HomeMy WebLinkAboutTender Opening Committee 2011 kk'
01FTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #1/11
March 4, 2011
The Tender Opening Committee Meeting #1/11, was held in the Victoria Room, Black
Creek Pioneer Village, on Friday, March 4, 2011. The Chair Colleen Jordan, called the
meeting to order at 9:23a.m.
PRESENT
Aaron D'Souza Project Coordinator
Jim Dillane Director, Finance and Business Services
John DiRocco Project Manager
Colleen Jordan Member
Kathy Stranks Manager, Chair and CAO's Office
John Stille Project Manager
1. TENDER OPENING COMMITTEE
1.1 RSD11-13 - SUPPLY OF RENTAL RATES FOR AN OPERATED HYDRAULIC
BACKHOE
HYDRAULIC BACKHOE CRAWLER
BIDDERS MOUNTED 16,300 KG
RATE PER HOUR
(Plus HST)
alefeild Contracting Inc. $94.00
Terra Excavating Enterprises Inc. $149.50
lirpa Construction & Materials Limited $150.00
mbler& Co. Inc. No Bid
odd Brothers Contracting $124.00
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred
to staff for review.
/j r
1
khk
01FTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #2/11
March 11, 2011
The Tender Opening Committee Meeting #2/11, was held in the Humber Room, TRCA
Head Office, on Friday, March 11, 2011. The Chair Laurie Bruce, called the meeting to
order at 12:35 p.m.
PRESENT
Laurie Bruce Member
Jim Dillane Director, Finance and Business Services
Cindy Maw Project Coordinator
Judith Reda Executive Assistant, Chair and CAO's Office
1. TENDER OPENING COMMITTEE
1.1 KORTRIGHT VISITOR CENTRE RETROFIT
HVAC and mezzanine window replacement
BIDDERS TOTAL TENDER 10% Bid Bond 50% Labour &
AMOUNT Material Payment
(Including HST) Bond
Struct-Con $1,086,606.00 Yes Yes
Elite Construction $1,231,700.00 Yes No
Strachan Construction $899,300.00 + HST Yes Yes
JJM McGuire $1,127,740.00 Yes Yes
Garritano Bros. $1,240,740.00 Yes Yes
Rutherford $1,208,693.20 Yes Yes
Percon $1,892,750.00 Yes Yes
Compass Construction $1,414,127.20 Yes Yes
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred
to staff for review.
/j r
2
khk
01FTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #3/11
May 6, 2011
The Tender Opening Committee Meeting #3/11, was held in the Victoria Room, Black
Creek Pioneer Village, on Friday, May 6, 2011. The Chair Bryan Bertie, called the meeting
to order at 9:15 a.m.
PRESENT
Bryan Bertie Member
Michael Di Biase Member
James Dickie Construction Technician
James Dillane Director, Finance and Business Services
Mark Preston Senior Supervisor
Kathy Stranks Manager, Chair and CAO's Office
1. TENDER OPENING COMMITTEE
1.1 MEADOWCLIFFE DRIVE SHORELINE REGENERATION PROJECT
CONTRACTS RDS 11 -26, 28 &29
Supply and Delivery of Armour and Riprap Stone
Contract Contract Contract
BIDDERS RSD 11-26 RSD 11-28 RSD 11-29 Tender Deposit 10%
ARMOUR ARMOUR RIPRAP RSD RSD RSD
STONE STONE STONE 11-26 11-28 11-29
(4-6 tonne) (0.5 - 1) (300mm -
600mm)
Nelson Aggregate Co. $62,370.00 No Bid $143,750.00 Yes n/a Yes
Duff erin Aggregates No Bid No Bid No Bid n/a n/a n/a
Glenn Windrem $448,000.00 $76,500.00 $127,500.00 Yes Yes Yes
Lafarge Aggregates $1,000,000.00 $300,000.00 $179,000.00 Yes Yes Yes
CDR Young $750,000.00 $360,000.00 $247,500.00 Yes Yes Yes
Stonescape No Bid No Bid No Bid n/a n/a n/a
J.C. Rock Ltd. $395,000.00 $127,500.00 $116,250.00 Yes Yes Yes
Elirpa Construction No Bid No Bid No Bid n/a n/a n/a
Fowler Construction No Bid No Bid No Bid n/a n/a n/a
Kawartha Rock No Bid No Bid No Bid n/a n/a n/a
Cut Above Natural Rock $625,000.00 $195,000.00 $170,000.00 $10,000.00 for the 3
contracts combined
Bot Ag g reg ates No Bid $202,013.92 $241,689.86 n/a I Yes I Yes
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred to staff for review.
