bayswater Avenue on the west, Woodrim Drive on the east, North Lake Road to the south, and Wothington Avenue to the north, in the Town of Richmond Hill. The proposed works are.Iocated in the nearby vicinity of a Provincially Significant Wetland (PSW) feature. The proposed works will consist of constructing new sections of asphalt trail to link existing communities and parks and to formalize existing informal pathways. The proposed works have been designed to minimize alterations to the natural landform and the location of the trail minimizes negative impacts to the interior of the wetland feature. Also, the trail has been designed to mitigate unnecessary vegetation removals through the woodlot feature. In order to mitigate the impacts of vegetation removal, an extensive enhancement planting plan has been incorporated into the design of this project to provide for an ecological net gain for this reach of the Humber River Watershed. 992 Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no adverse impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Erosion and sediment controls will be provided and maintained through all phases of construction in accordance with TRCA guidelines. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: As a result of the proposed works, vegetation will be removed. To mitigate the impacts of the proposed removals an extensive enhancement planting plan has been submitted with this project. In addition, several species will be transplanted during the construction of the trail. It is the opinion of TRCA Staff that the proposed mitigation plantings will achieve an ecological net gain for this area. Plantings All plantings are native arid non - invasive in accordance with TRCA Guidelines. Policy Guidelines: This proposal is consistent with Section 4.1.2 - New Resource -Based Uses - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41158 - Application #: 607/08/RH Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: September 24, 2008 TOWNSHIP OF KING 8.1.50 65 JOHN STREET To construct, reconstruct, erect or place a building or structure on Lot 2, Plan 416, (65 John Street), in the Township of King, Humber River Watershed. The purpose is to construct a second floor addition and carport to an existing dwelling within a Regulated Area of the Humber River Watershed at 65 John Street, in the Township of King. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. A -1.1, dated September 17, 2008, prepared by Edifice Consulting Group, received by the TRCA September 25, 2008; 993 • Basement Plan, Drawing No. A -3.0, dated August 8, 2008, prepared by Edifice Consulting Group, received by the TRCA September 12, 2008; • First Floor Plan, Drawing No. A -3.1, dated August 8, 2008, prepared by Edifice Consulting Group, received by the TRCA September 12, 2008; • Second Floor Plan, Drawing No. A -3.2, dated August 8, 2008, prepared by Edifice Consulting Group, received by the TRCA September 12, 2008; • West Elevation Drawing, Drawing No. A=4.0, dated August 8, 2008, prepared by Edifice Consulting Group, received by the TRCA September 12, 2008; • East Elevation Drawing, Drawing No. A -4.1, dated August 8, 2008, prepared by Edifice Consulting Group, received by the TRCA September 12, 2008; • North Elevation Drawing, Drawing No. A -4.2, dated August 8, 2008, prepared by Edifice Consulting Group, received by the TRCA September 12, 2008; • South Elevation Drawing, Drawing No. A -4.3, dated August 8, 2008, prepared by Edifice Consulting Group, received by the TRCA September 12, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a second floor addition and carport to an existing dwelling within a Regulated Area of the Humber River Watershed. The subject property is entirely within a Wetland Area of Interference and within a stream corridor. In addition, a small portion of the rear yard is within the Regional Storm Flood Plain. The proposed works are located on the edge of a terraced valley wall; however, the works are located approximately 8 metres away from the primary slope of the valley wall which has a gradient of approximately 1.5H:1 V. According to a Geotechnical Investigation and Slope Stability Assessment prepared by Haddad Geotechnical Inc. dated August 31, 2008, the proposed works are setback a minimum of 5.7 metres away from the stable slope line. TRCA ecology staff are satisfied that the proposed works are sufficiently setback from the wetland feature and note that the proposed works do not encroach further toward the natural feature. The proposed works are sufficiently setback approximately 20 metres from the Regional Storm Flood Plain. Control of Flooding: The proposed works are not located within the Regional Storm Flood Plain, there will be no impact on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be erected and maintained for the duration of construction to .prevent the transport of sediment into the valley and nearby watercourse. Dynamic Beaches: Not applicable. Erosion: Based upon the geotechnical study prepared by Haddad Geotechnical Inc., TRCA geotechnical staff are satisfied that the proposal works will not have an adverse impact on the stability of the slope and the proposed works are sufficiently setback from the stable slope line. 994 Conservation of Land: As the watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. The proposed works will not encroach further toward the wetland and there are no other significant natural on, or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program. CFN: 41432 - Application #: 794/08/KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: September 23, 2008 8.1.51 SENECA COLLEGE To construct, reconstruct, erect or place a building or structure on (13990 Dufferin Street, North), in the Township of King, Humber River Watershed as located on the property owned by Seneca College. The purpose is to construct a storage portable within a Regulated Area of the Humber River Watershed at 13990 Dufferin Street in the Township of King. The permit will be issued for the period of October 3, 2008 to October 2, 2010. • Site Plan, Drawing No. A202, dated July 25, 2008, prepared by Stevens Group Architects Inc., received by the TRCA September 23, 2008; • Elevations & Sections Drawing, Drawing No. Al, prepared by the applicant, received by the TRCA September 24, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a storage portable within a Regulated Area of the Humber River Watershed. The subject property is within a designated Countryside Area under the Oak Ridges Moraine Conservation Plan. The proposal is located within the Regional Storm Flood Plain of Lake Seneca but not within a hydraulic floodway. In addition, TRCA mapping indicates that the subject site is also within a Wetland Area of Interference and adjacent to an Area of Natural and Scientific Interest (ANSI). 995 Based upon a site visit conducted by TRCA staff on August 20, 2008, the proposed location for the storage portable is within an existing parking area, surrounded by existing development and is sufficiently setback from surrounding Key Natural Heritage Features (KNHF). The Regional Storm Flood Elevation for the subject property is 295.05 m.a.s.l. (metres above sea level). The proposed storage portable has been flood proofed to the Regional Storm Flood Elevation plus 0.3 metres freeboard. The skirting around the portable is composed of a fencing material which allows flood waters to pass through; thereby not impacting the storage or conveyance of flood waters. Control of Flooding: TRCA water resources staff are satisfied that the proposed works will have a minimal impact on the storage and conveyance of flood waters. In addition, the storage portable has been floodproofed to the Regional Storm Flood Elevation plus 0.3 metres freeboard. Pollution: There are no sediment transport issues associated with this application. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As-no body of water will be significantly impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to a sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41323 - Application #: 730 /08 /KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: September 24, 2008 PERMIT APPLICATIONS 8.1.52 - 8.1.54 ARE PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS: RES.#B115/08 - PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS PURSUANT TO ONTARIO REGULATION 166/06 996 Moved by: Seconded by: Jack Heath Reenga Mathivanan THAT permission for routine infrastructure granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.52 - 8.1.54), which are listed below, be received. CARRIED CITY OF VAUGHAN 8.1.52 CITY OF VAUGHAN To undertake structure maintenance in a Regulated Area on Centre Street between Oakbank Road and Thornbank Road, in the City of Vaughan, Don River Watershed as located on the property owned by City of Vaughan. The purpose is to repair six culverts within a warm water fisheries timing window. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project. The permit will be issued for the period of August 29, 2008 to August 28, 2010 in'accordance with the following documents and plans which form part of this permit: • Drawing S1, Repair Plans, Structures 708 and 706; Drawing S2, Repair Plans, Structures 601 and 705; Drawing S3, Repair Plans, Structures 704 and 703; Drawing S4, Repair Plans, Structures 702 and 701; dated June 2008; received June 26, 2008; redline revised August 12, 2008; prepared by SRM Associates. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The entire proposal involves the replacement of an existing 1.78 metre span concrete culvert with a 2.4 metre span concrete box culvert (structure 707) and repair of 8 existing smaller culverts (structures 601, 701, 702, 703, 704, 705, 706 and 708) along Centre Street between Oakbank Road and Thornbank Road, in the City of Vaughan. This application is for the repair of structures 601, 702, 703, 704, 705 and 706 on Centre Street. The proposed works include repair of deteriorated concrete and retaining walls and installation of bank protection. Control of Flooding: The proposed project will have no impacts on the 'storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (sediment fencing) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable 997 Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be provided by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). This application is subject to the warm water fisheries timing window. No in- water /near -water work is permitted between April 1 through to June 30 of any given year, for the protection of the local warm water fish community. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41163 - Application #: 610 /08NAUG Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: August 29, 2008 8.1.53 CITY OF VAUGHAN To undertake structure maintenance in a Regulated Area on Centre Street between Oakbank Road and Thornbank Road, in the City of Vaughan, Don River Watershed as located on the property owned by City of Vaughan. The purpose is to repair two culverts within a warm water fisheries timing window. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project. The permit will be issued for the period of August 29, 2008 to August 28, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing S1, Repair Plans, Structures 708 and 706; Drawings S4, Repair Plan, Structures 702 and 701; Drawing S5, Details; dated June 2008; received June 26,2008; red line revised August 12, 2008; prepared by SRM Associates. RATIONALE The application was reviewed by staff on the basis of the following information: 998 Proposal: The entire proposal involves the replacement of an existing 1.78 metre span concrete culvert with a 2.4 metre span concrete box culvert (structure 707) and repair of 8 existing smaller culverts (structures 601, 701, 702, 703, 704, 705, 706 and 708) along Centre Street between Oakbank Road and Thornbank Road, in the City of Vaughan. This application is for the repair of structures 701 and 708 on Centre Street. The proposed works include repair of deteriorated concrete and general maintenance. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (sediment fencing) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be provided by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). This application is subject to the warm water fisheries timing window. No in- water /near -water work.is permitted between April 1 through to June 30 of any given year, for the protection of the local warm water fish community. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - •Infrastructure and Servicing - of the Authority's Valley . and Stream Corridor Management Program. CFN: 41168 - Application #: 611 /08NAUG Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: August 29, 2008 999 TOWN OF WHITCHURCH - STOUFFVILLE 8.1.54 TOWN OF WHITCHURCH - STOUFFVILLE To undertake maintenance on an off-line stormwater management pond located in a Regulated Area east of 464 Cam Fella Boulevard, in the Town of Whitchurch - Stouffville, Duffins Creek Watershed as located on the property owned by the Town of Whitchurch - Stouffville. The purpose is to hydrovac a stormwater management pond within a cold water fisheries timing window. A Letter of Advice will be written by TRCA staff on behalf of the Fisheries and Oceans Canada (DFO) for this project. The permit will be issued for the period of September 8, 2008 to September 7, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 01, Michaluk Pond Cleaning, Erosion and Sedimentation Control Plan; dated August 2008; received September 3, 2008; redline revised September 8, 2008; prepared by the Town of Whitchurch - Stouffville; • Typical Detail of Silt /Sediment Fence; dated January 2006; received September 3, 2008; • Rock Check Dam Detail; received September 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: - The proposal involves the maintenance of a stormwater management pond located east of 464 Cam Fella Boulevard in the Town of Whitchurch - Stouffville, Regional Municipality of York. The pond is proposed to be drained through two rock check dams into an existing wetland area. Once the pond is drained the sediment from the bottom of the pond will be removed by a hydrovac truck. The clean sediment will be placed in a staging area surrounded by two double layer heavy duty silt fences to decant. The sediment will then be transported by truck to an approved disposal site. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (silt /sediment fencing, rock•flow check dam) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable 1000 Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be provided by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). This application is subject to the Ministry of Natural Resources (MNR) Coldwater fisheries timing window. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41311 - Application #: 716/08/WS Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: September 8, 2008 PERMIT APPLICATIONS 8.1.55 - 8.1.74 ARE MINOR WORKS LETTER OF APPROVAL: RES. #B116/08 - MINOR WORKS LETTER OF APPROVAL PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Jack Heath Reenga Mathivana THAT minor works letter of approval granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.55 - 8.1.74, inclusive), which are listed below, be received. CARRIED CITY OF BRAMPTON 8.1.55 16 PRUE COURT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 54, (16 Prue Court), in the City of Brampton, Humber River Watershed. CFN: 41379 - Application #: 744 /08 /BRAM Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: September 23, 2008 1001 8.1.56 21 PEBBLECREEK DRIVE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 27, Plan 43M1713, (21 Pebblecreek Drive), in the City of Brampton, Humber River Watershed. CFN: 41233 - Application #: 664 /08 /BRAM Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: August 28, 2008 CITY OF PICKERING 8.1.57 1766 SPARTAN COURT To install a swimming pool on 1766 Spartan Court, in the City of Pickering, Waterfront Watershed. CFN: 41321 - Application #: 727 /08 /PICK Report Prepared by: Leah Weller, extension 5250 For information contact: Quentin Hanchard, extension 5324 Date: August 28, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.58 2 HONEYVIEW PLACE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 66, Plan 66M -2227, (2 Honeyview Place), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 41430 - Application #: 787/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Nicole Moxley, extension 5284 Date: September 17, 2008 8.1.59 8 -10 SUSSEX DRIVE To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but Tess than 150 sq. m (1614 sq. ft) on Lot 10, 11, 12, Plan M494, Part Lot 13, Plan M494, (8 -10 Sussex Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 40259 - Application #: 954/07/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: September 17, 2008 1002 8.1.60 35 ELMCREST ROAD To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 10, Plan M1513, (35 Elmcrest Road), in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed. CFN: 41420 - Application #: 775/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: September 15, 2008 8.1.61 17 WALTHAM DRIVE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Block 12, Plan 4022, (17 Waltham Avenue), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 41406 - Application #: 767/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Nicole Moxley, extension 5284 Date: September 15, 2008 8.1.62 63 BONNYVIEW DRIVE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 1, Plan 8754, (63 Bonnyview Drive), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. CFN: 41401 - Application #: 762/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: September 15, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.63 386 ROSEWELL AVENUE To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part Lot 5, Concession 1 WYS Lot PART 1, 2, 3, Plan 63R -2172, (386 Rosewell Avenue), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: 41424 - Application #: 778/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: September 23, 2008 1003 8.1.64 12 GLENTWORTH ROAD To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 55, Plan M -895, (12 Glentworth Road), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: 41183 - Application #: 625/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: August 27, 2008 8.1.65 11 OXBOW AVENUE To construct, reconstruct, erect or place a building or structure on Lot 7, Plan 5078, (11 Oxbow Avenue), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: 41228 - Application #: 661/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: September 10, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.66 • 7 SKYLARK ROAD To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 32, Plan 4657 NPT, (7 Skylark Road), in the City of Toronto (Toronto and East York Community Council Area), Humber River Watershed. CFN: 41138 - Application #: 586/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: August 28, 2008 8.1.67 7 PARKVIEW AVENUE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 16, Concession 1 Lot 10, Plan 42E, (7 Parkview Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 40003 - Application #: 848/07/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: September 15, 2008 1004 CITY OF VAUGHAN 8.1.68 101 TREELAWN BOULEVARD To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on 101 Treelawn Boulevard, in the City of Vaughan, Humber River Watershed. CFN: 41378 - Application #: 746 /08 /VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Anthony Sun, extension 5724 Date: September 12, 2008 8.1.69 45 SALAMANDER COURT To install a swimming pool on Lot 239, Plan 65M -3878, (45 Salamander Court), in the City of Vaughan, Don River Watershed. CFN: 41377 - Application #: 745 /08 /VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: September 12, 2008 8.1.70 109 AUTUMN GROVE COURT To install a swimming pool on Lot 18, Plan 65M -3738, (109 Autumn Grove Court), in the City of Vaughan, Humber River Watershed. CFN: 41416 - Application #: 772 /08 /VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Anthony Sun, extension 5724 Date: September 15, 2008 8.1.71 22 CLOVERHILL COURT To install a swimming pool and undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 414, Plan 65M -3338, (22 Cloverhill Court), in the City of Vaughan, Don River Watershed. CFN: 41411 - Application #: 769 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: September 15, 2008 8.1.72 43 GAYLA STREET To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 2, Concession 2 Lot 224, Plan 65M -2300, (43 Gayla Street), in the City of Vaughan, Don River Watershed. 1005 CFN: 41141 - Application #: 589 /08NAUG Report Prepared by: Leah Weller, extension 5250 For information contact: Bill Kiru, extension 5306 Date: September 16, 2008 TOWN OF AJAX 8.1.73 76 PATTERSON CRESCENT To install a swimming pool on 76 Patterson Crescent, in the Town of Ajax, Duffins Creek Watershed. CFN: 41294 - Application #: 705 /08 /AJAX Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: September 3, 2008 TOWN OF MARKHAM 8.1.74 15 CASTLEGLEN BOULEVARD To construct, reconstruct, erect or place a building or structure on Lot 76, Plan 65M -3832, (15 Castleglen Boulevard), in the Town of Markham, Rouge River Watershed. CFN: 41374 - Application #: 741/08/MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: September 9, 2008 CITY OF VAUGHAN 8.1.75 IN STORAGE REIT To construct, reconstruct, erect or place a building or structure on Part Lot 13, Concession 5, (8929 Weston Road), in the City of Vaughan, Humber River Watershed as located on the property owned by InStorage REIT. The purpose is to construct a replacement office and storage building within a Regulated Area of the Humber River Watershed at 8929 Weston Road in the City of Vaughan. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking dated October 1, 2008 prepared by the applicant stating that revised drawings to the satisfaction of TRCA staff will be submitted. 1006 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to construct a replacement office and storage building within a Regulated Area of the Humber River Watershed. As part of the project, two existing buildings are to be demolished and replaced with a single building. Based on a flood study prepared by Pitura Husson Limited, dated September 2008, received by the TRCA September 30, 2008, one of the existing buildings to be demolished is entirely within the Regional Storm Flood Plain. The proposed replacement building is partially located within the Regional Storm Flood Plain but does not encroach as far into the flood plain area than the existing building to be replaced. According to the flood study, the Regional Storm Elevation for the development area is 209.51 m.a.s.l. (metres above sea level). The proposed building will be floodproofed to this level by ensuring all openings are above 209.51 m.a.s.l. TRCA staff note that as part of Official Plan Amendment 450 and supporting studies, the watercourse that currently flows through the subject property is to be realigned in the future with the ultimate result of removing the subject property from the Regional Storm Flood Plain. Control of Flooding: TRCA water resources staff are satisfied that the proposed works will not have a significant impact on the storage and conveyance of flood waters. Pollution: Sediment control fencing will be erect and maintained for the duration of construction to prevent sediment from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application Conservation of Land: As the watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings The development area is currently devoid of vegetation, the proposed works includes plantings along the Weston Road frontage and northern property boundary. Policy Guidelines: The proposal is consistent with Section 4.2.2 D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41467 - Application #: 813 /08 /VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: October 1, 2008 1007 8.1.76 METRUS DEVELOPMENT INC. To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 14, Concession 10, southwest of Huntington Road and Rutherford Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Metrus Development Inc. The purpose is to conduct site grading and to temporarily or permanently place, dump or remove any material within a Regulated Area, in order to conduct topsoil grading works for the purposes of restoring the valley corridor, within Planning Block 64, in the City of Vaughan. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking, prepared by David Kellershohn, Schaeffers Consulting Engineers, dated September 25, 2008, received September 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to conduct site grading and to temporarily or permanently place, dump or remove fill material within a Regulated Area of the Humber River, in order to conduct topsoil grading works which will facilitate the overall restoration of the valley corridor within Planning Block 64, in the City of Vaughan. Planning Block 64 is bounded by Rutherford Road to the north, Highway 50 to the west, Langstaff Road to the south and to the east by Huntington Road. There is an approved Master Environmental Servicing Plan (MESP) in place for Planning Block 64 (approved in 2005). During the MESP process, the limit of the Humber River valley corridor in this area was identified and delineated. Since the approval of the Block 64 MESP, TRCA staff has received and draft approved a related draft plan of subdivision (19T- 06V13). Topsoil from two different locations within Block 64 will be placed around two existing on -line ponds that are currently separated by an existing culvert. The proposed relocation of this topsoil was proposedduring the Block 64 MESP process and forms part of the overall effort to restore the valleyland. In the future, additional works will be conducted around the two on -line ponds, including extensive plantings and the creation of wetland areas. Additionally, a natural channel design will be implemented upstream /downstream of the existing ponds. This will promote fish habitat and passage through this area. An application for a permit under Ontario Regulation 166/06 (631 /08NAUG) for these works has been submitted and is currently being reviewed by TRCA technical staff. Control of Flooding: TRCA staff has reviewed the proposed topsoil placement plans and is satisfied that the works will not negatively affect the storage or conveyance of flood waters. 1008 Pollution: Erosion and sediment controls including silt fencing and rock check dams will be implemented prior to the initiation of grading works and maintained for the duration of construction, to ensure that sediment does not enter the nearby ponds and watercourse. Dynamic Beaches: Not applicable. Erosion: Erosion on site will be minimized through the implementation of the aforementioned erosion and sediment control measures. Conservation of Land: There are no geotechnical /slope stability issues associated with the proposed works. Given the close proximity of the works to the watercourse and ponds, a Letter of Advice will be issued on behalf of Fisheries and Oceans Canada (DFO). Plantings Areas that are disturbed as part of the proposed works will be stabilized and restored with native, non - invasive plantings. This overall planting effort will be finalized once the associated natural channel design works are completed and stabilized. Policy Guidelines: This proposal complies with Section 4.2.2 (F) - Opportunities for Regeneration, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41196 - Application #: 630 /08 /VAUG Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date: October 1, 2008 TOWN OF RICHMOND HILL 8.1.77 25 RIDGEWOOD DRIVE To change a building or structure so that it alters its use or potential use, . increases its size or increases the number of dwelling units on Lot 13, 14, Plan 65M -2232, Part Lot 12, Plan 65M -2232, (25 Ridgewood Drive), in the Town of Richmond Hill, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate construction of an addition to an existing dwelling and expansion of an existing garage. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: 1009 • Dwg No. LP -1, Landscape Plan, Prepared by Alcorn & Associates, Revised August 2008, Received September 25, 2008; Dwg No. TP -1, Tree Inventory / Preservation Plan, Prepared by Alcorn & Associates, Revised August 2008, Received September 25, 2008; • Dwg. No. GP -1, Site Plan, Grading & Drainage Servicing Plan, Prepared by Alcorn & Associates, Revised August 2008, Received September 25, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an additional 64 sq. m. for the existing home and also an additional 94 sq.' m. onto the existing garage. Both of the proposed additions are located within a regulated area that is delineated by our Wetlands Area of Interference and is within the Countryside planning area of the Oak Ridges Moraine Conservation Plan. The addition to the back of the home will be over an existing grass covered area and the garage addition will be along the north western property line. The proposed garage addition will remove some existing trees that will be replaced with new trees that are to be planted within the Applicants property. Control of Flooding: The subject proposals are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters are anticipated. Pollution: • Appropriate sediment and erosion controls will be installed and maintained on the subject property throughout all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings There will be trees planted on the property to replace the trees that are proposed to be removed as a result of the proposed garage. Policy Guidelines: The proposal is consistent with Section 4.2.2 (C) - Minor Additions, of the Authority's Valley and Stream Corridor Management Program (VSCMP). 1010 CFN: 41495 - Application #: 831/08/RH Report Prepared by: Uton Samuels, extension 5386 For information contact: Uton Samuels, extension 5386 Date: October 1, 2008 8.1.78 41 COUNTRY HEIGHTS DRIVE To construct, reconstruct, erect or place a building or structure on Lot 3, Plan 65M3856, (41 Country Heights Drive), in the Town of Richmond Hill, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate construction of a two- storey single detached dwelling. The permit will be issued for the period of October 3, 2008 to October 2, 2010 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking provided by Mary Filigno, dated Wednesday October 1, 2008 to address outstanding TRCA Ecology and Stormwater Management issues, prior to issuance of a permit RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: � The purpose of this application is to undertake works within a TRCA Regulated Wetland Area of Interference, in the Rouge River Watershed, in order to facilitate the construction of a two- storey dwelling. The subject property is located within the Oak Ridges Conservation Plan's Natural Core Area. Areas of Natural and Scientific Interest (ANSI), significant woodlands and a Provincially Significant Wetland (PSW) are located adjacent to the property. TRCA Staff are satisfied that the proposed dwelling will be placed in an area that has appropriate setbacks from the significant woodland and ANSI. The proposed dwelling is more than 120 metres away from the PSW, and as such, is outside of the Area of Interference. The septic system proposed for the property will be constructed in a location that is as far away as possible from the adjacent natural features. The applicant is providing additional plantings between the proposed dwelling and the natural features in order to increase the existing buffer to the natural areas. Control of Flooding: The subject proposals are located outside of the Regional Storm Floodplain. As such, no impacts to the storage-and/or conveyance of floodwaters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property throughout all phases of construction.. Dynamic Beaches: Not applicable 1011 Erosion: There are no geotechnical and /or slope stability concerns associated with this project Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings There will be extensive planting along the setback portion of the property in order to provide a naturally buffered function. Policy Guidelines: The proposal is consistent with Section 4.1.1 - New Urban Development, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41486 - Application #: 824/08/RH Report Prepared by: Uton Samuels, extension 5386 For information contact: Uton Samuels, extension 5386 Date: October 1, 2008 RES. #B117/08 - Moved by: Seconded by: REQUEST FOR DISPOSAL OF TRCA -OWNED LAND Rear of 2157 Lakeshore Boulevard West City of Toronto Waterfront, CFN 41447. Toronto and Region Conservation Authority (TRCA) is in receipt of a request from Lorraine Properties Limited for the sale of a parcel of TRCA -owned land located south of 2157 Lakeshore Boulevard West, City of Toronto, Lake Ontario waterfront. Maria Augimeri Rob Ford THAT the potential disposal of a parcel' of Toronto and Region Conservation Authority (TRCA) -owned land located south of 2157 Lakeshore Boulevard West, City of Toronto, be referred to TRCA staff for review in accordance with established TRCA policies; AND FURTHER THAT a report be brought forward to the Executive Committee at a future date recommending further action: CARRIED BACKGROUND This request is being brought to the attention of the Executive Committee in accordance with Resolution #A289/94, adopted by the Authority at meeting #12/94, held on January 27, 1995, pertaining to the disposal of TRCA -owned lands. 1012 A request has been received from Lorraine Properties Limited, the owner of 2157 Lakeshore Boulevard West, to purchase a parcel of TRCA -owned lands located between their property and Marine Parade Drive. Lorraine Properties Limited has recently acquired 2157 Lakeshore Boulevard West from Proudfoot Motel Limited. Lorraine Properties Limited are proposing to consolidate the subject property with their property to the north and redevelop the entire parcel for commercial and residential purposes. The subject lands were expropriated from Proudfoot Motels Limited for the purpose of grading related to the construction of Marine Parade Drive. The expropriation has been settled. The subject lands are under a management agreement with the City of Toronto Parks, Forestry and Recreation Department. TRCA, provincial and City staff will be circulated about the land sale proposal for review and comment. Following receipt of comments and further review a recommendation will be made to the Executive Committee. A plan illustrating the location of the subject lands is attached. Report prepared by: Mike Fenning, extension 5223 Emails: mfenning @trca.on.ca For Information contact: Mike Fenning, extension 5223 or Ron Dewell, extension 5245 Emails: mfenning @trca.on.ca or rdewell @trca.on.ca Date: September 16, 2008 Attachments: 1 1013 Attachment 1 ,4( , -.�,' \� t----illrir.".7-111.012 t i ISCIIII■ IIIMI ------•..wej ri. NI\ Sin* "10441‘. ,Iii„ 11* O 2 3 W z O m ¢3 CC j {L'm 0 7 0 Q to fn a. L to D .c ¢3 0 U) N W ` Q2 OHNMviNevd 10910N(ONW RCUON'Y" onservatron for The Living City \NTRCALANDS j SUBJECT PROPERTY 1014 RES. #8118/08 - Moved by: Seconded by: WILD WATER KINGDOM Deferral of Rent. Recommends acceptance of proposal from Wild Water Kingdom for deferral of 2007 and 2008 rent until July of 2009. Maria Augimeri Jack Heath THAT staff be directed to take the action necessary to implement a proposal from Wild • Water Kingdom for deferral of rent and other monies owed until July 31, 2009; THAT the deferral of rents be subject to any terms and conditions required by Toronto and Region Conservation Authority (TRCA) staff and solicitors. CARRIED RATIONALE TRCA is in receipt of a request from Wild Water Kingdom Inc. (WWK) for deferral of 2007 and 2008 rent and other monies owing to TRCA pursuant to the lease of land at Claireville. Wild Water Kingdom, along with many outdoor recreational venues, incurred significant decline in visitation and revenue because of wet weather during June, July and early August of 2008. A letter received from WWK listed the extent of the impact, including a 25% drop in attendance and projected 27% drop in gross revenues. A significant net Toss on the year is anticipated. Apart from the rent arrears, the lease with WWK is in good standing. Under the terms of the lease, WWK can defer up to $100,000 in rent owing from one year to June 30 of the following year. Interest is payable on deferred rent and all outstanding accounts in the amount of prime plus 1 %. Over almost 20 years that TRCA has leased lands to WWK, rents have always been paid and staff has had a good working relationship with the owner / manager. As of September 30, 2008, WWK owes the following: • percentage rent for 2007 in the amount of $140,000; • base rent for 2008 in the amount of $80,661.82; • percentage rent for 2008 estimated at $198,000; • realty taxes for 2008 in the amount of $59,742.88; and • • interest on the amounts outstanding which will be adjusted with credit for cost of water to • Indian Line Campground. WWK has an October 31st year end. After October 31st, the percentage rent and interest owing will be calculated. WWK proposes to pay: • Monthly payments of $25,000 commencing September 2008 and ending May, 2009, for a total of $225,000. • Deferred 2008 percentage rent of $100,000 as provided for in the lease agreement. • Balance of monies owing estimated at $153,000 payable on July 31, 2009, together with interest on all outstanding amounts. 1015 Under the terms of the lease, if there is a default and TRCA decides to terminate the lease then, unless the tenants lender pays the arrears and puts the lease in good standing, TRCA would be entitled to take the lands, improvements and fixtures and either lease the waterpark with the equipment etc. to another operator, close the park or operate the park. In 2008 WWK completed a sports dome, for soccer, football and other sports activities. This has potential for future, year round revenues beyond those of the existing water park and mini -golf. Report prepared by: Jim Dillane, extension 6292 Email: jdillane @trca.on.ca For Information contact: Jim Dillane, extension 6292 Email: jdillane @trca.on.ca Date: September 23, 2008 RES. #B119/08 - PORT UNION WATERFRONT IMPROVEMENT PROJECT Phase 2. Approval of the Minor Modification to Phase 2 shoreline as required under the Environmental Assessment Act conditions of approval. Moved by: Seconded by: ;Ron Moeser Maria Augimeri THAT the minor modification of the shoreline design for Phase 2 of the Port Union Waterfront Improvement Project be approved. CARRIED BACKGROUND Toronto and Region Conservation Authority (TRCA) received approval for the Port Union Waterfront Improvement Project under the Environmental Assessment Act on May 2, 2001. This approval included both Phase 1 and Phase 2 of the project. Phase 1 of the project was completed and opened to the public in September, 2006. Further to Condition 7 of the Environmental Assessment (EA) approval, TRCA is required to follow the Amendment Procedure developed by the Ministry of the Environment for any minor modifications to the concept plan. In 2003, further to detailed shoreline modeling, the coastal engineer recommended a modification of the shoreline design of Phase 2.. Specifically, the modifications included an additional headland and the realignment of the beaches on the _ Phase 2 portion of the project. The Phase 2 coastal engineering footprint resulted in an overall reduction of the 0.35 hectares or approximately 11 percent of the Phase 2 area. The modifications provided an appropriate final shoreline configuration consistent with the project objectiyes and conceptual plans. The end result of these modifications is the overall reduction to the extent of lakefilling and a final project design that is advantageous to the environment. 1016 In August 2003, staff requested and received written confirmation from every agency who had a mandate for any matter affected by the proposed minor modification. These agencies included CN, Fisheries and Oceans Canada, Transport Canada - Navigable Waters Program, City of Toronto, Ministry of Citizenship, Culture and Recreation, GO Transit, Ministry of Natural Resources and Environment Canada. In addition, information supporting the minor modification was presented to the Port Union Working Committee for approval. As required under conditions of EA approval, TRCA must receive approval by the Authority for the minor modification prior to the construction of the minor modification. TRCA began construction of Phase 2 in March however, the shoreline configuration described in the minor modification is not yet constructed. FINANCIAL DETAILS TRCA and Toronto Waterfront Revitalization Corporation have entered into a Delivery Agreement to complete Phase 2 of the Port Union Waterfront Improvement Project. The minor • modification does not have any financial implications, as Phase 1 and Phase 2 are fully funded. Report prepared by: Connie Pinto, extension 5387 Emails: cpinto @trca.on.ca For Information contact: Nancy Gaffney, extension 5313 Emails: ngaffney @trca.on.ca Date: September 18, 2008 Attachments: 1 1017 Attachment 1 1.018 TERMINATION ON MOTION, the meeting terminated at 10:35 a.m., on Friday, October 3, 2008. Gerri Lynn O'Connor . Brian Denney Chair Secretary- Treasurer /ks ts. THE TORONTO AND REGION CONSERVATION AUTHORITY MEETING OF THE EXECUTIVE COMMITTEE #9/08 November 7, 2008 The Executive Committee Meeting #9/08, was held, in the South Theatre, Black Creek Pioneer Village, on Friday, November 7, 2008. The Chair Gerri Lynn O'Connor, called the meeting to order at 9:38 a.m.. PRESENT David Barrow Member Rob Ford Member Suzan Hall Member Jack Heath Member Colleen Jordan Member Reenga Mathivanan Member Gerri Lynn O'Connor Chair Anthony Perruzza Member Richard Whitehead Member ABSENT Maria Augimeri Vice Chair Ron Moeser Member Maja Prentice Member RES. #B120/08 - MINUTES Moved by: Seconded by: Colleen Jordan Reenga Mathivanan THAT the Minutes of Meeting #8/08, held on October 3, 2008, be approved. CARRIED PRESENTATIONS (a) A presentation by Mr. Geoff Cape, Executive Director, Evergreen Environmental Foundation, Mr. George Dark, Chair, Evergreen Environmental Foundation and Mr. Joe Lobko, Lead Architect, DTAH Architects, in regard to permit application 8.1.42. 1020 (b) A presentation by Karen McDonald, Environmental Technician, TRCA, in regard to item 9.1 - Out of Country Travel. (c) A presentation and discussion with an update on the Long Term Office Accommodation Project. RES.#B121/08 - PRESENTATIONS Moved by: Seconded by: Suzan Hall Reenga Mathivanan THAT above -noted presentation (a) be heard and received. RES. #B122 /08 - PRESENTATIONS Moved by: Seconded by: Colleen Jordan Jack Heath THAT above -noted presentation (b) be heard and received. RES.#B123/08 - PRESENTATIONS Moved by: Seconded by: David Barrow Reenga Mathivanan THAT above -noted presentation (c) be heard and received. SECTION I - ITEMS FOR AUTHORITY ACTION RES.#B124/08 - Moved by: Seconded by: CARRIED CARRIED CARRIED REQUEST FOR DISPOSAL OF TORONTO AND REGION CONSERVATION AUTHORITY -OWNED LAND East side of Duffy's Lane, north of King Street, Regional Municipality of Peel, CFN 40518. Toronto and Region Conservation Authority is in receipt of a request from Pat and Linda Paniccia to explore the possibility of a sale of a fragment of Toronto and Region Conservation Authority -owned land located on the east side of Duffy's Lane, north of King Street, Town of Caledon, Regional Municipality of Peel, Humber River watershed. Jack Heath Richard Whitehead 1021 THE EXECUTIVE COMMITTEE RECOMMENDS THAT the Toronto and Region Conservation Authority (TRCA) -owned land located on the east side of Duffy's Lane, north of King Street, Town of Caledon, Regional Municipality of Peel, be retained for conservation purposes. CARRIED BACKGROUND A letter was received from Pat and Linda Paniccia, requesting the sale of a fragment of TRCA -owned land situated on the east side of Duffy's Lane, north of King Street for an addition to their existing rural residential property. At Executive Committee Meeting #2/08, held on April 11, 2008, Resolution #B28/08 was approved as follows: THAT the potential disposal of a fragment of land on the east side of Duffy's Lane, north of King Street, Town of Caledon, Regional Municipality of Peel, be referred to Toronto and Region Conservation Authority (TRCA) staff for review and discussion in accordance with established TRCA policies; AND FURTHER THAT a report be brought forward to the Executive Committee at a future date recommending further action. This request was circulated to Town of Caledon and Regional Municipality of Peel staff as well as TRCA staff for review and comment. The following comments have been received: Town of Caledon staff This parcel of land will be subject to a significant road widening (7 metres + / -) required for the future Bolton Arterial Route (BAR). As construction of this portion of the BAR is a Region of Peel project, Regional Municipality of Peel staff should be contacted for more detailed information. Regional Municipality of Peel staff A road widening requirement is required in connection with the future Bolton Arterial Route (BAR) project. At this point in time, only the Environmental Assessment has been completed for this project. The detailed design has not yet commenced. The Region of Peel is requesting that TRCA delay its decision regarding this property until the detailed design is complete to the point that property impact can be determined; it is anticipated that this information will be available by the end of 2008. TRCA staff The subject site has been identified in the Refined Humber Terrestrial Natural Heritage System (TNH) system as potential habitat and forms part of the land base needed for the Natural Heritage system to achieve TRCA's biodiversity targets. TRCA staff has surveyed this site and collected terrestrial information. The area has been classified as a cultural thicket and provides habitat for some open country bird species of concern (i.e. Field Sparrow, Nashville Warbler and White Throated Sparrow). In addition, the subject area is an excellent buffer for the higher quality natural habitats immediately to the east (i.e. the Humber River valley). 1022 Not only has this TRCA -owned property been identified as potential natural cover for habitat and an area which could benefit from regeneration in the TNH system, it also currently provides some ecological function that should be protected. Given the fact that a substantial strip of the frontage is required for the BAR and that the property has significant potential for regeneration, staff is recommending that the parcel be retained. A plan illustrating the location of the subject lands is attached. Report prepared by: George Leja, extension 5342 Emails: gleja @trca.on.ca For Information contact: George Leja, extension 5342 or Ron Dewell, extension 5245 Emails: gleja @trca.on.ca or rdewell @trca.on.ca Date: October 17, 2008 Attachments: 1 1023 Attachment 1 ... • ... ..K' 1 ..-^. -4.1'. .. '',....s - I- ...,. -....., 4 4 . ,1 46: .4.'3' .... ,..0,65 ttt ''•,t . , f -E, 0„,f vt; ..„••• • • SUISJECT PROPERTY NMI HI OM `1.-I I (114 Gl'>POSAL IOHONTO AND REGION ((NF PVATION A If 1-1(1;1114 flVit.- AND t north ot K.r1D tottfoct CFN 40518 Niow,„ rem •nr ,Mn -.-. cmcervatron Nor 1 ho, f t.rr A■ fy 11111111V lkiJEC I PROPERTY 4s1 1024 RES.#B125/08 - TM MOBILE INC. (TELUS MOBILITY) PROPOSAL FOR LEASE OF LAND Vicinity of Restoration Services Centre, Region of York, CFN 41476. Proposal to lease Toronto and Region Conservation Authority -owned land located south of Major Mackenzie Drive, east of Islington Avenue, City of Vaughan, Regional Municipality of York, to construct and operate a cell phone antenna and associated equipment. Moved by: Seconded by: Jack Heath • Colleen Jordan THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region Conservation Authority (TRCA) has been requested by TM Mobile Inc. (Telus Mobility) to, enter into a lease arrangement for lands located south of Major Mackenzie Drive, east of Islington Avenue, City of Vaughan, Regional Municipality York; WHEREAS it is in the opinion of TRCA that it is in the best interests of TRCA in furthering its objectives, as set out in Section 20 of the Conservation Authorities Act, to cooperate with Telus Mobility in this instance; THAT TRCA enter into a lease with Telus Mobility of approximately 0.013 hectares, more or less, (0.032 acres) together with use of 0.385 hectares (0.951 acres) parcel of land for access and utilities for the construction and operation of a cell phone antenna and associated equipment, said land being Part of Lot 18, Concession 7, City of Vaughan, Regional Municipality of York; THAT the lease with Telus Mobility be premised on the following: (i) the initial term of the lease will be for five years, with three renewal options for successive five year periods subject to the concurrence of TRCA to the renewals; (ii) the lease rate is to be $15,203.20 per annum; (iii) Telus Mobility is to be responsible for all approvals required for construction of a cell phone antenna and associated equipment; (iv) Telus Mobility shall be solely responsible for all costs associated with the construction of a cell phone antenna and associated equipment; (v) any other terms and conditions deemed appropriate by the TRCA's solicitor; THAT an archaeological review is to be completed at the expense of Telus Mobility with any mitigative measures being carried out to the satisfaction of the TRCA; AND FURTHER THAT the authorized TRCA officials be directed to take whatever action may be required to implement the lease, including the obtaining of necessary approvals and the signing and execution of any documents. CARRIED 1025 BACKGROUND TRCA has been approached by Telus Mobility to locate a cell phone antenna and associated equipment on TRCA -owned land in the vicinity of TRCA's Restoration Services Centre. Telus Mobility's equipment requirement for this proposal includes a 40 metre high tower with a shelter, which would be housed in a 10.67 metre x 12.19 metre compound. The access right -of -way will be approximately 6 - 12 metres in width which will include connection to existing utilities. Telus Mobility has indicated that they will work with TRCA to develop an aesthetically pleasing design for the top of the tower. Lease Agreement The area subject to this lease consists of approximately 0.013 hectares of land (0.032 acres) all of which is tableland. A sketch showing the lands subject to this lease is attached. The following are the key terms of the proposed lease arrangement: 1. Lease Payment: $15,203.20 (present rate for the Boyd Conservation Area and Lake St. George Field Centre Telus towers excluding any sub -let revenue) plus GST per annum to be increased by 2% per year; 2. Initial Term: 5 years; 3. Renewals: 3 successive 5 year terms subject to TRCA concurrence; 4. Access: Telus Mobility will be provided with access to the antenna and shelter at all times; 5. Insurance: Telus Mobility will provide $5,000,000 in commercial general liability; 6. Realty Taxes: Telus Mobility will pay all taxes levied against the property; 7. Hydro: Telus Mobility will be responsible for electrical connections and charges relating to this use; 8. Approvals: Telus Mobility will comply will all required laws, directions, rules and regulations; 9. Equipment Removal: Telus will remove all equipment and restore the site to the satisfaction of TRCA within 90 days of termination of the lease. DETAILS OF WORK TO BE DONE Upon TRCA approval, the necessary other approvals required to bring the lease into effect will be pursued. FINANCIAL DETAILS The $15,203.20 per year in revenues generated from this lease will be used for TRCA purposes. Report prepared by: Mike Fenning, extension 5223 Emails: mfenning @trca.on.ca For Information contact: Mike Fenning, extension 5223 or Ron Dewell, extension 5245 Emails: mfenning @trca.on.ca or rdewell @trca.on.ca Date: October 20, 2008 Attachments: 1 1026 Attachment 1 / „ • / 1/ 1 / , , .4 4 / x I / / ' / 1,/ /7/2 Ta, 1 Z tt' V. 4. R 0.W / -4.-■•■ . TM MCI3LL. NC II LI. MOTU...11V PROP OSA - tit S I ORA HON a'alt441.4T.4, r n4 1 It I .4 r , TRCA LANDS 1027 P RC) AcccssR404W LLASh1/ ANCA / RES. #B126/08 - Moved by: Seconded by: THE REGIONAL MUNICIPALITY OF YORK Request for a Permanent Easement for the extension of the Bathurst Street Sanitary Trunk Sewer to Langstaff Road, Don River Watershed, CFN 41542. Receipt of a request from The Regional Municipality of York to provide a permanent easement for the extension of the Bathurst Street Sanitary Trunk Sewer to Langstaff Road across the southeast corner of the Baker Sugar Bush (which is jointly owned by the City of Vaughan, Regional Municipality of York and Toronto and Region Conservation Authority), north of Regional Road 7, west of Bathurst Street, in the City of Vaughan. David Barrow Suzan Hall THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region Conservation Authority (TRCA) is in receipt of. a request from The Regional Municipality of York to provide a permanent easement for the extension of the Bathurst Street Sanitary Trunk Sewer to Langstaff Road, north of Regional Road 7, west of Bathurst Street, in the City of Vaughan; WHEREAS it is in the opinion of TRCA that it is in the best interest of TRCA in furthering its objectives, as set out in Section 20 of the Conversation Authorities Act, to cooperate with The Regional Municipality of York in this instance; THEREFORE LET IT BE RESOLVED THAT a permanent easement containing a total of 0.01 hectares (0.24 acres), more or less, be granted to The Regional Municipality of York for the extension of the Bathurst Street Sanitary Trunk Sewer to Langstaff Road, said land being Part of Lot 11, Concession 2, City of Vaughan, Regional Municipality of York, designated as Parts 9, 10 and 11 on Plan 65R- 30171; THAT consideration is to be the nominal sum of $2.00, plus all legal, survey and other costs to be paid by The Regional Municipality of York; THAT The Regional Municipality of York is to fully indemnify and save harmless TRCA from any and all claims for injuries, damages or loss of any nature resulting in any way either directly or indirectly from this easement or the carrying out of construction; THAT the granting of this easement is subject to the approval of the Minister of Natural Resources in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O. 1990, Chapter C.27 as amended; THAT the granting of this easement be subject to the approval of the City of Vaughan; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents. CARRIED 1028 BACKGROUND The Regional Municipality of York has formally requested a permanent easement for the extension of the Bathurst Street Sanitary Trunk Sewer to Langstaff Road, north of Regional Road 7, west of Bathurst Street, in the City of Vaughan. The project has been reviewed by TRCA Planning and Development staff through the Environmental Assessment (EA) Act process. The proposed easement crosses the southeast corner of the Baker Sugar Bush; the subject site is not regulated pursuant to Ontario Regulation 166/06. The proposed works are being completed by subsurface drilling and boring; therefore, no surface disturbance will occur during construction. In addition, a temporary construction easement will not be required as part of the proposed works. The subject TRCA lands were acquired from Sugarbush Developments Limited on January 21, 2000 under the Greenspace Protection and Acquisition Project, 1996 -2000, Flood Plain and Conservation Component /Don River Watershed. The property is jointly owned by the City of Vaughan, Regional Municipality of York and TRCA. Plantings: As noted above, there will be no surface disturbance during construction; all existing vegetation on this portion of the Baker Sugar Bush will remain intact. A plan illustrating the permanent easement location is attached. FINANCIAL DETAILS York Region has agreed to assume all legal, survey and other costs involved in completing this transaction. Report prepared by: George Leja, extension 5342 Emails: gleja @trca.on.ca For Information contact: George Leja, extension 5342 or Ron Dewell, extension 5245 Emails: gleja @trca.on.ca or rdewell @trca.on.ca Date: October 17, 2008 Attachments: 1 1029 Attachment 1 r 1 t2! 5 1 1250 5 1�. . • J 6a' 9 • is\\ S Z, 30 �f • yf' i 55 51 25! 1\ 09• \• • 1 i • CRS // 209 5 • 202 111. / 1 1 1 1 ...r1 15 .D 5 1 ZOOS \ 2,,0 1 \ 1 20. 0 .1' va. • 2or o1. —�— ■1 0* 1 i /• 2020 / 70 m ioc 5 THE REGIONAL MUNICIPALITY OF YORK Request for a Permanent Easement for the extension of the Bathurst Street Sanitary Trunk Sewer to Langstaff Road, Don River Watershed CFN 41542 1030 IOZONIO w0 0tCiON �.- onserva tion for The Living City" (K:=TRCA LANDS SUBJECT PROPERTY SECTION II - ITEMS FOR EXECUTIVE ACTION RES. #B127 /08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Development, Interference with Wetlands and Alterations to Shorelines and Watercourses. Pursuant to Ontario Regulation 166/06, written . permission from the Authority is required for: a) straightening, changing, diverting or interfering in any way with the existing channel of a river, creek, stream or watercourse, or for changing or interfering in any way with a wetland; b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development. A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected. Moved by: Seconded by: Colleen Jordan Reenga Mathivanan THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.1 - 8.1.22, and 8.1.83 - 8.1.86, with the exception of 8.1.15 - 97 Worthview Drive, and 8.1.20 - 8.1.22, inclusive) which are listed below. CARRIED RES. #6128108 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Jack Heath Richard Whitehead THAT a permit be granted in accordance with Ontario Regulation 166/06 for the application 8.1.15 - 97 Worthview Drive, which is listed below. RES.#B129/08 - Moved by: Seconded by: CARRIED APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Jack Heath David Barrow THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.20 - Town of Richmond Hill and 8.1.21 - 584 Cam Fella Boulevard), which are listed below. CARRIED RES. #B130 /08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Jack Heath Colleen Jordan 1031 THAT a permit be granted in accordance with Ontario Regulation 166/06 for the application 8.1.22 - York Catholic District School Board, which is listed below. CARRIED CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.1 1545355 ONTARIO LTD. To change a building or structure so that it alters its use or potential use - increases its size or increases the number of dwelling units on Lot 127, Plan 3578, (38 Noranda Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by 1545355 Ontario Ltd.. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a two - storey addition to the side and rear of the existing 1.5- storey single family detached residential dwelling. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing unnumbered, Site Plan, prepared by Uraldo Dirienzo, undated, received on September 23, 2008, redlined by TRCA staff on October 28, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to construct a two - storey addition to the side and rear of the existing 1.5- storey single family detached dwelling at 38 Noranda Drive in the City of Toronto (Etobicoke York Community Council Area). The subject site is located south of Lawrence Avenue West and west of Black Creek Drive within a Regulated Area of the Humber River Watershed. Control of Flooding: This site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: A geotechnical brief has been reviewed and approved by TRCA geotechnical engineering staff. TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the proposal. 1032 Conservation of Land: The proposed works are located no further than the existing limit of development. The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41485 - Application #: 823/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 28, 2008 8.1.2 15 VALECREST DRIVE To construct, reconstruct, erect or place a building or structure on Lot 4, Plan 3939, (15 Valecrest Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new two - storey single family detached dwelling and rear terrace. The existing dwelling is to be demolished. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing unnumbered, Site Plan, prepared by Lorne Rose Architect, dated August 14, 2008, received on August 15, 2008, redlined by TRCA staff on October 22, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new two- storey single family detached dwelling. The existing dwelling is to be demolished. The subject site is located east of Royal York Road and south of Eglinton Avenue West in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. 1033 Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. Erosion: TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the proposal. Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to, the site that may be negatively impacted by the project. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41286 - Application #: 699/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 27, 2008 8.1.3 84 ELLIS PARK ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Lot 339, Plan M -438, (84 Ellis Park Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a third storey addition to the existing two - storey dwelling. The footprint of the existing dwelling is to remain unchanged. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1, Site Plan, prepared by Harry Morison Lay Architect, dated February 28, 2008, Revision No. 3, revised on May 27, 2008, received on September 8, 2008. 1034 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to allow for the construction of a third storey addition to the existing two- storey dwelling located at 84 Ellis Park Road in the City of Toronto (Etobicoke York Community Council Area). The footprint of the existing dwelling is to remain unchanged. The subject property is located south of Bloor Street West, east of South Kingsway and backs on to High Park within a TRCA Regulated Area of the Humber River Watershed. Control of Flooding: The proposal is not located within a Regional Storm Floodplain and therefore will not impact the storage or conveyance of flood waters. Pollution: Sediment control fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable Erosion: TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the proposal. Conservation of Land: The subject property is located within an urbanized valley corridor. As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to, the site that may be negatively impacted by the project. Plantings Plantings are not required for the purpose of this application. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41482 - Application #: 821/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 27, 2008 8.1.4 CITY OF TORONTO To temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on 2001 Lakeshore Boulevard West in the City of Toronto (Etobicoke York Community Council Area), Waterfront Watershed as located on the property owned by City of Toronto. 1035 The purpose is to develop within a TRCA Regulated Area of the Waterfront Watershed in order to upgrade the existing pathway at Sir Casimir Growski Park. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing unnumbered, West Site Plan, prepared by the City of Toronto, dated October 2008, received on October 16, 2008; • Drawing No. D -3, Standard Asphalt Paving, prepared by the City of Toronto, dated January 2005, received on October 16, 2008; • Drawing No. D -7, Granular Path, prepared by the City of Toronto, dated January 2005, received on October 16, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Waterfront Watershed in order to upgrade the existing paths at Sir Casimir Growski Park. The work will involve asphalt paving of the existing pathway. There will be no change to the location of the path or.grading. The area is located along the Lake Ontario Waterfront area, in the City of Toronto (Etobicoke York Community Council Area), Waterfront Watershed Area and the proposed work will occur on property owned by City of Toronto. Control of Flooding: There will be no impacts to the control of flooding, storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering any watercourse or the lake. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical engineering issues associated with the proposed works. Conservation of Land: TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the proposal. As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to, the site that may be negatively impacted by the project. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. 1036 Policy Guidelines: This proposal is consistent with Section 4.2. - Development Guidelines for Existing Development of the TRCA's Valley and Stream Corridor Management Program. CFN: 41585 - Application #: 896/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 28, 2008 8.1.5 KINTAIL CORPORATION To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 14, Plan 4491, (74 Industry Street), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to regrade portions of the site in order to accommodate additional surface parking. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. SSG -101, Site Servicing and Grading, prepared by Sernas Associates, revised Oct. 15, 2008, received Oct. 22, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The property is located in a highly modified and urbanized reach of the Black Creek Valley corridor and currently developed with a two storey commercial building which is to remain and surface parking. The applicant proposes to regrade portions of the site including removal of a section of vegetated slope located on the west side of the property. The works are required in order accommodate additional on site surface parking. The vegetation proposed for removal is not considered significant. New retaining walls having a maximum height of approximately 1.8m would be constructed along the perimeter of the parking areas. The applicant will also be installing an infiltration bed beneath the parking lot so that the site will retain /infiltrate the 5mm storm event in accordance with the City of Toronto's wet weather flow management guidelines. Control of Flooding: The proposal is not located within the Regional Storm Floodplain and therefore will not impact the storage or conveyance of flood waters. Pollution: Silt fencing will be secured around all construction areas to prevent the migration of construction generated sediment into the receiving watercourse. 1037 Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues with the proposed works. Conservation of Land: All filled and disturbed areas will be stabilized and revegetated following construction. No significant resource features will be impacted by the proposed works. Plantings New plantings will be required by the City of Toronto Urban Forestry Department. Policy Guidelines: The project complies with Section 4.2.2 E - Property Improvements and Ancillary Structures- of this Authority's Valley and Stream Corridor Management Program. CFN: 41211 - Application #: 642/08/TOR Report Prepared by: Mark Rapus, extension 5259 For information contact: Mark Rapus, extension 5259 Date: October 28, 2008 8.1.6 9 HUMBERCREST POINT To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 64, 65, 66, 67, 68, 69, 70, Plan 2491, (9 Humbercrest Pt.), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of two additions to the rear of the existing single family detached dwelling. The proposed additions will effectively square off the rear elevation of the dwelling. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Arch Dwg Inc., dated September 2008, Revision No. 4, revised on October 23, 2008, received on October 24, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 1038 Proposal: The purpose of this application is to facilitate the construction of two additions to the rear of the existing single family detached dwelling at 9 Humbercrest Point in the City of Toronto (Etobicoke York Community Council Area). The proposed additions will effectively square off the rear elevation of the dwelling. The subject property is located west of Jane Street, south of Dundas Street West and backs on to Magwood Park within a TRCA Regulated Area of the Humber River Watershed. Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment controls will be installed and maintained during construction to prevent debris from entering the adjacent ravine. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the proposal. As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to, the site that may be negatively impacted by the project. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41512 - Application #: 843/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 27, 2008 1039 8.1.7 87 VALECREST DRIVE To construct, reconstruct, erect or place a building or structure on Lot 31, Plan 4103, (87 Valecrest Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to acknowledge works within a TRCA Regulated Area of the Humber River Watershed to facilitate the construction of an inground whirlpool and second storey balcony to the rear of the existing single family detached dwelling. The subject works were completed more than two years ago and were built without the benefit of a municipal or TRCA permit. A penalty fee (additional 25% of the current fee) has been received for the subject works. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Surveyor's Real Property Report, prepared by Tom A. Senkus, dated March 14, 2008, Revision No. 1, revised on September 8, 2008, received on September 24, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to acknowledge the construction of an inground whirlpool and second storey balcony to the rear of the existing single family detached dwelling at 87 Valecrest Drive in the City of Toronto (Etobicoke York Community Council Area). The subject works were completed more than two years ago and were built without the benefit of a municipal or TRCA permit. A penalty fee (additional 25% of the current fee) has been received for the subject works. The subject site is located east of Royal York Road, south of Eglinton Avenue West, within a TRCA Regulated Area of the Humber River Watershed. Control of Flooding: The proposal is not located within a Regional Storm Floodplain and therefore will not impact the storage or conveyance of flood waters. Pollution: Temporary sediment control fencing is not required for the purpose of this application. • Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff. Conservation of Land: TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the completed works. There are no fisheries concerns as the watercourse was not impacted by the works. There are no other significant natural features on, or adjacent to, the site that were negatively impacted by the project. 1040 Plantings Plantings are not required for the purpose of this application. Policy Guidelines: This proposal is consistent with Section 4.2.2.(E) - Development Guidelines for Property Improvements and Ancillary Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41506 - Application #: 840/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 27, 2008 8.1.8 53 BABY POINT CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 249, Plan 1582, (53 Baby Point Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to develop within the TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a side and rear addition to the existing three - storey single - family detached dwelling. The proposed addition includes an attached garage. The existing detached garage is to be demolished. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. SG 1, Lot Drainage and House Siting Control Plan, prepared by R. G. McKibbon Limited, dated April 30, 2008, Revision No. 2, revised on October 17, 2008, received on October 20, 2008; • Drawing No. A1.2, Site Plan Landscaping Plan, prepared by Richard Wengle Architects, dated May 13, 2008, Revision No. 2, revised on October 17, 2008, received on October 20, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a rear and side addition to the existing three - storey dwelling at 53 Baby Point Crescent. The proposed addition includes an attached garage. The existing detached garage is to be demolished. The subject site is located west of Jane Street, north of Bloor Street West in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The proposal is not located within a Regional Storm Floodplain and therefore will not impact the storage or conveyance of flood waters. 1041 Pollution: Sediment controls will be installed and maintained during construction to prevent debris from entering the adjacent ravine. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the proposal. As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to, the site that may be negatively impacted by the project. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly,Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41385 - Application #: 751/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 27, 2008 8.1.9 TORONTO DISTRICT SCHOOL BOARD To construct, reconstruct, erect or place a building or structure on Block B, Plan 6815, (15 Tandridge Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by Toronto District School Board. The purpose is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the installation of a portable classroom on the site of an existing junior public school. The permit will be issued for the period of November 7, 2008 to November 6, 2010 ih accordance with the following documents and plans which form part of this permit: • Drawing No. A2, Site Plan, prepared by Eugene Kuan Architect, dated June 2008, Revision No. 2, revised on July 18, 2008, received on October 21, 2008. 1042 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the installation of a portable classroom on the site of an existing junior public school. The subject property is located east of Albion Road and north of Highway 401 in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The site is located within a Regional Storm Floodplain of the Humber River Watershed. The depth of flooding is minimal (less than 0.4 metres) at the location where the proposed portable classroom is to be erected. The classroom will be floodproofed to the level of the Regulatory Flood (131.08 mast). As such, the proposal will have no impact on the storage or conveyance of floodwaters. Pollution: Sediment fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries concerns as the watercourse was not impacted by the works. There are no other significant natural features on, or adjacent to, the site that were negatively impacted by the project. Plantings Plantings are not required for the purpose of this application. Policy Guidelines: This proposal is consistent with Section 4.2.2., Development and Redevelopment /Intensification within Non - Established Communities /Highly Urbanized Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41583 - Application #: 894/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 28, 2008 1043 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL) 8.1.10 441 BLYTHWOOD ROAD To site grade on Lot 15, Plan 205, (441 Blythwood Road), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a rear yard deck and grade and landscape the rear yard. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. L2 of 6 Rear Yard Grading Plan, dated May 2008, revised September 25, 2008, prepared by Sunarts Design, received September 30, 2008; • Drawing No. L3 of 6 Landscape Plan, dated May 2008, revised September 25, 2008, prepared by Sunarts Design, received September 30, 2008; • Drawing No. L4 of 6 Landscape Sections, dated May 2008, revised September 25, 2008, prepared by Sunarts Design, received September 30, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant proposes to construct a rear yard wooden deck where there is currently a stone patio, and to enlarge the area of the stone patio. Minor regrading works in the rear yard, including the construction of two low retaining walls, will be implemented in order to create plant beds. All works are minor in nature, and adequately set back from the top of the slope. A 3 metre vegetated buffer will be planted above the top of the slope. Control of Flooding: The proposed works are not located within the Regional Storm Floodplain, and therefore will not impact the storage or conveyance of flood waters. Pollution: Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from entering nearby watercourses. Dynamic Beaches: Not applicable. Erosion: There will be no geotechnical /slope stability issues associated with the proposed development. Conservation of Land: The slope feature will. be enhanced with stabilization plantings and a 3 metre vegetated buffer. Plantings Plantings have been approved by the City of Toronto, and all disturbed areas will be restored upon completion of the project. 1044 Policy Guidelines: The proposal is consistent with Section 4.2.2. E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41387 - Application #: 754/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: October 27, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.11 PIER 27 (TORONTO) INC. To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on (25 Queens Quay East), in the City of Toronto (Toronto and East York Community Council Area), Waterfront Watershed as located on the property owned by Pier 27 (Toronto) Inc. The purpose is to develop within a TRCA Regulated Area of the Waterfront Watershed in order to facilitate the construction of a mixed -use condominium development at 25 Queens Quay East in the City of Toronto (Toronto and East York). The proposed development consists of two 'H' shaped condominium buildings with a total of 693 units. The buildings are to be 14- stories in height and will include an underground parking garage. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Sheet No. ESR, Erosion and Sediment Control Plan, prepared by Underhill Associates Ltd., dated December 2007, received on September 4, 2008; • Drawing No. A -01, Overall Site Plan Context Plan Site Statistics, prepared by Architects Alliance, dated December 2007, Revision No. 2, revised on July 4, 2008, received on September 4, 2008; • Drawing No. A -07, Building D Ground Floor, prepared by Architects Alliance, dated December 2007, Revision No. 2, revised on July 4, 2008, received on September 4, 2008; • Drawing No. A -16, Building D North Elevation, prepared by Architects Alliance, dated December 2007, Revision No. 2, revised on July 4, 2008, received on September 4, 2008; • Drawing No. A -17, Building D East Elevation, prepared by Architects Alliance, dated December 2007, Revision No. 2, revised on July 4, 2008, received on September 4, 2008; • Drawing No. A -18, Building D West Elevation, prepared by Architects Alliance, dated December 2007, Revision No. 2, revised on July 4, 2008, received on September 4, 2008; • Drawing No. A -19, Building D South Elevation, prepared by Architects Alliance, dated December 2007, Revision No. 2, revised on July 4, 2008, received on September 4, 2008; 1045 • Drawing No. A -20, Building B Ground Floor, prepared by Architects Alliance, dated December 2007, Revision No. 2, revised on July 4, 2008, received on September 4, 2008; • Drawing No. A -32, Building B West Elevation Eastern Building, prepared by Architects Alliance, dated December 2007, Revision No. 2, revised on July 4, 2008, received on September 4, 2008; • Drawing No. A -33, Building B West Elevation Western Building, prepared by Architects Alliance, dated December 2007, Revision No. 2, revised on July 4, 2008, received on September 4, 2008; • Drawing No. A -34, Building B North Elevation, prepared by Architects Alliance, dated December 2007, Revision No. 2, revised on July 4, 2008, received on September 4, 2008; • Drawing No. A -35, Building B East Elevation Western Building, prepared by Architects Alliance, dated December 2007, Revision No. 2, revised on July 4, 2008, received on September 4, 2008; • Drawing No. A -36, Building B South Elevation, prepared by Architects Alliance, dated December 2007, Revision No. 2, revised on July 4, 2008, received on September 4, 2008; • Drawing No. A -37, Building B East Elevation Eastern Building, prepared by Architects Alliance, dated December 2007, Revision No. 2, revised on July 4, 2008, received on September 4, 2008; • Drawing No. L -1, Phase 1: Landscape Layout Plan, prepared by The MBTW Group, dated February 14, 2007, Revision No. 4, revised on July 24, 2008, received on September 4, 2008; • Sheet No. SP, Phase 1: Servicing Plan, prepared by Underhill Associates Ltd., dated December 2007, Revision No. 1, revised on July 17, 2008, received on September 4, 2008; • Sheet No. GR, Phase 1: Grading Plan, prepared by Underhill Associates Ltd., dated December 2007, Revision No. 1, revised on July 17, 2008, received on September 4, 2008. ATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Waterfront Watershed in order to facilitate the construction of a mixed -use condominium development at 25 Queens Quay East in the City of Toronto (Toronto and East York). The proposed development consists of two 'H' shaped condominium buildings with a total of 693 units. The buildings are to be 14- stories in height and will include an underground parking garage. The subject site is located in the southeast quadrant of the Queens Quay and Yonge Street intersection. The subject site is bounded to the north by Queens Quay East, Redpath Sugar to the east, Lake Ontario to the South and the Yonge Street Slip to the west. The current use of the site is surface parking. Control of Flooding: The site is located in the Lower Don Special Policy Area. TRCA staff have confirmed that the entire site is located well above the Lake Ontario Flood Hazard Limit of 75.7 metres. As such the proposal will have no impact on the storage or conveyance of floodwaters. 1046 Pollution: The site will be entirely isolated from Lake Ontario with hoarding. Dynamic Beaches: Not applicable. Erosion: The site is located on Lake Ontario and will have no impact on watercourse erosion. Conservation of Land: The site is entirely urbanized and is not within a significant area. The proposed work is adequately setback from Lake Ontario. Plantings No plantings are required as part of this proposal. Policy Guidelines: The project is consistent with Policy 4.2.1., Development and Redevelopment /Intensification within Established Communities /Highly Urban Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41405 - Application #: 766/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 28, 2008 8.1.12 39 DOUGLAS CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 116, 117, Plan 2398, (39 Douglas Crescent), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a new two - storey single family detached dwelling. The existing dwelling is to be demolished. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A1.0, Site Plan, prepared by Martin Associates Architects, dated March 2008, Revision No. 2, revised on April 23, 2008, received on April 25, 2008, red -line revised by TRCA staff on October 22, 2008. • RATIONALE The application was reviewed by staff on the basis of the following information: 1047 Proposal: The purpose is to develop within a TRCA Regulated Area 'of the Don River Watershed in order to facilitate the construction of a new two- storey single family detached dwelling. The existing dwelling is to be demolished. The subject site is located west of Bayview Avenue and north of Bloor Street East in the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment controls will be installed and maintained during construction to prevent debris from entering the adjacent ravine. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the proposal. As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to, the site that may be negatively impacted by the project. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40779 - Application #: 305/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 27, 2008 1048 8.1.13 TORONTO DISTRICT SCHOOL BOARD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Block A, Plan 1227, (4 Massey Square), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by Toronto District School Board. The purpose is to construct a three storey addition to the rear (north side) of the existing elementary school and a one storey addition to the east and south sides of the school. New surface parking areas would also be provided on site. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. SS, Site Grading and Servicing, prepared by R.V Anderson Associates Limited, revised September 16, 2008, received September 19, 2008; • Drawing No. GN1, General Notes and Details, prepared by R.V Anderson Associates Limited, revised September 16, 2008, received September 19, 2008, red -line revised by TRCA on October 28, 2008; • Drawing No. A1.1, Site and Context Plan, prepared by CS & P Architects Inc., dated August 15, 2008, received September 19, 2008; • Drawing No. L1, Landscape Plan, prepared by Graham Hess and Associates Inc., dated May 28, 2008, received September 19, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: It is proposed to construct a three storey addition to the rear of the school and one storey additions to the south and east sides of the building. Additional surface parking will also be provided on site. The existing school is located adjacent to the Taylor Creek Valley corridor. The proposed development will be adequately setback from the top of bank. Control of Flooding: The proposed works are not located within a Regional Storm Floodplain and therefore will not impact the storage or conveyance of flood waters. Pollution: Sediment control fencing will be secured around all construction areas to prevent the migration of construction generated sediment into the adjacent valley. Dynamic Beaches: Not applicable Erosion: A geotechnical study has been submitted by the applicant in support of the proposed works. TRCA technical staff have reviewed this study and have determined that there will be no erosion issues associated with this proposal. 1049 Conservation of Land: A comprehensive planting plan for the site has been submitted and approved by staff. Plantings All plantings will be in accordance with TRCA's Post - Construction Restoration Guidelines and Seed -Mix Guidelines. Policy Guidelines: This proposal is consistent with Section 4.2.2 C - Minor Additions - of this Authority's Valley and Stream Corridor Management Program. CFN: 41490 - Application #: 825/08/TOR Report Prepared by: Mark Rapus, extension 5259 For information contact: Mark Rapus, extension 5259 Date: October 28, 2008 CITY OF VAUGHAN 8.1.14 1417 CENTRE STREET To construct, reconstruct, erect or place a building or structure on Lot 8, Plan 3668, (1417 Centre Street), in the City of Vaughan, Don River Watershed. The purpose is to construct a paved parking area associated with a medical office within a Regulated Area of the Don River Watershed at 1417 Centre Street in the City of Vaughan. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. C1, prepared by Weston Consulting Group Inc., received by the TRCA October 20, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a paved parking area associated with a proposed medical office within a Regulated Area of the Don River Watershed. The subject property was recently used as a residential dwelling. In order to accommodate a permitted change in use for a medical office, additional parking is required as stipulated under the City of Vaughan's Zoning By -law 1 -88. The proposed works are located in close proximity to the Regional Storm Flood Plain (approximately 5 metres). However, the proposed parking area and the existing dwelling / office are not located within the flood plain area. There are no proposed grade changes or external. alteration to the existing dwelling / office on the subject property. The proposal is consistent with TRCA objectives to reduce the risk to life by changing the use from a primary place of residence to a business hours only dental office. 1050 Control of Flooding: The proposed works are in close proximity to the Regional Storm Flood Plain but are outside of the Flood Plain. There will be no impacts on the storage or conveyance of flood waters. Pollution: The area of disturbance is relatively flat and surrounding areas are sodded. There will be no migration of sediment off the subject property. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41584 - Application #: 898 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: October 29, 2008 8.1.15 97 WORTHVIEW DRIVE To construct, reconstruct, erect or place a building or structure on Lot 103, Plan 65M -3927, (97 Worthview Drive), in the City of Vaughan, Humber River Watershed. The purpose is to recognize an existing rear yard deck which was constructed without a TRCA permit within a Regulated Area of the Humber River Watershed at 97 Worthview Drive, in the City of Vaughan. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by the applicant, received by the TRCA September 22, 2008. 1051 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to recognize an existing rear yard deck within a Regulated Area of the Humber River Watershed. As identified by the City of Vaughan Building Standards Department, the deck constructed had not previously been approved through the building permit process and the owner was requested to contact TRCA prior to the issuance of a building permit to recognize the structure. Based upon a site visit conducted by TRCA staff on September 29, 2008, the deck is located approximately 5 metres from the rear lot line and approximately 7 metres away from the existing top of bank. The slope appears to have an inclination of 3H : 1V or milder and has been determined to be a stable by TRCA geotechnical staff. Control of Flooding: The works are not located within the Regional Storm Flood Plain. There will be no impacts on the storage or conveyance of flood waters. Pollution: The site has already been sodded and stabilized. No sediment transport will result from this project. Dynamic Beaches: Not applicable. Erosion: TRCA geotechnical staff are satisfied that the completed works will not impact the stability of the slope. Conservation of Land: As a watercourse has not been impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that have been or will be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41478 - Application #: 818 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: September 30, 2008 1052 8.1.16 175 WILLIS ROAD To construct, reconstruct, erect or place a building or structure on 175 Willis Road in the City of Vaughan, Humber River Watershed. The purpose is to permit the continued construction of a minor addition to an existing dwelling within a Regulated Area of the Humber River Watershed at 175 Willis Road in the City of Vaughan. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. Al, prepared by Architectural CADD Studio, dated September 25, 2008, received by the TRCA September 26, 2008, redline revised to indicate the removal of excess fill material; • Floor Plans, Drawing No. A2, prepared by Architectural CADD Studio, dated September 25, 2008, received by the TRCA September 26, 2008; • Exterior Elevations Drawing, Drawing No. A3, prepared by Architectural CADD Studio, dated September 25, 2008, received by the TRCA September 26, 2008; and • Exterior Elevations Drawing, Drawing No. A4, prepared by Architectural CADD Studio, dated September 25, 2008, received by the TRCA September 26, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to permit the continued construction of a minor addition to an existing dwelling within a Regulated Area of the Humber River Watershed. The applicant was issued a stop work order by the City of Vaughan for the commencement of construction of an addition to the existing dwelling. TRCA enforcement and planning staff were informed of the violation order and it was decided that TRCA interests can be addressed through the permitting system. An additional administration fee has been charged to this permit application. The subject property is located entirely within the Humber River Valley Corridor but is outside of the Regional Storm Flood Plain. In addition, the subject property is relatively flat and the toe of slope for the valley system is located on the property immediately to the east. The property is devoid of significant vegetation. The proposed addition involves the demolition of an existing detached garage which is to be replaced with an attached car port with a second storey. The proposed works will not significantly increase the existing footprint of the existing home and detached garage area. Additionally, the proposed works will not cause the development envelope to significantly encroach further towards any natural features including the toe of slope which is located approximately 35 metres away. Control of Flooding: The proposed works are not located within the Regional Storm Flood Plain. There will be no impact on the storage or conveyance of flood waters. 1053 Pollution: As the subject lands are relatively flat and currently sodded, there will be no transport of sediment. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As a watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program. CFN: 41501 - Application #: 836 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: October 24, 2008 8.1.17 545 WOODLAND ACRES CRESCENT To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Lot 22, 29, Concession 2 Plan M1731, (545 Woodland Acres Crescent), in the City of Vaughan, Don River Watershed. The purpose is to construct a two storey minor addition and two storey deck to an existing dwelling within a Regulated Area of the Don River Watershed at 545 Woodland Acres Crescent, in the City of Vaughan. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. Al, prepared by SDH Custom Home Designs, revise dated September 30, 2008, received by the TRCA October 8, 2008 redline revised to indicate the removal of excess fill material and the erection and maintenance of sediment control fencing for the duration of construction; • Left and Right Elevations, Drawing No. A10, prepared by SDH Custom Home Designs, revise dated September 30, 2008, received by the TRCA October 8, 2008; 1054 • Rear Elevation and Section, Drawing No. Al 1 prepared by SDH Custom Home Designs, revise dated September 30, 2008, received by the TRCA October 8, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a two storey minor addition and two storey deck to an existing dwelling within a Regulated Area of the Don River Watershed. The proposal is located within an area identified as a Wetland Area of Interference. A stream corridor and associated wetland area is located within a heavily vegetated area beyond the rear lot line. The proposed addition and deck are located within a manicured lawn area and are setback approximately 40 metres from the vegetation located on the subject property that is contiguous with the adjacent stream corridor / wetland area. TRCA ecology staff are satisfied that the proposed works will not have an adverse impact on the nearby natural features. Control of Flooding: The proposed works are not located within the Regional Storm Flood Plain. There will be no impact on the storage or conveyance of flood waters. Pollution: The proposed works are sufficiently setback from the natural features and sediment control fencing will be erected and maintained for the duration of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program. CFN: 41548 - Application #: 868 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: October 24, 2008 1055 TOWN OF CALEDON 8.1.18 8 WOLF CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 33, Plan M -31, (8 Wolf Crescent), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an ancillary deck structure at the rear of an existing residential dwelling located at 8 Wolf Crescent, in the Town of Caledon. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan and Survey, stamped received by TRCA Planning & Development staff on September 26, 2008; • Drawing No. Al, Deck Plan, stamped received by TRCA Planning & Development staff on September 26, 2008; • Drawing No. A2, Footing Plan, stamped received by TRCA Planning & Development staff on September 26, 2008; • Drawing No. A3, Gazebo Framing Plan, stamped received by TRCA Planning & Development staff on September 26, 2008; • Drawing No. A4, Main Deck Elevation & Secondary Deck Elevation, stamped received by TRCA Planning & Development staff on September 26, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an ancillary deck structure at the rear of an existing residential dwelling at 8 Wolf Crescent, in the Town of Caledon. The rear of the subject property is adjacent to a stream corridor. TRCA Water Resources staff has confirmed that the proposed deck structure is located outside of the Regional Storm Floodplain and is sufficiently setback. The area to which this application applies is currently a manicured lawn and void of any significant vegetation. As well, there are no geotechnical or ecology related concerns associated with this proposal. Control of Flooding: TRCA Water Resources staff has confirmed that the proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. 1056 Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this proposal. Plantings As no vegetation is to be removed by the proposed works, plantings are not required. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41518 - Application #: 849/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: October 28, 2008 TOWN OF MARKHAM 8.1.19 335 ELSON STREET To construct, reconstruct, erect or place a building or structure on Lot 130, Plan 65M -3669, (335 Elson Street), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an ancillary deck structure at the rear of an existing residential dwelling located at 335 Elson Street, in the Town of Markham. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Sheet A3 of 7, Site Plan, prepared by C Squared Design Ltd., dated September 8, 2008, stamped received by TRCA Planning & Development staff on October 17, 2008; • Sheet A4R of 7, Plan, prepared by C Squared Design Ltd., dated September 8, 2008, stamped received by TRCA Planning & Development staff on October 17, 2008; • Sheet A5R of 7, Elevations, prepared by C Squared Design Ltd., dated September 8, 2008, stamped received by TRCA Planning & Development staff on October 17, 2008; • Sheet A6R of 7, Section A -A, prepared by C Squared Design Ltd., dated September 8, 2008, stamped received by TRCA Planning & Development staff on October 17, 2008; • Sheet A7 of 7, Detail, prepared by C Squared Design Ltd., dated September 8, 2008, stamped received by TRCA Planning & Development staff on October 17, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 1057 Proposal: The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an ancillary deck structure at the rear of an existing residential dwelling located at 335 Elson Street, in the Town of Markham. The rear of the subject property is adjacent to an on -line stormwater management facility. The area to which this application applies is currently a manicured lawn. As such, no significant vegetation will be removed as a result of construction. The proposed works are sufficiently setback from the stormwater management pond. There are no geotechnical, ecological, or flooding related concerns associated with this proposal. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries related concerns associated with these works. Plantings The ancillary deck structure is located within an existing manicured lawn. No significant vegetation will be removed as a result of the construction. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41462 - Application #: 808 /08 /MARK Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: October 28, 2008 TOWN OF RICHMOND HILL 8.1.20 TOWN OF RICHMOND HILL To construct, reconstruct, erect or place a building or structure in a Regulated Area, in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Town of Richmond Hill. 1058 The purpose is to construct a 200 metre long asphalt pedestrian path (including a 6 metre span bridge over a tributary of the Rouge River) from Heirloom Street to an existing path located south of Ravine Edge Drive, in the Town of Richmond Hill. The bridge and portions of the path are located within the flood plain and will be constructed within the cold water fisheries timing window. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing L1, Crossmar Trail Connection, Existing Conditions /Proposed Works /Restoration Plan; dated August 2008; last revised October 15, 2008; received October 16, 2008; prepared by Harrington and Hoyle Limited RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to construct a pedestrian path connecting Heirloom Street to an existing path located south of Ravine Edge Drive in the Town of Richmond Hill, Regional Municipality of York (Crossmar Trail Connection). The proposed asphalt path will be 200 metres long and 2.4 metres wide. The path will include a 6 metre span pedestrian bridge with the abutments located approximately 2.5 metres from the existing tributary. All works proposed within the flood plain are to be constructed within the cold water fisheries timing window of July 1 to September 15. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (silt /sediment fencing) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated a Letter of Advice will be provided by TRCA staff on behalf of the Department of Fisheries and Oceans (DFO). Construction proposed within the flood plain must be completed within the cold water fisheries timing window of July 1 to September 15. 1059 Plantings All disturbed areas will be restored with native non - invasive species following construction. As part of this project, 16 trees and 105 shrubs will be planted along the proposed path resulting in a net gain of plantings. Policy Guidelines: This proposal complies with Section 4.1.2 - New Development - New Resource -Based Uses - of the Authority's Valley and Stream Corridor Management Program. CFN: 41368 - Application #: 736/08/RH Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: October 27, 2008 TOWN OF WHITCHURCH - STOUFFVILLE 8.1.21 584 CAM FELLA BOULEVARD To construct, reconstruct, erect or place a building or structure on Lot 22, Plan 65M -2296, (584 Cam Fella Boulevard), in the Town of Whitchurch - Stouffville, Duffins Creek Watershed. The purpose is to recognize the construction of a small bridge that was constructed to replace a previous bridge without TRCA approval. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No.1, SITE PLAN, prepared by Peter Guinane, dated July 28, 2008 received by TRCA on Aug 13, 2008; • Drawing No.2, PLAN, prepared by Peter Guinane, dated July 28, 2008 received by TRCA on Aug 13, 2008; • Drawing No.3, SOUTH ELEVATION, prepared by Peter Guinane, dated July 28, 2008 received by TRCA on Aug 13, 2008; • Drawing No.4, TYPICAL BRIDGE SUPPORT, prepared by Peter Guinane, dated July 28, 2008 received by TRCA on Aug 13, 2008; • Drawing No.5, TYPICAL RAMP CONNECTION, prepared by Peter Guinane, dated July 28, 2008 received by TRCA on Aug 13, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 1060 Proposal: The purpose is to recognize the construction of a small bridge that was constructed to replace a previous bridge without TRCA approval. The existing (previous) bridge has already been demolished and the proposed (existing) bridge has been constructed. The new bridge has maintained the original character and relative dimensions of the demolished bridge, and will therefore poses no significant impacts to the surrounding vegetation and natural features. As well, the replacement bridge does not require the import or removal of fill onto or off of the property, or any alteration of the watercourse. Violation: The bridge has been constructed in the absence of a TRCA permit. The owner has submitted this application, at the request of TRCA staff, in order to rectify this situation. Control of Flooding: The new bridge does not pose any new obstructions to the conveyance of flood waters, and does not increase the likelihood of damage to people or property downstream in the event of a flood. Pollution: Sediment control fencing or other methods of ensuring minimal discharge of construction debris into the waterway would have been required as part of this permit due to the structure's location above the creek. However, since the work has already been completed, any sediment or pollution controls imposed are redundant. Dynamic Beaches: Not applicable Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The proposed construction retains the existing limit of development and does not further encroach into surrounding natural areas, or negatively impact any existing natural features. Plantings No restoration plantings are required due to very limited removal (if any) of surrounding vegetation. Policy Guidelines: This proposal is consistent with Section 4.2.2.(E) - Development Guidelines for Property Improvements and Ancillary Structures of the TRCA's Valley and Stream Corridor Management Program. CFN: 41283 - Application #: 695/08/WS Report Prepared by: Brian Storozinski, extension 5744 For information contact: Bill Kiru, extension 5306 Date: October 28, 2008 1061 TOWNSHIP OF KING 8.1.22 YORK CATHOLIC DISTRICT SCHOOL BOARD To construct, reconstruct, erect or place a building or structure on (2585 King Road), in the Township of King, Humber River Watershed as located on the property owned by York Catholic District School Board. The purpose is to recognize the construction of a portable and paved area for an existing school within a Regulated Area of the Humber River Watershed located at 2585 King Road, in. the Township of King. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. A202 prepared by Stevens Group Architects Inc., dated September 26, 2008, received by the TRCA September 29, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to recognize the construction of a classroom portable and associated paved area for. an existing school within a Regulated Area of the Humber River Watershed. The works are located within the wetland area of interference of a Provincially Significant Wetland (PSW) which forms a part of the King- Vaughan Wetland Complex. Based upon a site visit conducted by TRCA staff October 6, 2008, the completed works are located approximately 10 metres from the ill- defined top of bank of a gentle valley slope. In addition, the development area is sodded and devoid of any significant natural features. It is our understanding that due to time constraints relating to the start of a new school year and the pending approval of a Site Plan Application from King Township, the school board had commenced works prior to the issuance of a permit under Ontario Regulation 166/06. As the works were commenced and completed prior to the issuance of our permit, an additional administration fee has been charged. Control of Flooding: The completed works are not located within the Regional Storm Flood Plain. There are no impacts on the conveyance or storage of flood waters. Pollution: The works are located within a sodded tableland and there was and will not be any transport of sediment into the nearby watercourse and wetland. Dynamic Beaches: Not applicable. 1062 Erosion: TRCA geotechnical staff are satisfied that the works will not impact the stability of the gentle valley slope. Conservation of Land: As the watercourse was not impacted by the works, there are no fisheries concerns. There are no other significant natural features on or adjacent to the site that have been or may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41505 - Application #: 839/08/KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: October 24, 2008 THE FOLLOWING PERMIT APPLICATIONS WERE ERRATA ITEMS: RES.#B131/08 - APPLICATIONS FOR PERMITS PURUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS Moved by: Seconded by: Colleen Jordan Reenga Mathivanan THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.23 - 8.1.54, with the exception of 8.1.35 - 68 Hilldale Road and 8.1.40 - Scarboro Golf & Country Club, which were withdrawn, and 8.1.30 - 7476 Discus Crescent and 8.1.42 - City of Toronto and Evergreen Brick Works), that had been scheduled on the agenda as errata applications, for which all the required information was received and finalized as listed below. RES.#B132/08 - Moved by: Seconded by: CARRIED APPLICATIONS FOR PERMITS PURUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS Jack Heath Reenga Mathivanan THAT a permit be granted in accordance with Ontario Regulation 166/06 for the application 8.1.30 - 7476 Discus Crescent, that had been scheduled on the agenda as an errata application, for which all the required information was received and finalized as listed below. CARRIED 1063 RES. #6133/08 - APPLICATIONS FOR PERMITS PURUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS Moved by: Seconded by: Suzan Hall Reenga Mathivanan THAT a permit be granted in accordance with Ontario Regulation 166/06 for the application 8.1.42 - City of Toronto and Evergreen Brick Works, that had been scheduled on the agenda as an errata application, for which all the required information was received and finalized as listed below. CITY OF BRAMPTON 8.1.23 CARRIED 1329343 ONTARIO LIMITED (GREAT GULF GROUP OF COMPANIES) To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on lands located west of Highway 50, south of Castlemore Road, in the City of Brampton, Humber River Watershed as located on the property owned by 1329343 Ontario Limited (Great Gulf Group of Companies). The purpose is to site grade within a Regulated area to facilitate topsoil stripping, earth works and initial servicing associated with a proposed residential plan of subdivision. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Letter of undertaking provided by Piotr Szponar, Rand Engineering, dated November 5, 2008, to address all outstanding TRCA issues prior to the issuance of the permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant is requesting permission to strip topsoil, initiate earthworks and interim servicing associated with a proposed residential plan of subdivision located between Clarkway Drive and Highway 50, south of Castlemore Road, in the City of Brampton. This application is one of six within this area that are before the Executive Committee at this meeting for topsoil stripping, earthworks and initial servicing. The subject property is located within the Bram East Area 'F' Block Plan area, which incorporates lands between The Gore Road and Highway 50, south of Castlemore Road in the City of Brampton. As part of Brampton's Growth Management program, a,number of proposed subdivisions within Phase 1 of this Block Plan area have been given development allotment, and are being given draft approval by the City. TRCA staff have provided conditions of approval for these subdivisions. 1064 The property is traversed by Rainbow Creek, a tributary of the West Humber River. Due to a presently undersized culvert under Highway 50, Regional Storm flows back -up in the area in which Rainbow Creek .crosses under Highway 50, and spill onto the subject lands to the south. As a consequence, a substantial portion of the 'Phase 2' portion of this proposed subdivision are presently within the Regulatory Floodplain. Through a recent Environmental Assessment for proposed works on this section of Highway 50, measures have been proposed to increase the capacity of the culverts under Highway 50, which would alleviate the flooding on the subject property. In the interim, the applicant is proceeding with grading works, as well as development on the Phase 1 lands which are outside of the floodplain, and are not Regulated by the TRCA. As part of the Phase 1 earthworks, low areas within Phase 1 will need to be filled, using fill that will be removed from the Phase 2 lands. As Phase 2 is presently within the floodplain, fill may only be removed from floodprone portions of this area at this time, to ensure that floodplain storage and conveyance are not adversely impacted. This permit is only to allow the removal of fill from Phase 2 lands with associated grading works, as well as the temporary storage of fill within Regulated areas that will not exacerbate flooding off the property, and that are satisfactory to TRCA engineering staff. The works proposed under this permit constitute the first phase in the development on this proposed subdivision. Additional permits will be brought forward to a future Executive • Committee meeting for permanent stormwater management works within this Block Plan area, as well as proposed cut and fill works, once the outstanding comments and concerns of TRCA staff have been adequately addressed. Control of Flooding: The proposed works are partially located within the Regulatory Floodplain. However, only the removal of fill and the temporary storage of fill in areas that will not adversely impact upon the existing storage and /or conveyance of flood waters, will be permitted at this time. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Although there are no fisheries related concerns associated with this proposal, a Letter of Advice will be provided on behalf of Fisheries and Oceans Canada as the temporary stormwater management ponds will discharge to surface features that drain to watercourses downstream. 1065 Plantings A comprehensive planting plan is to be provided, and implemented as a condition of the approval of this subdivision. As a coordinated plan is still being developed for all of the subdivisions within this Block Plan, details on the proposed plantings cannot be provided at this time. Additional details will be provided in subsequent permits for this Block Plan. Policy Guidelines: This proposal is consistent with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41597 - Application #: 905 /08 /BRAM Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: October 29, 2008 8.1.24 CRITERION DEVELOPMENT CORPORATION To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 9;10, Concession 10, (Castlemore Road and The Gore Road), in the City of Brampton, Humber River Watershed as located on the property owned by Criterion Development Corporation. The purpose is to site grade within a Regulated area to facilitate topsoil stripping, earth works and initial servicing associated with a proposed residential plan of subdivision. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Letter of undertaking provided by Michael Oldham, MMM Group, dated November 5, 2008, to address all outstanding TRCA issues prior to the issuance of the permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant is requesting permission to strip topsoil, initiate earthworks and interim servicing associated with a proposed residential plan of subdivision located directly east of The Gore Road, south of Castlemore Road, in the City of Brampton. This application is one of six within this area that are before the Executive Committee at this meeting for topsoil stripping, earthworks and initial servicing. 1066 The property is traversed by the Clarkway Tributary of the Humber River. Adjacent tableland areas - which are to be developed as part of the proposed residential subdivision - are Regulated by the TRCA. This property is also adjacent to the Gore Road Tributary of the Humber River, which although not on the subject property, crosses The Gore Road south of this property. A small portion of this property is also Regulated due to its proximity to the Gore Road Tributary on the property to the south. This permit is to allow for grading and initial servicing works (to include temporary stormwater management measures) within the Regulated tableland areas, as well as initial stormwater servicing works within the valley corridor. As only small portions of the subject property are Regulated by the TRCA, grading works are presently underway on portions of the property that are not Regulated by the TRCA. The works proposed under this permit constitute the first phase of works, and the first of several permits that will be required for works on the subject property. Additional permits will be brought forward to a future Executive Committee meeting for permanent stormwater management works within this Block Plan area, as well as proposed cut and fill works, once the outstanding comments and concerns of TRCA staff have been adequately addressed. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Although there are no fisheries related concerns associated with this proposal, a Letter of Advice will be provided on behalf of Fisheries and Oceans Canada as a temporary stormwater management outfall is to be constructed. Plantings A comprehensive planting plan is to be provided, and implemented as a condition of the approval of this subdivision. As a coordinated plan is still being developed for all of the subdivisions within this Block Plan that are traversed by the Clarkway Tributary, details on the proposed plantings cannot be provided at this time. Additional details will be provided in subsequent permits for this Block Plan. Policy Guidelines: This proposal is consistent with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). 1067 CFN: 41601 - Application #: 908 /08 /BRAM Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: October 29, 2008 8.1.25 EDENFIELD DEVELOPMENT C/O GOLD PARK GROUP To site grade on Lot 7, Concession 10, (Highway 50 and Clarkway Drive), in the City of Brampton, Humber River Watershed as located on the property owned by Edenfield Development c/o Gold Park Group. The purpose is to site grade within a Regulated area to facilitate topsoil stripping, earth works and initial servicing associated with a proposed residential plan of subdivision. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Letter of undertaking provided by Shamor Paul, SCS Consulting, dated November 5, 2008, to address all outstanding TRCA issues prior to the issuance of the permit. RATIONALE . The application was reviewed by staff on the basis of the following information: Proposal: The applicant is requesting permission to strip topsoil, initiate earthworks and interim servicing associated with a proposed residential plan of subdivision located west of Clarkway Drive, south of Castlemore Road, in the City of Brampton. This application is one of six within this area that are before the Executive Committee at this meeting for topsoil stripping, earthworks and initial servicing. The subject property is located within the Bram East Area 'F' Block Plan area, which incorporates lands between The Gore Road and Highway 50, south of Castlemore Road in the City of Brampton. As part of Brampton's Growth Management program, a number of proposed subdivisions within Phase 1 of this Block Plan area have been given development allotment, and are being given draft approval by the City. TRCA staff have provided conditions of approval for these subdivisions. The property is traversed by the Clarkway Tributary of the Humber River. Adjacent tableland areas - which are to be developed as part of the proposed residential subdivision - are Regulated by the TRCA. This permit is to allow for grading and initial servicing works (to include temporary stormwater management measures) within the Regulated tableland areas, as well as initial stormwater servicing works within the valley corridor. . As only small portions of the subject property are Regulated by the TRCA (areas directly adjacent Clarkway Tributary) grading works are presently underway on portions of the property that are riot Regulated by the TRCA. 1068 The works proposed under this permit constitute the first,phase of works, and the first of several permits that will be required for works on the subject property. Additional permits will be brought forward to a future Executive Committee meeting for permanent stormwater management works within this Block Plan area, as well as proposed cut and fill works, once the outstanding comments and concerns of TRCA staff have been adequately addressed. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Although there are no fisheries related concerns associated with this proposal, a Letter of Advice will be provided on behalf of Fisheries and Oceans Canada as a temporary stormwater management outfall is to be constructed. Plantings A comprehensive planting plan is to be provided, and implemented as a condition of the approval of this subdivision. As a coordinated plan is still being developed for all of the subdivisions within this Block Plan that are traversed by the Clarkway Tributary, details on the proposed plantings cannot be provided at this time. Additional details will be provided in subsequent permits for this Block Plan. Policy Guidelines: This proposal is consistent with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41547 - Application #: 867/08/BRAM Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: October 29, 2008 1069 8.1.26 HELENA BEACH (ARMLAND GROUP) To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 10, Concession 10, (Castlemore Road and The Gore Road), in the City of Brampton, Humber River Watershed as located on the property owned by Helena Beach (Armland Group). The purpose is to site grade within a Regulated area to facilitate topsoil stripping, earth works and initial servicing associated with a proposed residential plan of subdivision. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Letter of undertaking provided by Michael Oldham, MMM Group, dated November 5, 2008, to address all outstanding TRCA issues prior to the issuance of the permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant is requesting permission to strip topsoil, initiate earthworks and interim servicing associated with a proposed residential plan of subdivision located directly east of The Gore Road, south of Castlemore Road, in the City of Brampton. This application is one of six within this area that are before the Executive Committee at this meeting for topsoil stripping, earthworks and initial servicing. The subject property is located within the Bram East Area 'F' Block Plan area, which incorporates lands between The Gore Road and Highway 50, south of Castlemore Road in the City of Brampton. As part of Brampton's Growth Management program, a number of proposed subdivisions within Phase 1 of this Block Plan area have been given development allotment, and are being given draft approval by the City. TRCA staff have provided conditions of approval for these subdivisions. The property is traversed by the Clarkway Tributary of the Humber River. Adjacent tableland areas - which are to be developed, as part of the proposed residential subdivision - are Regulated by the TRCA. This permit is to allow for grading and initial servicing works (to include temporary stormwater management measures) within the Regulated tableland areas, as well as initial stormwater servicing works within the valley corridor. As only small portions of the subject property are Regulated by the TRCA (areas directly adjacent Clarkway Tributary) grading works are presently underway on portions of the property that are not Regulated by the TRCA. The works proposed under this permit constitute the first phase of works, and the first of several permits that will be required for works on the subject property. Additional permits will be brought forward to a future Executive Committee meeting for permanent stormwater management works within this Block Plan area, as well as proposed cut and fill works, once the outstanding comments and concerns of TRCA staff have been adequately addressed. 1070 Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Although there are no fisheries related concerns associated with this proposal, a Letter of Advice will be provided on behalf of Fisheries and Oceans Canada as a temporary stormwater management outfall is to be constructed. Plantings A comprehensive planting plan is to be provided, and implemented as a condition of the approval of this subdivision. As a coordinated plan is still being developed for all of the subdivisions within this Block Plan that are traversed by the Clarkway Tributary, details on the proposed plantings cannot be provided at this time. Additional details will be provided in subsequent permits for this Block Plan. Policy Guidelines: This proposal is consistent with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41603 - Application #: 910 /08 /BRAM Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: October 29, 2008 8.1.27 MATTAMY (CLARKWAY) HOMES To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 10, Concession 10, (Castlemore Road and the Gore Road), in the City of Brampton, Humber River Watershed as located on the property owned by Mattamy (Clarkway) Homes. The purpose is to site grade within a Regulated area to facilitate topsoil stripping, earth works and initial servicing associated with a proposed residential plan of subdivision. The permit will be issued for the period of November 7, 2008 to November 6, 2010. 1071 • Letter of undertaking provided by Michael Oldham, MMM Group, dated November 5, 2008, to address all outstanding TRCA issues prior to the issuance of the permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant is requesting permission to strip topsoil, initiate earthworks and interim servicing associated with a proposed residential plan of subdivision located directly east of The Gore Road, south of Castlemore Road, in the City of Brampton. This application is one of six within this area that are before the Executive Committee at this meeting for topsoil stripping, earthworks and initial servicing. The subject property is located within the Bram East Area 'F' Block Plan area, which incorporates lands between The Gore Road and Highway 50, south of Castlemore Road in the City of Brampton. As part of Brampton's Growth Management program, a number of proposed subdivisions within Phase 1 of this Block Plan area have been given development allotment, and are being given draft approval by the City. TRCA staff have provided conditions of approval for these subdivisions. The property is traversed by the Clarkway Tributary of the Humber River. Adjacent tableland areas - which are to be developed as part of the proposed residential subdivision - are Regulated by the TRCA. This permit is to allow for grading and initial servicing works (to include temporary stormwater management measures) within the Regulated tableland areas, as well as initial stormwater servicing works within the valley corridor. As only small portions of the subject property are Regulated by the TRCA (areas directly adjacent Clarkway Tributary) grading works are presently underway on portions of the property that are not Regulated by the TRCA. The works proposed under this permit constitute the first phase of works, and the first of several permits that will be required for works on the subject property. Additional permits will be brought forward to a future Executive Committee meeting for permanent stormwater management works within this Block Plan area, as well as proposed cut 'and fill works, once the outstanding comments and concerns of TRCA staff have been adequately addressed. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. 1072 Conservation of Land: No significant vegetation will be removed as a result of construction. Although there are no fisheries related concerns associated with this proposal, a Letter of Advice will be provided on behalf of Fisheries and Oceans Canada as a temporary stormwater management outfall is to be constructed. Plantings A comprehensive planting plan is to be provided, and implemented as a condition of the approval of this subdivision. As a coordinated plan is still being developed for all of the subdivisions within this Block Plan that are traversed by the Clarkway Tributary, details on the proposed plantings cannot be provided at this time. Additional details will be provided in subsequent permits for this Block Plan. Policy Guidelines: This proposal is consistent with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41602 - Application #: 909 /08 /BRAM Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: October 29, 2008 8.1.28 REGION OF PEEL To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, in the City of Brampton (The Gore Road and Queen Street), Humber River Watershed, as located on property owned by the Region of Peel. The purpose is to expand The Gore Road sewage pumping station and construct sanitary forcemains which will connect the 300 mm diameter forcemain west of the site to the proposed buildings and manholes. Hydro poles will also be installed and replaced between the pumping station and The Gore Road. No works will take place in water. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Letter of Undertaking to provide revisions to engineering drawings to the satisfaction of TRCA; dated October 27, 2008; received October 27, 2008; prepared by Region of Peel. RATIONALE The application was reviewed by staff on the basis of the following information: 1073 Proposal: The proposal consists of expanding The Gore Road sewage pumping station, including the construction of a new pumping station, wet well and water cistern north of the existing building, and reconstruction of a driveway. Sanitary forcemains will be constructed within the study area and will connect the pumping station to existing sanitary forcemains which were approved under permit C- 07294, and issued in June 2007. Two existing hydro poles between the existing pumping station and The Gore Road will be replaced, and two additional poles will be installed. Control of Flooding: There will be no impacts to the control of flooding. Pollution: Standard erosion control measures (sediment fence) will be implemented for the duration of construction, and until the site is restored, in order to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). There will be no in -water works. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40511 - Application #: 116 /08 /BRAM Report Prepared by: Sharon Lingertat, extension 5717 For information contact: Sharon Lingertat, extension 5717 Date: October 27, 2008 8.1.29 TONLU HOLDINGS INC. To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 9, 10, Concession 10, (Castlemore Road and The Gore Road), in the City of Brampton, Humber River Watershed as located on the property owned by Tonlu Holdings Inc.. 1074 The purpose is to site grade within a Regulated area to facilitate topsoil stripping, earth works and initial servicing associated with a proposed residential plan of subdivision. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Letter of undertaking provided by Michael Oldham, MMM Group, dated November 5, 2008, to address all outstanding TRCA issues prior to the issuance of the permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant is requesting permission to strip topsoil, initiate earthworks and interim servicing associated with a proposed residential plan of subdivision located directly east of The Gore Road, south of Castlemore Road, in the City of Brampton. This application is one of six within this area that are before the Executive Committee at this meeting for topsoil stripping, earthworks and initial servicing. The subject property is located within the Bram East Area 'F' Block Plan area, which incorporates lands between The Gore Road and Highway 50, south of Castlemore Road in the City of Brampton. As part of Brampton's Growth Management program, a number of proposed subdivisions within Phase 1 of this Block Plan area have been given development allotment, and are being given draft approval by the City. TRCA staff have provided conditions of approval for these subdivisions. The property is traversed by the Clarkway Tributary of the Humber River. Adjacent tableland areas - which are to be developed as part of the proposed residential subdivision - are Regulated by the TRCA. An area of the property adjacent to the Gore Road is also traversed by the Gore Road Tributary of the Humber River, which is also Regulated by the TRCA. This permit is to allow for grading and initial servicing works (to include temporary stormwater management measures) within the Regulated tableland areas, as well as initial stormwater servicing works within the valley corridor. As only small portions of the subject property are Regulated by the TRCA (areas directly adjacent Clarkway Tributary) grading works are presently underway on portions of the property that are not Regulated by the TRCA. The works proposed under this permit constitute the first phase of works, and the first of several permits that will be required for works on the subject property. Additional permits will be brought forward to a future Executive Committee meeting for permanent stormwater management works within this Block Plan area, as well as proposed cut and fill works, once the outstanding comments and concerns of TRCA staff have been adequately addressed. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. 1075 Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Although there are no fisheries related concerns associated with this proposal, a Letter of Advice will be provided on behalf of Fisheries and Oceans Canada as a temporary stormwater management outfall is to be constructed. Plantings A comprehensive planting plan is to be provided, and implemented as a condition of the approval of this subdivision. As a coordinated plan is still being developed for all of the subdivisions within this Block Plan that are traversed by the Clarkway Tributary, details on the proposed plantings cannot be provided at this time. Additional details will be provided in subsequent permits for this Block Plan. Policy Guidelines: This proposal is consistent with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41540 - Application #: 862/08/BRAM Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: October 29, 2008 CITY OF MISSISSAUGA 8.1.30 7476 DISCUS CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 53, Plan 752, (7476 Discus Crescent), .in the City of Mississauga, Mimico Creek Watershed. The purpose is to recognize the unlawful construction of a shed within a TRCA Regulated Area of the Mimico Creek Watershed. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Letter of Undertaking prepared by B. Liladhar dated November 5, 2008, stamped recieved by TRCA Planning and Development November 5, 2008, to address all outstanding engineering related issues. RATIONALE The application was reviewed by staff on the basis of the following information: 1076 Proposal: The purpose of this application is to recognize the unlawful construction of a shed within a TRCA Regulated Area of the Mimico Creek Watershed. The rear of the subject property is located adjacent to a valley corridor of the Mimico Creek Watershed. In the 1970s a violation notice was issued for fill placement without a permit. At present time, the violation remains active. The purpose of this application is to resolve the active violation. As such, TRCA staff conducted a site inspection and confirm that the existing development is sufficiently setback from the valley corridor feature. Additionally, the area to which this application applies appears to have been a manicured lawn, void of any significant vegetation. As well, the existing shed structure is located outside of the Regional Storm Floodplain. In this regard, it is the opinion of TRCA staff that the existing shed structure is in conformity with TRCA's current policies. The proponent has agreed to provide enhancement plantings between the existing shed structure and the valley corridor in order to improve the ecological condition of this site. In accordance with our current fee schedule, an additional violation fee (50% of the base fee) has been collected with this permit application. Control of Flooding: The subject property is located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters is anticipated. Pollution: As no development is proposed at this time, no sediment and erosion controls are required. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application Conservation of Land: No significant vegetation was removed as result of construction. However, an enhancement planting plan has been provided with this application. Plantings All proposed plantings are in conformity with TRCA's planting guidelines. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41539 - Application #: 861 /08 /MISS Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: October 28, 2008 1077 8.1.31 3480 GRAND FORKS ROAD To construct, reconstruct, erect or place a building or structure on (3480 Grand Forks Road), in the City of Mississauga, Etobicoke Creek Watershed. The purpose is to undertake works within a Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of an in- ground swimming pool at the rear of an existing residential dwelling located at 3480 Grand Forks Road, in the City of Mississauga. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Site Plan, prepared by Robcon Pools Incorporated, redline revised by TRCA Planning & Development staff on October 31, 2008, stamped received by TRCA Planning & Development staff on September 30, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of an in- ground swimming pool at the rear of an existing residential dwelling located at 3480 Grand Forks Road, in the City of Mississauga. The rear of the property is adjacent to a valley corridor. Based on our review, the proposed location of the in- ground pool is within an existing manicured lawn and partially located within the Regional Storm Floodplain. Recognizing all existing grades will be maintained, TRCA Water Resources staff are satisfied that the proposed in- ground pool will not impact the storage and /or conveyance of flood waters. In addition, there are no geotechnical, or ecology related concerns with this proposal. Control of Flooding: The proposed works are located partially within the Regional Storm Floodplain. However, all existing grades will be maintained. As such, TRCA staff do not anticipate any adverse impacts to the storage and /or conveyance of flood waters as a result of construction. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. There are no fisheries related concerns associated with this project. 1078 Plantings As no significant vegetation is being removed, enhancement plantings are not required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41514 - Application #: 845/08/MISS Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: October 28, 2008 8.1.32 3051 VICTORY CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 10, Plan 436, (3051 Victory Crescent), in the City of Mississauga, Mimico Creek Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a 22.30 square metre (240 sq. ft.) replacement garage structure at the rear of an existing residential dwelling located at 3051 Victory Crescent, in the City of Mississauga. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Drawing No. A -1, Plans, prepared by MP Design & Associates, dated August 2008, stamped received by TRCA Planning & Development staff on October 29, 2008; • General Notes, prepared by MP Design & Associates, dated 2008, stamped received by TRCA Planning & Development staff on October 29, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a 22.30 square metre (240 sq. ft.) replacement garage structure at the rear of an existing residential dwelling located at 3051 Victory Crescent, in the City of Mississauga. Although the existing and proposed works are located within the Regional Storm Floodplain, the proposed replacement garage structure will be floodproofed to the level of the Regional Storm event and does not exceed the risk associated with the existing garage structure. Additionally, the proposed structure will be designed to withstand water flow velocities expected during and up to the Regional Storm event. The location of the proposed garage is void of any significant natural features, and there are no geotechnical or ecology related concerns with this application. 1079 Control of Flooding: The proposed works are located within the Regional Storm Floodplain. TRCA Water Resources staff do not anticipate any significant impacts to the storage and /or conveyance of flood waters. The proposed works are located outside of the hydraulic floodway. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: The location of the proposed garage is void of any significant vegetation. As such, no significant vegetation will be removed as a result of this project. There are no fisheries related concerns associated with this project. Plantings As no vegetation is to be removed by the proposed works, plantings have not been required at this time. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41443 - Application #: 796/08/MISS Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: October 29, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.33 48 ORCHARD CRESCENT To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 26, Plan 4064, (48 Orchard Crescent), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a second - storey addition, one - storey rear addition and a rear deck to the existing single family detached dwelling. The permit will be issued for the period of November 7, 2008 to November 6, 2010. 1080 • Drawing No. Al, Site Plan, prepared by Culmone & Associates Ltd., dated October 12, 2007, Revision No. 5, revised on July 7, 2008, received on July 8, 2008; • Drawing No. A3, Basement Floor Plan, prepared by Culmone & Associates Ltd., dated October 12, 2007, Revision No. 3, revised on January 21, 2008, received on July 8, 2008; • Drawing No. A4, Ground Floor Plan, prepared by Culmone & Associates Ltd., dated October 12, 2007, Revision No. 3, revised on January 21, 2008, received on July 8, 2008; • Drawing No. A5, Second Floor Plan, prepared by Culmone & Associates Ltd., dated October 12, 2007, Revision No. 4, revised on July 4, 2008, received on July 8, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to construct a second - storey addition above the existing single- storey detached dwelling at 48 Orchard Crescent in the City of Toronto (Etobicoke York). The proposal also includes the construction of a one - storey addition and deck to the rear of the existing dwelling. The subject site is located south of Bloor Street West and west of Royal York Road, backing on to Mimico Creek and within a Regulated Area of the Mimico Creek Watershed. The proposed works are to be constructed in the Regulatory Floodplain. Control of Flooding: The subject property is located within a Regulatory Floodplain of the Mimico Creek Watershed. However, TRCA staff have determined the proposed works will not adversely impact the storage and /or conveyance of floodwaters, and the proposed addition is adequately flood proofed. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. 1081 Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established Communities /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40543 - Application #: 147/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 29, 2008 8.1.34 17 ELMCREST ROAD To construct, reconstruct, erect or place a building or structure on 17 Elmcrest Road in the City•of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed. The purpose is to develop within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a garden shed in the rear yard of the existing single family detached residential dwelling. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Drawing unnumbered, Site Plan, prepared by Building Permit Services by Architect Inc., undated, received on October 15, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a shed in the rear yard of the existing single family detached dwelling. Control of Flooding: The proposed works are to take place outside of the regional storm floodplain. As such, the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the watercourse. • Dynamic Beaches: Not applicable. Erosion: TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the proposal. 1082 Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to, the site that may be negatively impacted by the project. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(E) - Development Guidelines for Property Improvements and Ancillary Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41580 - Application #: 892/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 28, 2008 8.1.35 68 HILLDALE ROAD To construct, reconstruct, erect or place a building or structure on Part Lot 6, 7, Plan 1982, (68 Hilldale Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. • Withdrawn 8.1.36 96 RAVENSCREST DRIVE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on (96 Ravenscrest Drive), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a rear sunroom addition to the existing single family detached dwelling. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Drawing unnumbered, Site Plan, prepared by Apple Ridge Design Ltd., undated, received August 29, 2008, redlined by TRCA staff on October 22, 2008; • Drawing No. Page 4, Side Elevation, prepared by Apple Ridge Design Ltd., undated, received August 29, 2008; • Drawing No. Page 5, Rear Elevation, prepared by Apple Ridge Design Ltd., undated, received August 29, 2008; • Drawing No. Page 6, Side Elevation, prepared by Apple Ridge Design Ltd., undated, received August 29, 2008. 1083 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a rear sunroom addition to the existing single family detached dwelling. The subject property is located east of Martin Grove Road and north of Rathburn Road in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The subject site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. Erosion: TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the proposal. Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to, the site that may be negatively impacted by the project. Plantings • Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41412 - Application #: 770/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 28, 2008 1084 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.37 20 OVERBANK CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 88, Plan, (20 Overbank Crescent), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a second storey addition on an existing detached bungalow. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Drawing No. Al Site Plan, prepared by Mina Design Group, dated August 14, 2008, revised September 24, 2008, received September 30, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant proposes to construct a second storey addition on an existing detached bungalow with a walk -out basement. The site slopes gradually towards the open space feature at the rear of the property. Control of Flooding: The proposed works are not within a Regional Storm flood plain, and therefore will not impact the storage or conveyance of flood flows. Pollution: Sediment and erosion control measures will be installed and maintained throughout the construction to prevent migration of sediments from the site. Dynamic Beaches: Not applicable. Erosion: There will be no geotechnical /slope stability issues associated with the proposed development. Conservation of Land: The proposed works will not disturb any significant natural heritage features. Plantings No plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2. B) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program. 1085 CFN: 41531 - Application #: 854/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: October 28, 2008 8.1.38 22 SIFTON COURT To.construct, reconstruct, erect or place a building or structure and site grade on Lot 91', Plan 4847, (22 Sifton Court), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to demolish an existing detached dwelling and construct a replacement detached dwelling with a walk -out basement. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Drawing No. A -1 Site Plan, prepared by Town Square Developments Inc., dated July 3, 2008, revised August 8, 2008, received October 17, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed replacement dwelling will occupy a larger footprint than the existing dwelling, however will be set back approximately 10.4 meters from the existing top of the slope. Control of Flooding: The proposed works are not located within a Regional Storm floodplain, and will therefore not impact the storage or conveyance of flood waters. Pollution: Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There will be no geotechnical /slope stability issues associated with the proposed development. Conservation of Land: The proposed works are outside of any significant natural heritage features. Plantings As the proposed works will not require the removal of any significant vegetation, no plantings are required as part of this permit. 1086 Policy Guidelines: This proposal is in conformity with Section 4.2.2. D) - Replacement Structures - of the Authority's Valley and Steam Corridor Management Program. CFN: 41088 - Application #: 544/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: October 28, 2008 8.1.39 NORTH YORK GENERAL HOSPITAL To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on, (4001 Leslie Street), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a new 5- storey parking garage as an expansion to the existing multi -level parking garage for North York General Hospital. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Drawing No. SPA- 002R5, Overall Site Plan, prepared by Stantec Architecture Ltd. dated July 4, 2008, received July 11, 2008; • Drawing No. SPA- 003R3, L2 Parking Floor Plan, prepared by Stantec Architecture Ltd. dated July 4, 2008, received July 11, 2008; • Drawing No. SPA- 008R3, Building Elevations, prepared by Stantec Architecture Ltd., dated July 4, 2008, received July 11, 2008; • Drawing No. SPA- 009R2, Building Sections, prepared by Stantec Architecture Ltd., dated July 4, 2008, received July 11, 2008; • Drawing No. L200SP, Details, prepared by Vertechns Design Inc., dated April 30, 2008, received May 7, 2008; • Report, Operational Management Plan for Proposed Parking Garage Expansion North York General Hospital, prepared by MMM Group Limited, dated October 2008, received October 28, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant proposes to construct a 5 storey parking garage addition to the rear of the existing multi -level parking garage. The parking garage addition would be constructed over an area that is currently used as a surface parking lot. The parking garage addition would have a gross floor area of approximately 3089 sq.m. (33,250 sq.ft) and would provide parking for an additional 484 vehicles. The garage as enlarged would be able to accommodate 1,261 parking spaces. Over the last three years TRCA staff have been working with NYGH staff and their consultants regarding the expansion of parking facilities on site. Through discussions with the applicant it became apparent that the site is highly constrained and an addition to the existing parking garage as proposed was the best option, notwithstanding that the lowest floor (L2) of 1087 the garage addition would be situated below the Regional flood level. The number of spaces provided in the lowest level of the garage addition does not exceed the existing number of parking spaces within the floodplain portion of the site. Access to the lowest level of the proposed parking structure would be provided from the north and from the west along the ring road similar to existing conditions. Control of Flooding: As noted above the proposed garage addition is located in an area that is susceptible to flooding in the event of a Regional Storm. Based on the information submitted by the applicant, TRCA staff are satisfied that there will be no significant impacts to upstream or downstream flood storage or conveyance of floodwaters resulting from the proposed structure. Overall the parking garage extension would reduce the risk to life and property in the event of a Regional flood. For example, a vehicle containment system will be installed along the perimeter of the lowest level of the proposed garage to prevent vehicles from being swept away during a flood. Furthermore, to enable the safe evacuation of the lowest level of the garage in the event of a flood, North York General Hospital (NYGH) in consultation with TRCA staff have prepared a series of emergency response procedures which form part of the Hospital's Operational Management Plan (OMP). The OMP has been reviewed and approved by TRCA staff and will form part of the approved permit. Conditional Approval: The applicant is in the process of receiving final site plan approval from the City of Toronto for the proposed works. One of the requirements of site plan approval is that the owner (NYGH) enter into a site plan agreement with the City of Toronto. TRCA staff requested a number of conditions be included in the site plan agreement including having NYGH agree that no additional parking or structures will be permitted within the regulatory floodplain. Furthermore, NYGH has agreed to the condition that the lowest level of parking within the garage addition will be utilized by hospital staff only and that appropriate signage will be placed to warn staff of the flood risk associated with this parking level. Given the above staff is requesting permission from the Executive Committee to allow the issuance of the Ontario Regulation 166/06 permit for this project subject to written confirmation that NYGH has entered into a Site Plan Agreement with the City of Toronto. Pollution: A silt fence will be secured around all construction areas to prevent the migration of construction generated sediment into the watercourse Dynamic Beaches: Not applicable Erosion: Not applicable 1088 Conservation of Land: The proposed works will occur well beyond the margin (top of bank) of the watercourse thereby mitigating direct impacts on the existing river. All filled and disturbed areas will be stabilized and re- vegetated following construction. No significant resource features ill be impacted by the proposed works. Plantings New plantings and renaturalization within the valley corridor are required as part of the site plan approval of the project. Policy Guidelines: The proposal complies with Section 4.2.2 - Development and Redevelopment /Intensification Within Non - Established Communities /Highly Urbanized Areas, of the Authority's Valley and Stream Corridor Management Program. CFN: 39766 - Application #: 681/07/TOR Report Prepared by: Mark Rapus, extension'5259 For information contact: Mark Rapus, extension 5259 Date: October 28, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.40 SCARBORO GOLF & COUNTRY CLUB To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 16, Concession D, (321 Scarborough Golf Club Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. • Withdrawn CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.41 1 CROWN PARK ROAD To construct, reconstruct, erect or place a building or structure on Part Lot 14, Plan 562 E, 464 E, (1 Crown Park Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a deck and associated landscaping in the rear of the existing single family detached dwelling. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. P -0, Proposed Site Plan, prepared by Spaces by Rohan Inc., dated October 1, 2008, received on October 2, 2008. 1089 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to facilitate the construction of a deck and associated landscaping in the rear yard of the existing single family detached dwelling at 1 Crown Park Road in the City of Toronto (Toronto and East York Community Council Area). The subject property is located west of Victoria Park Avenue, north of Queen Street East, and backs on to Ivan Forest Gardens within a TRCA Regulated Area of the Don River Watershed. Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment controls will be installed and maintained during construction to prevent debris from entering the adjacent ravine. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: The rear yard of the subject property is already highly modified. TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the proposal. As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to, the site that may be negatively impacted by the project. • Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41515 - Application #: 846/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 28, 2008 1090 8.1.42 CITY OF TORONTO AND EVERGREEN BRICK WORKS To construct, reconstruct, erect or place a building or structure on Part Lot 13, 18, Concession 2 Plan 66R- 22918, (550 Bayview Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by City of Toronto and Evergreen. The purpose is to install sediment controls and tree protection fencing; develop a new access driveway; excavate, fill and grade surface parking and courtyards; install an erosion and sediment control pond and other stormwater management infrastructure; install sanitary sewer and potable water infrastructure; remediate a failing retaining wall and slope; repair, and stabilize and /or demolish various buildings, all as part of the first phase of the regeneration of the Don Valley Brick Works. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Construction Site Plan, prepared by Eastern Construction, dated October 15, 2008, received October 29, 2008; • Emergency Response Plan, prepared by Eastern Construction, dated October 27, 2008, received October 29, 2008; • Drawing No. L0 -1, Site Demolition and Removals Plan, prepared by DTAH, Revision 2, revised June 6, 2008, received October 7, 2008; • Drawing No. D100, Existing Buildings / Demolition Plan, prepared by DTAH, Revision 3, revised September 8, 2008, received October 7, 2008; • Drawing No. 9/10/11 -A301, Buildings 9, 10 & 11 Proposed Ground Floor Plan, prepared by ERA Architects, Revision 4, revised September 8, 2008, received October 7, 2008; • Drawing No. 9/10/11 -A303, Buildings 9, 10 & 11 Proposed Roof Plan, prepared by ERA Architects, Revision 4, revised September 8, 2008, received October 7, 2008; • Drawing No. 9/10/11 -A401, Buildings 9, 10 & 11 Proposed Sections, prepared by ERA Architects, Revision 4, revised September 8, 2008, received October 7, 2008; • Drawing No. 9/10/11 -A501, Buildings 9, 10 & 11 Proposed Elevations, prepared by ERA Architects, Revision 4, revised September 8, 2008, received October 7, 2008; • Drawing No. 9/10/11 -A601, Buildings 9, 10 & 11 Details, prepared by ERA Architects, Revision 4, revised September 8, 2008, received October 7, 2008; • Drawing No. 12 -D101, Building 12 Demolition and Conservation Plan, Sections & Elevations, prepared by Diamond & Schmitt Architects, Revision 4, revised September 8, 2008, received October 7, 2008; • Drawing No. 12 -S200, Building 12 Foundation and Second Floor Framing Plans, prepared by Halsall Engineers, Revision 4, revised October 28, 2008, received October 29, 2008; • Drawing No. 14 -D100, Building 14 Demolition Plan, Foundation Plan, prepared by DTAH, Revision 5, revised October 28, 2008, received October 29, 2008; • Drawing No. S200, Building 14 Foundation and Mezzanine Floor Framing Plans, prepared by Halsall Engineers, Revision 2, revised September 8, 2008, received October 7, 2008; • Drawing No. TP -1, Tree Preservation Plan, prepared by Dougan & Associates, Revision 3, revised October 24, 2008, received October 29, 2008; • Drawing No. C101, Construction Mitigation Plan, prepared by TSH, Revision 4, revised October 24, 2008, received October 29, 2008; 1091 • Drawing No. C201, Public Utilities Plan, prepared by TSH, Revision 5, revised October 24, 2008, received October 29, 2008; • Drawing No. C202, Public Utilities Schedules, Notes & Details, prepared by TSH, Revision 5, revised October 24, 2008, received October 29, 2008; • Drawing No. C301, Site Grading Plan Main Entrance, prepared by TSH, Revision 5, revised October 24, 2008, received October 29, 2008; • Drawing No. C302, Site Grading Plan East Parking & Entrance, prepared by TSH, Revision 5, revised October 24, 2008, received October 29, 2008; • Drawing No. C303, Site Grading Plan North, prepared by TSH, Revision 5, revised October 24, 2008, received October 29, 2008; • Drawing No. C304, Site Grading Typical Sections, prepared by TSH, Revision 4, revised October 24, 2008, received October 29, 2008; • Drawing No. C305, Site Grading Typical Details, prepared by TSH, Revision 2, revised October 24, 2008, received October 29, 2008; • Drawing No. C403, Stormwater Management Facility Plan, prepared by TSH, Revision 4, revised October 24, 2008, received October 29, 2008; • Drawing No. C404, Stormwater Management Facility Sections, prepared by TSH, Revision 4, revised October 24, 2008, received October 29, 2008; • Drawing No. L2 -3, Landscape Details, prepared by DTAH, Revision 4, revised October 27, 2008, received October 29, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: Evergreen's proposal is to obtain a TRCA permit to place and excavate fill, and develop within a Regulated Area of the Don River Watershed to facilitate the site preparation, building stabilization and servicing phase of the regeneration of the Don Valley Brick Works. The Brick Works is located in the Don Valley on the west side of the Bayview Avenue extension and north of Bloor Street in the City of Toronto. Existing conditions are illustrated on Attachment 1. All works are limited to the portion of the "industrial pad" illustrated on Attachment 1. The site currently includes sixteen (16) industrial buildings formerly used in the 19th and 20th century for the production of bricks. Four (4) of the buildings are currently occupied to various extents by the City of Toronto and the Don Valley Art Club. The remainder are unoccupied and deteriorating. The history of Evergreen's involvement with the Brick Works is as follows. The Brick Works site was acquired by TRCA by expropriation in 1987 and the site is under management agreement with the City of Toronto. The site includes significant heritage buildings and was designated under the Ontario Heritage Act by the City of Toronto in 2002. Since the expropriation in 1987, there have been a number of plans supported by TRCA and the City of Toronto outlining how best to use the site as a public asset. Partial implementation of those plans has resulted in the creation of the Weston Quarry Garden, daylighting of a portion of Mud Creek, and the redevelopment and reuse of Building 1. Recognizing the deteriorating state of the remaining heritage buildings, the TRCA and City of Toronto issued a public request for proposals for partners to regenerate the site. TRCA and the City of Toronto selected Evergreen pursuant to a proposal dated August 15, 2003 to regenerate and operate the "industrial pad" of the Brick Works for the purposes of: 1) maintaining and enhancing the public open space; 2) 1092 rehabilitating and adaptively re -using the heritage structures on a financially self - supporting basis; and 3) creating an exciting Toronto destination on the themes of community, culture and urban ecology. The next step in the process was the signing of a tripartite Memorandum of Understanding between TRCA, Evergreen and City of Toronto on September 30, 2004. The MoU provided Evergreen with options to lease the industrial pad and regenerate the site subject to the site drawing, proposed uses and capital plan outlined in the schedules to the MoU. Following the MoU, TRCA worked with Evergreen and its partners to develop the Master Plan for Evergreen at the Brickworks. On July 27, 2007, the TRCA Authority Board approved Resolution #A160/07 supporting the Master Plan and directing staff to enter into a Lease Agreement with Evergreen for the industrial pad subject to various conditions including the approval of the City of Toronto. The lease agreement was also approved by City Council in 2007. The approval of TRCA permits is one of the conditions that must be satisfied for the lease agreement to be executed and for Evergreen to obtain the committed funding for the projects construction. In 2006, the Toronto and East York Committee of Adjustment approved a Minor Variance for the Brick Works site to allow for uses accessory to the principal use as public recreation. In 2007, Evergreen submitted a Site Plan application to the City of Toronto for the regeneration of the industrial pad. The proposal is illustrated on Attachment 2. The Site Plan application includes full or partial restoration and occupation of twelve (12) buildings, the stabilization of three (3) buildings to remain unoccupied for the time being, the demolition of one (1) building, the construction of a new four - storey multi - purpose building above a restored Building No. 12, and surface parking. The Site Plan application including a detailed Floodplain Management Plan has been reviewed by TRCA staff and is satisfactory subject to Evergreen meeting a series of detailed conditions. These conditions include Evergreen developing and implementing an Site Flooding Management and Evacuation Plan with the assistance of TRCA staff and various emergency management agencies such as Police, Fire and EMS prior to occupancy of the development. The purpose of this permit application is to allow for the first phase of construction to begin in November 2008 and includes the following: • The installation of sediment / tree protection fencing; • Development of a new access driveway from Bayview Avenue to lands leased by Evergreen from CP Rail; • Excavating, filling and grading surface parking and courtyards, including lands leased by Evergreen from CP Rail; • Construction of an erosion and sediment control pond; • Construction of temporary stormwater management swales and rock check dams; • Installation of oil -grit separators; • Installation of sanitary sewer facilities; • Installation of potable water facilities; • Removal and replacement of a failing retaining wall on the north slope behind Building Nos. 15 and 16; • Remediation of a failing slope associated with the retaining wall behind Building Nos. 15 and 16; • Roof and window repair and stabilization of Building Nos. 9, 10 and 11; • Drilling micropiles and foundation cassions for Building Nos. 12 and 14; • Partial demolition of Building 12; and 1093 • Full demolition of Building 13. A second permit application for the remainder of the construction (Phase 2) is expected to be considered by the Executive Committee in early 2009. Conditional Permit: TRCA staff is currently reviewing the Lease Agreement with respect to allowing for the installation of deep foundation micropiles and /or foundation cassions. As such, the Lease Agreement may need to be amended or other legal documentation approved. Therefore the drilling of micropiles and foundation cassions for Building Nos. 12 and 14 component of this permit is conditional upon the appropriate approvals by TRCA and the City of Toronto. Control of Flooding: The site is in a floodplain and susceptible to routine flooding. The site is susceptible to approximately four metres of flooding during a 350 -year flood event and approximately six metres during a Regional flood event. Bayview Avenue is typically closed to through traffic in response to flooding. The buildings are located within a widened area of the Don Valley, where the floodplain is not subject to the full impact of flood flows in the Don River. Of critical importance is the location of the hydraulic floodway through the site. The hydraulic floodway is defined as the part of the floodplain where flood velocities are the highest, and where structures, people, and vehicles are at the greatest risk during floods. Only the southernmost extent of the site falls within the hydraulic floodway, to the south of Building Nos. 14, 15 and 16. This area includes a portion of the existing parking. Flood velocities are minimal on the remainder of the site. As such, there are challenges to re- occupying the site so that the designated heritage buildings can be restored and the history of brick making in this part of the Don Valley can be preserved. The heritage consultants expect that a number of the heritage buildings would need to be demolished in the near future due to safety hazards if the buildings continue to remain unoccupied and impacted by vandalism and water penetration. Therefore, the Master Plan, Lease Agreement and subsequent planning and permit approvals require the following: 1) all buildings will be flood proofed to the 350 year flood event and a flood study shows that there will be no impact to up or down stream flooding; and 2) an Site Flooding Management and Evacuation Plan will be developed and implemented. As such, extensive efforts have been made by Evergreen to manage the flooding on site, including the following: 1) The approach to flood proofing includes raising the base grade and ground floor elevations of much of the industrial pad to above the two year flood elevation to eliminate the "nuisance" flooding that occurs on a routine basis. A flood study has confirmed that this approach will have no impact on up or down stream flooding and will eliminate frequent and costly property damage during these smaller storms. The approach to floodproofing also includes "wet" floodproofing the buildings to the 350 year flood elevation. This includes raising all critical electrical and mechanical infrastructure to approximately 4 metres above grade, installing trips on electrical connections, using materials such as concrete or brick that can take water and confirming that the buildings can structurally withstand a Regional flood event. Finally, the overall on the ground" footprint of the existing development has been reduced and the new development above Building No. 12 is raised above the 350 year flood elevation. All of these floodproofing measures have been confirmed through the Site Plan approval process. 1094 2) The development of the Site Flooding Management and Evacuation Plan is being prepared by Evergreen with assistance from a committee including TRCA staff, City staff, and Fire, Police and EMS staff, among others. The development and implementation of this Plan is required as a condition of the Lease Agreement and Site Plan approval, and occupancy of the development will not be considered until such time as the Plan is complete. The Plan will include a communications protocol, emergency power, a process to trigger full human and vehicle evacuation of the industrial pad under the threat of flooding and, in the unlikely situation where a full evacuation is not possible, the provision of an on -site safe haven located above the Regional Storm flood elevation in the new portion of Building No. 12. The Plan's procedures will evolve over time based on experience with the threat of flooding. TRCA staff is satisfied that all of the above requirements can be met in Phase 2 and therefore consideration of the Phase 1 works subject to this permit application can proceed. Most of the work to take place in Phase 1, including building demolition and stabilization, excavation of the stormwater management facilities, and drilling micropiles and foundation cassions will either have no impact on the storage or conveyance of flood waters due to their nature, or will increase flood storage due to excavation. The filling of the site to above the two year flood elevation has been confirmed through a flood study to have no impact on up or down stream flood storage and will have a positive effect of reducing property damage during nuisance storms. In addition, an Emergency Response Plan reviewed and approved by TRCA staff will be implemented during construction. This Plan provides the necessary protocols for Evergreen's contractor to follow if there is a threat of flooding during construction. As such the works subject to this permit application for Phase 1 will have no impact on the storage or conveyance of flood waters and TRCA staff is confident that the Phase 2 works can meet the technical conditions of the Lease Agreement, Master Plan and Site Plan approvals. Pollution: Temporary sediment control has been provided per the Greater Golden Horseshoe Area Conservation Authorities, Erosion and Sediment Control Guideline for Urban Construction. These controls include a stormwater management pond with interim erosion and sediment controls during construction, swales, rock -check dams, oil -grit separators, and sediment control fencing. Dynamic Beaches: Not applicable. Erosion: Temporary erosion control has been provided per the Greater Golden Horseshoe Area Conservation Authorities, Erosion and Sediment Control Guideline for Urban Construction. The removal and replacement of the failing retaining wall and associated north slope remediation works behind Building Nos. 15 and 16 has been reviewed by TRCA geotechnical engineering staff. As such, there are no geotechnical issues with the proposal. Conservation of Land: The proposal within the industrial pad is not located in a significant area and will not impact the conservation of land. The industrial pad is either fully developed with buildings, paved parking or previously disturbed. Tree protection hoarding will be installed. Native restoration plantings 1095 will be provided on the valley slopes, within the buffers to be located between the toe of slope and the eastern parking area, and within the industrial pad during Phase 2 of the development. These plantings will mitigate the loss of various hazard trees and non - native species that will be removed as part of Phase 1. The plantings will be secured through the Site Plan approval process. Plantings No plantings are required at this stage. They will be secured through the Site Plan approval process and will be included in the permit application for Phase 2. Policy Guidelines: The TRCA reviews all Planning and Permit applications in concert with the Valley and Stream Corridor Management Program. An Objective of the Program is to "prevent development that... affects the control of flooding, pollution or conservation of land within valley and stream corridors." The Program recognizes that "where development has occurred within valley...corridors, increased flexibility for valleyland management is required" and provides policies for redevelopment of existing developed sites located within the floodplain. Specifically, the Program prohibits major additions but allows for redevelopment with replacement structures and /or minor additions subject to various criteria, the intent of which is to reduce the risk to life and property damage. Phase 2 of the project will include a minor addition. One of the policy guidelines for such redevelopment is that "ingress and egress should be 'safe' pursuant to Provincial floodproofing guidelines and /or achieve the maximum level of flood protection determined to be feasible or practical based on existing infrastructure ". In the case of the Brick Works, 'safe' ingress and egress cannot be achieved and the construction of 'safe' ingress and egress cannot be constructed through the valley slopes without negatively impacting the conservation of land. However, there are a number of fundamental differences to this application, including: 1) the Program recognizes the provincial interest in preserving and restoring buildings and structures designated as architecturally or historically important; 2) a recognition of the need for an additional environmental education centre in the Toronto region; and 3) the site is owned by the TRCA, managed by the City of Toronto and is subject to a Lease Agreement that mandates flood proofing and implementation of an Emergency Response Plan during construction and a Site Flooding Management and Evacuation Plan for Evergreen's staff and visitors upon occupancy. As such, TRCA staff are satisfied that the maximum level of flood protection determined to be feasible or practical based on existing infrastructure is achieved in Phase 1 and can be achieved in Phase 2. Therefore, the risk to life and property can be sufficiently reduced so that both the overall plan for the redevelopment and the Phase 1 works included in this permit application meet the objectives of the Valley and Stream Corridor Management Program. CFN: 41552 - Application #: 875/08/TOR Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: October 28, 2008 Attachments: 2 1096 Attachment 1 1097 Attachment 2 SITE KEY PLAN: ATTACHMENT 2 \N, \\ f H 1,11:1 1 \\ ►fir r \ 1.1,1,11} jM-tE 1 tad 0 T CO I 0 0 _T I in rm 1II1I1111�111 11II1 1 11 1 IIIIII!111II, 11111IIII1I U1111111111111111111111111 1 1111111111111 1111111 II1 1 ftHt1' l I I I 1 L1111p 1 II;c!1;II111 111 awilu 1I1t11I11fh NN,J 1111111111'111V ►i111'1[1111 1098 8.1.43 TORONTO WATERFRONT REVITALIZATION CORPORATION To construct, reconstruct, erect or place a building or structure on (125 Queens Quay to 155 Queens Quay), in the City of Toronto (Toronto and East York Community Council Area), Waterfront Watershed as located on the property owned by Toronto Waterfront Revitalization Corporation. The purpose is to install temporary stormwater servicing, final sanitary servicing and base roadways in the western portion of the East Bayfront. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Drawing No. GR -B, Grading Plan, prepared by TMIG, dated February 2008, Revision 1, revised September 17, 2008, received October 8, 2008; • Drawing No. ES -1, ESC Plan, prepared by TMIG, dated February 2008, Revision 3, revised July 7, 2008, received October 8, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to fill and site grade and install temporary stormwater servicing, final sanitary servicing and base roadways to service the western half of the East Bayfront located at the foot of Lower Jarvis and Lower Sherbourne Streets and Lake Ontario. This portion of the East Bayfront will eventually be developed with the Corus Building (under construction), the future Sherbourne and "Sugar Beach" parks (undergoing detailed design), various structures on four blocks and an innovative stormwater treatment system (undergoing preliminary design). This permit application is for the base servicing. Control of Flooding: The site is located in the Lower Don Special Policy Area and is subject to flooding in a Regional Storm event. The site will be removed from the floodplain upon completion of the Lower Don River West Remedial Flood Protection Project, currently underway. The proposal will have no impact on the storage or conveyance of floodwaters. The grading will be located above a minimum of the 350 year flood elevation. Pollution_ : The site will be entirely isolated from Lake Ontario with hoarding. A temporary stormwater treatment system to include oil and grit separators will be installed to service the site until such time as the final system is designed and developed. Dynamic Beaches: Not applicable. Erosion: The site is located on Lake Ontario and will have no impact on watercourse erosion. Conservation of Land: The site is entirely urbanized and is not within a significant area. No work will take place within 30 metres of Lake Ontario. 1099 Plantings Plantings are not required for the excavation and shoring. Two parks will be developed in the future. Policy Guidelines: The project is consistent with Policy 4.2.1., Development and Redevelopment /Intensification within Established Communities /Highly Urban Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41545 - Application #: 865/08/TOR Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: October 28, 2008 CITY OF VAUGHAN 8.1.44 209 GLENFOREST DRIVE To construct, reconstruct, erect or place a building or structure on Lot 5, Plan 65M3447,(209 Glenforest Drive), in the City of Vaughan, Don River Watershed. The purpose is to construct a new dwelling on an existing lot of record within a Regulated Area of the Don River Watershed at 209 Glenforest Drive in the City of Vaughan. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Site Grading Plan prepared by Rowan - Stanciu Ltd, received by the TRCA September 22, 2008; • Tree Protection and Landscape Plan, prepared by Philip S. Rogic, received by the TRCA September 22, 2008; • Planting List, prepared by the applicant, received by the TRCA October 29, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a new dwelling on an existing lot of record within a Regulated Area of the Don River Watershed. In addition to the construction of the dwelling, the proposed works include the construction of a retaining wall, site grading and restoration planting. The subject property and neighbouring residential lots contain a slope feature. The slope on the existing lot has already been highly altered through the construction of the subdivision in the 1990's. As part of the original Plan of Subdivision approval process for the neighbourhood (19T -89025 - Jansil Properties Ltd.), a 7.5 metre building setback was established from the staked Top of Bank at the request of TRCA. The staked Top of Bank roughly coincides with the rear lot line of the subject property. The proposed dwelling is located approximately 10.5 metres from the rear lot line and is therefore beyond the 7.5 metre building setback. 1100 The proposed grading of the site, ranging from 3H to 6H:1 V, is consistent with the existing grades on the neighbouring lots and TRCA geotechnical staff are satisfied that the proposed works will not have an adverse impact on the surrounding lots or the stability of the valley wall. Several existing trees near the rear property line are to be preserved and an area adjacent to the valley system is to be restored with native, non - invasive species plants and trees. Control of Flooding: The proposed works are not located within the Regional Storm Flood Plain. There will be no impact on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be installed and maintained during the construction of the proposed dwelling and during associated grading works. Dynamic Beaches: Not applicable. Erosion: TRCA Geotechnical staff are satisfied that the proposed works will not have an adverse impact on the surrounding lots or the stability of the valley wall. Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings A portion of the valley is to be restored with native, non - invasive species of plants and trees. All other disturbed areas will be restored to a sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 G) - Infilling - of the Authority's Valley and Stream Corridor Management Program. CFN: 41470 - Application #: 816 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: October 29, 2008 8.1.45 METRUS DEVELOPMENT INC. To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 14, Concession 10, Southwest of Huntington Road and Rutherford Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Metrus Development Inc. 1101 The purpose is to construct a con -span culvert crossing over a tributary of the Humber River (West Rainbow Creek), within Planning Block 64, in the City of Vaughan. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Letter of Undertaking, prepared by David Kellershohn, Schaeffers Consulting Engineers, dated September 25, 2008, received September 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to construct a con -span culvert crossing over a tributary of the Humber River (West Rainbow Creek) in Planning Block 64, in the City of Vaughan. The proposed crossing is located where Street '1' crosses West Rainbow Creek (southwest of Rutherford Road and Huntington Road). The proposed infrastructure works will facilitate the development of a previously approved industrial subdivision on the Block 64 lands (19T -06V13 - Boca East). Planning Block 64 is located on the west side of the City of Vaughan; bounded by Rutherford Road to the north, Huntington Road to the east, Langstaff Road t� the south and to the west by Highway 50. The watercourse in this area exhibits low flows and mud substrate during the summer months. It is considered to be intermittent in nature while the streambed is dry in the summer. Groundwater is located well below the proposed culvert crossing and therefore, groundwater seepage is not expected during construction. In order to install the proposed culvert crossing, coffer dams will be constructed upstream and downstream of the crossing, thereby isolating the work site. A fish rescue will then be conducted by a certified fisheries biologist. Flows from the watercourse will then be pumped around the work site. Once the crossing has been completed, the coffer dams will be removed. Appropriate restoration and stabilization of disturbed areas will then be conducted. Control of Flooding: Technical staff has reviewed the applicant's submissions, including revised floodline modeling and is satisfied that the storage or conveyance of flood waters will not be impacted by the proposed works. Pollution: Environmental /sediment fencing is proposed as an erosion and sediment control measure around the work site. This will ensure that the migration of sediment into the watercourse is minimized to the furthest extent possible. Dynamic Beaches: Not applicable. 1102 Erosion: Erosion will be minimized through the implementation of the aforementioned sediment control measures. There are no geotechnical /slope stability issues associated with the proposed works. Conservation of Land: Given that coffer dams will be constructed in the watercourse and flows from the tributary will be directed around the work site, a Letter of Advice will be issued on behalf of Fisheries and Oceans Canada (DFO). Plantings All disturbed areas will be restored and stabilized upon completion of the proposed works. This includes extensive plantings of native, non - invasive species. Policy Guidelines: This proposal complies with Section 4.3 Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41114 - Application #: 570 /08NAUG Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date: October 29, 2008 8.1.46 METRUS DEVELOPMENT INC. To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 14, Concession 10 , southwest of Huntington Road and Rutherford Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Metrus Development Inc. The purpose is to conduct restoration works in order to implement a natural channel design within a tributary of the Humber River (West Rainbow Creek), within Planning Block 64, in the City of Vaughan. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Letter of Undertaking, prepared by David Kellershohn, Schaeffers Consulting Engineers, dated September 25, 2008, received September 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to conduct restoration works in order to implement a natural channel design within a tributary of the Humber River (West Rainbow Creek), in Planning Block 64, in the City of Vaughan. The proposed works are located within the valley corridor of the Planning Block (southwest of Rutherford Road and Huntington Road). 1103 Planning Block 64 is located on the west side of the City of Vaughan; bounded by Rutherford Road to the north, Huntington Road to the east, Langstaff Road to the south and to the west by Highway 50. There is an approved Master Environmental Servicing Plan (MESP) in place for Block 64, which was approved in 2005. During the MESP process, the limits of the West Rainbow Creek valley corridor was identified and delineated. Since the approval of the Block 64 MESP, TRCA staff has received and draft approved a related draft plan of subdivision for the area (19T -06V13 - Boca East). The proposed works are associated with another application for a permit under Ontario Regulation 166/06 (630 /08NAUG) which was conditionally approved by the Executive Committee on October 3, 2008 (for topsoil grading works). As part of this grading permit, topsoil from two different locations within Block 64 are proposed to be placed around two existing on -line ponds. These ponds are irrigation ponds previously utilized by the former golf course on the subject lands. The ponds will remain on -line, however, extensive works will take place to implement a natural channel design to promote fish habitat and passage through this area. In order to implement the proposed natural channel design works, sediment control measures will be erected. Coffer dams will be erected upstream and downstream of the work site. A pump by -pass system will be used to direct flows around the proposed work area. Once the channel is constructed, the coffer dams will be removed, followed by appropriate restoration and stabilization of all disturbed areas. Control of Flooding: TRCA staff has reviewed technical submissions regarding the proposed natural channel design works and is satisfied that the storage or conveyance of flood waters will not be negatively impacted. Pollution: Erosion and sediment controls including silt fencing will be implemented prior to the initiation of works and maintained for the duration of construction; to ensure that sediment does not enter the watercourse and ponds. Dynamic Beaches: Not applicable. Erosion: Erosion on site will be minimized through the implementation of the aforementioned erosion and sediment control measures. Conservation of Land: There are no geotechnical /slope stability issues associated with the proposed works. Given the nature of the in- stream works, a Letter of Advice will be issued on behalf of Fisheries and Oceans Canada (DFO). Plantings Extensive plantings of native, non - invasive species will be carried out in the valley corridor as part of the overall restoration effort in Block 64. 