/ks
3
616,
OrTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #4/11
June 24, 2011
The Tender Opening Committee Meeting #4/11, was held in the Weston Theatre'B',
Black Creek Pioneer Village, on Friday, June 24, 2011. The Chair Gerri Lynn O'Connor,
called the meeting to order at 9:05 a.m.
PRESENT
Gerri Lynn O'Connor Chair
James Dickie Construction Technician
Jim Dillane Director, Finance and Business Services
Moranne McDonnell Senior Manager, Environmental Engineering Projects
Mark Preston Senior Supervisor, Construction Services
Kathy Stranks Manager, Chair and CAO's Office
1. TENDER OPENING COMMITTEE
1.1 SUPPLY OF RENTAL RATES FOR OPERATED HEAVY CONSTRUCTION
EQUIPMENT AND DUMP TRUCKS -CONTRACT RSD11-25
HOURLY RATES (Plus HST)
TRACTOR BULLDOZER CRAWLER TYPE
BIDDER 60 KW 100 KW 140 KW
Sarton & Susin Ltd. 63.95 78.75 94.99
DDR Landscape Contractors Ltd. No Bid 80.00 No Bid
Elirpa Construction & Materials Ltd. 95.00 125.00 145.00
Dan Cordingley Gradall Rental No Bid No Bid No Bid
Tri Nacc Construction Ltd. No Bid No Bid No Bid
HOURLY RATES (Plus HST)
FRONT END LOADER CRAWLER MOUNTED
BIDDER 13,500 KG 21,000 KG
Sarton & Susin Ltd. 68.75 78.75
DDR Landscape Contractors Ltd. No Bid No Bid
Elirpa Construction & Materials Ltd. No Bid 125.00
Dan Cordingley Gradall Rental No Bid No Bid
Tri Nacc Construction Ltd. No Bid No Bid
4
HOURLY RATES (Plus HST)
HYDRAULIC BACKHOE CRAWLER MOUNTED
BIDDER 24,500 KG LONG ARM 40,000KG 50,000 KG
Sarton & Susin Ltd. 89.50 118.50 97.95 105.50
DDR Landscape Contractors Ltd. 90.00 No Bid 95.00 105.00
Elirpa Construction & Materials Ltd. 140.00 No Bid 150.00 160.00
Dan Cordingley Gradall Rental No Bid No Bid No Bid No Bid
Tri Nacc Construction Ltd. No Bid No Bid No Bid No Bid
HOURLY RATES (Plus HST)
FRONT END 4WD TANDEM TRIAXLE
LOADER 4WD TRACTOR DUMP DUMP
RUBBER LOADER/ TRUCKS TRUCKS
BACKHOE
BIDDER 14,000 KG 45 KW 22,000KG 32,000 KG
Sarton & Susin Ltd. 83.75 68.50 53.50 74.95
DDR Landscape Contractors Ltd. 72.00 68.00 No Bid 65.00
Elirpa Construction & Materials Ltd. 125.00 95.00 85.00 95.00
Dan Cordingley Gradall Rental No Bid No Bid 75.00 No Bid
Tri Nacc Construction Ltd. No Bid No Bid No Bid 94.50
HOURLY RATES (Plus HST)
ROCK TRUCKS
BIDDER 14,000 KG 23,000 KG
Sarton & Susin Ltd. 79.75 84.75
DDR Landscape Contractors Ltd. No Bid 125.00
Elirpa Construction & Materials Ltd. No Bid No Bid
Dan Cordingley Gradall Rental No Bid No Bid
Tri Nacc Construction Ltd. No Bid No Bid
1.2 PORT UNION WATERFRONT IMPROVEMENT PROJECT (PHASE 2)
CONTRACT RSD11-38
Pedestrian Bridge Construction
BIDDERS TOTAL 10% Security
(Plus HST) Deposit
Hobden Construction Ltd. $196,884.61 Yes
McPherson-Andrews Contracting Ltd. $199,600.00 Yes
Clearwater Structures Inc. $289,285.00 Yes
Taylor Wakefield $191,539.01 Yes
Silver Birch Contracting $239,725.00 Yes
The Ontario Construction Co. $185,799.00 Yes
DDR Landscape Contractors Ltd. $168,485.00 Yes
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred to staff for review.
/ks
5
616,
OrTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #5/11
June 30, 2011
The Tender Opening Committee Meeting #5/11, was held in the Humber Room, Head
Office, on Friday, June 30, 2011. The Chair Maria Augimeri, called the meeting to order
at 12:45 p.m.
PRESENT
Janice Darnley Manager, Financial Systems Projects
Jim Dillane Director, Finance and Business Services
Judith Reda Executive Assistant, Chair and CAO's Office
Rocco Sgambelluri Controller
1. TENDER OPENING COMMITTEE
1.1 FINANCIAL INFORMATION SYSTEMS
BIDDER SUBMISSION SCHEDULE W SEPARATE
WITH CD-ROM ENVELOPE
LABELLED
'SCHEDULE B **
Enabled Success Yes Yes $1,262,536.00
Altus Dynamics Yes Yes $678,042.00
Second Foundation Consulting Yes Yes $402,237.00
Inforica Solutions Inc. Yes Yes $659,815.00
Illumiti Inc. Yes Yes $1,242,459.00
Unit 4 Business Services Yes Yes $637,290.00
** 'SCHEDULE B' was opened on July 5th at 1:50pm. Jim Dillane, Rocco Sgambelluri, Janice
Darnley and Judith Reda were present.
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred
to staff for review.
/j r
6
616,
OrTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #6/11
July 8, 2011
The Tender Opening Committee Meeting #6/11, was held in the Victoria Room, Black
Creek Pioneer Village, on Friday, July 8, 2011. The Chair Bryan Bertie, called the
meeting to order at 9:00 a.m.
PRESENT
Bryan Bertie Member
Aaron D'Souza Project Coordinator (PMO)
Craig Mitchell Hydrometric Coordinator
Rocco Sgambelluri Controller
Kathy Stranks Manager, Chair and CAO's Office
1. TENDER OPENING COMMITTEE
1.1 G. ROSS LORD DAM INFRASTRUCTURE PROJECT
CONTRACT PM011-06
BIDDERS TOTAL VALUE OF 10% TENDER DEPOSIT
CONTRACT
(Plus HST)
Atlas Fence $119,424.05 Yes
AMG Metals Inc. $83,083.25 Yes
Leone Fence No Bid N/a
Roma Fence $92,349.25 Yes
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred
to staff for review.
/ks
7
616,
OrTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #7/11
July 15, 2011
The Tender Opening Committee Meeting #7/11, was held in the Humber Room, Head
Office, on Friday, July 15, 2011. The Chair Michael Di Biase, called the meeting to order
at 11:00 a.m.
PRESENT
Michael Di Biase Member
James Dickie Construction Technician
Jim Dillane Director, Finance and Business Services
Mark Preston Senior Supervisor, Construction Services
Dave Rogalsky Senior Manager, Resource Management Projects
Nick Saccone Director, Restoration Services
Kathy Stranks Manager, Chair and CAO's Office
1. TENDER OPENING COMMITTEE
1.1 DON VALLEY BRICKWORKS
QUARRY GARDEN ENTRANCE FEATURE AND MID-POINT ACCESS TRAIL
RSD #11-49
BIDDER TOTAL BID PRICE
(Plus HST& Contingency)
Aldershot Landscape Contractors Inc. $669,595.80
Hobden Construction $416,256.50
Dynex Construction $891,110.00
R & M Construction No Bid
Rutherford Contracting No Bid
Hawkins Contracting $615,540.60
Lisgar Construction Disqualified - Submitted Late
Serve Construction No Bid
Salivan Landscape Ltd. $485,093.29
8
1.2 ASHBRIDGES BAY WEST PROJECT
BOARDWALK AND DAY MOORING DOCK REPLACEMENT
RSD #11-43
BIDDERS TOTAL 10% Quotation Agreement to Bond
(Plus HST) Security Deposit
Hobden Construction Ltd. $311,200.00 Yes Yes
McPherson-Andrews $632,103.00 Yes Yes
Contracting Ltd.
Clearwater Structures Inc. $570,000.00 Yes Yes
DDR Landscapre $353,000.00 Yes Yes
COntractors Ltd.
Aplus General Contractors $642,876.00 Yes Yes
Silver Birch Contracting Ltd. $600,000.00 Yes No
Taylor Wakefield General $488,272.22 Yes Yes
Contractors
Somerville Construction No Bid n/a n/a
MTM Landscaping $738,000.00 Yes Yes
Contractors
CSL Group $412,480.00 Yes Yes
Seaco Maring No Bid n/a n/a
Ontario Construction No Bid n/a n/a
Company
Greco Construction No Bid n/a n/a
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred
to staff for review.
/ks
9
616,
OrTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #8/11
July 22, 2011
The Tender Opening Committee Meeting #8/11, was held in the Humber Room, Head
Office, on Friday, July 22, 2011. The Chair Laurie Bruce, called the meeting to order at
10:00 a.m.