1104 Policy Guidelines: This proposal complies with Section 4.2.2 (F) - Opportunities for Regeneration, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41195 - Application #: 631 /08NAUG Report Prepared by: Kevin Huang, extension 5307 For information contact: Kevin Huang, extension 5307 Date: October 29, 2008 8.1.47 40 WIGWOSS DRIVE To construct, reconstruct, erect or place a building or structure on Lot 100, Plan M -1526, (40 Wigwoss Drive), in the City of Vaughan, Humber River Watershed. The purpose is to construct an inground pool, patio and shed within a Regulated Area of the Humber River Watershed at 40 Wigwoss Drive in the City of Vaughan. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Site Plan, prepared by the Applicant, received by the TRCA November 3, 2008, redline revised to indicate the erection of sediment control fencing and the removal of excess fill material. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct an inground pool, patio and shed within a Regulated Area of the Humber River Watershed. The proposed inground pool is located approximately 7 metres away from a 1.6 metre high retaining wall and the proposed shed is located at least 6 metres from the retaining wall. Based upon a Site Visit conducted by TRCA staff August 21, 2008, TRCA geotechnical staff observed that the existing retaining wall was beginning to show signs of failure. According to a Geotechnical Report prepared by Terraprobe dated October 15, 2008, the proposed location of the pool is sufficiently setback and will not have an adverse impact on the retaining wall. In addition, based upon revised drawing submitted by the applicant, the location of the proposed shed is also sufficiently setback from the retaining wall as recommend by the Terraprobe report. TRCA geotechnical staff are satisfied that the setback for the shed and 7 metre setback for the inground pool are sufficient for any works that may be required in the future to replace or stabilize the existing retaining wall. Control of Flooding: The proposed works are located in close proximity (approximately 6 metres) to, but outside, of the Regional Storm Flood Plain. There will be no impacts on the storage or conveyance of flood waters. 1105 Pollution: Sediment control fencing will be installed and maintained during the construction of the pool and shed to prevent sediment from migrating off the subject property. Dynamic Beaches: Not applicable. Erosion: TRCA geotechnical staff are satisfied that the proposed works will not have an adverse impact on the stability of the retaining wall located at the rear lot line. Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41263 - Application #: 684 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: October 29, 2008 TOWN OF CALEDON 8.1.48 14534 CALEDON KING TOWN LINE SOUTH To construct, reconstruct, erect or place a building or structure on Lot 13, Concession 9, (14534 Caledon King Town Line South), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, single - family dwelling on a vacant lot of record at 14534 Caledon -King Townline South, in the Town of Caledon. The permit will be issued for the period of November 7, 2008 to November 6, 2010. Letter of Undertaking, prepared by R.J. Burnside Limited, dated November 5, 2008, to address all outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: 1106 Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, single - family dwelling on a vacant lot of record at 14534 Caledon -King Townline South, in the Town of Caledon. An intermittent tributary of the Humber River Watershed traverses the front portion of the property adjacent to the Caledon -King Townline and flows from an Oak Ridges Moraine (ORM) wetland feature at the south of the property to the north. The proposed works will be located on the tableland portion of the subject property away from the stream corridor associated with the above -noted tributary. Based on our review, the proposed works appear to be sufficiently setback from both the stream corridor and wetland feature. An existing farm laneway and watercourse crossing will be upgraded and utilized in order to gain access to the tableland portion of the lot where the works are proposed. TRCA staff has confirmed that the existing driveway is located outside of the Regional Storm Floodplain. As such, there are no flooding, geotechnical or ecology related concerns associated with this proposal. Additionally, enhancement riparian plantings are proposed with this application along the banks of the watercourse and adjacent to the wetland feature in order to provide an ecological net gain for this site. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters is anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. An extensive enhancement planting plan has been submitted with this application, Additionally, although there are no fisheries related concerns associated with these works, a Letter of Advice (LOA) will be issued on behalf of Fisheries and Oceans Canada (DFO). The LOA will be issued with the permit to identify to the proponent that the erosion and sediment controls as proposed with this project are required to prevent the release of sediment laden runoff into the nearby tributary as required under the Federal Fisheries Act. In our opinion, the proposed controls will prevent any adverse impacts to fish habitat. Plantings A planting plan in accordance with TRCA's guidelines has been submitted with this application in order to enhance the stream corridor and wetland features on the property. In addition, all disturbed areas will be re- vegetated with native and non - invasive species as per TRCA's guidelines. 1107 Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 40958 - Application #: 441/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: October 28, 2008 TOWN OF MARKHAM 8.1.49 21 PERSONNA BOULEVARD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 21, Plan 5316, (21 Personna Boulevard), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a replacement dwelling on the subject property. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Letter of Undertaking Prepared by Uni- vative Designs, dated November 5, 2008, stamped received November 5, 2008, to address all outstanding engineering related concerns. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a replacement dwelling on the subject property. The subject property is located within an approved residential subdivision in the Town of Markham and currently contains an existing residential dwelling and an in- ground pool. The existing house is to be demolished, and replaced with a proposed new dwelling. The proposed new dwelling is to be constructed on the same footprint of the existing structure. Although the proposed development is partially located within the Regional Storm Floodplain, the structure will be appropriately floodproofed in accordance with TRCA's policy requirements. The area to which this application applies is void of any significant vegetation and is currently manicured lawn. There are no geotechnical concerns related to this application. Control of Flooding: TRCA Water Resources staff . have reviewed this proposal and do not anticipate any impacts to the storage and /or conveyance of flood waters. The proposed dwelling is located outside of the hydraulic floodway and will be appropriately floodproofed. All excavated fill will be removed from the floodplain. 1108 Pollution: Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings Since no significant vegetation will be removed, additional plantings are not required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41565 - Application #: 883 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: October 28, 2008 TOWN OF RICHMOND HILL 8.1.50 116 BERNARD AVENUE To site grade on Lot 98, Plan 65M -2821, (116 Bernard Avenue), in the Town of Richmond Hill, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an in- ground pool. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Pool Layout Concept Plan, prepared by Drawn From Nature, dated September 9, 2008, stamped received by TRCA Planning and Development October 16, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 1109 Proposal: The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an in- ground pool. The rear of the subject property is located adjacent to a valley corridor of the Rouge River Watershed. TRCA staff has conducted a site inspection and confirm that the works are sufficiently setback from the valley corridor feature. The area to which this application applies is currently a manicured lawn and is void of any significant vegetation. The proposed works are located outside of the Regional Storm Floodplain. Control of Flooding: The subject property is located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters is anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as result of construction. Plantings As no vegetation was removed, no additional plantings are required. Policy Guidelines: his proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41187 - Application #: 634/08/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: October 28, 2008 8;1.51 LBS GROUP LIMITED To construct, reconstruct, erect or place a building or structure on Lot 51, Concession 1, (10870 Yonge Street), in the Town of Richmond Hill, Don River Watershed as located on the property owned by LBS Group Limited. The purpose is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a commercial plaza consisting of three (3) commercial buildings, totalling 6,778 square metres (72,966 sq. ft.) on the subject property located at 10870 Yonge Street. 1110 The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Letter of Undertaking, prepared by LBS Group Limited, dated November 5, 2008, to address all outstanding ecology and engineering related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a commercial plaza consisting of three (3) commercial buildings, totalling 6,778 square metres (72,966 sq. ft.) on the subject property located at 10870 Yonge Street. The subject property is 2.87 hectares in size and is located within the Settlement Area land use designation of the Oak Ridges Moraine (ORM) within the approved OPA 123 /Elgin Mills Master Servicing Plan (MSP). The subject property abuts the German Mills Creek and associated valley corridor. The valley corridor contains an existing stormwater management facility (GM3 pond). The top of bank on the western limit of the property was engineered through the construction of an adjacent stormwater management facility as approved by the TRCA and the Ministry of Natural Resources (MNR). The proposed works associated with this application are sufficiently setback (i.e., 10 metre buffer) from the engineered top of bank. As well, in accordance with OPA 123, a 30 metre vegetated buffer is provided from the low flow channel of the German Mills Creek. Stormwater quantity and quality controls will be provided on -site, including the implementation of infiltration galleries, in order to replicate pre - development water balance in accordance with the approved MSP. The property was previously used as a tree nursery and contains many stand -alone mature trees on -site proposed to be removed through this application. These trees do not meet the criteria for a significant woodland under the Oak Ridge Moraine Conservation Plan (ORMCP). However, in addition to a buffer planting plan, an extensive planting enhancement plan will be provided in order to provide needed tree cover within the German Mills valley corridor and also surrounding the existing stormwater management facility. Additionally, there are no ecology, geotechnical, or flooding concerns associated with this application. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. However, an extensive enhancement planting plan is proposed with this project to achieve an ecological net gain for this reach of the Don River Watershed. Although there are no fisheries related concerns associated with this proposal, a Letter of Advice (LOA) will be provided on behalf of Fisheries and Oceans Canada (DFO) for the proposed outfall within proximity of the watercourse. The proposed outfall has been designed in accordance with TRCA's guidelines. Plantings All proposed plantings will be native and non - invasive consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41569 - Application #: 884/08/RH Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: October 28, 2008 8.1.52 PARS HOLDING INC. To construct, reconstruct, erect or place a building or structure on Part Lot 123, Plan 104, (12915 Bayview Avenue), in the Town of Richmond Hill, Humber River Watershed as located on the property owned by Pars Holding Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, replacement 164 square metre (1,768 sq. ft.) single - family dwelling located at 12915 Bayview Avenue, in the Town of Richmond Hill. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Letter of Undertaking, prepared by Pars Holding Inc., dated November 5, 2008, to address all outstanding engineering related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, replacement 164 square metre (1,768 sq. ft.) single - family dwelling located at 12915 Bayview Avenue, in the Town of Richmond Hill. The subject property is located in the nearby vicinity of Lake Wilcox. However, the property is separated from Lake Wilcox by Bayview Avenue and adjacent properties currently developed. As such, no impacts to Lake Wilcox are anticipated as a result of construction. Additionally, there are no flooding, hydrological, geotechnical or ecology related concerns associated with this proposal. 1112 Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries related concerns associated with these works. Plantings All disturbed areas will be re- vegetated with native and non - invasive species as per TRCA's post- construction restoration guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41588 - Application #: 899/08/RH Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: October 28, 2008 8.1.53 32 ROSEMARY AVENUE To construct, reconstruct, erect or place a building or structure on Lot 80, 81, Plan 240, (32 Rosemary Avenue), in the Town of Richmond Hill, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an addition to an existing dwelling. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Letter of Undertaking prepared by R. Gregory, dated November 5, 2008, stamped received by TRCA Planning and Development November 5, 2008, to address all outstanding engineering related concerns. RATIONALE The application was reviewed by staff on the basis of the following information: 1113 Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of an addition to an existing dwelling. The subject property is located within an approved residential subdivision in the Town of Richmond Hill and currently contains an existing residential dwelling. The existing development is currently located within the Regional Storm Floodplain. A portion of the proposed new structure will be constructed on the footprint of the existing structure. Although the existing and proposed development are partially located within the Regional Storm Floodplain, the proposed dwelling will be appropriately floodproofed in accordance with TRCA's policy requirements. The area to which this application applies is void of any significant vegetation and is currently manicured lawn. There are no geotechnical concerns related to this application. Control of Flooding: TRCA Water Resources staff has reviewed this proposal and do not anticipate any impacts to the storage and /or conveyance of flood waters. The proposed dwelling is located outside of the hydraulic floodway and will be appropriately floodproofed. All excavated fill will be removed from the floodplain. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this project. Plantings Since no significant vegetation will be removed, additional plantings are not required. Policy Guidelines: The proposal is consistent with Section 4.2.2 (C) - Minor Additions, of the Authority's Valley and Stream Corridor Management Program. CFN: 41572 - Application #: 887/08/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: October 28, 2008 1114 TOWNSHIP OF KING 8.1.54 13305 DUFFERIN STREET To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 7, 8, Concession 2 (13305 Dufferin Street), in the Township of King, Humber River Watershed. The purpose is to construct an addition to an existing dwelling and a replacement septic system within a Regulated Area of the Humber River Watershed at 13305 Dufferin Street in the Township of King. The permit will be issued for the period of November 7, 2008 to November 6, 2010. • Site Plan, Darwing No. A -1, prepared.by Robert Segarra Architect Inc., dated June 2007, received by the TRCA June 17, 2008, redline revised to indicate the erection of sediment control fencing and the removal of excess fill material; • Basement Plan, Drawing No. A.1, prepared by The Gregory Design Group, received by the TRCA June 17, 2008; • Main Floor Plan and Elevations Drawing, Drawing No. A.2, prepared by The Gregory Design Group, received by the TRCA June 17, 2008; • Second Floor Plan and Elevations Drawing, Drawing No. A.3, prepared by The Gregory Design Group, received by the TRCA June 17, 2008; • Letter of Undertaking, dated October 28, 2008, stating that a Restoration Planting Plan will be submitted to the TRCA to our satisfaction, received by the TRCA October 30, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct an addition to an existing dwelling and a replacement septic system within a Regulated Area of the Humber River Watershed. The subject property is located along the edge of the East Humber River valley corridor. TRCA staff note that the entire septic system and only a portion of the addition are located within the Regulated Area. Excavation and foundation work had commenced on the portion of the dwelling addition outside of the Regulated Area in June 2008. Additionally, the fill removed during excavation was placed over the existing top of bank. As a result, TRCA enforcement staff issued a violation (Violation No. V2382) in June 2008 and construction activity has stopped pending approval of TRCA's permit. An additional administrative fee has been charged as part of this permit application. 1115 In order to resolve the violation, the fill material placed over top of bank is to be removed from the property and the slope is to be regraded to a slope ratio of approximately 3H:1 V. In addition, plantings are to be provided along the restored slope and top of bank to increase slope stability and provide an enhanced buffer between the proposed residential use and the adjacent valley lands. The proposed addition does not encroach further towards the natural feature. Violation: The placement of fill over the top of bank was done in the absence of a TRCA permit. The owner has submitted this application, at the request of TRCA staff in order to rectify this situation. Control of Flooding: The proposed works are not located within the Regional Storm Flood Plain. There will be no impact on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be erected and maintained for the duration of construction to prevent the transport of sediment into the adjacent valleylands. Dynamic Beaches: Not applicable. Erosion: TRCA geotechnical staff are satisfied that the proposed works will not adversely affect the stability of the slope or valley wall. Conservation of Land: As the watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings A buffer composed of native, non - invasive species plantings is provided along the edge of the valley system in order to create an enhanced buffer between the proposed residential uses and the valley corridor. All other disturbed areas are to be restored to the previous existed sodded conditions and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program. CFN: 41049 - Application #: 509 /08 /KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: October 28, 2008 1116 PERMIT APPLICATIONS 8.1.55 - 8.1.64 ARE PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS: RES.#B134/08 - PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Colleen Jordan Reenga Mathivanan THAT permission for routine infrastructure granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.55 - 8.1.64, inclusive), which are listed below, be received. CARRIED CITY OF PICKERING 8.1.55 CITY OF PICKERING To undertake watermain or utility installation or maintenance within an existing roadway on Twyn Rivers Drive within Rouge Valley Conservation Region, in the City of Pickering, Rouge River Watershed. The purpose is to directional drill within the road right of way to place cables underground. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 7 of 9, 79 Twyn Rivers Drive, Twyn Rivers Drive and Ashwood Gate; received by TRCA September 26, 2008; prepared by Rogers Cable, May 13, 2008, revised September 26, 2008, redline revised by TRCA October 2, 2008; • Drawing No. 8 of 9, 79 Twyn Rivers Drive, Twyn Rivers Drive and Ashwood Gate; received by TRCA September 26, 2008; prepared by Rogers Cable GTA Central, May 13, 2008, revised September 26, 2008, redline revised by TRCA October 2, 2008; • Drawing No. 9 of 9, 79 Twyn Rivers Drive, Twyn Rivers Drive and Ashwood Gate; received by TRCA September 26, 2008; prepared by Rogers Cable GTA Central, May 13, 2008, revised September 26, 2008, redline revised by TRCA October 2, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: To drill bore holes within the road right -of -way to place television cables underground and connect to the existing cable network above ground. The works are located within a Regulated Area. Fisheries and Oceans Canada (DFO) Operational Statement for Directional Drilling will be applied. Control of Flooding: The proposed works are located within the Regional floodplain of the Rouge River. TRCA Water Resources staff have confirmed that the proposed television cables are not anticipated to have any significant impact to the storage and /or conveyance of flood waters. 1117 Pollution: Appropriate erosion and sediment controls (i.e. silt fence) will be installed and maintained for the duration of all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. DFO Operational Statement for Directional Drilling will be applied. Plantings No additional plantings are required as the construction will be kept within the existing road right -of -way. Policy Guidelines: The proposal is consistent with Section 4.3 (A) Section 2) Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41471 - Application #: 817/08/PICK Report Prepared by: Louise Monaghan, extension 5756 For information contact: Laura Richards, extension 5723 Date: October 2, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.56 CITY OF TORONTO To undertake road /pathway resurfacing or reconstruction on (Near #58 Triple Crown), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by City of Toronto. The purpose is to pave an existing dirt trail with asphalt. The trail leads from the residential neighbourhood at Triple Crown Avenue down to the West Humber Parkland where it links with the existing Humber Trail, west of Highway 27 and north of Rexdale Boulevard. The trail is highly used by the residents, and paving this section of the trail is supported by the City Parks and Recreation staff. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Dwg. No. 1, Temporary Silt Control Fence Detail; prepared by City of Toronto; received by TRCA October 1, 2008; 1118 • Triple Crown Drawing #3, City of Toronto Photo and Restoration Plan; prepared by City of Toronto; received by TRCA October 1, 2008; Site Visit Photos #1 -3 of Existing trail conditions; dated September 15, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves paving an existing dirt trail with asphalt. The trail is located in Etobicoke, in the City of Toronto's West Humber Parkland. It extends from the residential homes located along Triple Crown Avenue to the base of the hillside. When completed, the asphalt trail will connect to the existing asphalt walkway and pathlands located south of the Humber Woods Park. During wet weather conditions, the dirt surface of the existing trails poses a safety concern. This is the only access route to the parkland and trail system that is highly used by local home owners. The site will not be altered from the existing natural grade. The construction plan is to cover the existing surface with a gravel base topped with asphalt. The width, length and alignment of the existing dirt trail will remain the same. Control of Flooding: The proposed works are located within the Regional storm floodplain. The proposed work will have no impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate sediment and erosion controls (i.e. silt fence) will be installed and maintained for the duration of the proposed work. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: With appropriate erosion and sediment control measures in effect, the potential a Harmful, Alteration, Disruption and Destruction (HADD) of fish habitat will be mitigated. Plantings The proposed work will be kept within the same footprint of the existing gravel pathway. Any disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: The proposal is consistent with Section 4.3, Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program (VSCMP). CFN: 41393 - Application #: 756/08/TOR Report Prepared by: Louise Monaghan, extension 5756 For information contact: Renee Afoom, extension 5714 Date: October 29, 2008 1119 8.1.57 ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer and watermain or utility installation or maintenance within an existing roadway in a Regulated Area on Scarlett Road, in the City. of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by Enbridge Gas Distribution Inc. The purpose is to perform routine maintenance work to a gas main located under the bridge on Scarlett Road, south of Clairton Crescent over the Black Creek - Humber River. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which•form part of this permit: • Drawing No. 4 -G -S8- 1268 -01, Typical Rolling Scaffold Tower Elevation and Section; prepared by Construction Control Inc, dated September 4, 2008; received by TRCA September 25, 2008; • Letter; prepared by Enbridge Gas Distribution Inc., dated September 19, 2008; received by TRCA September 25, 2008; • Google Map, Scarlett Road & Clairton Crescent Toronto, ON; prepared by Enbridge Gas Distribution Inc., dated September 19, 2008; received by TRCA September 25, 2008; • Aerial Photo, Google Images, Scarlett Road Bridge; prepared by Enbridge Gas Distribution Inc., not dated; received by TRCA September 25, 2008; • Photo 1, Scarlett Road Vehicle Location; prepared by Enbridge Gas Distribution Inc., dated July 10, 2008; received by TRCA September 25, 2008; • Photo 2, Scarlett Road Bridge; prepared by Enbridge Gas Distribution Inc., dated July 10, 2008; received by TRCA September 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: To undertake pipe maintenance work on an existing bridge at Scarlett Road, Enbridge is proposing to erect scaffolding to gain access to existing gas pipe. One lane of traffic will be closed off during the proposed work. Aluminum planks will be set up over the spillway to support rolling scaffold. The pipe will be hand cleaned and re- coated. A kick plate and drop cloth will be set up to catch all debris. Control of Flooding: The proposed works are located within the Regulated floodplain. TRCA Water Resources staff have confirmed that the proposed work will not have any impacts to the storage and /or conveyance of flood waters. 1120 Pollution: Appropriate erosion and sediment controls (i.e. a canvas tarp will be used as drop cloth) will be installed and maintained for the duration of the proposed work. The tarp will wrap around the kick plate /toe board. The kick plate /toe board is a lip installed around any open section of the scaffold floor and prevents any object from falling off of the scaffold. By wrapping the tarp around the kick plate /toe board, all debris removed from the pipe can be contained. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No vegetation will be removed as a result of the proposed work. A DFO Letter of Advice will be prepared. Plantings No additional plantings are required as the proposed work will be kept within the existing structural footprint. Policy Guidelines: The proposal is consistent with Section 4.3 (A)(2), Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program (VSCMP). CFN: 41225 - Application #: 658/08/TOR Report Prepared by: Louise Monaghan, extension 5756 For information contact: Renee Afoom, extension 5714 Date: October 9, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.58 ENBRIDGE GAS DISTRIBUTION INC. To undertake watermain or utility installation or maintenance within an existing roadway in a Regulated Area on Weston Road in the City of Toronto (North York Community Council Area), Humber River Watershed as located on the property owned by Enbridge Gas Distribution Inc. The purpose is to perform maintenance work on a gas pipeline situated under the bridge at Weston Road and Humber Boulevard over Black Creek. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Photograph of Bridge Master Truck, equipment to be used; prepared by Enbridge Gas Distribution Inc., photo not dated; received by TRCA September 25, 2008; 1121 • Letter; prepared by Enbridge Gas Distribution Inc., dated September 19, 2008; received by TRCA September 25, 2008; • Google Map - Weston Rd & Humber Blvd, Toronto, ON; prepared by Enbridge Gas Distribution Inc., dated September 19, 2008; received by TRCA September 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: To undertake pipe maintenance work on an existing bridge at Weston Road. Enbridge is proposing to use a Bridge Master Truck to access the pipe located underneath the bridge. The truck and all access to the truck and pipe will be from the top of the bridge. The Bridge Master Truck will extend its arm and bucket /platform underneath the bridge. The pipe will be hand - cleaned and re- coated. The bucket /platform will be lined with a trap to collect any falling debris. Control of Flooding: The proposed works are located within the Regional storm floodplain. TRCA Water Resources staff have confirmed that the proposed works will not have any impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate erosion and sediment controls (le: The work platform /bucket will be lined with a tarp to collect any falling debris and at no time will debris be allowed to enter the water) will be installed and maintained for the duration of the work. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No vegetation will be removed as a result of proposed work. A DFO Letter of Advice will be prepared. Plantings No additional plantings are required as the proposed work will be kept within the existing structural footprint. Policy Guidelines: The proposal is consistent with Section 4.3 (A)(2), Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program (VSCMP). CFN: 41224 - Application #: 657/08/TOR Report Prepared by: Louise Monaghan, extension 5756 For information contact: Renee Afoom, extension 5714 Date: October 14, 2008 1122 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.59 CITY OF TORONTO To undertake road /pathway resurfacing or reconstruction on Clemes Drive - from Centennial Road to 160 metres Westerly, in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by City of Toronto. The purpose is to replace the existing asphalt sidewalk with 130mm thick concrete sidewalk on Clemes Drive from Centennial Road to 160 metres west of the intersection. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A2, Proposed Sidewalk, Intersection of Clemes Drive and Centennial Road; prepared by City of Toronto Technical Services Division, September 11, 2008; received by TRCA October 7, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works involve resurfacing of an existing sidewalk on Clemes Drive. This is part of the City's maintenance tasks. All work will be done within City owned lands. The area that may be impacted during the installation of the sidewalk will be sodded at the end of the job. Control of Flooding: Although the proposed works are partially located within the Regional storm floodplain, the proposed work will have no impacts to the storage and /or conveyance of floodwaters. Pollution: Appropriate sediment and erosion control measures will be installed and maintained for the duration of the proposed work. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: With appropriate erosion and sediment control measures in effect, the potential for a Harmful, Alteration, Disruption and Destruction (HADD) of fish habitat will be mitigated. • Plantings The proposed work will be kept within the same footprint of the existing asphalt pathway. Any disturbed areas will be restored with native, non - invasive species following construction. 1123 Policy Guidelines: The proposal is consistent with Section 4.3, Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program (VSCMP). CFN: 41562 - Application #: 876/08/TOR Report Prepared by: Louise Monaghan, extension 5756 For information contact: Renee Afoom, extension 5714 Date: October 29, 2008 8.1.60 ENBRIDGE GAS DISTRIBUTION INC. To undertake watermain or utility installation or maintenance within an existing roadway on Dewey Drive, in the City of Toronto (Scarborough Community Council Area), Don River Watershed as located on the property owned by Enbridge Gas Distribution Inc. The purpose is to install a NPS 2 ST YJ IP gas pipeline within a 4" casing above a concrete box culvert in a grassy area on the east side of Dewey Drive, south of Dalecliff Crescent in the City of Toronto. The permit will be issued for the period of October 29, 2008 to October 28, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing Project No. 1.3099164, Dewey Dr.; prepared by Enbridge October 10, 2008; received by TRCA October 14, 2008; • Letter dated October 14, 2008, prepared by Enbridge, received October 14, 2008; • Photo 1 by Enbridge, received August 14, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: To undertake gas pipeline installation within a concrete box culvert in a grassy area on the east side of Dewey Drive in accordance with Drawing No. 1.3099164. The concrete box culvert is located across Taylor Massey Creek. The proposed pipe will connect to an existing pipe located in the same area. The existing pipe will be abandoned after the proposed pipe is installed. Control of Flooding: The proposed works are located within the Regional storm floodplain. The proposed work will have no impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate sediment and erosion control measures will be installed and maintained for the duration of the proposed work. Dynamic Beaches: Not applicable 1124 Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: With erosion and sediment control measures in effect, the potential a Harmful, Alteration, Disruption and Destruction (HADD) of fish habitat will be mitigated. A Letter of Advice will be provided by TRCA staff of behalf of the Department of Fisheries and Oceans (DFO). Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: The proposal is consistent with Section 4.3, Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Plan (VSCMP). CFN: 41301 - Application #: 708/08/TOR Report Prepared by: Louise Monaghan, extension 5756 For information contact: Renee Afoom, extension 5714 • Date: October 29, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.61 ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer and watermain or utility installation or maintenance within an existing roadway in a Regulated Area on Bayview Avenue, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by Enbridge Gas Distribution Inc. The purpose is to complete maintenance work on the existing gas main located under the bridge on Bayview Avenue, just north of Lawrence Avenue over the West Don River. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 4- G- S8- 1266 -01, Typical Access Scaffold Layout Elevation and Section; prepared by Construction Control Inc., dated September 4, 2008; received by TRCA September 25, 2008, • Letter; prepared by Enbridge Gas Distribution Inc., dated September 19, 2008; received by TRCA September 25, 2008, • Google Map - Lawrence Ave W, Toronto, ON; prepared by Enbridge Gas Distribution Inc., dated September 19, 2008; received by TRCA September 25, 2008, • Photo 1 - Aerial, Bayview Avenue Bridge, Google Maps; prepared by Enbridge Gas Distribution Inc.; received by TRCA September 25, 2008, 1125 • Photo 2, Bayview Avenue Lane Way; prepared by Enbridge Gas Distribution Inc., dated July 10, 2008; received by TRCA September 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: To complete pipe maintenance work at Bayview Avenue and Lawrence Avenue. Enbridge is proposing to erect scaffolding to gain access to existing gas pipelines. To access the pipe, engineered scaffolding will be stationary and fixed under the bridge beams. The pipe will be cleaned by hand and taped. A drop cloth will line the basket to prevent any debris from entering the water. Access to the bridge via a shared driveway with the City. Control of Flooding: The proposed works are located within the Regulated floodplain. TRCA Water Resources staff have confirmed that the proposed work will not have any impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate sediment and erosion controls (i.e. drop cloth to line the basket) will be installed and maintained for the duration of the proposed work. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. A DFO Letter of Advice will be applied. Plantings No additional plantings are required as the construction will be kept within the existing structure (bridge) footprint. Policy Guidelines: The proposal is consistent with Section 4.3 (A) Section 2) Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program (VSCMP) CFN: 41223 - Application #: 656/08/TOR Report Prepared by: Louise Monaghan, extension 5756 For information contact: Renee Afoom, extension 5714 Date: October 9, 2008 1126 CITY OF VAUGHAN 8.1.62 CITY OF VAUGHAN To undertake road /pathway resurfacing or reconstruction and drainage structure general maintenance in a Regulated Area on Pine Valley Drive (Intersite Place to Clubhouse Road), in the City of Vaughan, Humber River Watershed as located on the property owned by City of Vaughan. The purpose is to implement road /pathway resurfacing or reconstruction and drainage structure general maintenance. The permit will be issued for the period of October 7, 2008 to October 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing 1 of 7, Pine Valley Drive, Removals Sta. 0 +000 to Sta. 0 +550; Drawing 3 of 7, Pine Valley Drive, New Construction, Sta. 0 +000 to Sta. 0 +250; Drawing 7 of 7, Pine Valley Drive, Typical Sections and Details; all dated August 25, 2008; all received September 8, 2008; all prepared by the City of Vaughan RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to resurface and rehabilitate Pine Valley Drive from Intersite Place to Clubhouse Road in the City of Vaughan, Regional Municipality of York. The works will include the removal of existing pavement and granular base, subdrain installation and resurfacing of the road. The proposed works are part of the City of Vaughan's 2008 Pavement Management Program. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (silt /sediment fencing) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: There will be no in stream work associated with the project and there are no concerns related to fish habitat. 1127 Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41408 - Application #: 765 /08/VAUG Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: October 7, 2008 TOWN OF MARKHAM 8.1.63 REGIONAL MUNICIPALITY OF YORK To undertake drainage structure general maintenance on (McCowan at 19th Avenue (West of McCowan Road and North West Corner)), in the Town of Markham, Rouge River Watershed as located on the property owned by Regional Municipality of York. The purpose is to remove silt and gravel from the ditches to design grade and restoration of the culvert inlet area. All excavated areas will be stabilized and restored with topsoil and approved seed mixes.. The permit will be issued for the period of September 29, 2008 to September 28, 2010 in accordance with the following documents and plans which form part of this permit: • Construction Method /Drawing Notes: West side of McCowan Road from 19th Ave. to appx. 60m to the north; and north side of 19th Ave. from McCowan Rd. to appx. 80m to the west; received September 3, 2008; prepared by the Regional Municipality of York; • Seed Mix Specifications; received September 3, 2008; prepared by the Regional Municipality of York; • Drawing OPSD 219.130; Heavy -Duty Silt Fence Barrier; dated November 2006; received September 3, 2008; prepared the Regional Municipality of York; • Drawing OPSD 219.211; Rock Flow Check Dam Flat Bottom Ditch; dated November 2006; received September 3, 2008; prepared the Regional Municipality of York; • Drawing No. 1; Work Plan.; dated August 26, 2008; received September 3, 2008; prepared the Regional Municipality of York; • Drawing No. 2; Culvert Inlet Area Restoration NW Corner of 19th and McCowan Rd.; dated August 2008; received September 3, 2008; prepared the Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: 1128 Proposal: To remove silt and gravel from the ditches to design grade and restoration of the culvert inlet area. All excavated areas will be stabilized and restored with topsoil and approved seed mixes. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (sediment fencing) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated to the adjacent cold water fisheries community. This application is not subject to the fisheries timing window although fish habitat begins immediately south of the 19th Ave culvert. Any release of sediment into this area could violate the federal fisheries act. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41349 - Application #: 733 /08 /MARK Report Prepared by: Ben Krul, extension 5769 For information contact: Ben Krul, extension 5769 Date: September 29, 2008 1129 CITY OF VAUGHAN 8.1.64 REGIONAL MUNICIPALITY OF YORK To undertake drainage structure general maintenance on (West side of Keele Street between McDonald Street and North of 12470 Keele Street), in the Vaughan City of, Don River Watershed as located on the property owned by Regional Municipality of York. The purpose is to undertake minor restorative ditching within the Region right of way on the west side of Keele St. between McDonald St. and N of 12470 Keele St. The restoration is required to allow the ditch to properly outfall and resume the drainage pattern as designed.. The permit will be issued for the period of September 29, 2008 to September 28, 2010 in accordance with the following documents and plans which form part of this permit: • Cover Letter; Proposed Ditch Cleanout on Keele Street: Dated August 29, 2008; received September 3; prepared by the Regional Municipality of York; • Drawing No.1; Ditch Cleanout, Construction Methodology; dated August 2008; received September 3, 2008; prepared by the Regional Municipality of York; • Drawing No. 2; Keele Street West Side Ditch Restoration; dated September 2, 2008; received September 3, 2008; prepared by the Regional Municipality of York; • Drawing OPSD 219.211; Rock Flow Check Dam; dated November 2006; received September 3, 2008; prepared by the Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: To undertake minor restorative ditching within the Region right of way on the west side of Keele St. between McDonald St. and N of 12470 Keele St. To allow the ditch to properly outfall and resume the drainage pattern as designed. Control of Flooding: The proposed project will have no impacts on the storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (sediment fencing) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable • Erosion: There are no geotechnical /slope stability issues associated with the proposal. 1130 Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated. This application is not subject to the fisheries timing window although fish habitat begins immediately north of the driveway culvert 275m north of the Keele and McDonald intersection. Any release of sediment into this area could violate the federal fisheries act. All works will be conducted in the dry. Plantings All disturbed areas will be restored with native non - invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41315 - Application #: 721/08/KING Report Prepared by: Ben Krul, extension 5769 For information contact: Ben Krul, extension 5769 Date: September 29, 2008 PERMIT APPLICATIONS 8.1.65 - 8.1.82 ARE MINOR WORKS LETTER OF APPROVAL: RES. #B135/08 - MINOR WORKS LETTER OF APPROVAL PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Colleen Jordan Reenga Mathivanan THAT minor works letter of approval granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.65 - 8.1.82, inclusive), which are listed below, be received. CARRIED CITY OF BRAMPTON 8.1.65 16 VIOLETRIDGE COURT To install a swimming pool on Lot 376, Plan 43M -1714, (16 Violetridge Court), in the City of Brampton, Humber River Watershed. CFN: 41537 - Application #: 859/08/BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: October 10, 2008 8.1.66 51 DONWOODS COURT To install a swimming pool on Lot 39, Plan 43M -1611, (51 Donwoods Court), in the City of Brampton, Humber River Watershed. 1131 CFN: 41491 - Application #: 827/08/BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Jason Wagler, extension 5743 Date: October 3, 2008 CITY OF PICKERING 8.1.67 1622 FAIRFIELD CRESCENT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 158, Plan 40M -1499, (1622 Fairfield Crescent), in the City of Pickering, Duffins Creek Watershed. CFN: 41519 - Application #: 850 /08 /PICK Report Prepared by: Brian Storozinski, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: October 21, 2008 8.1.68 1961 SPRUCE HILL ROAD To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 89, Plan 1041, (1961 Spruce Hill Road), in the City of Pickering, Waterfront Watershed. CFN: 41500 - Application #: 835/08/PICK Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: October 8, 2008 8.1.69 1790 FINCH AVENUE, UNIT 43 To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Block 7, Plan 40M -2261, (1790 Finch Avenue, Unit 43), in the City of Pickering, Duffins Creek Watershed. CFN: 41561 - Application #: 880 /08 /PICK Report Prepared by: Brian Storozinski, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: October 16, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.70 21 RIVERVIEW GARDENS To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 27, Plan 2714, (21 Riverview Gardens), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. 1132 CFN: 41496 - Application #: 832/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 21, 2008 8.1.71 1 ORCHARD CREST ROAD To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 163, Plan 1582, Lot 41, Plan 2659, (1 Orchard Crest Road), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. CFN: 41566 - Application #: 878/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 28, 2008 8.1.72 125 VARSITY ROAD To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Block PART OF BLOCK R, Plan 1260, (125 Varsity Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 41575 - Application #: 890/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 28, 2008 8.1.73 325 MARKLAND DRIVE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on 325 Markland Drive in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed. CFN: 41463 - Application #: 809/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 21, 2008 8.1.74 264 SOUTH KINGSWAY To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 208, 209, Plan M -22, (264 South Kingsway), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 41582 - Application #: 893/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 28, 2008 1133 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.75 940412 ONTARIO LTD. To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 2, Plan 749, (43 Saulter Street), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by 940412 Ontario Ltd.. CFN: 41494 - Application #: 830/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 21, 2008 8.1.76 ARCTURUS REALTY CORPORATION To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on 23 Leslie Street, 17 Leslie Street in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by Arcturus Realty Corporation. CFN: 41517 - Application #: 848/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: October 21, 2008 CITY OF VAUGHAN 8.1.77 155 PEAK POINT BOULEVARD To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 30, Concession 3 Plan 65M -3878, (155 Peak Point Boulevard), in the City of Vaughan, Don River Watershed. CFN: 41557 - Application #: 871 /08/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: October 22, 2008 TOWN OF AJAX 8.1.78 26 HUNWICKS CRESCENT To install a swimming pool on Lot 88, Plan 40M -2347, (26 Hunwicks Crescent), in the Town of Ajax, Carruthers Creek Watershed. 1134 CFN: 41581 - Application #: 895 /08 /AJAX Report Prepared by: Brian Storozinski, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: October 27, 2008 TOWN OF CALEDON 8.1.79 48 ENGLISH ROSE LANE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 38, Plan M -1374, (48 English Rose Lane), in the Town of Caledon, Humber River Watershed. CFN: 41498 - Application #: 833/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: October 16, 2008 TOWNSHIP OF KING 8.1.80 5737 FIFTEENTH SIDEROAD To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 10, Concession 8 Lot 10, Plan 442, (5737 Fifteenth Sideroad), in the Township of King, Humber River Watershed. CFN: 41425 - Application #: 779/08/KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Anthony Sun, extension 5724 Date: October 9, 2008 8.1.81 67 MACTAGGART DRIVE To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on 67 MacTaggart Drive, in the Township of King, Humber River Watershed. CFN: 41511 - Application #: 842 /08 /KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: October 9, 2008 1135 TOWNSHIP OF UXBRIDGE 8.1.82 2650 THIRD CONCESSION To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 9, Concession 2 Plan 40R- 32545, (2650 Third Concession), in the Township of Uxbridge, Duffins Creek Watershed. CFN: 41407 - Application #: 768/08/UXB Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: September 25, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.83 15 GREEN VALLEY ROAD To construct, reconstruct, erect or place a building or structure on Lot 26, Plan 4227, (15 Green Valley Road), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to demolish an existing bungalow and construct a two- storey dwelling with a rear yard pool and terraced landscaping. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. L2 Grading and Landscape Plan, dated February, 2008, revised July 3, 2008, prepared by Visionscapes Landscape Architects Inc., received August 29, 2008; • Disposal of Storm Runoff Water Report, dated September 8, 2008, prepared by Haddad Geotechnical Inc., received September 11, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed replacement dwelling and rear yard pool are located in the Hogg's Hollow Special Policy Area. The applicant has provided a letter from a structural engineer outlining that the structure will withstand flood flow velocities during the Regional Storm, and the dwelling will be flood proofed for the Regional Storm flood elevation. Control of Flooding: As noted above, the proposed replacement dwelling and pool are located in an area that is susceptible to flooding in the event of a Regional Storm. Based on the information submitted by the applicant, TRCA staff are satisfied that there will be no significant impacts to upstream or downstream flood storage or conveyance of floodwaters resulting from the proposed works. Given the above, staff is requesting permission from the Executive Committee to allow the issuance of the Ontario Regulation 166/06 permit for this project subject to written confirmation that the applicant has entered into a Site Plan Agreement with the City of Toronto. 1136 Pollution: Sediment and erosion control measures will be installed and maintained before and during construction activity to prevent the migration of construction generated sediment into the watercourse. Dynamic Beaches: Not applicable. Erosion: TRCA staff are satisfied that there are no slope stability concerns with the proposed works. Conservation of Land: The proposed works will not occur beyond the top of bank of the watercourse, thereby mitigating direct impacts on the existing river. All disturbed areas will be stabilized and vegetated following construction. Plantings New plantings will be required on the site as part of the Site Plan approval process. All disturbed areas will be restored with native, non - invasive plantings and sod to the satisfaction of the City of Toronto. Policy Guidelines: This proposal is consistent with Section 4.2.1. B) - Development Guidelines for Development /Redevelopment within Designated Two Zone Areas or Special Policy Areas, and Section 4.2.2. D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41429 - Application #: 789/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: November 4, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.84 97 ARDWOLD GATE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 3, PART 4, Plan 711E, (97 Ardwold Gate), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a second storey addition above the attached garage to the existing single family detached residential dwelling. The permit will be 'issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: 1137 • Drawing unnumbered, Site Plan, prepared by M. Sapera Construction Limited, undated, received on September 23, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to facilitate the construction of a second storey addition above the attached garage to the existing single family detached residential dwelling at 97 Ardwold Gate in the City of Toronto (Toronto and East York Community Council Area). The footprint of the existing dwelling is to remain unchanged. The subject property is located east of Spadina Road, south of St. Clair Avenue West and backs on to Sir Winston Churchill Park within a TRCA Regulated Area of the Don River Watershed. Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment controls will be installed and maintained during construction to prevent debris from entering the adjacent ravine. Dynamic Beaches: Not applicable. Erosion: A geotechnical letter has been reviewed TRCA geotechnical engineering staff. TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the proposal. Conservation of Land: The proposed works are located no further than the existing limit of development. As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to, the site that may be negatively impacted by the project. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41600 - Application #: 907/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: November 5, 2008 1138 CITY OF VAUGHAN 8.1.85 VENETO FEDERATION To construct, reconstruct, erect or place a building or structure on Lot 2, 3, 4, Concession 7, (7465 Kipling Avenue), in the City of Vaughan, Humber River Watershed as located on the property owned by Veneto Federation. The purpose is to construct an addition to an existing enclosed tennis facility within a Regulated Area of the Humber River Watershed at 7465 Kipling Avenue in the City of Vaughan. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. Al, prepared by Natale Architect Inc., Dated September 29, 2008, received by the TRCA October 23, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct an addition to an existing enclosed tennis facility within a Regulated Area of the Humber River Watershed. The proposed addition is located on an area which is devoid of significant vegetation and contains the remnant foundations for a previous structure. The proposed addition is located approximately 12 metres from the existing top of bank and is sufficiently setback from the adjacent valley feature. The area between the proposed addition and the top of bank is currently sodded. Control of Flooding: The proposal is not located within the Regional Storm Flood Plain. There will be no impacts on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be installed and maintained during the construction of the addition to prevent sediment from entering the adjacent valleylands. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. 1139 Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 C) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program. CFN: 41625 - Application #: 926 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: November 5, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.86 ISLINGTON GOLF CLUB To alter a watercourse on Lot 9, Concession A, (45 Riverbank Drive), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed as located on the property owned by Islington Golf Club. The purpose is to construct an intake structure on the bank of Mimico Creek. The permit will be issued for the period of November 7, 2008 to November 6, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. IN -1, Mimico Creek Intake, prepared by R.J. Burnside & Associates Limited, dated September 11, 2008, received on September 15, 2008; • Drawing No. PP1 Plan /Profile: Directional Drilled Pile & Intake, prepared by R.J. Burnside &Associates Limited, dated September 11, 2008, received on September 15, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks approval for the construction of an intake structure on the bank of the Mimico Creek within the Islington Golf Club located west of Islington. This structure will.take water from the creek in order to supply a water reservoir for irrigating the golf course. The works are associated with an MoE permit to take water. The pipe from the intake structure to the reservoir will be constructed by directional drilling underneath the bed of the watercourse. The sediment filter bag for the intake structure will be placed a minimum of 10 metres away from the watercourse in a well vegetated area outside of the work area. .Control of Flooding: The proposed works are minor in size and will therefore have no impact the storage or conveyance of flood waters. 1140 Pollution: Sediment filtered from the water will be disposed off-site. Directional drilling for the pipe underneath the watercourse has been designed to minimize the risk of frac -out. Gabion baskets will stabilize the intake structure and minimize in- stream and bank erosion. Dynamic Beaches: Not applicable. Erosion: Vegetated, angular stone facing will be placed in the vicinity of the proposed works to protect the bank of the watercourse against erosion caused by the construction of the proposed works. Conservation of Land: All disturbed land will be restored upon completion of construction. Plantings Native, non - invasive species will be planted to restore disturbed soils. Policy Guidelines: This proposal is in conformity with Section 4.2.2. H) - Existing Resource -based Uses - of the TRCA's Valley and Stream Corridor Management Program. CFN: 40848 - Application #: 350/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: November 5, 2008 RES. #B136/08 - Moved by: Seconded by: APPOINTMENT OF ENFORCEMENT OFFICER Chris Jones. Appointment of Enforcement Officer to administer Regulation of Development, Interference with Wetlands and Alterations to Shorelines and Watercourses (Ontario Regulation 166/06). Suzan Hall David Barrow THAT Chris Jones be appointed as Enforcement Officer for the purposes of enforcing Development, Interference with Wetlands and Alterations to Shorelines and Watercourses Regulation (Ontario Regulation 166/06) made by Toronto and Region Conservation Authority (TRCA), pursuant to Section 28 of the Conservation Authorities Act. CARRIED BACKGROUND The Conservation Authorities Act provides for a conservation authority to appoint Enforcement Officers to enforce its regulations. There are several TRCA staff who currently have this designation, both for the purpose of enforcing TRCA's Ontario Regulation 166/06 and for authorizing the issuance of permits approved by the Executive Committee under the regulation. 1141 RATIONALE Mr. Chris Jones has recently been appointed to the position of Senior Planner within the Planning and Development division. In this position, he has the responsibility for supervising TRCA's regulation services associated with the review and approval of applications. The appointment as Enforcement Officer will allow him to authorize the issuance of approvals for the work that he supervises and will enable him to assist with the enforcement of the regulation as required. Report prepared by: Carolyn Woodland, extension 5214 Email: cwoodland @trca.on.ca For Information contact: Carolyn Woodland, extension 5214 Email: cwoodland @trca.on.ca Date: October 2, 2008 RES. #B137/08 - Moved by: Seconded by: REQUEST FOR DISPOSAL OF TORONTO AND REGION CONSERVATION AUTHORITY -OWNED LAND East of Dixie Road, north of Highway No. 407(Rear of 171 / 173 Advance Boulevard), Regional Municipality of Peel, CFN 41574. Toronto and Region Conservation Authority is in receipt of a request from Mr. Frank Thiele, Property Manager, Caber Management Services Inc., agent on behalf of Peel Condominium Corporation No. 299, to explore the possibility of a sale of a fragment of Toronto and Region Conservation Authority -owned land located east of Dixie Road, north of Highway No. 407 (rear of 171 / 173 Advance Boulevard), City of Brampton, Regional Municipality of Peel, Etobicoke Creek watershed. Suzan Hall David Barrow THAT the potential disposal of a fragment of land located east of Dixie Road, north of Highway No. 407 (rear of 171 / 173 Advance Boulevard), City of Brampton, Regional Municipality of Peel, be referred to Toronto and Region Conservation Authority (TRCA) staff for review and discussion in accordance with established TRCA policies; AND FURTHER THAT a report be brought forward to the Executive Committee at a future date recommending further action. CARRIED BACKGROUND This request is being brought to the attention of the Executive Committee in accordance with Resolution #26, adopted by TRCA at Authority Meeting #1/91, held on February 22, 1991. 1142 A letter has been received from Mr. Frank Thiele, Property Manager, Caber Management Services Inc., requesting the sale of a fragment of TRCA -owned land situated east of Dixie Road, north of Highway No. 407, to include as additional land along the rear of the existing commercial / industrial property located at 171 / 173 Advance Boulevard which is owned by his client, Peel Condominium Corporation No. 299. TRCA, City of Brampton, and Regional Municipality of Peel staff will be circulated the land sale proposal for review and comment. A plan illustrating the location of the subject lands is attached. Report prepared by: George Leja, extension 5342 Emails: gleja @trca.on.ca For Information contact: George Leja, extension 5342 or Ron Dewell, extension 5245 Emails: gleja @trca.on.ca or rdewell @trca.on.ca Date: October 23, 2008 Attachments: 1 1143 Attachment 1 Yi 4 ) . • 4.(p, • • • • 0 - e^' 41.1 lAW q41131G Olt -C+ 110 C r 4 6 \ N 1144 RES.#B138/08 - Moved by: Seconded by: MORNINGSIDE STORM SEWER OUTFALL SHORELINE PROTECTION PROJECT Tender RSD08 -38 and Tender RSD08 -39. Award of Tender RSD08 -38 and Tender RSD08 -39 to other than the lowest bids for the supply and delivery of approximately 2,500 tonnes of 4 to 6 tonne armour stone, and approximately 2,000 tonnes of 300mm to 600mm rip rap stone, respectively, for the Morningside Storm Sewer Outfall Shoreline Protection Project, City of Toronto. Jack Heath David Barrow THAT Contract RSD08 -38, subject to receipt of all necessary approvals, for the supply and delivery of approximately 2,500 tonnes of 4 to 6 tonne armour stone to the Morningside Storm Sewer Outfall Shoreline Protection Project, City of Toronto, be awarded to Glenn Windrem Trucking for the total unit price of $44.68 per tonne and a total cost not to exceed $111,700.00, plus applicable taxes, it being the lowest qualified bid that meets Toronto and Region Conservation Authority (TRCA) specifications; AND FURTHER THAT Contract RSD08 -39, subject to receipt of all necessary approvals, for the supply and delivery of approximately 2,000 tonnes of 300mm to 600mm rip rap stone to the Morningside Storm Sewer Outfall Shoreline Protection Project, City of Toronto, be awarded to Dufferin Aggregates for the total unit price of $27.95 per tonne and a total cost not to exceed $55,900.00, plus applicable taxes, it being the lowest qualified bid that meets Toronto and Region Conservation Authority (TRCA) specifications. CARRIED BACKGROUND The Morningside Storm Sewer Outfall Shoreline Protection Project is located south of Guildwood Parkway at the base of the Scarborough Bluffs below Morningside Avenue, City of Toronto. The project involves shoreline protection directly in front of the newly restored outfall structure. The storm sewer outfall shoreline protection was designed by Shoreplan Engineering Limited and calls for an armour stone revetment along with the shoreline and slope stabilization works. This shoreline protection will prevent future erosion and damage to the Morningside storm sewer outfall structure. RATIONALE Tender RSD08 -38 and Tender RSD08 -39 were publicly advertised in the Daily Commercial News on September 24, 2008. Tender packages were sent to a total of nine potential bidders for both projects. The Tender Opening Committee opened tenders on October 3, 2008 with the following results: 1145 Tender RSD08 -38 Supply and Delivery of Approximately 2,500 Tonnes of 4 to 6 Tonne Armour Stone BIDDERS APPROXIMATE QUANTITY (tonnes) TOTAL UNIT PRICE (per tonne) TOTAL VALUE OF CONTRACT (plus GST) TENDER DEPOSIT J.C. Rock Limited 2,500 $44.09 $110,225.00 Non- Certified Cheque Glenn Windrem Trucking 2,500 44.68 $111,700.00 Certified Cheque Stonescape Quarry 2,500 $47.00 $117,500.00 Certified Cheque . Lafarge Aggregates 2,500 $66.00 $165,000.00 Certified Cheque Nelson Aggregate Company 2,500 $67.00 $167,500.00 Certified Cheque Salandria Limited 2,500 $108.00 $270,000.00 Certified Cheque Dufferin Aggregates 2,500 NO BID NO BID - Tender RSD08 -39 Supply and Delivery of Approximately 2,000 Tonnes of 300mm to 600mm Rip Rap Stone BIDDERS APPROXIMATE QUANTITY (tonnes) TOTAL UNIT PRICE (per tonne) TOTAL VALUE OF CONTRACT (plus GST) TENDER DEPOSIT J.C. Rock Limited 2,000 $27.27 $54,540.00 Non - Certified Cheque Dufferin Aggregates 2,000 $27.95 $55,900.00 Certified Cheque Glenn Windrem Trucking 2,000 $29.20 $58,400.00 Certified Cheque Nelson Aggregate Company 2,000 $30.70 $61,400.00 Certified Cheque Lafarge Aggregates 2,000 $36.00 $72,000.00 Certified Cheque Salandria Limited 2,000 $38.48 $76,960.00 Certified Cheque Stonescape Quarry 2,000 $47.00 $94,000.00 Certified Cheque Based on the bids received, TRCA staff has determined that the lowest bid on both projects by J.C. Rock is disqualified as it did not contain a certified cheque. The tender stipulates that... " In order to secure the due performance by Tenderers of the obligations undertaken by them, an original Tender Security of 10% of tender price in the format of a bank guarantee or certified cheque is required." 1146 This has resulted in J.C. Rock being disqualified from the tendering process. Therefore, staff recommend that Contract RSD08 -38 be awarded to Glenn Windrem Trucking for the total unit price of $44.68 per tonne and a total cost not to exceed $111,700.00, plus GST, and Contract RSD08 -39 be awarded to Dufferin Aggregates for the total unit price of $27.95 per tonne and a total cost not to exceed $55,900.00, plus GST, as they are the second lowest bidder, but the lowest bid that meets TRCA specifications for both tenders. FINANCIAL DETAILS Funds are available from the 2008 City of Toronto Capital Budget within account #135 -29 from the Morningside Outfall: Shoreline Protection Project. Report prepared by: Aaron D'Souza, 416- 392 -9720 For Information contact: Joe DeIle Faye, 416 - 392 -9724 Email: jdellefave @trca.on.ca Date: October 20, 2008 RES.#B139/08 - Moved by: Seconded by: PORT UNION WATERFRONT IMPROVEMENT PROJECT (PHASE 2) Award of Contract. Award of Tender RSD08 -41 for the supply and delivery of approximately 4,200 tonnes of 50mm to 150mm cobbles to the Port Union Waterfront Improvement Project (Phase 2), City of Toronto. Jack Heath David Barrow THAT Contract RSD08 -41 for the supply and delivery of approximately 4,200 tonnes of 50mm to 150mm cobbles to the Port Union Waterfront Improvement Project (Phase 2), City of Toronto, be awarded to Nelson Aggregate Company for a total unit price of $26.58 per tonne and a total cost not to exceed $111,636.00, plus applicable taxes, it being the lowest bid that meets Toronto and Region Conservation Authority (TRCA) specifications. CARRIED BACKGROUND The Port Union Waterfront Improvement Project (Phase 2) is located south of Lawrence Avenue east, between Chesterton Shores and the Rouge River in the City of Toronto. The project will consist of approximately 1.6 km of shoreline protection, trails and parkland development. The preferred option through the Class Environmental Assessment process calls for the construction of 6 headlands and 7 beach units. The cobble material will be used in the construction of the beach units. RATIONALE Tender RSD08 -41 was publicly advertised in the Daily Commercial News on September 24, 2008. Tender packages were sent to a total of eight potential bidders. The Tender Opening Committee opened tenders received on October 3, 2008 with the following results: 1147 BIDDERS APPROXIMATE QUANTITY (tonnes) TOTAL UNIT PRICE (per tonne) TOTAL VALUE OF CONTRACT (plus GST) Nelson Aggregate Company 4,200 $26.58 $111,636.00 Lafarge Aggregates 4,200 $28.00 $117,600.00 Glenn Windrem Trucking 4,200 $32.10 $134,820.00 J.C. Rock Limited 4,200 $38.58 $162,036.00 Dufferin Aggregates 4,200 NO BID NO BID Based on the bids received, staff recommend award of Contract RSD08 -41 to Nelson Aggregate Company for the total unit price of $26.58 per tonne and a total cost not to exceed $111,636.00 plus GST, as they are the lowest bidder that meets TRCA specifications. FINANCIAL DETAILS Funds are available within account #22470 from the Toronto Waterfront Revitalization Corporation. Report prepared by: Aaron D'Souza For Information contact: Joe Delle Fave, 416 - 392 -9724 Email: jdellefave @trca.on.ca Date: October 10, 2008 RES. #B140/08 - Moved by: Seconded by: GREENING RETAIL PROGRAM Award of Contract. Recommends award of sole source contract to Evans & Company Consultants Inc. to provide consulting support for the Greening Retail project "Documenting Best Practices of Leading Retailers ". Reenga Mathivanan Colleen Jordan THAT Toronto and Region Conservation Authority (TRCA) enter into a sole source contract with Evans & Company Consultants Limited to conduct research and report on the best environmental practices of leading retailers from around the world at a cost not to exceed $88,000 plus applicable taxes; THAT the contract be for a period ending March 31, 2009, and on terms and conditions satisfactory to TRCA staff; 1148 AND FURTHER THAT authorized TRCA officials be directed to take such action as is necessary to implement the contract including signing and execution of documents. CARRIED BACKGROUND At Authority Meeting #3/06, held on April 28, 2006, Resolution #A86/06, in regards to the Greening Retail program, was approved as follows: THAT staff pursue funding and partnership opportunities in order to develop and implement a new program of The Living City that engages the retail sector in the application of sustainable practices and technologies. Since 2006, TRCA staff has worked with Evans & Company Consulting to develop the Greening Retail program. The goal of Greening Retail is to help retailers reduce their environmental impact and at the same time save money and improve the bottom line. Leading retailers from around the world are setting the example of what can be done, and what can be saved from both environmental and financial perspectives when you implement environmental practices. By compiling and synthesizing the practices of these retailers we will be able to provide retailers in Canada with a competitive advantage while improving the environment. For this contract Evans & Company Consulting Limited will: • Contact six to ten leading retailers (from an agreed list of potential retailers) to solicit their participation in the project. • Coordinate the efforts of partner universities and their faculty in the project and assist where necessary in contacting leading retailers, compiling materials and information and preparing case study reports. • Conduct in -depth interviews in- person or by phone with six leading retailers. • Prepare a case study report for each of six leading retailers interviewed. • Liaise with partner universities and their faculty to ensure open communication, consistency in the interviews and reporting of the individual cases. • Participate in project team meetings as required. • Compile up to 15 case study reports into a final report for the project. The final report will include an executive summary, introduction, methods, synthesis and discussion of results, conclusions, recommendations, and an appendix of individual case studies. Formatting and editing are to be undertaken by TRCA. • Prepare PowerPoint presentations jointly with TRCA to convey the results of the research in future workshops and conferences. RATIONALE Wendy Evans, principle at Evans & Company Consultants Limited, has worked with TRCA staff to develop the initial concept for the Greening Retail Program as well as design and complete Phase I of the program. As an adjunct professor at Ryerson University, Ms Evans was able to have the results of Phase I published through Ryerson's Centre for the Study of Commercial Activity. Ms Evan's has 25 years of experience, spanning both the retail and wholesale sectors, working closely with some of North America's best -known retailers. Experience and contacts in retail along with adjunct professor status at Ryerson University are critical attributes for the development and implementation of the Greening Retail Program and in particular, undertaking "Documenting Best Practices of Leading Retailers" research project. 1149 The contract is recommended being awarded on a sole source basis as per Criteria 5 of Section 1.14 of TRCA's Purchasing Policy - The required goods and services are to be supplied by a particular vendor or supplier having special knowledge, skills, expertise or experience that cannot be provided by any other supplier. Ms Evans' unique experience and familiarity with the retail sector and affiliation with Ryerson University are essential to making the necessary retail and academic contacts, designing the research, undertaking interviews and in analysing the results for the Greening Retail Program. TRCA Purchasing Policy requires that sole source contracts between $50,000 and $200,000 require Executive Committee approval. FINANCIAL DETAILS The cost of the contract is not to exceed $88,000 plus applicable taxes. Funds have been provided for the project by a private sponsor and are in the Greening Retail account. Report prepared by: Anne Reesor, extension 5202 Email: areesor @trca.on.ca For Information contact: Bernie McIntyre, extension 5326 Email: bmcintyre @trca.on.ca Date: October 06, 2008 RES.#B141/08 - Moved by: Seconded by: OUT OF COUNTRY TRAVEL Approval for staff to travel outside Canada to attend the Great Lakes Urban Habitat Restoration Symposium in Chicago, Illinois. Suzan Hall David Barrow THAT approval be granted for Cassandra Bach, Environmental Technician, TWAHRS Implementation, and Laura Stephenson, Project Manager, Waterfront Special Projects, TRCA, to attend the Great Lakes Urban Habitat Restoration Symposium in Chicago, Illinois, United States of America from January 22- 23, 2009 at a cost not to exceed $2,500; AND FURTHER THAT a presentation be made to the Executive Committee on February 13, 2009 to provide an overview of the conference. CARRIED BACKGROUND The Toronto and Region Conservation Authority (TRCA) policy on travel requires Executive Committee approval for staff travel outside of the country on TRCA business. TRCA members have requested that a presentation be made to the appropriate committee upon returning. 1150 RATIONALE The Great Lakes Urban Habitat Restoration Symposium is being convened by the Chicago Park District, in cooperation with several agencies involved in Great Lakes restoration. This major symposium will focus on restoration in the urban nearshore with participation expected from scientists, planners, policy makers and other experts. The symposium will consist of plenary sessions and breakout groups designed to discuss methods for urban habitat restoration; exchange ideas about how to make restoration projects more cost effective; and develop methods to communicate the benefits of urban nearshore restoration to the public, decision - makers and the scientific community. This symposium offers an opportunity for staff to learn more about the many urban nearshore restoration projects underway in the Great Lakes basin. Staff expect to gain a better understanding of the science and techniques that are available to restore nearshore habitats in urban areas and to share technical knowledge with other practitioners. Staff will also have the opportunity to showcase the work TRCA is doing to enhance nearshore habitats in our own urban environment in collaboration with other agencies and stakeholders. Furthermore, Cassandra Bach will attend the symposium as a representative of Aquatic Habitat Toronto to illustrate the successes being achieved on the Toronto waterfront through the collaborative efforts of TRCA, City of Toronto, Fisheries and Oceans Canada, Ministry of Natural Resources and Toronto Waterfront Revitalization Corporation (TWRC). FINANCIAL DETAILS Costs to attend this conference, including registration, transportation, meals and accommodations, will not exceed $2,500 and will be fully covered by City of Toronto capital budget and TWRC. Report prepared by: Laura Stephenson, extension 5296 Email: Istephenson @trca.on.ca For Information contact: Laura Stephenson, extension 5296 Email: Istephenson @trca.on.ca Date: October 20, 2008 SECTION IV - ITEMS FOR THE INFORMATION OF THE BOARD RES. #B142/08 - Moved by: Seconded by: OUT OF COUNTRY TRAVEL Great Lakes Area Working Group on Colonial Waterbirds Cicero, New York on October 15 and 16, 2008. Receipt of presentation by Toronto and Region Conservation Authority staff on Parks Canada Point Pelee findings on Double- crested Cormorants. Colleen Jordan Jack Heath 1151 THAT the presentation by Karen McDonald, Project Manager, Toronto and Region Conservation Authority (TRCA), in regard to the Great Lakes Area Working Group on Colonial Waterbirds meeting in Cicero, New York on October 15 and 16, 2008, be received. CARRIED BACKGROUND The Great Lakes Area Working Group on Colonial Waterbirds (GLAWGCW) is composed of representatives from Canadian Wildlife Service, Parks Canada, Ministry of Natural Resources, Ontario Parks, TRCA, United States Fish and Wildlife Service, United States Department of Agriculture - National Wildlife Research Center / Animal and Plant Health Inspection Service, New York State Department of Environmental Conservation, New York State Parks, and various Canadian and American academic institutions. The purpose of the GLAWGCW meeting is to gather agencies involved in waterbird management to share information on their management programs, research projects and monitoring data. The group has been meeting annually since 1981 and TRCA has been participating since approximately 1994. The meetings rotate annually between the American and Canadian side of the Great Lakes. The TRCA policy on travel requires Executive Committee approval for staff travel outside of the country on TRCA business. RATIONALE Staff had not intended on attending the Great Lakes Area Working Group on Colonial Waterbirds (GLAWGCW) meeting, but on October 14, 2008 an updated agenda for the meeting was circulated which included a presentation on the Parks Canada Point Pelee work as it relates to Double- crested Cormorants. Because of this addition to the agenda, it was determined to be important that a TRCA staff member attend the meeting. As a result, TRCA's Chief Administrative Officer approved the out of country travel for Karen McDonald and requested that Ms. McDonald make a presentation to the Executive Committee, in keeping with the procedures for out of country travel. Travel to Cicero, New York, was by car and it included a 1 night hotel stay. Approximately 20 participants attended the 27th annual GLAWGCW meeting held in Cicero, New York on October 15th and 16th, 2008. The management of Double- crested Cormorants was the main topic of discussion on October 15th. Several agencies gave presentations on cormorant impacts and management practices and the effects of management practices on other colonial waterbird species. TRCA presented information on the establishment of the Cormorant Advisory Group that was formed to help guide management of cormorants and other colonial waterbirds at Tommy Thompson Park; as well as research and monitoring activities undertaken in 2008. Additional discussions and presentations were given on monitoring programs, population trends and management efforts of other colonial waterbirds including Common Terns, Black- crowned Night- Herons, Great Egrets, Herring Gulls and Ring - billed Gulls. The emerging risk of Botulism `E' and its effects on colonial waterbird populations was also discussed. Information shared at this meeting will assist with the adaptive management of colonial waterbird populations at Tommy Thompson Park. 1152 FINANCIAL DETAILS Costs to attend this meeting include travel and accommodation (estimated $250). Funds are available in the Tommy Thompson Park Interim Management account, 210 -19. Report prepared by: Karen McDonald, extension 5248 Emails: kmcdonald @trca.on.ca For Information contact: Karen McDonald, extension 5348 Emails: kmcdonald @trca.on.ca Date: October 20, 2008 TERMINATION ON MOTION, the meeting terminated at 12:00 p.m., on Friday, November 7, 2008. Gerri Lynn O'Connor Brian Denney Chair Secretary- Treasurer /ks 1153 THE TORONTO AND REGION CONSERVATION AUTHORITY MEETING OF THE EXECUTIVE COMMITTEE #10/08 December 12, 2008 The Executive Committee Meeting #10/08, was held in the South Theatre, Black Creek Pioneer Village, on Friday, December 12, 2008. The Chair Gerri Lynn O'Connor, called the meeting to order at 9:40 a.m.. PRESENT Maria Augimeri Vice Chair Rob Ford Member Suzan Hall Member Jack Heath Member Colleen Jordan Member Reenga Mathivanan Member Gerri Lynn O'Connor Chair Anthony Perruzza Member Maja Prentice Member Richard Whitehead Member ABSENT David Barrow Member Ron Moeser Member RES. #B143/08 - MINUTES Moved by: Seconded by: Jack Heath Rob Ford THAT the Minutes of Meeting #9/08, held on November 7, 2008, be approved. CARRIED PRESENTATIONS (a) A presentation by David Soknacki, Chair of the Board of Directors, Parc Downsview Park Inc., in regard to item 7.1 - Parc Downsview Park Secondary Plan Review and Watershed Management Initiatives. 1154 RES.#B144/08 - PRESENTATIONS Moved by: Seconded by: Maria Augimeri Suzan Hall THAT above -noted presentation (a) be heard and received. SECTION I - ITEMS FOR AUTHORITY ACTION RES. #B145 /08 - Moved by: Seconded by: CARRIED PARC DOWNSVIEW PARK SECONDARY PLAN REVIEW AND WATERSHED MANAGEMENT INITIATIVES The Authority has requested an update of the on -going construction and management of a stormwater management pond on the Parc Downsview Park lands. This report also addresses on -going Downsview Secondary Plan Review to include the Parc Downsview Park lands and surrounding area. Maria Augimeri Suzan Hall THE EXECUTIVE COMMITTEE RECOMMENDS THAT Parc Downsview Park (PDP) be commended for its initiatives to improve the water quality and quantity controls in the Black Creek subwatershed; THAT PDP be requested to contribute toward funding to Toronto and Region Conservation Authority's (TRCA) West Nile virus monitoring program for the purposes of monitoring the proposed stormwater management ponds and proposed lake; AND FURTHER THAT PDP and the City of Toronto be requested to include the following objective in the Downsview Secondary Plan Update: "Protect, restore, enhance and expand the form, features and functions of the natural heritage system as well as advance environmental stewardship and sustainable site and building design in the Secondary Plan study area. ". CARRIED BACKGROUND At Authority Meeting #8/08, held on October 24, 2008, Resolution #A252/08 was approved as follows: THAT Toronto and Region Conservation Authority staff contact the staff of Parc Downsview Park (PDP) with a view to investigating the on -going construction and management of a pond on the Keele Street side of PDP, specifically the viability of the pond with respect to, but not limited to: • health - related concerns (ie. West Nile virus); • monitoring of algae and bacteria; • effect of rain water; • water management; 1155 • potential of degradation over time; AND FURTHER THAT staff report back at Executive Committee Meeting #9/08, scheduled to be held on November 7, 2008. This report responds to this request and will be accompanied by a presentation by the Chair of Parc Downsview Park Inc. Also included is an update on the Downsview Secondary Plan Review process. Water Management Initiatives In November 2007, PDP staff approached TRCA Planning and Development, and Ecology staff to provide technical review of the stormwater management system proposed to service a portion of the PDP and Bombardier lands located east of Keele Street and south of Sheppard Avenue West in the City of Toronto. PDP is proposing three pond -type facilities as part of the overall stormwater management strategy for the area. This strategy was reviewed by TRCA staff in October 2008 and meets TRCA water management objectives. The North Pond. and South pond will receive runoff from the areas in the northeast and southern portions of the site that are planned to be redeveloped. The exact use and design of these redeveloped areas will be determined through the Secondary Plan Review (see below). These two ponds will function to provide settling of suspended sediment and pollutants. The North Pond and South Pond will also function in concert with the lake proposed on the west side of the park to detain runoff from the park lands and release it slowly to prevent any increase in flooding and erosion that could be caused by runoff from newly developed areas. All three facilities are proposed to continuously contain water; in the case of the North and South ponds this is necessary to achieve the water quality treatment function, whereas the lake requires a permanent water level to sustain its function as a landscape feature. While the PDP report outlining the strategy does not speak specifically to the issue of West Nile virus (WNV), large artificial bodies ,of water such as the proposed stormwater retention ponds are not typically considered to be significant breeding sites for mosquito species that transmit the virus, as noted on the City of Toronto Public Health web page. As part of its Regional Watershed Monitoring Program, TRCA operates an annual monitoring program for West Nile virus vector mosquitos that includes some stormwater management (SWM) ponds and natural wetlands. Results obtained over the past four years have indicated that although stormwater retention ponds may contain higher numbers of WNV vector species than natural wetlands, in most cases the density of larvae are usually low enough to preclude any risk to the public. Similar findings were obtained in 2008 during a particularly "wet" summer season. TRCA is currently looking for funding and partnerships in order to monitor additional SWM ponds, including an assessment of their design characteristics, habitat features and maintenance regime in order to determine any linkages between these variables and the presence and number WNV vector mosquitos. The proposed PDP ponds could be monitored as part of this program if requested. 1156 With respect to "monitoring of algae and bacteria, effect of rain water, water management and potential degradation over time," TRCA staff has reviewed the stormwater management strategy for PDP and have verified that TRCA objectives are met with respect to water quality, erosion and flood control. In addition, the measures proposed to manage stormwater, including the proposed ponds, are consistent with provincial guidelines and are typical of development in the Greater Toronto Area and elsewhere in Ontario. TRCA staff has made PDP staff aware of the City of Toronto Wet Weather Flow Management Guidelines and the opportunities for the application of innovative lot and conveyance stormwater management measures during the planning and design of the development parcels. This is typically addressed through the Secondary Plan Review. Secondary Plan Review The City of Toronto is undertaking a review of the Downsview Area Secondary Plan which was initially approved in 1999. The boundary of the Secondary Plan is approximately 530 hectares in area and major landowners include PDP, Bombardier Aerospace, Department of National Defense and the City of Toronto. The review presents an opportunity to reassess the Secondary Plan in the context of the City's planning goals and objectives and to ensure the planning policies for this area are current and appropriate to guide future development. In particular, the review will consider the Spadina Subway Extension which will include a new subway station near Sheppard Avenue and the CN rail line which will connect with the GO Transit rail service between Barrie and downtown Toronto. As well, PDP, a major landowner within the Secondary Plan area, has evolved the development vision for their lands and would like this vision to be considered through the review. The vision includes a Comprehensive Park Plan, December 2007 and Sustainable Community Development Guidelines, December 2007. A consulting team has been retained by the City to assist with the review. Public and agency consultation includes the formation of a community liaison committee to include a small group of residents, businesses and local agencies as well as a Technical Review Committee. TRCA staff is included on the Technical Review Committee and has to date taken part in various site visits and provided natural heritage system data to the City. Staff has raised the importance of protecting, restoring, enhancing and expanding the natural heritage system in the study area, including the provision of water quality and quantity, and terrestrial and aquatic enhancements to the Black Creek watershed, as well as the protection and enhancement of existing woodlots. The Secondary Plan Review is expected to be presented in draft in mid 2009. Report prepared by: Steven Heuchert, extension 5311 Emails: sheuchert @trca.on.ca For Information contact: Steven Heuchert, extension 5311 Emails: sheuchert @trca.on.ca Date: November 28, 2008 RES. #B146/08 - STORMWATER MANAGEMENT PONDS Environmental Protection During Clean Out. To clarify the Toronto and Region Conservation Authority role in the clean out of stormwater management ponds to ensure the environment is protected. 1157 Moved by: Seconded by: Jack Heath Rob Ford THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation Authority (TRCA) staff continue to review the environmental protection measures applied for the management of environmental impacts that may arise during clean out of stormwater management ponds in regulated areas or that discharge to regulated areas. CARRIED BACKGROUND At Executive Committee Meeting #8/08, held on October 3, 2008, a permit provided to a municipality for clean out of a stormwater management (SWM) pond was discussed, and specifically whether TRCA monitors the environment during the clean out process and how TRCA ensures water discharged from a SWM pond during removal of accumulated sediments would not degrade water quality in receiving streams. Staff was asked to report back to the Executive Committee on environmental protection during the clean out of SWM ponds. SWM ponds are designed to settle sediment to protect downstream water quality and typically operate for a number of years (10 years minimum) before requiring the pond to be cleaned to remove the accumulated sediment. In order to clean out a pond, the water levels would be drawn down, and inflows to the pond would temporarily bypass the facility. The pond is then cleaned by means of excavating equipment to restore its storage capacity and operating characteristics. The removal of large volumes of sediment as well as discharge of sediment -laden water during clean out operations poses a risk of to natural systems, unless such activities are undertaken in a manner that minimizes the risk and potential impact to the natural environment. Under the Ontario Water Resources Act, the clean out of sediment control ponds is the responsibility of the owner of the facility (typically the municipality in which the facility is located), and each clean out operation should be undertaken as a Class Environmental Assessment Schedule A which covers on -going maintenance activities and characterization of sediment quality. The municipality would be required to prepare all plans, ensure all approvals are obtained, manage or undertake the clean out operations, and ensure the environmental systems are not adversely affected as a result of these operations. Where the SWM pond is in a regulated area, or clean out operations are proposed that will discharge water into an area regulated under Ontario Regulation 166/06 - Development, Interference with Wetlands and Alterations to Shorelines and Watercourses, TRCA requires an application for a permit. In advance of approving a permit, TRCA reviews and comments on the proposed operations and environmental controls in order to ensure water quality is protected and the natural environment is not adversely affected. Specifically, staff would review and provide comments on sediment and erosion control plans, dewatering activities, flow management and restoration of the natural environment after completion of works. 