PRESENT
Laurie Bruce Member
James Dickie Construction Technician
Chris Gerstenkorn Senior Manager, Information Services/Technology
Mark Preston Senior Supervisor, Construction Services
Nick Saccone Director, Restoration Services
Kathy Stranks Manager, Chair and CAO's Office
1. TENDER OPENING COMMITTEE
1.1 GLEN STEWART RAVINE PROJECT, CONTRACT RSD11-34
Design / Build Boardwalk, Staircase and Two Bridges
TOTAL 10% Agreement to
BIDDERS (Plus HST) Bid Bond Bond
DDR Landscape Contractors Ltd. 869,000.00 Yes Yes
Aplus General Contractors No Bid n/a n/a
Silver Birch Contracting Ltd. 944,324.00 Yes Yes
Taylor Wakefield General Contractors No Bid n/a n/a
Clearwater Structures Inc. No Bid n/a n/a
Dynex Construction Ltd. No Bid n/a n/a
Hobden Construction No Bid n/a n/a
McPherson-Andrews Contracting Limited 1,096,349.00 Yes Yes
Serve Construction No Bid n/a n/a
Postech North No Bid n/a n/a
Trade Mark Industrial No Bid n/a n/a
Lomco Contracting No Bid n/a n/a
Pine Valley Enterprises Inc. No Bid n/a n/a
Cedar Springs Landscape Group No Bid n/a n/a
Iron Bridge Fabrication No Bid n/a n/a
Atlantic No Bid n/a n/a
Resource Industrial Group No Bid n/a n/a
Ross Steel Fabricators & Contractors No Bid n/a n/a
10
1.2 TROUTBROOKE DRIVE SLOPE STABILIZATION PROJECT, CONTRACT RSD11-46
Retaining Wall Construction
TOTAL 10% Agreement to
BIDDERS (Plus HST) Bid Bond Bond
Speedside Construction 838,550.00 Yes Yes
DDR Landscape Contractors Ltd. 787,290.00 Yes Yes
CSL Group No Bid n/a n/a
R-Chad General Contractors No Bid n/a n/a
Clearwater Structures Inc. No Bid n/a n/a
Lomco No Bid n/a n/a
McPherson-Andrews Contracting Ltd. No Bid n/a n/a
R-Chad General Contractors No Bid n/a n/a
MTM Landscaping Contractors 463,220.00 Yes Yes
Ontario Construction No Bid n/a n/a
Pine Valley Enterprises Inc. No Bid n/a n/a
JMJ Construction 1,209,207.00 Yes Yes
The Beach Gardener 1,181,737.71 Yes Yes
RTD Construction No Bid n/a n/a
Dynex Construction 868,628.00 Yes Yes
Iron Trio Inc. 817,222.00 Yes Yes
1.3 GLEN STEWART RAVINE PROJECT, CONTRACT RSD11-45
Construction of Envirolok Retaining Walls
TOTAL 10% Agreement to
BIDDERS (Plus HST) Bid Bond Bond
FTD Construction No Bid n/a n/a
Sustainable Trails No Bid n/a n/a
CSL Group No Bid n/a n/a
McPherson-Andrews Contracting Limited. No Bid n/a n/a
DDR Landscape Contractors Ltd. 200,000.00 Yes Yes
Dynex Construction Ltd. No Bid n/a n/a
Clearwater Structures Inc. No Bid n/a n/a
Pine Valley Enterprises Inc. No Bid n/a n/a
Iron Trio Inc. No Bid n/a n/a
M N Dynamic Construction No Bid n/a n/a
Lomco No Bid n/a n/a
The Beach Gardener 127,435.37 Yes Yes
11
1.4 WILKET CREEK PARK SITE 6/7 EMERGENCY WORKS, CONTRACT RSD11-56
Construction of Two Steel Pedestrian Bridges and a Boardwalk
BIDDERS TOTAL 10% Agreement to
(Plus HST) Bid Bond Bond
Items 1-6 Items 7-11
DDR Landscape Contractors Ltd. 544,000.00 108,000.00 Yes Yes
Aplus General Contractors No Bid No Bid n/a n/a
Silver Birch Contracting Ltd. 441,916.00 242,460.00 Yes Yes
Taylor Wakefield General Contractors 397,755.92 262,739.74 Yes Yes
Clearwater Structures Inc. 422,000.00 261,500.00 Yes Yes
Dynex Construction Ltd. No Bid No Bid n/a n/a
Hobden Construction No Bid No Bid n/a n/a
McPherson-Andrews Contracting Limited 377,904.00 239,510.00 Yes Yes
Serve Construction No Bid No Bid n/a n/a
Postech North No Bid No Bid n/a n/a
Trade Mark Industrial No Bid No Bid n/a n/a
Lomco Contracting No Bid No Bid n/a n/a
Pine Valley Enterprises Inc. No Bid No Bid n/a n/a
Cedar Springs Landscape Group No Bid No Bid n/a n/a
Iron Bridge Fabrication No Bid No Bid n/a n/a
Peninsula Construction Inc. No Bid No Bid n/a n/a
R-Chad General Contractors No Bid No Bid n/a n/a
MTM Landscaping Contractors 575,400.00 376,800.00 Yes Yes
R and M Construction No Bid No Bid n/a n/a
TMP Foundations No Bid No Bid n/a n/a
Hawkins Contracting No Bid No Bid n/a n/a
PCR Contractors 488,180.00 249,500.00 Yes Yes
Resource Industrial Group No Bid No Bid n/a n/a
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred
to staff for review.
/ks
12
616,
OrTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #9/11
July 25, 2011
The Tender Opening Committee Meeting #9/11, was held in the Chair's Office, Black
Creek Pioneer Village, on Monday, July 25, 2011. The Chair Laurie Bruce, called the
meeting to order at 2:05 p.m.
PRESENT
Laurie Bruce Member
Aaron D'Souza Project Coordinator, Restoration Services
Chris Gerstenkorn Senior Manager, Finance and Business Services
Judith Reda Executive Assistant, Chair and CAO's Office
Ralph Toninger Manager, Restoration Services
1. TENDER OPENING COMMITTEE
1.1 TOMMY THOMPSON PARK INFRASTRUCTURE PROJECT
CONTRACT RSD11-58
BIDDERS Total Value of Contract 10% Bid
(including H.S.T) Bond
Al Langman Construction Disqualified Yes
(late submission)
DeFaveri $2,118,750.00 Yes
Elite Construction $2,272,104.00 Yes
Martinway Contracting Limited $2,101,884.75 Yes
M.J. Dixon $2,383,170.00 Yes
Somerville Construction No Bid n/a
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred
to staff for review.
/j r
13
616,
OrTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #10/11
July 29, 2011
The Tender Opening Committee Meeting #10/11, was held in Weston Room B, Black
Creek Pioneer Village, on Friday, July 29, 2011. The Chair Gerri Lynn O'Connor, called
the meeting to order at 9:07 a.m.
PRESENT
Jim Dillane Director, Finance and Business Services
Aaron D'Souza Project Coordinator
Gerri Lynn O'Connor Chair
Kathy Stranks Manager, Chair and CAO's Office
1. TENDER OPENING COMMITTEE
1.1 51 DEER VALLEY DRIVE EMERGENCY EROSION CONTROL
MAINTENANCE PROJECT
CONTRACT PMO11-05
Supply and Delivery of 1 00m - 300mm Gabion Stone
BIDDERS CONTRACT PMO 11-05 CONTRACT PM011-07
6,500 tonnes of 500 tonnes of
100mm-200mm Gabion 150mm-300mm Gabion
Stone Stone
(Plus HST) (Plus HST)
Glenn Windrem Trucking 187,655.00 16,685.00
James Dick No Bid No Bid
J. C. Rock No Bid No Bid
Lafarge Aggregates No Bid No Bid
Nelson Aggregate 174,850.00 13,450.00
Dale Ottwell Construction & 173,875.00 No Bid
Logging Ltd.
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred
to staff for review.
/ks
14
616,
OrTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #11/11
August 5, 2011
The Tender Opening Committee Meeting #11/11, was held in the Victoria Room, Black
Creek Pioneer Village, on Friday, August 5, 2011. The Chair Bryan Bertie, called the
meeting to order at 9:03 a.m.