1158 RATIONALE TRCA is involved in pond clean out applications for facilities which are located within regulated areas or which discharge to regulated areas. TRCA permits the SWM Pond clean out operations in regulated areas in accordance with our regulations, policies and guidelines in order to ensure our environmental protection and enhancement objectives are achieved, in much the same manner as any other type of activity in our regulated areas. This requires the proponent to prepare environmental management plans that provide details on the methodology for cleaning the pond, the various types of measures to be used to isolate the work area, and details of how discharges from the pond will be filtered or otherwise treated prior to discharge into a valley or stream corridor. Proposed measures are evaluated by TRCA staff for their efficacy in treating the discharge in order to achieve Ministry of the Environment water quality objectives, at a minimum. TRCA enforcement staff will inspect the progress of the clean out works at various times during the duration of the works, and where an adverse environmental impact is noted, staff will work with the municipality to provide recommendations for alternative measures to mitigate these impacts. These clean out works are of relatively short duration and with the current procedures for review and revisions of SWM pond clean out plans, as well as field inspections during clean out operations, staff is satisfied that these measures are adequate to ensure environmental impacts are minimized. Report prepared by: Michael Heralall, extension 5703 Email: mheralall @trca.on.ca For Information contact: Michael Heralall, extension 5703 Email: mheralall @trca.on.ca Date: December 01, 2008 RES. #B147/08 - Moved by: Seconded by: ONTARIO MUNICIPAL BOARD HEARING R & D Investments Incorporated and City of Toronto. Authorization for Toronto and Region Conservation Authority staff to obtain Party Status before the Ontario Municipal Board on referrals related to a draft plan of subdivision and zoning by -law amendment applications under the Planning Act, to permit a residential development at 0 Sheppard Avenue East (lands adjacent to 33 Boydwood Lane). Maja Prentice Jack Heath THE EXECUTIVE COMMITTEE RECOMMENDS THAT authorization be given for Toronto and Region Conservation Authority (TRCA) staff to obtain Party Status before the Ontario Municipal Board regarding proposed plan of subdivision and zoning by -law amendment applications and any other associated applications under the Planning Act, to permit a residential development at 0 Sheppard Avenue East (lands adjacent to 33 Boydwood Lane), that is not in conformity with policies of the Rouge Park Management Plan (1994); 1159 THAT staff continue to work cooperatively with the City of Toronto and the appellants to ensure that the requirements of the Rouge Park Management Plan are met; THAT staff be authorized to retain legal counsel to pursue this appeal before the OMB; AND FURTHER THAT the OMB and all parties and participants to the hearing be so advised. CARRIED BACKGROUND The subject lands are located in the vicinity of Boydwood Lane /Sheppard Avenue East and include a portion of valley floor, valley slope and watercourse (Rouge River) (Attachment 1). The applicant has indicated that the existing property was historically used as one single family residence. The original dwelling was demolished several years ago. The eastern portion of the property is regulated under Ontario Regulation 166/06 and is located within the boundaries of Rouge Park as defined in the Rouge Park Management Plan. The applicant is proposing to subdivide the existing one lot (tableland portion) into six single family residential lots to be serviced by a new public roadway (cul -de -sac). The Planning Act application is to amend the zoning by -law of the former City of Scarborough to permit six new lots and a public road where currently the zoning permits only one single family dwelling. The application has been appealed to the OMB by the proponents of the application for the City of Toronto's failure to render a decision on the application within the review period allotted by the Planning Act. TRCA staff has submitted comments on the application to Toronto's City Planning Division and to the applicant. Staff comments explain that staff do not support the application on the basis that the redevelopment does not provide a 30 metre buffer from the stable top of bank which is the standard buffer promoted by the Rouge Park Management Plan (1994). The applicant proposes a 10 metre buffer from the staked top of bank to the edge of the proposed lots. In addition, TRCA staff has raised concern over the long term stability of the slope in the vicinity of the proposed lots and have requested a new geotechnical study be prepared by the applicant. TRCA staff has consulted with Rouge Park staff as well as staff from the Ministry of Municipal Affairs and Housing (MMAH) regarding the intent of the Greenbelt Plan and the Rouge Park policies contained within it. TRCA staff met with the applicant to discuss TRCA comments on the application. RATIONALE A three day hearing has been set by the OMB for February 11, 2009. City of Toronto legal staff is preparing a report to Council recommending that City staff be directed to retain the necessary expert witnesses to oppose the proposed subdivision and zoning amendment at the OMB. 1160 DETAILS OF WORK TO BE DONE Staff is requesting the authorization of the Authority to represent TRCA interests and provide expert advice to the City of Toronto in order to defend the policies of the Rouge Park Management Plan at a future OMB hearing. Staff will continue to work with the parties and participants to the hearing to resolve the issues, and will represent TRCA interests in advance of the hearing. We anticipate that our legal costs will be streamlined in this case. Report prepared by: Mark Rapus, extension 5259 Email: mrapus @trca.on.ca For Information contact: Carolyn Woodland, extension 5214 Email: cwoodland @trca.on.ca Date: November 28, 2008 Attachment: 1 1161 Attachment 1 Rouge Park Regulation Limit 1162 RES. #8148/08 - Moved by: Seconded by: GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Rouge River Watershed Heather Ann Beare and Margaret Christina Beare, CFN 40462. Purchase of property, fronting on the east side of Beare Road north of Finch Avenue East, City of Toronto in the Rouge River watershed. Jack Heath Suzan Hall THE EXECUTIVE COMMITTEE RECOMMENDS THAT 1.62 hectares (4.00 acres), more or less, consisting of a rectangular shaped parcel of vacant land, said land being Part of Lot 2, Concession 4 (formerly City of Scarborough), City of Toronto, be purchased from Heather Ann Beare and Margaret Christina Beare; THAT the purchase price be $493,000; THAT acquisition by Toronto and Region Conservation Authority (TRCA) is conditional on all necessary funding being available from the City of Toronto and terms and conditions satisfactory to TRCA staff and solicitors; THAT TRCA receive conveyance of the land required free from encumbrance subject to existing service easements; THAT Gardiner, Roberts, Barristers and Solicitors, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs and disbursements are to be paid; THAT the appropriate TRCA officials be authorized and directed to execute all necessary documentation required; AND FURTHER THAT the Rouge Park Alliance be so advised. CARRIED BACKGROUND Resolution #A260/05 at Authority Meeting #9/05, held on November 25, 2005, approved the Greenlands Acquisition Project for 2006 -2010. The subject property is 1.62 hectares (4.00 acres) in total size and is located immediately north of Finch Avenue East in the City of Toronto and is composed of two lots. The north lot is owned by Heather Ann Beare and the south lot is owned by Margaret Christina Beare. Both lots are vacant land without any improvements. The subject property is in the Rouge River watershed and Rouge Park. Negotiations have been conducted with the owners through their realtor, who represents both parties. The agreement is conditional on the availability of funding. The offer at hand is supported by an appraised value based on independent valuations. Attached is a plan showing the location of the subject lands. 1163 RATIONALE The subject property falls within TRCA's approved master plan for acquisition for the Rouge River watershed as outlined in the approved Greenlands Acquisition Project for 2006 -2010. It also meets the Rouge Park objective to consolidate private lands within the park into public ownership when opportunities arise. Overall the subject property provides a link to neighboring TRCA -owned lands which are to the south, east and west portion of the subject property. The subject property is primarily meadow with a small wetland pocket being subject to existing TRCA regulation. This purchase would prevent two potential private applications on these lots and it would simultaneously provide a unique opportunity to expand the Rouge Park. TAXES AND MAINTENANCE This property will be turned over to the City of Toronto under the terms of the existing management agreement. FINANCIAL DETAILS The subject property was identified on the list of properties approved by the City of Toronto to be funded from the City's Land Acquisition for Source Water Protection Reserve. The city will fund up to 100% of the costs of the acquisition for properties on the list located within its boundaries. Expenditures related to this acquisition will be charged to account 004 -11 -502. Report prepared by: Dan O'Donohue, extension 5767 Email: do'donohue @trca.on.ca For Information contact: Dan O'Donohue, extension 5767, Ron Dewell, extension 5245 Emails: do'donohue @trca.on.ca, rdewell @trca.on.ca Date: November 19, 2008 Attachments:1 1164 Attachment 1 .11EENLANDA ACQUISITION PRO..; CT FOR 2,106 2010 ocd P am .1 iu Conservation fit),*(1, • her Ann Beare and r gorAI ,..11A0,11na Beau' N -10462 • .00 J0.0 .1110 " tie 't3 • ==-4 / /r/ / -RCA . / IMO SUEJL F1R1.)F1Lli / / 1165 RES. #B149L08 - Moved by: Seconded by: GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Humber River Watershed 2041320 Ontario Inc., CFN 41671. Purchase of property located south of Major Mackenzie Drive and east of Pine Valley Drive, City of Vaughan, Regional Municipality of York, under the "Greenlands Acquisition Project for 2006 - 2010 ", Flood Plain and Conservation Component, Humber River watershed. Colleen Jordan Reenga Mathivanan THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.85 hectares (2.10 acres), more or less, of vacant land being Part of Lot 19, Concession 6 and designated as Part 3 on Plan 65R- 29670, City of Vaughan, Regional Municipality of York, located south of Major Mackenzie Drive and east of Pine Valley Drive, be purchased from 2041320 Ontario Inc.; THAT the purchase price be $2.00; THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land free from encumbrance, subject to existing service easements; THAT the firm of Gardiner Roberts LLP, Barristers & Solicitors, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to execute all necessary documentation required. CARRIED BACKGROUND Resolution #A260/05 at Authority Meeting #9/05, held on November 25, 2005, approved the Greenlands Acquisition Project for 2006 -2010. Negotiations have been conducted with the owner's consultant, Ms. Rosemarie Humphries of Humphries Planning Group Inc.. Attached is a plan showing the location of the subject lands. Access to the subject lands will be available directly from Pine Valley Drive. RATIONALE The subject property falls within TRCA's approved master plan for acquisition for the Humber River watershed as outlined in the approved Greenlands Acquisition Project for 2006 -2010. Through the review of subdivision 19T -97V15 for proposed single lot residential development of • this site, TRCA staff established the limits of the open space lands (i.e. Part 3 on Plan 65R- 29670) which are comprised of the valley corridor of a tributary of the East Humber River at this location. 1166 TAXES AND MAINTENANCE Based on our preliminary review of the environmental criteria for lands that are eligible to receive a property tax exemption under the provincial Conservation Land Tax Incentive Program, it would appear that all of the subject property would be eligible for exemption for the 2009 taxation year. The addition of the subject parcel of and will not significantly impact TRCA's maintenance costs at this location. FINANCIAL DETAILS Funds for the costs related to this purchase are available in the TRCA land acquisition capital account. Report prepared by: George Leja, extension 5342 Emails: gleja @trca.on.ca For Information contact: George Leja, extension 5342, Ron Dewell, extension 5245 Emails: gleja @trca.on.ca, rdewell @trca.on.ca Date: November 20, 2008 Attachments: 1 1167 Attachment 1 Ist■-1-7 / GHEENLANDS ACOUISITION PROJECT FOR 2006-2010 Flood Plain and Conservation Component, Humber River Watersh 2041320 Ontarin Inc CFN 41871 for The Ca, / / :TWA LANIDC / SL JCC Pie.. 04 42 \ / -/// 14‘ 1168 RES. #6150/08 - Moved by: Seconded by: GREENLANDS ACQUISITION PROJECT FOR 2006 -2010 Flood Plain and Conservation Component, Humber River Watershed Kleinburg Residential Estates Ltd., CFN 41672. Purchase of property located north of Nashville Road, east of Huntington Road, City of Vaughan, Regional Municipality of York, under the "Greenlands Acquisition Project for 2006 - 2010 ", Flood Plain and Conservation Component, Humber River watershed. Colleen Jordan Reenga Mathivanan THE EXECUTIVE COMMITTEE RECOMMENDS THAT 6.85 hectares (16.93 acres), more or less, of vacant land being Part of Lots 26 and 27, Concession 9 and designated as Blocks 23 and 25 on a Draft Plan of Subdivision prepared by Ted Van Lankveld, Ontario Land Surveyors, under their Job No. 05 -1692, dated December 3, 2007, City of Vaughan, Regional Municipality of York, located north of Nashville Road, east of Huntington Road, be purchased from Kleinburg Residential Estates Ltd.; THAT the purchase price be $2.00; THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land free from encumbrance, subject to existing service easements; THAT the firm of Gardiner Roberts LLP, Barristers & Solicitors, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid; AND FURTHER THAT the appropriate TRCA officials be authorized and directed to execute all necessary documentation required. CARRIED BACKGROUND Resolution #A260/05 at Authority Meeting #9/05, held on November 25, 2005, approved the Greenlands Acquisition Project for 2006 -2010. Negotiations have been conducted with the owner's consultant, Ms. Rosemarie Humphries of Humphries Planning Group Inc.. Attached is a plan showing the location of the subject lands. RATIONALE The subject property falls within TRCA's approved master plan for acquisition for the Humber River watershed as outlined in the approved Greenlands Acquisition Project for 2006 -2010. Through the review of subdivision 19T -95098 for proposed estate residential development of this site, TRCA staff established the limits of the open space lands (i.e. Blocks 23 and 25 on Draft Plan of Subdivision) which are comprised of the valley corridor and tableland buffer of the Humber River at this location. 1169 TAXES AND MAINTENANCE Based on our preliminary review of the environmental criteria for lands that are eligible to receive a property tax exemption under the provincial Conservation Land Tax Incentive Program, it would appear that all of the subject property would be eligible for exemption for the 2009 taxation year. The addition of the subject parcel of land will not significantly impact TRCA's maintenance costs at this location. FINANCIAL DETAILS Funds for the costs related to this purchase are available in the TRCA land acquisition capital account. Report prepared by: George Leja, extension 5342 Emails: gleja @trca.on.ca For Information contact: George Leja, extension 5342, Ron Dewell, extension 5245 Emails: gleja @trca.on.ca, rdewell @trca.on.ca Date: November 20, 2008 Attachments: 1 1170 Attachment 1 • I — / ---....er..' * t .4.--...-i-- re-- - 0.):,;.,..treiPty::',461.' .,// ,;.=-- / ,..= , ,ri sIt3 rlt---• • ., ..-f---l-'7 1, (' •j ti _......11,4•0 c;'• ''' --- = .: , r'.' .---/::,;. Wei c ■(- r o•poovw-- 001414 • -,/k< ,/,„/ / / 'Conservation P.• GREENLANDS ACQUISITION PROJECT FOR 2OO-2O1fl / flood Plain and Conservation Component, Humber RIvor rAnt,,rOrtrd 7 A • Klelnburg Residential Estates Ltd. CFN 41672 1171 RES.#B151/08 - Moved by: Seconded by: TORONTO DON VALLEY BRICK WORKS Lease Amendment Agreement. Recommends approval of amendments to the lease of the Toronto Don Valley Brick Works to Evergreen. Colleen Jordan Reenga Mathivanan THE EXECUTIVE COMMITTEE RECOMMENDS THAT a lease amending agreement, and other . agreements, with Evergreen, the City of Toronto, the Weston Foundation and the Ontario Heritage Trust as may be reasonably required, be approved subject to the following: 1. extend the dates in the Brick Works lease with Evergreen and the City by which the conditions and work at the Leased Premises is to be completed and satisfied, but in no event are such dates to go beyond December 31, 2010; 2. amend the aforesaid lease to include in the Leased Premises certain subsurface areas, or to grant subsurface easements and rights, from time to time as required for the construction of the improvements as contemplated by the aforesaid lease on the Leased Premises; 3. amend the aforesaid lease to reduce the maximum price of construction contracts between Evergreen and its contractors from $42,000,000 to $30,750,000, plus applicable taxes; 4. amend the requirement for Evergreen to produce evidence of its receipt of $42,000,000 or that $42,000,000.00, inclusive of contingencies, has been allocated by Evergreen to the completion of the improvements on the Leased Premises by changing $42,000,000.00 to $30,750,000 plus contingencies of $6,200,000; 5. amend other agreements involving the Leased Premises as may be required, including those with the Ontario Heritage Trust, to be consistent with and in compliance with the amendments in items noted above; 6. amend any prior authorizations of Toronto and ,Region Conservation Authority (TRCA) to permit staff to negotiate or settle terms of financing arrangements, including leasehold mortgages and guarantees as provided in the aforesaid lease to reflect the provisions of this resolution; 7. make such other amendments to the lease agreement as may be reasonably necessary in connection to the lease, satisfactory to staff and its solicitor; THAT the lease amendment with regard to the Leased Premises be subject to approval of the City of Toronto; THAT the lease amendment be subject to obtaining approval of the Minister of Natural Resources in accordance with Section 21(2) of the Conservation Authorities Act and section 42 of the Expropriations Act; AND FURTHER THAT authorized TRCA officials be directed to take such action as is necessary to implement the lease amendment agreement and other agreements including the signing and execution of documents. CARRIED BACKGROUND On July 28, 2006, the Authority approved resolution A171/06 as follows: 1172 THAT the Toronto and Region Conservation Authority (TRCA) enter into a lease with Evergreen for the "leased premises ", being the portion of the Don Valley Brick Works which includes the industrial buildings and parking areas at the southern end of the site at 550 Bayview Avenue, subject to the following: 1) the lease be on terms and conditions satisfactory to TRCA staff and solicitors; 2) the lease be subject to approval by the City of Toronto; THAT, if formally requested by Evergreen, and subject to negotiation of a satisfactory agreement with the City of Toronto, TRCA consider a joint and several loan guarantee for Evergreen not to exceed $3 million to a financial institution acceptable to TRCA and the City of Toronto and subject to terms and conditions satisfactory to TRCA and solicitors; THAT the Evergreen Master Plan for the restoration and adaptive re -use of the heritage and cultural resources of the Toronto Don Valley Brick Works dated June, 2006, be approved; THAT said lease be subject to obtaining approval of the Minister of Natural Resources in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O. 1990, C.27, as amended, and Section 42 of the Expropriations Act, R.S.O.1990, E.26; AND FURTHER THAT appropriate TRCA officials be authorized and directed to take all necessary action to implement the lease including the signing and execution of documents. Also, the Executive Committee at its meeting on November 14, 2008, approved the Evergreen application for permits. RATIONALE Staff has been working with representatives of Evergreen and the City of Toronto to implement the lease agreement. City of Toronto Council has approved recommendations from City staff to implement the amendments to the lease agreement concurrent with the proposed amendments listed in the recommendation. The effect of the changes is to create a two -phase construction schedule. The lease requires Evergreen to secure substantial federal and provincial funding which they have done. To continue the private sector fundraising, it is important that Evergreen demonstrate that the project is progressing. By separating the site mobilization and building stabilization from what was previously deemed to be an "official Construction Start", Evergreen has additional time to finalize the project financing and establish construction contracts. All of the preconditions in the lease must still be fulfilled. 1173 The value of the construction work has been reduced as Evergreen has acquired more accurate pricing information since the lease was executed about 10 months ago. Evergreen has completed three cycles of costing, using two different approaches to estimating (trade pricing and quantity surveying). The project is now estimated to cost $37,800,000 including contingencies. The lease contained a clause that required Evergreen to provide evidence to TRCA /City that funding in the full project amount of $42,000,000 had been secured. With the cost reduction, the lease will be amended so that Evergreen will be required to provide evidence of funding of $37,800,000. Under the terms of the existing lease, the area to be leased by Evergreen is "above ground" as requested by Evergreen. Evergreen is now proposing to lease certain below grade portions of the leased area to accommodate footings for various structures. Accordingly, the lease must be amended to accommodate the additional leased area. This will require approval of the Minister of Natural Resources. Staff will make the necessary application and anticipate approval since the above grade leased area remains unchanged. Evergreen will be responsible for any environmental or other risks associated with the below grade leased area. There are no changes to the scope of the project, the requirement for $18.4 million of Interim Financing nor to the TRCA/City joint and several loan guarantee of $7,500,000 previously approved by the Authority. All other terms and conditions of the lease will remain substantially the same being adjusted only as necessary to implement the foregoing. FINANCIAL DETAILS There are no additional financial implications for TRCA as a result of the amendment of the lease. Report prepared by: Jim Dillane, extension 6292 Emails: jdillane @trca.on.ca For Information contact: Jim Dillane, extension 6292 Emails: jdillane @trca.on.ca Date: December 2, 2008 RES.#B152/08 - Moved by: Seconded by: OAK RIDGES CORRIDOR PARK Traffic Control Signal Installation. Reimbursing the Region of York for the cost to install a traffic signal, signs, line markings and controller cabinet on Yonge Street to facilitate a safe pedestrian crossing for users of the Oak Ridges Corridor Park. Colleen Jordan Reenga Mathivanan 1174 THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation Authority (TRCA) reimburse the Regional Municipality of York in the amount of $115,355.53 plus applicable taxes, for the installation of a traffic signal and associated signs, line markings and controller cabinet for users of the Oak Ridges Corridor Park. CARRIED BACKGROUND The Oak Ridges Corridor Park, totalling 1,057 acres (428 ha) is a provincially -owned parcel of land acquired as a result of a land exchange with private landowners in the Town of Richmond Hill. The purpose of the land exchange was to protect the last remaining natural corridor link between the eastern and western parts of the Oak Ridges Moraine in the Town. Maintaining these lands as open space ensures continuity across the moraine in Richmond Hill. At the request of the Province of Ontario, through the Ministry of Municipal Affairs and Housing, TRCA was asked to develop a management plan for the property with the objective that the lands be managed to protect and restore natural ecosystems, and that a five kilometre pedestrian trail be designed and built across the lands (the spine trail). An advisory committee was formed in June 2005 and the Oak Ridges Corridor Park Management Plan was finalized in early 2006. Additionally, the construction of the east -west primary spine trail was completed in 2007, prior to the formal land transfer to the Province. The land transfer is now complete. Currently, discussions are ongoing between the Province and TRCA to have TRCA manage the land. The former private landowners were required to contribute $3.5 million as part of the land exchange. This money is to be used to initiate habitat restoration work and construct the east -west spine trail. Considerable effort was made to locate the spine trail in areas that would not impact the sensitive habitats or detract from the ability of the land to function as a wildlife corridor. TRCA worked with the Regional Municipality of York to identify a safe pedestrian access location across Yonge Street within the boundaries of the subject property. RATIONALE Yonge Street is a regional road and, as such, traffic control signals are governed by York Region. TRCA considers this a noncompetitive procurement, as per Section 1.14.1 and Section 1.14.5 of TRCA's Purchasing Policy whereby the required goods and services have been arranged by York Region who have the special knowledge, skills and experience, and statutory responsibility, for providing the required goods and services. However, the Region of York did invite tenders for the traffic signal and associated signs, line markings and controller. Eight companies expressed an interest in the project. Seven companies submitted a bid. York Region accepted the lowest quote submitted by D.J. Charlton Power and Line Construction. Three invoices have been received from the Region of York as follows: DETAILS OF WORK COST (including taxes) Supply and install traffic control signals $103,896.62 Install traffic signs and line markings $8,640,48 Supply and install traffic controller cabinet $12,046.87 TOTAL $124,583.97 1175 Total project cost is $115,355.53 plus PST. Funds are available from the $3.5 million originally given by the private landowners to initiate habitat restoration work and construct the east -west spine trail. Provincial officials have approved of the use of these funds for the traffic signalization as part of the trail system. The account code is 406 -10. Report prepared by: Gary Wilkins, extension 5211 Emails: gwilkins @trca.on.ca For Information contact: Gary Wilkins, extension 5211 Emails: gwilkins @trca.on.ca Date: December 4, 2008 RES. #8153/08 - Moved by: Seconded by: LONG TERM OFFICE ACCOMMODATION PROJECT Business Plan, Preliminary Site Planning and Design. Recommends direction to staff to begin preliminary site planning and design phase for new office space located in the vicinity of the Black Creek Pioneer Village, finalize business plan and complete other activities. Jack Heath Reenga Mathivanan THE EXECUTIVE COMMITTEE RECOMMENDS THAT staff be directed to: 1. begin the preliminary site planning and design phase for the location of new office space, meeting City of Toronto's Green Development Standard, Leadership in Energy and Environmental Design (LEED) standard or equivalent, to be located in the parking lot vicinity of Black Creek Pioneer Village (BCPV); 2. finalize a detailed business and financial plan to secure funding for the project; 3. work with Toronto and Region Conservation Authority (TRCA) funding partners to determine funding opportunities and requirements; AND FURTHER THAT the working group and staff report to the Executive Committee at regular intervals on the status of the project. CARRIED BACKGROUND At Executive Meeting #8/08, held on November 7, 2008, a presentation was made and discussion took place on the Long Term Office Accommodation Project . This included a presentation from Mr. Robert Lewis of Integra Project Services Limited, outlining the facilities definition program and its conclusions together with a presentation from Mr. Bruce Wills from CB Richard Ellis Limited who outlined the cost estimate and market analysis. At Meeting #1/08, held on October 24, 2008, the Long Term Office Accommodation Working Group was presented with a report dealing with the facility definition program and preliminary building evaluation, and adopted the following resolution: 1176 THAT the report on Toronto and Region Conservation Authority's (TRCA) long term office accommodation requirements dated October 15, 2008, be received. Staff was requested to provide details of the information presented to the working group on October 24, 2008, and to have a further meeting with the working group. The meeting was subsequently scheduled for November 28, 2008. At Authority Meeting #4/08, held on May 23, 2008, Resolution #127/08 was approved, as amended, as follows: THAT a Long Term Office Accommodation Working Group consisting of Toronto and Region Conservation Authority (TRCA) Members representative of the participating municipalities including the Chair, be created to support and guide staff in development and implementation of the Long Term Office Accommodation project; THAT staff include in the 2009 -2013 capital budget projections funding for the project; THAT the Working Group include Chair Gerri Lynn O'Connor, Councillor Ron Moeser, Councillor Maria Augimeri, Deputy Mayor Jack Heath and Councillor John Sprovieri; (Mr. Brian Bertie as since been added) AND FURTHER THAT the working group and staff report back to the Executive Committee no later than December 31, 2008. RATIONALE The Long Term Office Accommodation Working Group has met on two occasions, most recently, November 28, 2008, when the working group agreed that there was a need for the project to be located in the vicinity of the parking lot at BCPV. Further, the working group and staff agreed that a detailed business and financial plan demonstrating needs and opportunities was critical. Also, the plan will set out the phases of the project. Further meetings of the working group have been scheduled. FINANCIAL DETAILS As directed in May of 2008, staff included in TRCA capital budget plans provision to fund long term office accommodation needs. In 2009, $1 million was identified and $2 million in each year to 2018. The capital budget process does not extend beyond 10 years but staff expected that the $2 million per year would have extended out another 10 years. The amount identified in the budget was a very preliminary estimate based on available information which suggested long term office accommodation capital costs of about $35 million. Staff has discussed the long term office accommodation project with some senior financial staff among TRCA's participating municipalities. The current economic uncertainty has made it difficult to assess future sources of funding. Staff has been advised that a meeting with senior financial staff from the City of Toronto and the regions of Peel, York and Durham early in 2009 would be appropriate. The meetings would explore funding sources and methods of raising the necessary capital under the requirements of the Conservation Authorities Act. Also, the prospect of federal and /or provincial funding for capital projects which might act as an economic stimulus would be considered. 1177 Staff continue to explore partnership opportunities and this will have an important impact on funding of the project. Again, economic conditions impact these discussions. The status of 2009 capital funding requested of TRCA's municipal partners is as follows: • City of Toronto staff and budget committee have turned down the request. The City Manager has agreed to meet early in 2009 to consider the project. • Region of Peel staff has recommended the Peel share of the project subject to receipt of a satisfactory business plan and agreement of the other partners. • Region of York staff is considering the project. • Region of Durham has yet to deal with the TRCA budget. The regional share is modest, reflecting that the current value assessment factor for Durham is about 3 %. In the absence of funding approval of the long term office accommodation project by the major participating municipalities, staff is proposing to fund the preliminary design and planning using existing funding in the facilities retrofit account 006 -01. In 2009, the estimate is that about $500,000 would be available to undertake work in relation to the long term office accommodation project. DETAILS OF WORK TO BE DONE • Detailed business and financial plan to be prepared setting out phases for completion of the project. • Begin preliminary site planning and design work; retain appropriate consultants pursuant to TRCA'S Purchasing Policy. • Meetings with municipal funding partners. • Continue discussions with potential building partners. Report prepared by: Jim Dillane, extension 6292; Ron Dewell, extension 2545 Emails: jdillane @trca.on.ca; rdewell @trca.on.ca For Information contact: Jim Dillane, extension 6292; Ron Dewell, extension 2545 Emails: jdillane @trca.on.ca; rdewell @trca.on.ca Date: December 2, 2008 RES.#B154/08 - Moved by: Seconded by: RECOGNITION POLICY Amendment. Amendment to the eligible gifts awarded under the Recognition Policy. Jack Heath Suxan Hall THE EXECUTIVE COMMITTEE RECOMMENDS THAT the Recognition Policy, dated November 19, 2008, as amended and set out in Attachment 1, be approved. 1178 AMENDMENT RES. #8155/08 Moved by: Seconded by: Jack Heath Suzan Hall THAT the main motion be amended to read: THE EXECUTIVE COMMITTEE RECOMMENDS THAT the Recognition Policy, dated November 19, 2008, as amended and set out in Attachment 1, with the exception that the years of service remain as 3, 6 and 10 years in Section B.1., be approved. THE AMENDMENT WAS CARRIED THE MAIN MOTION, AS AMENDED, WAS CARRIED BACKGROUND The Recognition Policy for staff and members of TRCA was approved at Executive Committee Meeting #17/76, held on November 3, 1976. The policy, which has been updated from time to time, sets out awards to be presented to recognize staff, volunteers and Authority members for their dedicated years of services. Also, the policy provides for Honour Roll Awards to be presented annually to those who have made significant contributions to the cause of conservation. Although some changes to the policy have been made since its inception to ensure recognition of appropriate individuals and to amend eligibility criteria for awards, the employee recognition gifts that are awarded have remained unchanged since 1976. As the policy has been in place for more than 30 years, staff has taken the opportunity to review the Recognition Policy in its entirety to ensure appropriate employee recognition gifts are awarded, and to better reflect current TRCA operating practices. Also, staff is seeking to ensure employee recognition practices are meaningful to staff and that any recognition gifts are suitable and appropriate. As a result of the review, changes noted below are recommended by staff. RATIONALE 1. Section A.2. (i) persons serving as members of the Authority its subcommittees or The Conservation Foundation of Greater Toronto (CFGT) at the time of nomination; be amended to read (i) persons serving as members of the Authority or The Conservation Foundation of Greater Toronto (CFGT) at the time of nomination; Many years ago, members were appointed to the subcommittees of TRCA that were not members of the Authority. Under the current structure, the subcommittees include the Executive Committee and advisory board(s), members of which are all members of the Authority. 2. Section A.3. (ii) a tree planted and identified with the recipient's name; be amended to read (ii) a tree planted; 1179 In April 2007, the Employee /Recognition Subcommittee recommended to staff that identifiers on trees be replaced with maps of tree locations prominently displayed at TRCA's Head Office. Because of vandalism and theft of markers and difficulty in maintaining them at the various locations, it is no longer practical to have individual markers. As a result, identifiers were, not produced for the awards presented in 2007 and 2008. Staff is surveying various locations and developing the maps of tree locations. 3. Section A.3. (iv) awards to be recorded in display at TRCA's Head Office and recipient of an award to be issued a lifetime pass. be amended to read: (iv) awards to be displayed at TRCA's Head Office and individual recipients who are not corporate bodies or groups, to be issued an individual lifetime pass. Section A is for the Honour Roll Awards which are annually awarded to 4 -5 individuals or groups "who have made a significant contribution to the aims and objectives of TRCA. ". The Honour Roll Award consists of: • a framed citation; • a tree planted and identified with the recipient's name; • a lifetime pass. Difficulty arises in determining who the appropriate recipient of the lifetime pass is when a group or corporation receives an Honour Roll Award. As a result, recent practice of TRCA has been to only issue lifetime passes when it is an individual receiving the award. Staff recommend the above change to bring the policy in line with practices. 4. Section B. Remove Section B. in its entirety and change the following Section C to B. Section B of the policy is the Toronto and Region Conservation Award of Excellence which "will be granted to organizations and /or individuals making an outstanding contribution to the direct management of renewable natural resources through design and implementation of projects within the Authority's watershed. ". This award has never been issued and the Honour Roll Awards outlined in Section A are a broader award that is annually awarded. Staff recommends that Section B be removed from the policy and the Honour Roll Awards be maintained as the predominate TRCA award given to outside individuals or groups. 5. Section B (formerly C). The Service Recognition Award Program was created to recognize Authority members, CFGT members, Authority Committee Members, TRCA staff and volunteers, on an annual basis, as follows: be amended to read: The Service Recognition Award Program was created to recognize Authority members, CFGT members, members of TRCA's watershed councils, TRCA staff and volunteers, on an annual basis, as follows: 1180 In practice, this includes members of TRCA's watershed councils such as the Don Council, Humber Watershed Alliance, etc., but "Authority Committee Members" is felt to be vague and left to interpretation as to whether it means watershed councils, or just advisory boards directly report to the Authority, so staff propose "members of TRCA's watershed councils" replace "Authority Committee Members" so there is no confusion. 6. Section B.1. (formerly C.1.) Authority Members: be amended to read: Authority members, CFGT members, members of TRCA's watershed councils, and volunteers (volunteers eligible for awards are those that provide their services to TRCA on a continuing basis and who provide 30 hours or more of service per year): Currently there are two sections, Section C.1. for Authority members and C.2. for CFGT members, Authority Committee Members and volunteers. Staff is recommending consolidation of awards under these two sections into one Section B. to streamline the process. The same awards criteria would apply to Authority members, CFGT members, members of TRCA's watershed councils and volunteers. 7. Section B.1. (formerly C.1.) • (i) with 3 years of service to be recognized with a silver TRCA logo; be amended to read (i) with 4 years of service to be recognized with a silver lapel pin; (ii) with 6 years of service to be recognized with a lifetime pass and gold TRCA logo; be amended to read (ii) with 8 years of service to be recognized with a gold lapel pin; (iii) with 10 years of service to be recognized with a gold award and to be recorded in permanent display at the Authority office. be amended to read (iii) with 12 years of service to be recognized with a lifetime pass. •. Changes to the years of service requirements are to bring the policy in line with the municipal term of office. • Change from "TRCA logo" to "lapel pin" to clarify the intent. The TRCA logo awarded since the inception of the policy is a lapel pin. • Lifetime pass be awarded at 10 years of service rather than six years to be more in line with the staff award of the lifetime pass, which will be recommended for award upon leaving TRCA after 15 years of service. • Gold and silver awards be removed from the policy due to the high cost of gold and the difficulty in getting the awards produced, in favour of items awarded above, and to be recommended in Section B.2 below. • Requirement for awards to be recorded in permanent display at Head Office be removed as this has not been done to date and would be an onerous task to collect the information for the 30 years that these have been awarded. 1181 8. Staff recommend that Section C.3. be broken down into two sections (Section B.2(a) and (b)), to clearly define the awards for regular staff versus supplementary staff. Section B.2(a). (formerly C.3.) TRCA staff: Regular staff is eligible for all the awards listed below. Supplementary staff eligible for awards (i) and (ii) are those that provide their services on a continuing basis and who provide more than 120 hours of service per year. be amended to read TRCA regular staff is eligible for all the awards listed below: (i) staff in all categories of the Authority, with a minimum of 10 years of service to be recognized with a silver award; be amended to read (i) with a minimum of 10 years of service to be recognized with a $100 cash gift and a silver lapel pin; (ii) staff in all categories of the Authority, with a minimum of 15 years of service to be presented with a lifetime pass; be amended to read (ii) with a minimum of 15 years of service to be recognized with a $200 cash gift and a gold lapel pin; (iii) regular staff of the Authority, with a minimum of 25 years of service, or on retirement after 20 years or more of service, to be presented a gold award; be amended to read (iii) with a minimum of 25 years of service, or on retirement after 20 years or more of service, to be recognized with a gift of choice from a catalogue of items provided by TRCA; add as a new clause (iv) on leaving the organization in good standing after 15 years of service to be presented a lifetime pass. (v) regular staff of the Authority on retirement to be presented with a gift at a value equivalent to $25.00 for each year of service. be amended to read (v) on retirement to be presented with a cash gift at a value of $35.00 for each year of service. Section B.2(b). (formerly Section C.3.) TRCA staff: Supplementary staff that provide their services on a continuing basis and who provide more than 120 hours of service per year are eligible for the awards listed below. 1182 (i) staff in all categories of the Authority, with a minimum of 10 years of service to be recognized with a silver award; be amended to read (i) with a minimum of 10 years of service to be recognized with a $100 cash gift and a silver lapel pin; (iv) staff in all categories, except regular staff, with minimum of 25 years of service, or on retirement after 20 years of service, to be presented a gold Authority logo. be amended to read (ii) with minimum of 25 years of service, or on retirement after 20 years of service, to be recognized with a $200 cash gift and a gold lapel pin; add as a new clause (iii) on leaving the organization in good standing after 15 years of service to be presented a lifetime pass. • As previously stated, it is recommended that gold and silver awards be removed from the policy due to the high cost of gold and the difficulty in getting the awards produced, in favour of items awarded above. Cash awards are recommended so that staff can use the gift in a way meaningful to them. • Section B.2(a)(iii) recommends a gift to be selected from a catalogue to allow staff to choose the gift they receive in the hopes of being more meaningful. The catalogue has not been developed yet, but the intention is to include items such as watches, clocks, vases, jewelry, that can include a TRCA identifier. It is recommended that the maximum value of these gifts be set at $500, and modified as appropriate with market fluctuations. • Change the award of the lifetime pass from 15 years of service to upon leaving the organization in good standing after 15 years is recommended since those who received the pass at 15 years felt it had no value until they left the organization as their staff pass provides the same benefits. The revised policy to be effective July 1, 2008, so that the next awards given will be in compliance with the revised policy outlined in Attachment 1. FINANCIAL DETAILS The average cost of the awards presented under the policy for the last five years is approximately $6,500. The proposed changes in the policy will result in a small savings to TRCA while providing a more consistent valued gift to staff. Gold and silver awards are becoming increasingly expensive and difficult to produce, and as a result staff is having difficulty getting a consistent quality product produced. Report prepared by: Kathy Stranks, extension 5264 Emails: kstranks @trca.on.ca For Information contact: Kathy Stranks, extension 5264 Emails: kstranks @trca.on.ca Date: November 19, 2008 Attachments: 1 1183 Attachment 1 RECOGNITION POLICY A. Honour Roll Awards 1. Awards on behalf of Toronto and Region Conservation Authority (TRCA) will be granted to persons and /or corporate bodies who have made a significant contribution to the aims and objectives of TRCA. 2. Nominations will not be accepted for, nor awards granted to: (i) persons serving as members of the Authority or The Conservation Foundation of Greater Toronto (CFGT) at the time of nomination; (ii) staff members of TRCA serving at the time of nomination. 3. Honour Roll Awards shall consist of: (i) a framed citation; (ii) a tree planted; (iii) trees so identified to be planted in areas designated by the Employee /Recognition Subcommittee; (iv) awards to be displayed at TRCA's Head Office and individual recipients, not corporate bodies or groups, of an award to be issued a lifetime pass. B. Service Recognition Awards The Service Recognition Award Program recognizes Authority members, CFGT members, members of TRCA's watershed councils, TRCA staff and volunteers, on an annual basis, as follows: 1 Authority members, CFGT members, members of TRCA's watershed councils and volunteers (volunteers eligible for awards are those that provide their services to TRCA on a continuing basis and who provide 30 hours or more of service per year): (i) with 4 years of service to be recognized with a silver lapel pin; (ii) with 8 years of service to be recognized with a gold lapel pin; (iii) with 12 years of service to be recognized with a lifetime pass. 1184 2. TRCA Staff: (a) Regular staff is eligible for all the awards listed below. (i) with a minimum of 10 years of service to be recognized with a $100 cash gift and a silver lapel pin; (ii) with a minimum of 15 years of service to be recognized with a $200 cash gift and a gold lapel pin; (iii) with a minimum of 25 years of service, or on retirement after 20 years or more of service, to be recognized with a gift of choice from a catalogue of items provided by TRCA; (iv) on leaving the organization in good standing after 15 years of service to be presented a lifetime pass. (v) on retirement to be presented with a cash gift at a value of $35.00 for each year of service. (b) Supplementary staff that provide their services on a continuing basis and who provide more than 120 hours of service per year are eligible for the awards listed below. (i) with a minimum of 10 years of service to be recognized with a $100 cash gift and a silver lapel pin; (ii) with a minimum of 25 years of service, or on retirement after 20 years or more of service, to be recognized with a $200 cash gift and a gold lapel pin; (iii) on leaving the organization in good standing after 15 years of service to be presented a lifetime pass. Presentations Service Recognition Awards to Authority members, CFGT members, members of TRCA's watershed councils, TRCA staff and volunteers are to be presented on a suitable occasion. 1185 RES. #B156/08 - Moved by: Seconded by: YORK - PEEL - DURHAM - TORONTO /CONSERVATION AUTHORITIES MORAINE COALITION MEMORANDUM OF UNDERSTANDING Approval to enter into a Memorandum of Understanding with the York -Peel- Durham - Toronto /Conservation Authorities Moraine Coalition for the collection, maintenance, and distribution of data obtained for the groundwater management study. Colleen Jordan Reenga Mathivanan THE EXECUTIVE COMMITTEE RECOMMENDS TO THE AUTHORITY THAT a Memorandum of Understanding (MOU) with.York -Peel- Durham - Toronto /Conservation Authorities Moraine Coalition for the collection, maintenance and distribution of data obtained for the groundwater management study be approved; THAT the MOU be subject to terms and conditions satisfactory to TRCA staff and, as necessary, solicitor; AND FURTHER THAT authorized officials be directed to take the necessary action to implement the MOU including the signing and execution of documents. CARRIED BACKGROUND The York -Peel- Durham - Toronto (YPDT) Groundwater Management Study, initiated in 1999, is being carried out under the umbrella of the Conservation Authorities Moraine Coalition (CAMC). The project reflects the interests of nine conservation authorities and four municipalities that are working together to better understand groundwater issues across the Greater Toronto Area. The YPDT /CAMC groundwater initiative continues to contribute insightful, practical deliverables to the partner agencies. The key focus areas of the groundwater program continue to be data management, geological understanding, numerical groundwater modeling and policy development. A large part of the program's success has been the delivery of data and tools at a practical level to partner agency staff and their consultants who are charged with understanding the groundwater system for a variety of day -to -day issues. An important theme of the YPDT initiative is that the major technical components assembled for the project including the database, hydrogeological interpretation and numerical groundwater flow model, have been designed as a comprehensive groundwater analysis system. Each of the component parts are to be refined and updated on a continual basis. It is the goal of the partnered agencies that the project be maintained as a long term initiative in order to continually build on the early development work that has now largely been completed. After years of program development, the partners determined that there was a need to clearly define the terms and conditions for data collection, storage and sharing. A Memorandum of Understanding was prepared to address these issues. RATIONALE The Memorandum of Understanding for the Collection, Maintenance, and Distribution of Groundwater Data and Information is available from the website www.ypdt - camc.ca as Report CAMC /YPDT #01 -2008, and includes the following key aspects: • project and MOU objectives; 1186 • data collection, storage and maintenance; • interpretation of data and maintenance of such information; • distribution of data and interpreted information; • liability and insurance; and • term of agreement, amendments and termination. This MOU reflects the outcome of a multi -year process that was initiated through the YPDT -CAMC Technical Steering Committee and culminated with the dedicated work of a legal team from the regional municipalities of Peel, York and Durham. It reflects the commitment of the partner agencies to, as much as possible, share the data and information that has been developed through the YPDT -CAMC Program. FINANCIAL DETAILS The regional municipalities of Peel, York and Durham, and the City of Toronto have provided annual financial support for this project since 1999. Report prepared by: Donald Ford, extension 5369 Emails: dford @trca.on.ca For Information contact: Donald Ford, extension 5369 or Steve Holysh, extension 5588 Emails: dford @trca.on.ca; sholysh @trca.on.ca Date: November 25, 2008 SECTION II - ITEMS FOR EXECUTIVE ACTION RES. #B157/08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Development, Interference with Wetlands and Alterations to Shorelines and Watercourses. Pursuant to Ontario Regulation 166 /06, written permission from the Authority is required for: a) straightening, changing, diverting or interfering in any way with the existing channel of a river, creek, stream or watercourse, or for changing or interfering in any way with a wetland; b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development. A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected. Moved by: Seconded by: Suzan Hall Maja Prentice THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.1 - 8.1.22, inclusive), which are listed below. CARRIED 1187 CITY OF PICKERING 8.1.1 547 RODD AVENUE To construct, reconstruct, erect or place a building or structure on Block A, Plan 233, (547 Rodd Avenue), in the City of Pickering, Waterfront Watershed. The purpose is to demolish existing dwelling straddling 545 and 547 Rodd Ave. and create a new dwelling wholly contained within the property boundary of 547 Rodd Ave. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1, Site Plan, prepared by Sabourin Kimble & Associates, dated Sept. 2008, received by TRCA on Oct. 21, 2008; • Drawing No. 2, Tree Preservation and Removal Plan, prepared by The MBTW Group, dated November, 2008, received by TRCA December 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to permit the demolition of an existing dwelling located partly within 545 Rodd Ave. and 547 Rodd Ave., and allow a replacement structure to be constructed at 547 Rodd Ave., within a TRCA Regulated Area of the Waterfront. The new dwelling has been located to have no impacts on slope stability. This work will not require any alterations or the placement of fill into the nearby valley along the east side of the property or the Lake Ontario shoreline. Control of Flooding: The proposed structure is not located within the Regional Storm Flood Plain. Due to the elevation of the subject lands, the proposed structure is protected from costal natural hazards associated with Lake Ontario. Pollution: Sediment control fencing will prevent construction debris and sediment from entering the valley or the lake. Dynamic Beaches: Not applicable. Erosion: The location of the proposed structure is set back well outside of the erosion allowance in accordance with MNR's Technical Guide for River & Stream Systems. Therefore, the safety of the proposed structure will not be impacted by slope erosion over the lifetime of the building. Conservation of Land: There are no significant natural heritage features impacted by the proposed redevelopment. 1188 Plantings No additional plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D), Development Guidelines for Replacement Structures, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41621 - Application #: 922/08/PICK Report Prepared by: Brian Storozinski, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: December 2, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.2 36 HUMBERCREST BOULEVARD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 24, Plan 2458, (36 Hurnbercrest Boulevard), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a second storey addition over the existing attached garage of the single family detached dwelling. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -1 B, Site Plan, prepared by Raymond Woloszczak, dated November 21, 2008, received on November 21, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a second storey addition over the existing attached garage of the single family detached dwelling. The subject site is located west of Jane Street and south of Annette Street in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment controls will be installed and maintained during construction to prevent debris from entering the adjacent ravine. 1189 Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the proposal. As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41688 - Application #: 963/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: December 2, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.3 34 BANNATYNE DRIVE To construct, reconstruct, erect or place a building or structure and site grade on 34 Bannatyne Drive, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to demolish an existing bungalow and construct a new two- storey dwelling with a walk -out basement. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Statistics Site Plan, Prepared by George Theodorakopoulos Engineering Office, Dated April 2008, Revised June 4, 2008, Received November 17, 2008, Redlined by TRCA staff to include sediment fence. RATIONALE The application was reviewed by staff on the basis of the following information: 1190 Proposal: The proposed works consist of a new home, extending approximately 2.9 meters beyond the existing limit of construction. The property is located south west of Leslie Street and Highway 401, adjacent to the East Don River. Control of Flooding: The proposed works are outside of the Regional Storm flood plain, and will not impact the storage or conveyance of flood flows. Pollution: Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of the proposed works. Plantings No plantings are required, as no significant vegetation will be removed. Policy Guidelines: This proposal is in conformity with Section 4.2.2. D) - Replacement Structures - of the TRCA's Valley and Stream Corridor Management Program. CFN: 41093 - Application #: 552/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: December 2, 2008 8.1.4 162 OLD YONGE STREET To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 11, Concession 1 EYS Plan 66R -23418 PART 2, (162 Old Yonge Street), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a new single family dwelling, associated landscaping and a bioswale. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: 1191 • Drawing No. Al, Site Plan and Context Plan, prepared by Anna Voineskos Architect, dated August 20, 2007, Revision No. 10, revised on October 22, 2008, received November 25, 2008; • Drawing No. A4, Basement and Roof Plans, prepared by Anna Voineskos Architect, dated April 21, 2004, Revision No. 4, revised on October 22, 2008, received November 25, 2008; • Drawing No. A5, First and Second Floor Plans, prepared by Anna Voineskos Architect, dated April 21, 2004, Revision No. 4, revised on October 22, 2008, received November 25, 2008; • Drawing No. A6, East -West Section A -A, prepared by Anna Voineskos Architect, dated April 21, 2008, Revision No. 4, revised on October 22, 2008, received November 25, 2008; • Drawing No. A7, North -South Section B -B, prepared by Anna Voineskos Architect, dated April 21, 2008, Revision No. 4, revised on October 22, 2008, received November 25, 2008; • Drawing No. A8, Elevations, prepared by Anna Voineskos Architect, dated August 20, 2007, Revision No. 7, revised on October 22, 2008, received November 25, 2008; • Drawing No. SS1, Site Servicing and Grading Plan, prepared by Masongsong Associates Engineering Limited, dated November 12, 2007, Revision No. 4, revised October 2008, received November 25, 2008; • Drawing No. L1, Landscape Plan, prepared by NAK Design Group, dated September 26, 2007, Revision No. 1, revised on March 25, 2008, received November 25, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to demolish an existing single family home, site grade and replace with a new single family dwelling, associated landscaping and a bioswale. 162 Yonge Street is a lot created by severance from the former 160 Old Yonge Street. The dwelling at 160 Old Yonge Street currently sits on both 162 and 164 Old Yonge Street. 164 Old Yonge Street is also subject to a TRCA permit application for a new single family dwelling. Control of Flooding: The subject property is not located in a Regional Storm Floodplain. Pollution: Temporary sediment control fencing will be installed during construction. Dynamic Beaches: ' Not applicable. Erosion: The subject property is not located near a watercourse. Stormwater will be partially directed to a bioswale and infiltrated rather than discharging directly to the sewer system. 1192 Conservation of Land: During the severance process a restrictive covenant was placed over a large portion of the valley slope at the rear of the proposed dwelling. A geotechnical report was reviewed by TRCA technical staff and there are no geotechnical concerns with the proposed new dwelling, landscaping or bioswale. Stormwater runoff from the site will be partially directed to a bioswale in the rear yard to avoid surficial erosion. Plantings The slope is subject to a ravine stewardship and planting plan and will be renaturalized with native trees, shrubs and seed mix. Policy Guidelines: The proposal is consistent with Section 4.2.2.G, Infilling, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41169 - Application #: 613/08/TOR Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: December 1, 2008 8.1 :5 164 OLD YONGE STREET To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 11, Concession 1 EYS Plan 66R- 23418, PART 1, (164 Old Yonge Street), in the City of.Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a new single family dwelling, associated landscaping and a bioswale. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 41, Site Plan and Context Plan, prepared by Anna Voineskos Architect, dated August 20, 2007, Revision No. 10, revised on October 22, 2008, received November 25, 2008; • Drawing No. A4, Basement and Roof Plans, prepared by Anna Voineskos Architect, dated April 21, 2004, Revision No. 4, revised on October 22, 2008, received November 25, 2008; • Drawing No. A5, First and Second Floor Plans, prepared by Anna Voineskos Architect, dated April 21, 2004, Revision No. 4, revised on October 22, 2008, received November 25, 2008; • Drawing No. A6, East -West Section A -A, prepared by Anna Voineskos Architect, dated April 21, 2008, Revision No. 4, revised on October 22, 2008, received November 25, 2008; • Drawing No. A7, North -South Section B -B, prepared by Anna Voineskos Architect, dated April 21, 2008, Revision No. 4, revised on October 22, 2008, received November 25, 2008; 1193 • Drawing No. A8, Elevations, prepared by Anna Voineskos Architect, dated August 20, 2007, Revision No. 7, revised on October 22, 2008, received November 25, 2008; • Drawing No. SS1, Site Servicing and Grading Plan, prepared by Masongsong Associates Engineering Limited, dated November 12, 2007, Revision No. 4, revised October 2008, received November 25, 2008; • Drawing No. L1, Landscape Plan, prepared by NAK Design Group, dated September 26, 2007, Revision No. 1, revised on March 25, 2008, received November 25, 2008, redline revised by TRCA to remove a portion of coloured concrete paving and replace with planting. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to demolish an existing single family home, site grade and replace with a new single family dwelling, associated landscaping and a bioswale. 164 Yonge Street is a lot created by severance from the former 160 Old Yonge Street. The dwelling at 160 Old Yonge Street currently sits on both 162 and 164 Old Yonge Street. 162 Old Yonge Street is also subject to a TRCA permit application for a new single family dwelling. Control of Flooding: The subject property is not located in a Regional Storm Floodplain. Pollution: Temporary sediment control fencing will be installed during construction. Dynamic Beaches: Not applicable. Erosion: The subject property is not located near a watercourse. Stormwater will be partially directed to a bioswale and infiltrated rather than discharging directly to the sewer system. Conservation of Land: During the severance process a restrictive covenant was placed over a large portion of the valley slope at the rear of the proposed dwelling. A geotechnical report was reviewed by TRCA technical staff and there are no geotechnical concerns with the proposed new dwelling, landscaping or bioswale. Stormwater runoff from the site will be partially directed to a bioswale in the rear yard to avoid surficial erosion. Plantings The slope is subject to a ravine stewardship and planting plan and will be renaturalized with native trees, shrubs and seed mix. Policy Guidelines: The proposal is consistent with Section 4.2.2.G, Infilling, of the TRCA's Valley and Stream Corridor Management Program. 1194 CFN: 41170 - Application #: 614/08/TOR Report Prepared by: Steve Heuchert, extension 5311 For information contact: Steve Heuchert, extension 5311 Date: December 1, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.6 30 FALLINGBROOK CRESCENT To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Block E, Plan 2836, (30 Fallingbrook Crescent), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to construct a ground - floor, rear -yard addition to an existing dwelling. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Unnumbered Site Plan, prepared by unknown author, undated, received October 2, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant proposes to demolish an existing sunroom and a portion of an existing deck in order to construct a ground -floor addition on the same footprint. The addition will not extend beyond the current limit of development. Control of Flooding: The proposed works are not located within the Regional Storm floodplain, and consequently will not impact the storage or conveyance of flood waters. Pollution: The proposed works are located approximately 5 meters from the existing toe of the slope and no grading works are proposed. Therefore there is minimal risk of sedimentation of any significant environmental features. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical or slope stability concerns associated with this proposal. Conservation of Land: There is no significant vegetation present on the site of the proposed works. 1195 Plantings No vegetation will be removed as part of this proposal, and no plantings have been required as part of this permit. Policy Guidelines: This proposal is consistent with Policy 4.2.2. C) - Minor Additions - of the TRCA's Valley and Stream Corridor Management Program. CFN: 41527 - Application #: 853/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: December 1, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.7 177B LYNDHURST AVENUE To construct, reconstruct, erect or place a building or structure on Lot 39, Plan 1282, (177B Lyndhurst Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a new three - storey single family detached dwelling with at grade garage. The original lot was severed in order to accommodate the construction of a similar dwelling on the adjacent lot. The existing dwelling is to be demolished. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Alexander Boros Planning and Design Associates, dated October 31, 2008, received on November 4, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a new three - storey single family detached dwelling with at -grade garage. The original lot was severed in order to accommodate the construction of a similar dwelling on the adjacent lot. The existing dwelling is to be demolished. The subject property is located east of Bathurst Street and south of St. Clair Avenue West in the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: This site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. 1196 Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley corridor. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the completed works. There are no fisheries concerns as the watercourse was not impacted by the works. There are no other significant natural features on, or adjacent to, the site that were negatively impacted by the project. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41648 - Application #: 937/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: December 2, 2008 8.1.8 65 LOGAN AVENUE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Lot 88,89, Plan 423, (65 Logan Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct partial second and third storey additions and a roof -top terrace to the existing single - family dwelling. Also proposed is a one - storey addition to the front of the dwelling to replace the existing front porch. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. A2, Proposed Site Plan, prepared by Replacement Design, dated September 2008, Received on November 21, 2008; 1197 • Drawing No. A9, East and West Elevations, prepared by Replacement Design, dated September 2008, Received on November 21, 2008; • Drawing No. A10, North Elevation, prepared by Replacement Design, dated September 2008, Received on November 21, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River watershed in order to facilitate the construction of partial second and third storey additions and roof -top terrace to the existing single - family dwelling. Also proposed is a one - storey addition to the front of the existing dwelling to replace the existing front porch. The footprint of the existing dwelling is to remain unchanged. The subject property is located south of Eastern Avenue and west of Carlaw Avenue within the Lower Don Special Policy Area (SPA) in the City of Toronto (Toronto and East York Community Council Area. Control of Flooding: TRCA staff have determined that the proposed works will not adversely impact the storage and /or conveyance of floodwaters. Pollution: Sediment fencing is not required as the proposed works are adequately setback from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The entire property is located within a highly urbanized area surrounded by both commercial and residential developments. There are no slope stability /geotechnical issues evident at this site. No significant natural heritage features will be impacted by the proposed works. Plantings No plantings are required as part of this application. Policy Guidelines: This proposal is consistent with Section 4.2.1.(B) - Development Guidelines for Development /Redevelopment within Designated Two -Zone Areas or Special Policy Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41692 - Application #: 964/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: December 2, 2008 1198 8.1.9 177A LYNDHURST AVENUE To construct, reconstruct, erect �r place a building or structure on Lot 39, Plan 1282, (177A Lyndhurst Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a new three - storey single family detached dwelling with at grade garage. The original lot was severed in order to accommodate the construction of a similar dwelling on the adjacent lot. The existing dwelling is to be demolished. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Alexander Boros Planning and Design Associates, dated October 31, 2008, received on November 4, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a new three - storey single family detached dwelling with at -grade garage. The original lot was severed in order to accommodate the construction of a similar dwelling on the adjacent lot. The existing dwelling is to be demolished. The subject property is located east of Bathurst Street and south of St. Clair Avenue West in the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: This site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley corridor. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the completed works. There are no fisheries concerns as the watercourse was not impacted by the works. There are no other significant natural features on, or adjacent to, the site that were negatively impacted by the project. 1199 Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41632 - Application #: 929/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: December 2, 2008 8.1.10 7 WOODVALE CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 20, Plan M -1741, (7 Woodvale Crescent), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a deck and patio to the rear of the existing single family detached dwelling. The existing deck is to be removed. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing unnumbered, Deck Plan /Landscape Plan, prepared by Blue Willow Garden Centre, dated September 17, 2008, received on September 30, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a replacement deck and patio in the rear yard of the existing single family detached dwelling. The existing rear deck is to be removed. The subject site is located north of O'Connor Drive and west of Woodbine Avenue in the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: This site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley corridor. 1200 Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the completed works. There are no fisheries concerns as the watercourse was not impacted by the works. There are no other significant natural features on, or adjacent to, the site that were negatively impacted by the project. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(E) - Development Guidelines for Property Improvements and Ancillary Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41513 - Application #: 844/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: December 2, 2008 CITY OF VAUGHAN 8.1.11 185 WORTHVIEW DRIVE To construct, reconstruct, erect or place a building or structure on Lot 31, Plan 65M 3927, (185 Worthview Drive), in the City of Vaughan, Humber River Watershed. The purpose is to recognize an existing rear yard deck which was constructed without a TRCA permit within a Regulated Area of the Humber River Watershed at 185 Worthview Drive, in the City of Vaughan. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by the applicant, received by the TRCA November 4, 2008; RATIONALE The application was reviewed by staff on the basis of the following information: 1201 Proposal: The purpose is to recognize an existing rear yard deck within a Regulated Area of the Humber River Watershed. City of Vaughan Building Standards Department staff identified the deck that was constructed had not been approved via the building permit process. As such, the owner was requested to contact TRCA prior to the issuance of a building permit to recognize the structure. Based upon a site visit conducted by TRCA staff on November 12, 2008, the deck is located approximately 5 metres from the rear lot line and approximately 8 metres from the existing top of bank. The slope appears to have an inclination of 3H:1V or milder and has been determined to be stable by TRCA geotechnical staff. Control of Flooding: The works are not located within the Regional Storm Flood Plain. There will be no impacts on the storage or conveyance of flood waters. Pollution: The site has already been sodded and stabilized. No sediment transport will result from this project. Dynamic Beaches: Not applicable Erosion: TRCA geotechnical staff are satisfied that the completed works will not impact the stability of the slope. Conservation of Land: As a watercourse has not been impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that have been or will be negatively impacted by the project. Plantings All disturbed areas have been restored to the previously existing sodded condition and there are no impacts on any.significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41629 - Application #: 925 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: November 28, 2008 8.1.12 41 GAYLA STREET To construct, reconstruct, erect or place a building or structure on Lot 223, Plan 65M -2300, (41 Gayla Street), in the City of Vaughan, Don River Watershed. 1202 The purpose is to allow the maintenance of an existing rear yard shed and a canopy frame at the rear of an existing dwelling. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Unnumbered site plan drawing, undated, prepared by unknown author, received by TRCA staff September 5, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks to maintain a rear yard canopy and rear yard shed, built before 2002, and partially within the flood plain. The flood plain extends from the front of the dwelling towards the rear yard. The works are not within the Regional Storm flood plain. The property is located north east of Dufferin Street and Steeles Avenue West. Fees: The works were built without a municipal building permit, as the applicant was not aware that this was required for ancillary structures. The applicant has paid an elevated permit fee as a result. Control of Flooding: The works are non - habitable and minor in nature and will not impact the conveyance or storage of flood flows. Pollution: No grading or excavation works were conducted for these works. Dynamic Beaches: Not applicable. Erosion: There are no slope stability or erosion concerns with this proposal. Conservation of Land: The canopy and shed have not been constructed in a significant natural heritage feature. Plantings Due to the minor nature of the works, no plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2. E) - Property Improvements and Ancillary Structures - of TRCA's Valley and Stream Corridor Management Program. 1203 CFN: 41428 - Application #: 788 /08/VAUG Report Prepared by: Leah Weller, extension 5250 For information contact: Bill Kiru, extension 5306 Date: December 2, 2008 8.1.13 REGIONAL MUNICIPALITY OF YORK To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere (Rutherford Road Approximately 250 metres East of Napa Valley Avenue), in the City of Vaughan, Humber River Watershed as located on the property owned by Regional Municipality of York. The purpose is to conduct an emergency repair the embankment which was damaged as a result of a Stormwater pond overflow, 250 metres east of Napa Valley on Rutherford Road. The works are classified a "Emergency Works" since Rutherford Road infrastructure is at risk. The repairs include the removal of 10m2 of granular material from the adjacent creek bed and removal of a further 150m2 of material from the adjacent banks. Fish will temporarily be removed from a coffer dammed section of the channel while sediments are removed by manual labour. A fish collection permit has been obtained from the Ministry of Natural Resources. The roadway embankment will then be repaired with new granular fill and covered with rip -rap protection. The works will be conducted in a warm water tributary of the Upper Humber River system. The works will extend for 10 to 15 calendar days. A TRCA "Emergency Works" authorization letter was issued on October 27, 2008 in order for the Regional Municipality of York to proceed with the repair. The permit will be issued for the period of October 27, 2008 to October 26, 2010 in accordance with the following documents and plans which form part of this permit: • Figure 1: Existing Conditions; dated September 23, 2008; received October 20, 2008; prepared on behalf of the Regional Municipality of York; • Figure 2: Environmental Protection and Sediment Removal Locations; dated September 23, 2008; received October 15, 2008; prepared on behalf of the Regional Municipality of York. (Redline revised from temporary sand bags cofferdam to temporary pea gravel cofferdam as per regional standard, by TRCA staff on October 27, 2008 with permission granted by the Regional Municipality of York on October 24, 2008); • Figure 3: Restoration; dated September 23, 2008; received October 24, 2008; prepared on behalf of the Regional Municipality of York; • Figure 4: Silt Fence Detail, Temporary Coffer Dam; received October 20, 2008; prepared on behalf of the Regional Municipality of York; • Embankment Restoration Drawing; Rutherford Road South Embankment Restoration 250m East of Napa Valley Avenue; dated: September 18, 2008; received: October 20, 2008; prepared by the Regional Municipality of York; • Drawing Notes; received October 15, 2008; prepared by the Regional Municipality of York; • Sequence of Construction; received October 15, 2008; prepared by the Regional Municipality of York. 1204 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed works are classified as "Emergency Works" since the Rutherford Road infrastructure is at risk. The works involve the removal of 10m2 of granular material from the adjacent creek bed and the removal of a further 150m2 of material from the adjacent banks. Fish will temporarily be removed from a coffer dammed section of the channel while sediments are removed by manual labour. The roadway embankment will then be repaired with new granular fill and covered with rip -rap protection. The works will be conducted in a warm water tributary of the Upper Humber River system. Control of Flooding: No adverse impacts to the storage or conveyance of flood waters were anticipated as a result of this project. Pollution: Standard sediment and erosion control measures will be implemented and maintained for the duration of construction and until the site is stabilized and restored in order to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There are no slope stability /geotechnical concerns associated with the proposed repair works. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advise will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The proposed works will impact no significant terrestrial resource features. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41278 - Application #: 696 /08NAUG Report Prepared by: Ben Krul, extension 5769 For information contact: Beth Williston, extension 5217 Date: December 2, 2008 1205 8.1.14 42 BRODA DRIVE To construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 6, Plan 4005, (42 Broda Drive), in the City of Vaughan, Humber River Watershed. The purpose is to replace an existing single - family dwelling and attached garage at 42 Broda Drive in the City of Vaughan with a larger single - family dwelling and garage. The development is situated within a Regulated Area of the Humber River Watershed and will also include the replacement of the existing septic system on the property. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Letter, Addition and Renovations to 42 Broda Drive, Vaughan, Ontario, prepared by Daria J. Khachi, P. Eng., dated May 27, 2008, received by the TRCA on July 14, 2008; • Drawing S1, Foundation & Ground Floor Plans, prepared by Daria J. Khachi Structural Engineers, dated December 2007, revised May 27, 2008, received by the TRCA on July 14, 2008; • Drawing S2, Roof Framing & Ceiling Framing Plans, prepared by Daria J. Khachi Structural Engineers, dated December 2007, revised May 27, 2008, received by the TRCA on July 14, 2008; • Drawing S3, Foundation Sections, prepared by Daria J. Khachi Structural Engineers, dated December 2007, revised May 27, 2008, received by the TRCA on July 14, 2008; • Drawing S4, Sections and Details, prepared by Daria J. Khachi Structural Engineers, dated December 2007, revised May 27, 2008, received by the TRCA on July 14, 2008; • Drawing S5, General Notes and Typical Details, prepared by Daria J. Khachi Structural Engineers, dated December 2007, revised May 27, 2008, received by the TRCA on July 14, 2008; • Drawing L-2,,Site Plan, prepared by Juergen Partridge Limited, dated February 2008, revised October 14, 2008, received by the TRCA on November 5, 2008, redline revised to add the internal landing elevation; • Drawing L -3, Sediment Control Plan, prepared by Juergen Partridge Limited, dated February 2008, revised October 14, 2008, received by the TRCA on November 5, 2008, redline revised to add notes regarding the regular inspection and maintenance of sediment control fencing; • Drawing L -4, Septic Layout Plan, prepared by Juergen Partridge Limited, dated February 2008, revised June 10, 2008, received by the TRCA on July 16, 2008; • Drawing L -5, Site Restoration Landscape Plan, prepared by Juergen Partridge Limited, dated February 2008, revised June 10, 2008, received by the TRCA on July 16, 2008; • Drawing A2, Floor Plan, prepared by Napa Design Group, dated January 2006, revised April 25, 2008, received by the TRCA on July 14, 2008; • Drawing A3, Floor Plan, prepared by Napa Design Group, dated January 2006, revised April 25, 2008, received by the TRCA on July 14, 2008; • Drawing A4, Elevations, prepared by Napa Design Group, dated January 2006, revised June 5, 2008, received by the TRCA on July 14, 2008. 1206 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to replace an existing single - family dwelling and attached garage at 42 Broda Drive in the City of Vaughan with a larger single - family dwelling and garage. The new building will not exceed a 50 percent increase in the total area of the existing structure. The development will also include the replacement of the existing septic system on the property. The northern boundary of the property abuts the main Humber River. The new residence, garage and septic system will be constructed in the same approximate location as the previous structures, toward the southern portion of the site and approximately 40 metres (131 feet) from the edge of the river. The entire property is situated within the Regulatory Flood Plain. The new single - family dwelling will be located in the area of lowest flood risk on the property and will be flood proofed to the level of the Regulatory Flood. A professional structural engineer has verified that the new residence will withstand the depths and velocities of a Regulatory Flood Event. Control of Flooding: TRCA staff are satisfied that the proposed works will have minimal impact on the storage and conveyance of flood waters. Pollution: Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from entering the adjacent natural features. Dynamic Beaches: Not applicable. Erosion: There will be no geotechnical /slope stability issues associated with the development. In addition, the implementation of the aforementioned sediment and erosion control measures will minimize sedimentation and erosion on the site. Conservation of Lancf: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored upon completion of the project. Policy Guidelines: The proposal is consistent with Section 4.2.2 D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program. 1207 CFN: 41121 - Application #: 577 /08NAUG Report Prepared by: Coreena Smith, extension 5269 For information contact: Coreena Smith, extension 5269 Date: December 3, 2008 8.1.15 5821 HUMBER BRIDGE TRAIL To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 20, Concession 8, (5821 Humber Bridge Trail), in the City of Vaughan, Humber River Watershed. The purpose is to construct a replacement dwelling and privacy berm within a Regulated Area of the Humber River Watershed at 5821 Humber Bridge Trail in the City of Vaughan. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. A -1.1, prepared by C.Y. Lee Architect Inc., dated November 10, 2008, received by the TRCA November 12, 2008; • • Elevations, Drawing No. A -2.1, prepared by C.Y. Lee Architect Inc., dated November 10, 2008, received by the TRCA November 12, 2008; • Elevations, Drawing No. A -2.2, prepared by C.Y. Lee Architect Inc., dated November 10, 2008, received by the TRCA November 12, 2008; • Ground Floor Plan, Drawing No. A -3.1, prepared by C.Y. Lee Architect Inc., dated November 10, 2008, received by the TRCA November 12, 2008; • Second Floor Plan, Drawing No. A -3.2, prepared by C.Y. Lee Architect Inc., dated November 10, 2008, received by the TRCA November 12, 2008; • Landscape Plan, Drawing L -1, prepared by YWLA Landscape Architect, dated November 26, 2008, received by the TRCA November 28, 2008; • Grading Plan, Drawing No. G01, prepared by SPNR Consultants Limited, revise dated November 26, 2008, received by the TRCA November 28, 2008; • Grading Plan Enlargement, Drawing No. G02, prepared by SPNR Consultants Limited, revise dated November 26, 2008, received by the TRCA November 28, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a replacement dwelling and privacy berm within a Regulated Area of the Humber River Watershed. According to our mapping, the subject property is entirely within the Humber River valley and a large portion of the property, including the existing dwelling to be demolished, is within the Regional Storm Flood Plain. The Regional Storm Flood Elevation of the property is approximately 174.63 metres above sea level (m.a.s.I.). The proposed replacement dwelling has beenlocated outside of the flood plain with all openings at a minimum 176.0 m.a.s.l. In addition, the proposed dwelling falls within the 50% floor area increase provision for replacement homes under Valley and Stream Corridor Management Program. 1208 The proposed privacy berm is located along Highway 27 and is outside of the Regional Storm Flood Plain and therefore will not impact the storage or conveyance of flood waters. The development area is mainly within an already disturbed area; however, the majority of the vegetation that exists within this area fronting Humber Bridge Trail and Highway 27 will be preserved. The proposal includes a planting plan composed of native, non - invasive species plants. Control of Flooding: TRCA water resources staff are satisfied that the proposed replacement home and privacy berm are located outside of the Regional Storm Flood Plain, there will be no impacts on the storage or conveyance of flood waters. The existing home to be demolished is located within the flood plain and the project will result in an improvement over existing conditions. Pollution: Sediment control fencing will be installed and maintained during the demolition of the existing home and the construction of the replacement home and privacy berm to prevent sediment from entering the adjacent watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As a watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings The majority of the vegetation located near the area of disturbance will be preserved and will be enhanced through the planting plan composed of native, non - invasive species. All other areas will be restored to the existing sodded conditions and will not affect any natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41673 - Application #: 950 /08/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: December 2, 2008 1209 TOWN OF CALEDON 8.1.16 1693388 ONTARIO INC. To construct, reconstruct, erect or place a building or structure on Lot 29, Concession 7, (17717 Highway #50), in the Town of Caledon, Humber River Watershed as located on the property owned by 1693388 Ontario Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, replacement single - family dwelling on an existing lot of record associated with a site plan application. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan, stamped received by TRCA Planning & Development staff on November 28, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, replacement single - family dwelling on an existing lot of record located at 17717 Highway 50, in the Town of Caledon. A fire recently destroyed the previous dwelling on the subject property. The proposed dwelling is located within the existing building envelope. The proposed works are located in the nearby vicinity of a wetland feature and appear to be sufficiently setback. As such, no hydrological or ecological impacts to the wetland feature are anticipated. Although there are no flooding, geotechnical, and /or ecological related concerns with this proposal, enhancement plantings to improve the ecological functions of this area are proposed. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. 1210 Plantings Native, non - invasive enhancement plantings consistent with TRCA's guidelines are included as part of this application. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 41713 - Application #: 980 /08 /CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: December 2, 2008 8.1.17 14110 KENNEDY ROAD To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 28, Concession 1, E.H.S., (14110 Kennedy Road), in the Town of Caledon, Etobicoke Creek Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the placement of approximately 2,200 cubic metres (77,692 cubic feet) of fill material in an agricultural field located at 14110 Kennedy Road, in the Town of Caledon in order to improve the existing agricultural use of the land associated with a fill by -law permit. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Site Plan and Cross - Section Plan, prepared by J. Gray, stamped received by October 20, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the placement of approximately 2,200 cubic metres of fill material in an agricultural field located at 14110 Kennedy Road, in the Town of Caledon in order to improve the existing agricultural use of the land. The subject property is located on the northwest corner of Kennedy Road and King Street. Recently, the TRCA Executive Committee approved the placement of 9,000 cubic metres of fill in this location (TRCA permit #C06 -240). Traditional farm practices (i.e., cash crops) occur on the subject property and a and depression exists in the area to which fill placement is to occur. It is our understanding that localized drainage from rain events and snow thaw continues to reduce crop production within the.depression, although the previous fill placement has improved the previous condition. The proposed additional fill placement works are necessary in order to improve the drainage and increase crop production in order to increase agricultural viability on the subject property. The area to which this application applies is located within the estimated 1211 Regional Floodplain. TRCA Water Resources staff confirmed that this area floods during a Regional Storm event as a result of an undersized culvert beneath King Street, which creates a backwater effect in the area to be filled. Although a loss of storage will occur, TRCA Water Resources staff has confirmed that this section of the floodplain is within an ineffective flow area and that flooding will not be exacerbated upstream and /or downstream of this site. The depression is void of any significant vegetation or features and is located on the tableland portion of the subject property, 120 metres from the nearest watercourse feature. As such, no adverse ecological impacts are expected as a result of construction. Control of Flooding: As noted above, due to the flood characteristics in this area, TRCA Water Resources staff has confirmed that no significant impacts to the storage and /or conveyance of flood waters are anticipated as a result of the proposed fill placement. Pollution: The proposed works are setback approximately 120 metres from the nearest watercourse feature. In addition, vehicular access to the land depression will not require crossing of the corridor feature. As such, it is anticipated that sediment will not reach the adjacent watercourse. However, appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns anticipated with this proposal. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this proposal. Plantings Compensatory planting is not required. The proposed fill placement is located within an area that is actively farmed. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (E) - Development and Redevelopment /Intensification Within Non - Established Communities /Highly Urbanized Areas - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41576 - Application #: 891/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: December 2, 2008 1212 8.1.18 17650 DUFFY'S LANE To interfere with a wetland on Lot E 1/2 29, Concession 5, (ALB), (17650 Duffy's Lane), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new septic system adjacent to an existing residential dwelling located at 17650 Duffy's Lane, in the Town of Caledon associated with a site plan application. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Sheet 1 of 1, Site Plan, prepared by Scoles Septic Service Inc., dated November 5, 2008, stamped received by TRCA Planning & Development staff on November 25, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new septic system adjacent to an existing residential dwelling located at 17650 Duffy's Lane, in the Town of Caledon. The proposed works are within the nearby vicinity of a Locally Significant Wetland and are sufficiently setback from the wetland feature. In addition, no significant vegetation is to be removed as a result of this proposal. As such, no ecological or hydrogeological impacts to the wetland features are anticipated. Additionally, there are no flooding or geotechnical related concerns associated with this proposal. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries related concerns associated with these works. 1213 Plantings All disturbed areas will be re- vegetated with native and non - invasive species as per TRCA's post - construction restoration guidelines. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41704 - Application #: 973/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: December 2, 2008 8.1.19 REGIONAL MUNICIPALITY OF PEEL To construct, reconstruct, erect or place a building or structure on Lot 28, Concession 3, (4400 King Street), in the Town of Caledon, Humber River Watershed as located on the property owned by Regional Municipality of Peel. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 200 mm watermain, booster station and cistern, and a proposed 155.2 square metre (1,240 sq. ft.) employee building on the Peel Curing Facility site associated with a site plan application. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. SP-01c, Site Plan, prepared by Lonsdale Consulting Engineers Inc., dated November 6, 2008, Revision No. 10, revised on November 18, 2008, stamped received by TRCA Planning and Development staff on November 19, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 200 mm watermain, booster station and cistern, and a proposed 155.2 square metre (1,240 sq. ft.) employee building on the Peel Curing Facility site. The proposed works are necessary in order to provide a sufficient water supply for the proper functioning of the Region's waste curing facility located on the subject property. The subject property contains two Provincially Significant Wetlands (PSWs) and the proposed works are sufficiently setback from the wetland features. TRCA technical staff confirm that no impacts to the wetland features are anticipated as a result of the proposed works. Additionally, there are no flooding, or geotechnical related concerns associated with this proposal. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters are anticipated. 1214 Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries related concerns associated with these works. Plantings All disturbed areas will be re- vegetated with native and non - invasive species as per TRCA's post- construction restoration guidelines. Policy Guidelines: This proposal is in conformity with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 41571 - Application #: 886/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: December 2, 2008 8.1.20 3 PROCTOR AVENUE To construct, reconstruct, erect or place a building or structure at 3 Proctor Avenue, in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single family dwelling on Lot 1, Plan 43M -860 (3 Proctor Avenue), in the town of Caledon associated with a site plan application. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Lot Development Plan and Sewage System Design, prepared by Van Harten Surveying Inc., dated November 19, 2008, stamped received by TRCA Planning and Development on November 21, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 1215 Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a single family dwelling and attached garage at 3 Proctor Avenue, in the Town of Caledon. The subject property is located within Mill Creek Estates, a subdivision that was registered prior to the subject lands being designated Natural Core under the Oak Ridge Moraine Conservation Plan (ORMCP). Additionally, the subdivision was approved prior to the Hockey Valley Wetland Complex, which lies within and around the subdivision, being designated by the Province as a Provincially Significant Wetland (PSW). Based upon current Provincial policy requirements, a subdivision of this nature would not be permitted; however, as a registered plan of subdivision, the lots have already been established and sold. As an existing lot of record, as prescribed by the ORMCP, the proponent is required to demonstrate "to the extent possible that the use, erection, and location will not adversely affect the ecological integrity of the Plan Area". Please be advised that development proposals on some of the lots within this subdivision may not meet the tests required for the issuance of a permit under the Conservation Authorities Act and Ontario Regulation 166/06. TRCA staff are currently working with Town of Caledon and Ministry of Natural Resources (MNR) staff to establish a protocol for managing development within this subdivision to ensure that the approval process fully considers both TRCA and Town of Caledon requirements. Meanwhile, TRCA staff continue to receive permit applications and Town of Caledon Oak Ridges Moraine (ORM) Scoped Site Plan Applications for development on the lots within this subdivision. For each application, TRCA staff are working with the proponent and the Town of Caledon to minimize to the extent possible any anticipated impacts of the development on this sensitive area. The subject property is one of the less sensitive lots within this subdivision. While the proposed works are located within 120 metres of a PSW (i.e., Hockley Valley PSW), the extent of the proposed works area significant distance from the edge of the wetland. Its land is largely flat and is characterized by meadow grasses and a few young coniferous trees. TRCA staff do not anticipate any significant negative impacts to the wetland complex from the development, as the area being disturbed by the development is limited to the front of the property furthest away from the wetland boundary. No significant vegetation will be removed as a result of this proposal. As such, there are no significant ecology - related concerns anticipated with this proposal. Nevertheless, TRCA staff have worked along side the proponent and Town of Caledon staff to incorporate low impact development (LID) practices into the site plan. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be erected and maintained throughout all phases of construction in accordance with TRCA guidelines. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns related to this application. 1216 Conservation of Land: The disturbance envelope is not within close proximity of the wetland and the area disturbed is minimized with no ancillary structures, such as swimming pools. The area disturbed through grading is minimized. Gradients and impervious surfaces were also minimized to encourage water infiltration to occur within the boundaries of the lot. The owner will implement a state of the art septic system to minimize any potential water quality impacts on the adjacent wetland. There are no fisheries related concerns associated with the project. No significant vegetation will be removed as a result of construction. Plantings Given that the lot is largely meadow and does not lie close to the forested boundary of the adjacent wetland, the proponent was not required to develop a forest edge management plan. Nevertheless, the owner has been encouraged to naturalize the rear area of his lot closest to the wetland boundary with native species,, and not to encroach within these areas in the post development period. As such, it is our expectation that the proponent will provide an extensive enhancement planting plan as a component of this application prior to the permit being issued. Policy Guidelines: The proposed works are consistent with Section 4.1.1 - New Urban Development, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41703 - Application #: 970 /08 /CAL Report Prepared by: Wendy McWilliam, extension 5763 For information contact: Quentin Hanchard, extension 5324 Date: December 3, 2008 TOWN OF WHITCHURCH - STOUFFVILLE 8.1.21 2 LAKEVIEW AVENUE To construct, reconstruct, erect or place a building or structure on Lot 45, Plan 404, (2 Lakeview Avenue), in the Town of Whitchurch - Stouffville, Rouge River Watershed. The purpose is to demolish and replace the existing dwelling, and to relocate a faulty septic tank. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1, SITE PLAN A -1, prepared by M -Arch Design Group Inc., dated September, 2008, received by TRCA on November 7, 2008; • Drawing No. 2, LANDSCAPE PLAN L -1, prepared by MSLA, dated September, 2008, received by TRCA on September 29, 2008; • Drawing No. 3, LANDSCAPE DETAILS, prepared by MSLA, dated September, 2008, received by TRCA on September 29, 2008; 1217 • Arborist Report for 2 Lakeview Ave., prepared by D. Andrew White, dated September 10, 2008, received by TRCA on September 29, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to permit the demolition and reconstruction of a single family dwelling on the south shore of Preston Lake, within a TRCA Regulated Area of the Rouge River watershed associated with a Provincially Significant Wetland community. In addition to a replacement structure, the proposal also calls for the replacement of a faulty septic tank as part of the lot redevelopment, which will likely improve groundwater quality by fixing a leak in the existing septic tank. The building location will be stepped back higher up the slope, farther from the water. The, new home will retain the original character and relative dimensions of the demolished dwelling, will have few to no additional negative impacts to the surrounding vegetation and natural features. Control of Flooding: The proposed dwelling is located beyond the limits of the Regional Storm Flood Plain. In addition, the proposed dwelling is elevated farther away from the lake, and the existing elevated wood deck will be replaced with an at- grade, stone patio. Therefore, the proposed design will not affect the conveyance and storage of flood water. Pollution: As directed by TRCA staff, the applicant has included appropriate sediment control fencing down -grade in order to capture any debris or silt runoff resulting from both the demolition work and construction of the proposed structure. Dynamic Beaches: Not applicable Erosion: TRCA technical staff have determined that the proposed redevelopment will have minimal to no effect on the stability of the slope. Because the proposed dwelling would be located over 10 metres from the stable top of bank and the slope has a gradient ratio of about 4H : 1V (which is milder than the TRCA criterion for unstable slopes 3H : 1V), there are no geotechnical objections to the proposed development. Conservation of Land: This redevelopment maintains current distances from surrounding Key Natural Heritage Features (KNHF) including wetlands and marshes located along the shoreline of Preston Lake. The distance between the septic tank and the Preston Lake KNHF has been increased. 5 trees in the front yard will need to be removed in order to accommodate the septic tank, 4 of which are non - native, and one native red maple in poor health. Adequate tree protection is displayed for all lakefront vegetation, as well as vegetation located on adjacent properties and the municipal right of way. 1218 Plantings The transplanting of two non - native ornamentals is contemplated in the proponents arborist report. As well, a total of 19 new native trees alongside approximately 200 native shrub and flower species are included in the proposed lot landscaping. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures of the TRCA's Valley and Stream Corridor Management Program. CFN: 41587 - Application #: 900 /08 /WS Report Prepared by: Brian Storozinski, extension 5744 For information contact: Bill Kiru, extension 5306 Date: November 12, 2008 8.1.22 TOWN OF WHITCHURCH - STOUFFVILLE To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on (19 Civic Avenue), in the Town of Whitchurch - Stouffville, Duffins Creek Watershed as located on the property owned by Town of Whitchurch - Stouffville. The purpose is to permit a parking lot and associated minor grading work within the floodplain. The permit will be issued for the period of December 12, 2008 to December 11, 2010 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1, NO TITLE (Site Plan), prepared by The Town of Whitchurch Stouffville, dated December 1, 2008, received by TRCA on December 2, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The municipality is proposing to pave an area partially located within the floodplain associated with Stouffville Creek for the purposes of a municipal parking area. The proposed parking area is associated with the redevelopment of the former Town Hall into an arts and community facility known as 19 On The Park. The area of the proposed parking lot is currently a manicured lawn and does not further extend the limit of development closer to Stouffville Creek or any natural heritage features. Control of Flooding: As existing grades are to be maintained, this project will not negatively impact the conveyance of flood water, or create any additional hazards to property or personal safety. A parking lot in this location meets the requirements for such facilities with respect to flood depths and velocities, as set out in the Valley and Stream Corridor Management Program. Pollution: Appropriate sediment control fencing is to be installed as required. 1219 Dynamic Beaches: Not applicable Erosion: The proposed parking lot will not negatively affect slope stability or create additional erosion hazards. Conservation of Land: Only one tree exists within the limit of development, and adequate tree protection measures are proposed to protect it from development activities. Plantings No plantings are proposed. Policy Guidelines: This proposal is consistent with Section 4.2.2.(E) - Development Guidelines for Property Improvements & Ancillary Structures and Appendix 1 - Parking Lot Flood Proofing Measures of the TRCA's Valley and Stream Corridor Management Program. CFN: 41701 - Application #: 968/08/WS Report Prepared by: Brian Storozinski, extension 5744 For information contact: Bill Kiru, extension 5306 Date: December 2, 2008 THE FOLLOWING PERMIT APPLICATIONS WERE ERRATA ITEMS: RES. #B158 /08 - APPLICATIONS FOR PERMITS PURUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS Moved by: Seconded by: Suzan Hall Maja Prentice THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.23 - 8.1.40, with the exception of 8.1.34 - Scarboro Golf & Country Club, which was withdrawn, and 8.1.28 - 2225 Dundas St. East Ltd.), that had been scheduled on the agenda as errata applications, for which all the required information was received and finalized as listed below. RES.#B159/08 - Moved by: Seconded by: CARRIED APPLICATIONS FOR PERMITS PURUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS Maja Prentice Suzan Hall 1220 THAT application 8.1.28 - 2225 Dundas St. East Ltd., that had been scheduled on the agenda as an errata application, be tabled until Executive Committee Meeting #11/08, scheduled to be held on January 16, 2009. CARRIED CITY OF BRAMPTON 8.1.23 BERKSHIRE GLADE ESTATES INC. & BAY -YONGE CUSTOM BUILDERS INC. (ARMLAND GROUP) To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 8, Concession 10, (Clarkway Drive and Cottrelle Boulevard), in the City of Brampton, Humber River Watershed as located on the property owned by Berkshire Glade Estates Inc. & Bay -Yonge Custom Builders Inc. (Armland Group). The purpose is to site grade within a Regulated area to facilitate topsoil stripping, earth works and initial servicing associated with a proposed residential plan of subdivision. The permit will be issued for the period of December 12, 2008 to December 11, 2010. • Letter of undertaking provided by Michael Oldham, MMM, dated December 10, 2008, to address all outstanding TRCA issues prior to the issuance of the permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant is requesting permission to strip topsoil, initiate earthworks and interim servicing associated with a proposed residential plan of subdivision located directly west of Clarkway Drive, south of Castlemore Road, in the City of Brampton. This application is within the Bram East Area 'F' Block Plan Area, for which the City of Brampton has recently provided development allotment, and subdivision draft approvals. Six previous permit applications were brought forward to, and approved by the Executive Committee at the November 7, 2008 meeting for similar works on other properties within this block plan area. This application is one of three within this block plan area that are presently before the Executive Committee for topsoil stripping, earthworks and initial servicing. The property is traversed by the Clarkway Tributary of the Humber River. Adjacent tableland areas - which are to be developed as part of the proposed residential subdivision - are Regulated by the TRCA. This permit is to allow for grading and initial servicing works (to include temporary stormwater management measures) within the Regulated tableland areas, as well as initial stormwater servicing works within the valley corridor. As only small portions of the subject property are Regulated by the TRCA, grading works are presently underway on portions of the property that are not Regulated by the TRCA. The works proposed under this permit constitute the first phase of works, and the first of several permits that will be required for works on the subject property. Additional permits will be brought forward to a future Executive Committee meeting for permanent stormwater management works within this Block Plan area, as well as proposed cut and fill works, once the outstanding comments and concerns of TRCA staff have been adequately addressed. 1221 Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Although there are no fisheries related concerns associated with this proposal, a Letter of Advice will be provided on behalf of Fisheries and Oceans Canada for any temporary stormwater management outfalls which are to be constructed within the valley. Plantings A comprehensive planting plan is to be provided, and implemented as a condition of the approval of this subdivision. As a coordinated plan is still being developed for all of the subdivisions within this Block Plan that are traversed by the Clarkway Tributary, details on the proposed plantings cannot be provided at this time. Additional details will be provided in subsequent permits for this Block Plan. Policy Guidelines: This proposal is consistent with Section 4.1.1.- New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41635 - Application #: 932/08/BRAM Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: December 2, 2008 8.1.24 DOLOMITI ESTATES INC. /YONGESTAR CUSTOM HOMES INC. To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 7, Concession 10, N.D.S., (Cottrelle Boulevard), in the City of Brampton, Humber River Watershed as located on the property owned by Dolomiti Estates Inc./Yongestr Custom Homes Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of'the proposed Cottrelle Boulevard bridge over the Clarkway Tributary of The West Humber River associated with a residential plan of subdivision. 1222 The permit will be issued for the period of December 12, 2008 to December 11, 2010. • Letter of Undertaking, prepared by D. Horgan, Candevcon Ltd., dated December 8, 2008, to address all outstanding TRCA engineering and ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of the proposed Cottrelle Boulevard bridge over the Clarkway Tributary of The West Humber River. The proposed development is located within the planning boundaries of the Edenfield Developments Incorporated residential subdivision (City File No. 21T-06023B / TRCA File No. CFN 38760) and the Bram East Area 'A' Master Environmental Servicing Plan (MESP). The proposed road is designated by the City of Brampton as a minor arterial road, which is currently being constructed on adjacent lands. The road has been constructed to the east and west of the Clarkway Tributary valley corridor. The right -of -way has been conveyed to the City of Brampton, except for a small area of the right -of -way, which is still in the ownership of Edenfield Developments Incorporated. A Class Environmental Assessment (EA - Schedule C) (TRCA File No. CFN 29551) has been approved for Cottrelle Boulevard between McVean Drive and Regional Road 50. As a component of this project, a fluvial geomorphology assessment study has been submitted to the TRCA for review. Through the crossing location, the tributary appears to have been historically straightened. The active channel width is approximately 5 metres (maximum). The proposed bridge structure has been designed to comply with the proposed span recommendations of the report, and provides a 25 metre span. The proposed bridge has been designed to accommodate the Regional Storm event without over - topping the road. As well, the future upstream Regional Storm Flood elevations will not be adversely impacts as a result of development. Construction of the bridge will take place during low flow conditions. It is our understanding that no in -water works are anticipated as a result of construction. Additionally, all near water works will be conducted during the warm water fisheries timing window of July 1 to March 31 of any given year. As part of the permit, a Letter of Advice (LOA) will be issued on behalf of Fisheries and Oceans Canada (DFO). The proposed construction has taken into account the ecological conditions of this area. Riparian planting is to be established through the extent of the corridor in this area. The riparian habitat will consist of native and non - invasive plant species, 50% of which will be woody plants. Given the historical straightening to this reach of the Clarkway Tributary, it is our opinion that the proposed enhancement planting plan achieves an ecological net gain for this area of the Humber River Watershed. 1223 Control of Flooding: The proponent has updated TRCA's current hydraulic model, which incorporates the proposed bridge crossing. TRCA Water Resources staff have confirmed that the proposed structure will accommodate the Regional Storm event without over - topping the road. Additionally, the future upstream Regional Storm Flood water level will not be adversely impacted. Lastly, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls will be installed prior to construction and maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: A geotechnical /slope stability report has been submitted with this application. Based on our review, TRCA staff concur with the report findings. As such, there are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. All disturbed areas will be restored with native species. An extensive enhancement planting plan has been provided with this proposal and will improve the riparian function for this reach of the Humber River Watershed. Although there are no fisheries concerns related to this project, a LOA will be issued on behalf of DFO with this permit. Plantings All proposed plantings are native and non - invasive consistent with TRCA's guidelines. Policy Guidelines: The proposed works are in conformity with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41690 - Application #: 965 /08 /BRAM Report Prepared by: Adam Miller, extension 5244 For information contact: Adam Miller, extension 5244 Date: December 2, 2008 8.1.25 FORESTSIDE ESTATES INC. To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 8, Concession 10, (Castlemore Road and The Gore Road), in the City of Brampton, Humber River Watershed as located on the property owned by Forestside Estates Inc. The purpose is to site grade within a Regulated area to facilitate topsoil stripping, earth works and initial servicing associated with a proposed residential plan of subdivision. The permit will be issued for the period of December 12, 2008 to December 11, 2010. 1224 • Letter of undertaking provided by Michael Oldham, MMM, dated December 10, 2008, to address all outstanding TRCA issues prior to the issuance of the permit. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant is requesting permission to strip topsoil, initiate earthworks and interim servicing associated with a proposed residential plan of subdivision located directly east of The Gore Road, south of Castlemore Road, in the City of Brampton. This application is within the Bram East Area 'F' Block Plan Area, for which the City of Brampton has recently provided development allotment, and subdivision draft approvals. Six previous permit applications were brought forward to, and approved by the Executive Committee at the November 7, 2008 meeting for similar works on other properties within this block plan area. This application is one of three within this block plan area that are before the Executive Committee at this meeting for topsoil stripping, earthworks and initial servicing. The property is traversed by the Clarkway Tributary of the Humber River. Adjacent tableland areas - which are to be developed as part of the proposed residential subdivision - are Regulated by the TRCA. This property is also adjacent to the Gore Road Tributary of the Humber River, which although not on the subject property, crosses The Gore Road north of this property. A small portion of this property is also Regulated due to its proximity to the Gore Road Tributary. This permit is to allow for grading and initial servicing works (to include temporary stormwater management measures) within the Regulated tableland areas, as well as initial stormwater servicing works within the valley corridor. As only small portions of the subject property are Regulated by the TRCA, grading works are presently underway on portions of the property that are not Regulated by the TRCA. The works proposed under this permit constitute the first phase of works, and the first of several permits that will be required for works on the subject property. Additional permits will be brought forward to a future Executive Committee meeting for permanent stormwater management works within this Block Plan area, as well as proposed cut and fill works, once the outstanding comments and concerns of TRCA staff have been adequately addressed. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. 1225 Conservation of Land: No significant vegetation will be removed as a result of construction. Although there are no fisheries related concerns associated with this proposal, a Letter of Advice will be provided on . behalf of Fisheries and Oceans Canada for any temporary stormwater management outfalls which are to be constructed in the valley. Plantings A comprehensive planting plan is to be provided, and implemented as a condition of the approval of this subdivision. As a coordinated plan is still being developed for all of the subdivisions within this Block Plan that are traversed by the Clarkway Tributary, details on the proposed plantings cannot be provided at this time. Additional details will be provided in subsequent permits for this Block Plan. Policy Guidelines: This proposal is consistent with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41636 - Application #: 933/08/BRAM Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324, Date: December 2, 2008 8.1.26 LIDIA DEVELOPMENTS INC. To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 8, Concession 10, (Castlemore. Road and The Gore Road), in the City of Brampton, Humber River Watershed as located on the property owned by Lidia Developments Inc. The purpose is to site grade within a Regulated area to facilitate topsoil stripping, earth works and initial servicing associated with a proposed residential plan of subdivision. The permit will be issued for the period of December 12, 2008 to December 11, 2010. • Letter of undertaking provided by Michael Oldham, MMM, dated December 10, 2008, to address all outstanding TRCA issues prior to the issuance of the permit. RATIONALE The application was reviewed by staff on the basis of the following information: 1226 Proposal: The applicant is requesting permission to strip topsoil, initiate earthworks and interim servicing associated with a proposed residential plan of subdivision located directly east of The Gore Road, south of Castlemore Road, in the City of Brampton. This application is within the Bram East Area 'F' Block Plan Area, for which the City of Brampton has recently provided development allotment, and subdivision draft approvals. Six previous permit applications were brought forward to, and approved by the Executive Committee at the November 7, 2008 meeting for similar works on other properties within this block plan area. This application is one of three within this block plan area that are presently before the Executive Committee for topsoil stripping, earthworks and initial servicing. The property is traversed by the Clarkway Tributary of the Humber River. Adjacent tableland areas - which are to be developed as part of the proposed residential subdivision - are Regulated by the TRCA. This permit is to allow for grading and initial servicing works (to include temporary stormwater management measures) within the Regulated tableland areas, as well as initial stormwater servicing works within the valley corridor. As only small portions of the subject property are Regulated by the TRCA, grading works are presently underway on portions of the property that are not Regulated by the TRCA. The works proposed under this permit constitute the first phase of works, and the first of several permits that will be required for works on the subject property. Additional permits will be brought forward to a future Executive Committee meeting for permanent stormwater management works within this Block Plan area, as well as proposed cut and fill works, once the outstanding comments and concerns of TRCA staff have been adequately addressed. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Although there are no fisheries related concerns associated with this proposal, a Letter of Advice will be provided on behalf of Fisheries and Oceans Canada for any temporary stormwater management outfalls which are to be constructed within the valley. 1227 Plantings A comprehensive planting plan is to be provided, and implemented as a condition of the approval of this subdivision. As a coordinated plan is still being developed for all of the subdivisions within this Block Plan that are traversed by the Clarkway Tributary, details on the proposed plantings cannot be provided at this time. Additional details will be provided in subsequent permits for this Block Plan. Policy Guidelines: This proposal is consistent with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41634 - Application #: 931/08/BRAM Report Prepared by: Quentin Hanchard, extension 5324 For information contact: Quentin Hanchard, extension 5324 Date: December 2, 2008 8.1.27 PORT MARK INVESTMENTS LTD. To construct, reconstruct, erect or place a building or structure and site grade on Lot 8, Concession 9, N.D., (Cottrelle Boulevard and McVean Drive), in the City of Brampton, Humber River Watershed as located on the property owned by Port Mark Investments Limited. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of the proposed Cottrelle Boulevard bridge over The Main Branch of The West Humber River associated with a residential plan of subdivision. The permit will be issued for the period of December 12, 2008 to December 11, 2010. • Letter of Undertaking, prepared by G. Karakokkinos, Nu -Land Management Inc., dated December 10, 2008, to address all outstanding TRCA engineering and ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this project is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of the proposed Cottrelle Boulevard bridge over The Main Branch of The West Humber River. The proposed development is located within the planning boundaries of the Port Mark Investments Limited subdivision (City File No. 21T-05039/TRCA File No. CFN 37178) and the larger Bram East Area 'D' Master Environmental Servicing Plan (MESP). 1228 Cottrelle Boulevard, which is designated as a minor arterial road, is being constructed in phases as the adjacent lands are being developed. The road has already been constructed to the east and west of the Port Mark Investments Limited subdivision. A Class Environmental Assessment (EA - Schedule C) (TRCA File No. CFN 29551) was previously completed for Cottrelle Boulevard between McVean Drive and Regional Road 50. The EA study determined the preferred alignment for Cottrelle Boulevard and recommended a two (2) span structure at 30 metres each for the crossing of The Main Branch of The West Humber River. The actual proposal involves two (2) span structures of 35 metres. As part of the Port Mark Investments Limited planning approval process, slope stability, geotechnical, fluvial geomorphic and hazard assessment studies were completed along The Main Branch of The West Humber River in order to determine the required setbacks for slope stability and long -term erosion for the proposed development. Accordingly, the bridge has been designed based on the recommendations of the above noted reports. The proposed bridge structure has been designed to accommodate the Regional Storm event without over - topping the road. It is also confirmed that the future upstream Regional Storm Flood water levels (with the bridge in place) will not be adversely impacted and will not impact future residential development in this area. Construction of the bridge foundations will be carried out during low flow conditions. No in -water works are anticipated as a result of construction. Additionally, all near water works will be conducted within the warm water fisheries timing window of July 1 to March 31 of any given year. Although there are no fisheries related concerns associated with this proposal, a Letter of Advice (LOA) on behalf of Fisheries and Oceans Canada (DFO) will be issued with this permit. The proposed crossing alignment has taken into account the existing ecological form and function for this reach of the Humber River Watershed. As part of this project, an extensive enhancement planting plan has been incorporated into the design. The key objective of the proposed plantings is to improve the riparian function of the valley corridor and provide additional riparian habitat. It is our opinion that the proposed plantings will improve the ecological condition for this area, thereby achieving an ecological net gain for this reach of the Humber River Watershed. Control of Flooding: The proponent has updated TRCA's current hydraulic model, incorporating the proposed bridge structure. Based on our review of the hydraulic update, TRCA Water Resources staff has confirms that the proposed bridge structure will accommodate the Regional Storm event without over - topping of the road. As well, the future upstream Regional Storm Flood water level will not be adversely impacted. As such, no impacts to the storage and /or conveyance of flood waters is anticipated. Pollution: Appropriate erosion and sediment controls have been incorporated into the design of this project, and will be installed and maintained throughout all phases of construction. Dynamic Beaches: Not applicable. 1229 Erosion: Based on our review of several engineering reports provided with this application, there are no slope stability, fluvial geomorphic and /or geotechnical concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. A comprehensive enhancement planting plan has been submitted with this application. There are no fisheries related concerns. However, a LOA on behalf of DFO will be provided. Plantings All proposed plantings are native and non - invasive consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41113 - Application #: 567 /08 /BRAM Report Prepared by: Adam Miller, extension 5244 For information contact: Adam Miller, extension 5244 Date: December 2, 2008 CITY OF MISSISSAUGA 8.1.28 2225 DUNDAS ST. EAST LTD. To construct, reconstruct, erect or place a building or structure and site grade at 2225 Dundas Street East, in the City of Mississauga, Etobicoke Creek Watershed as located on the property owned by 2225 Dundas St. East Limited. • Tabled CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.29 85 HUMBERVIEW ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 34, Plan 2458, (85 Humberview Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a one - storey rear sunroom addition to the existing single family detached dwelling. The permit will be issued for the period of December 12, 2008 to December 11, 2010. • Drawing No. Al, Site Plan, prepared by Architectural CADD Studio, dated September 27, 2008, received on October 2, 2008. 1230 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this proposal is to construct a one - storey rear sunroom addition to the existing single family detached dwelling at 85 Humberview Road in the City of Toronto (Etobicoke York Community Council Area). The subject site is located west of Jane Street, north of Bloor Street West and backs on to Etienne Brule Park within a TRCA Regulated Area of the Humber River Watershed. Control of Flooding: This site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment and erosion control fence will be installed in order to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: A geotechnical investigation /slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of the report. Conservation of Land: TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the completed works. There are no fisheries concerns as the watercourse was not impacted by the works. There are no other significant natural features on, or adjacent to, the site that were negatively impacted by the project. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B), Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41516 - Application #: 847/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: December 2, 2008 1231 8.1.30 1 LAKE PROMENADE To construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 1, Plan 1581, (1 Lake Promenade), in the City of Toronto (Etobicoke York Community Council Area), Waterfront Watershed. The purpose is to demolish and replace existing dwelling. The permit will be issued for the period of December 12, 2008 to December 11, 2010. • Drawing No.1, Site Plan, revised December 3, 2008, received by TRCA on December 5, 2008; • Drawing No. 2, Grading Plan & Tree Preservation Plan, dated May 26, 2008, received by TRCA on December 5, 2008; • Sediment Control Fence Details, received by TRCA on December 5, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to permit the development of a single family dwelling partially within the Regulated Area of Lake Ontario. The existing dwelling will be demolished. The replacement structure will be located approximately 5 metres closer to the Lake, but will remain approximately 30 metres from top of bank and the Lake Ontario shoreline. Control of Flooding: The proposed structure is not located within the Regional Storm Flood Plain and therefore will not affect the storage and conveyance of flood water. Pollution: , Temporary sediment control fencing will be installed to keep construction debris and sediment from entering the Lake. Dynamic Beaches: Not applicable. Erosion: there are no geotechnical concerns with the proposed development as the proposed dwelling will be located approximately 30 metres from the shoreline top of bank. Conservation of Land: The proposal is not located within a significant area. There are no tree removals or impacts to vegetation within the regulated area. Plantings Plantings are not required. 1232 Policy Guidelines: This proposal is consistent with Section 4.2.2.(D), Development Guidelines for Replacement Structures, of the TRCA's Valley and Stream Corridor Management Program. CFN: 40607 - Application #: 179/08/TOR Report Prepared by: Brian Storozinski, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: December 2, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.31 90 SANDRINGHAM DRIVE To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Lot 51, 52, Plan 1842, (90 Sandringham Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a second storey addition. The permit will be issued for the period of December 12, 2008 to December 11, 2010. • Drawing No. 1 of 9 Site Plan, Prepared by unknown author, undated, received September 4, 2008; • Drawing No. 2 Typical Section - Frost Action Protection Measures, Raising Grade Option, Prepared by Haddad Geotechnical Inc., dated December 4, 2008, received December 4, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks a permit to allow the continued construction of a second storey addition above an existing single- storey wing of the dwelling located in proximity to the existing top of slope. The subject property is located on Sandringham Drive near Highway 401. A geotechnical study has confirmed that the works will not impact long term slope stability. Permit After the Fact: The applicant began construction without the benefit of a TRCA permit or a municipal building permit. The City of Toronto has issued a stop -work order until the appropriate permits can be obtained. As a result, the applicant has paid the application fee and an additional fee of 50% of the application fee associated with a violation. Control of Flooding: The works are not located within the Regional Storm flood plain and will not impact the storage or conveyance of flood flows. 1233 Pollution: Appropriate sedimentation and erosion controls will be installed and maintained throughout the construction phase. Dynamic Beaches: Not applicable. Erosion: The applicant's and TRCA's geotechnical engineers have confirmed that the proposal will have no impact on long term stability of the slope. Conservation of Land: No significant vegetation will be removed as a result of the continued construction of the works. Plantings No plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2.(C), Minor Additions, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41413 - Application #: 771/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: December 3, 2008 8.1.32 ST. JOHN'S REHABILITATION HOSPITAL To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 21, 22, Concession 1 EYS Part 4 To 31 Plan 64R 15232, (285 Cummer Avenue), in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by St. John's Rehabilitation Hospital. The purpose is to install a new storm sewer manhole at the existing top of bank. The permit will be issued for the period of December 12, 2008 to December 11, 2010. • Drawing No. C102, Erosion and Sediment Control Plan, prepared by EMC Group Limited, revised Nov. 26, 2008, received Dec. 2, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 1234 Proposal: It is proposed to install a new storm sewer manhole located at the existing top of bank. The existing manhole which is also presently located at the top of bank will be abandoned and left in situ. The new manhole installation is required as part of the overall expansion and improvements to the existing hospital facilities. Control of Flooding: The proposed works are not located within the Regional Storm Floodplain of Newtonbrook Creek and therefore will not impact the storage or conveyance of flood waters. Pollution: Sediment control fencing will be secured around all construction areas to prevent the migration of construction generated sediment into the adjacent valley. Dynamic Beaches: Not applicable Erosion: There are no geotechnical issues associated with the proposed works. Conservation of Land: All filled and disturbed areas will be stabilized and revegetated following construction. No significant resource features will be impacted by the proposed works. Plantings New native trees and shrubs will be planted within 10 metres of the top of bank. Policy Guidelines: The proposal is consistent with Section 4.3, Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41538 - Application #: 860/08/TOR Report Prepared by: Mark Rapus, extension 5259 For information contact: Mark Rapus, extension 5259 Date: November 27, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.33 12 LAKESIDE AVENUE To construct, reconstruct, erect or place a building or structure on Part Lot 14, Plan 1228, (12 Lakeside Avenue), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to demolish the existing dwelling and construct a new two- storey dwelling. The permit will be issued for the period of December 12, 2008 to December 11, 2010. 1235 • Drawing No. G1, Proposed Grading Plan (Landscape), prepared by Eatly Drafting & Design, dated October 27, 2008, received on November 26, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant proposes to demolish an existing two - storey dwelling and construct a new two- storey dwelling in the vicinity of the Scarborough Bluffs. The proposed works are located south east of Warden Avenue and Kingston Road and are not immediately adjacent to the Bluffs. The property slopes moderately towards the street, and stormwater is to be directed to the municipal storm drainage system. Control of Flooding: The proposed works are not located within the Regional Storm floodplain and therefore will not impact the storage or conveyance of flood waters. Pollution: The site is primarily flat and minor regrading works are not expected to produce sediment. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical slope stability issues associated with the proposed development. Conservation of Land: The proposal is not located within a significant area. Plantings No plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D), Replacement Structures, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41711 - Application #: 978/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: December 2, 2008 8.1.34 SCARBORO GOLF & COUNTRY CLUB To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 16, Concession D, (321 Scarborough Golf Club Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by Scarboro Golf & Country Club. 1236 • Withdrawn CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.35 4 HARPER GARDENS To site grade on Lot 12, 13, Plan 920 YORK, (4 Harper Gardens), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to permit the reconstruction of a slope damaged by water runoff from fire - fighting activities. The permit will be issued for the period of December 12, 2008 to December 11, 2010. • Drawing No. L -1, Restoration Inventory Plan, prepared by Urban Forest innovations, dated September, 2008, received by TRCA on October 27, 2008; • Drawing No. L -2, Restoration Planting Plan, prepared by Urban Forest Innovations, dated September, 2008, received by TRCA on October 27, 2008; • Drawing No. L -3 Restoration Details, prepared by Urban Forest Innovations, dated September, 2008, received by TRCA on October 27, 2008; • Ravine Restoration Report for 4 Harper Gardens, prepared by Urban Forest Innovations Inc., dated December 2, 2008, received by TRCA on December 5, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: On February 14, 2007, the house located next to the subject property exploded and required an emergency response to extinguish the flames. The volume of water used in the fire - fighting activities caused a measurable amount of erosion to the slope at the rear of the property. The applicant has requested a permit to import fill onto the property to restore the pre- existing slope grade. Control of Flooding: The property is not located within the Regional Storm Flood Plain and therefore will not impact the storage and conveyance of floodwaters. Pollution: All fill brought into the site will be secured within the 'Geoweb' cells, and erosion control blankets will be placed on top of these cells to prevent the release of fill into the valley. Dynamic Beaches: Not applicable 1237 Erosion: The import of fill, laying of'Geoweb' erosion control matting and grading work will serve to improve the slope stability. As well, the proposed restoration plantings will provide protection against future slope erosion. Conservation of Land: All work proposed in the area is intended to restore and /or improve the existing natural features and vegetation. There will be no removal of existing vegetation and no impacts to areas outside of.the designated restoration zone. Plantings As part of the restoration works the proponent will be planting 8 trees and seeding the area with a native seed mix to increase slope stability. All trees and grasses are native and /or non - invasive Policy Guidelines: This proposal is.consistent with Section 4.2.2.(E), Development Guidelines for Property Improvements and Ancillary Structures of the TRCA's Valley and Stream Corridor Management Program. CFN: 41675 - Application #: 952/08/TOR Report Prepared by: Brian Storozinski, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: December 2, 2008 CITY OF VAUGHAN 8.1.36 YORK MAJOR HOLDINGS INC. To construct, reconstruct, erect or place a building or structure and site grade on 1520 Major Mackenzie Drive, in the City of Vaughan, Don River Watershed as located on the property owned by York Major Holdings Inc. The purpose is to conduct site grading and construct a commercial retail plaza within a Regulated Area of the Don River Watershed at 1520 Major Mackenzie Drive, in the City of Vaughan. The permit will be issued for the period of December 12, 2008 to December 11, 2010. • Site Plan, Drawing No. A -1.0, prepared by A. Baldassarra Architect Inc., revise dated December 2008, received by the TRCA December 10, 2008; • Site Grading and Servicing Plan, Drawing No. G -1, prepared by V.A. Piscione & Associates, revise dated December 9, 2008, received by the TRCA December 10, 2008, • Miscellaneous Details and Servicing Data, Drawing No. G -2, prepared by V.A. Piscione & Associates, revise dated December 9, 2008, received by the TRCA December 10, 2008; • Landscape Plan, Drawing No. L -1, prepared by The MBTW Group, revise dated December 3, 2008, received by the TRCA December 10, 2008; 1238 • Landscape Details, Drawing No. D -1, prepared by The MBTW Group, revise dated . December 3, 2008, received by the TRCA December 10, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to conduct site grading and construct a commercial retail plaza within a Regulated Area of the Don River Watershed. According to our mapping, the proposal is partially located within the Regional Storm Flood Plain; however, through the associated Master Environmental Servicing Plan for Block 19 it was confirmed the site is outside of the flood plain. The subject site is located on the north side of Major Mackenzie Drive and west of Dufferin Street. As part of the associated Site Plan Application (Application No. DA.08.055 - York Major Holdings Inc.), TRCA staff conducted a site visit on September 24, 2008. The subject property contains a low berm along the edge of the valley system and part of the valley wall contains an existing retaining wall with a maximum height of approximately 1.5 metres. As part of the proposed works, a landscaped 5 metre buffer has been provided from the top of the low berm inland, in addition, the valley wall is also to be vegetated. In order to ensure adequate drainage and irrigation of the proposed vegetated valley wall and buffer area, the grades along the inland side of the berm have been raised to remove the berm and create a gentle overland flow pattern into the valley system. Control of Flooding: TRCA water resources staff are satisfied that the proposed works are located outside of the Regional Storm Flood Plain. There will be no impacts on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be erected along the top of the existing berm to prevent the transport of sediment into the valley system. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with the application. Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. 1239 Plantings A 5 metre vegetated buffer composed of native, non - invasive plantings is to created between the valley system and the proposed works. These plantings provide an enhanced buffer between the commercial use and the valley system. In addition, part of the valley wall is to be restored with native, non - invasive plantings; thereby providing a net ecological gain for the subject property and the stream / valley system. Policy Guidelines: The proposal is consistent with Section 4.2 - Existing Development - of the Authority's Valley and Stream Corridor Management Program. CFN: 41677 - Application #: 954 /08/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: December 2, 2008 TOWN OF MARKHAM 8.1.37 BOX GROVE HILL DEVELOPMENTS INC. To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 6, Concession 9, (9th Line and 14th Avenue), in the Town of Markham, Rouge River Watershed as located on the property owned by Box Grove Hill Developments Inc.. The purpose is to construct a stormwater management pond and associated outfall in order to service a new residential and commercial development. The permit will be issued for the period of December 12, 2008 to December 11, 2010. • Drawing No. 1001, Stormwater Management Pond 5 Plan View, prepared by SCS Consulting Group Ltd., dated August 2008, Engineer's Stamp Dated December 3, 2008, received by TRCA on December 4, 2008; • Drawing No. 1002, Stormwater Management Pond 5 Details, prepared by SCS Consulting Group Ltd., dated August 2008, Engineer's Stamp Dated November 24, 2008, received by TRCA on November 26, 2008;. • Drawing No. 1003, Stormwater Management Pond 5 Details, prepared by SCS Consulting Group Ltd., dated August 2008, Engineer's Stamp Dated November 24, 2008, received by TRCA on November 26, 2008; • Drawing No. 1004, Stormwater Management Pond 5 Details, prepared by SCS Consulting Group Ltd., dated August 2008, Engineer's Stamp Dated August 28, 2008, received by TRCA on September 8, 2008; • Drawing No. SWM1,'Stormwater Management Facility Block 169, prepared by stla, dated January 2008, Revision No. 4, revised on August 22, 2008, received by TRCA on August 25, 2008; • Drawing No. 01, Planting Details, prepared by stla, dated January 2008, Revision No. 4, revised on August 22, 2008, received by TRCA on August 25, 2008. 1240 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This proposed stormwater management pond, known as Box Grove Pond 5, will service a draft approved plan of subdivision within the Box Grove Secondary Plan area in the southeastern portion of the Town of Markham's urban area. The applicant seeks permission to undertake site grading, permanently place fill material within a Regulated Area and alter a watercourse in order to construct the stormwater management pond. The proposed pond is to drain to a watercourse known as 'Tributary B.' This watercourse is tributary to the Little Rouge Creek and has been protected from development as part of the Box Grove secondary planning process. The proposed pond design contains a naturalized outfall and emergency spillway, which connect to the watercourse. Control of Flooding: Flood plain elevations up to the Regional Storm elevation associated with Tributary B are to be accommodated within the pond area, as described in the Environmental Master Drainage Plan for the Box Grove community. As a result, the majority of the pond is located within the Regional Storm Flood Plain. The pond has been designed to safely convey flood flows and will provide for the detention and release of storm waters in line with criteria established by TRCA and the Ontario Ministry of the Environment. Pollution: A sediment and erosion control plan will be implemented and maintained for the duration of construction so that sedimentation of the tributary will be prevented. Dynamic Beaches: Not applicable Erosion: The stormwater management pond has been designed to detain stormwater run -off within the plan of subdivision in order to increase erosion within the watercourse. Conservation of Land: During construction of the outfall channel, some in -water works may be required. Appropriate staging measures including coffer dams and pumping are contained on the engineering plans for the in -water works. There are no natural heritage features where the pond and outfall are proposed. Staff will issue a Letter of Advice on behalf of Fisheries and Oceans Canada (DFO) with this permit, as DFO Authorization pursuant to the Fisheries Act(Canada) was not required. All disturbed areas are to be stabilized following construction. Plantings Following construction, all disturbed areas are to be restored and enhanced with native plantings in accordance with a landscape plan that has been reviewed by staff as part of this permit. Policy Guidelines: This proposal is consistent with Section 4.3, Infrastructure and Servicing, of TRCA's Valley and Stream Corridor Management Program. 1241 CFN: 40566 - Application #: 158 /08 /MARK Report Prepared by: Chris Jones, extension 5718 For information contact: Chris Jones, extension 5718 Date: December 2, 2008 8.1.38 TOWN OF MARKHAM To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse in a Regulated Area adjacent to Tuclor Lane between Billy Joel Crescent and Squire Baker's Lane, in the Town of Markham, Rouge River Watershed as located on the property owned by Town of Markham. The purpose is to undertake the restoration of the creek banks by removing exposed parts of sewer structure, lining an existing stormwater outlet area with stones and constructing vegetated 3:1 slopes within a warm water fisheries timing window. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project. The permit will be issued for the period of December 12, 2008 to December 11, 2010. • Letter of Undertaking to provide minor revisions to the engineering and landscape drawings to the satisfaction of TRCA staff; dated December 9, 2008; received December 9, 2008; prepared by the Town of Markham. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The Town of Markham has undertaken a study called the Markham Erosion Restoration Implementation Plan, June 2007. The study was carried out under the Municipal Class Environmental Assessment planning process. The purpose of this study was to identify priority erosion restoration sites along the watercourses within the Town of Markham which may pose a risk to public health and safety, and to develop a restoration plan to address these erosion sites on a site specific basis. TRCA has been involved and provided input in the review of this plan. This proposal is identified in the plan as Site #2, and is being undertaken in order to facilitate the remediation of eroding creek banks. The works will include removal of an exposed manhole with a 2 metre long Corrugated Steel Pipe (CSP) outlet which is located within the watercourse. The structure was an overflow outlet on the inlet side of the sewage treatment plant that was formerly situated on vacant land on the east side of the creek. The structure was abandoned and left within the watercourse when the plant was decommissioned. The proposal also includes the strengthening of an existing storm sewer outlet with a combination of large diameter boulders and river stones to prevent further erosion and the implementation of vegetated 3:1 banks. 1242 Control of Flooding: The storage or conveyance of floodwaters will not be impacted by the proposed works. Pollution: Standard erosion and sediment control measures (sediment fencing and rock check dam) will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediments from entering any watercourse or wetland. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: The proposal is to conduct instream works to stabilize a channel. Staff has reviewed the proposal and has no channel stability concerns with the proposed works. Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be provided by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). This application is subject to the warmwater fisheries timing window, all works to be completed from July 1 to March 31. Plantings All disturbed areas will be restored with native non - invasive species following construction. This project will result in a net gain of approximately seventy shrubs and trees within the study area. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 40997 - Application #: 471 /08 /MARK Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: December 2, 2008 TOWN OF RICHMOND HILL 8.1.39 WOODLAND COURT SHOPPING CENTRE INC. To construct, reconstruct, erect or place a building or structure on Part Block 183, Plan 65M -2453, (10815 Bathurst Street), in the Town of Richmond Hill, Don River Watershed as located on the property owned by Woodland Court Shopping Centre Incorporated. 1243 The purpose is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a 30 metre high Rogers Communication Tower at 10815 Bathurst Street, in the Town of Richmond Hill associated with a site plan application. The permit will be issued for the period of December 12, 2008 to December 11, 2010. • Letter of Undertaking, prepared by Rogers Wireless Inc., dated December 10, 2008, to address all outstanding ecology related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a 30 metre high Rogers Communication Tower at 10815 Bathurst Street, in the Town of Richmond Hill. The proposed works are located within a manicured lawn area adjacent to a valley corridor and are sufficiently setback from the valley corridor. As such, no geotechnical concerns are anticipated. In addition, there are no ecology or engineering concerns with this application. Although a planting enhancement planting was not provided, the applicant has committed to providing a contribution, which has yet to be determined, to a TRCA Habitat Improvement Program (HIP) in the nearby vicinity. Control of Flooding: The proposed works are located outside of the Regional Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed prior to construction and maintained throughout construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this proposal. Plantings All disturbed areas will be stabilized and restored in accordance with TRCA's Restoration Guidelines. Policy Guidelines: This proposal is in conformity with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). 1244 CFN: 40854 - Application #: 351/08/RH Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: December 2, 2008 TOWNSHIP OF KING 8.1.40 140 ELMPINE TRAIL To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on 140 Elmpine Trail, in the Township of King, Humber River Watershed. The purpose is to construct a replacement dwelling, new and replacement retaining walls, replacement septic system and gazebo within a Regulated Area of the Humber River Watershed at 140 Elmpine Trail in the Township of King. The permit will be issued for the period of December 12, 2008 to December 11, 2010. • Site Plan, prepared by Rowan - Stanciu Ltd., dated December 4, 2008, received by the TRCA December 5, 2008; • Ground Floor Plan, prepared by the applicant, received by the TRCA November 26, 2008; • Basement Floor Plan, prepared by the applicant, received by the TRCA November 26, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a replacement dwelling, new and replacement retaining walls, a replacement septic system and a gazebo within a Regulated Area of the Humber River Watershed. According to our mapping, the majority of the subject property is within the valley system with a portion of the rear yard located within the Regional Storm Flood Plain. Based upon a site visit conducted by TRCA staff on November 3, 2008, the proposed development area contains a portion of table land that is terraced approximately 1.5 metres above the primary table land. Existing retaining walls along the edge upper table land area are to be reconfigured and replaced to accommodate the new dwelling. Based upon the site visit and Site Plan drawings provided by the applicant, the proposed replacement home is located approximately 12 metres away from the primary existing top of bank. The existing home is located approximately 7 metres from this same primary existing top of bank. As such, the proposed dwelling does not encroach further towards the top of bank than the current development footprint. However, the proposed cabana is to be located approximately 5.5 metres from the primary top of bank. Based upon a Geotechnical Report • prepared by McClymont & Rak Engineers Inc., dated November 2008 and the site visit, TRCA geotechnical staff are satisfied that the proposed cabana and replacement dwelling are sufficiently setback from the top of bank and will not affect the stability of the slope. 1245 The proposed dwelling falls within the 50% floor are increase provision for replacement homes under Valley and Stream Corridor Management Program. Due to site constraints, the replacement septic bed is required to be located within an already disturbed area of the valley. As the septic bed is to be seeded with native, non - invasive species of grasses, TRCA ecology staff are satisfied that there will be no impact on the ecological integrity of the valley. In addition, vegetation along the line running from the septic tank located on the table land to the septic bed in the valley will be protected during construction through the erection of temporary fencing. Control of Flooding: The proposed works are not located within the Regional Storm Flood Plain. There will be no impacts on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be erected and maintained for the duration of construction to prevent the transport of sediment into the valley system. Dynamic Beaches: Not applicable. Erosion: TRCA geotechnical staff are satisfied that the proposed works will not have an adverse impact on the stability of the valley wall. Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings All trees to be removed will be replaced at a 3:1 ratio with native trees. The area disturbed for the installation of the septic bed will be seeded with a native, non - invasive seed mix. All other disturbed areas will be restored to their existing sodded condition. Policy Guidelines: The proposal is consistent with Section 4.2.2 D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41609 - Application #: 914/08/KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: December 2, 2008 1246 PERMIT APPLICATIONS 8.1.41 - 8.1.46 ARE PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS: RES. #B160/08 - PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Suzan Hall Maja Prentice THAT permission for routine infrastructure granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.41 - 8.1.46, inclusive), which are listed below, be received. CARRIED CITY OF MISSISSAUGA 8.1.41 REGIONAL MUNICIPALITY OF PEEL To undertake sewer and watermain or utility installation or maintenance within the paved portion of Dixie Road from Dundas Street East to Little Etobicoke Creek, in the City of Mississauga, Etobicoke Creek Watershed, as located on the property owned by Regional Municipality of Peel. The purpose is to construct a watermain within a Regional Storm Floodplain. CFN: 41276 - Application #: 692/08/MISS Report Prepared by: Scott Smith, extension 5758 For information contact: Sharon Lingertat, extension 5717 Date: November 20, 2008 8.1.42 REGIONAL MUNICIPALITY OF PEEL To undertake sewer and watermain or utility installation or maintenance within the paved portion of Monica Drive from Darcel Avenue to Brandon Gate Drive in the City of Mississauga, Mimico Creek Watershed, as located on the property owned by Regional Municipality of Peel. The purpose is to construct a watermain within a Regional Storm Floodplain CFN: 41296 - Application #: 702 /08 /MISS Report Prepared by: Scott Smith, extension 5758 For information contact: Sharon Lingertat, extension 5717 Date: October 31, 2008 8.1.43 WESTWOOD MALL (MISSISSAUGA) LIMITED To undertake road /pathway resurfacing or reconstruction on Concession 8 EHS Part Lot 12, Block A, Plan 710, (7205 Goreway Drive, southeast of Goreway Drive and Morning Star Drive), in the City of Mississauga, Mimico Creek Watershed as located on the property owned by Westwood Mall (Mississauga) Limited. The purpose is to resurface the pavement and install curbs at a bus terminal within a TRCA Regulated area. 1247 CFN: 41700 - Application #: 967/08/MISS Report Prepared by: Scott Smith, extension 5758 For information contact: Sharon Lingertat, extension 5717 Date: December 2, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.44 UNIVERSITY OF GUELPH - SCHOOL OF ENGINEERING To undertake sewer and watermain or utility installation or maintenance within an existing roadway on (Highland Creek - Markham Branch Bridge Under the Highway 401), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by City of Toronto and Ministry of Transportation. The purpose is to install two 300mm diameter, 2.5m in height PVC pipes, one on each side of the outfall located under the Highway 401 Bridge associated with the Markham Branch of the Highland Creek in a Regulated Area, to collect stormwater samples during snowmelt runoff events. The project is required to facilitate a University of Guelph research study on stream chloride in the Highland Creek Watershed, in partnership with a number of provincial ministries, the City of Toronto and TRCA. CFN: 41563 - Application #: 877/08/TOR Report Prepared by: Renee Afoom, extension 5714 For information contact: Renee Afoom, extension 5714 Date: November 20, 2008 CITY OF VAUGHAN 8.1.45 CITY OF VAUGHAN To undertake road /pathway resurfacing or reconstruction in a Regulated Area on Beverly Glen Boulevard, in the City of Vaughan, Don River Watershed as located on the property owned by City of Vaughan. The purpose is to remove and replace existing asphalt pavement on Beverly Glen Boulevard. CFN: 41568 - Application #: 882/08NAUG Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: October 31, 2008 1248 8.1.46 REGIONAL MUNICIPALITY OF YORK To undertake road /pathway resurfacing or reconstruction on Part Lot 5, Plan 65R- 11385, (1550 Creditstone Road), in the City of Vaughan, Don River Watershed as located on the property owned by Regional Municipality of York. The purpose is to remove and replace the chimney in manhole MH13A at 1550 Creditstone Road, south -east of Jane Street and Rutherford Road. This is to allow for the installation of a temporary sluice gate in the manhole. A six metre wide temporary access driveway from Creditstone Road to manhole MH13A will be constructed using 50mm diameter, 300mm depth crusher -run limestone or 75mm of asphalt on a minimum of 100mm depth crusher -run limestone. Part of this access road is within the TRCA regulation limit but outside of the floodplain and over 30m away from the nearest watercourse. CFN: 41348 - Application #: 732 /08/VAUG Report Prepared by: Ben Krul, extension 5769 For information contact: Ben Krul, extension 5769 Date: October 24, 2008 PERMIT APPLICATIONS 8.1.47 - 8.1.58 ARE MINOR WORKS LETTER OF APPROVAL: RES. #B161/08 - MINOR WORKS LETTER OF APPROVAL PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Suzan Hall Maja Prentice THAT minor works letter of approval granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.47 - 8.1.58, inclusive), which are listed below, be received. CARRIED CITY OF BRAMPTON 8.1.47 20 RICHLAND CRESCENT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 10, Plan 43M -1517, (20 Richland Crescent), in the City of Brampton, Humber River Watershed. CFN: 41607 - Application #: 912/08/BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: November 7, 2008 8.1.48 80 VALLEYCREEK DRIVE To change the use - size - or number of dwelling units of a structure - or undertake work that does not change the footprint of the existing structure on Lot 373, Plan 43M -1622, (80 Valleycreek Drive), in the City of Brampton, Humber River Watershed. 1249 CFN: 41586 - Application #: 897/08/BRAM Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: October 29, 2008 CITY OF PICKERING 8.1.49 CITY OF PICKERING To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Pickering Museum Village, 2365 6th Concession, in the City of Pickering, Duffins Creek Watershed as located on the property owned by City of Pickering. CFN: 41546 - Application #: 866/08/PICK Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: November 10, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.50 100 GWENDOLYN CRESCENT To install a swimming pool on Part Lot 13, 14, Plan 4060, (100 Gwendolyn Crescent), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: 41650 - Application #: 939/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: November 26, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.51 CITY OF TORONTO To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on 225 Confederation Drive, in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by City of Toronto. CFN: 41595 - Application #: 903 /08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: November 5, 2008 1250 8.1.52 28 CHESTNUT CRESCENT To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 23, , (28 Chestnut Crescent), in the City of Toronto (Scarborough Community Council Area), Don River Watershed. CFN: 41633 - Application #: 930/08/TOR Report Prepared by: Brian Storozinski, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: November 12, 2008 CITY OF TORONTO .(TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.53 976 EASTERN AVENUE To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 31, Plan 248E, (976 Eastern Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 41608 - Application #: 913/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: November 5, 2008 8.1.54 50 DAVIES CRESCENT To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on 50 Davies Crescent in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 41691 - Application #: 962/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: November 28, 2008 TOWN OF CALEDON 8.1.55 41 COUNTRY STROLL CRESCENT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 17, Plan 43M -1287, (41 Country Stroll Crescent), in the Town of Caledon, Humber River Watershed. CFN: 41628 - Application #: 924/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: November 10, 2008 1251 TOWN OF MARKHAM 8.1.56 7328 BAYVIEW AVENUE To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 96, Plan 2368, (7328 Bayview Avenue), in the Town of Markham, Don River Watershed. CFN: 41404 - Application #: 764 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: November 10, 2008 8.1.57 4855 19TH AVENUE To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 30, Concession 6 , (4855 19th Avenue), in the Town of Markham, Rouge River Watershed. CFN: 41669 - Application #: 949 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: November 21, 2008 TOWNSHIP OF KING 8.1.58 32 WINTER ROAD To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 14, Plan M -1579, (32 Winter Road), in the Township of King, Humber River Watershed. CFN: 41615 - Application #: 920 /08 /KING Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: November 7, 2008 RES. #B162/08 - REQUEST FOR DISPOSAL OF TORONTO AND REGION CONSERVATION AUTHORITY -OWNED LAND Rear of Various Residential Properties along Royalpark Way, East of Highway No. 27, south of Rutherford Road, CFN 40996. Toronto and Region Conservation Authority (TRCA) is in receipt of requests from 16 residential property owners to explore the possibility of a sale of fragments of TRCA -owned land located directly behind 6, 10, 14, 16, 20, 24, 26, 28, 30, 34, 36, 40, 42, 46, 50 and 52 Royalpark Way, City of Vaughan, Regional Municipality of York, Humber River watershed. 1252 Moved by: Seconded by: Jack Heath Reenga Mathivanan THAT the potential disposal of fragments of Toronto and Region Conservation Authority (TRCA) -owned land located directly behind 6, 10, 14, 16, 20, 24, 26, 28, 30, 34, 36, 40, 42, 46, 50 and 52 Royalpark Way, City of Vaughan, Regional Municipality of York, be referred to TRCA staff for review and discussion in accordance with established TRCA policies; AND FURTHER THAT a report be brought forward to the Executive Committee at a future date recommending further action. CARRIED BACKGROUND This request is being brought to the attention of the Executive Committee in accordance with Resolution #26, adopted by TRCA at Authority Meeting #1/91, held on February 22, 1991. A request has been received from 16 residential property owners along Royalpark Way, each requesting the sale of a fragment of TRCA -owned land situated on east of Highway No. 27, south of Rutherford Road, City of Vaughan, for an addition to their existing residential properties. TRCA, City of Vaughan and Regional Municipality of York staff will be circulated the land sale proposal for review and comment. A plan illustrating the location of the subject lands is attached. Report prepared by: George Leja, extension 5342 Emails: gleja @trca.on.ca For Information contact: George Leja, extension 5342, Ron Dewell, extension 5245 Emails: gleja @trca.on.ca, rdewell @trca.on.ca Date: November 19, 2008 Attachments: 1 1253 Attachment 1 REQUEST FOR DISPOSAL 01 T0,10f110 AND PETiiON CONSEMATION AU T HORITY iDWNL 0 LAND Rear Of Her:0.2,1031 Prove■ t .1 Hoy;!![,;,r vi Highway N. 2:. L.-truth R“therterri Cf-N 40996 6.` -,• -/, /I / . .,4,.,,,) 1 ---/./\/././../ ' - / ., ,./, ,, ,, , I / . .7,' • ' z,4 , , , . 7 ) , 1254 ` MIMS i,Je...ittit RES. #B163/08 - Moved by: Seconded by: 16TH AVENUE ECOLOGICAL ENHANCEMENTS PROJECTS Regional Municipality of York Funding Agreements. Approval of funding agreements with the Regional Municipality of York to implement projects for 16th Avenue ecological enhancements. Suzan Hall Maja Prentice THE EXECUTIVE COMMITTEE RECOMMENDS THAT funding agreements with the Regional Municipality of York for 16th Avenue Ecological Enhancements Projects be approved; THAT the agreements be on terms and conditions satisfactory to Toronto and Region Conservation Authority (TRCA) staff and, as necessary, solicitor; AND FURTHER THAT authorized officials be directed to take such action as is necessary to implement the agreements including the signing and execution of documents. CARRIED BACKGROUND As part of the 16th Ave Trunk Sewer Project the Region of York has developed a series of ecological enhancement projects. These projects are focused on enhancing the aquatic ecosystems of the Rouge River watershed and focus on the strategic implementation of wetland, riparian and woodland habitat projects. The projects were developed in consultation with public stakeholders, nongovernmental organizations, TRCA and Rouge Park Alliance staff. RATIONALE The following are projects within the Rouge watershed: Site Habitat Type Budgeted Cost Oak Ridges Moraine Corridor Park East Berczy Creek Site 8 & 9 1.5 hectares of wetland habitat, 9 hectares reforestation. $113,000 Oak Ridges Moraine Corridor Park East Berczy Creek Site 10 1.7 hectares of wetland habitat, 8.6 hectares of riparian habitat, 27 hectares of reforestation. $344,000 Elgin Mills Road and Warden Berczy Creek Site 12 0.3 hectares of wetland habitat and 1.2 hectares of riparian habitat $43,000 Bruce's Mill Conservation Area Bruce Creek Site 4 2 hectares of riparian habitat and 7 hectares of reforestation $79,000 Hwy 404 and Bloomington Sideroad Bruce Creek Site 5 1.1 hectares of wetland habitat, 6.6 hectares of riparian habitat, and 19.8 hectares of reforestation. $262,600 Major Mackenzie Ave and McCowan Road Robinson Creek Site 12 0.5 of wetland habitat and 0.5 hectare of riparian habitat. $32,500 1255 Each project will be implemented on the basis of an individual funding agreement. The nature of the project work, time frames, value and deliverables will vary but the terms and conditions will be similar for each agreement. Staff will ensure that the terms and conditions are satisfactory to TRCA and consult with TRCA solicitors as necessary. Planning and implementation of these projects will commence in the spring of 2009 and most projects are slated to be completed by 2011 or 2012. FINANCIAL DETAILS These projects will be funded directly by the Regional Municipality of York. Report prepared by: Gord MacPherson, extension 5246, Emails: gmacpherson @trca.on.ca, For Information contact: Gord MacPherson, extension 5246, Emails: gmacpherson @trca.on.ca, Date: November 25, 2008 RES. #B164/08 - ARCHETYPE SUSTAINABLE HOUSE Electrical Work. Award of contract to an electrical contractor. Moved by: Seconded by: Suzan Hall Maja Prentice THAT the post -blitz build contract for the supply and installation of all electrical work for the Archetype Sustainable House "A" and "B" be awarded to Bolton Electric Company Incorporated (BECI) for a cost not to exceed $95,000 plus applicable taxes. CARRIED BACKGROUND The Toronto and Region Conservation Authority (TRCA) Archetype Sustainable House project began with a national competition conducted in partnership with The Design Exchange. The intent of the competition was to engage architects, engineers and graduate students from across Canada to design a mass production green home for new community development. The winning design chosen on June 21, 2006, submitted by Building Blocks, was selected from 17 entries by a blue ribbon panel of judges. A comprehensive report was provided with each design submission, with final design drawings and specifications to be generated by the winning team prior to construction. The winning design is currently being built at The Living City Campus at Kortright, at the entrance to the Power Trip Trail. The Power Trip Trail is an interactive renewable energy learning exhibition. The Archetype Sustainable House project will serve as the primary energy conservation education facility for workshop participants and as a model to help monitor and verify the effectiveness of materials, systems and technologies. 1256 TRCA has entered into a partnership with Building Industry and Land Development Association (BILD) to build the Archetype Sustainable House at The Living City Campus at Kortright. BILD members have agreed to work with TRCA to get most of the materials and labour donated to build the house. Some materials and labour are a 100% donation while some are discounted. Although the Archetype Sustainable House project construction was initiated with a blitz -build approach in July 2008, the complexity of the project design has extended the project into December 2008. RATIONALE Based on BECI's familiarity with the ongoing project, the extensive electrical work to be done on an ongoing basis and no other in -kind electrical labour to be found - the extension of an existing contract proves most beneficial for efficient completion of the Archetype House construction. Staff is therefore recommending the contract be awarded on a sole source basis as per Section 1.14.3 - When the extension or reinstatement of an existing contract would prove most cost - effective or beneficial. Further, BECI agreed to donate $5,000.00 in labour towards the Archetype Sustainable House project and was present on -site during the blitz build period in July 2008. BECI agreed to complete all electrical work associated with the project and provided a quotation for hourly service rates. FINANCIAL DETAILS Funds are available from the Archetype Sustainable House budget. Report prepared by: Alex Waters, 905 - 832 -2289 extension 227 Emails: awaters @trca.on.ca For Information contact: Derek Edwards, extension 5672 Emails: dedwards @trca.on.ca Date: November 21, 2008 RES.#B165/08 - Moved by: Seconded by: OUT OF COUNTRY TRAVEL Approval for Gord MacPherson to travel outside Canada to attend the Great Lakes Urban Habitat Restoration Symposium in Chicago, Illinois. Jack Heath Colleen Jordan THAT approval be granted for Gord MacPherson, Manager, Environmental Monitoring and Habitat Restoration, Toronto and Region Conservation Authority (TRCA), to attend the Great Lakes Urban Habitat Restoration Symposium in Chicago, Illinois, United States of America from January 22- 23, 2009 at a cost not to exceed $1,300; AND FURTHER THAT a presentation be made to the Executive Committee on February 13, 2009 to provide an overview of the conference. CARRIED 1257 BACKGROUND The Toronto and Region Conservation Authority (TRCA) policy on travel requires Executive Committee approval for staff travel outside of the country on TRCA business. TRCA members have requested that a presentation be made to the appropriate committee upon returning. RATIONALE The Great Lakes Urban Habitat Restoration Symposium is being convened by the Chicago Park District, in cooperation with several agencies involved in Great Lakes restoration. This major symposium will focus on restoration in the urban nearshore with participation expected from scientists, planners, policy makers and other experts. The symposium will consist of plenary sessions and breakout groups designed to discuss methods for urban habitat restoration; exchange ideas about how to make restoration projects more cost effective; and develop methods to communicate the benefits of urban nearshore restoration to the public, decision - makers and the scientific community. Gord MacPherson was asked by the conference organizers to present the TRCA programs and experience with nearshore aquatic habitat restoration projects underway on the Toronto waterfront. Staff expect to share with other practitioners and conference participants TRCA's understanding of the science and techniques that are available to restore nearshore coastal habitats in urban areas. Furthermore, staff hope to highlight the work of Aquatic Habitat Toronto and illustrate the successes being achieved on the Toronto waterfront through the collaborative efforts of TRCA, City of Toronto, Fisheries and Oceans Canada, Ministry of Natural Resources and Toronto Waterfront Revitalization Corporation (TWRC). FINANCIAL DETAILS Costs to attend this conference, including registration, transportation, meals and accommodations, will not exceed $1,300 and will be fully covered by the City of Toronto capital budget and TWRC. Report prepared by: Gord MacPherson, extension 5246 Emails: gmacpherson @trca.on.ca For Information contact: Gord MacPherson, extension 5246 Emails: gmacpherson @trca.on.ca Date: November 24, 2008 RES. #B166/08 - Moved by: Seconded by: OUT OF COUNTRY TRAVEL Laserfiche User Conference. Approval for staff to attend the 2009 Laserfiche User Conference in Los Angeles, California, January 2009. Suzan Hall Maja Prentice 1258 THAT approval be granted for John Annunziello, Manager, Records Information and Miranda Townsend, Records Analyst, to attend the annual Laserfiche User Conference in Los Angeles, California, USA, from January 11- 14, 2009, at a total cost not to exceed $2,400; AND FURTHER THAT a report on the results of the conference be made at a future Executive Committee. CARRIED BACKGROUND The Toronto and Region Conservation Authority (TRCA) policy on travel requires Executive Committee approval for staff travel outside of Canada on TRCA business. Members have requested that a report on the results of conferences attended be made to Executive Committee. RATIONALE In 2005, TRCA committed to implement the Laserfiche software as the key component of the electronic document and records management system (EDRMS). The Laserfiche end user conference is an annual, international event for the education and development of records professionals who use the Laserfiche software. Educational sessions cover the latest trends and use of the software. A new version of the software with extensive changes is being released shortly and TRCA will be required to upgrade to the new release. The conference will provide a training opportunity for the records staff to receive first hand knowledge of the changes to the software and to benefit from the experiences of other users. The records staff will be in a position to train other TRCA staff and share knowledge of the upgraded version of the software. FINANCIAL DETAILS Funding is identified in the 2009 Operating and Capital Budget under account 001 -09. Report prepared by: Jim Dillane, extension 6292 Emails: jdillane @trca.on.ca For Information contact: Jim Dillane, extension 6292 Emails: jdillane @trca.on.ca Date: December 01, 2008 RES. #B167/08 - Moved by: Seconded by: BLACK CREEK PIONEER VILLAGE Contract For Pioneer Brewery and Beer Museum. Award of contract for a pioneer brewery and beer museum at Black Creek Pioneer Village. Jack Heath Suzan Hall 1259 THAT a contract with Trafalgar Ales and Meads to establish and operate a pioneer brewery and museum at Black Creek Pioneer Village be approved, at a cost not to exceed $92,000 annually, plus applicable taxes and reasonable inflationary adjustments; THAT the contract be subject to the following terms and conditions satisfactory to TRCA staff and, as necessary, solicitor: (a) term of seven (7) years effective the date of signing; (b) termination by either party for any reason with six months written notice; (c) Trafalgar Ales and Meads will: (i) design, install, operate and assist in interpreting the historic brewery; (ii) fulfill all regulatory requirements for the manufacture and sale of beer on premise and in the LCBO; (iii)purchase brewing equipment to be leased back to TRCA; (iv) maintain all brewing equipment; (v) purchase supplies and ingredients; (vi) produce, market and sell Black Creek branded beer through the LCBO; (d) performance satisfactory to TRCA staff at their sole discretion; (e) other terms and conditions as TRCA staff shall deem necessary and reasonable. AND FURTHER THAT authorized officials be directed to take the necessary action to implement the contract including the signing and execution of documents. AMENDMENT RES. #B168/08 Moved by: Seconded by: Jack Heath Suzan Hall THAT the following be inserted after the main motion: AND FURTHER THAT staff report back after one season of operation of the Pioneer Brewery and Beer Museum. THE AMENDMENT WAS THE MAIN MOTION, AS AMENDED, WAS THE RESULTANT MOTION READS AS FOLLOWS: CARRIED CARRIED THAT a contract with Trafalgar Ales and Meads to establish and operate a pioneer brewery and museum at Black Creek Pioneer Village be approved, at a cost not to exceed $92,000 annually, plus applicable taxes and reasonable inflationary adjustments; THAT the contract be subject to the following terms and conditions satisfactory to TRCA staff and, as necessary, solicitor: (a) term of seven (7) years effective the date of signing; (b) termination by either party for any reason with six months written notice; (c) Trafalgar Ales and Meads will: (i) design, install, operate and assist in interpreting the historic brewery; 1260 (ii) fulfill all regulatory requirements for the manufacture and sale of beer on premise and in the LCBO; (iii) purchase brewing equipment to be leased back to TRCA; (iv) maintain all brewing equipment; (v) purchase supplies and ingredients; (vi) produce, market and sell Black Creek branded beer through the LCBO; (d) performance satisfactory to TRCA staff at their sole discretion; (e) other terms and conditions as TRCA staff shall deem necessary and reasonable. THAT authorized officials be directed to take the necessary action to implement the contract including the signing and execution of documents; AND FURTHER THAT staff report back after one season of operation of the Pioneer Brewery and Beer Museum. BACKGROUND Black Creek Pioneer Village (BCPV) staff was approached in September 2008 by the owner of Oakville, Ontario -based Trafalgar Ales and Meads with a proposal to build and operate a historic brewery at BCPV. The small brewing operation, proposed to be located in the basement of the Halfway House Inn, will replicate the brewing process that was common in this area in the mid- 1800s, and would produce beer following recipes and methods used in more than 300 commercial breweries and countless private brewing operations across the Province of Ontario. The fact that the history of brewing in Ontario is as relevant and prevalent as any other topic related to Ontario rural living in the 1860s makes this brewery an appropriate addition to Black Creek Pioneer Village. Trafalgar Ales and Meads is a unique craft brewery in Ontario in that it specializes in brewing small batches of beer, including historic beers. It has received acclaim for its beer formulations, including five (5) awards at the Ontario Brewing Awards in 2007. In its proposal to TRCA, Trafalgar Ales and Meads is offering to fulfill all regulatory requirements for the manufacture of beer (licensing, auditing, etc.), operate the brewery three days a week, participate in presentations for public tours, and brew Black Creek - branded beer in its commercial brewing facility for sale at the LCBO. TRCA will provide the space and amenities, license the Black Creek trademark for off site beer sale, organize and staff tours, interpretation, and on -site beer and merchandise sales, and market the brewery. Accompanying the brewery, a beer museum will also be created in the Halfway House Inn. This museum will highlight the history of brewing in Ontario. From the first known brew "Mead ", to 1860s Ales & Porters, to the current day beer, TRCA staff and Trafalgar Ales and Meads on -site brewers will be experts in sharing this history. All this will help create a rich, multifaceted visitor experience. This brewery will also be highlighted as a link to sustainability, then and now. Pioneer breweries made do with the raw materials and equipment available. The barley and hops were grown in local fields, the equipment was built in the local village shops, and the waste streams were used for animal feed and compost. Little was wasted. The environmental footprint of these breweries was small. Demonstrating this supports TRCA's mission and Black Creek Pioneer Village's programming related to agriculture, sustainability and the promotion of buying locally produced food and drink. 1261 Trafalgar Ales and Meads sees particular benefits in developing a historic brewery at Black Creek Pioneer Village. In addition to BCPV's historic context, BCPV can integrate the entire brewing process from growing the raw materials (hops and barley), to processing them (milling the malted barley) to serving the final product. Furthermore Black Creek Pioneer Village has a fully functioning food service department that can enhance the visitor experience. RATIONALE A historic brewery in the Half Way House Inn at Black Creek Pioneer Village, offers a wide range of benefits to TRCA. Touching almost every element of BCPV's operation (programming, interpretation, collections, food services, corporate sales, etc.), the brewery will: • provide several new revenue streams; • deliver new, previously unengaged audiences to Black Creek Pioneer Village; • create a visitor experience unique in Canada (it will be the only operating historic, brewery in Canada); • leverage and strengthen Black Creek Pioneer Village's existing brand; • offer revenue - generating marketing outreach through the distribution and sale of Black Creek branded product (beer); • leverage a currently underutilized income earning asset - the Half Way House Restaurant; • integrate other parts of BCPV to create a rich, multifaceted visitor experience; • offer opportunities to showcase self- sufficient, sustainable food production. Trafalgar Ales and Meads is the only micro - brewery in Ontario that specializes in small batch brewing (1 OOL or less) of experimental and historic brews, coupled with the capacity for commercial -scale brewing for LCBO distribution. It is the only brewery in Ontario, possessing special knowledge, skills and experience in the kind of brewing typical of 19th century rural Ontario that will be showcased at Black Creek Pioneer Village. As a result, staff is recommending approval as per section 1.14.5 of the TRCA Purchasing Policy as follows: The required goods and services are to be supplied by a particular vendor or supplier having special knowledge, skills, expertise or experience that cannot be provided by another supplier. As one of Ontario's oldest operating craft breweries, Trafalgar Ales and Meads also brings a long- standing relationship with the Canadian Brewrianists Society, collectors of beer memorabilia. Through this relationship, the brewery will facilitate the provision of artifacts, photos and other items to develop the beer museum that will accompany the brewery. FINANCIAL DETAILS In addition to the $92,000 upset limit annual operating fee outlined in the contract agreement, it is anticipated that there will be a one time cost of $30,000 to retrofit the Half Way House Inn and an annual cost of $50,000 for marketing. All funding will be made available through internal reallocation of Black Creek Pioneer Village operating budgets. These will be offset by cultural grants and revenue generation. 1262 Forecasted revenues from the brewery will result in a first -year net loss of $9,000 owing to the start-up investment costs. Every year following, it is conservatively forecasted to generate a net revenue from $32,000 in the second year and growing to $52,000 in the seventh year. Report prepared by: Derek Edwards, extension 5672 Emails: dedwards @trca.on.ca For Information contact: Derek Edwards, extension 5672 Emails: dedwards @trca.on.ca Date: December 03, 2008 SECTION IV - ITEMS FOR THE INFORMATION OF THE BOARD RES.#B169/08 - Moved by: Seconded by: INFORMATION TECHNOLOGY DISASTER PREVENTION AND RECOVERY PLAN Implementation. Update on the implementation of the Information Technology Disaster Prevention and Recovery Plan. Reenga Mathivanan Maja Prentice THAT the report on Information Technology Disaster Prevention and Recovery Plan, dated December 2, 2008, be received. CARRIED BACKGROUND At Authority Meeting #3/07, held on April 27, 2007, Resolution #A90/07 was approved, in part, as follows: ...AND FURTHER THAT staff report to the Business Excellence Advisory Board in 2008 on the implementation of the plan and on any updates which may be required to keep the plan current and effective. As a result of the change in the governance model for the Authority, the report is being made to the Executive Committee. RATIONALE The Information Technology (IT) Disaster Prevention and Recovery Plan prepared in March, 2007, included a number of items for implementation. Actions Required as detailed in Plan 1. Implementation of Downsview Disaster Recovery Centre: a. LAN extension from Head Office to Downsview Office; i) 10 MB circuit to facilitate high volume data transfer - May 2007; b. replacement Novell file server - Downsview server; i) hardware /software purchase and install - April 2007; c. Lotus Notes /Domino email and applications replica server; 1263 i) hardware /software purchase and install - June 2007; ii) replication configuration and testing - June 2007; d. Windows back -up server; i) licensing /software purchase and install - June 2007. This follow -up report addresses the required actions as detailed in the IT Disaster Prevention and Recovery Plan. It also provides information pertaining to additional activities undertaken to improve or address Toronto and Region Conservation Authority's (TRCA) IT response mechanisms in the event of a disaster. LAN Extension from Head Office to Downsview Office TRCA acquired a new high capacity circuit to be used for high volume data transfer between Head Office and the Downsview Office. The circuit is a fibre connection with capacity of 10 Mbit /sec bandwidth. This connection serves TRCA in facilitating much improved data transfer between the two offices. Higher capacity connectivity between Head Office and Downsview Office has allowed IT to implement one of the key recommendations of the Disaster Plan which is redundancy at the Downsview Office to be used as a Disaster Recovery Centre. Replacement Novell File Server - Downsview Server IT Staff has purchased and deployed a new and much larger capacity Novell file server for the Downsview Office. This server not only provides much needed file storage capacity for Downsview Office staff but also provides adequate capacity to 'restore' user files and data for key staff from any other office location should a disaster make the files usually stored on their local network server unavailable. In summary, should another office location such as Head Office, Eastville, Boyd Centre, etc. experience an event which made either the workplace unavailable, or destroyed the file server at that location, the server at the Downsview Office could be used to restore the data lost and have it available to displaced staff. This could be done for an entire office location such as Eastville, Boyd Centre, Kortright Centre or for a large number of key staff in the case of the Head Office. Lotus Notes / Domino email and applications replica server A new Lotus Notes / Domino server has been purchased and deployed for the Downsview Office. This server has been setup as a replica server. A replica server in this type of configuration acts as an exact 'copy' of the Notes /Domino Server at the Head Office. Once the replica has been established the software automatically monitors any changes between the two servers and ensures that any changes in data which have occurred on either server are reflected in the replica. Therefore, in the event of a disaster at any TRCA office location including the Head Office, it is assured that an exact copy of the server contents exist at the Downsview location. Having this replica also greatly improves the efficiency of bandwidth utilization between the two office locations. Previously,.staff at Downsview Office had to access all Lotus Notes /Domino email and business applications over the network connection between the two offices. Now the users at Downsview Office access their email and Lotus Notes business application databases locally on their replica server, thus consuming far less bandwidth than before and greatly improving access speed and capability. 1264 Windows Back -up Server A separate back -up server for Downsview Office was determined to be unnecessary to provide reliable back -up for that location. Tape back -up hardware and software which functions on the existing Novell file server was acquired and installed. This configuration reduces the complexity of having an additional back -up server at this location as well as reduces initial capital and future replacement costs associated with the additional hardware and software. Additional Activities Undertaken Supporting TRCA's Disaster Prevention and Recovery Plan Purchase of new large capacity, high speed tape library for Head Office Tape back -up is essential in providing a safe and secure method for securing server data in an archival format. However, with ever increasing amounts of data storage, the capacity of the tape library TRCA was utilizing had reached it physical limits. Back -up speed is also a serious consideration. TRCA full back -up (which runs over the weekend) was taking approximately 36 to 48 hours to complete. IT staff found that on some occasions the back -up was still running on Monday morning and had to be aborted before general staff began accessing the network in large numbers. To address this situation IT staff purchased a new tape library with much more storage capacity and which is approximately four times faster. Currently, the Head Office central computer facility backs -up over one Terabyte of data on any given full back -up. This tape library and associated back -up software backs -up 10 file and application servers including, Accounting, Payroll, Geographic Information Systems (GIS), Laserfiche, Lotus Notes, Novell, etc.. Setup and deployment of Novell Virtual Private Network (VPN) A virtual private network (VPN) allows for secure, remote access to the TRCA computer network via the internet. The VPN uses encryption technology to ensure secure connectivity to the TRCA network over the internet. This technology will allow staff to get access to the TRCA network from anywhere in the world if an internet connection is available. This technology is not only very useful in supporting sustainable initiatives such as telecommuting and access from home, but would be a critical resource in the event of a disaster where physical access to the Head Office would be impossible. DETAILS OF WORK TO BE DONE Staff continue to update IT equipment and software as necessary to ensure that plans are in place to protect TRCA information systems and data. Report prepared by: Chris Gerstenkorn, extension 5347 Emails: cgerstenkorn @trca.on.ca For Information contact: Chris Gerstenkorn, extension 5347 Emails: cgerstenkorn @trca.on.ca Date: December 2, 2008 1265 TERMINATION ON MOTION, the meeting terminated at 11:40 a.m., on Friday, December 12, 2008. Gerri Lynn O'Connor Brian Denney Chair Secretary- Treasurer /ks 1266 c. THE TORONTO AND REGION CONSERVATION AUTHORITY MEETING OF THE EXECUTIVE COMMITTEE #11/08 January 16, 2009 The Executive Committee Meeting #11/08, was held Victoria Room, Black Creek Pioneer Village, on Friday, January 16, 2009. The Chair Gerri Lynn O'Connor, called the meeting to order at 9:35 a.m.. PRESENT Suzan Hall Member Jack Heath Member Colleen Jordan Member Reenga Mathivanan Member Ron Moeser Member Gerri Lynn O'Connor Chair Anthony Perruzza Member Maja Prentice Member Richard Whitehead Member ABSENT Maria Augimeri Vice Chair David Barrow Member . RES. #B170/08 - MINUTES Moved by: Seconded by: Reenga Mathivanan Suzan Hall THAT the Minutes of Meeting #10/08, held on December 12, 2008, be approved. CARRIED PRESENTATIONS (a) A presentation by Peter Kendall, Executive Director, Earth Rangers Centre, in regard to item 7.1 - Earth Rangers Foundation. 1267 RES. #B171 /08 - PRESENTATIONS Moved by: Seconded by: Suzan Hall Ron Moeser THAT above -noted presentation (a) be heard and received. SECTION I - ITEMS FOR AUTHORITY ACTION RES.#B172/08 - Moved by: Seconded by: CARRIED EARTH RANGERS FOUNDATION Request for Lease Amendment, CFN 31514. The Earth Rangers Foundation has requested the leased area be amended. Jack Heath Suzan Hall THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS The Earth Rangers Foundation (Earth Rangers) entered into a lease of certain lands within the Kortright Centre for Conservation, City of Vaughan, with Toronto and Region Conservation Authority (TRCA) for the construction and operation of a wildlife veterinary and rehabilitation centre; WHEREAS TRCA is in receipt of a request from Earth Rangers to amend the leased area. THEREFORE LET IT BE RESOLVED THAT the leased area be amended as follows: (1) add 2,949 square metres to the leased area as shown on the survey sketch prepared by MMM Group dated December, 2008; (2) delete 3,907 square metres from the leased area as shown on the survey sketch prepared by MMM Group dated December, 2008; THAT Earth Rangers be responsible for all costs related to amending the lease; THAT an archaeological review is to be completed at the expense of Earth Rangers with any mitigative measures being carried out to the satisfaction of TRCA; THAT the granting of the lease be subject to any Planning Act approvals that may be required; THAT the granting of the lease be subject to the approval of the Minister of Natural Resources in accordance with Section 21(2) of the Conservation Authorities Act. R.S.O. 1990, chapter C.27 as amended; 1268 AND FURTHER THAT authorized TRCA officials be directed to take whatever action may be required to implement the lease amendment, including the obtaining of necessary approvals and the signing and execution of any documents. CARRIED BACKGROUND At Authority Meeting #6/01, held on July 27, 2001, under Resolution #A139/01, the Authority directed staff to enter into a lease of certain lands within the Kortright Centre for Conservation, City of Vaughan, with The Earth Rangers Foundation for the construction and operation of a wildlife veterinary and rehabilitation centre. The lease was signed on August 1, 2001. At Authority Meeting #6/02, held on June 21, 2002, under Resolution #A153/02, the Authority approved the building, site plan and trail plan associated with the Earth Ranger Centre (ERC). The Earth Rangers Foundation completed the construction of the ERC and veterinarian residence in 2004 and began operations. The ERC building is a landmark in Canada for energy efficiency and has been recognized for outstanding leadership and design related to sustainable energy practices. In May of 2006, the Earth Rangers Centre received a Leadership in Energy and Environmental Design (LEED) Gold designation from the Canada Green Building Council. The Earth Rangers mission is to inspire children with a lasting passion to build a better future. In order to achieve this they are focusing on three areas: school programs featuring Animal Ambassadors (features non - releasable animals), outdoor leadership camps and environmental technologies at the ERC. In the Fall of 2006, The Earth Rangers Foundation decided to transfer their wildlife hospital to the Toronto Wildlife Centre and focus the ERC programs on living responsibly and transforming the ERC into a showcase for sustainable technologies and practices. The ERC will continue to house their Animal Ambassadors and provide educational opportunities. •At Authority Meeting #1/07, held on February 23, 2007, under Resolution #A17/07, staff was directed to submit a bid to the World Green Building Council to develop and support a Secretariat to be located in The Living City Campus at Kortright. TRCA's bid was successful. As part of the efforts to transform the ERC, The Earth Rangers Foundation agreed to lease approximately 4,200 square feet of the ERC to the World Green Building Council, to support a Secretariat. Earth Rangers programming has grown to the point where their parking is no longer adequate and TRCA is in receipt of a request to increase the size of their parking lot. As a result, it is proposed that 2,949 square metres be added to their current leased area. In exchange, Earth Rangers is prepared to remove 3,907 square metres from the leased area as shown on the attached sketch. The parking lot will be enhanced with a ground source heat pump loop, four 10kw solar photovoltaic trackers and the surface will be permeable pavers. The design will minimize tree and earth removal. A tree relocation and replacement plan will be prepared to the satisfaction of TRCA. The Humber Watershed Alliance, at its meeting held on October 21, 2008, adopted resolution #G45/08 as follows supporting the proposed parking lot expansion: 1269 THAT the Humber Watershed Alliance members support the proposal by Mr. Schad to expand the parking facility at Earth Rangers, in a northerly direction, by 1,500 square metres in exchange for 4,500 square metres of TRCA land which will be removed from the existing lease agreement; THAT solar panels be installed in the parking lot to generate education opportunities and energy which will be used in the Earth Rangers facility; THAT permeable pavement be used in the parking lot as a preferred sustainable building practice; THAT replanting and landscaping be undertaken in all disturbed areas to the satisfaction of TRCA; AND FURTHER THAT the expansion of geothermal heating at the facility be endorsed to further reduce heating and cooling costs. FINANCIAL DETAILS Earth Rangers is responsible for all costs related to amending the leased area and for all the construction, planting compensation and maintenance costs related to the expanded parking lot. All terms and conditions of the 2001 lease, including rent, remain unchanged. Report prepared by: Ron Dewell, extension 5245 Emails: rdewell @trca.on.ca For Information contact: Ron Dewell, extension 5245 Emails: rdewell @trca.on.ca Date: November 05, 200.8 Attachments: 1 1270 Attachment 1 1 HE I Aftlil liANC;ERS FOUNDATION LEASE WITH TORONTO AND Hi (dor, c()NsYrniATION AUTHORITY 1133%1%10%A 101 L333133, Area Amendment CI N 3151-1 .1% Pl kl)(11 11 '%5 ",r • at 44 * Iti 01 ASI ;011P, 4 1. • ........ 7 ....... 3314.3.43, 3%. Ir.:. A A 33.* -04-/Jy4444 y mi,serv.itimi 1271 141 RES. #B173/08 - Moved by: Seconded by: SOCCER FIELDS Bruce's Mill Conservation Area Town of Whitchurch - Stouffville, CFN 31698. Request from the Town of Whitchurch- Stouffville to extend the existing lease for soccer fields located within the Bruce's Mill Conservation Area, south of Stouffville Sideroad, east of Warden Avenue, Rouge River watershed, in the Town of Whitchurch - Stouffville, Regional Municipality of York. Jack Heath Reenga Mathivanan THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS the Town of Whitchurch - Stouffville has requested an additional extension to the lease for soccer fields within the Bruce's Mill Conservation Area, south of Stouffville Sideroad and east of Warden Avenue; THEREFORE LET IT BE RESOLVED THAT the lease with the Town of Whitchurch - Stouffville for soccer fields at Bruce's Mill Conservation Area be extended until December 31, 2010; AND FURTHER THAT authorized officials be directed to take whatever action is necessary to finalize the lease extension, including the obtaining of any approvals and signing and execution of documents. CARRIED BACKGROUND At Authority Meeting #2/07, held on March 30, 2007, Resolution #A46/07 was approved as follows: THAT WHEREAS the Town of Whitchurch- Stouffville has requested an additional extension to the lease for soccer fields within the Bruce's Mill Conservation Area, south of Stouffville Sideroad and east of Warden Avenue; THEREFORE LET IT BE RESOLVED THAT the existing lease be extended for an additional 2 year period; AND FURTHER THAT the appropriate Toronto and Region Conservation Authority (TRCA) officials be authorized and directed to take whatever action is necessary to finalize the transaction, including the obtaining of any approvals and signing and execution of documents. In 2001, TRCA entered into a lease for a three year period with the Town of Whitchurch - Stouffville for the use of a parcel of land in the Bruce's Mill Conservation Area for four mini - soccer fields. In 2003 the lease was extended for an additional 3 year period and in 2007 the lease was extended for an additional 2 years. 1272 The master plan for Bruce's Mill Conservation Area was initiated in 2004 and it is anticipated that it will be completed early this year. The soccer fields are located in an area that has been designated as a public use zone in the draft master plan. The public use management zone allows for recreational and educational uses, facilities or services and may accommodate low, moderate or high intensity public use. Through the Public Use and Recreation Plan component of the draft master plan, the site is further designated to be used as an active, nature -based recreation area. The intent is to use these open fields on the west side of the property for an active recreational use, such as a campground, equestrian facility, bike facility, etc.. No specific opportunity or use has yet been specified. Given that the eventual plan for this area is conversion to a larger, active use area, staff is recommending that the period of the extension be kept to a minimum. Town of Whitchurch - Stouffville staff has requested an extension until December 31, 2010. A map showing the lands subject to this proposal is attached. FINANCIAL DETAILS The lease rate for 2008 was $6,300. Staff is proposing a lease rate of $6,500 for the first year of the extension and $6,700 for the second year. Report prepared by: Mike Fenning, extension 5223 Emails: mfenning @trca.on.ca For Information contact: Mike Fenning, extension 5223 or Ron Dewell, extension 5245 Emails: mfenning @trca.on.ca or rdewell @trca.on.ca Date: December 16, 2008 Attachments: 1 1273 Attachment 1 5 z LsJ > J rc 2 t' a." cr 2 1.4 4 1 1274 RES. #B174/08 - Moved by: Seconded by: CITY OF BRAMPTON Request for a permanent easement for a stormwater management facility located south of Queen Street East and west of The Gore Road, in the Claireville Conservation Area, City of Brampton, Region of Peel, CFN 32643. Receipt of a request from the City of Brampton and Orchard Ridge (Brampton) G.P. Inc. to provide a permanent easement for a stormwater management facility located south of Queen Street East and west of The Gore Road, in the Claireville Conservation Area, City of Brampton, Humber River watershed. Jack Heath Maja Prentice THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region Conservation Authority (TRCA) is in receipt of a request from the City of Brampton for a stormwater management facility which will assist Orchard Ridge (Brampton) G.P. Inc. with their development in this vicinity; WHEREAS it is in the opinion of TRCA that it is in the best interests of TRCA in furthering its objectives, as set out in Section 20 of the Conservation Authorities Act, to cooperate with the City of Brampton and Orchard Ridge (Brampton) G.P. Inc. in this instance; THEREFORE LET IT BE RESOLVED THAT a permanent easement containing 6.03 acres (2.44 hectares), more or less, be granted to the City of Brampton for a stormwater management facility to facilitate the development of adjacent lands owned by Orchard Ridge (Brampton) G.P. Inc., said land being part of Lot 4, Concession 9, City of Brampton, Regional Municipality of Peel, subject to the following terms and conditions: (a) The easement price is $1,203,003.18 which is to be paid by Orchard Ridge (Brampton) G.P. Inc. to TRCA, plus all legal and survey costs incurred to complete the transaction; (b) In addition, Orchard Ridge (Brampton) G.P. Inc. will provide the following restoration enhancements; (i) buffer planting along the west limit of the subdivision; (ii) tertiary wetland enhancement; and (iii) development and construction of an off-site wetland and restoration project; (c) All disturbed areas are to be restored to the satisfaction of TRCA as soon as possible after completion of construction; (d) Sediment control measures in a manner satisfactory to TRCA are to be practiced during construction; (e) Orchard Ridge (Brampton) G.P. Inc. shall monitor the effectiveness of the facility for a two year period following construction; 1275 (f) The City of Brampton is to be responsible for all repairs and /or maintenance of the stormwater management facility which may be required in perpetuity and for indemnifying TRCA from any and all claims arising from the construction and payment of all taxes; (g) An archaeological investigation is to be conducted before any site disturbance with any mitigative measures required being carried out all at the expense of Orchard Ridge (Brampton) G.P. Inc. to the satisfaction of TRCA; (h) Any additional considerations as deemed appropriate by TRCA staff or its solicitor. THAT said easement be subject to an Order in Council being issued in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O. 1990, Chapter C.27 as amended; AND FURTHER THAT authorized TRCA officials be directed to take whatever action may be required to implement the easement agreement, including the obtaining of necessary approvals and the signing and execution of any documents. CARRIED BACKGROUND The proposed stormwater management facility will service lands owned by Orchard Ridge (Brampton) G.P. Inc. located south of Queen Street East and west of The Gore Road, in the Claireville Conservation Area of the City of Brampton, Humber River watershed. In addition, an adjacent industrial subdivision which was developed prior to implementation of stormwater management best practices, will be connected and treated by the facility. In accordance with TRCA guidelines "Use of Authority Owned Lands For Storm Water Management" approved at Authority Meeting #11/92, held on January 22, 1993, the proponent has demonstrated that the proposed location on TRCA -owned land is reasonable and all technical requirements of TRCA staff has been satisfied. A detailed design will be carried out prior to construction of the pond, and a permit will be required under Ontario Regulation 166/06. The Orchard Ridge (Brampton) G.P. Inc. hosted a Community Information Session to explain the proposed application on June 7, 2005 and the City of Brampton held a public meeting on December 11, 2006. Also, the proposal was reviewed by at the Claireville Subcommittee on September 3, 2002. The Minutes of the subcommittee meeting were received by the Humber Watershed Alliance at Meeting #4/02, held on October 22, 2002. The subject land is part of a larger parcel acquired from the Favorite Construction Company Ltd. under the Claireville Dam & Reservoir Project on November 1st, 1963. Staff has carried out negotiations with representatives of the developer and respectfully submit that the compensation package relating to the 6.05 acres (2.44 hectares) easement, is fair and reasonable. 1276 The total compensation package includes $1,203,003.18 for purchase of the permanent easement and restoration enhancements estimated to cost $118,000. The enhancements will include: (i) buffer planting along the west limit of the subdivision; (ii) tertiary wetland enhancement; and (iii) development and construction of an off -site wetland and restoration project. It is proposed that Orchard Ridge (Brampton) G.P. Inc. carry out terms (i) and (ii) based on plans approved by TRCA and that item (iii) will be a cash payment to TRCA at the time the permit under O. Reg. 166/06 is issued. FINANCIAL DETAILS It is proposed that the compensation obtained from this easement be utilized for the purchase of priority properties under the 'Greenlands Acquisition Project for 2006 - 2010'. Report prepared by: Edlyn Wong, extension 5711, Mike Fenning, extension, 5223 Ron Dewell, extension 5245 Emails: ewong @trca.on.ca, mfenning @trca.on.ca, rdewell @trca.on.ca For Information contact: Ron Dewell, extension 5245, Mike Fenning, extension 5223 Emails: rdewell @trca.on.ca, mfenning @trca.on.ca Date: December 16, 2008 Attachments: 1 1277 Attachment 1 CITY OF BRAMPTON Request lot a permanent eJtiornent for a storm water management tacilrty lo:ated south of Queen St. E. and west of The Gore Rd., in the C lairviile Conservation Area City of Brampton. Region of Peel (;FN 375:"1 SUBJECT PROPER1Y i)1)Sf'rvaiior) for rha• living city ®TRCA LANDS SUBJECT PROPERTY /// //// //, ( ii;' / / / / / /// 1278 RES. #B175/08 - Moved by: Seconded by: ADVERTISING VENDORS Preferred Vendor List 2009. Preferred vendor list for Toronto and Region Conservation Authority's 2009 roster of preferred advertising vendors. Ron Moeser Reenga Mathivanan THE EXECUTIVE COMMITTEE RECOMMENDS THAT the roster of preferred advertising vendors for Toronto and Region Conservation Authority's (TRCA) advertising requirements from January 1, 2009 to December 31, 2009 be established; THAT the total cost of services contracted to the preferred advertising vendors not exceed $300,000, plus applicable taxes; AND FURTHER THAT staff conduct a review of the performance of the individual vendors to determine any changes to the roster and budget allocation in 2010. CARRIED BACKGROUND TRCA uses many advertising vendors for the promotion of activities and communication with key audiences. TRCA's criteria for selecting vendors includes the ability to reach target audiences effectively, price, reliability, quality of service and opportunities for value added promotion. The proposed roster of preferred advertising vendors consists of the following companies: • Metroland • Today's Parent • Frugal Bride • Today's Bride • Wedding Essentials • Astral Media (EZ Rock) • Get out there communications • NOW magazine • Rogers Publishing • St. Joseph Media • The Globe and Mail • GTA Perspectives • Menu Palace • METRO • SPACING • RENEW • Trailer Life • CM • Woodalls Campground • Toronto Star • Halls.com • Toronto4kids.com • Toronto.com • Google 1279 These vendors provide advertising services to promote facilities, events, initiatives, public meetings and awareness of environmental issues. If it is determined that these vendors do not supply the best combination of reach, quality, service and price for a particular product, staff may use the purchasing policy to source vendors. FINANCIAL DETAILS The cost of services with this roster of vendors is not to exceed $300,000 plus applicable taxes and is identified in the respective 2009 Preliminary Operating budgets. Report prepared by: Adrienne Langston, extension 5201 Emails: alangston @trca.on.ca For Information contact: Rick Sikorski, extension 5214 Emails: rsikorski @trca.on.ca Date: December 09, 2008 SECTION II - ITEMS FOR EXECUTIVE ACTION RES. #B176/08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Development, Interference with Wetlands and Alterations to Shorelines and Watercourses. Pursuant to Ontario Regulation 166/06, written permission from the Authority is required for: a) straightening, changing, diverting or interfering in any way with the existing channel of a river, creek, stream or watercourse, or for changing or interfering in any way with a wetland; b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development. A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected. Moved by: Seconded by: Jack Heath Suzan Hall THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.1 - 8.1.21, with the exception of 8.1.18 - Roybridge Holdings Limited which was withdrawn), which are listed below. CARRIED 1280 CITY OF BRAMPTON 8.1.1 BELL CANADA To construct, reconstruct, erect or place a building or structure on Queen Street East, West of Centre Street, in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by Bell Canada. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the installation of an underground utility corridor associated with a municipal Road Occupancy and Access Permit. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Plan 401, prepared by Plantec Consulting Engineers, dated March 10, 2008, Revision No. 3, revised on December 12, 2008, stamped received by TRCA Planning & Development staff on December 19, 2008; • Plan 402, prepared by Plantec Consulting Engineers, dated March 10, 2008, Revision No. 3, revised on December 12, 2008, stamped received by TRCA Planning & Development staff on December 19, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the installation of an underground utility corridor on Queen Street East, west of Centre Street, in the City of Brampton. The utility corridor will consist of the installation of conduit portions on both the east and west side of the Etobicoke Creek under an existing sidewalk and will utilize an existing utility corridor located on the Queen Street bridge in order to cross Etobicoke Creek.-The installation of the utility corridor will be installed via directional drilling within an existing telecommunications manhole. As such, there are no ecology, geotechnical, hydrogeological, or flooding concerns with this application. Control of Flooding: The proposed works will utilize an existing telecommunication manhole for installation. As such, there will be no impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. 1281 Conservation of Land: No significant vegetation will be removed as a result of construction. All disturbed areas will be restored with a native, non - invasive seed mix in accordance with TRCA's guidelines. Plantings As no vegetation is to be removed by the proposed works, plantings are not required. Policy Guidelines: This proposal is in conformity with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 41150 - Application #: 598/08/BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: January 7, 2009 8.1.2 WOOD -HAVEN HOMES INC. To construct, reconstruct, erect or place a building or structure on Lot 118, Plan 43M -1778, (26 Scotchmere Crescent), in the City of Brampton, Humber River Watershed as located on the property owned by Wood -Haven Homes Incorporated. The purpose is to undertake works in a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 274.05 square metre (2,950 sq. ft.) single family dwelling associated with a minor variance application and building permit. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Sheet No. 118, Siting and Grading Plan, prepared by Hunt Design Associates Inc., dated September 5, 2008, stamped received by TRCA Planning& Development staff on December 12, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to undertake works in a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 274.05 square metre (2,950 sq. ft.) single family dwelling located at 26 Scotchmere Crescent, in the City of Brampton. The subject property is located within an approved residential subdivision (Plan 43M -1778 - Riverstone Phase II) for which a TRCA permit was previously issued (Permit #C06 -625). This previous permit was for the subdivision grading and infrastructure works only and not for the construction of the dwelling associated with this application. The implementing Zoning By -law for the subject property requires a 7.5 metre (24.61 ft.) structural setback for all buildings and structures adjacent to the buffer block and valleylands to the rear of the subject property. As requested 1282 through an associated Minor Variance Application (City File #A08 -207), a 7.0 metre (22.96 ft.) setback is proposed to the adjacent buffer block at the rear of the subject property. Though the 0.5 metre setback is considered by TRCA staff to be minor in nature in this instance, a new permit is required as the requested setback differs from the agreed setback outlined in both the previous permit and the implementing Zoning By -law. There are no geotechnical, ecology, or flooding concerns associated with this application. This application is considered to be one of three separate applications currently on the January 16, 2009 TRCA Executive Committee agenda (i.e., CFN 41769 and CFN 41770). Control of Flooding: TRCA staff has confirmed that the proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: No geotechnical concerns are anticipated with this proposal. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this project. Plantings As no significant vegetation is being removed, enhancement plantings are not required. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 41768 - Application #: 1004 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: January 7, 2009 8.1.3 WOOD -HAVEN HOMES INC. To construct, reconstruct, erect or place a building or structure on Lot 171, Plan 43M -1778, (56 Riverglen Street), in the City of Brampton, Humber River Watershed as located on the property owned by Wood -Haven Homes Incorporated. 1283 The purpose is to undertake works in a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 381.08 square metre (4,102 sq. ft.) single family dwelling associated with a minor variance application and building permit. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Sheet No. 171, Siting and Grading Plan, prepared by Hunt Design Associates Inc., dated September 5, 2008, stamped received by TRCA Planning& Development staff on December 12, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to undertake works in a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 381.08 square metre (4,102 sq. ft.) single family dwelling located at 56 Riverglen Street, in the City of Brampton. The subject property is located within an approved Plan of Subdivision (Plan 43M -1778 Riverstone Phase II) for which a TRCA permit was previously issued (Permit #C06 -625). The previous permit was associated with the subdivision grading and infrastructure works and did not include the construction of the proposed dwelling associated with this application. The implementing Zoning By -law for the subject property requires a 7.5 (24.61 ft.) metre structural setback for all buildings and structures adjacent to the buffer block and valleylands to the rear of the subject property. As requested through an associated Minor Variance Application (City File #A08 -208), a 7.0 (22.96 ft.) metre setback is proposed to the adjacent buffer block at the rear of the property. Though the 0.5 metre setback is considered by staff to be minor in nature in this instance, a new permit is required as the requested setback differs from the agreed setback outlined in both the previous permit and the implementing Zoning By -law. There are no geotechnical, ecology, or flooding concerns associated with this application. This application is considered to be one of three separate applications currently on the January 16, 2009 TRCA Executive Committee agenda (i.e., CFN 41770 and CFN 41768). Control of Flooding: TRCA staff has confirmed that the proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all. phases of construction. Dynamic Beaches: Not applicable. Erosion: No geotechnical concerns are anticipated with this proposal. 1284 Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings As no vegetation is to be removed by the proposed works, plantings are not required. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 41769 - Application #: 1005 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: January 7, 2009 8.1.4 WOOD -HAVEN HOMES INC. To construct, reconstruct, erect or place a building or structure on Lot 117, Plan 43M -1778, (28 Scotchmere Crescent (Lot #117, R.P. 43M- 1778)), in the City of Brampton, Humber River Watershed as located on the property owned by Wood -Haven Homes Incorporated. The purpose is to undertake works in a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 282.80 square metre (3,044 sq. ft.) single family dwelling associated with a minor variance application and building permit. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Sheet No. 117, Siting and Grading Plan, prepared by Hunt Design Associates Inc., dated September 5, 2008, stamped received by TRCA Planning& Development staff on December 12, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to undertake works in a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 282.80 square metre (3, 044 sq. ft.) single family dwelling located at 28 Scotchmere Crescent, in the City of Brampton. The subject property is located within an approved Plan of Subdivision (Plan 43M -1778 Riverstone Phase II) for which a TRCA permit was previously issued (Permit #C06 -625). The previous permit was associated with the subdivision grading and infrastructure works and did not include the construction of the proposed dwelling associated with this application: The implementing Zoning By -law for the subject property requires a 7.5 (24.61 ft.) metre structural setback for all buildings and structures adjacent to the buffer block and valleylands to the rear of the subject property. As requested through an associated Minor Variance Application, a 7.0 (22.96 ft) metre setback is proposed to the adjacent buffer block at the rear of the property. Though the 0.5 metre setback 1285 is considered by staff to be minor in nature in this instance, a permit is required as the requested setback differs from the agreed setback outlined in both the previous permit and the implementing Zoning By -law. There are no geotechnical, ecology, or flooding concerns associated with this application. This application is 1 of 3 similar applications (i.e., CFN 41769 and CFN 41768). Control of Flooding: TRCA staff has confirmed that the proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: No geotechnical concerns are anticipated with this proposal. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this project. Plantings As no significant vegetation is being removed, enhancement plantings are not required. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 41770 - Application #: 1006 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: January 7, 2009 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.5 30 RIDGEVALLEY CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 13, Plan 3515, (30 Ridgevalley Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to facilitate the construction of a new two- storey single family detached dwelling. The existing dwelling is to be demolished. 1286 The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing No. A1.2, Site Plan, Landscape Calculations and Servicing Plan, prepared by Richard Wengle Architect Inc., dated November 10, 2008, received on December 4, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new two - storey single family detached dwelling. The existing dwelling is to be demolished. The subject site is located east of Islington Avenue and south of Eglinton Avenue West backing onto St. George's Golf and Country Club in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The subject site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the ravine corridor. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: The proposed works are located no further than the existing limit of development. TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the completed works. There are no other significant natural features on, or adjacent to, the site that would be negatively impacted by the project. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. 1287 CFN: 41736 - Application #: 991/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: January 7, 2009 8.1.6 5 MOUNTAIN ASH COURT To construct, reconstruct, erect or place a building or structure on Lot 132, Plan M -944, (5 Mountain Ash Court), in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed. The purpose is to facilitate the construction of a second storey addition and covered porch to the existing single family detached dwelling. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing unnumbered, Proposed Site Plan, prepared by Lorne Rose Architect, dated September 6, 2008, received on October 7, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a second storey addition and covered porch to the existing single family detached dwelling. The subject site is located west of The West Mall and south of Bloor Street West backing onto Markland Wood Country Club and Etobicoke Creek in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The subject site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. 1288 Conservation of Land: The proposed works are located no further than the existing limit of development. As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to, the site that may be negatively impacted by the project. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B), Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41535 - Application #: 857/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: January 7, 2009 ,8.1.7 68 HILLDALE ROAD To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Lot 6, 7, Plan 1982, (68 Hilldale Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to acknowledge works that have taken place within a TRCA Regulated Area of the Humber River Watershed without the benefit of a municipal or TRCA permit. The works involved the construction of a two- storey addition to the rear of the existing two- storey single family detached dwelling. The proposed addition was constructed over top of the existing concrete slab verandah. A penalty fee (additional 25% of the current fee) has been received for the subject works. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -1, Site Plan, prepared by Epic Designs Inc., dated June 28, 2008, revised December 4, 2008, received on December 8, 2008; • Drawing No. A -5, West Elevation, prepared by Epic Designs Inc., dated June 18, 2008, revised December 4, 2008, received on December 8, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 1289 Proposal: The purpose of this application is to acknowledge works that have taken place within a TRCA Regulated Area of the Humber River Watershed without the benefit of a municipal or TRCA permit. The works involved the construction of a two- storey addition to the rear of the existing two- storey single family detached dwelling. The proposed addition was constructed over top of the existing concrete slab verandah. A penalty fee (additional 25% of the current fee) has been received for the subject works. The subject site is located within the Rockcliffe Park: Black Creek Special Policy Area, north of St. Clair Avenue West and east of Weston Road in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The subject property is located within the Regional Storm Floodplain of the Humber River Watershed. The new addition has been flood proofed to the 350 -year flood elevation and is consistent with the minimum requirements of Special Policy Areas. TRCA staff have determined that proposed addition is not expected to impact on the storage and /or conveyance of flood waters. Pollution: A sediment control fence was maintained during construction to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.1.(B) - Development Guidelines for Development /Redevelopment within Designated Two -Zone Areas or Special Policy Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41419 - Application #: 774/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: January 7, 2009 1290 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.8 24 ALDERBROOK DRIVE To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 19, Plan 5455, (24 Alderbrook Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a replacement dwelling with a walk -out basement. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Unnumbered Drawing, Proposed Site Plan, prepared by Lorne Rose Architect, dated September 29, 2008, received October 7, 2008, red -line revised by TRCA staff January 6, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant proposed to demolish an existing two - storey dwelling and construct a replacement two - storey dwelling with a walk -out basement on roughly the same footprint. The property is located across the street from the Wilket Creek Ravine, west of Leslie Street and North of Lawrence Avenue East, and slopes very mildly towards the street. Control of Flooding: The proposed works are not within a Regional Storm floodplain, and therefore will not impact the storage or conveyance of flood flows. Pollution: A silt fence will be secured around all construction areas to prevent the migration of construction - generated sediment into the watercourse, as per the Greater Golden Horseshoe Area Conservation Authorities' Erosion and Sediment Control Guideline for Urban Construction, 2006. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical /slope stability issues with the proposed works. Conservation of Land: No significant vegetation will be affected by the proposed works. Plantings No plantings are required. 1291 Policy Guidelines: This proposal is consistent with Section 4.2.2. D) - Replacement Structures - of the TRCA's Valley and Stream Corridor Management Program. CFN: 41543 - Application #: 863/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: January 6, 2009 8.1.9 42 THE BRIDLE PATH To construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 9, Plan 5320, (42 The Bridle Path), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to demolish an existing dwelling and construct a new dwelling, and reconfigure an existing in- ground pool with a pool house and associated patio space. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing No. L1 Landscape Plan, prepared by NAK Design Group, dated October 3, 2007, revised December 1, 2008, received December 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant proposes to construct a replacement dwelling and pool house, and to reconfigure an existing in- ground pool, on a terraced property backing on to the Wilket Creek Ravine. The property is located north of Lawrence Avenue East, and east of Bayview Avenue. The proposed works do not extend beyond the existing limit of development. Control of Flooding: The proposed works are not located within a Regional Storm flood plain, and therefore will not impact the storage or conveyance of flood waters. Pollution: A sediment fence will be installed and maintained throughout construction activities. Dynamic Beaches: Not applicable. 1292 Erosion: There are no geotechnical /slope stability concerns with the proposed works. Conservation of Land: No significant vegetation will be removed as a result of the proposed works. Plantings No plantings are required. Policy Guidelines: The proposed works are consistent with Section 4.2.2. D) - Replacement Structures - of the TRCA's Valley and Stream Corridor Management Program. CFN: 41284 - Application #: 697/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: January 7, 2009 8.1.10 174 STRATHGOWAN AVENUE To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Lot 126. 127, 128, Plan 511E, (174 Strathgowan Avenue),' in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a replacement dwelling on similar footprint to the existing dwelling. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing No. SKA 0.1 Site Plan, prepared by form architecture & design inc., dated February 2008, received November 7, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposed replacement dwelling is located across the street from the Burke Brook ravine. The property slopes gently towards the street, and is in a manicured condition. Control of Flooding: The proposed works are not located within a Regional Storm flood plain and will therefore not impact the storage or conveyance of flood waters. Pollution: The proposed works are located a minimum of 58 metres from the watercourse, and are separated by woodland vegetation and Strathgowan Avenue. Given this, it is expected that the proposed works will not have an impact on the watercourse. 1293 Dynamic Beaches: Not applicable. Erosion: There are no slope stability or erosion concerns with this proposal. Conservation of Land: There is no significant vegetation present on the site. Plantings No plantings are required. Policy Guidelines: This proposal is consistent with Policy 4.2.2 D) - Replacement Structures - of the TRCA's Valley and Stream Corridor Management Program. CFN: 41654 - Application #: 940/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: January 5, 2009 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.11 SCARBORO GOLF & COUNTRY CLUB To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 16, Concession D, (321 Scarborough Golf Club Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by Scarboro Golf & Country Club. The purpose is to remove and place fill material and site grade within the floodplain and regulated area in order to facilitate renovations of several tees on the existing golf course. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Scarboro Golf and Country Club, 2008 Fall Renovation Plan, prepared by Ian Andrew Golf Design Inc., dated November 2008, received December 8, 2008; • Drawing No. SED2, Site - Front 9 Holes, Renovation Plan Phase Two, Erosion Sediment Control Plan, prepared by Burnside, dated Nov. 26, 2008, received December 8, 2008; • Drawing No.SED1, Site - Back 9 Holes, Renovation Plan Phase Two, Erosion Sediment Control Plan, prepared by Burnside, dated Nov. 26, 2008, received December 8, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 1294 Proposal: The applicant is proposing to carry out phase two of the renovation plan for the existing golf course. Phase one of the proposed works were carried out in the spring /summer of 2008 under a separate permit. The works involve both the relocating and reshaping of several tees. The applicant is proposing to carry out phase two of the work in the fall /winter of 2008/09. Control of Flooding: A portion of the grading /cutting and filling works will take place within the floodplain portion of the property along Highland Creek. TRCA staff requested the applicant undertake a floodplain analysis of the west tributary of Highland Creek in order to assess the impacts of the proposed works upon the floodplain. TRCA staff are in agreement with the conclusions of the floodplain analysis which reveal that there will be no significant impacts to the upstream and downstream storage or conveyance of floodwaters. Pollution: A silt fence will be secured around all construction areas to prevent the migration of construction generated sediment into the watercourse. Dynamic Beaches: Not applicable. Erosion: Not applicable. Conservation of Land: The proposed works will be executed beyond the margin (top of bank) of the watercourse thereby mitigating direct impacts on the existing creek bank. All filled and disturbed areas will be stabilized and re- vegetated following construction. No significant resource features will be impacted by the proposed works. Plantings New trees will be planted throughout the golf course. Policy Guidelines: The proposal complies with Section 4.4.2(H), Existing Resource Based Uses, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41034 - Application #: 495/08/TOR • Report Prepared by: Mark Rapus, extension 5259 For information contact: Mark Rapus, extension 5259 Date: January 7, 2009 8.1.12 58 COPPING ROAD To construct, reconstruct, erect or place a building or structure and change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 64, Plan 4888, (58 Copping Road), • in the City of Toronto (Scarborough Commuriity Council Area), Highland Creek Watershed. 1295 The purpose is to construct a second - storey and a two - storey addition in the side yard of an existing 1- storey dwelling. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing No. 1 Site Plan, prepared by Sasha Milenov, dated June 28, 2007, received November 14, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant proposes to construct a second - storey addition and a two - storey side yard addition to an existing brick bungalow backing on to the Ravine. The proposed works do not extend closer to the existing top of the ravine slope, which is more than 10 meters from the existing limit of development. Control of Flooding: The proposed works are not located within a Regional Storm flood plain, and therefore will not impact the conveyance or storage of flood flows. Pollution: Sediment control fencing will be installed and maintained throughout construction activity. Dynamic Beaches: Not applicable. Erosion: There are no erosion /slope stability issues with the proposed works. Conservation of Land: No significant vegetation will be impacted by the proposed works. Plantings No plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2. C) - Minor Additions - of the TRCA's Valley and Stream Corridor Management Program. CFN: 41712 - Application #: 979/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: January 7, 2009 1296 8.1.13 42 FALLINGBROOK DRIVE To temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on 42 Fallingbrook Drive, in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to construct an in- ground pool in the rear yard of an existing dwelling. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Unnumbered Site Plan Drawing, prepared by Betz Pools, dated January 30, 2007, received December 22, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves the construction of an in- ground swimming pool in a flat portion of the terraced rear yard of the existing dwelling. Control of Flooding: The proposed works are not located within a Regional Storm flood plain, and therefore will not impact the storage or conveyance of flood flows. Pollution: The proposed works are located within a manicured, terraced portion of the Fallingbrook Ravine system, and not adjacent to any natural features or watercourses. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings No plantings are required. Policy Guidelines: This proposal is in conformity with Section 4.2.2. E) - Property Improvements and Ancillary Structures - of the TRCA's Valley and Stream Corridor Management Program (VSCMP). CFN: 41738 - Application #: 989/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: January 5, 2009 1297 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.14 38 RUSSELL HILL ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on 38 Russell Hill Road in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to facilitate the construction of a one - storey rear addition to the existing two- storey single family detached dwelling. The proposed addition will replace an existing patio. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Accurate Designs, dated December 2008, received on December 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a rear addition to the existing two - storey single family detached dwelling. The proposed addition will replace an existing patio. The subject site is located west of Avenue Road and south of St. Clair Avenue West in the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: The subject site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment fencing is not required as the proposed works are adequately set back from the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The proposed works are located no further than the existing limit of development. TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the completed works. There are no other significant natural features on, or adjacent to, the site that were negatively impacted by the project. 1298 Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B), Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41723 - Application #: 985/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: January 7, 2009 CITY OF VAUGHAN 8.1.15 7 BEVAN ROAD To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 19, Concession 4, (7 Bevan Road), in the City of Vaughan, Don River Watershed. The purpose is to permit the continued construction of a new dwelling within a Regulated Area of the Don River Watershed at 7 Bevan Road in the City of Vaughan. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing SP -1, prepared by Anderson & Associates Inc., dated January 30, 2002, received by the TRCA December 12, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to permit the continued construction of a new dwelling within a Regulated Area of the Don River Watershed. The project had previously received a permit under Ontario Regulation 158 from the TRCA issued April 25, 2003 (Permit No. C- 03070). However, the works were not completed prior to the expiration of the permit and the applicant has now reapplied under Ontario Regulation 166/06. The works which form this permit are identical to the previously approved works. Control of Flooding: The works are not located within the Regional Storm Flood Plain, there will be no impacts on the storage or conveyance of flood waters. 1299 Pollution: Sediment control fencing has been erected and will be maintained for the duration of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As a watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will be restored to the previously existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 G) - Infilling - of the Authority's Valley and Stream Corridor Management Program. CFN: 41757 - Application #: 1000 /08/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: January 6, 2009 8.1.16 128 WALLACE STREET To site grade at 128• Wallace Street, in the City of Vaughan, Humber River Watershed. The purpose is to recognize grading works completed within a Regulated Area of the Humber River Watershed in order to facilitate the construction of a driveway at 128 Wallace Street in the City of Vaughan. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Grading Plan, prepared by the applicant, dated November 28, 2008, received by the TRCA December 3, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 1300 Proposal: The purpose is to recognize minor grading works completed within a Regulated Area of the Humber River Watershed in order to facilitate the construction of a driveway. The subject property is located along the valley wall of the Main Humber River. The works completed are located between the main slope of the valley wall and in close proximity but outside of the Regional Storm Flood Plain (approximately 7 metres). Fees: As the works were completed prior to the issuance of a permit under Ontario Regulation 166/06, an additional administrative fee has been applied to this application. Control of Flooding: The completed works are located outside of the Regional Storm Flood Plain, there will be no impacts on the storage or conveyance of flood waters. Pollution: The works have already been completed and due to the minor nature of the works and immediate stabilization has not caused the transport of sediment off the subject property. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: As a watercourse has not been impacted by the proposal, there are no fisheries concerns. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas have been restored to their previously existing sodded condition and there are no affects on Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41676 - Application #: 953 /08/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: December 18, 2008 8.1.17 REGIONAL MUNICIPALITY OF YORK To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Jersey Creek Crossing of Islington Avenue, in the City of Vaughan, Humber River Watershed as located on the property owned by Regional Municipality of York. 1301 The purpose is to repair and reinforce an existing armourstone wall located on the north side of Jersey Creek at its Islington Avenue Crossing north of Highway 7. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Letter of undertaking to provide outstanding details; dated December 29, 2008; received January 6, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The Regional Municipality of York is working to address a failed section of an existing armourstone retaining wall on the south side of Jersey Creek. The class of undertaking under which this project has been submitted is Schedule A in accordance with the Municipal Engineers Association Class EA document. The works include the removal and replacement of failed armourstone pieces and filter fabric within Jersey Creek. In order to isolate the working area, a coffer dam will be utilized to divert flows into an existing road culvert. A fish removal plan is to be implemented and permits from the Ministry of Natural Resources may be necessary. Removals of existing materials will be taken off site and erosion and sediment controls will be implemented. Control of Flooding: The proposed project will not impact storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures (silt /sedimentation fence, coffer dams etc.) will be implemented and maintained for the duration of construction and until the site is stabilized and restored to prevent construction - generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: The proposed repair works will alleviate any slope stability concerns associated with the failed segment of the existing armourstone wall. Conservation of Land: This project involves both in- stream and near water works and as such, the project will be subject to a coldwater fisheries timing window restricting construction activities to between July 1 and September 15. A letter of advice will be issued for this project. Plantings Limited brush removal is anticipated and will be compensated for in a planting plan designed to generate a net benefit. All plantings will be native and non - invasive. 1302 Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41727 - Application #: 983 /08/VAUG Report Prepared by: Jennifer Draper, extension 5715 For information contact: Jennifer Draper, extension 5715 Date: January 6, 2009 8.1.18 ROYBRIDGE HOLDINGS LIMITED To construct, reconstruct, erect or place a building or structure and site grade on Lot 8, Concession 9 Block 41, Plan 65M -3627, (Milani Boulevard and Highway 27), in the City of Vaughan, Humber River Watershed as located on the property owned by Roybridge Holdings Limited. • Withdrawn 8.1.19 65 COOK'S MILL CRESCENT To construct, reconstruct, erect or place a building or structure on Lot 23, 65M3917, (65 Cook's Mill Crescent), in the City of Vaughan, Don River Watershed. The purpose is to permit the continued construction of a deck located within a Regulated Area of the Don River Watershed at 65 Cook's Mill Crescent in the City of Vaughan. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by the applicant, received by the TRCA December 8, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to permit the continued construction of a rear yard deck being built within a Regulated Area of the Don River Watershed. According to TRCA mapping, the subject property is partially within the valley. Based upon the site plan and a site visit conducted by TRCA staff December 5, 2008, the partially constructed deck is located approximately 10 metres away • from the existing top of bank. Through the Draft Plan of Subdivision process (Woodvalley Developments - 19T- 95062) an appropriate buffer to the valley was established and conveyed to the TRCA. The partially constructed deck is located approximately 3.3. metres away from this buffer. 1303 Fees: As the works commenced prior to the issuance of a permit under Ontario Regulation 166/06, an additional administrative fee has been applied to this application. Control of Flooding: The partially constructed deck is not located within the Regional Storm Flood Plain. There will be no impact on the storage or conveyance of flood waters. Pollution: The proposed / partially completed works will not cause the transport of sediment into the valley system as the area between the works and the buffer remain sodded and undisturbed. Dynamic Beaches: Not applicable. Erosion: TRCA geotechnical staff are satisfied that the proposed / partially completed works will not impact the stability of the existing slope. Conservation of Land: As a watercourse is not impacted by the project, there are no fisheries concerns. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings All disturbed areas will / have been restored to the previously existing sodded condition and no significant natural features will be affected. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41750 - Application #: 997 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: December 16, 2008 8.1.20 111 WORTHVIEW DRIVE To construct, reconstruct, erect or place a building or structure on Lot 106, Plan 65M 3927, (111 Worthview Drive), in the City of Vaughan, Humber River Watershed. The purpose is to recognize an existing rear yard deck which was constructed without a TRCA permit within a Regulated Area of the Humber River Watershed at 111 Worthview Drive, in the City of Vaughan. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: 1304 • Site Plan, prepared by the applicant, received by the TRCA August 29, 2008; • Deck Plan, prepared by the applicant, received by the TRCA December 1, 2008 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to recognize an existing rear yard deck within a Regulated Area of the Humber River Watershed. As identified by the City of Vaughan Building Standards Department, the deck constructed had not previously. been approved through the building permit process and the owner was requested to contact TRCA prior to the issuance of a building permit to recognize • the structure. Based upon a site visit conducted by TRCA staff on December 16, 2008, the deck is located approximately 4 metres from the rear lot line and approximately 8 metres away from the existing top of bank. The slope appears to have an inclination of 3H : 1 V or milder and has been determined to be stable by TRCA geotechnical staff. As the works have already been completed, the duration of the permit has been reduced. Fees: As the works were completed prior to the issuance of a permit under Ontario Regulation 166/06, an additional administrative fee has been applied to this application. Control of Flooding: The works are not located within the Regional Storm Flood Plain. There will be no impacts on the storage or conveyance of flood waters. Pollution: The site has already been sodded and stabilized. No sediment transport will result from this project. Dynamic Beaches: Not applicable Erosion: TRCA geotechnical staff are satisfied that the completed works will not impact the stability of the slope. Conservation of Land: As a watercourse has not been impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that have been or will be negatively impacted by the project. Plantings All disturbed areas will be restored to the existing sodded condition and will not affect any significant natural features. 1305 Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 41728 - Application #: 986 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: December 16, 2008 TOWN OF MARKHAM 8.1.21 REGIONAL MUNICIPALITY OF YORK To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Highway 7 and Woodbine Avenue, in the Town of Markham, Rouge River Watershed as located on the property owned by Regional Municipality of York. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the installation of a telecommunications conduit associated with a Regional corridor approval permit. The permit will be issued for the period of January 16, 2009 to January 15, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing No. UG -47, prepared by Plantec Consulting Engineers, dated April 2008, revised on December 18, 2008, stamped received by TRCA Planning & Development staff on December 23, 2008; • Drawing No. UG -46, prepared by Plantec Consulting Engineers, dated April 2008, revised on December 18, 2008, stamped received by TRCA Planning & Development staff on December 23, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The project involves the installation of an underground utility conduit within a TRCA Regulated Area of the Rouge River Watershed along the south side of Highway 7, west of Woodbine Avenue, in the Town of Markham. The underground conduit will be installed under the watercourse (i.e., Beaver Creek) and will be installed using the directional drilling method. The proposed works will be constructed a minimum 2.5 metres below the watercourse bottom (warm water stream). The entry and exit locations will be appropriately setback from the valley corridor feature and the work areas will be isolated and contained with sediment & erosion control fencing. Control of Flooding: No excavated material is to be stockpiled within the Regional Storm Floodplain and all existing grades are to be maintained. 1306 Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. All disturbed areas will be restored with a native, non - invasive seed mix in accordance with TRCA's guidelines. In addition, works are to be constructed in accordance with the DFO Operational Statement for High Pressure Directional Drilling. Plantings As no vegetation is to be removed by the proposed works, plantings are not required. The proposed seed mix composition is native and non - invasive. Policy Guidelines: This proposal is in conformity with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 41689 - Application #: 966/08 /MARK Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: January 7, 2009 THE FOLLOWING PERMIT APPLICATIONS WERE ERRATA ITEMS: RES.#B177/08 - APPLICATIONS FOR PERMITS PURUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS Moved by: Seconded by: Jack Heath Suzan Hall THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.22 - 8.1.29, inclusive), that had been scheduled on the agenda as errata applications, for which all the required information was received and finalized as listed below. CARRIED 1307 CITY OF BRAMPTON 8.1.22 11860 BRAMALEA ROAD To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 17, Concession 5 EHS, (11860 Bramalea Road), in the City of Brampton, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to permit the placement of approximately 3, 500 cubic metres (123 601 cu. ft.) of fill at the front of the subject 0.4 hectare (1 acre) residential property associated with a municipal fill permit application. The permit will be issued for the period of January 16, 2009 to January 15, 2011. • Grading Plan, prepared by Riepma Consultants Inc., dated December 2008, Revised on January 10, 2009, redline revised by TRCA Planning & Development staff on January 13, 2009, stamped received by TRCA Planning & Development staff on January 13, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to permit the placement of approximately 3,500 cubic metres (123, 601 cu. ft.) of fill at the front portion of 11860 Bramalea Road, in the City of Brampton. Please note that the subject 0.4 hectare (1 acre) property is located within the planning boundaries of the Springdale North /Countryside Villages /Area 48 Secondary Plan and TRCA staff is currently reviewing the Phase II component of the associated Master Environmental Servicing Plan (MESP). The proposed works are located within an area void of any significant vegetation and are sufficiently setback (i.e., 10 metres) from the valley corridor located at the rear of the subject property. As such, no geotechnical concerns are anticipated with this application. Additionally, there are no flooding concerns associated with this application. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate erosion and sediment controls (i.e., double silt fence, straw bales, etc.) have been proposed with this application, and will be maintained throughout all phases of construction. 1308 Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. Plantings As no vegetation is to be removed by the proposed works, plantings are not required. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 41638 - Application #: 934 /08 /BRAM Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: January 7, 2009 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.23 28 BEAUCOURT ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 19, Plan 3648, (28 Beaucourt Road), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to construct a second - storey addition to the existing single family detached dwelling. The permit will be issued for the period of January 16, 2009 to January 15, 2011. • Drawing No. A -2, Site Plan and Zoning Information, prepared by Lawrence Dodd Architect, dated April 7, 2008, Revision No. 1, revised on November 28, 2008, received on January 13, 2009; • Drawing No. A3 -01, North Elevation, prepared by Lawrence Dodd Architect, dated November 28, 2008, received on November 28, 2008; • Drawing No. A3 -02, South Elevation, prepared by Lawrence Dodd Architect, dated November 28, 2008, received on November 28, 2008; • Drawing No. A3 -03, East Elevation, prepared by Lawrence Dodd Architect, dated November 28, 2008, received on November 28, 2008; • Drawing No. A3 -04, West Elevation, prepared by Lawrence Dodd Architect, dated November 28, 2008, received on November 28, 2008. 1309 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to construct a second storey addition to the existing single family detached dwelling at 28 Beaucourt Avenue in the City of Toronto (Etobicoke York). The footprint of the existing dwelling is to remain unchanged. The subject site is located north of The Queensway, west of Park Lawn Road and backs on to Berry Road Park within a TRCA Regulated Area of the Mimico Creek Watershed. Control of Flooding: This site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment and erosion control fence will be installed in order to prevent construction debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns associated with this application. Conservation of Land: The proposed works are located no further than the existing limit of development. TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the completed works. There are no other significant natural features on, or adjacent to, the site that would be negatively impacted by the project. Plantings Native plantings will be provided as per Urban Forestry Protection Services Guidelines. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41256 - Application #: 680/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: January 7, 2009 1310 8.1.24 168 HUMBERCREST BOULEVARD To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on 168 Humbercrest Boulevard in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to facilitate the works associated with stabilizing and re- vegetating the slope in the rear yard of the existing dwelling. The proposed works involve the replacement of existing retaining walls. The permit will be issued for the period of January 16, 2009 to January 15, 2011. • Drawing unnumbered, Revised Wall Design, prepared by Terraprobe, dated January 13, 2009, received on January 13, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: This permit application is a result of vegetation being removed from rear slope with out the benefit of a municipal permit. The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the works associated with stabilizing and re- vegetating the slope in the rear yard of the existing dwelling. The proposed works involve the replacement of existing retaining walls. The subject site is located east of Jane Street and south of St. Clair Avenue West in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The subject site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: A temporary sediment and erosion control fence will be installed to prevent construction debris from being displaced off-site. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. 1311 Conservation of Land: TRCA staff are satisfied that there will be no geotechnical /slope stability issues associated with the completed works. There are no other significant natural features on, or adjacent to, the site that would be negatively impacted by the project. Plantings Native plantings will be provided as per the Ravine Stewardship Plan. Recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(E) - Development Guidelines for Property Improvements and Ancillary Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41656 - Application #: 942/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: January 7, 2009 TOWN OF MARKHAM 8.1.25 53 PROCTOR AVENUE To construct, reconstruct, erect or place a building or structure on 53 Proctor Avenue, in the Town of Markham, Don River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the replacement of an existing dwelling and ancillary deck structure associated with a building permit application. The permit will be issued for the period of January 16, 2009 to January 15, 2011. • Letter of Undertaking prepared by S. Shojaei, dated January 13, 2009 to address all outstanding ecology and engineering related issues. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the demolition of an existing residential dwelling and the construction of a new residential dwelling on the subject property. The project also involves the construction of an ancillary deck structure at the rear of the proposed new residential dwelling. 1312 The subject property is located within an approved residential subdivision, in which many of the residential dwellings, including the existing dwelling on the subject property, are located at top of bank or within the valley corridor. The proposed new residential dwelling is to be constructed on the footprint of the existing structure. Due to the limitations of the current lot configuration and existing site conditions, the proposed stairs associated with the ancillary deck structure are located below top of bank. However, based on our review of the subdivision in this area, the proposed ancillary structure is consistent with other development in this area. The proposed works are located outside of the Regional Storm Floodplain. Additionally, TRCA staff has reviewed a geotechnical report submitted with this application and confirm that there are no geotechnical and /or slope stability concerns related to the construction of the proposed residential dwelling and deck structure. The proposed works are located in an area void of any significant vegetation. In order to mitigate potential impacts associated with the deck structure, the proponent has committed to providing an extensive enhancement planting plan to improve the ecological condition of a wooded area located at the rear of the subject property and a small tributary of the Don River Watershed located adjacent to the existing driveway. A detailed landscape plan will be reviewed and approved by TRCA staff prior to the issuance of this permit and will be included as part of the approved plans associated with this permit. Control of Flooding: The subject property is located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters are anticipated. Pollution: Appropriate erosion and sediment controls will be installed and maintained on the subject property throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: A geotechnical report has been reviewed with this application, confirming that there are no geotechnical and /or slope stability concerns related to the development of the proposed dwelling and ancillary deck structure. Conservation of Land: No significant vegetation will be removed as a result of construction. However, an extensive enhancement planting plan will be provided with this application. Plantings A variety of native and non - invasive species will be planted on the subject lands consistent with TRCA's guidelines. Policy Guidelines: This proposal is consistent with Section 4.2.2 (D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). 1313 CFN: 41140 - Application #: 588 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: January 7, 2009 8.1.26 20 BAKERDALE ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 210, Plan 6999, (20 Bakerdale Road), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a sunroom associated with a future building permit application. The permit will be issued for the period of January 16, 2009 to January 15, 2011. • Drawing 1, prepared by Life Style Sunrooms, dated October 21, 2008, stamped received by TRCA Planning and Development December 12, 2008, redline revised by TRCA Staff January 13, 2009; • Drawing 2, prepared by Life Style Sunrooms, dated October 21, 2008, stamped received by TRCA Planning and Development December 12, 2008; • Drawing 3A, prepared by Life Style Sunrooms, dated October 21, 2008, stamped received by TRCA Planning and Development December 12, 2008; • Drawing 3B, prepared by Life Style Sunrooms, dated October 21, 2008, stamped received by TRCA Planning and Development December 12, 2008; • Drawing 4, prepared by Life Style Sunrooms, dated October 21, 2008, stamped received by TRCA Planning and Development December 12, 2008; • Drawing 5, prepared by Life Style Sunrooms, dated October 21, 2008, stamped received by TRCA Planning and Development December 12, 2008; • Drawing 6, prepared by Life Style Sunrooms, dated October 21, 2008, stamped received by TRCA Planning and Development December 12, 2008; • Drawing 7, prepared by Life Style Sunrooms, dated October 21, 2008, stamped received by TRCA Planning and Development December 12, 2008; • Drawing 8, prepared by Life Style Sunrooms, dated October 21, 2008, stamped received by TRCA Planning and Development December 12, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a sunroom to the rear of an existing dwelling. Although the subject property is partially located within the Regional Storm Floodplain, the existing dwelling and proposed sunroom are sufficiently setback from the limit of the floodplain. The footprint of the proposed sunroom is to be constructed on the footprint of an existing deck structure. As such, no significant vegetation will be removed as a result of this proposal. 1314 Control of Flooding: The subject proposal is located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of floodwaters are anticipated. Pollution: Sediment and erosion controls (i.e. silt fence) will be erected prior to construction taking place and will be maintained throughout all phases of construction in accordance with TRCA guidelines. Dynamic Beaches: Not applicable Erosion: There are no geotechnical and /or slope stability concerns related to this application. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this project. Plantings No significant vegetation will be removed as a result of construction. As such, no additional plantings are required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41758 - Application #: 1001 /08 /MARK Report Prepared by: Lisa Stern, extension 5370 For information contact: Quentin Hanchard, extension 5324 Date: January 6, 2009 8.1.27 REGIONAL MUNICIPALITY OF YORK To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Highway 7, west of Rodick Road, in the Town of Markham, Rouge River Watershed as located on the property owned by Regional Municipality of York. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the installation of a telecommunications conduit associated with a Regional corridor approval permit. The permit will be issued for the period of January 16, 2009 to January 15, 2011. • Drawing No. UG -53, prepared by Plantec Consulting Engineers, dated April 2008, revised on January 7, 2009, stamped received by TRCA Planning & Development staff on January 13, 2009; 1315 • Drawing No. UG -54, prepared by Plantec Consulting Engineers, dated April 2008, revised on January 7, 2009, stamped received by TRCA Planning & Development staff on January 13, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The project involves the installation of an underground utility conduit within a TRCA Regulated Area of the Rouge River Watershed along the south side of Highway 7, west of Rodick Road, in the Town of Markham. The underground conduit will run under the watercourse (i.e., Apple Creek) and will be installed by directional bore method. The proposed works will be constructed a minimum 2.5 metres below the watercourse bottom (warm water stream). The entry and exit locations will be appropriately setback from the valley corridor feature and the work areas will be isolated and contained with sediment & erosion control fencing. Control of Flooding: No excavated material is to be stockpiled within the Regional Storm Floodplain and all existing grades are to be maintained. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. All disturbed areas will be restored with a native, non - invasive seed mix in accordance with TRCA's guidelines. In addition, works are to be constructed in accordance with the DFO Operational Statement for High Pressure Directional Drilling. Plantings As no vegetation is to be removed by the proposed works, plantings are not required. The proposed seed mix composition is native and non - invasive. Policy Guidelines: This proposal is in conformity with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 41678 - Application #: 956 /08 /MARK Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: January 7, 2009 1316 8.1.28 TOWN OF MARKHAM To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse in a Regulated Area north of Proctor Park, west of Steele Valley Road, in the Town of Markham, Don River Watershed as located on the property owned by Town of Markham. The purpose is to construct channel stabilization and infrastructure protection by the implementation of riparian corridor enhancements and revegetation within a warm water fisheries timing window. A Letter of Advice will be written by TRCA staff on behalf of the Department of Fisheries and Oceans (FOC) for this project. The permit will be issued for the period of January 16, 2009 to January 15, 2011. • Letter of Undertaking to provide minor revisions to engineering and landscape drawings to the satisfaction of TRCA staff; dated January 14, 2009; received January 14, 2009; prepared by the Town of Markham. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The Town of Markham has undertaken a study called the Markham Erosion Restoration Implementation Plan, June 2007. The study was carried out under the Municipal Class Environmental Assessment planning process. The purpose of this study was to identify priority erosion restoration sites along the watercourses within the Town of Markham which may pose a risk to public health and safety, and to develop a restoration plan to address these erosion sites on a site specific basis. TRCA has been involved and provided input in the review of this plan. This proposal is identified in the plan as Site No. 1. The proposed works at this site will involve bank stabilization and corridor revegetation. The eroding portions of the bank will be regarded and stabilized to decelerate bank erosion and prevent excess release of sediment into the watercourse. The restored banks will be revegetated as part of the overall restoration approach which will increase the riparian cover through this reach of the system. Control of Flooding: The storage or conveyance of floodwaters will not be impacted by the proposed works. Pollution: Standard erosion control measures (silt /sediment fencing, cofferdam, dam and pump, silt control filter) will be implemented and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: The proposal is to conduct instream works to stabilize a channel. Staff has reviewed the proposal and has no channel stability concerns with the proposed works. 1317 Conservation of Land: With erosion and sedimentation plans in effect, the potential for a Harmful, Alteration Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be provided by TRCA staff on behalf of the Department of Fisheries and Oceans (FOC). This application is subject to the warmwater fisheries timing window, all works to be completed from July 1 to March 31. Plantings All disturbed areas will be restored with native non - invasive species following construction. This project will result in a net gain of vegetation along the study area. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program CFN: 40189 - Application #: 929 /07 /MARK Report Prepared by: Suzanne Bevan, extension 5759 For information contact: Suzanne Bevan, extension 5759 Date: January 6, 2009 TOWN OF WHITCHURCH - STOUFFVILLE 8.1.29 MATTAMY (HOOVER PARK) LTD. To interfere with a wetland on Lot 35, Concession 8 Lot 35, Plan 65R -7909, (Ninth Line and Hoover Park Drive), in the Town of Whitchurch - Stouffville, Rouge River Watershed as located on the property owned by Mattamy (Hoover Park) Ltd.. The purpose is to construct a catch basin at the edge of a wetland in order to eliminate the potential for rear yard flooding along adjacent residences. The permit will be issued for the period of January 16, 2009 to January 15, 2011. • Drawing No. 404, Hoover Park Drive (STA.2 +793.02 TO STA.3 +069.40), prepared by Stantec Consulting Ltd., dated October 2004, Revision No. 8, revised on January 7, 2009, received by TRCA on January 9, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to interfere with a wetland in order to construct a single catch basin at the edge of a Locally Significant wetland. The works are proposed on the north side of Hoover Park Drive within the recently constructed Wheler's Mill residential neighbourhood. 