PRESENT
Bryan Bertie Member
Jim Dillane Director, Finance and Business Services
Mark Preston Senior Supervisor, Construction Services
Kathy Stranks Manager, Chair and CAO's Office
1. TENDER OPENING COMMITTEE
1.1 BLUFFERS PARK EMERGENCY DREDGING
RS D 11-47
BIDDERS TOTAL BID TENDER DEPOSIT
(Plus HST) 10%
The Ontario Construction Company $220,945.00 Yes
Galcon Marine Ltd. $185,815.00 Yes
DDR Landscape Contractors No Bid n/a
McNally Construction Inc. No Bid n/a
Grascan Construction No Bid n/a
Mapherson-Andrews Contracting No Bid n/a
R & M Construction No Bid n/a
15
1.2 COATSWORTH CUT DREDGING PROJECT
RSD11-48 - Channel Maintenance Dredging
BIDDERS TOTAL BID TENDER DEPOSIT
(Plus HST) 10%
The Ontario Construction Company $182,960.00 Yes
Galcon Marine Ltd. $196,925.00 Yes
DDR Landscape Contractors No Bid n/a
McNally Construction Inc. No Bid n/a
Grascan Construction No Bid n/a
Mapherson-Andrews Contracting No Bid n/a
1.3 MEADOWCLIFFE DRIVE PROJECT
RSD11-61 and RSD11-62 - Supply and Delivery of Armour and Cobble Stone
BIDDERS CONTRACT CONTRACT TENDER TENDER
RSD11-61 RSD11-62 DEPOSIT DEPOSIT
13,000 5,000 tonnes 10% 10%
tonnes of of Armour CONTRACT CONTRACT
Cobblestone Stone RSD11-61 RSD11-62
(75mm - (4 - 6 tonne)
200mm)
J. C. Rock Ltd. No Bid $217,500.00 n/a Yes
Glenn Windrem Trucking $373,750.00 $232,500.00 Yes Yes
Nelson Aggregate Co. $455,000.00 No Bid Yes n/a
Lafarge Aggregates $572,000.00 $500,000.00 Yes Yes
CDR Young No Bid No Bid n/a n/a
Cut Above Natural Rock No Bid No Bid n/a n/a
Bot Aggregates $715,000.00 No Bid n/a n/a
Fowler Construction $392,600.00 No Bid Yes n/a
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred
to staff for review.
/ks
16
616,
OrTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #12/11
August 26, 2011
The Tender Opening Committee Meeting #12/11, was held in the CAO's Office, on Friday
, August 26, 2011. The Chair Michael Di Biase, called the meeting to order at 10:35 a.m.
PRESENT
Michael Di Biase Member
James Dickie Construction Technician
Jim Dillane Director, Finance and Business Services
Mark Preston Senior Supervisor, Construction Services
Kathy Stranks Manager, Chair and CAO's Office
1. TENDER OPENING COMMITEE
1.1 MEADOWCLIFFE DRIVE PROJECT
RSD11-68
Supply and deliver 5,000 tonnes of Rip-Rap Stone (300mm - 600mm)
BIDDERS CONTRACT RSD11-68 TENDER DEPOSIT 10%
J.C. Rock Ltd. $119,950.00 Yes
Glenn Windrem Trucking $142,500.00 Yes
Nelson Aggregate Co. $125,000.00 Yes
Lafarge Aggregates No Bid n/a
BOT Aggregates $142,150.00 Yes
Fowler Construction No Bid n/a
Miller Paving $110,000.00 Yes
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred
to staff for review.
/ks
17
616,
OrTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #13/11
September 9, 2011
The Tender Opening Committee Meeting #13/11, was held in the Victoria Room, Black
Creek Pioneer Village, on Friday, September 9, 2011. The Chair Gerri Lynn O'Connor,
called the meeting to order at 9:45 a.m.
PRESENT
James Dickie Construction Technician
Jim Dillane Director, Finance and Business Services
Mark Preston Senior Supervisor, Construction Services
Gerri Lynn O'Connor Chair
Kathy Stranks Manager, Chair and CAO's Office
1. TENDER OPENING COMMITTEE
1.1 TRCA NURSERY PERIMETER FENCING REPLACEMENT
RSD 11-60
To Supply and Install Chain Link Fence, 5 Double Swing Chain Link Gates
Bidders TOTAL 10% Bid Agreement to
(Plus HST) Bond Bond/Security
Roma Fence Ltd. 196,399.75 Yes Yes
McGowan Fence & Supply Ltd. No Bid n/a n/a
Atlas Fence 152,812.00 Yes Yes
PFS Fence Inc. No Bid n/a n/a
Leone Fence Co. Ltd. 111,810.00 Yes Yes
18
1.2 ROYAL ROUGE TRAIL SLOPE STABILIZATION PROJECT
RSD 11-67
Construction of an Envirolok Retaining Wall
Bidders Total 10% Bid Addendum#1
(Plus HST) Bond Acknowledged
Speedside Construction No Bid n/a n/a
Alpeza General Contracting No Bid n/a n/a
Elirpa Construction & Materials 2,355,800.00 Yes Yes
DDR Landscape Contractors No Bid n/a n/a
TBG Landscape No Bid n/a n/a
Sustainable Trails No Bid n/a n/a
Terratechnik No Bid n/a n/a
Grascan Construction No Bid n/a n/a
Dynex Construction 803,126.00 Yes Yes
JMJ Construction No Bid n/a n/a
Cedar Springs Landscape No Bid n/a n/a
The Beach Gardener Inc. 496,789.12 Yes Yes
1.3 TROUTBROOKE DRIVE SLOPE STABILIZATION PROJECT
RSD 11-70, 80 & 81
Off-Site Disposal of Excavated Material
BIDDERS RSD 11-70 RSD 11-80 RSD 11-81 10% Bid
Total Total Total Bond
(Plus HST) (Plus HST) (Plus HST)
Clipper/ Coreydale Contracting Co. 305,000.00 525,000.00 340,000.00 Yes
TBG Landscape 287,507.96 180,082.50 255,515.81 Yes
m p ro 290,000.00 260,000.00 255,000.00 Yes
Iron Trio Inc. 196,950.00 482,500.00 166,750.00 Yes
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred
to staff for review.