1318 The wetland in question is surrounded to the north and west by the rear yards of residential town homes and to the east and south by the Ninth Line and Hoover Park Drive, respectively. Urbanization in this area was initially approved by the Town of Whitchurch - Stouffville by the Community of Stouffville Secondary Plan (1997) and the Southwest Functional Servicing Study (2003). Both the secondary plan and functional servicing study required that the wetland area be set aside and protected from development although minimal environmental buffers were provided adjacent to the wetland area. During recent spring snow melt conditions, water levels within the wetland area have risen to, or in some cases, above the rear lot lines of the adjacent residences. Due to grading conditions, the wetland is low lying while the surrounding areas have been raised. In order to ensure that spring melt conditions do not flood the rear yards, the Town of Whitchurch- Stouffville has directed the developer to rectify this situation prior to assumption of the draft plan by the Town. A single catch basin is proposed at an elevation below the rear lot lines to ensure that the water level within the wetland can not flood adjacent residential properties. The catch basin is to drain to the existing storm sewer system at Hoover Park Drive. Control of Flooding: While the lands in question are not subject to riverine flooding and are not located within the Regional Storm Flood Plain, the proposal will minimize the possibility of localized nuisance flooding from the wetland. Pollution: Sediment and erosion control fencing is to be established prior to works taking place to delineate the area of disturbance required for construction of the catch basin and to ensure that sediment is not transported into the wetland area. Dynamic Beaches: Not applicable Erosion: There are no slope stability or erosion concerns with this proposal. Conservation of Land: The catch basin has been sited to the periphery of the wetland along the northern side slope of the Hoover Park Drive road platform. As it is a single catch basin, it will require minimal disturbance to the wetland community. The elevation of the catch basin opening will permit the seasonal fluctuation of water levels within the wetland and will not drain the wetland unless water levels have risen to an elevation that will cause flooding on adjacent residential properties. Plantings Due to the small scale of the project and the maintenance of existing wetland vegetation during construction, no plantings were required to support the application. Policy Guidelines: The application is consistent with Section 2.1.3 of the Provincial Policy Statement, 2005. 1319 CFN: 39605 - Application #: 557/07/WS Report Prepared by: Chris Jones, extension 5718 For information contact: Chris Jones, extension 5718 Date: January 6, 2009 PERMIT APPLICATION 8.1.30 IS PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS: RES. #B178 /08 - PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Jack Heath Suzan Hall THAT permission for routine infrastructure granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the application (8.1.30 - The Regional Municipality of York), which is listed below, be received. CARRIED TOWN OF RICHMOND HILL 8.1.30 THE REGIONAL MUNICIPALITY OF YORK To undertake drainage structure general maintenance on, (Bayview Avenue at CN Rail North of 19th Avenue), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by The Regional Municipality of York. The purpose is to undertake minor restorative ditching along both sides of Bayview Avenue at the CN Railway crossover, North of 19th Avenue and proposed by York Region, for an extent of approximately 75m. The proposed works will be confined entirely the Region right -of -way, which will include the removal of gravel and silt from the ditches to design grade. Rock check dams are to be installed north of the existing settling ponds to prevent any sediment from entering the ditch to the south. All excavated and disturbed areas will be stabilized and restored with river run stones. The works will be carried out in dry conditions and will take no longer than two days. CFN: 41702 - Application #: 969/08/RH Report Prepared by: Ben Krul, extension 5769 For information contact: Jennifer Draper, extension 5715 Date: December 16, 2008 PERMIT APPLICATIONS 8.1.31 - 8.1.47 ARE MINOR WORKS LETTER OF APPROVAL: RES. #B179 /08 - MINOR WORKS LETTER OF APPROVAL PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Jack Heath Suzan Hall 1320 THAT minor works letter of approval granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.31 - 8.1.47, inclusive), which are listed below, be received. CARRIED CITY OF BRAMPTON 8.1.31 CITY OF BRAMPTON To site grade on Part Lot 13, Concession 3 Plan 43M -1431, (Dixie Road and Sandalwood Parkway), in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by City of Brampton. CFN: 41759 - Application #: 1002 /08 /BRAM Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: December 29, 2008 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.32 506 RIVERSIDE DRIVE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 52, 53, Plan 1725, (506 Riverside Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. CFN: 41649 - Application #: 938/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: December 23, 2008 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 8.1.33 GRANITE CLUB To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on 2350 Bayview Avenue, in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by Granite Club. CFN: 41417 - Application #: 773/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: December 30, 2008 8.1.34 380 KEEWATIN AVENUE To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 36, 37, Plan M146, (380 Keewatin Avenue), in the City of Toronto (North York Community Council Area), Don River Watershed. 1321 CFN: 41668 - Application #: 948/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: January 5, 2009 8.1.35 265 BURBANK DR. To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 23, 24, Plan 2134, (265 Burbank Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: 41766 - Application #: 1003/08/TOR Report Prepared by: Brian Storozinski, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: December 19, 2008 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.36 596 BIRCHMOUNT ROAD To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on , (596 Birchmount Road), in the City of Toronto (Scarborough Community Council Area), Don River Watershed. CFN: 41710 - Application #: 977/08/TOR Report Prepared by: Brian Storozinski, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: December 10, 2008 8.1.37 1269 WARDEN AVENUE To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 244, Plan 4222, (1269 Warden Avenue), in the City of Toronto (Scarborough Community Council Area), Don River Watershed. CFN: 41786 - Application #: 1014/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: December 31, 2008 8.1.38 106 BONNYDON CRESCENT To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 54, Plan 66M2410, (106 Bonnydon Crescent), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. 1322 CFN: 41737 - Application #: 988/08/TOR Report Prepared by: Brian Storozinski, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: December 18, 2008 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.39 110 PARK ROAD To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 22, Plan 104 YORK, (110 Park Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 41655 - Application #: 941/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: December 10, 2008 8.1.40 14 ONEIDA AVENUE To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 60, Plan 718 -E, (14 Oneida Avenue), in the City of Toronto (Toronto and East York Community Council Area), Waterfront Watershed. CFN: 41706 - Application #: 971/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: December 5, 2008 8.1.41 51 STRATHEARN ROAD To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Part Lot 703, 704, Plan 1870, (51 Strathearn Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 41640 - Application #: 936/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: December 10, 2008 CITY OF VAUGHAN 8.1.42 211 GRANDVISTA CRESCENT To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 67, Plan 65M -3812, (211 Grandvista Crescent), in the City of Vaughan, Humber River Watershed. 1323 CFN: 41767 - Application #: 1007 /08/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: December 22, 2008 TOWN OF AJAX 8.1.43 43 GREENHALF DRIVE To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 63, Plan 40M1986, (43 Greenhalf Drive), in the Town of Ajax, Carruthers Creek Watershed. CFN: 41745 - Application #: 995 /08 /AJAX Report Prepared by: Brian Storozinski, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: December 17, 2008 TOWN OF CALEDON 8.1.44 4180 BEECHGROVE SIDE ROAD To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Part Lot 21, Concession 3 EHS, (4180 Beechgrove Side Road), in the Town of Caledon, Humber River Watershed. CFN: 41709 - Application #: 976/08/CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: December 23, 2008 8.1.45 104 GRAY PARK DRIVE To install a swimming pool on Lot 69, Plan 43M -1374, (104 Grey Park Drive), in the Town of Caledon, Humber River Watershed. CFN: 41288 - Application #: 701 /08 /CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: December 22, 2008 TOWN OF RICHMOND HILL 8.1.46 445 JUDLEA COURT To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Part Lot 4, 5, 6, Plan 484, (445 Judlea Court), in the Town of Richmond Hill, Rouge River Watershed. 1324 CFN: 41776 - Application #: 1011/08/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: December 23, 2008 8.1.47 129 BURNDEAN COURT To undertake minor landscaping involving the placement - removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 4, Plan M -1722, (129 Burndean Court), in the Town of Richmond Hill, Don River Watershed. CFN: 41040 - Application #: 498/08/RH Report Prepared by: Lisa Stern, extension 5370 For information contact: Lisa Stern, extension 5370 Date: December 4, 2008 RES. #B180/08 - Moved by: Seconded by: PORT UNION WATERFRONT IMPROVEMENT PROJECT (PHASE 2) Award of Tender RSD08 -55 for the supply and delivery of approximately 3,000 tonnes of 4 to 6 tonne armour stone to Port Union Waterfront Improvement Project (Phase 2), City of Toronto. Jack Heath Suzan Hall THAT Contract RSD08 -55 for the supply and delivery of approximately 3,000 tonnes of 4 to 6 tonne armour stone to the Port Union Waterfront Improvement Project (Phase 2), City of Toronto, be awarded to Stonescape Quarry for a total unit price of $40.00 per tonne and a total cost not to exceed $120,000.00, plus applicable taxes, it being the lowest bid that meets Toronto and Region Conservation Authority (TRCA) specifications. CARRIED BACKGROUND The Port Union Waterfront Improvement_ Project (Phase 2) is located south of Lawrence Avenue east, between Chesterton Shores and the Rouge River in the City of Toronto. The project will consist of approximately 1.6 km of shoreline protection, trails and parkland development. The preferred option through the Class Environmental Assessment process calls for the construction of 6 headlands and 7 beach units. The armour stone will be used in the construction of shoreline protection works along the waterfront. RATIONALE Tender RSD08 -55 was publicly advertised in the Daily Commercial News on December 8, 2008. Tender packages were sent to a total of seven potential bidders. The Tender Opening Committee opened tenders on December 12, 2008 with the following results: 1325 BIDDERS APPROXIMATE QUANTITY (tonnes) TOTAL UNIT PRICE (per tonne) TOTAL VALUE OF CONTRACT (plus GST) Stonescape 3,000 $40.00 $120,000.00 J.C. Rock Limited 3,000 $43.00 $129,000.00 Glenn Windrem Trucking 3,000 $43.65 $130,950.00 Lafarge Aggregates 3,000 $59.00 $177,000.00 Fowler Construction 3,000 $70.39 $211,170.00 Based on the bids received, staff recommend award of Contract RSD08 -55 to Stonescape Quarry for the total unit price of $40.00 per tonne and a total cost not to exceed $120,000.00 plus GST, as they are the lowest bidder that meets TRCA specifications. FINANCIAL DETAILS Funds are available within account #224 -70 from the Toronto Waterfront Revitalization Corporation. Report prepared by: Aaron D'Souza, 416 - 393 -6336 For Information contact: Joe Delle Faye, 416- 392 -9724 Email: jdellefave @trca.on.ca Date: December 17, 2008 RES. #B181/08 - Moved by: Seconded by: OUT OF COUNTRY TRAVEL Green Jobs National Conference. Approval for staff to attend the Green Jobs National Conference in Washington, D.C., February 4 -6, 2009. Jack Heath Suzan Hall THAT approval be granted for Chris Rickett, Project Manager, Watershed Planning to attend the Green Jobs National Conference in Washington, D.C., USA, from February 4 -6, 2009, at a total cost not to exceed $1,500; AND FURTHER THAT a presentation on the results of the conference be made at a future Executive Committee. CARRIED 1326 BACKGROUND The Toronto and Region Conservation Authority (TRCA) policy on travel requires Executive Committee approval for staff travel outside of Canada on TRCA business. Members have requested that a report on the results of conferences attended be made to Executive Committee. RATIONALE Through Partners in Project Green TRCA has received funding to develop a green job development program in the Pearson Eco- Business Zone. Woodbine Entertainment Group has provided seed funding and agreed to a three -year funding relationship to help kick -start the development and implementation of the program. The idea is to connect young people in Rexdale and Malton to job opportunities created through Partners in Project Green. These jobs could range from construction and landscaping positions, to energy and waste management internships with local companies, all created via programming initlatives through Partners in Project Green. The Green Jobs National Conference will provide an opportunity for staff to learn more about existing green job programs in the United States, develop relationships with business and labour leaders involved in green job development, and identify potential models for a green job program in the Pearson Eco- Business Zone. Furthermore, the program for the Green Jobs National Conference will also highlight green economic development strategies, ranging from attracting green companies to greening existing businesses, and underscores the importance of linking environmental issues to economic opportunities. This broad program will help staff overall in developing new opportunities for Partners in Project Green. FINANCIAL DETAILS Conference costs are available in the TRCA capital budget from the Partners in Project Green funding partnership for an amount not to exceed $1,500 . Report prepared by: Chris Rickett, extension 5316 Emails: crickett @trca.on.ca For Information contact: Chandra Sharma, extension 5237 Emails: crickett @trca.on.ca Date: December 17, 2008 RES. #B182/08 - OUT OF COUNTRY TRAVEL PastPerfect Artifact Software Training Program Exton, Pennsylvania, January 19 -20, 2009. Approval for Toronto and Region Conservation Authority staff to travel outside Canada to attend a training program in the United States of America. 1327 Moved by: Seconded by: Jack Heath Suzan Hall THAT approval be granted to James Hunter, Registrar, Black Creek Pioneer Village (BCPV), to attend an artifact collections management software training program in Exton, Pennsylvania from January 19 - 20, 2009; AND FURTHER THAT a presentation on the results of the conference be made at a future Executive Committee. CARRIED BACKGROUND The Toronto and Region Conservation Authority (TRCA) policy on travel requires Executive Committee approval for staff travel outside of Canada on TRCA business. Members have requested that a report on the results of conferences attended be made to Executive Committee. RATIONALE BCPV embarked on digitizing major components of its historic artifacts collection in 2007. BCPV has received grants totalling $89,700 from the Department of Canadian Heritage (DCH) for Phase 1 and Phase 2 of a project called Capturing the Past for the Future: Digitization of Black Creek Pioneer Village Collection. This funding has enabled BCPV to acquire specialized photographic and computer equipment and hire project staff to create an on -line database of 5,000 items in the collection, including detailed digital images and documentation. This project facilitates access to the collection for the public, staff and researchers worldwide, and enables BCPV to create on -line exhibits. Since 1990 BCPV has used a DOS -based artifact database management system to manage a collection of 50,000 artifacts and accompanying information records. This system has reached end of life and local technical support will not be available beyond 2010. BCPV has researched and reviewed its needs, consulted with other museums and the Department of Canadian Heritage, and selected PastPerfect as the new software required. PastPerfect will accommodate all collections, digitization and facilitate transfer of curatorial data to fellow institutions for such purposes as inter - museum loans, unit cataloguing, sharing support records and inter - museum travelling exhibit planning. 6,400 clients in the United States and 187 institutions in Canada use this system. Acquisition of new software and migration of the collection to the new system is a component of BCPV's Phase 3 grant application to DCH for funding in F/Y 2009/10. On December 16, 2008 BCPV staff was contacted by Department of Canadian Heritage grant staff. They advised that funds for the upcoming April grant run are seriously limited, and there was little likelihood that our full request would be approved. However, DCH has a small amount of funding from fiscal year 2008/2009 available to extend current projects. Recognizing the critical need for BCPV to acquire new software, DCH has recommended funding the software and training component, on condition the project is completed no later than March 31, 2009. For this reason, staff has prepared this request on short notice. 1328 PastPerfect software training is a two -day program. Only two sessions are scheduled prior to March 31st, with the January course in Exton, PA being the closest location and the only one that fits the project timing. Training in January will provide BCPV with an eight -week timeframe to complete the grant, project, in accordance with the grant conditions. FINANCIAL DETAILS Cost to attend this two -day training program include bus transportation, 3 nights accommodation, meals and course fees, at a cost not to exceed $1,000. Funding from DCH is available under account 513 -39 to cover these costs. Report prepared by: Marty Brent, extension 5403 Emails: mbrent @trca.on.ca For Information contact: Marty Brent, extension 5403 Emails: mbrent @trca.on.ca ' Date: January 07, 2009 SECTION IV - ITEMS FOR THE INFORMATION OF THE BOARD RES.#B183/08 - Moved by: Seconded by: LOWEST BID NOT ACCEPTED Region of Peel Spills Response Decision Support System. Receipt of report approved by the Chief Administrative Officer on award of contract for the completion of a user needs assessment for the Region of Peel Spill Decision Support System. Reenga Mathivanan Ron Moeser IT IS RECOMMENDED THAT the report from the Chief Administrative Officer on award of contract to Angus GeoSolutions, who was not the lowest bidder, be received. CARRIED BACKGROUND At Authority Meeting #5/05, held on June 24, 2005, Resolution #A124/05 approved the Purchasing Policy. As per Schedule 'A' of the policy, if the lowest bidder is not selected, a report shall be provided to the Executive Committee for their information at the next available meeting. In this regard, the report outlined in Attachment 1 that was approved by the Chief Administrative Officer on December 17, 2008 is provided for information in Attachment 1. Report prepared by: Kathy Stranks, extension 5264 Emails: kstranks @trca.on.ca For Information contact: Kathy Stranks, extension 5264 Emails: kstranks @trca.on.ca Date: December 12, 2008 Attachments: 1 1329 Attachment 1 TO: Chair and Members of the Procurement Not Requiring Board Approval Meeting RFQ Lowest Bid Not Accepted ($10,000 up to $25,000) - July 1 to Dec 31, 2008, December 31, 2008 FROM: Adele Freeman, Director, Watershed Management RE: REGION OF PEEL SPILLS RESPONSE DECISION SUPPORT SYSTEM KEY ISSUE Award of contract to Angus GeoSolutions Inc. (AGSI) for the completion of a user needs assessment for the Region of Peel Spill Decision Support System. RECOMMENDATION WHEREAS Toronto and Region Conservation Authority's (TRCA) private- sector partner Keigan Systems Inc. has gone out of business as of September 2008; WHEREAS TRCA and the Region of Peel has secured National Resources Canada funding from GeoConnections to complete the development and implementation of the Region of Peel Spill Decision Support System; THEREFORE LET IT BE RESOLVED THAT Angus GeoSolutions (AGSI) be awarded the contract for the development and facilitation of a stakeholder consultation session to develop a user needs assessment for the Region of Peel Spill Decision Support System at a cost not to exceed $17,900, plus applicable taxes. BACKGROUND At Executive Committee Meeting #10/07 , held on December 7, 2007, Resolution #B161/07, was approved, in part, as follows: THAT a contract for the development of Spills Response Decisions Support System tool be awarded to the firm of Keigan Systems Inc. at a cost not to exceed $185,000 plus applicable taxes; ... Since that time Keigan Systems, the private sector partner in the development of the Region of Peel Spill Decision Support System (SDSS), has gone out of business. TRCA staff had been working closely with Keigan Systems Inc. (Keigan) and the Regional Municipality of Peel (ROP) to identify funding opportunities to initiate work on spills prevention and management as a priority recommendation resulting from the Stakeholder's Workshop hosted by TRCA and Toronto and Region Remedial Action Plan (RAP). A joint funding application was made to Natural Resources Canada's GeoConnection Program with a total ask of $185,000 over four phases for the development a geo- spatial web -based tool for responding to spills within the ROP. Project partners were the ROP, Keigan and TRCA. Phase 1 and 2 funding in the amount of $22,875 has been approved. 1330 The project was to be completed in four phases: 1) Strategic Planning - the development a strategic vision and partnership for the development and coordinated utilization of a web -based SDSS and database. 2) User Needs Assessment - the identification of the exact data and tool requirements for the SDSS, based on input from the ROP, City of Brampton, City of Mississauga, Town of Caledon, TRCA, Credit Valley Conservation (CVC) and the Ministry of the Environment's Spills Action Centre (MOESAC). 3) Publishing Thematic Data Standards - integration of data standards of the ArcHydro data model and the development of standards for accessing and exchanging data with partner municipalities, TRCA and the Ministry of the Environment. 4) Geospatial Decision Support Systems - the development of the web -based SDSS that will provide a modelling system for spills; access to near -time weather information; background on hazardous chemical materials; and the ability to store historic spill data to assist in targeting outreach and infrastructure investments. Keigan Systems was to play a role in the project by assisting TRCA and the ROP in completing these four phases, but also by contributing in -kind technical and professional services towards the development of the Spill Decision Support System. Work Completed to Date Phase 1 had already been completed when Keigan Systems notified TRCA and the ROP that they could no longer partner in the project. Phase 2 funding had been secured to complete the User Needs Assessment and the decision was to continue forward with the project in hope of developing a new private- sector partner to take the place of Keigan Systems. This arrangement has been discussed with the ROP and GeoConnections and it will not impact future funding of the project. To complete the User Needs Assessment, staff developed a Request for Quotation asking for a consultant to complete the following deliverables: • design and distribute a questionnaire to spill responders; • collect, analyse and report on the questionnaire results; • develop and facilitate a focus group with spill responders to review the questionnaire results; • complete the user needs assessment report outlining data and tool requirements. The three contractors who received the Request for Quotation were as follows: • LURA Consulting; • AGSI; • Dillion. 1331 The quotations submitted were as follows: CONSULTANT QUOTE LURA Consulting $17,000, plus applicable taxes AGSI $17,900, plus applicable taxes RATIONALE Given AGSI's experience in the development and implementation of web -based mapping solutions, staff recommends that AGSI be selected to complete this contract. AGSI holds an exclusive licence for Go360 platform for web -based solutions. Further, AGSI has knowledge and expertise in the delivery of web -based solutions with the Go360 platform that cannot be provided by LURA Consulting. TRCA and ROP staff have met with and reviewed AGSI's Go360 platform and believe it is a web -based solution that could deliver the SDSS being designed. It was further felt that there was potential for AGSI to become a partner in the project during Phases 3 and 4, after the completion of the Phase 2 user needs assessment. For this reason, TRCA staff believe that awarding the contract to AGSI will provide the continuity for the project moving from Phase 2 to the later phases that could not be satisfied by LURA Consulting. FINANCIAL DETAILS Costs for this contract will be covered through the Natural Resources Canada GeoConnections contribution of $11,875, with the remaining amount being covered by the Region of Peel 2008 capital budget, for a total amount not to exceed $17,900 plus GST. This work will be completed by the end of January 2009. Report prepared by: Chris Rickett, extension 5316 Emails: crickett @trca.on.ca For Information contact: Chris Rickett, extension 5316 Emails: crickett @trca.on.ca Date: December 01, 2008 1332 NEW BUSINESS RES. #B184/08 - Moved by: Seconded by: COXWELL SANITARY TRUNK SEWER Ron Moeser Suzan Hall WHEREAS a very large sanitary sewer, known as the Coxwell trunk, in the City of Toronto is showing signs of structural instability; AND WHEREAS the City of Toronto is looking at all possible options for repair or replacement of the damaged section of pipe, along with plans to twin the sewer in accordance with the Wet Weather Flow Management Master Plan; AND WHEREAS failure of the existing pipe could result in the diversion of sanitary sewage to the Don River if alternative measures to contain the flow are not in place; AND WHEREAS the Toronto and Region Conservation Authority (TRCA) wants to ensure that every effort is made to contain the flows and avoid any diversion to the Don River, but recognizes that an emergency response plan must be in place to deal with any diversion that might occur should the pipe fail before a replacement mechanism for the damaged section of pipe can be put in place; THEREFORE LET IT BE RESOLVED THAT THE EXECUTIVE COMMITTEE RECOMMENDS THAT TRCA requests the City of Toronto to take every possible action to protect the Don River from any possible sewage overflows; AND FURTHER THAT the Chief Administrative Officer be authorized to approve Ontario Regulation 166/06 permits to the City of Toronto for the Coxwell Sanitary Trunk Sewer to facilitate an emergency overflow, a new section of sewer to bypass the damaged section, and any emergency repairs and other works associated with the implementation of an emergency response plan to deal with diversion, treatment and cleanup of any sewage flows to the Don River and Harbour, should that become necessary between Executive Committee meetings. TERMINATION ON MOTION, the meeting terminated at 10:43 a.m., on Friday, January 16, 2009. CARRIED Gerri Lynn O'Connor Brian Denney Chair Secretary- Treasurer /ks 1333 THE TORONTO AND REGION CONSERVATION AUTHORITY MEETING OF THE EXECUTIVE COMMITTEE #12/08 February 13, 2009 The Executive Committee Meeting #12/08, was held in the Victoria Room, Black Creek Pioneer Village, on Friday, February 13, 2009. The Chair Gerri Lynn O'Connor, called the meeting to order at 9:36 a.m.. PRESENT Maria Augmeri Vice Chair Suzan Hall Member Jack Heath Member Reenga Mathivanan Member Ron Moeser Member Gerri Lynn O'Connor Chair Anthony Perruzza Member Richard Whitehead Member VIA CONFERENCE CALL Colleen Jordan Member ABSENT David Barrow Member Maja Prentice Member RES. #B185/08 - MINUTES Moved by: Seconded by: Ron Moeser Suzan Hall THAT the Minutes of Meeting #11/08, held on January 16, 2009, be approved. CARRIED PRESENTATIONS (a) A presentation by Gord MacPherson, Manager, Environmental Monitoring and Habitat Restoration, TRCA, in regard to Out of Country Travel for Great Lakes Urban Habitat Restoration Symposium in Chicago, Illinois. 1334 (b) A presentation by Miranda Townsend, Operations Technician, EDRMS, in regard to Out of Country Travel for the annual Laserfiche User Conference in Los Angeles, California. RES. #B186 /08 - PRESENTATIONS Moved by: Seconded by: Richard Whitehead Suzan Hall THAT above -noted presentations (a) and (b) be heard and received. SECTION I - ITEMS FOR AUTHORITY ACTION RES.#B187/08 - Moved by: Seconded by: CARRIED ECOOFFICES PROGRAM Certification of Offices and Appointment of Energy Conservation Officer. Certification of Toronto and Region Conservation Authority offices as "EcoOffices ", update on EcoOffices program and creation of Energy Conservation Officer. Colleen Jordan Suzan Hall THE EXECUTIVE COMMITTEE RECOMMENDS THAT the following Toronto and Region Conservation Authority (TRCA) administration offices be certified "TRCA EcoOffices": • Boyd Centre and Restoration Services Centre (jointly) • Head Office • Downsview Office; THAT the Authority recognize the creation of the "Energy Conservation Officer" position; AND FURTHER THAT the municipalities in TRCA's jurisdiction be so advised. CARRIED BACKGROUND At Authority Meeting #8106, held on October 27, 2006, Resolution #A255/06 was approved as follows: THAT the EcoSchools model (5 Step Process) for managing environmental sustainability be adapted for use, under the Toronto and Region Conservation Authority (TRCA) Sustainability Management System (SMS), at TRCA's administrative offices; THAT the adapted program be called EcoOffices, and be initiated as a pilot project at the Boyd Office, Restoration Services Centre, Head Office and Downsview Office beginning in the fall of 2006; THAT EcoTeams be convened at each site; 1335 THAT the Coordinator, SMS lead the pilot project, with support from TRCA education staff, to facilitate its integration with the SMS and corporate EcoSchools program; THAT the EcoSchools Steering Committee be advised and consulted throughout the TRCA pilot project for consideration of its possible application at their school board offices; THAT staff develop an internal certification process to recognize office efforts; AND FURTHER THAT staff report in 2007 on results of the EcoOffice pilot project. In 2007, Ontario EcoSchools program materials were modified by TRCA staff to develop an EcoOffices program (with permission of Ontario EcoSchools and the Toronto and District School Board). EcoTeams were established for Boyd Centre and Restoration Services Centre, Head Office, and Downsview respectively, Team member training was conducted and the annual EcoOffice process commenced. After launching EcoOffices in June 2007, the intent was to establish June to June as the annual reporting timeframe for the program. Therefore, certification of TRCA's offices, if it was accomplished, would be done in June 2008. The June year end was selected initially to coincide with the "school year" cycle of the EcoSchools program, in which the five TRCA education facilities successfully participate. However, upon reflection the EcoOffice cycle was reset to correspond to the calendar year in order to be consistent with TRCA's Corporate Sustainability Reporting under its Sustainability Management System. Program Description Although TRCA supports relatively large scale, energy investments such as renewable energy sourcing at facilities and major energy retrofits, TRCA's operational sustainability through staff level grassroots "green" actions is equally vital. Since its inception, TRCA has sought to optimize engagement of staff in the Sustainability Management System. At the conclusion of the first year of TRCA's involvement with Ontario EcoSchools, it was determined that the EcoSchools protocols and processes would be helpful in furthering TRCA efforts to operate more sustainably at its various office facilities. In particular, the EcoSchools model excelled at involving and empowering the 'grassroots' element of an organization in facilitating change. EcoSchools processes, protocols and areas of focus tend to mesh more closely with typical office operations than environmental management systems such as International Standards Organization (ISO) 14000, which were designed primarily for industrial operations. EcoOffices, then, is a TRCA created program (based on Ontario EcoSchools) that administers the "greening" of our offices through coordination of specific office EcoTeams. It is important to note that, as a TRCA developed program, EcoOffices "certification" is, at this point, a "self- certification" process. Responsibility for certifying offices as EcoOffices rests with the Coordinator, SMS. RATIONALE The EcoOffices annual administrative cycle (based on that of EcoSchools) is as follows: • beginning of year - set up office EcoTeam; 1336 • establish current conditions in various areas of operational sustainability; • draft workplan to advance sustainability in functions and areas needing improvement (including targeted actions); • reassess progress on workplan and overall sustainability conditions; • submit documentation to SMS Coordinator; • year end - certification (or re- certification) by designated TRCA staff; • start process again. Certification of an office as a "TRCA EcoOffice" is based on the submission (by office EcoTeam chairs) of suitable documentation attesting to the completion of each of these stages. If the documentation is complete and can attest both to the following of proper EcoOffice processes, and to genuine sustainability progress, the Coordinator, SMS will grant the certification. EcoOffices' simple, cyclical process demands accountability and helps establish a culture of continual improvement in operational sustainability. EcoOffices, along with EcoSchools and the emerging Audubon Certification Program for TRCA parks are three programs playing grassroots sustainability administration roles within TRCA's overall Sustainability Management System. 2008 Accomplishments Approximately 30 staff members participated on TRCA's three EcoOffices EcoTeams. Highlights of what was accomplished are outlined below: Boyd Centre /Restoration Services Centre (Joint EcoTeam for these two offices) • Promotion and education of need to reduce waste, paper use and energy consumption. • Replaced incandescent bulbs with CFLs. • Installation of low flow toilets. • Repair of leaky faucets. • Enhanced composting (raccoon proofing composter). • Training /education for staff on composting procedures. • Movement to certified green cleaning products. • Promotion of use of portable flash drives in place of CDs. • Moved to recycled paper towel dispensers at Boyd Centre. • Continuing operation and analysis of Leadership in Energy and Environmental Design (LEED) Platinum Restoration Services Centre (RSC). • Conducted tours of RSC for internal and external groups. • Participated in 20 Minute Makeover challenge. Head Office • Expanded promotion of double -sided photocopying and printing with instructional signs posted at all copiers and printers. • Signs posted on cafeteria refrigerators encouraging waste free lunches. • Re- launch of compost program with volunteer staff compost team. • Removal of water bottles for sale from cafeteria. • Expansion of program to reuse paper that has been printed on one side only. • New PVC Roof Membrane installed on Head Office to reduce energy loss. • Motion sensing light switches installed in all areas where possible. 1337 • Fluorescent lights in hallways turned off from April to September. • Environmentally friendly pest control program being piloted. • Records and Information Staff purchase Enviro 100, a 100% post consumer waste Forest Stewardship Council (FSC) certified product, as the standard photocopying / printing paper. • Addresses of all Shell and Sunoco gas stations in TRCA jurisdiction posted on bulletin board (Shell /Sunoco recognized as having the most environmentally friendly fuels). • Environmental Accomplishment added as a category of the TRCA Employee Recognition Awards. • Participated in City of Toronto 20 Minute Makeover challenge. • Drafted plans for UV film coverings on windows. Downsview Office • Promotion and education of need to reduce waste, paper use and energy consumption. • Enacted major office lighting improvements with assistance of Parc Downsview Park (PDP). • Senior management negotiated major retrofit (2009) to geothermal heating and cooling with PDP. • Negotiated with PDP new efficient windows. • Expanded waste recycling stations. • Added recycling of paper in washrooms. • Enhanced vermin composting and new outdoor composters. • Moved to certified green cleaning products. • Expanded promotion of double sided photocopying and printing with instructional signs posted at all copiers and printers. • Signs posted on cafeteria refrigerators encouraging waste free lunches. • Green day planners obtained for 2009. • Motion sensing light switches installed in all areas where possible. • Participated in City of Toronto 20 Minute Makeover challenge. • Moved to Enviro 100 FSC paper. Energy Conservation Officer To provide additional recognition of the importance of energy conservation to TRCA's internal activities and programs, the role.of "Energy Conservation Officer" has been created. In the interim, TRCA's Coordinator, SMS will assume this role. In fact, the coordinator has been doing this work for a number of years and the title recognizes the contribution of this work to TRCA's energy conservation initiatives. It is also an opportunity to focus TRCA's efforts with one position to interact with individuals in similar positions in other organizations; such as the Ontario's Energy Conservation Office. DETAILS OF WORK TO BE DONE Head Office, Downsview Office and Boyd Centre /RSC EcoOffice EcoTeams are beginning the cyclical process for 2009, reassessing existing conditions, drafting and enacting action plans to become more sustainable. EcoOffice certification plaques will be displayed prominently at all four offices. 1338 FINANCIAL DETAILS There are savings associated with the energy conservation work being done. This will be documented when the annual report on sustainability management is presented to the Authority. There are no additional costs associated with creation of the Energy Conservation Officer role. Report prepared by: Brian Dundas, extension 5262 Emails: bdundas @trca.on.ca For Information contact: Brian Dundas, extension 5262 Emails: bdundas @trca.on.ca Date: January 22, 2009 SECTION II - ITEMS FOR EXECUTIVE ACTION RES.#B188/08 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Development, Interference with Wetlands and Alterations to Shorelines and Watercourses. Pursuant to Ontario Regulation 166/06, written permission from the Authority is required for: a) straightening, changing, diverting or interfering in any way with the existing channel of a river, creek, stream or watercourse, or for changing or interfering in any way with a wetland; b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development. A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected. Moved by: Seconded by: Richard Whitehead Ron Moeser THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.1 - 8.1.25, with the exception of 8.1.8 - City of Toronto), which are listed below. RES. #8189/08 - Moved by: Seconded by: CARRIED APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 Ron Moeser Suzan Hall THAT permit 8.1.8 - City of Toronto be deferred until Executive Committee Meeting #1/09, scheduled to be held on March 6, 2009. CARRIED 1339 CITY OF PICKERING 8.1.1 ONTARIO REALTY CORPORATION To construct, reconstruct, erect or place a building or structure, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 27, Concession 4, (2870 Sideline 26), in the City of Pickering, Duffins Creek Watershed as located on the property owned by Ontario Realty Corporation. The purpose is to permit the replacement of a washed out culvert. The permit will be issued for the period of February 13, 2009 to May 31, 2009 in accordance with the following documents and plans which form part of this permit: • Proposed,Works, received by TRCA on December 17, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to recognize development within a watercourse north of Taunton Road on the east side of Sideline 26, in a TRCA regulated area of the Duffins Creek Watershed. This work included the replacement of a washed out metal culvert, the placement of gabion protection around both culvert openings and the application of crushed stone cover to reconstruct the previous driveway. Emergency Works In August 2008, the culvert was washed out during a rain storm and required immediate replacement, as the driveway it supported was the only way to access a large portion of the existing farm lot. Emergency authorization to start this project was given by the Director of Planning and Development at the TRCA on August 19, 2008. The culvert replacement has since been completed. On this basis, the permit approval period will be reduced from the standard two years to May 31, 2009. This will enable TRCA Enforcement staff to conduct compliance monitoring. Control of Flooding: The applicant was required to install a larger diameter culvert and embed the replacement culvert 20% into the watercourse substrate in order to improve the conveyance of flood waters. Pollution: The applicant was required to install erosion and sediment controls in order to prevent sediment flushing downstream. This included using coffer dams or other methods of isolation and the erection of silt fencing around the construction area. In addition, the applicant was required to remove any sediment build -up /debris from the watercourse that accumulated during construction prior to the removal of these isolation measures. Dynamic Beaches: Not applicable. 1340 Erosion: The replacement culvert is not anticipated to decrease slope stability or create additional erosion hazards. Gabion protection around the culvert openings have been included to prevent erosion of the constructed driveway. Conservation of Land: TRCA ecology staff have indicated the area downstream of the culvert houses a diverse fish community. The sediment controls indicated above have been deemed satisfactory as a method of protecting this habitat, and the larger diameter culvert embedded within the creek substrate will reduce impediments to fish movement. Plantings Not required. Policy Guidelines: This proposal is consistent with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the TRCA's Valley and Stream Corridor Management Program. CFN: 41926 - Application #: 0005 /09 /PICK Report Prepared by: Brian Storozinski, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: February 3, 2009 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.2 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure on Cordella Avenue, Jasper Avenue, Langden Avenue, Edinborough Court), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by City of Toronto. The purpose is to construct a watermain within a Regional Storm Floodplain. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to provide revisions to engineering drawings to the satisfaction of TRCA and to confirm that all works will be conducted within the City of Toronto right -of -way. Letter received from City of Toronto Project Manager dated February 3, 2009 and received by TRCA on February 3, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: 1341 Proposal: The proposal consists of installing a 150mm watermain within the paved portion of Cordella Avenue, Jasper Avenue, and Langden Avenue a regulated area in the City of Toronto. The City of Toronto has classified this watermain project as a schedule A under the Municipal Class EA process. The proposed will replace the existing 150 mm watermain currently located within the same right -of -way. The proposed 150mm watermain will be installed using the open cut method of construction. Construction is anticipated to start April 2009. Sections of the proposed watermain will be located within the existing road way and other sections will be located within the curb and grassed areas of the road right -of -way. The proposed watermain will be located approximately 2 meters below the groundlevel. The City will be making direct home connections from the proposed watermain. Control of Flooding: There will be no impacts to the control of flooding. All grades within the Regional Storm Floodplain will be maintained. Pollution: Standard sediment and erosion controls (filtercloth over the catch basins) will be in place for the duration of construction, and until the site is restored. Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: A Letter of Advice is not required because works are limited to the paved portion of the road and of sufficient distance from any naturalized areas so as to preclude a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat. Plantings All disturbed areas will be located within the paved portion of the roadway; therefore there are no plantings proposed. Policy Guidelines: This proposal complies with Section 4.3, Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41264 - Application #: 685/08/TOR Report Prepared by: Scott Smith, extension 5758 For information contact: Renee Afoom, extension 5714 Date: February 2, 2009 1342 8.1.3 CITY OF TORONTO To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 1, 2, Block C, D, Plan 548, 1055, (130 The Queensway), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the property owned by City of Toronto. The purpose is to construct Chlorination and De- chlorination facilities in the regulated area of the Humber Treatment Plant located at 130 Queensway in the City of Toronto. A Letter of Advice will be prepared by TRCA staff on behalf of the Department of Fisheries and Oceans Canada (DFO).for this project. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to provide revisions to the drawings /plans and additional documentation from the City of Toronto Project Manager - Sandra Ormonde dated February 3, 2009 to TRCA on February 3, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to upgrade the Humber Treatment Plant located at 130 Queenway in the City of Toronto. The City is proposing to construct Chlorination and De- chlorination facilities on the site. The proposed works involves converting the existing workshop area located at the southeast corner of the property into a Chemical Metering site to house the chemical feeding system. The existing grassed yard will be converted into a chemical storage area. The city is also proposing to construct a temporary workshop - trailer workshop west of the existing workshop area. Construction is proposed to commence in the Spring of 2009. Control of Flooding: The proposed works will have no impacts to flooding, flood storage or conveyance of floodwaters. Pollution: The City contractor will be implementing standard erosion and sediment control measures prior to construction and maintaining these measures for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering into the Humber River. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: Appropriate mitigation measures will be implemented during construction. There will be no geotechncial engineering or slope stability issues associated with the proposed works. 1343 Conservation of Land: With erosion and sediment control measures in place, the potential for Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated. A Letter of Advice will be prepared by TRCA staff on behalf of the Department of Fisheries and Oceans Canada (DFO) for this project. Plantings Upon construction completion, all disturbed areas will be restored with native /non- invasive species. Policy Guidelines: The proposal is consistent with Section 4.3. Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program (VSCMP). CFN: 41314 - Application #: 719/08/TOR Report Prepared by: Renee Afoom, extension 5714 For information contact: Renee Afoom, extension 5714 Date: February 3, 2009 8.1.4 CITY OF TORONTO To temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on, (Silver Creek at Edenbridge Drive), in the City of Toronto (Etobicoke York Community Council Area), .Humber River Watershed as located on the property owned by City of Toronto. The purpose is to replace the existing gabion walls currently within the Silver creek channel with armourstone. The City is proposing to construct a low -flow channel within the flood channel to help restore fish passage. A restoration planting plan will be implemented as part of the proposed improvements. A Letter of Advice will be prepared by TRCA staff on behalf of the Department of Fisheries and Oceans Canada (DFO) for this project. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to provide revisions to engineering drawings /plans to the satisfaction of TRCA and to provide land owner authorization for works in the regulated area outside the regional right -of -way. Letter received from City of Toronto dated February 3, 2009 and received by TRCA on February 3, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: 1344 Proposal: The City of Toronto is proposing to replace the existing gabion walls in the Silver Creek channel with armourstone. As part of the proposed work, a low -flow channel will be installed within the flood channel. This low -flow channel will comprise of pools and cascading riffles including a series of rock vortex weirs to mimic natural channel processes and to help restore fish passage. A restoration planting plan is also proposed and will include vegetation along the low -flow channel, between the armourstone and riparian plantings in disturbed areas. The City is proposing to begin construction in 2009. Control of Flooding: Standard erosion and sediment control measures will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering into Silver Creek. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Pollution: The proposed works will have no impacts to flooding, flood storage or conveyance of floodwaters. Dynamic Beaches: Not applicable Erosion: There will be no geotechncial engineering or slope stability issues associated with the proposed works. Conservation of Land: With erosion and sediment control measures in place, the potential for Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated. A Letter of Advice will be prepared by TRCA staff on behalf of the Department of Fisheries and Oceans Canada (DFO) for this project. Plantings The City of Toronto has prepared a comprehensive restoration plan to be implemented during construction. All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal is consistent with Section 4.3. Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program (VSCMP). CFN: 41394 - Application #: 758/08/TOR Report Prepared by: Renee Afoom, extension 5714 For information contact: Renee Afoom, extension 5714 Date: February 3, 2009 1345 8.1.5 124 SATURN ROAD To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 4, Plan 4935, (124 Saturn Road), in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed. The purpose is to facilitate the construction of a second storey addition, a front two - storey addition, a rear three - storey addition and a rear wood deck to the existing single family detached dwelling. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing No. T -1, Site Plan, prepared by Peter Michno, undated, received on January 21, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a second storey addition, a front two - storey addition, a rear three - storey addition and a rear wood deck to the existing single family detached dwelling. The subject property is located west of Renforth Drive, south of Burnhamthorpe Road and backs onto Bloordale Park /Elmcrest Creek in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment controls will be installed and maintained during construction to prevent debris from entering the adjacent watercourse. Dynamic Beaches: Not applicable. Erosion: There are no slope stability /geotechnical concerns associated with this application. Conservation of Land: There are no other significant natural features on, or adjacent to, the site that would be negatively iriipacted by the project. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. 1346 Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41968 - Application #: 0028/09/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 3, 2009 8.1.6 32 HAMPSHIRE HEIGHTS To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 60, Plan M -701, (32 Hampshire Heights), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to facilitate the construction of a new front entrance, partial second storey addition, one - storey side addition and roof -top deck to the existing single family detached dwelling. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing No. A0, Proposed Site Plan, prepared by AXIIS Architects Inc., dated January 2009, received on January 29, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Mimico Creek Watershed in order to facilitate the construction of a new front entrance, partial second storey addition, one - storey side addition and roof -top deck to the existing single family detached dwelling. The subject site is located south of Rathburn and west of Kipling Avenue Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment controls will be installed and maintained during construction to prevent debris from entering the watercourse. Dynamic Beaches: Not applicable. 1347 Erosion: There are no slope stability /geotechnical concerns associated with this application. Conservation of Land: The proposed works are located no further than the existing limit of development. There are no other significant natural features on, or adjacent to, the site that would be negatively impacted by the project. Plantings Native plantings will be provided as per City of Toronto Urban. Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41988 - Application #: 0046/09/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 3, 2009 8.1.7 5 HUMBERCREST BOULEVARD To change a building or structure so-that it alters its use or potential use, increases its size or increases the number of dwelling units on Lot 5, 6, Plan 2658, (5 Humbercrest Boulevard), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to facilitate the construction of a second storey addition and replace an existing rear deck to the existing single family detached dwelling. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing No. A -1. Site Plan, prepared by Elevation Architects, dated November 4, 2008, received on January 21, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a second storey addition and rear deck to the existing single family detached dwelling. The existing rear deck is to be removed. The subject property is located at the toe of a slope within a residentially developed valley corridor, west of Jane Street and north of Bloor Street West in the City of Toronto (Etobicoke York Community Council Area). 1348 Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment controls are not required as the proposed works are located within a developed valley corridor at the toe of a slope. Dynamic Beaches: Not applicable. Erosion: There are no slope stability /geotechnical concerns associated with this application. Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on, or adjacent to, the site that may be negatively impacted by the project. Plantings No plantings are required as part of this project. Policy Guidelines: This proposal is consistent with Section 4.2.2.(B) - Development Guidelines for Minor Additions within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41986 - Application #: 0044/09/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 3, 2009 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.8 CITY OF TORONTO To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 7, 8, Concession 'D, (201 Copperfield Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek, Waterfront Watershed as located on the property owned by City of Toronto. • Deferred 1349 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.9 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 11, 12, Concession 3 FTB, (21 Redway Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by City of Toronto. The purpose is to upgrade the Chlorination and De- chlorination facilities at the North Toronto Treatment Plant located on 21 Redway Road in East York. The upgrades include a new chemical building, expanded and new above - ground containment with tanks; connecting pipes; chorine contact tank adjacent to the exiting stormwater tank and a temporary access road. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing # 1002 - 2009 -03 -4: Sheet # C01: North Toronto Treatment Plant Chlorination and Dechlorination Upgrades, General; Civil Legend and Notes; Dated January 2009; Prepared by UMA /AECOM on behalf of the City of Toronto; Received by TRCA on January 29, 2009; • Drawing # 1002 - 2009- 03 -05: Sheet # CO2: North Toronto Treatment Plant Chlorination and Dechlorination Upgrades, Civil; Existing Site Plan and Removals; Dated January 2009; Prepared by UMA /AECOM on behalf of the City of Toronto; Received by TRCA on January 29, 2009; • Drawing .# 1002 - 2009- 03 -06: Sheet # CO3: North Toronto Treatment Plant Chlorination and Dechlorination Upgrades, Civil; Site Grading Plan; Dated January 2009, Prepared by UMA /AECOM on behalf of the City of Toronto; Received by TRCA on January 29, 2009; • Drawing # 1002 - 2009- 03 -07: Sheet # C04: North Toronto Treatment Plant Chlorination and Dechlorination Upgrades, Civil: Contract Limits and Erosion and Sediment Control; Dated January 2009, Prepared by UMA /AECOM on behalf of the City of Toronto; Received by TRCA on January 29, 2009; • Drawing # 1002 - 2009- 03 -08: Sheet # C05: North Toronto Treatment Plant Chlorination and Dechlorination Upgrades, Civil; Construction Details 1; Dated January 2009; Prepared by UMA /AECOM on behalf of the City of Toronto; Received by TRCA on January 29, 2009; • Drawing # 1002 - 2009- 03 -15: Sheet # S02: North Toronto Treatment Plant Chlorination and Dechlorination Upgrades, Structural; Chlorine Contact Tank Base Slab @ 82.300; Dated January 2009; Prepared by UMA /AECOM on behalf of the City of Toronto; Received by TRCA on January 29, 2009; • Drawing #1002 - 2009- 03 -18: Sheet # S05: North Toronto Treatment Plant Chlorination and Dechlorination Upgrades, Structural; Chlorine Contact Tank Sections A, B & C; Dated January 2009; Prepared by UMA /AECOM on behalf of the City of Toronto; Received by TRCA on January 29, 2009; 1350 • Drawing # 1002 - 2009- 03 -23: Sheet # S08: North Toronto Treatment Plant Chlorination and Dechlorination Upgrades, Structural; Disinfection Building Cross Sections; Dated January 2009; Prepared by UMA /AECOM on behalf of the City of Toronto; Received by TRCA on January 29, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal involves upgrades to the existing Chlorination and De- chlorination facilities at the North Toronto Treatment Plant located on 21 Redway Road in East York. The City is proposing to construct a new chemical building, expanded and new above - ground containment with tanks; connecting pipes; chorine contact tank adjacent to the exiting stormwater tank. A temporary access road will be constructed to assist with construction. Once construction is completed, the City will restore the area of the temporary access road to its current condition. Dewatering may be required as part of the construction. The City construction contractor will be providing TRCA with a detailed dewatering plan prior to construction commencement for review and approval. This permit will remain invalid until the TRCA approves the construction dewatering plan. Construction is scheduled for the Spring /Summer of 2009. Control of Flooding: The proposed works will have no impacts to flooding, flood storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering into the Don River. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: Appropriate mitigation measures will be implemented during construction. There will be no geotechncial engineering or slope stability issues associated with the proposed works Conservation of Land: With erosion and sediment control measures in place, the potential for Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated. To ensure that fish habitat will be protected during construction of the proposed upgrades, the City of Toronto will provide TRCA with a detailed dewatering plan to review prior to construction commencement. Plantings All disturbed areas will be restored with native /non- invasive species following construction. 1351 Policy Guidelines: The proposal is consistent with Section 4.3. Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program (VSCMP) CFN: 41277 - Application #: 694/08/TOR Report Prepared by: Renee Afoom, extension 5714 For information contact: Renee Afoom, extension 5714 Date: February 3, 2009 8.1.10 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 11, 12, Plan 64R 8775 PTI PT WARD 29, (21 Redway Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by City of Toronto. The purpose is to construct - reconstruct - erect or place a building or structure in a regulated area on 21 Redway Road, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by City of Toronto. The purpose is to improve the capacity and water quality of the Combined Sewer Outflow (CSO) facility located at the North Toronto Treatment Plant (NTTP). The proposed improvements were identified as part of the City of Toronto's Wet Weather Flow Master Plan which recommended that the CSO facility be considered for high -rate treatment (HRT) to improve the quality of the wet weather flow discharges to the Don River. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Sheet No. C -100, Existing Layout; Sheet No. C -101, Site Plan; prepared by CH2MHILL for the City of Toronto Technical Services and received by TRCA on January 20, 2009; • Sheet No. C -102, Terrestrial Protection, Erosion and Sedimentation Control Plan; prepared by CH2MHILL for the City of Toronto Technical Services and received by TRCA on January 20, 2009; • Sheet No. C -103, Demolition Plan; prepared by CH2MHILL for the City of Toronto Technical Services and received by TRCA on January 20, 2009; • Sheet No. C -104, Grading and Yard Piping Plan; prepared by CH2MHILL for the City of Toronto Technical Services and received by TRCA on January 20, 2009; Sheet No. C -501, Miscellaneous Details; prepared by CH2MHILL for the City of Toronto Technical Services and received by TRCA on January 20, 2009; Sheet No. C -502, Miscellaneous Details; prepared. by CH2MHILL for the City of Toronto Technical Services and received by TRCA on January 20, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: 1352 Proposal: The proposal involves upgrading the existing Combined Sewer Outflow (CSO) facility located at the North Toronto Treatment Plant (NTTP). The City of Toronto is proposing to expand the size of the existing CSO tank capacity and to improve the water quality discharged from the Treatment Plant into the Don River. These improvements were identified as part of the City of Toronto's Wet Weather Flow Master Plan which recommended that the CSO facility be considered for high -rate treatment (HRT) to improve the quality of the wet weather flow discharges to the Don River. It involves expanding the CSO tank volume from 4810 cubic metres to 8940 cubic metres, providing a laboratory to house a polymer injection system, and installing a pumping and tank flushing system. Construction is proposed to commence in Spring /Summer of 2009. Dewatering may be required as part of the construction. The City construction contractor will be providing TRCA with a detailed dewatering plan prior to construction commencement for review and approval. This permit will remain invalid until the TRCA approves the construction dewatering plan. Control of Flooding: The proposed works will have no impacts to flooding, flood storage or conveyance of floodwaters. Pollution: Standard erosion and sediment control measures will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from entering into the Don River. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Dynamic Beaches: Not applicable Erosion: Appropriate mitigation measures will be implemented during construction. There will be no geotechncial engineering or slope stability issues associated with the proposed works. Conservation of Land: With erosion and sediment control measures in place, the potential for Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated. To ensure that fish habitat will be protected during construction of the proposed upgrades, the City of Toronto will provide TRCA with a detailed dewatering plan to review prior to construction commencement, Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3, Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program 1353 CFN: 41367 - Application #: 734/08/TOR Report Prepared by: Renee Afoom, extension 5714 For information contact: Renee Afoom, extension 5714 Date: February 2, 2009 8.1.11 ROYAL CANADIAN YACHT CLUB To construct, reconstruct, erect or place a building or structure, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a shoreline on, (Toronto Islands), in the City of Toronto (Toronto and East York Community Council Area), Waterfront Watershed as located on the property owned by Royal Canadian Yacht Club. The purpose is to construct a new 360 m long, 200 mm diameter water service connection in a regulated area, appropriately 175 m of 200 mm diameter and 100 m of 150 mm diameter water service line on the North Island and approximately 275 m of 150 mm diameter water service line on the South Island to replace the existing water service line within the same area. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Cover Sheet; • Legend and Abbreviations; • Sheet G01: Existing Water Distribution System, dated November 2008, prepared by AECOM, revised on January 28, 2009, received by TRCA on January 30, 2009; • Sheet G02: Proposed Water Distribution System, dated November 2008, prepared by AECOM, revised on January 28, 2009, received by TRCA on January 30, 2009; • Sheet W1: Plan and Profile - From Existing 300mm Watermain to South Island, dated November 2008, prepared by AECOM, revised on January 28, 2009, received by TRCA on January 30, 2009; • Sheet W2: Plan and Profile - From South Island to North Island, dated November 2008, prepared by AECOM, revised on January 28, 2009, received by TRCA on January 30, 2009; • Sheet W3: Plan and Profile - South Island, dated November 2008, prepared by AECOM, revised on January 28, 2009, received by TRCA on January 30, 2009; • Sheet W4: Plan and Profile- North Island, dated November 2008, prepared by AECOM, revised on January 28, 2009, received by TRCA on January 30, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: 1354 Proposal: The Royal Canadian Yacht Club (RCYC) requires a new watermain in order to provide fire protection to the existing RCYC facility. The proposal involves constructing a new 360 m long. 200 mm diameter water service connection, appropriately 175 m of 200 mm diameter and 100 m of 150 mm diameter water service line on the North Island and approximately 275 m of 150 mm diameter water service line on the South Island to replace the existing water service line within the same area. The proposed new water service lines will be constructed by direction drilling a fused high density polyethylene pipe from the existing Toronto Islands watermain through two channels to the South and North Islands. Construction is scheduled to begin in the Spring of 2009. Control of Flooding: There will be no impacts to the control of flooding. All grades within the Regional Storm Floodplain will be maintained. Pollution: The proposed works will have no impacts to flooding, flood storage or conveyance of floodwaters. Dynamic Beaches: The pipes will be installed using HDD; no impacts to the beaches are anticipated. Erosion: Standard erosion and sediment control measures will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from draining into the Lagoon and Lake Ontario. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. Conservation of Land: A Letter of Advice is not required as construction will be undertaking using the Horizontal Directional Drilling (HDD) method of construction. RCYC will be following the Department of Fisheries and Oceans Canada (DFO) Operational Statement for HDD construction. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3, Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41749 - Application #: 992/08/TOR Report Prepared by: Renee Afoom, extension 5714 For information contact: Renee Afoom, extension 5714 Date: February 3, 2009 1355 CITY OF VAUGHAN 8.1.12 IMPERIAL OIL LIMITED To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and site grade on Part Lot 24, Plan 9691, (7018 Islington Avenue), in the City of Vaughan, Humber River Watershed as located on the property owned by Imperial Oil Limited. The purpose is to construct a drive - through driveway within a Regulated Area of the Humber River Watershed at 7018 Islington Avenue, in the City of Vaughan. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Site Plan, prepared by Imperial Oil, revise dated January 12, 2009, received by the TRCA January 26, 2009; • Site Grading Plan, prepared by R.V. Anderson Associates Limited, revise dated January 21, 2009, received by the TRCA January 26; 2009; • Landscape Plan, prepared by Douglas W. Kerr & Associates Ltd., revise dated January 12, 2009, received by the TRCA January 26, 2009; • Existing Tree Preservation Plan, prepared by Douglas W. Kerr & Associates Ltd., revise dated January 12, 2009, received by the TRCA January 26, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to reconstruct a gas bar and construct a new convenience retail store where the drive - through driveway is within a Regulated Area of the Humber River Watershed. The property is located on the northwest corner of Islington Avenue and Steeles Avenue. The regulated portion of the site currently contains a building /vehicle repair garage. Under the proposal, the regulated portion of the site will contain a drive - through driveway which is located approximately 3 metres to the primary top of bank. In addition, the existing building will be demolished and a new building structure will be located over 20 metres from the nearby slope feature and therefore outside of the Regulated Area. The proposed drive - through driveway follows the approximate footprint of the building to be removed and will not result in a significant encroachment towards top of bank, TRCA Geotechnical staff are satisfied that through the extensive planting plan, there will be no impacts on the stability of the slope. Control of Flooding: The proposed works are not located within the Regional Storm Flood Plain, there will no impacts on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be erected and maintained for the duration of construction to ensure there will be no transport of sediment into the adjacent valley feature. 1356 Dynamic Beaches: Not applicable. Erosion: TRCA Geotechnical staff are satisfied that the proposed works will not have an adverse impact on the stability of the slope feature provided plantings are implemented. Conservation of Land: As a watercourse will not be impacted by the project, no fisheries concerns will result. There are no other significant natural features on, or adjacent to the site that may be negatively impacted by the project. Plantings As part of the proposal, an extensive planting plan composed of native, non - invasive plantings will restore the edge of the valley system as well as provide stability to the slope feature. There will be no impacts on any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 E) - Property Improvements and Ancillary Structures and 4.2.2 D) - Replacement Structures - of the Authority's Valley and Stream Corridor Management Program. CFN: 40572 - Application #: 162 /08/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: January 28, 2009 8.1.13 127 TIMBER LANE To construct, reconstruct, erect or place a building or structure and site grade on Lot 225, (127 Timber Lane), in the City of Vaughan, Humber River Watershed. The purpose is to permit the continued construction of a basement and main floor addition to an existing dwelling within a Regulated Area of the Humber River Watershed at 127 Timber Lane, in the City of Vaughan. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. A -001, prepared by New Image Group, dated May 20, 2008, received by the TRCA September 2, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 1357 Proposal: The purpose is to permit the continued construction of a basement and main floor addition to an existing dwelling within a Regulated Area of the Humber River Watershed. The works are located approximately 8 metres from the existing top of bank. As the works commenced without a Building Permit, City of Vaughan Building Standards Department issued a stop work order to the applicant and notified the applicant to contact TRCA. Based upon a site visit conducted by TRCA staff on September 12, 2008, it was noted that the excavated materials for the basement extension had been placed and spread across the rear yard of the property and over the top of bank beyond the property boundary. TRCA staff instructed the applicant to submit a geotechnical study to determine the extent of filling and undertake immediate stabilization measures to prevent the transport of sediment into the valley system. The applicant has since addressed this issue through the submission of a geotechnical study prepared by Terraprobe, dated December 12, 2008 and the removal of fill material from the valley corridor as recommended by the report. TRCA geotechnical staff are satisfied that these restoration measures are sufficient in ensuring stability of the slope. As the works commenced prior to the issuance of a municipal building permit and a permit under Ontario Regulation 166/06, an additional administrative fee has been applied to the application. In order to ensure there is sufficient time for City of Vaughan Building Standards Department staff to review the works and issue a building permit, as well as time for an inspection by TRCA enforcement staff upon completion of the works, the timing for this permit has not been reduced. Control of Flooding: The works are not located within the Regional Storm Flood Plain, there will be no impact on the storage or conveyance of flood waters. Pollution: TRCA geotechnical staff are satisfied that site has been stabilized and the works will n of cause sediment transport to occur. Dynamic Beaches: Not applicable. Erosion: TRCA geotechnical staff are satisfied that the works under construction and the restoration works which the applicant has already undertaken will not cause increased erosion concerns or destabilize the existing slope. Conservation of Land: As a watercourse have not and will not be impacted by the works, there are no fisheries concerns. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. 1358 Plantings All disturbed areas will be restored to the previously existing sodded condition and will not affect any significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 c) - Minor Additions - of the Authority's Valley and Stream Corridor Management Program. CFN: 41427 - Application #: 782 /08/VAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: January 28, 2009 8.1.14 REGIONAL MUNICIPALITY OF YORK To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere (South of Langstaff Road Between Keele Street and Dufferin Street), in the City of Vaughan, Don River Watershed as located on the property owned by Regional Municipality of York. The purpose is to construct a manhole to connect to the Maple Collector relief sewer to the Langstaff Trunk sewer. The works include the requirement for temporary access between Langstaff Road and the proposed manhole location. These works were previously approved under permit no. C -06597 and have been resubmitted because of the addition of the temporary access route.. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking to provide outstanding details dated February 2, 2009 and received February 3, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: As part of the larger Bathurst - Langstaff YDSS sanitary sewer works, the Regional Municipality of York requires a connection between the existing Maple Collector sewer and the newly constructed Langstaff trunk sewer. This connection involves the construction of a new maintenance hole on the existing Maple Collector sewer and a short pipe connection between the new sewer and the new maintenance hole. These works are separate from the larger design -build contract for the Langstaff trunk sewer and are proposed to be completed under a new contract with a different contractor thereby necessitating an alternative access around the existing construction compound to access the proposed maintenance hole. 1359 The proposed access route is to be 130 metres long and 10 metres wide and will originate from Langstaff side road to the maintenance hole location. This access route will necessitate the extension of an existing driveway culvert on Langstaff road and the potential for the transplanting of some trees. A cast -in -place maintenance hole is proposed with an approximate depth of 9 metres. Control of Flooding: The proposed project will not impact storage or conveyance of floodwaters Pollution: Standard erosion and sediment control measures (silt /sedimentation fence, mud mats) will be implemented and maintained for the duration of construction and until the site is restored. Dynamic Beaches: Not applicable Erosion: There are no significant slope stability or geotechnical concerns with the proposed works. Conservation of Land: There will be no impacts to significant aquatic or terrestrial habitat from the proposed works. Plantings Limited tree transplants may be required should the contractor additional area for access. The site is to be restored upon the completion of the works. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41952 - Application #: 0016 /09NAUG Report Prepared by: Jennifer Draper, extension 5715 For information contact: Jennifer Draper, extension 5715 Date: February 3, 2009 8.1.15 ROYBRIDGE HOLDINGS LIMITED To construct, reconstruct, erect or. place a building or structure and site grade on Lot 8, Concession 9 Block 41, Plan 65M -3627, (Milani Boulevard and Highway 27), in the City of Vaughan, Humber River Watershed as located on the property owned by Roybridge Holdings Limited. The purpose is to construct a landscape swale and parking area as well as to conduct grading works within a Regulated Area of the Humber River Watershed associated with the construction of a Sports Facility near the-southwest corner of Milani Boulevard and Highway 27 in the City of Vaughan. 1360 The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Site Servicing & Grading Plan, Drawing No. SP -1, prepared by Urban Ecosystems Limited, revise dated January 6, 2009, received by the TRCA January 7, 2009; • Site Servicing & Grading Plan, Drawing No. SP -2, prepared by Urban Ecosystems Limited, revise dated January 6, 2009, received by the TRCA January 7, 2009; • Erosion and Sediment Control Plan, Drawing No. EC -1, prepared by Urban Ecosystems Limited, revise dated January 6, 2009, received by the TRCA January 7, 2009; • Landscape Plan, Drawing No. L -1, prepared by Landscape Planning Limited, revise dated December 16, 2008, received by the TRCA January 7, 2009; • Landscape Plan Enlargements, Drawing No. L -2, prepared by Landscape Planning Limited, revise dated December 16, 2008, received by the TRCA January 7, 2009; • Landscape Details Drawing, Drawing No. L -3, prepared by Landscape Planning Limited, revise dated December 16, 2008, received by the TRCA January 7, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a landscape swale and parking area as well as to conduct grading works within a Regulated Area of the Humber River Watershed. These works are associated with the construction of a Sports Facility as part of Site Plan Application DA.08.009. The proposed grading works are located within the 10 metre buffer from the TRCA agreed to Top of Bank as part of Plan of Subdivision 19T -89058 (Roybridge Holdings Limited) and the proposed parking area is located along the outside edge of the 10 metre buffer. The proposed landscape swale is located on additional lands owned by the applicant which are within the valley system and will provide enhanced treatment of stormwater runoff from the subject property. The areas subject to the proposed grading works and landscape swale will be planted with native, non - invasive species. As a portion of the proposed works within the Regulated Area commenced prior to the issuance of an Ontario Regulation 166/06 permit, as a result, an additional administrative fee has been applied. Control of Flooding: The proposed works are not located within the Regional Storm Flood Plain, there will be no impacts on the storage or conveyance of flood waters. Pollution: Sediment control fencing will be erected and maintained for the duration of construction to prevent the transport of sediment into the adjacent valley corridor. Dynamic Beaches: Not applicable. 1361 Erosion: There are no geotechnical issues associated with this application. Conservation of Land: As a watercourse will not be significantly impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings Extensive plantings of native, non - invasive species are proposed along the 10 metre Top of Bank setback and will provide an enhanced buffer between the proposed development and the valley system. The proposed landscape swale is also to be planted with native, non - invasive species and will provide enhanced treatment for stormwater runoff. Policy Guidelines: The proposal is consistent with Section 4.1.1 New Urban Development of the Authority's Valley and Stream Corridor Management Program. CFN: 41729 - Application #: 987 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: January 21, 2009 TOWN OF CALEDON 8.1.16 160 OLD KING ROAD To construct, reconstruct, erect or place a building or structure on Lot 6, Plan ALB -2, (160 Old King Road), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new 420.57 square metre (4,526.94 sq. ft.) single - family dwelling on 160 Old King Road, in the Town of Caledon, associated with a municipal building permit. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing No. Al, Site Plan, prepared by Culmone & Associates Ltd., dated October 29, 2008, Revision No. 3, revised on January 19, 2009, stamped received by TRCA Planning & Development staff on January 21, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: 1362 Proposal: The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, 420.57 square metre (4,526.94 sq. ft.) single - family dwelling on 160 Old King Road, in the Town of Caledon, associated with a municipal building permit. The subject property is located within the existing urban area of the Humber River Valley in Bolton. The proposed single dwelling complies with the existing residential zoning for this property and appears to be consistent with other residential development in this community. Additionally, the proposed works are not within the vicinity of any significant natural features and are located outside of the Regional Storm Floodplain. The area to which this application applies is currently a manicured lawn. As such, no significant vegetation will be removed as a result of construction. As such, there are no flooding, hydrological, geotechnical or ecology related concerns anticipated with this proposal. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries related concerns associated with these works. Plantings As no significant vegetation will be removed as a result of this proposal, no plantings are required. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41972 - Application #: 0045 /09 /CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: February 3, 2009 1363 8.1.17 DUFFERIN -PEEL CATHOLIC SCHOOL BOARD To construct, reconstruct, erect or place a building or structure and site grade on Lot 7, ALBION Part Lot 11, 12, Plan 43R- 32199, (Columbia Way), in the Town of Caledon, Humber River Watershed as located on the property owned by Dufferin -Peel Catholic School Board. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of 15643.07 square metre (168 381 sq. ft.) secondary school, associated parking areas and playing fields on the subject property associated with a municipal Site Plan Application. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Site Plan, Dwg. No. A1.1, prepared by Moffet & Duncan Architects Inc., dated November 2008, Revision No. 6, revised on January 14, 2009, stamped received by TRCA Planning & Development staff on January 15, 2009; • Site Grading, Dwg. No. GR -1, prepared by Moffet & Duncan Architects Inc., dated March 2007, Revision No. 9, revised on January 14, 2009, stamped received by TRCA Planning & Development staff on January 15, 2009; • Site Drainage Plan, Dwg. No. SD -1, prepared by Moffet & Duncan Architects Inc., dated March 2007, Revision No. 9, revised on January 14, 2009, stamped received by TRCA Planning & Development staff on January 15, 2009; • Site Servicing Plan, Dwg. No. SS -1, prepared by Moffet & Duncan Architects Inc., dated March 2007, Revision No. 9, revised on January 14, 2009, stamped received by TRCA Planning & Development staff on January 15, 2009; • Sediment And Erosion Control Plan, Dwg. No. ER -1, prepared by Moffet & Duncan Architects Inc., dated March 2007, Revision No. 9, revised on January 14, 2009, stamped received by TRCA Planning & Development staff on January 15, 2009; • Layout & Grading Plan, Dwg. No. L.1, prepared by Moffet & Duncan Architects Inc., dated October 2006, Revision No. 6, revised on January 14, 2009, stamped received by TRCA Planning & Development staff on January 15, 2009; • Planting Plan, Dwg. No. L.2, prepared by Moffet & Duncan Architects Inc., dated October 2006, Revision No. 7, revised on February 2, 2009, stamped received by TRCA Planning & Development staff on February 3, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new 15,643.07 square metre (168,381 sq. ft.) secondary school, associated parking areas and playing fields on the subject property associated with a municipal site plan application (Town File No. SPA 06 -64). The subject property is located on the north side of Columbia Way, east of Highway 50, north of the Bolton Northeast Secondary Plan Area. The subject property is currently zoned Agricultural (A1), which permits a school use within Agricultural zoned areas. A Provincially Significant Wetland (PSW) associated with a tributary of the Humber River is located adjacent to the 1364 eastern portion of the property. Based on our review, the proposed works are located on the tableland portion of the property and are sufficiently setback from the PSW and associated watercourse. As such, no impacts to the wetland feature or stream corridor are anticipated as a result of this development. The eastern portion of the subject property is located within the Protected Countryside of the Greenbelt Plan. No works associated with this proposal are located within the limits of the Greenbelt designation. Stormwater flows for the proposal will drain to an existing storm sewer at Kingsview Road to the south and ultimately to a stormwater management facility within the Bolton Northeast Secondary Plan Area, which is to be modified slightly in order to accommodate the proposed development. For the portions of the site requiring stormwater quality control (excluding clean roofwater), Level 1 Enhanced quality control is proposed utilizing two stormceptors and vegetated bioswales within the parking lot. These proposed vegetated bioswales in the parking lot will also provide for a degree of infiltration. Water balance is to be achieved using the above mentioned bioswales as well as an infiltration trench along the eastern development limit. The proposed groundwater infiltration methods will replicate pre - development recharge conditions. There are no flooding, geotechnical, or ecology related concerns with this application. Plantings are proposed within the Greenbelt lands adjacent to the stream corridor and wetland in order to provide a net ecological gain for this area. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls will be installed and maintained on the subject property during all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns anticipated with this project. Conservation of Land: No significant vegetation will be removed as a result of construction. There are no fisheries related concerns associated with this proposal. Plantings All proposed plantings will be native and non - invasive consistent with TRCA's guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development - of the Authority's Valley and Stream Corridor Management Program (VSCMP). 1365 CFN: 41941 - Application #: 0015 /09 /CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: February 3, 2009 8.1.18 135 JAMES STREET To construct, reconstruct, erect or place a building or structure on Lot 60 and Part LOT 61, Plan BOL -7, (135 James Street), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, single - family dwelling on 135 James Street, in the Town of Caledon, associated with a municipal building permit. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Site Plan, Drawing No. A -1, prepared by Marcos Ltd. B.D.C., dated January 13, 2009, Revision No. 3, revised on January 13, 2009, stamped received by TRCA Planning & Development on January 13, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this proposal is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, single - family dwelling on 135 James Street, in the Town of Caledon, associated with a municipal building permit. The property is located within a highly urban area of the Humber River Valley in Bolton. The proposed works comply with the existing zoning on the subject property and will be surrounded by similar single family dwellings. Also, the subject property is not in the vicinity of any significant natural features and the proposed works are located outside of the Regional Storm Floodplain. As such, there are no flooding, hydrological, geotechnical or ecology related concerns anticipated with this proposal. Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impact to the storage and /or conveyance of flood waters are anticipated. Pollution: Appropriate sediment and erosion controls (i.e., silt fencing) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. 1366 Erosion: There are no geotechnical and /or slope stability concerns anticipated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. Additionally, there are no fisheries related concerns associated with these works. Plantings All disturbed areas will be re- vegetated with native and non - invasive species as per TRCA's post- construction restoration guidelines. Policy Guidelines: This proposal is in conformity with Section 4.1.1 - New Urban Development, of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41954 - Application #: 0019 /09 /CAL Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: February 3, 2009 TOWN OF MARKHAM 8.1.19 AMBER PLAIN INVESTMENTS LIMITED To construct, reconstruct, erect or place a building or structure and site grade on Roy Rainey Avenue at Robinson Creek, in the Town of Markham, Rouge River Watershed as located on the property owned by Amber Plain Investments Limited. The purpose is to is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a 25.4 metre bridge structure, located near the corner of Roy Rainey Avenue and Jeffreys Avenue, in the Town of Markham. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • General Plan, Drawing No. 101, prepared by Schaeffers Consulting Engineers, dated July 2007, stamped received by TRCA Planning & Development staff on July 25, 2007; • Grading Plan, Drawing No. 401, prepared by Schaeffers Consulting Engineers, dated July 2007, stamped received by TRCA Planning & Development staff on July 25, 2007; • Plan and Profile, Drawing No. 501, prepared by Schaeffers Consulting Engineers, dated July 2007, stamped received by TRCA Planning & Development staff on July 25, 2007; • Site Alteration Plan, Drawing No. 601, prepared by Schaeffers Consulting Engineers, dated February 2008, Revision No. 2, revised on August 27, 2008, stamped received by TRCA Planning & Development staff on November 26, 2008; • General Arrangement, Drawing No. 1300, prepared by G.D. Jewell Engineering Inc., dated June 2007, stamped received by TRCA Planning & Development staff on July 25, 2007; 1367 • Footing Layout & Reinforcing, Drawing No. 1301, prepared by G.D. Jewell Engineering Inc., dated April 2007, stamped received by TRCA Planning & Development staff on July 25, 2007; • Valley Restoration Plan, Sheet VR -1, prepared by Nak Design Group, dated September 2007, Revision No. 3, revised on October 10, 2008, stamped received by TRCA Planning & Development staff on November 26, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of the proposed Roy Rainey bridge located near the corner of Roy Rainey Avenue and Edward Jeffreys Avenue, in the Town of Markham. The proposed development is located between two residential subdivisions within the planning boundaries of the Wismer Commons Secondary Plan Area. The bridge is a component of the Secondary Plan and conforms to the requirements of the approved Environmental Services and Stormwater Management (ESSM) Study completed for the Secondary Plan. The proposed bridge will cross a tributary to the Rouge River Watershed, known as West Robinson Creek. Based on TRCA's review of submitted ecology and engineering reports, the structure has been designed to respect the estimated erosion thresholds for the watercourse, to properly convey Regional Storm flows, as well as to allow for wildlife passage. The proposed total structure length of the bridge is approximately 33 metres with a crossing span of approximately 25.4 metres. The proposed bridge abutments are approximately 6.7 metres from the outer high water mark of the watercourse, which, based on the submitted engineering reports, is acceptable to TRCA staff. As such, no geotechnical, engineering, or fluvial geomorphology concerns are anticipated with this proposal. No in -water works are anticipated as a result of construction. Additionally, all near water works will be conducted within the cold water fisheries timing window of July 1 to September 15 of any given year. Although there are no fisheries related concerns associated with this proposal, a Letter of Advice (LOA) on behalf of Fisheries and Oceans Canada (DFO) will be issued with this permit. An extensive enhancement planting plan has been submitted with this application, which proposes to increase vegetative cover throughout this area and improve the ecological condition of this area. Control of Flooding: A portion of the proposed works are located within the Regional Storm Floodplain. However, TRCA technical staff have reviewed the proposal and do not anticipate and significant adverse impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate erosion and sediment controls will be installed and maintained throughout all phases of construction. 1368 Dynamic Beaches: Not applicable. Erosion: ,Based on our review of several engineering reports provided with this application, there are no slope stability, fluvial geomorphic and /or geotechnical concerns associated with this project. As previously noted, the proposed bridge has been designed to span the meander belt width for this system. In addition, it is not anticipated that any adverse impacts to any other natural channel processes will occur as a result of this proposal. As such, TRCA staff are satisfied that the geomorphic components of this application are satisfactory. Conservation of Land: No significant vegetation will be removed as a result of the proposed construction. However, an extensive enhancement planting plan for the surrounding area has been proposed. The intent of the planting plan is to provide for a renaturalized corridor, as well as to provide for additional terrestrial habitat. Although there are no fisheries related concerns with this proposal, a LOA will be issued on behalf of DFO. Plantings Native and non - invasive restoration /enhancement plantings consistent with TRCA's guidelines have been provided with this application. Policy Guidelines: This proposal is in conformity with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Plan (VSCMP). CFN: 41974 - Application #: 0032 /09 /MARK Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: February 3, 2009 8.1.20 REGIONAL MUNICIPALITY OF YORK To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, interfere with a wetland and alter a watercourse on Lot 20, Concession IX, (Major Mackenzie Bridge (over the Little Rouge River, between Highway 48 and 9th Line)), in the Town of Markham, Rouge River Watershed as located on the property owned by Regional Municipality of York. The purpose is to remove the existing bridge (6.9 m Length x 14.3 m Span/Width x 3.0 m Height) and construct structures (23.0 m Length x 25.0 m Span/Width x 3.0 m Height) bridge with pedestrian rail, abutment walls on all four quadrants, asphalt paving) within a Regional Storm Floodplain; to excavate and place fill ( for bridge footings, for abutment walls, for road widening) in a Regulated Area; to interfere with a wetland with road widening /bridge construction; to temporarily alter a watercourse ( Little Rouge River) during the coldwater timing window through a coffer dam method in order to work in the dry to conduct in water and near water works associated with the bridge and abutment wall construction. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 1369 The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Letter of Undertaking; (to provide revisions to engineering drawings and landscape drawings to the satisfaction of TRCA staff on or before March 16, 2009); dated February 3, 2009; received February 4, 2009; prepared by Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The entire proposal consists of the widening of Major Mackenzie Drive from Highway 48 to Ninth Line from two to four lanes while maintaining a rural cross section with grassed swales. This file deals with only the bridge removal and replacement on Major Mackenzie Drive within the Regulated Area with a net benefit of an increase in span /width from approximately 15 metres to 25 metres as well as an increase in length from approximately 7 metres to 23 metres to accommodate the road widening. The proposed 25 metre span of the bridge was reviewed by TRCA staff in the proponent's Meander Belt /100 Year Erosion Limit Report submission. The height of the bridge will remain constant at 3 metres. The entire site is located within a Regulated Area as well as a Regional Storm Floodplain associated with the Little Rouge River. There is a wetland area on the north and south sides of the existing bridge. In May of 2008 this project was brought forth to the Executive for approval with a temporary retaining wall on the north side. Since that time the Regional Municipality of York has acquired the land on the north side of the bridge, therefore, the temporary north retaining walls are not required, and this revised report without the north retaining walls has to be taken to this Executive Committee meeting for approval. This section of Major Mackenzie Drive is located in the Greenbelt and the Regional Municipality of York is required to comply with that legislation. The works associated with this project have been reviewed under the Environmental Assessment Act in Central File Number 38734, Ontario Regulation 166 and under the Federal Fisheries Act for best management practices. Control of Flooding: Staff has reviewed the hydraulics for the proposed bridge structure and has determined that there will not be any negative impacts to flooding. The existing span size of approximately 15 metres will be increased to 25 metres which will facilitate flow. Pollution: Standard erosion control measures (silt fences, pea gravel coffer dams) will be implemented to ensure that the construction - generated sediments do not enter the watercourse. Dynamic Beaches: Not applicable Erosion: There will be no slope'stability issues related to the works. 1370 Conservation of Land: There will be in stream works associated with this project. A coffer dam method will be utilized to isolate the watercourse from construction. With erosion and sedimentation plans in effect and the works being conducted within the coldwater timing window from July 1 to September 15, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated. A Letter of Advice will be written by TRCA staff on behalf of the Fisheries and Oceans Canada (DFO) after the permit is issued. The impacts to the wetland on the north and south side of the bridge will be minimized as much as technically possible during construction. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 41965 - Application #: 0029 /09 /MARK Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: February 3, 2009 TOWNSHIP OF KING 8.1.21 HAMLEYS DEVELOPMENTS INC. To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lots 7, 8, 9, 10, Concession 8, (Highway 27 and 15th Sideroad), in the Township of King, Humber River Watershed as located on the property owned by Hamleys Developments Inc.. The purpose is to allow development and the alteration of a watercourse within a Regulated Area to facilitate topsoil stripping and grading, the installation of sediment and erosion control measures including temporary sediment control ponds, the installation of infiltration swales and a roof drain collector system, the construction of a pedestrian trail including one watercourse crossing over a tributary of the Humber River (Swale 2), and associated works for a 698 -unit draft approved plan of subdivision in the northeast quadrant of Nobleton, Township of King. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing No. SC -1, Siltation Control Plan Phase 1, prepared by Schaeffers Consulting Engineers, dated December 2006, revised March 3, 2008, received by the TRCA on May 21, 2008; 1371 • Drawing No. SC -1A, Siltation Control Plan Initial Stage, prepared by Schaeffers Consulting Engineers, dated December 2006, revised May 13, 2008, received by the TRCA on May 21, 2008, redline revised to indicate that the environment fence will be installed around the `Areas for Initial Stage of Topsoil Stripping 1.85ha' and the cut -off swale will be constructed within that area prior to topsoil stripping and that the erosion and sediment control measures will be maintained and monitored to ensure proper performance; • Drawing No. SC -2, Siltation Control Plan Phase 1, prepared by Schaeffers Consulting Engineers, dated December 2006, revised May 30, 2007, received by the TRCA on May 21, 2008; • Drawing No. SC -3, Siltation Control Details and Notes, prepared by Schaeffers Consulting Engineers, dated February 2007, revised March 3, 2008, received by the TRCA on May 21, 2008; • Drawing No. SC -4, Siltation Control Plan and Construction Works, prepared by Schaeffers Consulting Engineers, dated December 2006, revised January 30, 2008, received by the TRCA on May 21, 2008; • Drawing No. SC -5, Siltation Control Ponds A & B, prepared by Schaeffers Consulting Engineers, dated December 2006, revised March 6, 2008, received by the TRCA on May 21, 2008; • Drawing No. SC -6, Siltation Control Pond C, prepared by Schaeffers Consulting Engineers, dated December 2006, revised May 30, 2007, received by the TRCA on May 21, 2008; • Drawing No. SC -7, Siltation Control Plan and Pumping /Damming Arrangements for Culvert Crossing Parkheights Trail, prepared by Schaeffers Consulting Engineers, dated December 2006, revised March 3, 2008, received by the TRCA on May 21, 2008; • Drawing No. SC -8, Siltation Control Plan and Pumping /Damming Arrangements for Culvert Crossing Fairmont Ridge Trail, prepared by Schaeffers Consulting Engineers, dated December 2006, revised March 3, 2008, received by the TRCA on May 21, 2008; • Drawing No. SC -9, Low Flow Channel and Pond Storm Outfall, prepared by Schaeffers Consulting Engineers, dated February 2008, received by the TRCA on May 21, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to allow development and the temporary alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the construction of 698 units in a draft approved residential plan of subdivision (19T- 03K01) in the northeast quadrant of Nobleton, Township of King. A permit for these works was previously approved by the Executive Committee on February 1, 2008 (Permit No. C- 08370). Ownership of these lands has since changed from 1083951 Ontario Ltd. to Hamleys Developments Inc. and, thus, a new permit is required. There have been no substantial changes to the proposed development since the works were first approved by the Executive Committee. 1372 The proposed Noble Ridge Community is bounded by the 15th Sideroad to the north, the 8th Concession Road to the east, existing residential development to the south and Highway 27 to the west. There are three watercourses in the area of the proposed development: one which flows from north to south along the developments western limits (Tributary A), one which flows from north to south along the eastern development boundary (Tributary B) and one which flows from west to east in the northeast corner of the development and connects to Tributary B (Swale 2). There is a wetland connected to Tributary A and a second wetland connected to Swale 2. The development will occur in phases, with topsoil stripping and preliminary site grading following the phasing for the site. The construction of the temporary sediment ponds will occur in the first phase. Three temporary sediment ponds and outfalls are proposed. These temporary sediment ponds will capture storm and sediment run -off associated with the preliminary grading works for the proposed subdivision. Other sediment and erosion control measures will also be employed, including sediment control fencing, 'cut -off swales, rock check dams and cofferdams. This application will also facilitate the final grading for the site, the installation of infiltration swales and a roof drain collector system, the construction of a pedestrian trail and other associated works. The infiltration trenches will be installed in parts of the buffer and will be filled with permeable material. The roof drain collectors will be installed at specified lots within the subdivision and will be directed to a central outlet. These measures are intended to maintain surface flows to the wetlands on the site and to maintain overall water balance for the development. The proposed pedestrian trail will be located within the 10- to 30 -metre buffer between the natural features and the proposed development, which generally extends around the perimeter of the proposed subdivision. The trail alignment has been provided, but will be field fit in order to minimize grading and avoid impacts to existing vegetation. The trail will be approximately 2 metres wide and will be surfaced with limestone screenings. Asphalt will be used only in areas of steeper slopes where the construction of a limestone trail is not feasible. The trail will include one watercourse crossing in the form of a wooden boardwalk, approximately 78 metres long, supported by reinforced concrete piers. Control of Flooding: There will be no impact on the storage or conveyance of floodwaters. Pollution: Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from entering the adjacent natural features. Dynamic Beaches: Not applicable. 1373 Erosion: There will be no geotechnical /slope stability issues associated with the proposed development. In addition, the implementation of the aforementioned sediment and erosion control measures will minimize erosion on the site. Conservation of Land: The project does not constitute a Harmful Alteration, Destruction, or Disruption of fish habitat and, therefore, an Authorization from Fisheries and Oceans Canada (DFO) is not required. Staff will issue a Letter of Advice to the proponent on behalf of DFO. Plantings An extensive restoration plan has been prepared for the valley lands and buffers. All disturbed areas will be restored with native, non - invasive plantings and seed to the satisfaction of TRCA staff. Policy Guidelines: The proposal is consistent with Section 4.1 (New Development) and Section 4.3 (Infrastructure and Servicing) of the Authority's Valley and Stream Corridor Management Program. CFN: 41977 - Application #: 0035 /09 /KING Report Prepared by: Coreena Smith, extension 5269 For information contact: Coreena Smith, extension 5269 Date: February 3, 2009 8.1.22 HAMLEYS DEVELOPMENTS INC. To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lots 7, 8, 9, 10, Concession 8, (Highway 27 and 15th Sideroad), in the Township of King, Humber River Watershed as located on the property owned by Hamleys Developments Inc.. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed in order to facilitate the construction of a stormwater management facility (SWM Pond A) and an associated outfall to service, in part, a 698 -unit draft approved plan of subdivision in the northeast quadrant of Nobleton, Township of King. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing No. SWM A -1, SWM Pond "A ", prepared by Schaeffers Consulting Engineers, dated February 2007, revised May 30, 2007, received by the TRCA on May 21, 2008; • Drawing No. SWM A -2, Sections Al - A3, prepared by Schaeffers Consulting Engineers, dated February 2007, received by the TRCA on May 21, 2008; • Drawing No. SWM A -3, Sections A4 - A7 and X2 - X3, prepared by Schaeffers Consulting Engineers, dated February 2007, received by the TRCA on May 21, 2008; • Drawing No. SWM A -4, Control Flow Structure (SWM Pond 'A'), prepared by Schaeffers Consulting Engineers, dated February 2007, received by the TRCA on May 21, 2008; 1374 • Drawing No. SWM A -5, Headwall Detail, prepared by Schaeffers Consulting Engineers, dated February 2007, received by the TRCA on May 21, 2008; • • Drawing No. SC -1, Siltation Control Plan Phase 1, prepared by Schaeffers Consulting Engineers, dated December 2006, revised March 3, 2008, received by the TRCA on May 21, 2008; • Drawing No. SC -3, Siltation Control Details and Notes, prepared by Schaeffers Consulting Engineers, dated February 2007, revised March 3, 2008, received by the TRCA on May 21, 2008; • Drawing No. SC -5, Siltation Control Ponds A & B, prepared by Schaeffers Consulting Engineers, dated December 2006, revised March 6, 2008, received by the TRCA on May 21, 2008; • Drawing No. SC -9, Low Flow Channel and Pond Storm Outfall, prepared by Schaeffers Consulting Engineers, dated February 2008, received by the TRCA on May 21, 2008; • Drawing No. SWM -1, Stormwater Management Pond A & B Planting Plans, prepared by The MBTW Group, dated July 2005, revised June 24, 2008, received by the TRCA on June 27, 2008; • Drawing No. SWM -3, Stormwater Management Pond A, B, C Plant List, Details and Notes, prepared by The MBTW Group, dated July 2005, revised June 24, 2008, received by the TRCA on June 27, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed in order to facilitate the construction of a stormwater management facility (SWM Pond A) and an associated outfall to service, in part, a 698 -unit draft approved plan of subdivision in the northeast quadrant of Nobleton, Township of King. A permit for these works was previously approved by the Executive Committee on February 1, 2008. Ownership of these lands has since changed from 1083951 Ontario Ltd. to Hamleys Developments Inc. and, thus, a new permit is required. There have been no substantial changes to the proposed development since the works were first approved by the Executive Committee. The proposed Noble Ridge Community is bounded by the 15th "Sideroad to the north, the 8th Concession Road to the east, existing residential development to the south and Highway 27 to the west. This stormwater management facility is one of three to be constructed for the proposed subdivision. This facility will be constructed in the southwest corner of the site, east of Highway 27 and north of an existing public school. The facility will outlet to a tributary of the Humber River (Tributary A). A portion of the works for the proposed stormwater management facility will occur within the buffer area and watercourse, including grading and the construction of the outfall. The proposed location of the facility was accepted by TRCA staff after an extensive review of the Master Environmental Servicing Plan (MESP) and Environmental Impact Statement for the Nobleton Community and subsequent submissions by the applicant in response to TRCA comments on the MESP. As such, conditions of draft approval were issued by TRCA staff on November 9, 2005. 1375 This permit application fulfills one of the conditions of draft approval. Through this process, the applicant has continued to work with TRCA staff on the detailed design of the stormwater management facility. Control of Flooding: There will be no impact on the storage or conveyance of floodwaters. Pollution: Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from entering the adjacent natural features. Dynamic Beaches: Not applicable. Erosion: There will be no geotechnical /slope stability issues associated with the proposed development. In addition, the implementation of the aforementioned sediment and erosion control measures will minimize erosion on the site. Conservation of Land: The project does not constitute a Harmful Alteration, Destruction, or Disruption of fish habitat and, therefore, an Authorization from Fisheries and Oceans Canada (DFO) is not required. Staff will issue a Letter of Advice to the proponent on behalf of DFO. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings An extensive restoration plan has been prepared for the stormwater management facility to the satisfaction of TRCA staff. Policy Guidelines: This proposal is consistent with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41978 - Application #: 0036 /09 /KING Report Prepared by: Coreena Smith, extension 5269 For information contact: Coreena Smith, extension 5269 Date: February 3, 2009 8.1.23 HAMLEYS DEVELOPMENTS INC. To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lots 7, 8, 9, 10, Concession 8, (Highway 27 and 15th Sideroad), in the Township of King, Humber River Watershed as located on the property owned by Hamleys Developments Inc.. 1376 The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed in order to facilitate the construction of a stormwater management facility (SWM Pond B) and an associated outfall to service, in part, a 698 -unit draft approved plan of subdivision in the northeast quadrant of Nobleton, Township of King. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing No. SWM B -1, SWM Pond "B ", prepared by Schaeffers Consulting Engineers, dated February 2007, received by the TRCA on May 21, 2008; • Drawing No. SWM B -2, Sections B1 - B3 and Sections Y1 - Y2, prepared by Schaeffers Consulting Engineers, dated February 2007, received by the TRCA on May 21, 2008; • Drawing No. SWM B -3, Sections B4 - B8, prepared by Schaeffers Consulting Engineers, dated February 2007, received by the TRCA on May 21, 2008; • Drawing No. SWM B -4, Control Flow Structure (SWM Pond 'B'), prepared by Schaeffers Consulting Engineers, dated February 2007, received by the TRCA on May 21, 2008; • Drawing No. SWM B -5, Headwall Detail, prepared by Schaeffers Consulting Engineers, dated February 2007, received by the TRCA on May 21, 2008; • Drawing No. SC -1, Siltation Control Plan Phase 1, prepared by Schaeffers Consulting Engineers, dated December 2006, revised March 3, 2008, received by the TRCA on May 21, 2008; • Drawing No. SC -3, Siltation Control Details and Notes, prepared by Schaeffers Consulting Engineers, dated February 2007, revised March 3, 2008, received by the TRCA on May 21, 2008; • Drawing No. SC -5, Siltation Control Ponds A & B, prepared by Schaeffers Consulting Engineers, dated December 2006, revised March 6, 2008, received by the TRCA on May 21, 2008; • Drawing No. SC -9, Low Flow Channel and Pond Storm Outfall, prepared by Schaeffers Consulting Engineers, dated February 2008, received by the TRCA on May 21, 2008; • Drawing No. SWM -1, Stormwater Management Pond A & B Planting Plans, prepared by The MBTW Group, dated July 2005, revised June 24, 2008, received by the TRCA on June 27, 2008; • Drawing No. SWM -3, Stormwater Management Pond A, B, C Plant List, Details and Notes, prepared by The MBTW Group, dated July 2005, revised June 24, 2008, received by the TRCA on June 27, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed in order to facilitate the construction of a stormwater management facility (SWM Pond B) and an associated outfall to service, in part, a 698 -unit draft approved plan of subdivision in the northeast quadrant of Nobleton, Township of King. A permit for these works was previously approved by the Executive Committee on February 1, 2008. Ownership of these lands has since changed from 1083951 Ontario Ltd. to Hamleys Developments Inc. and, thus, a new permit is required. There have been no substantial 1377 changes to the proposed development since the works were first approved by the Executive Committee. The proposed Noble Ridge Community is bounded by the 15th Sideroad to the north, the 8th Concession Road to the east, existing residential development to the south and Highway 27 to the west. This stormwater management facility is one of three to be constructed for the proposed subdivision. This facility will be constructed in the southwest corner of the site, east of Highway 27 and north of an existing public school. The facility will outlet to a tributary of the Humber River (Tributary A). A portion of the works for the proposed stormwater management facility will occur within the buffer area and watercourse, including grading and the construction of the outfall. The proposed location of the facility was accepted by TRCA staff after an extensive review of the Master Environmental Servicing Plan (MESP) and Environmental Impact Statement for the Nobleton Community and subsequent submissions by the applicant in response to TRCA comments on the MESP. As such, conditions of draft approval were issued by TRCA staff on November 9, 2005. This permit application fulfills one of the conditions of draft approval. Through this process, the applicant has continued to work with TRCA staff on the detailed design of the stormwater management facility. Control of Flooding: There will be no impact on the storage or conveyance of floodwaters. Pollution: Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from entering the adjacent natural features. Dynamic Beaches: Not applicable. Erosion: There will be no geotechnical /slope stability issues associated with the proposed development. In addition, the implementation of the aforementioned sediment and erosion control measures will minimize erosion on the site. Conservation of Land: The project does not constitute a Harmful Alteration, Destruction, or Disruption of fish habitat and, therefore, an Authorization from Fisheries and Oceans Canada (DFO) is not required. Staff will issue a Letter of Advice to the proponent on behalf of DFO. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. Plantings An extensive restoration plan has been prepared for the stormwater management facility to the satisfaction of TRCA staff. 1378 Policy Guidelines: This proposal is consistent with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41979 - Application #: 0037 /09 /KING Report Prepared by: Coreena Smith, extension 5269 For information contact: Coreena Smith, extension 5269 Date: February 3, 2009 8.1.24 HAMLEYS DEVELOPMENTS INC. To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lots 7, 8, 9, 10, Concession 8, (Highway 27 and 15th Sideroad), in the Township of King, Humber River Watershed as located on the property owned by Hamleys Developments Inc.. The purpose is to allow development and the temporary alteration of a watercourse within a Regulated Area to facilitate the installation of a sanitary sewer, storm sewer and watermain under a tributary of the Humber River (Swale 2). These works will, in part, service a 698 -unit draft approved plan of subdivision in the northeast quadrant of Nobleton, Township of King. The permit will be issued for the period of February 13, 2009 to February 12, 2011 iri accordance with the following documents and plans which form part of this permit: • Drawing No. PP -45, Plan and Profile of Storm, Sanitary and Watermain Crossing Block 646, prepared by Schaeffers Consulting Engineers, dated December 2006, received by the TRCA on May 28, 2008; • Drawing No. SC -3, Siltation Control Details and Notes, prepared by Schaeffers Consulting Engineers, dated February 2007, revised March 3, 2008, received by the TRCA on May 21, 2008; • Drawing No. SC -4, Siltation Control Plan and Construction Works; prepared by Schaeffers Consulting Engineers, dated December 2006, revised January 30, 2008, received by the TRCA on May 28, 2008; • Drawing No. TR -8, Sanitary, Storm Sewer & Watermain Crossing Restoration Plan, prepared by The MBTW Group, dated May 2006, revised January 31, 2008, received by the TRCA on June 27, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal is to install a sanitary sewer, storm sewer and watermain under a tributary of the Humber River (Swale 2). These works will, in part, service a 698 -unit draft approved plan of subdivision in the northeast quadrant of Nobleton, in the Township of King. A permit for these works was previously approved by the Executive Committee on January 18, 2008. Ownership of these lands has since changed from 1083951 Ontario Ltd. to Hamleys Developments Inc. and, thus, a new permit is required. There have been no substantial changes to the proposed development since the works were first approved by the Executive Committee. 1379 The services will extend from the cul -de -sac at Street "7" to the turning circle at Street "5 ". The proposed services are to be installed in the open space block through an open trench, a minimum of 1.5 metres below the existing grade. The trench within the open space block will be approximately 61 metres long and no greater than 15 metres wide. Control of Flooding: The final grades will be restored to match the existing grades; therefore, there will be no impact on the storage or conveyance of floodwaters. Pollution: Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from entering the watercourse. The sewers and watermain will be installed during a dry period to avoid /minimize pumping the watercourse around the work area. Dynamic Beaches: Not applicable. Erosion: There will be no geotechnical /slope stability issues associated with the proposed development. Conservation of Land: The project does not constitute a Harmful Alteration, Destruction, or Disruption of fish habitat and, therefore, an Authorization from Fisheries and Oceans Canada (DFO) is not required. Staff will issue a Letter of Advice to the proponent on behalf of DFO. Plantings All disturbed areas will be restored with native, non - invasive seed and plantings to the satisfaction of TRCA staff. Policy Guidelines: This proposal is consistent with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41980 - Application #: 0038 /09 /KING Report Prepared by: Coreena Smith, extension 5269 For information contact: Coreena Smith, extension 5269 Date: February 3, 2009 8.1.25 HAMLEYS DEVELOPMENTS INC. To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lots 7, 8, 9, 10, Concession 8, (Highway 27 and 15th Sideroad), in the Township of King, Humber River Watershed as located on the property owned by Hamleys Developments Inc.. 1380 The purpose is to allow development within a Regulated Area of the Humber River Watershed in order to facilitate the construction of a stormwater management facility (SWM Pond C) and an associated outfall to service, in part, a 698 -unit draft approved plan of subdivision in the northeast quadrant of Nobleton, Township of King. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing No. SWM C -1, SWM Pond 'C', prepared by Schaeffers Consulting Engineers, dated December 2006, received by the TRCA on May 21, 2008; • Drawing No. SWM C -2, Sections 1 - 1 to 3 - 3, prepared by Schaeffers Consulting Engineers, dated February 2007, received by the TRCA on May 21, 2008; • Drawing No. SWM C -3, Sections 4 - 4 to 6 - 6, prepared by Schaeffers Consulting Engineers, dated February 2007, received by the TRCA on May 21, 2008; • Drawing No. SWM C -4, Sections 7 - 7 to 10 - 10 and Section 13 - 13, prepared by Schaeffers Consulting Engineers, dated May 2006, received by the TRCA on May 21, 2008; • Drawing No. SWM C -5, Control Flow Structure (Pond 'C'), prepared by Schaeffers Consulting Engineers, dated February 2007, received by the TRCA on May 21, 2008; • Drawing No. SWM C -5B, Detail of Outfall Structure and Seepage Zone, prepared by Schaeffers Consulting Engineers, dated February 2007, received by the TRCA on May 21, 2008; • Drawing No. SWM C -6, Headwall Detail, prepared by Schaeffers Consulting Engineers, dated February 2008, received by the TRCA on May 21, 2008; • Drawing No. SWM C -7, Headwall Detail, prepared by Schaeffers Consulting Engineers, dated February 2008, received by the TRCA on May 21, 2008; • Drawing No. SC -2, Siltation Control Plan Phase 1, prepared by Schaeffers Consulting Engineers, dated December 2006, revised May 30, 2007, received by the TRCA on May 21, 2008; • Drawing No. SC -3, Siltation Control Details and Notes, prepared by Schaeffers Consulting Engineers, dated February 2007, revised March 3, 2008, received by the TRCA on May 21, 2008; • Drawing No. SC -6, Siltation Control Pond C, prepared by Schaeffers Consulting Engineers, dated December 2006, revised May 30, 2007, received by the TRCA on May 21, 2008; • Drawing No. SWM -2, Stormwater Management Pond 'C' Planting Plan, prepared by The MBTW Group, dated July 2005, revised June 24, 2008, received by the TRCA on June 27, 2008; • Drawing No. SWM -3, Stormwater Management Pond A, B, C Plant List, Details and Notes, prepared by The MBTW Group, dated July 2005, revised June 24, 2008, received by the TRCA on June 27, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: 1381 Proposal: The purpose is to allow development within a Regulated Area of the Humber River Watershed in order to facilitate the construction of a stormwater management facility (SWM Pond C) and an associated outfall to service, in part, a 698 -unit draft approved plan of subdivision in the northeast quadrant of Nobleton, Township of King. A permit for these works was previously approved by the Executive Committee on February 1, 2008. Ownership of these lands has since changed from 1083951 Ontario Ltd. to Hamleys Developments Inc. and, thus, a new permit is required. There have been no substantial changes to the proposed development since the works were first approved by the Executive Committee. The proposed Noble Ridge Community is bounded by the 15th Sideroad to the north, the 8th Concession Road to the east, existing residential development to the south and Highway 27 to the west. This stormwater management facility is one of three to be constructed for the proposed subdivision. This facility will be constructed along the eastern limits of the development site and will outlet to a proposed seepage area, to the west of a tributary of the Humber River (Tributary B). The proposed stormwater management facility is located below the staked top of bank, but outside of the Regional Storm Flood Plain and dripline of the valley vegetation. The proposed location of the facility was accepted by TRCA staff after an extensive review of the Master Environmental Servicing Plan (MESP) and Environmental Impact Statement for the Nobleton Community and subsequent submissions by the applicant in response to TRCA comments on the MESP. As such, conditions of draft approval were issued by TRCA staff on November 9, 2005. This permit application fulfills one of the conditions of draft approval. Through this process, the applicant has continued to work with TRCA staff on the detailed design of the stormwater management facility. Control of Flooding: There will be no impact on the storage or conveyance of floodwaters. Pollution: Sediment and erosion control measures will be installed and maintained throughout construction to prevent sediment from entering the adjacent natural features. Dynamic Beaches: Not applicable. Erosion: There will be no geotechnical /slope stability issues associated with the proposed development. In addition, the implementation of the aforementioned sediment and erosion control measures will minimize erosion on the site. Conservation of Land: As the watercourse will not be impacted by the proposal, no fisheries concerns will result. There are no other significant natural features on or adjacent to the site that may be negatively impacted by the project. 1382 Plantings An extensive restoration plan has been prepared for the stormwater management facility to the satisfaction of TRCA staff. The outfall has been designed to mimic a natural seepage area and will tie in with the existing vegetation community in that area. The facility has been integrated into the natural system and the proposed pedestrian trail design for the development. Policy Guidelines: This proposal is consistent with Section 4.3 - Infrastructure and Servicing - of the Authority's Valley and Stream Corridor Management Program. CFN: 41981 - Application #: 0039 /09 /KING Report Prepared by: Coreena Smith, extension 5269 For information contact: Coreena Smith, extension 5269 Date: February 3, 2009 THE FOLLOWING PERMIT APPLICATIONS WERE ERRATA ITEMS: RES. #8190/08 - APPLICATIONS FOR PERMITS PURUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS Moved by: Seconded by: Richard Whitehead Ron Moeser THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (8.1.27 - 8.1.38, inclusive (8.1.26 - 75 Wellington Street East was withdrawn)), that had been scheduled on the agenda as errata applications, for which all the required information was received and finalized as listed below. CARRIED CITY OF BRAMPTON 8.1.26 75 WELLINGTON STREET EAST To construct, reconstruct, erect or place a building or structure on Part Lot 84, 85, Plan BR 221, (75 Wellington Street East), in the City of Brampton, Etobicoke Creek Watershed. • Withdrawn CITY OF MISSISSAUGA 8.1.27 CITY OF MISSISSAUGA To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere in Wildwood Park (Derry Road and Goreway Drive), City of Mississauga, Mimico Creek Watershed, as located on property owned by the City of Mississauga. 1383 The purpose is to stabilize a section of stream bank at Mimico Creek that is experiencing various levels of erosion and bank instability, located in Wildwood Park near Professional Court (Derry Road and Goreway Drive). In water works will be permitted between July 1 and April 30 and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada. The permit will be issued for the period of February 13, 2009 to February 12, 2011. • Letter of Undertaking to provide Landowner Authorization and to provide revisions to the Engineering Drawings to the satisfaction of TRCA staff; dated February 9, 2009; received February 11, 2009; prepared by the City of Mississauga. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of stabilizing a section of Mimico Creek that is currently subject to localized slope failure at Professional Court. Works will include a combination of hard and soft rehabilitation treatments including a stone revetment placed in alternating layers in combination with plantings. Toe protection will also be included as part of the design to prevent further stream erosion of material at the base of the slope and the slope bank. A temporary access road will be constructed off an existing park access road and will run west through the park to the watercourse. Emergency measures will be in place to remove the temporary crossing and secure the site in the event of flooding. Control of Flooding: There will be no impacts to the control of flooding. Pollution: Standard erosion control measures (mud mats, coffer dam, silt fence) will be implemented for the duration of construction, and until the site is restored, in order to prevent construction generated sediment from entering the watercourse. Dynamic Beaches: Not applicable Erosion: There will be no geotechnical /slope stability issues associated with the proposal. Conservation of Land: With erosion and sediment controls in place, the potential for a Harmful, Alteration, Disruption or Destruction (HADD) of fish habitat will be mitigated and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). This application is subject to the Ministry of Natural Resources (MNR) warmwater fisheries timing window. The timing window has been extended due to the severity of the erosion at this location and the need to complete the works early within the year. As a result, all in or near water works must be completed between July 1 and April 30. 1384 Plantings Disturbed areas will be restored with native non - invasive species following construction. The newly stabilized slope will be planted with live stakes and new plantings (trees and shrubs) will be located on the top of bank. Policy Guidelines: This proposal complies with Section 5.2 - Erosion Control and Slope Stability Remedial Works - of the Authority's Valley and Stream Corridor Management Program. CFN: 41708 - Application #: 975/08/MISS Report Prepared by: Sharon Lingertat, extension 5717 For information contact: Sharon Lingertat, extension 5717 Date: February 3, 2009 8.1.28 MARKLAND WOOD COUNTRY CLUB To construct, reconstruct, erect or place a building or structure on Part Lot 1, Concession 1, (245 Markland Drive), in the City of Mississauga, Etobicoke Creek Watershed as located on the property owned by Markland Wood Country Club. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a 185.78 square metre (1999.72 sq. ft.) addition to an existing 373.72 square metre (4,022.69 sq. ft.) maintenance facility building located at the Markland Wood Country Club associated with a municipal minor variance application and building permit application. The permit will be issued for the period of February 13, 2009 to February 12, 2011. • Floor Plan, prepared by KMA Contracting Inc., dated February 15, 2008, stamped received by TRCA Planning & Development staff on February 5, 2009; • Elevations, prepared by KMA Contracting Inc., dated February 15, 2008, stamped received by TRCA Planning & Development staff on February 5, 2009; • Existing Building Electrical Services Relocation Plan /Proposed Expansion Electrical Services Plan, Drawing - EP1, prepared by Schollen & Company Inc., dated February 2009, stamped received by TRCA Planning & Development staff on February 5, 2009; • Drawing 1 -1, prepared by Schollen & Company Inc., dated October 31, 2008, stamped received by TRCA Planning & Development staff on November 13, 2008; • Foundation Plan /Floor Plan, Drawing No. S1, prepared by R.J. Burnside & Associates Limited, dated September 2008, Revision No. 1, revised on September 22, 2008, stamped received by TRCA Planning & Development staff on November 13, 2008; • Elevations, Drawing No. S2, prepared by R.J. Burnside & Associates Limited, dated September 2008, revised on September 22, 2008, stamped received by TRCA Planning & Development staff on November 13, 2008; • Sections and Details, Drawing No. S3, prepared by R.J. Burnside & Associates Limited, dated September 2008, revised on September 22, 2008, stamped received by TRCA Planning & Development staff on November 13, 2008; • Sections and Details, Drawing No. S4, prepared by R.J. Burnside & Associates Limited, dated September 2008, revised on September 22, 2008, stamped received by TRCA Planning & Development staff on November 13, 2008. 1385 RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a 185.78 square metre (1999.72 sq. ft.) addition to an existing 373.72 square metre (4,022.69 sq. ft.) maintenance facility building located at 245 Markland Drive, at the Markland Wood Country Club. The existing building and proposed addition are located within the Regional Storm Floodplain of the adjacent Etobicoke Creek. In accordance with TRCA policy, the proposed expansion is less than 50% of the total gross floor area (GFA) of the existing building, which existed as of January 1, 1987. Given the floor elevation and nature of operations (i.e., golf cart storage) of the existing structure, it has been confirmed that dry- passive floodproofing measures are not feasible. As a result, the addition and existing structure will be floodproofed using wet - passive measures, which include elevating electrical and mechanical systems above the Regional Storm Floodplain water level. The proposed addition has been designed to withstand water flows and velocities expected during the Regional Storm event. Based on our review, TRCA staff do not anticipate any significant adverse impacts to the storage and /or conveyance of flood waters. The location of the proposed addition is currently a manicured lawn. As such, there are no ecology related concerns associated with this application. Control of Flooding: The proposed works are located within the Regional Storm Floodplain. However, TRCA Water Resources staff have confirmed that this proposal will not have any significant impacts to the storage and /or conveyance of flood waters. Pollution: Appropriate erosion and sediment controls (i.e., silt fence) have been proposed with this application, and will be maintained throughout all phases of construction. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical and /or slope stability concerns associated with this application. Conservation of Land: No significant vegetation will be removed as a result of this project. There are no fisheries related concerns associated with this project. Plantings The existing site is currently a manicured lawn. As such, no significant vegetation is to be removed as a result of construction. Policy Guidelines: The proposal is in conformity with Section 4.2.2. (C) - Development and Redevelopment /Intensification within Non - Established Communities /Highly Urbanize Areas - Minor Additions. 1386 CFN: 41657 - Application #: 943/08/MISS Report Prepared by: Jason Wagler, extension 5743 For information contact: Quentin Hanchard, extension 5324 Date: February 3, 2009 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.29 CITY OF TORONTO To construct, reconstruct, erect or place a building or structure (150mm diameter watermain) on Gracefield Avenue, Parson Court, and Queens Drive, in the City of Toronto (Etobicoke York Community Council Area, southeast of Lawrence Avenue West and Black Creek Drive), Humber River Watershed as located on the property owned by City of Toronto. The purpose is to construct a watermain within a Regional Storm Floodplain. The permit will be issued for the period of February 13, 2009 to February 12, 2011. • Letter of Undertaking to provide revisions to engineering drawings to the satisfaction of TRCA and to confirm that all works will be conducted within the City of Toronto right -of -way. Letter received from City of Toronto Project Manager dated February 6, 2009 and received by TRCA on February 6, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The proposal consists of installing a 150mm diameter watermain on Gracefield Avenue, Parson Court and Queens Drive in a regulated area. The City of Toronto has classified this project as a schedule A under the Municipal Class EA. The proposal will replace the existing 150mm watermain located within the same right of way. The watermain will be installed by open -cut with all of Gracefield Avenue and sections on Queen Street to be installed by Horizontal Directional Drill. Construction is anticipated to start April 2009. Sections of the watermain will be located within the existing paved roadway and other sections will be located within the curb and grassed sections of the road right of way. The City of Toronto will be making direct home connections from the proposed watermain. Control of Flooding: There will be no impacts to the control of flooding. All grades within the Regional Storm Floodplain will be maintained. Pollution: Standard erosion and sediment control measures will be implemented prior to construction and maintained for the duration of construction, and until the site is stabilized and restored, in order to prevent the generated sediments from draining' into nearby ditches. Erosion and sediment control measures have been provided in accordance with the TRCA Erosion and Sediment Control Guideline for Urban Construction. 1387 Dynamic Beaches: Not applicable Erosion: There are no geotechnical /slope stability issues associated with the proposal. Conservation of Land: A Letter of Advice is not required because works are limited to the road right of way and of sufficient distance from any naturalized areas so as to preclude a Harmful Alteration, Disruption or Destruction (HADD) of fish habitat. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: This proposal complies with Section 4.3, Infrastructure and Servicing, of the TRCA's Valley and Stream Corridor Management Program. CFN: 41262 - Application #: 683/08/TOR Report Prepared by: Scott Smith, extension 5758 For information contact: Renee Afoom, extension 5714 Date: February 3, 2009 8.1.30 76 HIGH STREET To construct, reconstruct, erect or place a building or structure and site grade on Lot 21, Plan 548, (76 High Street), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to facilitate the construction of a new two- storey single family detached dwelling. The existing single- storey dwelling and detached garage are to be demolished. The permit will be issued for the period of February 13, 2009 to February 12, 2011. • Drawing A1-2, Proposed Site Plan, prepared by Natale and Scott Architect, dated July 18, 2007, Revision No. 3, revised on December 18, 2008, received on February 11, 2009; • Drawing A3 -1, South and East Elevations, prepared by Natale and Scott Architect, dated June 14, 2007, Revision No. 2, revised on April 8, 2008, received on February 11, 2009; • Drawing A3 -2, North and West Elevations, prepared by Natale and Scott Architect, dated June 14, 2007, Revision No. 2, revised on April 8, 2008, received on February 11, 2009; • Drawing No. LP -1, Tree Protection and Removals Plan, prepared by Scott Torrance Landscape Architect, dated September 14, 2008, Revision No. 3, revised on November 7, 2008, received on November 10, 2008; 1388 • Drawing No. LP -2, Landscape Plan, prepared by Scott Torrance Landscape Architect, dated September 14, 2008, Revision No. 3, revised on November 7, 2008, received on November 10, 2008. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new two- storey single family detached dwelling and an attached garage. The existing single - family detached dwelling and garage are to be demolished. The proposal involves some re- grading of the site in order to address both stormwater management as well as erosion issues. The subject property is located north of The Queensway and east of Park Lawn Road in the City of Toronto (Etobicoke York). Control of Flooding: The site is not located within a Regional Storm Floodplain and the proposal will have no impact on the storage and /or conveyance of flood waters. Pollution: A temporary sediment control fence will be installed to prevent construction debris from entering the valley. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: The appropriate tree protection fencing will be installed. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 40347 - Application #: 022/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 3, 2009 1389 8.1.31 18 BEAUCOURT ROAD To construct, reconstruct, erect or place a building or structure on Lot 24, Plan 3648, (18 Beaucourt Road), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to facilitate the construction of a new two- storey single family detached dwelling. The permit will be issued for the period of February 13, 2009 to February 12, 2011. • Drawing No. A1.1, Site Plan /Replanting Plan, prepared by Richard Wengle Architects, dated February 2, 2009, received on February 3, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new two - storey single family detached dwelling at 18 Beaucourt Road. The subject site is located west of Park Lawn Road, north of The Queensway and backs on to Berry Road Park in the City of Toronto (Etobicoke York Community Council Area). Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment controls will be installed and maintained during construction to prevent debris from entering the watercourse. Dynamic Beaches: Not applicable. Erosion: A geotechnical slope stability report has been reviewed and approved by TRCA geotechnical engineering staff and the proposal will be constructed in accordance with the recommendations of this report. Conservation of Land: The proposed works are located no further than the existing limit of development. There are no other significant natural features on, or adjacent to, the site that would be negatively impacted by the project. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. 1390 Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41567 - Application #: 879/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 3, 2009 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.32 61 CLIFFCREST DRIVE To construct, reconstruct, erect or place a building or structure on Lot 269, Plan 1566, (61 Cliffcrest Drive), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to construct a one - storey, rear -yard addition to an existing dwelling, and a parking pad in the rear yard.. The permit will be issued for the period of February 13, 2009 to February 12, 2011. • Drawing No. A -1 Site Plan, prepared by Elevation Architects Inc., dated November, 2008, received January 22, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to construct a one - storey addition and parking pad at the rear of an existing dwelling located south east of Midland Avenue and Kingston Road, adjacent to Bluffers Park. The limit of the proposed development will be approximately 30 feet from the existing top of the ravine slope. Control of Flooding: The proposed works are not located within a Regional Storm flood plain, and therefore will not impact the storage or conveyance of flood waters. Pollution: A sediment control fence will be erected and maintained throughout construction activities. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical concerns with the proposed works. 1391 Conservation of Land: The proposed works are not within any significant natural heritage features. Plantings No plantings are required. Policy Guidelines: The proposed works are consistent with Section 4.2.2. B) - Minor Additions - of the TRCA's Valley and Stream Corridor Management Program. CFN: 41950 - Application #: 0021 /09/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: February 3, 2009 8.1.33 5 HARDING BOULEVARD To construct, reconstruct, erect or place a building or structure on 5 Harding Boulevard, in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to demolish an existing dwelling and construct two new two- storey dwellings. The permit will be issued for the period of February 13, 2009 to February 12, 2011 in accordance with the following documents and plans which form part of this permit: • Drawing No. A1.01 Site Plan, prepared by JCI Architects Inc., dated April 21, 2008, revised December 16, 2008, received December 19, 2008; • Unnumbered Site Servicing & Grading Plan, prepared by Tom A. Senkus, dated March 27, 2008, revised January 6, 2009, received February 10, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The applicant seeks permission to demolish an existing dwelling and construct two detached two - storey dwellings on the subject lands. The subject lands have recently been severed, and are located south west of Birchmount Avenue and Kingston Road, near the Scarborough Bluffs. Control of Flooding: The proposed works do not fall within a Regional Storm flood plain, and therefore will not impact the storage or conveyance of flood flows. Pollution: Sediment fencing will be installed and maintained throughout the duration of construction works. 1392 Dynamic Beaches: Although the property is located in proximity to the Scarborough Bluffs, the limit of development is located more than 25 meters from the long -term stable top of the bluff slope. Erosion: There are no geotechnical concerns with the proposed works. Conservation of Land: The proposed works are not proposed within an area of any significant natural heritage features. Plantings No plantings are required as part of the proposed works. Policy Guidelines: This proposal is consistent with Section 4.2.2. D) - Replacement Structures, and 4.2.2. G) - Infilling - of the TRCA's Valley and Stream Corridor Management Program. CFN: 41795 - Application #: 1020/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: February 3, 2009 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.34 207 AVA ROAD To construct, reconstruct, erect or place a building or structure on Part Lots 951 and 952, Registered Plan 1870, (207 Ava Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to facilitate the construction of a new two- storey single family detached dwelling and in- ground pool. The permit will be issued for the period of February 13, 2009 to February 12, 2011. • Drawing No. A01, Site Plan, prepared by Drew Mandel Design, dated January 21, 2009, received on January 30, 2009; • Drawing No. A200, South Elevation, prepared by Drew Mandel Design, dated January 21, 2009, received on January 30, 2009; • Drawing No. A201, East Elevation, prepared by Drew Mandel Design, dated January 21, 2009, received on January 30, 2009; • A202, North Elevation, prepared by Drew Mandel Design, dated January 21, 2009, received on January 30, 2009; • A203, West Elevation, prepared by Drew Mandel Design, dated January 21, 2009, received on January 30, 2009; • A300, Building Section - View Looking West, prepared by Drew Mandel Design, dated January 21, 2009, received on January 30, 2009; 1393 • Re -Plant Plan, prepared by Cohen & Master, dated January 5, 2009, received on January 30, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to develop within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a new two - storey single family detached dwelling at 207 Ava Road. The subject site is located west of Bathurst Street, south of Eglinton Avenue West and backs on to Cedarvale Park in the City of Toronto (Toronto and East York Community Council Area). Control of Flooding: The site is not located within a regional storm flood plain and the proposal will have no impact on the storage and /or conveyance of floodwaters. Pollution: Sediment controls will be installed and maintained during construction to prevent debris from entering the adjacent park lands. Dynamic Beaches: Not applicable. Erosion: There are no slope stability /geotechnical concerns associated with this application. Conservation of Land: There are no other significant natural features on, or adjacent to, the site that would be negatively impacted by the project. Plantings Native plantings will be provided as per City of Toronto Urban Forestry Ravine Protection Services Guidelines and recommendations pertaining to tree protection and maintenance during construction will be implemented. Policy Guidelines: This proposal is consistent with Section 4.2.2.(D) - Development Guidelines for Replacement Structures within Non - Established /Highly Urbanized Areas of the TRCA's Valley and Stream Corridor Management Program. CFN: 41659 - Application #: 945/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 3, 2009 1394 CITY OF VAUGHAN 8.1.35 CLUBLINK CORPORATION To construct, reconstruct, erect or place a building or structure and alter a watercourse on Lot 10, Concession 7, (300 Clarence Street), in the City of Vaughan, Humber River Watershed as located on the property owned by ClubLink Corporation. The purpose is to construct a new water intake pipe and pump structure within a Regulated Area of the Humber River at 300 Clarence Street in the City of Vaughan. The permit will be issued for the period of February 13, 2009 to February 12, 2011. • Humber River Intake Design Drawing, Drawing No. D1, prepared by R.J. Burnside & Associates Limited, Revision No. 5 (revised February 2009), received by the TRCA February 5, 2009; • Intake Pipe Profile Cross - Section A -A Drawing, Drawing No. D2, prepared by R.J. Burnside & Associates Limited, Revision No. 4 (revised January 2009), received by the TRCA February 5, 2009. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose is to construct a new water intake pipe and pump structure within a Regulated Area of the Humber River for golf course irrigation purposes. The purpose of the works are to supplement the water level of an existing irrigation pond which is primarily fed through surface runoff only when necessary. The works are located within Regional Storm Flood Plain and a portion of the proposed PVC intake pipe is located within the erosion limit of the watercourse. Through discussions with the applicant, the manhole structure which contains the pump as well as an isolation valve have been located outside of the 30 metre 100 year erosion limit; therefore, no permanent structures are proposed within the erosion limit. The portion of the proposed works within the erosion limit has been limited to an expendable PVC pipe which can be relatively inexpensively modified as required to adjust to the natural movement of the watercourse. Due to the ability to modify the intake as required, permanent structures, which may harden the watercourse in order to protect the inlet from erosion are not required. As part of the overall approvals process for these works, the applicant has already acquired a Permit to Take Water (PTTW No. 0842- 6VBKD2) from the Ministry of the Environment (MOE). For the PTTW permit process, the approved water taking volume has been determined not to affect baseflow of the watercourse; furthermore, the elevation of the intake pipe has been designed accordingly. Control of Flooding: The proposed works are located within the Regional Flood Plain; however, due to the minor impact and small footprint of the proposed works, TRCA water resources staff are satisfied that the proposed works will not impact the storage or conveyance of flood waters. 1395 Pollution: A double silt -fence will be erected around the area of disturbance near the watercourse. The silt fencing in conjunction with a proposed coffer dam will prevent the transport of sediment into the watercourse. Dynamic Beaches: Not applicable. Erosion: There are no geotechnical issues associated with this application. Conservation of Land: All disturbed areas including the creek bed will be restored following the completion of the works. All in -water works will take place in the dry" and inside Ministry of Natural Resources' (MNR) fisheries timing window; a Fisheries and Oceans Canada (DFO) Letter of Advice will be issued by TRCA staff upon permit release. Plantings The creek bank will be planted with native, non - invasive species to create a net ecological gain over the existing sodded / manicured conditions. There will be no adverse affects on any other significant natural features. Policy Guidelines: The proposal is consistent with Section 4.2.2 H) - Existing Resource based Uses - of the Authority's Valley and Stream Corridor Management Program. CFN: 40910 - Application #: 410 /08NAUG Report Prepared by: Anthony Sun, extension 5724 For information contact: Bill Kiru, extension 5306 Date: February 3, 2009 8.1.36 REGIONAL MUNICIPALITY OF YORK To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse (Langstaff Road - Rainbow Bridge between Huntington Drive and Highway 27), in the City of Vaughan, Humber River Watershed as located on the properly owned by Regional Municipality of York. The purpose is to remove the existing 2550 mm diameter corrugated steel pipe (CSP) and to construct structures (28.5m. span /width x 31.0m length single span bridge with abutment walls, parapet walls, outfalls on north side, and asphalt paving) within a Regional Storm Floodplain; to excavate and place fill (for bridge footings, for abutment walls, for Oil Grit Separators (OGS), for road widening from 2 to 4 lanes) in a Regulated Area; to temporarily alter a watercourse (Rainbow Creek - Humber River) during the coldwater timing window through a coffer dam method in order to work in the dry to conduct in water and near water works associated with the bridge and abutment wall, OGS and outfall construction. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 1396 The permit will be issued for the period of February 13, 2009 to February 12, 2011. • Letter of Undertaking (to provide revisions to engineering drawings and landscape drawings to the satisfaction of TRCA staff and to provide any applicable landowner authorizations in the regulated area outside the ROW); dated February 4, 2009; received February 5, 2009; prepared by Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The entire proposal consists of the widening of 2.7 kilometres of Langstaff Road from Highway 50 in the west to Highway 27 in the east from two to four lanes. A combination of rural (road side ditches) and urban (curb and gutter) cross sections will be constructed, with the majority being urban cross sections surrounding the watercourses and culverts. This file focuses on the regulated area between Huntington Drive and Highway 27 in the east end of the project limits and the removal of the existing CSP and replacement with a bridge. There will be a net benefit of an increase in span /width from the 2.5 metre diameter CSP to the 28.5 metre single span bridge which will facilitate flood flows and terrestrial passage. The span of the 28.5 metre bridge was reviewed by TRCA staff in the proponent's Meander Belt /100 Year Erosion Limit Report submission. The entire site is located within a Regulated Area as well as a Regional Storm Floodplain associated with the Rainbow Creek. The works associated with this project have been reviewed under the Environmental Assessment Act in Central File Number 33232, Ontario Regulation 166 and under the Federal Fisheries Act for best management practices. Control of Flooding: Staff has reviewed the hydraulics for the proposed bridge structure and has determined that there will not be any negative impacts to flooding. The existing 2.5 metre diameter CSP will be replaced with a 28.5 metre span bridge which will facilitate flow. Pollution: Standard erosion control measures (silt fences, dam and pump, sheet walls) will be implemented to ensure that the construction - generated sediments do not enter the watercourse. Dynamic Beaches: Not applicable Erosion: There will be no slope stability issues related to the works. 1397 Conservation of Land: There will be temporary in stream works associated with this project. A coffer dam method will be utilized to isolate the watercourse from construction. With erosion and sedimentation plans in effect and the works being conducted within the coldwater timing window from July 1 to September 15, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated. A Letter of Advice will be written by TRCA staff on behalf of the Fisheries and Oceans Canada (DFO) after the permit is issued. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. CFN: 37501 - Application #: 104 /06NAUG Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: February 4, 2009 8.1.37 REGIONAL MUNICIPALITY OF YORK T� construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 10, 11, Concession 10 Plan 65R- 27879, (Langstaff Road - Tributary 4 - between Highway 50 and Huntington Road), in the City of Vaughan, Humber River Watershed as located on the property owned by Regional Municipality of York. The purpose is to remove the existing 1030mm x 740 mm Corrugated Steel Pipe Arch (CSPA) and to construct structures (twin 800mm diameter x 28.0 m length Corrugated Steel Pipes (CSPs) with headwalls, and asphalt paving) within a Regional Storm Floodplain; to excavate and place fill (for culvert installation, for road widening from 2 to 4 lanes) in a Regulated Area; to temporarily alter a watercourse (tributary of Rainbow Creek) during the coldwater timing window through a coffer dam method in order to work in the dry to conduct in water and near water works associated with the culvert removal and replacement. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). The permit will be issued for the period of February 13, 2009 to February 12, 2011. • Letter of Undertaking (to provide revisions to engineering drawings and landscape drawings to the satisfaction of TRCA staff and to provide any applicable landowner authorizations in the regulated area outside the ROW); dated February 4, 2009; received February 5, 2009; prepared by Regional Municipality of York. RATIONALE The application was reviewed by staff on the basis of the following information: 1398 Proposal: The entire proposal consists of the widening of 2.7 kilometres of Langstaff Road from Highway 50 in the west to Highway 27 in the east from two to four lanes. A combination of rural (road side ditches) and urban (curb and gutter) cross sections will be constructed, with the majority being urban cross sections surrounding the watercourses and culverts. This file focuses on the regulated area between Highway 50 and Huntington Drive in the west end of the project limits and the removal of the existing CSPA and replacement with twin CSPs. There will be a net benefit of an increase in span /width from the existing single 1030mm CSPA to twin 800 mm CSPs. The entire site is located within a Regulated Area as well as a Regional Storm Floodplain associated with the tributary of Rainbow Creek. The works associated with this project have been reviewed under the Environmental Assessment Act in Central File Number 33232, Ontario Regulation 166 and under the Federal Fisheries Act for best management practices. Control of Flooding: Staff is currently reviewing the hydraulics for the proposed twin CSPs and does not anticipate any negative impacts to flooding. The 1030mm span /width of the existing CSPA will be replaced with twin 800mm diameter CSPs which will facilitate flow. Pollution: Standard erosion control measures (silt fences, dam and pump) will be implemented to ensure that the construction - generated sediments do not enter the watercourse. Dynamic Beaches: Not applicable Erosion: There will be no slope stability issues related to the works. Conservation of Land: There will be temporary in stream works associated with this project. A coffer dam method will be utilized to isolate the watercourse from construction. With erosion and sedimentation plans in effect and the works being conducted within the coldwater timing window from July 1 to September 15, the potential for a harmful alteration, disruption or destruction (HADD) of fish habitat will be mitigated. A Letter of Advice will be written by TRCA staff on behalf of the Fisheries and Oceans Canada (DFO) after the permit is issued. Plantings All disturbed areas will be restored with native /non- invasive species following construction. Policy Guidelines: The proposal complies with Section 4.3 - Infrastructure and Servicing of the Authority's Valley and Stream Corridor Management Program. 1399 CFN: 37724 - Application #: 227 /06/VAUG Report Prepared by: June Murphy, extension 5304 For information contact: June Murphy, extension 5304 Date: February 4, 2009 TOWN OF MARKHAM 8.1.38 UNIONVILLE ALLIANCE CHURCH To site grade on Lot 16, Concession 6, Lot 8, 9, Concession 11, (4898 16th Avenue), in the Town of Markham, Rouge River Watershed as located on the property owned by Unionville Alliance Church. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to improve the function of an existing stormwater management facility and implement best management practices (BMPs) as part of the 16th Avenue Environmental Improvements Initiative. The permit will be issued for the period of February 13, 2009 to February 12, 2011. • Letter of Undertaking, prepared by G. Farmer, AECOM, dated February 11, 2009, to address outstanding TRCA engineering related concerns. RATIONALE The application was reviewed by staff on the basis of the following information: Proposal: The purpose of this application is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to improve the function of an existing stormwater management facility and implement best management practices (BMPs) at 4898 16th Avenue, in the Town of Markham. This work is part of the 16th Avenue Environmental Improvements Initiative, which is a strategy developed by York Region to further enhance the natural environment within the Rouge River Watershed subsequent to the construction of the York - Durham Sanitary Sewer (YDSS) along 16th Avenue. The strategy has identified this site as one of the many properties to be improved. The land use and corresponding surface cover conditions for the Unionville Alliance Church site can be classified as a mixture �f pavement, gravel, grass and rooftops. The church, as well as a detached classroom building, and a house are all located in the south portion of the subject property., The buildings are surrounded by a paved access road, parking lot, recreational area, a manicured lawn and a small landscaped area. The northern portion of the site consists of an additional gravel parking lot and a large grassed area. The site is graded such that stormwater drains south, primarily via sheet flow, towards 16th Avenue, an existing stormwater management pond, and to Eckhardt Creek of the Rouge River Watershed. The stormwater management pond and the watercourse feature are located near the southwest site boundary, which collect runoff generated by the grass area at the north end of the site, as well as a portion of the rear parking and lawn areas. 1400 The background information on this project initiative indicates the site was selected as a location to implement retrofit measures. The current criteria for site draining to Eckhardt Creek requires a distinct level of source control in order to reduce the volume of stormwater discharging into the creek. To achieve this objective, the proposal involves runoff being treated with a combination of an expanded /improved stormwater management pond, a bioretention swale and permeable pavers. The existing stormwater management pond will be enlarged to increase the storage capacity. Further to the expansion, modifications to the pond will include the removal and replacement of the existing outlet to Eckhardt Creek, the installation of a rock check dam within the pond to provide a small sediment forebay and the implementation of landscape enhancement measures. These works are intended to promote the removal of suspended sediment from site runoff prior to discharging into the adjacent tributary. An area of approximately 200 square metres of the existing paved parking lot on the south side of the church is to be converted to permeable paver stones. Although the area is relatively small, the proposed permeable pavement will enhance the treatment of stormwater and promote infiltration. The bioretention swale is a stormwater management technique that provides an opportunity for detention and infiltration of runoff, as well as a means of improving the ecological conditions of the site. Given that the contributing drainage is predominately paved and almost impervious on the subject property, the proposed bioretention swale to be constructed immediately south of the proposed permeable pavement, is intended to provide pre- treatment of runoff prior to discharging to the stormwater management pond to be retrofitted, as well as provide limited infiltration. An extensive enhancement planting plan has been provided with this application, incorporating ecological improvements for the stormwater management pond, bioretention swale, and natural area located along the western property limit (i.e., Eckhardt Creek). Control of Flooding: The proposed works are located outside of the Regional Storm Floodplain. As such, no impacts to the storage and /or conveyance of flood waters are anticipated. Pollution: In accordance with TRCA's erosion and sediment control guidelines, construction will be undertaken using a staged approach to mitigate any potential impacts on the receiving Eckhardt Creek. The first of three steps will be to implement erosion and sediment control measures. Second, the proposed modifications to the existing stormwater management pond will be carried out by first erecting an impermeable barrier at the location of the proposed rock check dam to facilitate the pond expansion works. Inflow will be diverted through the existing outlet structure such that a dry work area can be maintained. The outlet hose for the pump will be equipped with a filter bag to remove suspended sediment, prior to discharging back into the adjacent natural area. In order to carry out the removal and replacement of the outlet structure, during the third phase, surface runoff will be directed to the site entrance culvert where it will be pumped to a filter bag prior to discharge. A temporary plug will be inserted into the culvert to prevent flow into the stormwater management pond during the existing outlet structure removal and replacement. Subsequent to the completion of the proposed stormwater management improvements, all disturbed areas will be restored. Dynamic Beaches: Not applicable. 1401 Erosion: There are no geotechnical and /or slope stability concerns associated with this proposal. Conservation of Land: No significant vegetation will be removed as a result of construction. However, an extensive enhancement planting strategy has been provided to improve the ecological condition of this area. In accordance with our Level III Agreement with Fisheries and Oceans Canada (DFO), TRCA staff conclude that no Harmful Alteration, Disruption or Destruction (HADD) of fish habitat anticipated. However, a Letter of Advice (LOA) on behalf of DFO will be issued with this permit. As well, the coldwater fisheries timing window (July 1 to September 15) will be applied to the construction of the outfall structure, due to the proximity of the proposed works to the coldwater tributary (i.e., Eckhardt Creek). Plantings All proposed plant species are native and non - invasive consistent with TRCA guidelines. Policy Guidelines: This proposal is in conformity with Section 4.2.2 (E) - Property Improvements and Ancillary Structures - of the Authority's Valley and Stream Corridor Management Program (VSCMP). CFN: 41596 - Application #: 904 /08 /MARK Report Prepared by: Adam Miller, extension 5244 For information contact: Adam Miller, extension 5244 Date: February 3, 2009 PERMIT APPLICATIONS 8.1.39 - 8.1.43 ARE PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS: RES. #B191/08 - PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Richard Whitehead Ron Moeser THAT permission for routine infrastructure granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.39 - 8.1.43, inclusive), which are listed below, be received. CARRIED TOWN OF MARKHAM 8.1.39 THE CORPORATION OF THE TOWN OF MARKHAM To undertake road /pathway resurfacing or reconstruction on McCowan Road (Bur Oak Drive to Major Mackenzie Drive), in the Town of Markham, Rouge River Watershed as located on the property owned by The Corporation of the Town of Markham. The purpose is to install a new sidewalk within a Regulated Area along a portion of McCowan road. The new sidewalk will match.existing grades. and Sediment Control Guideline for Urban Construction. 1402 CFN: 41719 - Application #: 974 /08 /MARK Report Prepared by: Louise Monaghan, extension 5756 For information contact: Suzanne Bevan, extension 5759 Date: January 22, 2009 8.1.40 THE CORPORATION OF THE TOWN OF MARKHAM To undertake road /pathway resurfacing or reconstruction on Woodbine Avenue (Highway 7 to North of Buttonville Crescent, Personna Boulevard to Major Mackenzie Drive), in the Town of Markham, Rouge River Watershed as located on the property owned by The Corporation of the Town of Markham. The purpose is to install a new sidewalk within a Regulated Area along a portion of Woodbine Avenue and construct a retaining /toe wall south of the Woodbine Avenue Bridge. The new sidewalk will match existing grades. CFN: 41720 - Application #: 982 /08 /MARK Report Prepared by: Louise Monaghan, extension 5756 For information contact: Suzanne Bevan, extension 5759 Date: January 22, 2009 8.1.41 TOWN OF MARKHAM To undertake sewer and watermain or utility installation or maintenance within an existing roadway on Elgin Mills Road East and Reesor Road, in the Town of Markham, Rouge River Watershed as located on the property owned by Town of Markham. The purpose is to install a 4" cable by directional drilling under the watercourse and install a new at -grade utility vault in the road shoulder on Elgin Mills Road East, west of Reesor Road. CFN: 41624 - Application #: 921 /08 /MARK Report Prepared by: Louise Monaghan, extension 5756 For information contact: Suzanne Bevan, extension 5759 Date: January 22, 2009 8.1.42 TOWN OF MARKHAM To undertake structure maintenance in a Regulated Area on Elgin Mills Road East, 0.4 km West of Highway 48, in the Town of Markham, Rouge River Watershed as located on the property owned by Town of Markham, Regional Municipality of York. The purpose is to undertake routine bridge maintenance. The works include repair of the concrete in the sidewalk and girder end and replacement of the expansion joint seals, and damaged hand and guide rails. CFN: 41796 - Application #: 1021/08 /MARK Report Prepared by: Louise Monaghan, extension 5756 For information contact: Suzanne Bevan, extension 5759 Date: February 3, 2009 1403 8.1.43 TOWN OF MARKHAM To undertake structure maintenance in a Regulated Area on Carlton Road Bridge and Main Street Bridge - Unionville, in the Town of Markham,. Regional Municipality of York, Rouge River Watershed as located on the property owned by Town of Markham. The purpose is to undertake routine maintenance of two bridges. The works include repair of concrete sidewalks along the bridge surface and spalls in the abutment; seal cracks in the wearing surface, extension of deck drains, seal stone facing on the barrier walls, crack injection in the deck soffit, clean graffiti on the abutments and replace outdated guide rails. CFN: 41798 - Application #: 1023 /08 /MARK Report Prepared by: Louise Monaghan, extension 5756 For information contact: Suzanne Bevan, extension 5759 Date: February 3, 2009 PERMIT APPLICATIONS 8.1.44 - 8.1.50 ARE MINOR WORKS LETTER OF APPROVAL: RES.#B192/08 - MINOR WORKS LETTER OF APPROVAL PURSUANT TO ONTARIO REGULATION 166/06 Moved by: Seconded by: Richard Whitehead Ron Moeser THAT minor works letter of approval granted by Toronto and Region Conservation Authority staff in accordance with Ontario Regulation 166/06 for the applications (8.1.44 - 8.1.50, inclusive), which are listed below, be received. CARRIED CITY OF PICKERING 8.1.44 FRENCHMAN'S BAY YACHT CLUB To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 5, 6, 7, 8, Plan, (635 Breezy Drive), in the City of Pickering, Frenchman's Bay Watershed as located on the property owned by Frenchman's Bay Yacht Club. CFN: 41920 - Application #: 0006 /09 /PICK Report Prepared by: Brian Storozinski, extension 5744 For information contact: Steve Heuchert, extension 5311 Date: January 9, 2009 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 8.1.45 59 RIVERCOVE DRIVE To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on 59 Rivercove Drive in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. 1404 CFN: 41752 - Application #: 998/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: January 9, 2009 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 8.1.46 19 FENWOOD HEIGHTS To construct a non - habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 53, Plan 3757, (19 Fenwood Heights), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. CFN: 41955 - Application #: 0018 /09/TOR Report Prepared by: Leah Weller, extension 5250 . For information contact: Steve Heuchert, extension 5311 Date: January 29, 2009 8.1.47 FIELDGATE COMMERCIAL To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part Lot 17, Concession 5 Part Lot 17, Plan 66R- 24068, (3351 Markham Road), in the City of Toronto (Scarborough Community Council Area), Rouge River Watershed as located on the property owned by Fieldgate Commercial. CFN: 41791 - Application #: 1017/08/TOR Report Prepared by: Leah Weller, extension 5250 For information contact: Steve Heuchert, extension 5311 Date: January 12, 2009 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 8.1.48 100 GLEN ROAD To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 2, Plan 703E, (100 Glen Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 41967 - Application #: 0027/09/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: February 3, 2009 1405 8.1.49 390 LUMSDEN AVENUE To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 116, Plan 1351, (390 Lumsden Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 41794 - Application #: 1019/08/TOR. Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: January 9, 2009 8.1.50 137 STRATHEARN ROAD To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 77, Plan REG'D 1870, (137 Strathearn Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 41799 - Application #: 1024/08/TOR Report Prepared by: Nicole Moxley, extension 5284 For information contact: Steve Heuchert, extension 5311 Date: January 9, 2009 RES.#B193/08 - Moved by: Seconded by: OUT OF COUNTRY TRAVEL Professional Trailbuilders Association Conference, Asheville, North Carolina, March 15 -20, 2009. Approval for staff to travel outside Canada to attend a trail conference in the United States of America. Maria Augimeri Ron Moeser THAT approval be granted for Steve Joudrey, Land Management Technician to attend the Professional Trailbuilders Association Conference in Asheville, North Carolina, United States of America, from March 15 -20, 2009 at a cost not to exceed $3,900 plus applicable taxes; AND FURTHER THAT a presentation on the results of the conference be made at a future Executive Committee. CARRIED BACKGROUND The Toronto and Region Conservation Authority (TRCA) policy on travel requires Executive Committee approval for staff travel outside of the country on TRCA Business. 1406 The Professional Trailbuilders Association (PTBA) is North America's largest private sector group of trail specialists, contractors, designers and consultants with over 30 years in the business of supporting quality trail design, construction and maintenance for all types of trails. Attendance for this event is expected to be approximately 300 participants from around the continent. PTBA's primary activities include: • promoting professional trail contracting and consulting as cost - effective ways to design, build and maintain high - quality trails; • establishing the importance of sustainable trails realized through skillful trail design, construction and maintenance; • helping trail contractors improve skills and abilities; • marketing the services of members to federal, state and local governments, special districts, nonprofit organizations, and private landowners; • providing networking opportunities between members and with the wider world; • serving as the organized voice of private trail contractors with governments and other organizations; and • hosting the annual, national Trailbuilders Conference to further the above goals. RATIONALE TRCA is currently experiencing very high demands for trails on conservation lands with associated increases in use and requests for multiple uses on the trails. Attendance at the PTBA conference and workshops would be beneficial to TRCA not only for the general planning and implementation of our trails and plans but also specifically for the necessary background research to update TRCA's Trail Planning and Design Guidelines manual. This event would allow TRCA to gain a broader perspective on philosophies and techniques used in jurisdictions outside of southern Ontario. The PTBA Conference is well attended by participants from all over the United States and Canada with varying backgrounds and specializations in the industry. In 2008, 175 organizations were represented at the PTBA Conference. The trade $show that runs in conjunction with the conference would allow staff to meet new supply contacts and test equipment on the premises for products TRCA may or may not have considered previously. In addition, TRCA may be able to participate in the PTBA Conference program by presenting our experiences with trail building and planning in the Toronto region and introduce TRCA as an organization to a larger audience as there is a call for presentation proposals focusing on Conservation Land Management. This would provide a great opportunity for TRCA staff to learn about other trail planning and management techniques, as well as share our experiences with others. Steve Joudrey will be attending workshops, presentations and a trade show over six days as a means for professional development and networking. Upon his return, presentations on findings will be made to the Conservation Lands and other groups within TRCA that are involved in trail building as well as to the Executive Committee FINANCIAL DETAILS Costs to attend this conference, including return flight, meals, conference fees and accommodations, are estimated at $3,900 plus applicable taxes and funds are available in the 2009 Operating and Capital Budget under Account 440 -19. 1407 Report prepared by: Lesli Rynyk, extension 5579 Emails: Irynyk @trca.on.ca For Information contact: Lesli Rynyk, extension 5579, Mike Bender, extension 5287 Emails: Irynyk @trca.on.ca, mbender @trca.on.ca Date: January 26, 2009 RES. #B194/08 - Moved by: Seconded by: PURCHASE OF VEHICLES Award of Contract for Hybrid Trucks. Award of contract for purchase of three hybrid trucks. Richard Whitehead Maria Augimeri THAT quotation FM2009 -04 for three 2009 4X4 Crew Cab Hybrid Trucks be awarded to Plaza Pontiac Buick GMC at a total cost not to exceed $121,878.00, plus applicable taxes, it being the lowest bid meeting Toronto and Region Conservation Authority (TRCA) specifications. CARRIED BACKGROUND The TRCA Purchasing Policy requires that purchases over $100,000 be approved by the Executive Committee. These new vehicles are to replace existing vehicles that have reached the end of their life cycle in the TRCA vehicle and equipment pool. Consistent with TRCA's sustainability objectives, the replacement vehicles will be energy efficient hybrids. RATIONALE Requests for Quotation were sent to fourteen suppliers as follows: • Colonial Chevrolet Ltd; • Leggat Chevrolet Ltd; • Cedar Mills Pontiac Buick Cadillac GMC; • AB Cox Pontiac Buick Sales Ltd.; • Pine View Pontiac Buick Sales Ltd.; • Humberview GMC Truck Centre; • Marvin Starr Pontiac Buick Cadillac Inc.; • North York Chevrolet Oldsmobile Ltd.; • Plaza Pontiac Buick GMC; • Foster Pontiac Buick GMC; • Dean Myers Chevrolet Ltd.; • . MacMaster Pontiac Buick GMC; • Woodbine Pontiac Buick GMC ltd.; • Richmond Hill Pontiac Buick GMC. Five quotations were received and opened by Finance and Business Services staff (Jim Dillane, Jim Tucker and Stella Ku) on Friday, January 30, 2009 with the following results: 1408 REQUEST FOR QUOTATION FM2009 -04 THREE (3) NEW 2009 4X4 CREW CAB HYBRID TRUCK COMPANY QUOTE (Plus PST & GST) Plaza Pontiac Buick GMC $121,878.00 Pine View Pontiac Buick Sales Ltd $123,900.00 Woodbine Pontiac Buick GMC Ltd. $123,954.00 Humberview GMC Truck Centre $124,002.00 Dean Myers Chevrolet Ltd. $124,665.00 Staff recommends that the contract be awarded to Plaza Pontiac Buick GMC at a cost not to exceed $121.878.00 plus PST and GST, it being the lowest bid meeting TRCA specifications. FINANCIAL DETAILS Funds for this purchase are available in TRCA's Vehicle and Equipment Fund. Report prepared by: Jim Tucker, extension 5247 Emails: jtucker @trca.on.ca For Information contact: Jim Tucker, extension 5247 Emails: jtucker @trca.on.ca Date: February 02, 2009 SECTION IV - ITEMS FOR THE INFORMATION OF THE BOARD RES. #B195/08 - Moved by: Seconded by: LOWEST BID NOT ACCEPTED Humber River Watershed Plan Printing. Receipt of report approved by the Chief Administrative Officer on award of contract for printing of the Humber River Watershed Plan. Maria Augimeri Suzan Hall IT IS RECOMMENDED THAT the report from the Chief Administrative Officer on award of contract to Swiss Print International, who was not the lowest bidder, be received. CARRIED 1409 BACKGROUND At Authority Meeting #5/05, held on June 24, 2005, Resolution #A124/05 approved the Purchasing Policy. As per Schedule 'A' of the policy, if the lowest bidder is not selected, a report shall be provided to the Executive Committee for their information at the next available meeting. In this regard, the report outlined in Attachment 1 that was approved by the Chief Administrative Officer on January 23, 2009 is provided for information in Attachment 1. Report prepared by: Kathy Stranks, extension 5264 Emails: kstranks @trca.on.ca For Information contact: Dean Young, extension 5662 Emails: dyoung @trca.on.ca Date: January 23, 2009 Attachments: 1 1410 Attachment 1 TO: Chair and Members of the Procurement Not Requiring Board Approval Meeting RFQ Lowest Bid Not Accepted ($10,000 up to $25,000) - Jan 1 to June 30, 2009, June 30, 2009 FROM: Deborah Martin - Downs, Director, Ecology RE: HUMBER RIVER WATERSHED PLAN PRINTING KEY ISSUE Award of contract to Swiss Print International for the printing of the Humber River Watershed Plan. RECOMMENDATION THAT Swiss Print International be awarded the contract to print the Humber River Watershed Plan at a cost not to exceed $18,869.00 plus applicable taxes and shipping. BACKGROUND In 2003, Toronto and Region Conservation Authority (TRCA) began a five year work program with York Region, Peel Region and the City of Toronto to prepare a watershed plan for the Humber River. This initiative was to assist York and Peel regions and the City of Toronto in fulfilling the Oak Ridges Moraine Conservation Plan, 2002 requirement to have watershed plans completed for all rivers draining from the Oak Ridges Moraine. The study was also designed to update the 1997 watershed strategy, Legacy: A Strategy ForA Healthy Humber, augment the City of Toronto Wet Weather Flow Management Master Plan by providing direction for upstream municipalities, identify high priority remedial actions that address goals of the Remedial Action Plan for the Toronto and Region Great Lakes Areas of Concern, and apply TRCA's vision for The Living City at a watershed scale. The Humber River Watershed Plan was approved at Authority Meeting #5/08, held on June 28, 2008. RATIONALE The full watershed plan document is 183 pages, including 70 colour pages and 19 colour pull -out maps. A total of 500 copies will be published for distribution to municipalities, provincial and federal agencies, environmental stewardship groups, libraries and other interested stakeholders. Quotes for printing services were requested from three vendors: Swiss Print International, Creative Path and Warren's Waterless Printing. The table below summarizes the cost estimates received from each vendor. Vendor Estimated cost (plus GST, PST and shipping) Swiss Print International $18,869.00 • Creative Path $18,600.00 . Warren's Waterless Printing $25,929.00 1411 Staff recommends that the contract be awarded to Swiss Print, one of TRCA's Forest Stewardship Council Certified preferred vendors, due to the quality of work they produce, their ability to meet our deadlines as well as their great customer service. The lowest bidder, Creative Path, is unable to meet TRCA's timeline. Enviro (100% recyclable) paper will be used to print the document and final piece will be metal wire bound, which allows for the book to lay flat when reading. Of the three quotes, Swiss Print was comparable to Creative Path, with only couple of hundred dollars difference. Swiss Print was recommended as the preferred vendor because Creative Path indicated that they could not meet the timeline for turnaround that we required. FINANCIAL DETAILS Cost for the project is 1$8,869.00 plus GST, PST and shipping. Funding for the Humber River Watershed Plan was provided by the Regional Municipality of York, Regional Municipality of Peel and City of Toronto as part of the municipal capital budgets for TRCA. Report prepared by: Dean Young, extension 5662 Emails: dyoung @trca.on.ca For Information contact: Dean Young, extension 5662 Emails: dyoung @trca.on.ca Date: December 18, 2008 1412 TERMINATION ON MOTION, the meeting terminated at 10:55 a.m., on Friday, February 13, 2009. Gerri Lynn O'Connor Brian Denney Chair Secretary- Treasurer /ks 1413