/ks
19
616,
OrTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #14/11
September 30, 2011
The Tender Opening Committee Meeting #14/11, was held in Weston Room B, Black
Creek Pioneer Village, on Friday, September 30, 2011. The Chair Gerri Lynn O'Connor,
called the meeting to order at 9:10 a.m.
PRESENT
James Dickie Construction Technician
Mark Lowe Landscape Architect
Gerri Lynn O'Connor Chair
Mark Preston Senior Supervisor, Construction Services
Dave Rogalsky Senior Manager, Resource Management Projects
Rocco Sgambelluri Controller
Kathy Stranks Manager, Chair and CAO's Office
1. TENDER OPENING COMMITTEE
1.1 MILKMAN'S LANE TRAIL IMPROVEMENTS RSD 11-79
RSD 11-79
BIDDER CONTRACT RSD 11-79
(Plus 10% Contingency& HST)
Rutherford Contracting No Bid
Hankj Deenan Landscaping No Bid
Griffith Property Services No Bid
Glen Oaks Landscaping No Bid
R & M Construction No Bid
Northgate Farms (NGF Golf) No Bid
Dynex Construction No Bid
Leedle Landscaping $72,678.95
Hobden Construction No Bid
Sustainable Trails Ltd. $152,892.00
Speedside Construction Ltd. $84,620.00
20
1.2 MEADOWCLIFFE DRIVE PROJECT
Supply and Deliver 10,000 tonnes of 75mm-200mm Cobblestone RSD 11-83
Supply and Deliver 2,500 tonnes of 300mm - 600mm rip-rap stone RSD 11-84
BIDDERS Contract RSD 11-83 Contract RSD 11-84
10,000 tonnes of Tender 2,500 tonnes of Tender
Cobblestone Deposit 10% Rip-Rap Stone Deposit 10%
(75mm-200mm) (300mm -
(Plus HST) 600mm)
(Plus HST)
Glenn Windrem Trucking $297,500.00 Yes $62,125.00 Yes
Nelson Aggregate Co. No Bid n/a $67,175.00 Yes
Lafarge Aggregates No Bid n/a No Bid n/a
Bot Aggregates No Bid n/a No Bid n/a
Fowler Construction $298,500.00 Yes $77,500.00 Yes
J.C. Rock No Bid n/a $58,125.00 Yes
CDR Youngs Aggregates Inc. No Bid n/a No Bid n/a
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred
to staff for review.
/ks
21
616,
OrTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #15/11
October 14, 2011
The Tender Opening Committee Meeting #15/11, was held in the Victoria Room, Black
Creek Pioneer Village, on Friday, October 14, 2011. The Chair Jack Heath, called the
meeting to order at 9:22 a.m.
PRESENT
James Dickie Construction Technician
Jim Dillane Director, Finance and Business Services
Jack Heath Member
Kathy Stranks Manager, Chair and CAO's Office
1. TENDER OPENING COMMITTEE
1.1 MIMICO LINEAR WATERFRONT PARK (PHASE 2)
RSD 11-85 - Construction of Three Pedestrian Boardwalks
BIDDERS TOTAL 10% ADDENDUM
(Plus HST) QUOTATION ACKNOWLEDGED
SECURITY
DEPOSIT
Tanenbaum Landscape Contractors Ltd. 512,610.32 Yes Yes
Taylor Wakefield General Contractors 524,805.01 Yes Yes
Clearwater Structures Ltd. 594,025.00 Yes Yes
Somerville Construction Ltd. No Bid n/a n/a
Hobden Construction 434,465.50 Yes Yes
McPherson-Andrews Contracting Limited 420,483.00 Yes Yes
Iron Bridge Fabrication No Bid n/a n/a
MTM Landscaping Contractors No Bid n/a n/a
Resource Industrial Group No Bid n/a n/a
The Ontario Construction Company 406,279.00 Yes Yes
The Beach Gardener 612,914.77 Yes Yes
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred
to staff for review.
/ks
22
616,
OrTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #16/11
January 6, 2012
The Tender Opening Committee Meeting #16/11, was held in Weston Room B, Black
Creek Pioneer Village, on Friday, January 6, 2012. The Chair Maria Augimeri, called the
meeting to order at 9:05 a.m.
PRESENT
Maria Augimeri Vice Chair
Mike Bender Manager, Conservation Lands
Jim Dillane Director, Finance and Business Services
Kathy Stranks Manager, Chair and CAO's Office
1. TENDER OPENING COMMITTEE
1.1 SEATON HIKING TRAIL STAIRCASE IMPROVEMENTS
CL11-01 - Construction of Steel Staircase
BIDDERS TOTAL BID SECURITY 10%
(Excluding HST)
CSL Group 420,820.00 Yes
Alpeza General Contracting Inc. 334,300.00 Yes
Silver Birch Contracting Ltd. 496,800.00 Yes
McPherson-Andrews Contracting Limited 425,582.00 Yes
Clearwater Structures Inc. No Bid No Bid
GMP Contracting 492,425.75 Yes
Tanenbaum Landscape and Design 465,048.75 Yes
Morosons Construction Ltd. 346,115.00 Yes
Pine Valley Enterprises Inc. 238,840.00 Yes
R-Chad General Contracting Inc. 306,800.00 Yes
Hawkins Contracting Services 387,780.00 Yes
Roof Tile Management 438,000.00 Yes
Rapid / GFI No Bid No Bid
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred
to staff for review.
/ks
23
616,
OrTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #17/11
January 13, 2012
The Tender Opening Committee Meeting #17/11, was held in the Victoria Room, Black
Creek Pioneer Village, on Friday, January 13, 2012. The Chair Richard Whitehead, called
the meeting to order at 9:30 a.m.
PRESENT
Jim Dillane Director, Finance and Business Services
Mark Lowe Landscape Architect
Kathy Stranks Manager, Chair and CAO's Office
Richard Whitehead Member
1. TENDER OPENING COMMITTEE
1.1 BOB HUNTER MEMORIAL PARK PEDESTRIAN BRIDGE
RSD 11-119
BIDDER TOTAL BID BOND
(Plus HST) 5%
Hawkins Contracting $668,600.00 Yes
Serve Construction $493,540.00 Yes
Taylor Wakefield General Contractors $615,940.00 Yes
Rutherford Contracting $499,659.25 Yes
Dynex Construction $617,394.00 Yes
Somerville Construction No Bid No
McPherson-Andrews Contracting Limited $577,136.00 Yes
The Ontario Construction Company Limited No Bid No
Hobden Construction No Bid No
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred
to staff for review.
/ks
24
616,
OrTHE TORONTO AND REGION CONSERVATION AUTHORITY
MEETING OF THE TENDER OPENING COMMITTEE #18/11
January 27, 2012
The Tender Opening Committee Meeting #18/11, was held in Weston Room B, Black
Creek Pioneer Village, on Friday, January 27, 2012. The Chair Bob Callahan, called the
meeting to order at 9:10 a.m.
PRESENT
Bob Callahan Member
James Dickie Construction Technician
Jim Dillane Director, Finance and Business Services
Kathy Stranks Manager, Chair and CAO's Office
1. TENDER OPENING COMMITTEE
1.1 MEADOWCLIFFE DRIVE PROJECT
Contract RSD12-03, Supply and Delivery Approximately 15,000 tonnes of
Recycled Concrete 19mm Crusher Run
BIDDERS TOTAL VALUE OF BID BOND
CONTRACT (10%)
(Plus HST)
Lafarge North America Inc. 162,750.00 Yes
D. Crupi and Sons Ltd. 149,250.00 Yes
Strada Aggregates 165,000.00 Yes
Glenn Windrem Trucking 193,500.00 Yes
Vicdom Sand & Gravel Ltd. No Bid n/a
James Dick Construction Limited No Bid n/a
Associated Paving & Materials 193,500.00 Yes
Elirpa Construction & Materials 225,000.00 Yes
2026125 Ontario Ltd./Southview Asphalt 192,000.00 Yes
Miller Paving Ltd. 191,250.00 Yes
Furfari Paving 141,000.00 Yes
Nelson Aggregates No Bid n/a
IT WAS AGREED AND RECOMMENDED THAT the tender received as listed above be referred
to staff for review.
/ks
25